1 USACE / NAVFAC / AFCEC / NASA UFGS (August 2017) Preparing Activity: USACE Superseding UFGS (April 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated October 2017 SECTION TABLE OF CONTENTS DIVISION 32 - EXTERIOR IMPROVEMENTS SECTION PLAYGROUND PROTECTIVE SURFACING 08/17 PART 1 GENERAL 1.1 REFERENCES 1.2 DEFINITIONS Critical Height Designated Play Surface Head Injury Criteria (HIC) Impact Attenuation Loose Fill Maximum Equipment Height Play Event 1.3 SYSTEM DESCRIPTION Child Safety Child Accessibility Play Areas at CDC Sites Other than CDC 1.4 SUBMITTALS 1.5 QUALITY ASSURANCE Manufacturer's Qualification Manufacturer's Representative Installer's Qualification Shop Drawings 1.6 DELIVERY, STORAGE, AND HANDLING 1.7 WARRANTY 1.8 MAINTENANCE INSTRUCTIONS PART 2 PRODUCTS 2.1 MATERIALS 2.2 SYNTHETIC SURFACING Subbase Concrete Subbase Bituminous Subbase Aggregate Subbase Impact Attenuating Substrate SECTION Page 1

2 Poured-In-Place Substrate Loose Fill Substrate Wear Surface Poured-in-Place Wear Surface Synthetic Turf Wear Surface Rubber Sheet Wear Surface Polyethylene Plastic Woven Sheet Wear Surface Synthetic Tile Color Sealant Hardware Binder Adhesive Containment Curbs Transition Edge Combination System 2.3 LOOSE-FILL SURFACING Sand Gravel Wood By-Products Wood Mulch Engineered Wood Fiber 2.4 GEOTEXTILE FABRIC 2.5 RECYCLED PLASTIC High Density Polyethylene Structural Component Recycled Plastic Molded As Lumber 2.6 CURBS Concrete Curb Wood Wood Components Wood Treatment PART 3 EXECUTION 3.1 SITE PREPARATION Finished Grade and Underground Utilities Layout Obstructions Below Ground Percolation Test Substitution Subgrade Subsurface Subbase Concrete or Bituminous Curing Fall Height General Requirements Measuring Fall Height 3.2 INSTALLING SYNTHETIC SURFACING SYSTEM Temperature Limitation Poured-in-Place System Geotextile Fabric for Poured-In-Place Poured-in-Place Substrate Poured-in-Place Wear Surface Tile System Combination System Geotextile Fabric Modular Substrate Poured-in-Place Substrate SECTION Page 2

3 Synthetic Turf Wear Surface Rubber Sheet Wear Surface Poured-in-Place Wear Surface Polyethylene Plastic Woven Sheet Wear Surface 3.3 LOOSE FILL SURFACING SYSTEM Sand Surfacing System Gravel Surfacing System Wood By-Product Surfacing System Wood Mulch Surfacing System Engineered Wood Fiber Surfacing System Geotextile Fabric for Wood By-Product Minimum Depth for Wood By-Product 3.4 RESTORATION AND CLEAN UP Clean Up Protection Disposal of Materials 3.5 PROTECTIVE SURFACING ACCEPTANCE 3.6 RE-INSTALLATION -- End of Section Table of Contents -- SECTION Page 3

4 USACE / NAVFAC / AFCEC / NASA UFGS (August 2017) Preparing Activity: USACE Superseding UFGS (April 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated October 2017 SECTION PLAYGROUND PROTECTIVE SURFACING 08/17 NOTE: This guide specification covers the requirements for furnishing and installing protective surfacing in children's outdoor play areas. Adhere to UFC Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable item(s) or insert appropriate information. Remove information and requirements not required in respective project, whether or not brackets are present. Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR). PART 1 GENERAL NOTE: Designer should require materials, products, and innovative construction methods and techniques which are environmentally sensitive, take advantage of recycling and conserve natural resources. 1.1 REFERENCES NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, SECTION Page 4

5 and title. Use the Reference Wizard's Check Reference feature when you add a Reference Identifier (RID) outside of the Section's Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizard's Check Reference feature to update the issue dates. References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM INTERNATIONAL (ASTM) ASTM C136/C136M ASTM D1557 ASTM D2047 ASTM D2261 ASTM D412 ASTM D6112 ASTM F1015 ASTM F1292 ASTM F1487 ASTM F1951 (2014) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates (2012; E 2015) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kn-m/m3) (2011) Static Coefficient of Friction of Polish-Coated Floor Surfaces as Measured by the James Machine (2013; R 2017) Standard Test Method for Tearing Strength of Fabrics by the Tongue (Single Rip) Procedure (Constant Rate-of-Extension Tensile Testing Machine) (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension (2013) Compressive and Flexural Creep and Creep-Rupture of Plastic Lumber and Shapes (2003; R 2009) Relative Abrasiveness of Synthetic Turf Playing Surfaces (2017) Standard Specification for Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment (2017) Standard Consumer Safety Performance Specification for Playground Equipment for Public Use (2014) Standard Specification for Determination of Accessibility of Surface Systems Under and Around Playground SECTION Page 5

6 Equipment CONSUMER PRODUCT SAFETY COMMISSION (CPSC) CPSC Pub No 325 (2010) Handbook for Public Playground Safety 1.2 DEFINITIONS Critical Height The fall height at which the protective surfacing meets the requirements of ASTM F Designated Play Surface Any elevated surface for standing, walking, sitting, or climbing; or a flat surface a minimum 50 mm 2 inches wide having up to a maximum 30 degree angle from horizontal. In some play events the platform surface will be the same as the designated play surface. However, the terms should not be interchanged as they do not define the same point of measurement according to ASTM F Head Injury Criteria (HIC) A measure of impact severity that considers the duration over which the most critical section of the deceleration pulse persists as well as the peak level of that deceleration. Head impact injuries are not believed to be life threatening if the HIC does not exceed a value of 1, Impact Attenuation The ability of protective surfacing to reduce and dissipate the energy of an impacting body Loose Fill Consisting of small independent movable components such as sand, gravel, or wood chip. The percent of fine material in the loose fill affects its compression properties from rainfall Maximum Equipment Height The highest point on the equipment (i.e.: roof ridge, top of support pole) Play Event A piece of manufactured playground equipment that supports one or more play activities. 1.3 SYSTEM DESCRIPTION NOTE: Drawings will indicate the perimeters of the play event use zone defining fall height, platform height, and maximum equipment height; spot elevations; and details as required to install protective surfacing to meet child safety requirements. SECTION Page 6

7 Accessibility: Drawings will indicate spot elevations; dimensions; ramp slope and rise; transfer platform height and transfer space; transfer step and height; and maneuvering space as required to install protective surfacing to meet child accessibility requirements. Measure the perimeters of the play event use zone in accordance with the requirements of Section PLAYGROUND EQUIPMENT Child Safety Meet or exceed the impact attenuating performance requirements of synthetic surfacing and loose-fill surfacing systems, installed in the use zones, as follows. The surfacing critical height value must yield up to both a maximum 200 G's peak deceleration, and a maximum 1,000 Head Injury Criteria (HIC) value for a head-first fall from the play event in accordance with CPSC Pub No 325 and ASTM F1292. The protective surfacing should have a minimum critical height value equal to the height of the highest designated play surface. Measuring fall heights for play events is defined in paragraph FALL HEIGHT. Do not install sand, gravel, and wood products over a concrete or bituminous subsurface in accordance with CPSC Pub No Child Accessibility NOTE: Facilities will be accessible in accordance with TI and 36 CFR 1191, Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities. Ensure one access and egress point for a furnished play event meets accessibility. Ensure all children are accommodated on the playground in a 'play for all' socialization skill development environment. When children with disabilities are allowed to choose play events, they are more eager to learn the skills necessary to participate. The accessibility requirement in accordance with ASTM F1487 includes the following: When the play event use zone consists of a protective surfacing rated as inaccessible, at least one accessible route must be provided from the use zone perimeter to the play event. When there is more than one of the same play activity provided, only one must meet accessibility requirements (i.e.: one swing seat or one spring rocking play event). When the access and egress points are not the same for a play event, an accessible route must be provided to both. The accessible route must access all accessible play events and elements. The protective surfacing materials that meet accessibility are synthetic surfacing and engineered wood fiber in accordance with ASTM F1951. When the accessible surface is within the use zone, it must meet the requirements of paragraph CHILD SAFETY Play Areas at CDC The technical representative for outdoor play areas at CDC must be the SECTION Page 7

