1 ST. LUKE CATHOLIC ELEMENTARY SCHOOL Final 2017 ACM Re-Assessment Report Project Location: 345 Albright Road Hamilton, ON Prepared for: Hamilton Wentworth Catholic District School Board 57 Stuart Street Hamilton, ON L8L 1B5 Prepared by: MTE Consultants Inc Sutton Drive, Unit A Burlington, ON L7L 6B8 September 8, 2017 MTE File No.:
2 TABLE OF CONTENTS 1.0 INTRODUCTION REGULATORY FRAMEWORK SCOPE OF WORK METHODOLOGY Existing Document Review Visual Inspection Friability Condition RESULTS Existing Document Review Visual Inspection RECOMMENDATIONS LIMITATIONS... 8 TABLES TABLE 1 SUMMARY OF ASBESTOS-CONTAINING MATERIALS... 5 APPENDICES APPENDIX A APPENDIX B ASBESTOS-CONTAINING MATERIALS SUMMARY DRAWING M:\38313\104\Facilities\St. Luke\Report\ _St. Luke Aug17.doc
3 1.0 INTRODUCTION MTE Consultants Inc. (MTE) was authorized by the Hamilton Wentworth Catholic District School Board (HWCDSB to provide consulting services related to the reassessment of asbestos-containing building materials within St Luke Catholic Elementary School located at 345 Albright Road in Hamilton, Ontario (the Site). Asbestos-containing materials (ACMs) within the Site building were initially assessed during a comprehensive building survey conducted on July 24, This re-assessment was conducted in order to assist the HWCDSB in demonstrating compliance with regulatory requirements for the ongoing management of ACMs within their facilities, and was conducted in accordance with Ontario Regulation 278/05 - Designated Substance Asbestos on Construction Projects and in Buildings and Repair Operations. This assignment was conducted by Ms. Jessica Rastelli of MTE on August 9, Authorization to proceed was provided to MTE by the HWCDSB through issuance of a purchase order. The following sections of this report provide a summary of the regulatory framework surrounding asbestos, MTE s approved scope of work, assessment methodologies, findings, conclusions and recommendations for regulatory compliance (where applicable). 2.0 REGULATORY FRAMEWORK Under current health and safety legislation in Ontario, eleven (11) chemical agents are listed as Designated Substances due to their adverse effects on workers and the environment. Designated Substances in the workplace are typically regulated by several key pieces of legislation, which prescribe agent-specific practices for their safe use, disturbance, identification, management and disposal. These key pieces of legislation, made under the Occupational Health and Safety Act (OHSA), are commonly referred to as the Designated Substances Regulations. Asbestos, a fibrous and naturally-occurring silicate mineral which has been historically incorporated into various building materials due to its desirable physical properties, is one of the chemical agents listed as a Designated Substance. In Ontario, asbestos is regulated by the following Designated Substance Regulations: Ontario Regulation 490/09 entitled Designated Substances ; and Ontario Regulation 278/05 entitled Designated Substance Asbestos on Construction Projects and in Buildings and Repair Operations ACM Re-Assessment Report MTE File No: St. Luke Catholic Elementary School September 8, 2017
4 Specifically, Ontario Regulation 490/09 regulates all Designated Substances; however, with respect to asbestos, it primarily regulates worker exposure during the manufacturing of asbestos-containing products. It includes requirements related to appropriate respiratory equipment, measurement of airborne fibres and medical surveillance of workers. On the other hand, Ontario Regulation 278/05 regulates the identification, management and disturbance of ACMs within a building during construction, building and repair operations. As defined by Ontario Regulation 278/05, an ACM is any material which contains 0.5% or more asbestos by dry weight. With regards to the identification and management of ACMs within a building, Ontario Regulation 278/05 prescribes that: A building owner shall prepare, and keep on premises, a record of all ACMs within the building (Section 8(3)(a)). At a minimum, for each ACM, the record shall contain information regarding the location, friability and type of asbestos present (Section 8(4)). A building owner shall inspect all ACMs at reasonable intervals to determine their condition (Section 8(3)(f)). A building owner shall update the record at least annually, or whenever they become aware of new information relating to the ACMs (Section 8(5)). In addition to the Designated Substances Regulations, the disposal of asbestos waste in Ontario is regulated by Ontario Regulation 347, made under Ontario s Environmental Protection Act and entitled General - Waste Management. As defined by Ontario Regulation 347, asbestos waste is any solid or liquid waste which results from the removal of asbestos-containing construction or insulation materials or the manufacture of asbestos-containing products and contains asbestos in more than a trivial amount or proportion. In accordance with Ontario Regulation 347, all asbestos waste must be placed in an adequate waste container and disposed of at a licensed disposal facility. Adequate waste containers must be dust tight, suitable for the type of waste to be contained, impervious to asbestos, properly labeled as asbestos waste and have the exterior thoroughly cleaned of all asbestos waste. Licensed disposal facilities must receive prior notification regarding the delivery of asbestos waste. 3.0 SCOPE OF WORK Tasks associated with this re-assessment, as performed by MTE, included: Review of existing documents and/or reports pertaining to ACMs within the Site building; Visual inspection, within all accessible areas of the Site building, to assess the condition of known, or assumed, ACMs; Visual inspection, within all accessible areas of the Site building, to assess the condition, type and friability of any newly discovered ACMs which were not identified and/or discussed in previous reports; 2017 ACM Re-Assessment Report MTE File No: St. Luke Catholic Elementary School September 8, 2017
