1 Solid-Expandable Systems The Key to Economical Recovery in Mature Fields A White Paper November 2013
2 Solid-expandable technology provides a low-cost, permanent alternative to cement squeezes Weatherford. All rights reserved. 2
3 Executive Summary When exploiting mature fields, operators are challenged with finding a cost-effective method to enhance production and extend well life. Investments made to restore well integrity must be recouped while the well still produces. For decades most operators have chosen a cement squeeze to establish wellbore isolation, out of many conventional solutions that suit various applications and wellbore geometries. The perception is that a cement squeeze costs less than today s innovative solid-expandable technology. However, in general, one cement-squeeze operation costs more, and multiple squeezes are usually required. Using this approach to maintain isolation throughout the well s life cycle ends up costing more in the long run (Fig. 1). Solid-expandable technology provides a low-cost, permanent alternative to cement squeezes. The MetalSkin cased-hole liner successfully mitigates mature-field challenges, enhances productivity, and extends well life. After the initial investment, no additional costs are required to maintain lifelong wellbore isolation. And unlike other conventional casing-remediation techniques, such as a straddle packer or a scab liner, the resulting inside diameter (ID) is larger to help optimize production and access deeper reserves. Cost (in thousands of dollars) $300 $250 $200 $150 $100 $50 MetalSkin cased-hole liner operation Cement-squeeze operation Days Fig. 1 In comparison to a single cement squeeze operation, the Weatherford MetalSkin cased-hole liner saves the operator approximately $80,000 and three additional rig days. Industry Challenge: Reducing Recovery Costs in Mature Fields As the global demand for oil continues to grow, operators seek alternative solutions with more advantages and cost effectiveness than conventional methods to maximize production in existing mature wells. Mature fields alone account for more than 70% of the world s oil and gas production. The significant recovery opportunities in these fields make casing-remediation solutions critical to the industry. Prior to targeting deeper reserves or stimulating existing zones, operators must repair damaged casing by shutting off water or sealing off old production perforations. Solidexpandable liners are gaining momentum as a casingremediation solution to mature-field challenges, such as zonal isolation, water shutoff, parted casing, perforation isolation, subsidence remediation, and corrosion retrofitting. The liners safely restore wellbore integrity and maximize reservoir output, which results in improved performance that justifies solid-expandable investments in aging wells. Production and declination phase Zonal isolation and water shutoff Mature-Field Challenges Casing splits and parting Subsidence remediation Corrosion retrofitting MetalSkin cased-hole liner isolates single or multiple sections of damaged casing and perforations in existing wells. This system provides larger through-bore than conventional casingremediation systems and is a more reliable, long-term method of isolation than cement Weatherford. All rights reserved. 3
4 A Standard of the Past: Short-Term Cement Squeezes A conventional cement squeeze, or remedial cementing operation, is commonly used to fix poor primary cementing jobs, isolate perforations, or repair damaged casing. A cement squeeze is performed by forcing cement slurry into the annulus of a wellbore with pressure, blocking undesirable fluids and filling unwanted channels for effective zonal isolation. The amount of pressure to force cement into annular voids should be considered during cement-squeeze operations since high pressures can present many risks to a well s formation. A successful cement-squeeze operation that forms a thorough cement bond depends on important prerequisites, for example selecting the correct type of cement slurry and cleaning debris from perforations and channels. Although critical for proper zonal isolation, these prerequisites are not always followed. Sometimes this is because of time constraints. As a result, cement-squeeze repairs are frequently ineffective. In order to maintain isolation over the life of the well, multiple squeeze operations are usually required, and additional costs accumulate with each workover. A Forward-Looking Approach: Solid-Expandable Technology When cement-squeeze methods are used to overcome mature-field challenges, additional workover operations and costs are typically required. On the other hand, solidexpandable technology is a permanent solution for enhanced well integrity and productivity. And operators can now use comparative data to justify the upfront costs. Originally, solid-expandable technology was deployed as a contingency to conventional-technology failures. Today, solid-expandable technology is strategically used in an array of economic solutions for cased- and openhole wellboreisolation challenges, enabling operators to economically access reservoirs that they could not otherwise. Using this technology in casing-remediation applications has increased over the years. With proven field results, it is becoming a reputable solution for mitigating mature-field challenges, including excessive water production, reservoir sweep inefficiency, and aging. A single cement-squeeze operation is estimated to be 17% of a well s cost. However, three remedial cementing operations are typically required to ensure well integrity over the life of the well. Therefore, an operator can expect to spend approximately half of a well s cost when selecting a conventional cement squeeze as a casing-remediation solution Weatherford. All rights reserved. 4