8 installation Child Development Services (CDS) Coordinator. The design of the CDC outdoor play area must be based on the developmental play program for the age groups accommodated at the CDC. The play area is designed to support the CDC program and to provide a stage set for creative play. Developmental activities are selected which promote the intellectual, social, emotional and physical growth of the children. The developmental play program is developed by the MACOM CDS Director, installation CDS Coordinator and CDC Director. They are responsible for the developmental play program, child safety and accessibility to meet that program Sites Other than CDC The technical representative for outdoor play areas on sites other than CDCs is the Director of Public Works or designated representative. The design of these outdoor play areas must be based on the play program and the age groups to be accommodated as determined by the play area committee. 1.4 SUBMITTALS NOTE: Review submittal description (SD) definitions in Section SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. The Guide Specification technical editors have designated those items that require Government approval, due to their complexity or criticality, with a "G." Generally, other submittal items can be reviewed by the Contractor's Quality Control System. Only add a G to an item, if the submittal is sufficiently important or complex in context of the project. For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the "G" designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: "AE" for Architect-Engineer; "DO" for District Office (Engineering Division or other organization in the District Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project Office. Codes following the "G" typically are not used for Navy, Air Force, and NASA projects. Use the "S" classification only in SD-11 Closeout Submittals. The "S" following a submittal item indicates that the submittal is required for the Sustainability enotebook to fulfill federally mandated sustainable requirements in accordance with Section SUSTAINABILITY REPORTING. Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects. SECTION Page 8

9 Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for [Contractor Quality Control approval.][information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the Sustainability enotebook, in conformance to Section SUSTAINABILITY REPORTING. Submit the following in accordance with Section SUBMITTAL PROCEDURES: SD-02 Shop Drawings Shop Drawings Finished Grade and Underground Utilities SD-03 Product Data Synthetic Surfacing Loose Fill Surfacing Geotextile Fabric Wood Temperature Limitation Wood By-Products Wood Treatment Adhesive Color SD-04 Samples Synthetic Surfacing Loose Fill Surfacing System SD-06 Test Reports Percolation Test Recycled Plastic Synthetic Surfacing Sand Gravel SD-07 Certificates Manufacturer's Qualification Manufacturer's Representative SECTION Page 9

10 Installer's Qualification Substitution Protective Surfacing Acceptance SD-10 Operation and Maintenance Data Maintenance Instructions; G[, [ ]] SD-11 Closeout Submittals Protective Surfacing Acceptance Certificate of Insurance Warranty 1.5 QUALITY ASSURANCE Manufacturer's Qualification Submit name of the owner or user; service or preventive maintenance provider; date of the installation; point of contact and telephone number; and address for 10 sites. Protective surfacing should have been installed in a minimum 10 sites and been in successful service for a minimum 5 year calendar period. The manufacturer must provide a Certificate of Insurance AA rated for a minimum one million dollars covering both product and general liability Manufacturer's Representative Submit the individual's name, company name and address, and playground safety training certificate. The manufacturer's certified playground safety inspector or the manufacturer's designated certified playground safety representative must supervise the installation and adjustment of the protective surfacing to verify the installation meets the requirements of the manufacturer, this specification, and paragraphs CHILD SAFETY and CHILD ACCESSIBILITY Installer's Qualification Submit the installer's company name and address, training and experience certification. The installer must be certified by the manufacturer for training and experience installing the protective surfacing Shop Drawings When the use zone perimeter and play event configuration conflict with the requirements and paragraphs CHILD SAFETY and CHILD ACCESSIBILITY, submit scale drawings defining corrective measures to include the following: Adjustment to the play event with the use zone perimeter; use zone perimeter overlaps; fall height and critical height value. 1.6 DELIVERY, STORAGE, AND HANDLING Provide a delivery schedule at least 10 calendar days prior to the first day of delivery. Deliver, handle, and store protective surfacing material in accordance with the manufacturer's recommendations. The storage area SECTION Page 10

11 must be as designated. Store the materials in a dry, covered area until installed. Inspect protective surfacing material, upon arrival at the job site, for meeting specified quality. Unacceptable materials must be removed from the job site. 1.7 WARRANTY Furnish protective surfacing with a minimum 1 year calendar period warranty. 1.8 MAINTENANCE INSTRUCTIONS Submit [2] [ ] bound copies of the manufacturer's operation and maintenance manual describing the recommended preventive maintenance, inspection frequency and techniques, periodic adjustments, lubricants, and cleaning requirements. Furnish protective surfacing spare parts provided by the manufacturer. PART 2 PRODUCTS 2.1 MATERIALS NOTE: Before selecting a protective surfacing system, evaluate the different types of protective surfacing systems to determine the most appropriate surfacing for the climate, accessibility, play value, and cost. Consider life cycle maintenance cost. Synthetic Surfacing System: Synthetic surfacing systems, either unified or combined, meet accessibility requirements and have less daily maintenance requirements than loose-fill surfacing systems. Synthetic surfacing systems have limited play value. These systems may be used to add color patterns to the playground to be used for play activities. Loose Fill Surfacing System: The only loose fill surfacing that meets accessibility is engineered wood fiber. To maintain accessibility there needs to be a commitment to replenishing the material every month with the same engineered material. Some loose-fill materials such as sand, not only provide a good impact attenuation surface, but have excellent play value. Loose fill surfacing systems require daily maintenance to maintain impact attenuation performance due to material displacement, decomposition, and compression. Depth of Material: Depth of the protective surfacing is determined by both the fall height and the type of protective surfacing system selected. Prior to the delivery of materials, submit certificates of compliance attesting that materials meet the specified requirements. Certified copies of the material certificates must include composition and tests to which the material has been subjected. Submit manufacturer's descriptive data; SECTION Page 11