5 Preparation of a photographic log of ACMs within the Site building which were damaged at the time of assessment; An update of the existing ACM Inventory and Figures of the Site building; and Preparation of this report. 4.0 METHODOLOGY 4.1 Existing Document Review Prior to commencing with this re-assessment, MTE requested copies of all existing reports and/or documents pertaining to the location and condition of ACMs within the Site building. The existing ACM Re-Assessment Report entitled St. Luke Catholic Elementary School 2016 ACM Re-Assessment Report 345 Albright Road, Hamilton, Ontario which was prepared by MTE and dated September 16, 2016 was reviewed prior to conducting this re-assessment. 4.2 Visual Inspection On August 9, 2017, following a review of the existing documentation, MTE attended the Site to conduct a room-by-room visual inspection of all known, or assumed, ACMs within the Site building. It should be noted that this visual inspection was non-intrusive in nature, and therefore no demolition or equipment dismantling work was performed. Only those ACMs which were readily accessible were visually inspected. The purpose of MTE s visual inspection was to document the current condition of ACMs within the Site building Friability As defined by Section 1 of Ontario Regulation 278/05, a friable material is an ACM which: a) When dry, can be crumbled, pulverized or powdered by hand pressure; or b) Is crumbled, pulverized or powdered. Friable materials have a high propensity to liberate asbestos fibres when disturbed. Examples of friable materials include, but are not limited to; spray fireproofing, pipe insulation, soft texture coats, damaged materials and debris. Conversely, ACMs which do not meet the definition of friable (as stated in Ontario Regulation 278/05 and summarized above) are classified as non-friable. Non-friable ACMs typically represent a lower exposure hazard than friable ACMs. Examples of non-friable ACMs include, but are not limited to; floor tiles, rolled flooring, mastics, asbestos cement products, and tar impregnated fabrics such as roofing felts ACM Re-Assessment Report MTE File No: St. Luke Catholic Elementary School September 8, 2017
6 It is important to note that non-friable ACMs can become friable if they are sufficiently deteriorated or damaged by water, chemical agents, or physical wear. Furthermore the breaking, cutting, drilling, abrading, grinding, sanding or vibrating of non-friable ACMs, particularly with power-tools and power equipment can cause the material to become friable and increase exposure to workers, building occupants and the public Condition ACMs which were accessible for inspection were categorized as good, fair or poor, based on the following criteria: Good: ACMs which are intact and in a non-deteriorated condition or ACMs which are completely encapsulated within an outer non-asbestos material or covering. ACMs in this state are assumed to represent a negligible risk as a source of airborne asbestos fibres. Therefore, no remedial actions are currently required for ACMs in this state; however, annual re-inspection shall still be maintained. Fair: ACMs which are slightly deteriorated with no visible dust or debris present, or ACMs which are enclosed within an outer non-asbestos material or covering, where the outer material exhibits minor signs of physical damage to the integrity of the covering material (i.e. small nicks, tears, or shrinkage cracks). ACMs in this state are assumed to represent a low risk as a source of airborne asbestos fibres. Therefore, remedial actions are not immediately required for ACMs in this state; however, repair and/or removal of the damaged material is recommended prior to further deterioration. Annual re-inspection of ACMs which are repaired, but not removed, shall be maintained. Poor: ACMs which are significantly damaged and/or deteriorated, or the observed presence of ACM dust and/or debris. ACMs in this state are assumed to represent a high risk for the fugitive release of airborne asbestos fibres. Therefore, removal and/or repair of ACMs in this state should be conducted as soon as possible by a qualified asbestos abatement contractor. 5.0 RESULTS 5.1 Existing Document Review Based on a review of the existing documentation previously prepared by MTE, Table 1 provides a summary of ACMs that are confirmed and/or suspected present within the Site building ACM Re-Assessment Report MTE File No: St. Luke Catholic Elementary School September 8, 2017
7 TABLE 1: SUMMARY OF ASBESTOS-CONTAINING MATERIALS Determination of Material Location Asbestos Classification Woven Jacketing Suspected Based on Insulation on Old Throughout Inaccessibility Electrical Wire Breakers, Panels and Internal Electrical Components Vermiculite Insulation Window and Door Caulking Roofing Materials Drywall Joint Compound Vinyl Sheet Flooring Grey With Green and Red Flecks Suspected in Inaccessible Electrical and Switchgear Equipment Throughout Suspected within Block Walls Throughout the Site Around windows and doors throughout the Site Roof Walls and Ceilings Throughout Room 1032 Suspected Based on Inaccessibility Suspected Based on Inaccessibility Deemed Based on Limited Scope of Sampling Deemed Based on Limited Scope of Sampling Deemed Based on Limited Scope of Sampling Deemed Based on Limited Scope of Sampling Suspected Based on Inaccessibility Friability Non Friable Non Friable Friable Non Friable Non Friable Non Friable Non Friable Beneath Floor Tiles Non Adhesive Floor Mastic Throughout Friable *Note: Materials which are deemed or suspected of containing asbestos are assumed to contain a type of asbestos other than Chrysotile. 5.2 Visual Inspection At the time of visual inspection, all confirmed and/or suspected ACMs were in good condition. For a complete list of known, or assumed, ACMs within the Site building, including information pertaining to location, friability, condition and type of asbestos present, refer to the ACM database provided in Appendix A. A drawing depicting the location of confirmed ACMs within the Site building is provided in Appendix B ACM Re-Assessment Report MTE File No: St. Luke Catholic Elementary School September 8, 2017
8 6.0 RECOMMENDATIONS Based on the results of this re-assessment, the following recommendations are provided: 1) ACMs have been identified, and are assumed present, at various locations within the Site building. All ACMs which are assumed present, but could not be sampled due to inaccessibility and/or the non-destructive nature of this reassessment, must be managed in accordance with Ontario Regulation 278/05 as though they are ACMs. 2) It is possible that additional ACMs are present in concealed areas and may not become apparent until substantial construction, renovation, alteration or maintenance activities are conducted. If any construction, renovation, alteration or maintenance activities are required or planned, invasive inspections of concealed areas for potential ACMs is required prior to such activities. Should any suspect ACMs be discovered during the course of construction, renovation, alteration or maintenance activities, work should cease immediately and the materials should not be disturbed. Suspect ACMs may be treated as asbestos-containing, or sampled and proven non-asbestos through laboratory analysis. In instances where sprayed-on friable materials are treated as asbestos-containing but not sampled, they must be assumed to contain a type of asbestos other than Chrysotile and be managed accordingly. 3) Under current legislation, there are no requirements to remove ACMs from a building simply because they are present; however, Ontario Regulation 278/05 prescribes that an Asbestos Management Program (AMP) be implemented and maintained where ACMs have been identified, or are suspected present. Typically, an AMP consists of: The identification of ACMs within the facility; Providing notification to workers, contractors and tenants regarding the presence of ACMs within the facility; The control of employee exposure to asbestos fibres through: 1. Engineering controls; 2. Policies; 3. Procedures; 4. Training; 5. Personal protective equipment; and 6. Hygiene. The maintenance of information regarding asbestos ACM Re-Assessment Report MTE File No: St. Luke Catholic Elementary School September 8, 2017