5 Solid-Expandable Benefits for Mature Wells Solid-tubular expandable systems, such as the Weatherford MetalSkin cased-hole liner, provide long-term casing integrity with reduced intervention costs and extended production recovery a significant advantage in casingremediation applications. MetalSkin expandable casedhole liner is a safe, reliable, and cost-effective tool. It can be installed in a single trip and requires no drill out, which significantly reduces rig time, nonproductive time, and associated costs. In many cases, this casing-repair solution can be installed in one to two days without using cement or applying pressure to the formation. Operators can then test immediately and quickly return the well to production. The Weatherford MetalSkin cased-hole expandable liner system features elastomer seal elements that are molded to the outside diameter (OD) of isolation joints, for greater reliability than a cement squeeze. And it provides a larger ID than an isolation straddle, a scab liner, or a conventional liner to enable future drilling, completion, and production or injection operations without substantial loss in hole size. As opposed to conventional solutions that significantly decrease the wellbore ID with additional casing strings, solidexpandable technology increases downhole casing or liner diameters up to 30% and minimizes the telescoping effect Weatherford. All rights reserved. 5
6 Economic Comparison: Cement-Squeeze Versus Solid-Expandable Operation Comparing a conventional cement squeeze to a solidexpandable system by thorough cost analysis proves the most economical solution for mitigating mature-field challenges. For this comparison, each operation is broken down into processes and a percentage of the total cost for each day. At a daily workover rig rate of $6,000 a day, the objective is to repair 5 1/2-in. corroded casing. In this case, the solidexpandable solution is an 80-ft section of 4 1/4-5 1/2-in. expandable cased-hole liner. Table 1 shows the operational processes on each day along with the percentage costs. Fig. 2 to the right shows time versus cost. The first cementsqueeze operation is estimated to cost $225,000 and last a total of nine days, from the time the rig is moved on location until the well is back on production. In comparison, the solid-expandable liner operation saves three rig days, while incurring 36% less associated costs (Farley, SPE ). As discussed earlier, cement-squeeze operations typically require additional attempts before zonal isolation is achieved. Assuming another cement squeeze is required for the same operation, the operator can expect to increase costs by approximately $66,000 and rig time by two days. In contrast, the solid-expandable operation requires no additional investments, saving the operator up to 50% in costs compared with conventional cement-squeeze operations. Solidexpandable technology provides more value as a permanent, cost-effective solution to casing-remediation applications, while conserving hole size for optimized completions, production, and future interventions. The expandable-liner approach has a strong, successful track record for repairing and remediating casing problems with significant results in extending well life and maximizing production. Cost Expandable cased-hole operation Initial cement-squeeze operation Future cement-squeeze operation 3 to 4 years Long-term solution 3 to 4 years Time *Graph based on 5 1/2-in. cased-hole well in East Texas and 80 ft of 4 1/4-5 1/2-in. expandable cased-hole liner. Fig. 2 Cement-Squeeze and Solid-Expandable Costs Compared Days Single Cement-Squeeze Operation Percentage Cost Days Solid-Expandable Liner Operation Percentage Cost 1 Move in/rig up. Rig waiting orders. Nipple down tree. Nipple up blowout preventers (BOPs), and test. 9% 1 Move in/rig up. Rig waiting orders. Nipple down tree. Nipple up BOPs, and test. 9% 2 Pull tubing. 5% 2 Pull tubing. 5% 3 Rig up electric line. Run gamma ray and junk basket. Run VertiLog. 12% 3 Clean out run with scraper and string mill. 4% 4 Run in hole. Set retrievable bridge plug (RBP) and test. Isolate leak with tubing and packer. 8% 4 Rig up electric line. Run gamma ray and junk basket. Run VertiLog. 12% 5 Rig up electric line. Dump sand on RBP. Shoot squeeze perforations. Set retainer. 16% 5 Solid-expandable liner 4-1/2 in. 5-1/2 in. 18% Run in hole. Set inflate, pressure test, and retrieve IPP injection production packer (needed if pressure testing MetalSkin cased-hole liner). 8% 6 Run in hole. Sting into retainer. Pump cement. 13% 6 Break ceramic disc, swab, and move rig. 8% 7 Drill out retainer, and cement and pressure test. 12% 7 8 Run in hole with tubing and pull RBP. Pull out of hole. Run in hole with tubing, and land. 16% 8 Cost Savings 36% 9 Break ceramic disc, swab, and move rig. 9% 9 Table 1 Cement-Squeeze vs. Solid-Expandable Operation, Process by Process 2013 Weatherford. All rights reserved. 6
7 Case Study Providing value to a mature-field operator Challenge: In an aging onshore Colombian well, repair damaged casing with minimal ID loss for a quick return to production. Solution: Weatherford deployed a 5 1/2-in., 192-ft (58.58-m) length of MetalSkin cased-hole liner to cover two damaged casing sections. The liner was expanded between a depth of 3,876 and 4,060 ft (1,181 to 1,237 m) to permanently isolate the unwanted perforations. The final ID of in. and drift diameter of in. provided the client with enough passage for the desired production string. The liner delivered a long-term, stable, cost-effective solution that brought the well to full quality, health, safety, and environmental (QHSE) integrity without multiple squeezes, the need for drillout, or their cumulative costs. The MetalSkin cased-hole liner can be easily installed with a workover rig. No high-volume pumping equipment is required Weatherford. All rights reserved. 7
8 How to Learn More For more information on solid-expandable systems, please visit weatherford.com. weatherford.com 2013 Weatherford. All rights reserved. Weatherford products and services are subject to the Company s standard terms and conditions, available on request or at weatherford.com. For more information contact an authorized Weatherford representative. Unless noted otherwise, trademarks and service marks herein are the property of Weatherford and may be registered in the United States and/or other countries. Weatherford products named herein may be protected by one or more U.S. and/ or foreign patents. Specifications are subject to change without notice. Weatherford sells its products and services in accordance with the terms and conditions set forth in the applicable contract between Weatherford and the client.