12 catalogue cuts; and the latest edition of ASTM F1487 and CPSC Pub No 325. Provide materials which are the standard products of a manufacturer regularly engaged in the manufacture of protective surfacing and that are similar to surfacing in satisfactory use a minimum 5 year calendar period. Protective surfacing consists of two systems; synthetic surfacing and loose fill surfacing. 2.2 SYNTHETIC SURFACING Submit a minimum 50 by 50 mm 2 by 2 inch sample. Submit impact attenuation and critical height performance for each thickness of synthetic surfacing and loose fill surfacing provided. Submit delivery schedule and manufacturer's name for synthetic surfacing and loose fill surfacing plus delivery, storage and handling information. Furnish a list to include part numbers of furnished protective surfacing materials and components for synthetic surfacing and loose fill surfacing and manufacturer's specifications, handling and storage requirements, installation procedures, and safety data sheets to include warnings and critical height performance standards for synthetic surfacing and loose fill surfacing. Synthetic surfacing includes the following: poured-in-place system; tile system; and combination system. The synthetic surfacing consists of either impact attenuating substrate covered by a wear surface bonded to produce a unified system; a shredded rubber or aggregate substrate covered by a polyethylene plastic woven sheet wear surface; or a uniform material manufactured in such a way that the top portion meets the requirements specified for wear surface. Submit chemical composition, color granule percentage, and test results to which material has been subjected, identifying each material and component containing recycled materials and showing the estimated percentage of recovered material content. Furnish freezing temperature life-cycle durability Subbase The subbase for synthetic surfacing may be either concrete, aggregate, or bituminous material Concrete Subbase Provide concrete material conforming to Section CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS Bituminous Subbase Provide bituminous material conforming to Section BITUMINOUS SURFACE TREATMENT Aggregate Subbase Provide aggregate material conforming to Section AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE Impact Attenuating Substrate Provide a substrate compatible with the wear surface, and consisting of modular units; poured-in-place; or loose fill. NOTE: layground surface products are EPA designated recycled content products. Use materials with recycled content where appropriate for use. Verify SECTION Page 12

13 suitability, availability within the region, cost effectiveness and adequate competition before specifying product recycled content requirements. A resource that can be used to identify products with recycled content is the "Comprehensive Procurement Guidelines (CPG)" page within the EPA's website at Other products with recycled content are also acceptable when meeting all requirements of this specification. Research has shown that products are available among US national manufacturers meeting the recycled content percentage in the following substrate sections Poured-In-Place Substrate Poured-in-place substrate must consist of a 100 percent recycled, shredded, styrene butadiene rubber (SBR) adhered with a 100 percent solid polyurethane binder to form a resilient, porous material or shredded rubber. Strands of SBR may vary from a minimum 0.5 mm 1/50 inch to a maximum 2 mm 2/25 inch thickness; by a minimum 3 mm 1/8 inch to a maximum 20 mm 4/5 inch length. Binder must be between a minimum 12 percent and a maximum 16 percent of the total weight of the mixture of rubber and urethane; and must provide 100 percent coating of the particles. Foam rubber will not be accepted in the substrate Loose Fill Substrate The loose fill substrate must consist of 100 percent recycled shredded rubber produced from recycled vehicle tires without non-steel belts. Loose-fill strands may vary from a minimum 3 mm 1/8 inch to a maximum 6 mm 1/4 inch thickness; a minimum 3 mm 1/8 inch to a maximum 13 mm 1/2 inch width; and a minimum 13 mm 1/2 inch to a maximum 50 mm 2 inch length Wear Surface Wear surfaces consist of the following: a poured-in-place durable, weather-resistant, ultraviolet stable, water permeable material top-coat; an integral component of a tile system; synthetic turf wear surface; rubber sheet wear surface; or a polyethylene woven plastic sheet wear surface. The wear surface must meet requirements of ASTM D2047 for a minimum 0.8 coefficient of friction Poured-in-Place Wear Surface Poured-in-place wear surface consists of ethylene propylene diene monomer (EPDM) particles adhered with a polyurethane binder formulated to produce an even, uniform surface. Particles of EPDM must meet ASTM D412 for tensile strength and elongation, and contain a minimum 25 percent of rubber hydrocarbons. Particles of EPDM must be peroxide or sulfur cured in accordance with the manufacturer. Size of rubber particles must be between a minimum 1 mm 1/32 inch, and a maximum 3 mm 1/8 inch diameter. Binder must be between a minimum 16 percent and a maximum 21 percent total weight of rubber used in the wear surface, and must provide 100 percent coating of the particles. Wear surface must be a minimum 10 mm 3/8 inch thick. The wear surface must be porous. SECTION Page 13

14 Synthetic Turf Wear Surface Synthetic turf wear surface must consist of nylon fibers a minimum 500 denier, or heavy face weight polypropylene fiber a minimum 5,000 denier; and tufted construction conforming to ASTM F1015. Fibers in each roll must be from the same dye lot Rubber Sheet Wear Surface Rubber sheet wear surface must consist of a smooth, uniform formulation of EPDM rubber granules bonded under pressure in the factory with polyurethane to form a continuous sheet, and must be a minimum 10 mm 3/8 inch thick. Up to a maximum 80 percent of the rubber may consist of SBR particles. Particle size must vary from a minimum 1 mm 1/32 inch to a maximum 5 mm 3/16 inch diameter Polyethylene Plastic Woven Sheet Wear Surface Polyethylene plastic woven sheet wear surface must be lockstitched and meet the tear resistance test, ASTM D2261 and must have an accelerated ultra-violet degradation protection feature Synthetic Tile Synthetic tile must be sized [as indicated] [ ]. Synthetic tile must be a factory-molded unit consisting of the following: combining impact attenuating substrate and wear surface meeting requirements specified for substrate and wear surface; or a dual-density, uniform material, the top portion of which must conform to wear surface requirements specified Color NOTE: Specify the percentage of each color granule for a unified poured-in-place system. Recommend the overall color of the surfacing be light colors to reduce contact burn risk from solar heat buildup. An EPDM wear surface is preferred for color retention. Submit [2] [ ] color charts displaying surfacing colors, color granule percentages and finishes. The color must be [as shown in Section SCHEDULES FOR FINISHES] [as indicated] [ ]. An EPDM wear surface is preferred for color retention. Black or the following dark colored SBR wear surfaces retain heat and are not acceptable: color combinations containing more than 10 percent black; or color combinations averaging more than 10 percent dark colors Sealant Sealant for tile or combined protective surface systems must be compatible with the protective surfacing, and must match the color of the wear surface Hardware Hardware, anchors or fasteners must be corrosion resistant stainless steel or galvanized steel to anchor the surfacing system securely, in accordance SECTION Page 14

15 with manufacturer's instructions. Hardware must provide or be recessed to provide a flat surface and must be covered by the required depth of protective surfacing Binder Binder for synthetic surfacing must be nontoxic, weather-resistant, ultraviolet stable, non-hardening, and retaining impact-attenuating performance. It must be 100 percent solids containing polyurethane, methylene diphenel isocyanate (MDI), or as recommended by the manufacturer. The use of toluene diphenel isocyanate (TDI) must not exceed 2 percent. Weight of polyurethane must be between a minimum 1.02 kg/l 8.5 lbs/gal and a maximum 1.14 kg/l 9.5 lbs/gal. Coloring pigments must be inorganic oxides Adhesive Provide a two component polyurethane adhesive as recommended by the manufacturer Containment Curbs Containment curbs include the following: treated wood, concrete, recycled plastic, or recycled plastic molded as lumber. Containment curbs must provide a smooth and hazard-free transition from the protective surfacing to the adjacent surface. Curbs must be free of sharp vertical edges, protruding elements and trip hazards. Curbs must be as recommended by the manufacturer. Provide all edges with a minimum 13 mm 1/2 inch radius Transition Edge The transition edge must be designed to maintain the protective surfacing performance, support the surfacing between changes of material, and must be concrete in accordance with paragraph CONCRETE CURB. The face of the edge to the subgrade must be covered with the impact attenuating surface and meet the requirements of paragraph CHILD SAFETY Combination System Combination systems must consist of combined protective surfacing materials specified. Each component is a part of a manufactured surfacing system. Wear surface must be of the materials specified. 2.3 LOOSE-FILL SURFACING Loose-fill surfacing installed in the use zone must consist of sand, gravel or wood by-products Sand NOTE: Sand provides both a protective surface when installed to the recommended depth and play value as in deep digging. When selecting sand, the composition of fine to coarse particles becomes a factor as sand compresses from rainfall. Compressed sand no longer meets impact attenuation for the fall height specified. Also, sand is displaced from running, digging or dragging activities, requiring SECTION Page 15