9 4) All asbestos waste generated within the Site building must be handled, transported and disposed of in accordance with Ontario Regulation 278/05 and Ontario Regulation 347/90. 5) In accordance with Ontario Regulation 278/05, the condition of all ACMs within the Site building should be re-assessed at reasonable intervals. This record must be updated at least annually, or as new information pertaining to ACMs within the Site building becomes available ACM Re-Assessment Report MTE File No: St. Luke Catholic Elementary School September 8, 2017
10 7.0 LIMITATIONS Services performed by MTE CONSULTANTS INC. (MTE) were conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the Environmental Engineering & Consulting profession. No other representation expressed or implied as to the accuracy of the information, conclusions or recommendations is included or intended in this report. This report was completed for the sole use of MTE and HWCDSB. It was completed in accordance with the approved Scope of Work referred to in Section 3.0. As such, this report may not deal with all issues potentially applicable to the Site and may omit issues that are or may be of interest to the reader. MTE makes no representation that the present report has dealt with all-important environmental features, except as provided in the Scope of Work. All findings and conclusions presented in this report are based on Site conditions, as they existed during the time period of the investigation. This report is not intended to be exhaustive in scope or to imply a risk-free facility. Any use which a third party makes of this report, or any reliance on, or decisions to be made based upon it, are the responsibility of such third parties. MTE accepts no responsibility for liabilities incurred by or damages, if any, suffered by any third party as a result of decisions made or actions taken, based upon this report. Others with interest in the Site should undertake their own investigations and studies to determine how or if the condition affects them or their plans. It should be recognized that the passage of time might affect the views, conclusions and recommendations (if any) provided in this report because environmental conditions of a property can change. Should additional or new information become available, MTE recommends that it be brought to our attention in order that we may re-assess the contents of this report. All of which is respectively submitted, MTE CONSULTANTS INC. Melanie Chown, B.Sc., EPt Indoor Environments Technologist mchown@mte85.com Gavin Oakes, B.Sc., C.E.T., CIH Project Manager goakes@mte85.com MMC:vxp 2017 ACM Re-Assessment Report MTE File No: St. Luke Catholic Elementary School September 8, 2017
11 APPENDIX A ASBESTOS-CONTAINING MATERIALS SUMMARY
12 Building Information: Notes: Figures: Name: St Luke Friability F - Friable NF - Non Friable Address: 345 Albright Rd, Hamilton, ON, L8K 6N3 Condition Good Fair Poor Buildimg Type: Elementary Original Construction Date: 1974 Addition Construction Date: 2005 Square Footage: 36,737sq ft Database Creation Date: September 11, 2013 Database Revision Date: August 30, 2017 Sample/Identification Summary HM - Homogeneous Material - Homogeneous with Previously Sampled Material SL - Sample Location - Material Sampled VC - Visually Confirmed - Material not Sampled, Deemed Asbestos-Containing ACM Status Non-ACM - Not Asbestos-Containing based on Sampling, Installation Date or Surveyor Knowledge Confirmed ACM - Identified as Asbestos-Containing Based on Sampling Deemed ACM - Material not Sampled, Assumed to Contain Asbestos Recommended Action AMP - Material in Good Condition, Incorporate in Asbestos Management Program Repair/Removal - Material is Damaged, Repair/Remove to Prevent Exposure Figure 1 Functional Space Floor Room Room Description Access Inspected Item Inspected Material Material Description Material Detailed Location Friability Quantity Condition Sample / Identification Summary Sample ID Sample Date % Asbestos & Fibre Type ACM Status Recommended Action General Notes Yes General Exterior Cladding Brick Exterior Non ACM None No General Concrete Block Walls Vermiculite Within Cavity F Deemed ACM AMP Suspected Present, Sample Prior to Disturbance Yes General Doors Caulking Perimeter NF Deemed ACM AMP Sample Prior to Disturbance Yes General Windows Caulking Perimeter NF Deemed ACM AMP Sample Prior to Disturbance No General Roof Roofing Materials Roof Level NF Deemed ACM AMP Sample Prior to Disturbance No General Electrical Wiring Woven Jacketing and Insulation Older Wiring NF Deemed ACM AMP Suspected Present, Sample Prior to Disturbance No General Electical and Switchgear Equipment Transite Components Internal NF Deemed ACM AMP Suspected Present, Sample Prior to Disturbance Classroom 1 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 1 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 1 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 1 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 1 Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 1 Yes Wall Concrete Block - Wall Non ACM None Classroom 1 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Classroom 2 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 2 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 2 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 2 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 2 Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 2 Yes Wall Concrete Block - Wall Non ACM None Classroom 2 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Classroom 3 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 3 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 3 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 3 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 3 Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 3 Yes Wall Concrete Block - Wall Non ACM None Classroom 3 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Classroom 4 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 4 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 4 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 4 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 4 Yes Wall Drywall Drywall Joint Compound Wall Non ACM None 2005 Addition Classroom 4 Yes Wall Concrete Block - Wall Non ACM None Classroom 4 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Classroom 5 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 5 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 5 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 5 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 5 Yes Wall Drywall Drywall Joint Compound Wall Non ACM None 2005 Addition Classroom 5 Yes Wall Concrete Block - Wall Non ACM None Classroom 5 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) MTE File No St. Luke 1/6