MetalSkin Cased-Hole Liner System
MetalSkin Cased-Hole Liner System Using advanced solid expandable technology to reduce costs, optimize completion size and ultimately maximize production and ROI Reducing Operating Costs over the life
More informationWELL CONTROL THE RISING EAST NOVEMBER/DECEMBER INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS Drilling
OFFC MGZN OF H NRNON SSOCON OF DRNG CONRCORS Drilling C O N R C O R NOVMBR/DCMBR 2013 D R W CONRO N G W W W. D R N G C O N R C O R. O R G C O M P xpanded containment system under development for GOM; study
More informationCement Plug Placement and Integrity Mechanical Cementing Service
Cement Plug Placement and Integrity Mechanical Cementing Service Technology, Technique, Trust When it becomes necessary to plug and abandon a well or sections of the wellbore with multiple cement barriers,
More informationCLEARMAX Wellbore Cleaning Services
CLEARMAX Wellbore Cleaning Services Drilling Evaluation Completion Production Intervention Wellbore cleaning services Chemicals Hydraulic systems Mechanical tools Engineering a clearer path to optimize
More informationENDURA DUAL-STRING SECTION MILL. Set a rock-to-rock barrier and know that it s done right. WELL ABANDONMENT
WELL ABANDONMENT ENDURA DUAL-STRING SECTION MILL Set a rock-to-rock barrier and know that it s done right. DRILLING & FORMATION EVALUATION WELL CONSTRUCTION COMPLETION PRODUCTION MILL ADJACENT STRINGS
More informationTubing-Conveyed Perforating Systems
WIRELINE SERVICES Tubing-Conveyed Perforating Systems Full-Service Support, Complete Optimization Delivering downhole perforating solutions through our expertise, innovation, and collaboration Onshore
More informationAddressing Common Drilling Challenges Using Solid Expandable Tubular Technology By Larry Book, Enventure Global Technology, L.L.C.
Addressing Common Drilling Challenges Using Solid Expandable Tubular Technology By Larry Book, Enventure Global Technology, L.L.C. Copyright 2003, This paper was prepared for presentation at the Petromin
More informationSwellpacker Technology Bests Zonal Isolation Challenge in High-Pressure Wells
E A S Y W E L L Swellpacker Technology Bests Zonal Isolation Challenge in High-Pressure Wells R e d Te c h PA P E R Part of the RedTech Learning Series O c t o b e r 2 0 0 7 HALLIBURTON E A S Y W E L L
More informationCOMPLETIONS WFXØ VØ-RATED OPENHOLE GRAVEL- PACK SYSTEM
COMPLETIONS WFXØ VØ-RATED OPENHOLE GRAVEL- PACK SYSTEM Improving multizone gravel-pack reliability with single-trip efficiency REDUCE RIG TIME, ENHANCE SAFETY, AND ADD FLEXIBILITY IN YOUR OPENHOLE GRAVEL-PACKING
More informationPlugs and Profiles. Types Running Pulling Problems
Plugs and Profiles Types Running Pulling Problems Plugs are set for many reasons but mostly for isolation of pressures. Not all plugs are a permanent seal. Sand plugs, cement plugs and inflatables have
More informationUnconventional Resources
Houston, Texas (World Headquarters) 4620 Southerland Road Houston, TX, 77092 Phone: 1-800-462-7617 or 713-462-7617 E-mail: info@tamintl.com Aberdeen, Scotland Phone: 44-1224-875105 E-mail: info@tam-northsea.com
More informationDrilling-with-Liner (DwL ) System Drill the Undrillable
Drilling-with-Liner (DwL ) System Drill the Undrillable One-trip liner system cuts cost and risk. Drill, run, set and cement your liner system all in one trip as you mitigate drilling hazards, increase
More informationPractical Cementing Technique to Repair Severe Casing Damage David Cirer, Erick Arze, Juan Manuel Moggia, Ruben Hector Soto, Pan American Energy.