16 replenishment on a daily basis to maintain impact attenuation performance. "Uniformly graded" sand is to be specified as it has less tendency to compact than "well graded" sand. The specified sieve sizes provide a range of passing percentages that meet paragraph CHILD SAFETY requirements. The range of sieve sizes provided give a sand composition that is locally available and reduce custom mixing. In accordance with the US Army Community and Family Support Center (CFSC-FSCY) requirements for the Army developmental play program, sand is a required play element and must not be eliminated from the play area. Submit sieve test results. Sand must be uniformly graded, washed, free of dust, clay, dirt, hazardous substances, or foreign objects. Sand particles must be rounded naturally or by mechanical means and sieved in accordance with ASTM C136/C136M to be in the following gradation range. SIEVE SIZE, mm PERCENT PASSING 2.36 No No No No No. 100 less than Gravel Gravel must be washed, free of dust, clay, dirt, hazardous substances or foreign objects. Gravel particles must be rounded naturally or by mechanical means and sieved in accordance with ASTM C136/C136M to be in the following gradation range. SIEVE SIZE, mm PERCENT PASSING /2 inch /8 inch Wood By-Products Wood by-products include wood mulch and engineered wood fiber. Wood by-products must be free of sharp or foreign objects or toxic chemicals; poisonous plant material; protrusions; or hazardous material; provide information regarding composition, source, and particle size. Wood by-products manufactured from recycled pallets or lumber containing nails or metal fasteners must be rejected. SECTION Page 16

17 Wood Mulch Wood mulch must be untreated chipped bark or untreated chipped tree prunings a maximum 40 mm 1-1/2 inches long and must be free of twigs, leaves, branches, thorns, dirt, grass, yard clippings, soil, or poisonous plants Engineered Wood Fiber Engineered wood fiber manufactured for the purpose of protective surfacing must consist of particles varying from a minimum 3 mm 1/8 inch wide to a maximum 13 mm 1/2 inch thick; and a minimum 25 mm 1 inch wide to a maximum 75 mm 3 inches long. 2.4 GEOTEXTILE FABRIC Geotextile fabric consists of the following: nonwoven polypropylene sheet; nonwoven 100 percent polyester sheet; or nonwoven needle punched polyester sheet composed of recycled polyester resins. 2.5 RECYCLED PLASTIC NOTE: Plastic lumber used for landscaping timbers and posts is an EPA designated product for recycled content. Use materials with recycled content where appropriate for use. Verify suitability, availability within the region, cost effectiveness and adequate competition before specifying product recycled content requirements. A resource that can be used to identify products with recycled content is the "Comprehensive Procurement Guidelines (CPG)" page within the EPA's website at Other products with recycled content are also acceptable when meeting all requirements of this specification. Research shows products are available among US national manufacturers meeting the minimum recycled content of the percentage listed. Provide the estimated percentage of recovered material content in the material and components; and life-cycle durability. Submit individual component and assembled unit structural integrity test; creep tolerance; deflection tolerance; and vertical load test results; and life-cycle durability. Recycled plastic must contain a minimum 85 percent of recycled content High Density Polyethylene The material must be molded of ultraviolet (UV) and color stabilized polyethylene; and consist of a minimum 75 percent plastic profile of high-density polyethylene, low-density polyethylene, and polypropylene raw material. The material must be non-toxic and have no discernible contaminants such as paper, foil, or wood. The material must contain no more than 3 percent air voids. The material must be free of splinters, chips, peels, buckling, and cracks. Material must be resistant to deformation from solar heat gain. Material must have factory-drilled SECTION Page 17

18 holes. Components with extra holes not filled by hardware or covered by other components must be rejected. The material must not be painted Structural Component Recycled plastic materials will not be used as load bearing structural members Recycled Plastic Molded As Lumber NOTE: Recycled plastic molded as lumber and wood-polymer lumber are susceptible to both creep and deflection; therefore, it cannot be used for a load bearing structural member of protective surfacing systems. To overcome creep and deflection, the product is increased in volume of material and dimension. The component deflection must not exceed 1/360 of the span of the frame when exposed to a uniform live load of 585 N/m 40 lbs/ft. The product must meet the structural integrity test requirements set forth in ASTM F1487 and ASTM D CURBS Concrete Curb Concrete curbs must conform to Section CONCRETE SIDEWALKS AND CURBS AND GUTTERS Wood Wood Components Wood components must be exterior premium grade and free of knots. Wood components must have factory-drilled holes. Components with extra holes not filled by hardware or covered by other components must be rejected Wood Treatment Wood components that are not naturally rot and insect resistant must be treated to resist rot and insect attack by using standard treatment procedures. Provide wood treatment chemical content, toxicity level, and life-cycle durability. Any wood placed up to a maximum 150 mm 6 inches above, or any portion below the top elevation of the protective surfacing, must be treated after fabrication. Creosote, pentachlorophenol, and tributyl tin oxide are prohibited according to ASTM F1487. PART 3 EXECUTION 3.1 SITE PREPARATION NOTE: Provide positive drainage for the proper functioning of protective surfacing. Ensure a minimum 2 percent slope is provided for the protective surfacing subgrade. Ensure ponding at SECTION Page 18

19 the perimeter does not occur. To ensure proper drainage, provide a percolation test to establish the requirement for a subdrainage system. Prior to installing the protective surfacing, verify the playground equipment and site furnishings are installed in accordance with Section PLAYGROUND EQUIPMENT, and Section SITE FURNISHINGS Finished Grade and Underground Utilities Submit finished grade, underground utilities, storm-drainage system and irrigation system status; and location of underground utilities and facilities. Verify that finished grades are as indicated; the smooth grading has been completed in accordance with Section EARTHWORK; installation of the underground utilities through the area has been completed in accordance with Section EARTHWORK; installation of the storm-drainage system through the area has been completed in accordance with Section STORM DRAINAGE; and the installation of underground sprinklers through the area has been completed in accordance with Section UNDERGROUND SPRINKLER SYSTEMS. The location of underground utilities and facilities in the area of the operation must be verified. Damage to underground utilities and facilities must be repaired at the Contractor's expense Layout The layout of the entire use zone perimeter must be staked before excavation begins. The location of all elements must be staked to include the following: All play event configuration access and egress points; and use zone perimeters. The use zone is defined as the area beneath and immediately adjacent to a play structure or equipment that is designated for unrestricted circulation around equipment; and on whose surface it is predicted that a user would land when falling from or exiting the equipment. Also, the use zone is associated with the following terms; "Clear Area," and "Fall Zone". The use zone must be free of hard surfaces, objects or obstacles that a child could run into or fall on top of and be injured. Use zone perimeters must not overlap hard surfaces. The use zone perimeter must meet or exceed the requirements of paragraphs CHILD SAFETY and CHILD ACCESSIBILITY. Use zone perimeters must not overlap except for certain play events as defined in ASTM F Obstructions Below Ground When obstructions below ground affect the work, shop drawings showing proposed adjustments must be provided Percolation Test Submit a certified report of inspection, test method used and compliance with recognized test standard must be described. A test for percolation must be done to determine positive drainage, to include the lowest elevation of the subgrade in the areas containing the following: sand; gravel; wood by-products; or synthetic surfacing installed over a pervious base. A positive percolation must consist of a minimum 25 mm 1 inch per 3 hour period. When a negative percolation test occurs, a shop drawing must be provided to indicate the corrective measures. SECTION Page 19