13 Functional Space Floor Room Room Description Access Inspected Item Inspected Material Material Description Material Detailed Location Friability Quantity Condition Sample / Identification Summary Sample ID Sample Date % Asbestos & Fibre Type ACM Status Recommended Action General Notes Classroom 7 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 7 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 7 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 7 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 7 Yes Wall Drywall Drywall Joint Compound Wall Non ACM None 2005 Addition Classroom 7 Yes Wall Concrete Block - Wall Non ACM None Classroom 7 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Classroom 9 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 9 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 9 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 9 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 9 Yes Wall Drywall Drywall Joint Compound Wall Non ACM None 2005 Addition Classroom 9 Yes Wall Concrete Block - Wall VC Non ACM None Classroom 9 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good VC Non ACM None Date Stamp (8/12/05) Classroom 11 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 11 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 11 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 11 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 11 Yes Wall Drywall Drywall Joint Compound Wall Non ACM None 2005 Addition Classroom 11 Yes Wall Concrete Block - Wall Non ACM None Classroom 11 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Classroom 12 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 12 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 12 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 12 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 12 Yes Wall Drywall Drywall Joint Compound Wall Non ACM None 2005 Addition Classroom 12 Yes Wall Concrete Block - Wall Non ACM None Classroom 12 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Boiler Room Yes Floor Concrete - Floor Non ACM None Boiler Room Yes Wall Concrete Block - Wall Non ACM None Boiler Room Yes Deck Steel - Ceiling Non ACM None Boiler Room Yes Piping Pipe Insulation Fibreglass Insulation Ceiling Level Non ACM None Classroom 6 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 6 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 6 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 6 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 6 Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 6 Yes Wall Concrete Block - Wall Non ACM None Classroom 6 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Classroom 8 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 8 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 8 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 8 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 8 Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 8 Yes Wall Concrete Block - Wall Non ACM None Classroom 8 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Classroom 10 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 10 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 10 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 10 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 10 Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 10 Yes Wall Concrete Block - Wall Non ACM None Classroom 10 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Classroom 13 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 13 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 13 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 13 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 13 Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 13 Yes Wall Concrete Block - Wall Non ACM None Classroom 13 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Corridor Yes Floor Ceramic Tile - Floor Non ACM None Corridor Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Corridor Yes Wall Concrete Block - Wall Non ACM None Corridor Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) MTE File No St. Luke 2/6
14 Functional Space Floor Room Room Description Access Inspected Item Inspected Material Material Description Material Detailed Location Friability Quantity Condition Sample / Identification Summary Sample ID Sample Date % Asbestos & Fibre Type Library Yes Floor Carpet - Floor Non ACM None Library Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Library Yes Wall Concrete Block - Wall Non ACM None Library Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) ACM Status Recommended Action General Notes Computer Lab No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Computer Lab Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Computer Lab Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Computer Lab Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Computer Lab Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Computer Lab Yes Wall Concrete Block - Wall Non ACM None Computer Lab Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Classroom 14 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 14 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 14 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 14 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 14 Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 14 Yes Wall Concrete Block - Wall Non ACM None Classroom 14 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Corridor Yes Floor Ceramic Tile - Floor Non ACM None Corridor Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Corridor Yes Wall Concrete Block - Wall Non ACM None Corridor Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Classroom 15 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 15 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 15 Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Classroom 15 Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Classroom 15 Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 15 Yes Wall Concrete Block - Wall Non ACM None Classroom 15 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Classroom 16 No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Classroom 16 Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Classroom 16 Yes Wall Concrete Block - Wall Non ACM None Classroom 16 Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Womes Staff Washroom No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Womes Staff Washroom Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Womes Staff Washroom Yes Wall Ceramic Tile - Wall Non ACM None Womes Staff Washroom Yes Wall Concrete Block - Wall Non ACM None Womes Staff Washroom Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Mens Staff Washroom No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Mens Staff Washroom Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Mens