SPE 154241 Practical Cementing Technique to Repair Severe Casing Damage David Cirer, Erick Arze, Juan Manuel Moggia, Ruben Hector Soto, Pan American Energy. Copyright 2012, Society of Petroleum Engineers
More informationOverview of Completions
Overview of Completions PESA Oil & Gas 101 21 May 2015 Nick Clem, Applications Engineering Director Ganesh Subbaraman, Engineering Manager Outline Background Drivers affecting selection of completion types
More informationC0 2 / Acid Gas. Conversion. Prepared for the 5 Th Well Bore Integrity Network Meeting. Calgary Alberta May 14, 2009
C0 2 / Acid Gas Injection Well Conversion Prepared for the 5 Th Well Bore Integrity Network Meeting. Calgary Alberta May 14, 2009 Agenda Wellbore integrity Well design with annular integrity Well design
More informationNew Technologies for Cost Effective Abandonment Operations. Delaney Olstad, Weatherford
New Technologies for Cost Effective Abandonment Operations Delaney Olstad, Weatherford Abandonment Options Crane Assisted Operations Light Duty Work Decks Wireline Coil Tubing 2 Abandonment Options Jack-Up
More informationSteadyState Continuous Flow System
SteadyState Continuous Flow System Ultimate Wellbore Protection. Achieve greater control through continuous circulation of drilling fluids. Continuous Pressure, Along the Entire Wellbore Managing downhole
More informationRP 65 and other API Activities on Carbon Capture and Storage
RP 65 and other API Activities on Carbon Capture and Storage Co-authors: R. Sweatman, S. Crookshank. M. Parker, S. Meadows, K. Ritter, B. Bellinger Presented at 3 rd Well Bore Integrity Network Meeting
More informationDan Paul Ştefănescu*, Alexandru Nitulete** NONINVASIVE STIMULATION OPPORTUNITIES IN A MARGINAL GAS FIELD
AGH DRILLING, OIL, GAS Vol. 33 No. 2 2016 http://dx.doi.org/10.7494/drill.2016.33.2.507 Dan Paul Ştefănescu*, Alexandru Nitulete** NONINVASIVE STIMULATION OPPORTUNITIES IN A MARGINAL GAS FIELD 1. INTRODUCTION
More informationCoiled Tubing for Downhole Applications
Coiled Tubing for Downhole Applications Tenaris Tubular technologies. Innovative services. Tenaris is the leading global manufacturer and supplier of tubular products and services used in the drilling,
More informationArtificial Lift Technique (VI Semester)
Artificial Lift Technique (VI Semester) Q.1. What do you mean by artificial lift technique in Petroleum industry? Answer. Artificial lift is a means of overcoming bottomhole pressure so that a well can
More informationSeal 9 barrier verification by xlot and Communication test
Seal 9 barrier verification by xlot and Communication test P&A Forum 18 th Oktober 2017 Daniel Tomczak and Roar Flatebø Content Valhall overview and P&A Strategy Qualifying External Barriers Coil Tubing
More informationPre-Abandonment case history using inflatable solutions on Coiled Tubing John Stewart Sales Director June 2017
Pre-Abandonment case history using inflatable solutions on Coiled Tubing John Stewart Sales Director June 2017 Presentation Content Abandonment strategy Proposed operations Operational challenges Results
More informationA Case Study in Evaluating Technical Options for Well Abandonment in an Aging Offshore Field
A Case Study in Evaluating Technical Options for Well Abandonment in an Aging Offshore Field Tom Leeson: Reverse Engineering Stewart Buchan: Quadrant Energy Aberdeen: June 2017 www.resleng.com HARRIET
More informationSand control case histories: Shape memory polymers, resins, shunt tubes
Sand control case histories: Shape memory polymers, resins, shunt tubes BY DIANE LANGLEY, EDITORIAL COORDINATOR Sand, a familiar adversary for drilling and completion engineers, continues to present a
More informationCapillary Injection Tubing Anchor Technologies
Capillary Injection Tubing Anchor Technologies Patent Pending Randy Matthews- Weatherford Shad Frazier- SandRidge Energy ABSTRACT There are many oil and gas fields across the United States which have been
More informationAdvanced Production Technologies
Advanced Production Technologies For improved oil and gas recovery www.pragma-well.com Disruptive Industry Vision Pragma delivers advanced production technologies for the upstream oil and gas industry.
More informationRecent Geothermal Well Work-Over Experiences at the Kawerau Geothermal Field, New Zealand
PROCEEDINGS, 44th Workshop on Geothermal Reservoir Engineering Stanford University, Stanford, California, February 11-13, 2019 SGP-TR-214 Recent Geothermal Well Work-Over Experiences at the Kawerau Geothermal
More informationCleanReam Premium Casing-Reaming Bit Efficiently drills out casing and liner using a robust cutting structure
CleanReam Premium Casing-Reaming Bit Efficiently drills out casing and liner using a robust cutting structure Applications Liner reaming Casing reaming Features and Benefits The bladed concentric nose
More informationMACKERAL OIL TOOLS PVT. LTD.
CEMENT FLOAT SHOE Product Code:- MI 2102 Float shoe have a back-pressure valve that prevents fluids from entering the casing while the pipe is lowered into hole and prevents cement from flowing back into
More informationScreenless Sand Control Completions. New dimensions in sand management
Screenless Sand Control Completions New dimensions in sand management Applications Primary sand control completion for new wells expected to produce formation sand Remedial sand control completion for
More informationRemotely Operated Cementing Methods for Drilling with Liner Installations. Steve Rosenberg, Global Drilling Reliability Manager
Remotely Operated Cementing Methods for Drilling with Liner Installations Steve Rosenberg, Global Drilling Reliability Manager Outline Valhall Field history Drilling and completion challenges Drilling
More informationAvailable online at Energy Procedia 1 (2009) (2008) GHGT-9
Available online at www.sciencedirect.com Energy Procedia 1 (2009) (2008) 3531 3537 000 000 Energy Procedia www.elsevier.com/locate/procedia www.elsevier.com/locate/xxx GHGT-9 Review of failures for wells
More informationRELIEF WELL SERVICES Solving challenges.