20 3.1.5 Substitution Under no circumstances are substitutions to be allowed or protective surfacing to be selected without written approval from the technical representative. Evaluate manufacturer substitutions for the critical height value with meeting the site conditions and paragraph FALL HEIGHT Subgrade Correct subgrade irregularities to ensure the required depth of protective surfacing is provided. The subgrade elevation must be as required by the manufacturer Subsurface Install the subsurface in a true, even plane, and sloped to provide positive drainage as indicated Subbase Tolerance of the concrete or bituminous subbase must be within a maximum 6 mm in 3 m 1/4 inch in 10 feet. Tolerance of aggregate subbase must be within a maximum similar to 6 mm in 3 m 1/4 inch in 10 feet. Compact aggregate subbase to a maximum 95 percent, ASTM D1557. The compaction must be completed in accordance with Section EARTHWORK. Sand, gravel, and wood products must not be installed over a concrete, aggregate, or bituminous subbase, in accordance with paragraph CHILD SAFETY Concrete or Bituminous Curing Bituminous or concrete subbase must be cured [a minimum of 7 days] [in accordance with the manufacturer's requirements]. Curing compounds and other deleterious substances that adversely affect adhesion must be removed. Surface must be clean and dry Fall Height NOTE: To determine the required depth of protective surfacing, the fall height; maximum equipment height dimensions; and spot elevations for each play event must be shown on the drawings General Requirements The fall height is defined as the vertical distance between the finished elevation of the designated play surface and the finished elevation of the protective surfacing beneath it. For some play events the fall height and platform height are the same, while for other play events the fall height and maximum equipment height are the same, Section PLAYGROUND EQUIPMENT. When the furnished play event fall height varies from the play event shown, shop drawings must be provided defining the revised depth or type of protective surfacing to meet or exceed the requirements of paragraphs CHILD SAFETY and CHILD ACCESSIBILITY. SECTION Page 20

21 Measuring Fall Height EQUIPMENT Composite Equipment Structure MEASURING FALL HEIGHT For a platform surrounded by protective barriers, measure from the platform finished elevation. For a platform surrounded by guardrails, measure from the guardrail top elevation. Infant Crawl Area A maximum 600 mm 24 inches height, measured from the crawl wall or barrier finished elevation. Playhouse, Nonclimbable Spring Rocking Equipment Measure from the designated play surface finished elevation. Measure from the seat top elevation. Stationary Equipment, Climbable Measure from the maximum equipment height finished elevation. Stationary Equipment, Nonclimbable Measure from the designated play surface finished elevation. Swing Measure from the bottom of the pivot point. 3.2 INSTALLING SYNTHETIC SURFACING SYSTEM Surfacing edges must fully adhere to the subsurface. Fully cover the subsurface to ensure no hard surfaces are exposed through displacement of loose fill. Rolled or beveled containment curb or transition edges must maintain the full thickness required to meet paragraphs CHILD SAFETY and CHILD ACCESSIBILITY. Material must cover foundation and cutouts around elements penetrating the surface. Seams must be the minimum necessary and must be tight Temperature Limitation Provide temperature limitations for applying adhesive Poured-in-Place System Components of the poured-in-place system must be mixed mechanically on site in accordance with manufacturer's recommendations. Hand-mixing is prohibited. Installation of poured-in-place surfacing must be seamless and completely bonded to subsurface. Material must cover foundations and must be tight around elements penetrating the surface. Add a minimum 2 mm 1/16 inch depth to the required surfacing depth to ensure the full depth of material is installed to meet paragraph CHILD SAFETY Geotextile Fabric for Poured-In-Place Install geotextile fabric over a compacted aggregate base as indicated. Fabric must cover the entire area and must be lapped a minimum 100 mm 4 inch width at the seams. Seams must be adhered in accordance with manufacturer's recommendations. The aggregate base must be free of ruts or protruding objects. The fabric must be installed smooth; and free of tensile stresses, folds, and wrinkles. The fabric must be protected from clogging, tears, or other damage. Damaged fabric must be repaired or SECTION Page 21

22 replaced as directed Poured-in-Place Substrate The substrate layer of the poured-in-place system must be installed in one continuous pour on the same day. When a second pour is required, the edge of the previous work must be fully coated with polyurethane binder to ensure 100 percent bond with new work. Adhesive must be applied in small quantities so that new substrate can be placed before the adhesive dries Poured-in-Place Wear Surface Wear surface must be bonded to substrate. Adhesive must be applied to substrate in small quantities so that wear surface can be applied before adhesive dries. Surface must be hand troweled to a smooth, even finish. When wear surface is composed of different color patterns, pour must be continuous and seamless. When seams are required due to color change or field conditions, the adjacent wear surface must be placed as soon as possible, before initial pour has cured. The edge of initial pour must be coated with adhesive and wear surface mixture must be immediately applied Tile System Tile must be laid out to ensure that end cuts are equal. Tile must be installed in accordance with manufacturer's instructions. Hardware must be as recommended by the manufacturer. Tile must be bonded to the subsurface with an adhesive approved by the manufacturer. Cutouts must be filled with sealant according to manufacturer's instructions to eliminate voids at equipment. Sealant must be the minimum amount necessary, must not exceed a maximum 10 mm 3/8 inch width. Where excessive voids occur at cutouts, tile must be removed and refitted. The tile system must be installed throughout the play equipment use zone with the proper thickness Combination System The combination system must consist of [modular impact attenuating substrate units, adhered to form a unified system], [shredded rubber tires over a gravel substrate] [ ]. The substrate must be covered with a wear surface as specified. Cutouts around equipment must be properly filled and sealed according to manufacturer's instructions to eliminate voids. Sealant must be the minimum amount necessary, must not exceed a maximum 10 mm 3/8 inch width. Where excessive voids occur at cutouts, the modular substrate must be removed and refitted. Construction methods must be employed to ensure full depth installation of specified surfacing material and the finished wear surface Geotextile Fabric Geotextile fabric must be installed where a modular or shredded rubber substrate is installed over an aggregate base. It should be installed with poured-in-place wear surface or polyethylene plastic woven sheet wear surface installed over substrate. Fabric must cover the entire area to receive the tile system and must be lapped a minimum 100 mm 4 inch width at the seams. Seams must be adhered in accordance with manufacturer's recommendations Modular Substrate Modular substrate must be laid out to minimize small end pieces. The SECTION Page 22

23 substrate must be installed in accordance with manufacturer's instructions Poured-in-Place Substrate Same as paragraph POURED-IN-PLACE SYSTEM Synthetic Turf Wear Surface Wear surface must be bonded to substrate with 100 percent solids polyurethane adhesive. Surface irregularities and wrinkles must be corrected. Seams must be secured in accordance with manufacturer's recommendations. Wear surface roll width must be as wide as practical for the installation Rubber Sheet Wear Surface Wear surface must be bonded to substrate with 100 percent solids polyurethane adhesive. Surface irregularities and wrinkles must be corrected. Seams must be secured in accordance with manufacturer's recommendations. Wear surface roll width must be as wide as practical for the installation Poured-in-Place Wear Surface Same as paragraph POURED-IN-PLACE SYSTEM Polyethylene Plastic Woven Sheet Wear Surface Wear surface must be securely anchored to a perimeter containment material with hardware in accordance with the manufacturer's instructions. Hardware must be appropriate for the type of system and secured to eliminate protrusions. 3.3 LOOSE FILL SURFACING SYSTEM Submit a minimum cubic m cubic foot sample Sand Surfacing System Sand must be installed over a compacted subgrade at a minimum 450 mm 18 inches depth throughout the use zone. The finished elevation of sand must be determined after sand has been settled by saturating with water and percolating. The sand depth in high play activity areas must be as indicated. Sand must meet the requirements of paragraph CHILD SAFETY Gravel Surfacing System Gravel must be installed over a compacted subgrade at a minimum 300 mm 12 inch depth throughout the use zone. The depth of gravel in high play activity areas must be as indicated. Gravel must meet the requirements of paragraph CHILD SAFETY Wood By-Product Surfacing System Engineered wood fiber protective surfacing must be installed according to manufacturer's instructions. Wood products must meet the requirements of paragraph CHILD SAFETY. SECTION Page 23