Staff Washroom Yes Wall Ceramic Tile - Wall Non ACM None Mens Staff Washroom Yes Wall Concrete Block - Wall Non ACM None Mens Staff Washroom Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Copy Room No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Copy Room Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Copy Room Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Copy Room Yes Wall Concrete Block - Wall Non ACM None Copy Room Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Fench Office No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Fench Office Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Fench Office Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Fench Office Yes Wall Concrete Block - Wall Non ACM None Fench Office Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Storage Closet No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Storage Closet Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Storage Closet Yes Wall Concrete Block - Wall Non ACM None Storage Closet Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Server Room No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Server Room Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Server Room Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Server Room Yes Wall Concrete Block - Wall Non ACM None Server Room Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Storage Closet No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Storage Closet Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Storage Closet Yes Wall Concrete Block - Wall Non ACM None Storage Closet Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) MTE File No St. Luke 3/6
15 Functional Space Floor Room Room Description Access Inspected Item Inspected Material Material Description Material Detailed Location Friability Quantity Condition Sample / Identification Summary Sample ID Sample Date % Asbestos & Fibre Type ACM Status Recommended Action General Notes Staff Room No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Staff Room Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Staff Room Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Staff Room Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Staff Room Yes Wall Concrete Block - Wall Non ACM None Staff Room Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Staff Room Yes Piping Pipe Insulation Fibreglass/PVC Specify Non ACM None Storage Closet No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Storage Closet Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Storage Closet Yes Wall Concrete Block - Wall Non ACM None Storage Closet Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Special Education No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Special Education Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Special Education Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Special Education Yes Wall Concrete Block - Wall Non ACM None Special Education Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Sp Ed. Activity Room No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Sp Ed. Activity Room Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Sp Ed. Activity Room Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Sp Ed. Activity Room Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Sp. Ed. Washroom No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Sp. Ed. Washroom Yes Floor Vinyl Sheet Flooring Grey w Green & Red Flecs Floor NF - Good VC - - Deemed ACM AMP Sample Prior to Disturbance Sp. Ed. Washroom Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Sp. Ed. Washroom Yes Wall Concrete Block - Wall Non ACM None Sp. Ed. Washroom Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Storage No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Storage Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Storage Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Storage Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Storage No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Storage Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Storage Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Storage Yes Ceiling Drywall Drywall Joint Compound Ceiling - - Good VC Deemed ACM AMP Sample Prior to Disturbance Corridor Yes Floor Ceramic Tile - Floor Non ACM None Corridor Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Corridor Yes Wall Concrete Block - Wall Non ACM None Corridor Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Corridor Yes Floor Terrazzo - Floor Non ACM None Corridor Yes Wall Concrete Block - Wall Non ACM None Corridor Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Corridor Yes Ceiling Drywall Drywall Joint Compound Ceiling - - Good VC Deemed ACM AMP Sample Prior to Disturbance 1038 Corridor Yes Floor Terrazzo - Floor Non ACM None Corridor Yes Wall Concrete Block - Wall Non ACM None Corridor Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) 1038 Corridor Yes Ceiling Drywall Drywall Joint Compound Ceiling - - Good VC Deemed ACM AMP Sample Prior to Disturbance Kindergarten No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Kindergarten Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Kindergarten Yes Floor Vinyl Floor Tile 12"x 12" Yellow Floor Non ACM None Installed Post Kindergarten Yes Floor Vinyl Floor Tile 12"x 12" Blue Floor Non ACM None Installed Post Kindergarten Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Kindergarten Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Kindergarten Yes Wall Concrete Block - Wall Non ACM None Kindergarten Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Gymnasium No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Gymnasium Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Gymnasium Yes Wall Concrete Block - Wall Non ACM None Gymnasium Yes Deck Steel - Ceiling Non ACM None Gymnasium Yes Piping Pipe Insulation Fibreglass/PVC Specify Non ACM None Gym Storage No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Gym Storage Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Gym Storage Yes Wall Concrete Block - Wall Non ACM None Gym Storage Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) MTE File No St. Luke 4/6