RELIEF WELL SERVICES Solving challenges. Why should Boots & Coots be your preferred choice for Relief Well Contingency Planning, Project Management and Execution? Boots & Coots Services, provides unparalleled
More informationCementing Tool Supports Cement Plug in Large Diameter Geothermal Well Casing
GRC Transactions, Vol. 39, 2015 Cementing Tool Supports Cement Plug in Large Diameter Geothermal Well Casing Ozgur Balamir 1, Wm. M. Rickard 1, Fred Wilson 1, Kristian Harestad 2, and Per Arild Årebråt
More informationWell abandonment procedures and perforation with a slotted charge for cement squeeze applications
Well abandonment procedures and perforation with a slotted charge for cement squeeze applications European and West African Perforating Symposium (EWAPS) 7 9 th November 2012 Presented by Co-Author Frank
More informationMultistage Stimulation. Efficiency at every stage
Multistage Stimulation Efficiency at every stage Multistage Stimulation Efficiency at every stage Schlumberger multistage stimulation systems are designed to stimulate multiple stages efficiently and effectively.
More informationINTERNATIONAL PERFORATING SYMPOSIUM 2014
INTERNATIONAL PERFORATING SYMPOSIUM 2014 Completion evolution: The role of perforating in horizontal shale wells Kerry Daly, Global BD Manager- DST TCP WELL FLOW MANAGEMENT TM Introduction The first horizontal
More informationHeavy Oil Systems Experience and expertise to enhance productivity
Heavy Oil Systems Experience and expertise to enhance productivity In the emerging and rapidly growing market of heavy oil extraction, production using conventional techniques can be difficult and costly.
More informationCOPYRIGHT. Sand Control Fundamentals. Virtual Instructor Led Session #2
Sand Control Fundamentals Non-Gravel Pack Applications Virtual Instructor Led Session #2 Open Hole with Slotted Liner Open Hole with Screen or Prepacked Screen Slotted liners and screens in a non-gravel
More informationULTRALIFT DEEPWATER GAS-LIFT SYSTEMS
PRODUCTION ULTRALIFT DEEPWATER GAS-LIFT SYSTEMS Enhance production and improve completion integrity in the most extreme environment DRILLING & FORMATION EVALUATION WELL CONSTRUCTION COMPLETION & STIMULATION
More informationTrican s Burst Port System (BPS)
Trican s Burst Port System (BPS) (Patent Pending) A Cost Effective Method for Horizontal Well Stimulation Lewis Facca / Scott Sherman October 14, 2010 Review of Existing Methods for Horizontal Fracturing
More informationADVANCED FLUID SOLUTIONS FOR COMPLEX WELLBORE CHALLENGES
ADVANCED FLUID SOLUTIONS FOR COMPLEX WELLBORE CHALLENGES DRILLING / CEMENTING / COMPLETIONS Improve Performance, Predictability & Production. Impact Fluid Solutions develops advanced additives that enable
More informationRule 326: Mechanical Integrity Guidance
COGCC OPERATOR GUIDANCE RULE 326: MECHANICAL INTEGRITY GUIDANCE Document Control: Created Date: May 15, 2015 Last Updated Date: May 15, 2015 Last Updated By: Dave Kulmann Review Cycle: Yearly Review Systems
More informationEverything You Always Wanted to Know About Class I Injection Wells in Texas
Everything You Always Wanted to Know About Class I Injection Wells in Texas Lorrie Council, P.G., Manager UIC Permits Section Texas Commission on Environmental Quality Shelly Bergel, MLEIP Intern Summer
More informationWell Abandonment & Intervention Services, Gulf Coast Region. Plug into a New Approach
Well Abandonment & Intervention Services, Gulf Coast Region Plug into a New Approach Get it Right the First Time Permanent Solutions to Your Well Abandonment Challenge Thousands of wells await safe and
More informationIsolating Potential Flow Zones During Well Construction
Isolating Potential Flow Zones During Well Construction API Standard 65 Part 2 Glen Benge http://publications.api.org/ API Standard 65-2 Document highlights industry recommended cementing and well construction
More informationOptimizing Drilling Operations with Solid Expandable Tubulars. Enventure Global Technology, L.L.C.