24 Wood Mulch Surfacing System Wood mulch must be installed over a compacted subgrade covered with geotextile fabric. Wood mulch must meet the requirements of paragraph CHILD SAFETY Engineered Wood Fiber Surfacing System Engineered wood fiber protective surfacing must be installed according to manufacturer's instructions. The surfacing must meet the requirements of paragraphs CHILD SAFETY and CHILD ACCESSIBILITY Geotextile Fabric for Wood By-Product Geotextile fabric must cover the entire area and must be lapped a minimum 100 mm 4 inch width at the seams. Seams must be adhered in accordance with manufacturer's recommendations. Folds, wrinkles, or loose fabric must be smoothed. Fabric must be protected from damage during wood product placement Minimum Depth for Wood By-Product Wood by-product must be installed at a minimum 300 mm12 inch depth throughout the use zone. The depth of wood products in high play activity areas must be as indicated. 3.4 RESTORATION AND CLEAN UP When the operation has been completed, clean up and protect the site. Existing areas that have been damaged from the operation must be restored to original condition at the Contractor's expense Clean Up The site and play events must be cleaned of all materials associated with the operation. Play events and surfaces must be cleaned of dirt, stains, filings, and other blemishes occurring from shipment and installation. Cleaning methods and agents must be as recommended by the manufacturer Protection The area must be protected as required or directed by providing barricades and signage. Signage must be in accordance with Section EXTERIOR SIGNAGE Disposal of Materials Excess and waste material must be removed and disposed of off Government property. 3.5 PROTECTIVE SURFACING ACCEPTANCE Submit record of measurements and findings by the certified playground safety inspector. When the protective surfacing is installed, the play events and protective surfacing must be thoroughly inspected and measured to verify the playground meets manufacturer's recommendations, paragraphs CHILD SAFETY and CHILD ACCESSIBILITY, and paragraph FALL HEIGHT as follows: 1) secure anchoring; 2) all hardware and connectors are tight and below the wear surface; 3) sharp points, edges, and protrusions; 4) entanglement; and SECTION Page 24

TotTurf EPDM Product Specification

TotTurf EPDM Product Specification TotTurf EPDM Product Specification PART 1 GENERAL 1.01 POURED IN PLACE PLAYGROUND SURFACING TotTurf EPDM poured in place rubber playground surfacing shall consist of a polyurethane binder mixed with 100%

More information

TotTurf Pigmented Poured in Place Product Specifications TOTTURF a PLAYCORE company July 2011

TotTurf Pigmented Poured in Place Product Specifications TOTTURF a PLAYCORE company July 2011 PART 1 General TotTurf Pigmented 1.01 TotTurf PIGMENTED POURED IN PLACE PLAYGROUND SURFACING TotTurf Pigmented poured in place rubber playground surfacing shall consist of a polyurethane binder mixed with

More information

TotTurf Bonded TotTurf Bonded Poured in Place Product Specifications TOTTURF a PLAYCORE company May 2011

TotTurf Bonded TotTurf Bonded Poured in Place Product Specifications TOTTURF a PLAYCORE company May 2011 PART 1 General TotTurf Bonded 1.01 POURED IN PLACE PLAYGROUND SURFACING TotTurf Bonded poured in place playground surfacing consists of a polyurethane binder mixed with 100% recycled, shredded tire material

More information

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-32 11 16.13 (April 2006) ----------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-02723 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION PLAYGROUND PROTECTIVE SURFACING

SECTION PLAYGROUND PROTECTIVE SURFACING SECTION 32 18 16.13 PART 1 - GENERAL 1.1 SCOPE A. Furnish labor, material, and equipment necessary to install the poured-in-place, resilient surfacing system as shown on the drawings and specified herein.

More information

No Fault Safety Surface & SAF DEK for Playgrounds Product Specification

No Fault Safety Surface & SAF DEK for Playgrounds Product Specification PART 1 GENERAL 1.01 WORK INCLUDED POURED-IN-PLACE RUBBER EPDM SURFACING FOR PLAYGROUNDS This work includes furnishing and installing the No Fault Safety Surface. The surfacing Manufacturer/installer shall

More information

TotTurf TPV Supreme (.5-1.5mm) Product Specification

TotTurf TPV Supreme (.5-1.5mm) Product Specification TotTurf TPV Supreme (.5-1.5mm) Product Specification PART 1 GENERAL 1.1 POURED IN PLACE PLAYGROUND SURFACING TotTurf Supreme poured in place rubber playground surfacing shall consist of a polyurethane

More information

TotTurf EPDM STANDARD PIP Product Specification

TotTurf EPDM STANDARD PIP Product Specification TotTurf EPDM STANDARD PIP Product Specification PART 1 GENERAL 1.01 POURED IN PLACE PLAYGROUND SURFACING TotTurf EPDM poured in place rubber playground surfacing shall consist of a polyurethane binder

More information

TotTurf TPV (1-4mm) Product Specification

TotTurf TPV (1-4mm) Product Specification TotTurf TPV (1-4mm) Product Specification PART 1 GENERAL 1.01 POURED IN PLACE PLAYGROUND SURFACING TotTurf TPV poured in place rubber playground surfacing shall consist of a polyurethane binder mixed with

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-32 15 00 (May 2017) -------------------------- Preparing Activity: USACE Superseding UFGS-32 15 00 (April 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-02 66 10 (February 2010) ----------------------------- Preparing Activity: USACE Superseding UGGS-02 66 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-09 66 16 (August 2016) --------------------------- Preparing Activity: USACE Superseded UFGS-09 66 16 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-03 52 00 (August 2011) --------------------------- Preparing Activity: NAVFAC Superseding UFGS-03 52 00 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-03 33 00 (November 2009) ----------------------------- Preparing Activity: USACE Superseding UFGS-03 33 00 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SECTION PLAYGROUND FALL SURFACE

SECTION PLAYGROUND FALL SURFACE SECTION 02520 PART 1 - GENERAL 1.01 SECTION INCLUDES A. The Contractor shall supply all materials, labor and equipment required to install the items specified in this Section, and in accordance with the

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-07 11 13 (August 2011) Change 1-05/17 --------------------------- Preparing Activity: NAVFAC Superseding UFGS-07 11 13 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-03 11 13.00 10 (May 2014) --------------------------------- Preparing Activity: USACE Superseding UFGS-03 11 13.00 10 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.19 (February 2016) Change 1-05/17 -------------------------------- Preparing Activity: NAVFAC Superseding UFGS 31 31 16.19 (August 2014) UFGS 31 31 16.20 (April

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.19 (February 2016) Change 1-05/17 -------------------------------- Preparing Activity: NAVFAC Superseding UFGS 31 31 16.19 (August 2014) UFGS 31 31 16.20 (April