16 Functional Space Floor Room Room Description Access Inspected Item Inspected Material Material Description Material Detailed Location Friability Quantity Condition Sample / Identification Summary Sample ID Sample Date % Asbestos & Fibre Type 1042/ Girls Washroom Yes Floor Terrazzo - Floor Non ACM None / Girls Washroom Yes Wall Ceramic Tile - Wall Non ACM None / Girls Washroom Yes Wall Concrete Block - Wall Non ACM None / Girls Washroom Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) ACM Status Recommended Action General Notes Girls Changeroom Yes Floor Terrazzo - Floor Non ACM None Girls Changeroom Yes Wall Ceramic Tile - Wall Non ACM None Girls Changeroom Yes Wall Concrete Block - Wall Non ACM None Girls Changeroom Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Supply Room Yes Floor Terrazzo - Floor Non ACM None Supply Room Yes Wall Concrete Block - Wall Non ACM None Supply Room Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Electrical Room No Floor Mastic - Beneath Flooring NF - Good SL S01A-C 24-Jul-13 ND Non ACM AMP Electrical Room Yes Floor Vinyl Floor Tile 9"x 9" White w Grey Fleck Floor NF - Poor SL S01A-C 24-Jul Chrysotile Non ACM AMP Electrical Room Yes Wall Concrete Block - Wall Non ACM None Electrical Room Yes Ceiling Plywood - Ceiling Non ACM None Custodian Storage Yes Floor Terrazzo - Floor Non ACM None Custodian Storage Yes Wall Concrete Block - Wall Non ACM None Custodian Storage Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Custodian Storage Yes Piping Pipe Insulation Fibreglass/PVC Specify Non ACM None Gym Storage No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Gym Storage Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Gym Storage Yes Wall Concrete Block - Wall VC Non ACM None Gym Storage Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good VC Non ACM None Date Stamp (8/12/05) Boys Changeroom Yes Floor Terrazzo - Floor Non ACM None Boys Changeroom Yes Wall Ceramic Tile - Wall Non ACM None Boys Changeroom Yes Wall Concrete Block - Wall Non ACM None Boys Changeroom Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Boys Washroom Yes Floor Terrazzo - Floor Non ACM None Boys Washroom Yes Wall Ceramic Tile - Wall Non ACM None Boys Washroom Yes Wall Concrete Block - Wall Non ACM None Boys Washroom Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Storage Yes Floor Terrazzo - Floor Non ACM None Storage Yes Wall Concrete Block - Wall Non ACM None Storage Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Storage Yes Piping Pipe Insulation Fibreglass/PVC Above Ceiling Non ACM None Literacy Room No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Literacy Room Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Literacy Room Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Literacy Room Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Literacy Room Yes Wall Concrete Block - Wall Non ACM None Literacy Room Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Corridor Yes Floor Terrazzo - Floor Non ACM None Corridor Yes Wall Concrete Block - Wall Non ACM None Corridor Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Corridor Yes Floor Ceramic Tile - Floor Non ACM None Corridor Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Corridor Yes Wall Concrete Block - Wall Non ACM None Corridor Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Foyer Yes Floor Ceramic Tile - Floor Non ACM None Foyer Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Foyer Yes Ceiling Drywall Drywall Joint Compound Ceiling - - Good VC Deemed ACM AMP Sample Prior to Disturbance Principal Office No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Principal Office Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Principal Office Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Principal Office Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Principal Office Yes Wall Concrete Block - Wall Non ACM None Principal Office Yes Wall Drywall Drywall Joint Compound Wall - - Good VC Deemed ACM AMP Sample Prior to Disturbance Principal Office Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) Secretary Office No Floor Mastic - Beneath Flooring NF - Good VC Deemed ACM AMP Sample Prior to Disturbance Secretary Office Yes Floor Vinyl Floor Tile 12"x 12" Beige w Brown Fleck Floor Non ACM None Installed Post Secretary Office Yes Floor Vinyl Floor Tile 12"x 12" Green Floor Non ACM None Installed Post Secretary Office Yes Floor Vinyl Floor Tile 12"x 12" Red Floor Non ACM None Installed Post Secretary Office Yes Wall Concrete Block - Wall Non ACM None Secretary Office Yes Ceiling Ceiling Tile 2' x 4' Short Fissure Random Pinhole (2005 Ceiling - - Good Non ACM None Date Stamp (8/12/05) MTE File No St. Luke 5/6
REASSESSMENT SURVEY OF ASBESTOS - CONTAINING MATERIALS ANNE HATHAWAY DAYCARE CENTRE 103 Bruce Street Stratford, Ontario
REASSESSMENT SURVEY OF ASBESTOS - CONTAINING MATERIALS ANNE HATHAWAY DAYCARE CENTRE 103 Bruce Street Stratford, Ontario June 30 th, 2014 Prepared for: Debbie Kindler - Supervisor 103 Bruce Street Stratford,
More informationASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL
Project #: 13916 ASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland
More informationASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL
Project #: 13916 ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland
More informationPROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY:
PROJECT NO. 1197 REPORT TO CITY OF STRATFORD ON ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY: 1099 KINGSTON ROAD, SUITE 260 PICKERING, ONTARIO L1V 1B5 Tel: (416) 410-4333
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2286
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationAsbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22
Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationAsbestos Assessment East Facilities Services 97 Railside Road, Toronto, Ontario
Asbestos Assessment East Facilities Services 97 Railside Road, Toronto, Ontario Prepared for: Toronto Catholic District School Board 80 Sheppard Avenue East Toronto, Ontario, M2N 6E8 Attention: Kathleen
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationAsbestos Inventory and Condition Assessment
Prepared for: School District 85 - Vancouver Island North PO Box 9 Port Hardy, British Columbia VN 2P Asbestos Inventory and Condition Assessment NWest Project Number: 315 V.1. Prepared by: 21-415 Gorge
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2724
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationASBESTOS ASSESSMENT Science Building Memorial University of Newfoundland St. John s, NL
Project #: 14610 ASBESTOS ASSESSMENT Science Building Memorial University of Newfoundland St. John s, NL Prepared for: Tina Giles-Murphy Director, Department of Health and Safety Memorial University of
More informationAsbestos Inventory and Condition Assessment
Prepared for: School District 85 - Vancouver Island North PO Box 90 Port Hardy, British Columbia V0N 2P0 Asbestos Inventory and Condition Assessment NWest Project Number: 30639 V.1.0 Prepared by: 201-415
More informationASBESTOS MANAGEMENT PLAN PROCEDURE
ADMINISTRATIVE PROCEDURE Approval Date January 2011 Review Date 2016 Contact Person/Department Superintendent of Business Replacing All Previous Procedures Page 1 of 6 Identification BU-3565 ASBESTOS MANAGEMENT
More informationAsbestos Management Program
Oct. 10/06 Oct 10/06 1/13 Table of Contents 1 INTRODUCTION...2 2 PURPOSE...2 3 SCOPE...2 4 ROLES & RESPONSIBILITIES...2 5 INVENTORY...6 6 ACCESS CONTROL...6 7 INSPECTION...6 8 CLASSIFICATIONS OF ASBESTOS
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationFINAL REPORT. Asbestos-Containing Building Material Assessment
FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board St. Maurice Catholic School, 45 Kingsview Boulevard Etobicoke, Ontario PROJECT NO. 1025760 PROJECT NO.