Optimizing Drilling Operations with Solid Expandable Tubulars Tony Furniss Enventure Global Technology, L.L.C. Abstract Deep water and extensive lengths are no longer an anomaly for drilling conditions
More informationNew Advancements in the Abrasion Resistance of Internal Plastic Coatings
1 New Advancements in the Abrasion Resistance of Internal Plastic Coatings Robert S. Lauer NOV Tuboscope 2835 Holmes Road Houston, Texas, USA +17137995212 Robert.Lauer@NOV.com ABSTRACT For more than 60
More informationControl your cleanup Uniformly remove OBM filter cake to optimize well productivity
Control your cleanup Uniformly remove OBM filter cake to optimize well productivity The uniform effect all along the wellbore Effective removal of drilling damage before putting wells on production maximises
More informationImproving Late Life Well Integrity through Sustained Casing Pressure Remediation
Improving Late Life Well Integrity through Sustained Thore Andre Stokkeland Archer the well company Alex Lucas and Michael Cowling Total E&P Danmark SPE Aberdeen Well Late Life And Well Abandonment Conference
More informationHIGH-SALINITY, HIGH-PERFORMANCE PACKERS
HIGH-SALINITY, HIGH-PERFORMANCE PACKERS LEADING THE PACK IN COMPLETIONS Nothing is predictable in the oilfield. Maximizing production and minimizing costs is a balancing act. In challenging, unconventional
More informationManaging well integrity on Erskine Normally Unattended Installation The first HPHT development in the UKCS
Managing well integrity on Erskine Normally Unattended Installation The first HPHT development in the UKCS Iain Robertson Erskine Petroleum Engineer Chevron North Sea Limited 27 th June 2018 2018 Chevron
More informationLOWIS Life-of-Well Information Software
LOWIS Enabling better decision making for artificial-lift optimization Get More from Your Wells Optimizing production is no longer an option it s a necessity. But unleashing the potential of your artificially
More informationEnergize your mind. January 2008
Energize your mind. www.halliburton.com January 2008 A State-of-the-art Cased-Hole Tubing Conveyed Reservoir Fluid Sampling System for HPHT Applications. The capture and analysis of a representative reservoir
More informationThe SPE Foundation through member donations and a contribution from Offshore Europe
Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as
More informationApplication of a Unique Loss Circulation Curing Cement Spacer during Cement Placement in Geothermal Wells
Application of a Unique Loss Circulation Curing Cement Spacer during Cement Placement in Geothermal Wells Abraham S Samuel (Consultant) Kenya, Chike Uchendu, Francis Okoto (Consultant), Johnstone Maleche,
More informationREAD Cased Hole. Maximising operational efficiency Minimising operational cost
READ Cased Hole Maximising operational efficiency Minimising operational cost ZeroTime Logging while working Improves operational efficiency by saving time and reducing costs On-site confirmation of successful
More informationCase Histories (Downhole Tubing and Casing)
Case Histories ( and Casing) New San Andreas Water Injection Wells completed with Fiberglass Casing Bennet Ranch near Denver City, Texas 5 ½ 2000 psi Casing, Threaded and Coupled 20 Wells completed since
More informationSand Control. Gravel packing is the oldest and simplest method of sand control. Works in both on and off shore wells.
Sand Control Marine deposited sands, most oil and gas reservoir sands, are often cemented with calcareous or siliceous minerals and may be strongly consolidated. In contrast, Miocene or younger sands are
More informationUse of Pulsed Neutron Logs to Detect Tubing Leaks and to Identify Water Channeling behind Casing - Case Studies from Western Offshore Fields
10 th Biennial International Conference & Exposition P 030 Use of Pulsed Neutron Logs to Detect Tubing Leaks and to Identify Water Channeling behind Casing - Case Studies from Western Offshore Fields Rakesh
More informationHigh Strength Monobore Assemblies With Expanded D:t=12
High Strength Monobore Assemblies With Expanded D:t=12 For The Drilling Engineering Association, November 13, 2013 Elastic Expansion Technology-DEA Background Elastically biased tubular expansion concept
More informationADVANCED FLUID SOLUTIONS FOR COMPLEX WELLBORE CHALLENGES
ADVANCED FLUID SOLUTIONS FOR COMPLEX WELLBORE CHALLENGES DRILLING / CEMENTING / COMPLETIONS Improve Performance, Predictability & Production. Impact Fluid Solutions develops advanced additives that enable
More informationPOWERWAVE - WATERFLOOD Case History, ALBERTA, CANADA. Les Garner & John Warren
POWERWAVE - WATERFLOOD Case History, ALBERTA, CANADA Les Garner & John Warren Account Manager Vice President www.onthewavefront.com September 2010 symbol: WEE.TSX.V Presentation Outline Introduction and
More informationUse of Swellable Elastomers to Enhance Cementation in Deep Water Applications
Use of Swellable Elastomers to Enhance Cementation in Deep Water Applications Bob Brooks, Tim Davis, Frank DeLucia TAM International This paper was prepared for presentation at the Deep Offshore Technology
More informationKnowing Your Options When Attempting to Sidetrack in Open Hole Danny Harrell, Greg Nairn, and Rocky Seale-Smith International Inc.