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 05 20 (August 2008) --------------------------- Preparing Activity: USACE Superseding UFGS-31 05 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.19 (August 2014) ------------------------------ Preparing Activity: NAVFAC Superseding UFGS-31 31 16.19 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-11 68 13 (February 2009) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 68 13 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-09 66 23 (August 2016) --------------------------- Preparing Activity: USACE Superseding UFGS-09 66 23 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 56 63 (April 2006) --------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-11191 (September 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 22 13 (August 2016) --------------------------- Preparing Activity: NAVFAC Superseding UFGS-10 22 13 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Product Guide Specification

Product Guide Specification SofSURFACES, Inc. September 2004 4393 Discovery Line PO Box 239 Petrolia, Ontario N0N 1R0 Canada Toll Free (800) 263-2363 Phone (519) 882-8799 Fax (519) 882-2697 Website www.sofsurfaces.com E-mail alltinfo@sofsurfaces.com

More information

**************************************************************************

************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-32 01 16.75 (February 2017) --------------------------- Preparing Activity: USACE Superseding UFGS-32 01 25 (August 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 22 13 (August 2016) Change 1-08/18 --------------------------- Preparing Activity: NAVFAC Superseding UFGS-10 22 13 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 21 00 (May 2015) --------------------------- Preparing Activity: USACE Superseding UFGS-05 21 13 (August 2009) UFGS-05 21 16 (August 2009) UFGS-05 21 19 (July 2007)

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-09 66 23 (August 2016) Change 1-08/18 --------------------------- Preparing Activity: USACE Superseding UFGS-09 66 23 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.13 (August 2016) -------------------------------- Preparing Activity: NAVFAC Superseding UFGS-31 31 16.13 (November 2014) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-09 66 13 (August 2016) Change 1-08/18 --------------------------- Preparing Activity: USACE Superseding UFGS-09 66 13 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Parks, Recreation and Community Services

Parks, Recreation and Community Services Parks, Recreation and Community Services MEMORANDUM DATE: TO: THRU: FROM: SUBJECT: August 10, 2015 MAYOR AND CITY COUNCIL Andrew Clinger, City Manager~~ Kate Thomas, Assistant City Mana~ Andy Bass, Director,

More information

Product Guide Specification

Product Guide Specification SofSURFACES, Inc. 4393 Discovery Line PO Box 239 Petrolia, Ontario N0N 1R0 Canada Toll Free (800) 263-2363 Phone (519) 882-8799 Fax (519) 882-2697 Website www.sofsurfaces.com E-mail alltinfo@sofsurfaces.com

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 56 13 (April 2006) -------------------------- Preparing Activity: NAVFAC Replace without change UFGS-10675 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-22 66 53.00 40 (August 2015) ----------------------------------- Preparing Activity: NASA Superseding UFGS-22 66 53.00 40 (February 2011) UFGS-22 66 53 (August 2010)

More information

TotTurf GreenTurf. TotTurf GreenTurf. TotTurf GreenTurf Product Specifications TOTTURF a PLAYCORE company June 2012.

TotTurf GreenTurf. TotTurf GreenTurf. TotTurf GreenTurf Product Specifications TOTTURF a PLAYCORE company June 2012. PART 1 General TotTurf GreenTurf 1.01 GREENTURF PLAYGROUND SURFACING TotTurf GreenTurf Safety playground surfacing consists of a polyurethane binder mixed with 100% recycled, shredded tire buffings which

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-03 52 16 (April 2008) -------------------------- Preparing Activity: USACE Superseding UFGS-03 51 00 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 56 13 (April 2006) -------------------------- Preparing Activity: NAVFAC Replace without change UFGS-10675 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-09 97 13.28 (February 2010) -------------------------------- Preparing Activity: NAVFAC Superseding UFGS-09 97 13.28 (August 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 62 13.26 (April 2006) ----------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-02466 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-03 62 16 (February 2018) ----------------------------- Preparing Activity: NASA Superseding UFGS-03 62 16 (May 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-33 16 13.16 (April 2006) ----------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-13208 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

A. General: Refer to and comply with Division 1 Section Submittal Procedures, for procedures and other submittal criteria.

A. General: Refer to and comply with Division 1 Section Submittal Procedures, for procedures and other submittal criteria. SECTION 02790 POURED RUBBER PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-22 05 83.63 (November 2016) -------------------------------- Preparing Activity: NASA UFGS-22 05 83.63 (November 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SECTION ATHLETIC AND RECREATIONAL SURFACING. A. ASTM C 67 - Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile.

SECTION ATHLETIC AND RECREATIONAL SURFACING. A. ASTM C 67 - Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile. SECTION 02790 ATHLETIC AND RECREATIONAL SURFACING PART 1 GENERAL 1.1 SECTION INCLUDES A. Resilient interlocking fitness flooring. 1.2 RELATED SECTIONS 1.3 REFERENCES A. ASTM C 67 - Standard Test Methods

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 18 23.00 40 (August 2016) --------------------------------- Preparing Activity: NASA Superseding UFGS-26 18 23.00 40 (August 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

FlexGround Standard. Poured In Place Safety Surfacing. Manufacturer s Specifications

FlexGround Standard. Poured In Place Safety Surfacing. Manufacturer s Specifications FlexGround Standard Poured In Place Safety Surfacing Manufacturer s Specifications This document provides the specifications for a poured in place safety surfacing system composed of a wearing layer upper

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-32 11 16.16 (November 2011) -------------------------------- Preparing Activity: NAVFAC Superseding UFGS-32 11 16.16 (July 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-06 17 19 (November 2016) ----------------------------- Preparing Activity: USACE New Section UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-09 84 20 (August 2016) --------------------------- Preparing Activity: USACE Superseding UFGS-09 83 13 UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 60 00 (November 2008) ----------------------------- Preparing Activity: USACE Superseding UFGS-31 60 00 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-32 01 11.51 (May 2016) Change 2-08/17 ----------------------------- Preparing Activity: USACE Superseding UFGS 32 01 11.51 (April 2006) UFGS 32 01 11.52 (April 2008)

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-07 84 00 (May 2010) Change 1-08/13 ------------------------ Preparing Activity: USACE Superseding UFGS-07 84 00 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-03 53 14.00 20 (February 2010) ----------------------------------- Preparing Activity: NAVFAC Superseding UFGS-03 53 14.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UFGS (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-07 16 19 (January 2007) ---------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-07 16 19 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

TotTurf SPLASH TREAD Product Specification

TotTurf SPLASH TREAD Product Specification TotTurf SPLASH TREAD Product Specification PART 1 GENERAL 1.1 POURED IN PLACE PLAYGROUND SURFACING TotTurf Splash Tread poured in place playground surfacing shall consist of an Aliphatic binder mixed with

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

SECTION PLAYGROUND SAFETY SURFACING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION PLAYGROUND SAFETY SURFACING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 321810 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

A. Section Includes: SpectraPour Poured-in-Place Playground Surfacing System

A. Section Includes: SpectraPour Poured-in-Place Playground Surfacing System SpectraPour Poured-in-Place Specification SpectraTurf 500 E. Rincon Street #100 Corona, CA 92879-1352 Phone: (800) 875-5788 Fax: (951) 734-3630 E-mail: info@spectraturf.com www.spectraturf.com PART 1 GENERAL

More information

Zeager Bros. Inc. Middletown, Pa / Zeager Hardwood Co. Franklin, Ky Revised - August, 2012 by ASC