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2059
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationKelly Brown, Asbestos Group, Environmental Health and Safety, W-140 Boynton H.S. 410 Church Street S.E., Minneapolis, MN 55455
June 29, 2007 REPORT: Full Building Survey TO: FROM: Keith Passow, Manager Facilities Management Zone 6, 16 Architecture Building Fay Thompson, Department of Environmental Health and Safety, Director Tim
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationASBESTOS INSPECTION REPORT 3801 HARNEY STREET OMAHA, NEBRASKA 68132
ASBESTOS INSPECTION REPORT 3801 HARNEY STREET OMAHA, NEBRASKA 68132 Prepared For: Women s Center for Advancement 222 South 29 th Street Omaha, Nebraska 68131 June 20, 2016 Prepared By: New Horizons Enterprises,
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationETERNAL MEMORIALS ASBESTOS SURVEY REPORT
ETERNAL MEMORIALS ASBESTOS SURVEY REPORT February 2014 Prepared For: City of Saskatoon Infrastructure Services Department 1101 Avenue P North, Saskatoon SK, Canada S7L 7K6 Attn: Brent Anderson Prepared
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2270
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2059
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationAsbestos Inventory Survey of James Anderson Learning Centre, Avenue, Langley (Formerly Langley Fundamental Middle School)
October 31, 2016 200753 AIS R1 James Anderson Learning Centre School District #35 (Langley) 20260 64 th Avenue Langley, BC V2Y 1N3 E mail: Attention: Reference: KWagner@sd35.bc.ca Karen Wagner Asbestos
More informationASSESSMENT OF ASBESTOS-CONTAINING BUILDING MATERIALS
ASSESSMENT OF ASBESTOS-CONTAINING BUILDING MATERIALS KERR HALL NORTH KHN 113A LABORATORY RENOVATION PROJECT RYERSON UNIVERSITY 350 VICTORIA STREET, 2 ND FLOOR TORONTO, ONTARIO M5B 2K3 Prepared for: Mr.
More informationMichigan State University
Michigan State University ASBESTOS BUILDING INSPECTION REPORT Botany Field Lab (Plant Pathology) Building Number 452 Inspection conducted by Zach Hansmann Office of Environmental Health and Safety 150
More informationCosmo Senior Center Asbestos Survey Report
Cosmo Senior Center Asbestos Survey Report February 2015 Prepared For: City of Saskatoon Infrastructure Services - Facilities Branch 3130 Laurier Drive, Saskatoon, SK. Attn: Brent Anderson Prepared By:
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2080
More informationMICHIGAN STATE UNIVERSITY
ASBESTOS SURVEY REPORT MICHIGAN STATE UNIVERSITY CENTER FOR INTEGRATIVE PLANT SYSTEMS EAST LANSING, MICHIGAN Prepared By: TEK Environmental & Consulting Services, Inc. 9670 Chilson Commons Circle Suite
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationFINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board
FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board St. Jerome Catholic School, 111 Sharpecroft Blvd. Toronto, Ontario PROJECT NO. 1025760 PROJECT NO. 1025760
More informationLimited Asbestos Demolition Survey
Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600
More informationTim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall
July 3, 2007 REPORT: Full Building Survey TO: Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall FROM: Bryan
More informationFINAL REPORT. Asbestos-Containing Building Material Assessment
FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board Nativity of Our Lord Catholic School 35 Saffron Crescent Etobicoke, Ontario PROJECT NO. 1025760 PROJECT
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationFINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board
FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board Corpus Christi Catholic School 4 Edgewood Avenue Toronto, Ontario PROJECT NO. 05760 PROJECT NO. 05760
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationAsbestos Inventory and Condition Assessment
Prepared for: School District 85 - Vancouver Island North PO Box 9 Port Hardy, British Columbia VN 2P Asbestos Inventory and Condition Assessment NWest Project Number: 314 V.1. Prepared by: 21-415 Gorge
More informationCITY OF SASKATOON SURVEYOR S BUILDING ASBESTOS SURVEY REPORT
CITY OF SASKATOON SURVEYOR S BUILDING ASBESTOS SURVEY REPORT MAY 2013 Prepared For: City of Saskatoon Infrastructure Services Department 1101 Avenue P North, Saskatoon SK, Canada S7L 7K6 Attn: Brent Anderson
More informationLearn Charter School Excel Campus
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2490
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-3553
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2268
More informationChicago Public Schools 6 Month Asbestos Surveillance Fall
Chicago Public Schools 6 Month Surveillance 2017 - Fall School: Erie Elementary Charter School Oracle Unit: 66331 Building ID: 7510 Address: 1405 N. Washtenaw Region: 02 Mail Room: 35 Surveyor: McCormick,
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2497
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationFINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board
FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board St. Sebastian Catholic School 717 Brock Avenue Toronto, Ontario PROJECT NO. 1025760 PROJECT NO. 1025760
More informationFINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board
FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board Santa Maria Catholic School, 25 Avon Avenue Toronto, Ontario PROJECT NO. 1025760 PROJECT NO. 1025760
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationTRANSIT REPAIR TERMINAL NORTH BUILDING ASBESTOS SURVEY REPORT
TRANSIT REPAIR TERMINAL NORTH BUILDING ASBESTOS SURVEY REPORT April 2014 Prepared For: City of Saskatoon Infrastructure Services Department 1101 Avenue P North, Saskatoon SK, Canada S7L 7K6 Attn: Brent
More informationREAL ESTATE & FACILITIES MANAGEMENT Facilities Planning & Development
REAL ESTATE & FACILITIES MANAGEMENT Facilities Planning & Development Hazardous Materials Survey of 1710 East Kent Ave, Vancouver, BC Sampling Date: 2017-02-24 and 2017-03-10 Address: 1710 East Kent Ave,
More informationAsbestos Management Plan
Asbestos Management Plan Purpose: In accordance with the Work Place Health and Safety regulations this Asbestos Management Plan must remain available on site at all times Building address 775 Kingsford
More informationNoble Street Charter - UIC College Prep
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationTRANSIT STORAGE & ADMINISTRATION BUILDING ASBESTOS SURVEY REPORT
TRANSIT STORAGE & ADMINISTRATION BUILDING ASBESTOS SURVEY REPORT April 2014 Prepared For: City of Saskatoon Infrastructure Services Department 1101 Avenue P North, Saskatoon SK, Canada S7L 7K6 Attn: Brent
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationGreystone Heights Park Aquatic Rec-Unit Asbestos Survey Report
Greystone Heights Park Aquatic Rec-Unit Asbestos Survey Report October 2016 Prepared For: City of Saskatoon 1101 Avenue P North Saskatoon, SK S7L 7K6 Attn: Hazel Fernandez Prepared by: Bersch & Associates
More informationCity of Saskatoon #9 450 Ontario Avenue Asbestos Survey Report
City of Saskatoon #9 450 Ontario Avenue Asbestos Survey Report April 2016 Prepared For: City of Saskatoon Support Services 222 3 rd Avenue North, Saskatoon, SK. S7K 0J5 Attn: Lana Dodds Prepared By: Bersch
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-0043
More informationFINAL Asbestos Management Program University of Windsor 401 Sunset Avenue, Windsor, Ontario
FINAL Asbestos Management Program University of Windsor 401 Sunset Avenue, Windsor, Ontario Prepared for: University of Windsor 401 Sunset Avenue Windsor, Ontario, N9B 3P4 Attn: Danny A. Castellan, P.Eng.
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2168
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationAsbestos Inventory Survey of Glenwood Elementary, Avenue, Langley, BC
October 25, 2016 200753 AIS R1 Glenwood Elementary School District #35 (Langley) 20260 64 th Avenue Langley, BC V2Y 1N3 E mail: Attention: Reference: KWagner@sd35.bc.ca Karen Wagner Asbestos Inventory
More informationLIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for
LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Physical Plant Division Engineering and Architectural Services Department
More informationRowan University Asbestos Management Program
Rowan University Asbestos Management Program Table of Contents I. Introduction II. Regulatory Compliance III. Department Responsibilities for Asbestos A. EHS (Safety Specialist Staff) B. EHS (Asbestos
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationMcMaster University Asbestos Awareness Environmental & Occupational Health Support Services Gilmour Hall Room 304
The Campaign for McMaster University The Campaign for McMaster University McMaster University Asbestos Awareness Environmental & Occupational Health Support Services Gilmour Hall Room 304 The Campaign
More informationASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY:
ASBESTOS SURVEY Old Detective s Building Wadesboro, NC PREPARED FOR: Alex Sewell Town Manager Town of Wadesboro 124 E. Wade Street Wadesboro, NC Date of Inspection September 28, 2016 Date of Report October
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2121
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationChicago Public Schools 6 Month Asbestos Surveillance Fall
Chicago Public Schools 6 Month Surveillance 2017 - Fall School: South Loop Elementary School Oracle Unit: 23751 Building ID: 3961 Address: 1915 South Federal Street Region: 03 Mail Room: 38 Surveyor: Bulvan,
More informationHazardous Building Materials Assessment St. Louis Elementary School 75 Allen Street Waterloo, Ontario
St. Louis Elementary School 75 Allen Street Waterloo, Ontario Prepared for: City of Waterloo 500 Parkside Drive Waterloo, Ontario Attention: Jean Starchuk 79146 October 31, 2012 Pinchin Environmental Ltd.
More informationExplain in writing if the address of the building is different than the address on this form:
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON
ASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON May 23, 2007 Prepared for: Mr. Ron Smith GSA 400-15 th Street SW
More informationCHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos?
CHAPTER 34 ASBESTOS 34 ASBESTOS This chapter provides some brief information about asbestos in construction. If you encounter asbestos on the job, you will need more information. Here are the two main
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-381X
More information