AADE 01-NC-HO-57 Knowing Your Options When Attempting to Sidetrack in Open Hole Danny Harrell, Greg Nairn, and Rocky Seale-Smith International Inc. Copyright 2001 AADE National Drilling Technical Conference
More informationAlberta Oil and Gas Regulations The Key to Wellbore Integrity
Alberta Oil and Gas Regulations The Key to Wellbore Integrity Presented by Theresa Watson at the Third Wellbore Integrity Network Meeting Santa Fe, New Mexico March 13, 2007 Overview Alberta Oil and Gas
More informationNOTICE CONCERNING COPYRIGHT RESTRICTIONS
NOTICE CONCERNING COPYRIGHT RESTRICTIONS This document may contain copyrighted materials. These materials have been made available for use in research, teaching, and private study, but may not be used
More informationDown Hole Flow Assurance
Down Hole Flow Assurance Ferhat Erdal Senior Advisor - Flow Assurance Steve Cochran Senior Advisor - Flow Assurance SPE GCS Annual Drilling Symposium Spring, TX April 13, 2017 Flow Assurance Key Words
More informationRULE 68. DISPOSAL OF NATURALLY OCCURRING RADIOACTIVE MATERIALS (NORM) ASSOCIATED WITH THE EXPLORATION AND PRODUCTION OF OIL AND GAS
RULE 68. DISPOSAL OF NATURALLY OCCURRING RADIOACTIVE MATERIALS (NORM) ASSOCIATED WITH THE EXPLORATION AND PRODUCTION OF OIL AND GAS I. Definitions For the purposes of this Rule 1. Ambient Exposure Rate
More informationA five-step method for optimizing perforating design and placement to engineer more profitable completions
A five-step method for optimizing perforating design and placement to engineer more profitable completions 1 Data capture 5 Monitoring 2 Data analysis 4 High-efficiency field execution 3 Perforating design
More informationMAY 2016 ALLAN ALBERTSON, P.ENG., TYLER HALLMAN, P.ENG.
MULTILATERAL WELLS CAN BE EMPLOYED IN HEAVY OIL FORMATIONS REQUIRING ADDITIONAL RESERVOIR EXPOSURE TO ACHIEVE TARGET PRODUCTION RATES AND IMPROVE ECONOMICS MAY 2016 ALLAN ALBERTSON, P.ENG., TYLER HALLMAN,
More informationLiner Hanger Selection. A Guide for Drilling and Completion Engineers
Liner Hanger Selection A Guide for Drilling and Completion Engineers Disclaimer This document has been developed to help drilling and completion engineers identify the liner hanger equipment best suited
More informationAdvanced Well Integrity Management
An Intensive 5 Day Training Course Advanced Well Integrity Management 22-26 Oct 2017, Dubai 20-JUN-17 This course is Designed, Developed, and will be Delivered under Iso Quality standards Advanced Well
More informationOffshore Completion Systems
Offshore Completion Systems Meeting the Reservoir Needs Presented by: Martin Geddes Well Integrity and Control Convention #27 Some Completion teams can only operate down to the reservoir level. We start
More informationDesign for Naturally Completed and Stimulated Wells
MENAPS 13-18 More than just Penetration: Perforation Design for Naturally Completed and Stimulated Wells John Hardesty, PE Principal Research Engineer, GEODynamics, Inc. john.hardesty@perf.com Outline
More informationInnovation and Integrity by Design
3 rd EUROPEAN CONFERENCE ON GAS WELL DELIQUIFICATION NEW DEVELOPMENTS IN OFFSHORE DELIQUIFICATION SOLUTIONS Mark Murray Daniel Stewart 17 th September 2008 Market Size (excluding Russia and China) 775,000
More informationManaging Integrity Status for Large Well Stocks
Managing Integrity Status for Large Well Stocks M.C. Fatah & A.C. Spowage Subsea Asia 2015 Conference 23-24 th November 2015 Jakarta, Indonesia Outline Well Integrity Large Well Stocks Conclusion 2 - www.intetech.com
More informationFUSION Technology: increasing production and ultimate recovery rates with advanced proppant pack consolidation technology
WHITE PAPER FUSION Technology: increasing production and ultimate recovery rates with advanced proppant pack consolidation technology Author: Daryl Johnson, CARBO FUSION TECHNOLOGY: INCREASING PRODUCTION
More informationWhy Mines is a Source of Petroleum Technology Investment Opportunities
Why Mines is a Source of Petroleum Technology Investment Opportunities Dr. William W. Fleckenstein Enercom Oilfield Technology & Innovation Day August 17, 2017 Technology Investment Opportunities 2 1.