Zeager Bros. Inc. Middletown, Pa / Zeager Hardwood Co. Franklin, Ky Revised - August, 2012 by ASC Product Guide Specification 32 18 16.13 RECMAT Protective Playground Surfacing Specifier Notes: This product guide specification is written according to the Construction Specifications Institute (CSI)

More information

SECTION LIMESTONE SEGMENTAL RETAINING WALLS

SECTION LIMESTONE SEGMENTAL RETAINING WALLS (Specifier Notes: The purpose of this guide specification is to assist the specifier in correctly specifying segmental retaining walls and their installation. The specifier needs to edit this guide specification

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 88 53 (May 2011) --------------------------- Preparing Activity: NAVFAC Superseding UFGS-08 88 53 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-03 01 30.71 (April 2006) ----------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-03930 (September 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

FallZone Poured-in-Place Specification

FallZone Poured-in-Place Specification FallZone Poured-in-Place Specification www.fallzonesafetysurfacing.com PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Poured-in-place playground surfacing system. Specifier Note: Revise paragraph below

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 68 13 (August 2017) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 68 13 (February 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Playground Review and Maintenance Process

Playground Review and Maintenance Process Playground Review and Maintenance Process Line of Business: General Liability Risk Control Strategy/Key Issues: Establish procedures for existing playground equipment review to comply with current safety

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 32 13 (November 2008) ----------------------------- Preparing Activity: NAVFAC Superseding UFGS-08 32 13 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates. SECTION 32 14 23 ASPHALT UNIT PAVING PART 1 GENERAL 1.1 DESCRIPTION Work Included: All labor, materials, appliances, tools, equipment, facilities, transportation, and services for and incidental to performing

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 05 23.16.16 (May 2014) ----------------------------- Preparing Activity: USACE Superseding UFGS-05 05 23 (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

BONDED UNITARY RUBBER PROTECTIVE PLAYGROUND SURFACING

BONDED UNITARY RUBBER PROTECTIVE PLAYGROUND SURFACING BONDED UNITARY RUBBER PROTECTIVE PLAYGROUND SURFACING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION ASPHALT PAVING

SECTION ASPHALT PAVING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 32 12 16 ASPHALT PAVING SPEC WRITER NOTE: Delete or add information between // ---- // and any other items applicable to project. Any item added to the text shall

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-07 72 20 (August 2009) --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 05 48.00 10 (October 2006) ---------------------------------- Preparing Activity: USACE Superseding UFGS-26 05 48.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION RESILIENT TRACK SURFACING

SECTION RESILIENT TRACK SURFACING SECTION 32 2000 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 70 00 (May 2011) ------------------------------ Preparing Activity: NAVFAC Superseding UFGS-11 70 00 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-34 11 19.00 20 (April 2006) -------------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-05652N (September 1999) UNIFIED FACILITIES GUIDE

More information

ENGINEERING SPECIFICATION. PULTRUDED PEDESTRIAN FIBERGLASS GRATING SAFE-T-SPAN T1210 VINYL ESTER and ISOPHTHALIC. October 25, 2004 Revision 1

ENGINEERING SPECIFICATION. PULTRUDED PEDESTRIAN FIBERGLASS GRATING SAFE-T-SPAN T1210 VINYL ESTER and ISOPHTHALIC. October 25, 2004 Revision 1 ENGINEERING SPECIFICATION PULTRUDED PEDESTRIAN FIBERGLASS GRATING SAFE-T-SPAN T1210 VINYL ESTER and ISOPHTHALIC 1 PART 1 - GENERAL 1.1 SCOPE OF WORK SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS

More information

SECTION MODIFIED BITUMINOUS SHEET WATERPROOFING

SECTION MODIFIED BITUMINOUS SHEET WATERPROOFING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 13 52 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 05 23.16.16 (May 2014) ----------------------------- Preparing Activity: USACE Superseding UFGS-05 05 23 (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

BSS 200 Synthetic Track Surfacing System System Specifications

BSS 200 Synthetic Track Surfacing System System Specifications BSS 200 Synthetic Track Surfacing System System Specifications G.3 - Bidder: FieldTurf USA, Inc. Part I - General 1.1 - Scope The synthetic surfacing contractor shall furnish all labor, materials, equipment,

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-02 56 15 (February 2010) ----------------------------- Preparing Activity: USACE Superseding UFGS-02 56 15 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL 13686.00 CONCRETE WALKS AND CURBS 033015-1 1.1 RELATED DOCUMENTS: SECTION 033015 CONCRETE WALKS AND CURBS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General and Supplementary

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-06 71 33 (February 2015) ----------------------------- Preparing Activity: NASA Superseding UFGS-06 71 33 (May 2012) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Architectural Wall Products Guide Specifications

Architectural Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Wall Products Guide Specifications FORMED METAL WALL PANELS This Guide Specification is

More information

SECTION DETECTABLE GUIDE TACTILES

SECTION DETECTABLE GUIDE TACTILES SECTION 09655 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for surface applied and recessed detectable guide or directional tactiles (tactiles) for use on the station platforms

More information

DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION

DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION Please read through this instruction completely before beginning your installation. Be sure the proper equipment, and safety precautions are in place.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-04 23 00 (November 2009) ----------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

1. ASTM F : Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment.

1. ASTM F : Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment. PLAYGROUND GRASS SURFACING 7 Foot Critical Fall Height PART 1 - GENERAL 1.1 DESCRIPTION OF WORK: A. Playground Grass surface systems for surfaces under and around playground equipment including but not

More information

BSS 300 Embedded Synthetic Track Surfacing System System Specifications

BSS 300 Embedded Synthetic Track Surfacing System System Specifications BSS 300 Embedded Synthetic Track Surfacing System System Specifications G.3 - Bidder: FieldTurf USA, Inc. Part 1 General 1.1 Scope The synthetic surfacing contractor shall furnish all labor, materials,

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18) Page 1 of 8 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

ENGINEERING SPECIFICATION FIBERGRATE 62% OPEN AREA/ADA COMPLIANT MOLDED GRATING. January 5,

ENGINEERING SPECIFICATION FIBERGRATE 62% OPEN AREA/ADA COMPLIANT MOLDED GRATING. January 5, ENGINEERING SPECIFICATION FIBERGRATE 62% OPEN AREA/ADA COMPLIANT MOLDED GRATING January 5, 2016 06610-1 SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS MOLDED GRATING PART 1 - GENERAL 1.1

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 05 21 (August 2008) --------------------------- Preparing Activity: USACE Superseding UFGS-31 05 21 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SYNTHETIC TURF SYSTEMS Artificial Turf Perfect Putt

SYNTHETIC TURF SYSTEMS Artificial Turf Perfect Putt PART 1 GENERAL 1. WORK A. Furnishing, delivery, installation and warranty of a complete synthetic turf system including drainage, synthetic turf, and resilient infill material. 2. RELATED SECTIONS A. Section

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 321610 - CURBING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies requirements for furnishing and installing all types of curbing including the following: granite curb, concrete and bituminous

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 05 23.16.16 (May 2014) ----------------------------- Preparing Activity: USACE Superseding UFGS-05 05 23 (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

CONCRETE TILE PAVERS

CONCRETE TILE PAVERS Section 32 14 13 CONCRETE TILE PAVERS (1995 MasterFormat Section 02780) Note: This guide specification for the U.S. is for the installation of concrete tile paving units whose thickness are less than the

More information

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT PERMEABLE BITUMINOUS PAVEMENT PART 1: GENERAL 1.01. RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including Special Requirements General Conditions and Division 1 Specifications Sections,

More information