More informationDynaSlot System. 360 Certainty Well Abandonment
DynaSlot System 360 Certainty Well Abandonment SETTING THE STAGE FOR PERFECT ISOLATION The DynaSlot TM gun system presents a highly compelling alternative to traditional plug and abandonment and conventional
More informationThe Lowest OPEX Producer Wins the Production Game
The Lowest OPEX Producer Wins the Production Game Enercom Dallas, February 23, 2018 Jeff Saponja, CEO A Schlumberger Joint Venture Multiple Patents Pending HEAL Systems, 2018 Agenda 1. Horizontal Well
More informationNORSOK Standard D-010 Rev. 4 ( )
The table below shows where and how NORSOK D-010 rev. 4 responds to the recommendations in the OLF s Summary report to Deepwater Horizon (Macondo) accident. Color denotes that OLF comment..; 1 : is fully
More informationField Application Study of Zinc Based, Low Debris Perforating Charges
2016 INTERNATIONAL PERFORATING SYMPOSIUM GALVESTON Field Application Study of Zinc Based, Low Debris Perforating Charges POSTER PRESENTATION May 10TH, 2016 AUTHORS: Steve Zuklic, Bill Myers, Rajani Satti,
More informationPetroleum Production Optimization
Petroleum Production Optimization Petroleum Production Optimization Fundamentals Production Optimization refers to the various activities of measuring, analyzing, modelling, prioritizing and implementing
More informationTechnology For Enhancing Marginal Well Profitability
Technology For Enhancing Marginal Well Profitability Glenn R. McColpin, CEO Cell: 713 201 1396 Glenn@marginal wells.com www.marginal Wells.com SURGITECH Created in 2015 to develop or acquire innovative
More informationMaximum number of hours an employee may work in a day
PHONE: 780-427-3731 Oilwell Servicing October 2017 Part 3, Division 6 of the Employment Standards Regulation (Regulation) makes exceptions to employment standards for oilwell servicing employees in hours
More informationISOTHERM NT. Advanced insulating packer fluid for arctic and low-temperature reservoir applications
ISOTHERM NT Advanced insulating packer fluid for arctic and low-temperature reservoir applications ISOTHERM NT: Advanced insulating packer fluid for arctic and lowtemperature reservoir applications Complications
More informationOpenhole Cladding System Provides Effective, Economical and Reliable Zonal Isolation
Openhole Cladding System Provides Effective, Economical and Reliable Zonal Isolation By Olayinka Adeleye, Adedeji Oluwatosin, Lean Tai Lee, Cosmas Adewusi, Tunde Alabi, Ifeh Ugbaja, Segun Owolabi and Oke
More informationThe Better Business Publication Serving the Exploration / Drilling / Production Industry AOGR
JANUARY 2014 The Better Business Publication Serving the Exploration / Drilling / Production Industry Refracturing Extends Lives Of Unconventional Reservoirs The ability to refracture source rock reservoirs
More informationReactive Perforating: The New Ballistic Frontier That s Revolutionizing Well Completions
Dynamics, Inc. 2009 GEO Reactive Perforating: The New Ballistic Frontier That s Revolutionizing Well Completions Matt Bell Vice President Technology Society of Petroleum Engineers Bangkok Chapter 16 July
More informationOptimising Cementing. Rev: /04/01. Author: Peter Aird Ref:
Optimising Cementing Rev: 1.0 21/04/01 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment during cementing operations The following operational
More informationCAIRN ENERGY INDIA PTY LIMITED (Incorporated in New South Wales, Australia ACN )
CAIRN ENERGY INDIA PTY LIMITED (Incorporated in New South Wales, Australia ACN 002 066 784) GLOBAL EXPRESSION OF INTEREST / PRE-QUALIFICATION FOR PROVISION OF LAND DRILLING UNITS, WORKOVER RIGS AND VARIOUS
More informationAn Evaluation of Well Construction/Drilling/Conversion Methodologies Associated with Gas Storage Depleted Field Operations in the United States
An Evaluation of Well Construction/Drilling/Conversion Methodologies Associated with Gas Storage Depleted Field Operations in the United States Presented at: GWPC 2016 Annual Forum, September 11-14, 2016,
More informationCT Reverse Circulating - Basics
CT Reverse Circulating - Basics Reverse circulating with aqueous fluid to unload frac sand from large wellbores If sufficient annular velocities are possible with normal circulation, usually don t use
More informationINJECTION CONFORMANCE IN CO 2 FLOODS
INJECTION CONFORMANCE IN CO 2 FLOODS Presented by Baker Hughes Water Management Dan Pender 12/13/13 CO 2 Conference- Midland, TX Difference between Water and CO 2 Flooding CO 2 flooding Initial reservoir
More informationWELL WORKOVER COMPLETION REPORT
t...;..: ~ "I.-J 'J ",": HGP-A WELLHEAD GENERATOR FEASIBILITY PROJECT WELL WORKOVER COMPLETION REPORT February 1981 TABLE OF CONTENTS I. Introducti on Page 1 II. III. Workover Plan Workover Summary 4 7
More informationUnlocking the Future for a Mature Asset : Surveillance and Complex Wellwork Combine to Extend Field Life
Unlocking the Future for a Mature Asset : Surveillance and Complex Wellwork Combine to Extend Field Life Matt Dunning, Senior Petroleum Engineer, BP SNS Introduction Ravenspurn North field has recently
More informationRailroad Commission of Texas PROPOSAL FOR DECISION PROCEDURAL HISTORY
OIL & GAS DOCKET NO. 08-0240234 ENFORCEMENT ACTION AGAINST GEORGE M. CAMPBELL DBA PRODUCTION SERVICE CO. (OPERATOR NO. 680870) FOR VIOLATIONS OF STATEWIDE RULES ON THE HENDRICKS -M- LEASE, WELL NO. 18,
More informationInjection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection
Injection Wells for Liquid-Waste Disposal Long-term reliability and environmental protection ACHIEVE MULTIPLE GOALS FOR LIQUID-WASTE DISPOSAL INJECTION WELLS Expertly located, designed, constructed, and
More information