REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

Size: px
Start display at page:

Download "REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON."

Transcription

1 REQUEST FOR TENDER - SERVICES 1. PURPOSE AND SCOPE This specification is intended to govern the supply of all labour, materials and equipment for the dismantling, demolition of a single dwelling on the property known as 7958 Beaverdams Road, Niagara Falls, Ontario. It is further intended that this specification will provide for the removal of all waste debris on site, all debris resulting from the demolition or removal, leaving the site in graded, leveled condition, free of hazards all in accordance with the following specifications and all requirements as stated in the Request for Tender (RFT). Should a bidder submit an alternate method than what is proposed, the City reserves the right to evaluate it on any means it feels is justified and will accept or reject the bid based on the findings of their review. 2. PRE-BID SITE MEETING A pre-bid site meeting is scheduled for August 9th, 2016 at 1:00 p.m. local time at 7958 Beaverdams Road, Niagara Falls, Ontario. Site contact is Mr. Geoff Holman, Project Manager, City of Niagara Falls. The pre-bid site meeting is mandatory if bidders are not able to attend they will not be able to bid on this Tender. Contact Information: Geoff Holman, C.E.T. Director of Municipal Works Project Manager Ext gholman@niagarafalls.ca Page 1 of 7

2 3. UTILITIES The City has arranged for all utilities (gas, hydro, telephone) to be disconnected. Before commencing any work on the property, the Contractor shall confirm that all utility services (gas, hydro, telephone) have been shut off. The Contractor shall sever all sewer laterals and water services and properly cap same at the nearest point to the property line. The end of these services shall be marked with a wooden 2x4 painted blue for water and green for sewer. The 2x4 shall be located at the cap and extend 600 mm above the ground surface. The City shall be called for an inspection prior to backfilling any of the capped services. City staff will mark the location of the live sewer lateral prior to the demolition. 4. PRE-CONDITION SURVEY If the property owner gives consent, the Contractor shall complete a pre-condition survey of 5600 Montrose Road prior to starting the demolition. 5. TEMPORARY WORK STOPPAGE The City will notify the contractor of any funeral services that will be in the immediate area of the demolition. The Contractor will be required to stop work for the duration of the funeral service. Permits a) The Contractor shall, at the Contractor s expense obtain all necessary permits, pay all fees and charges and comply with all building, fire and health and safety rules and regulations applicable to the demolition of buildings and the preservation of public health and safety. b) The Contractor shall also comply with all other applicable Provincial Laws and Regulations pertaining to demolition and disposal and transportation of waste material to and from the site. c) The City of Niagara Falls will apply for the Demolition Permit for the site and provide it to the successful Contractor. d) A notice of Project shall be submitted by the Contractor to the Ministry of Labour. Forms for this purpose can be obtained from their local office. e) The Contractor shall obtain, or be in the possession of, a Certificate of Approval to haul waste and shall submit a copy of this certificate to the City prior to commencement of any demolition work. Page 2 of 7

3 f) The manner in which demolition is carried out will be governed by the requirements of the Occupational Health and Safety Act and the Environmental Protection Act and Regulations there under, current at the time of demolition and in addition to the Building Code Act, and all amendments therein, and any other applicable law together with the additional requirements by the City of Niagara Falls as contained herein. (See City Requirements). It is noted that the Occupational Health and Safety Act, amended, and Regulations thereunder, where applicable, will govern the execution of this project. g) For complete information, reference should be made to the Regulations, a copy of which will be made available to the Contractor upon request to the Health and Safety Administrator at City Hall. h) No demolition or dismantling of any part of the structure shall commence until the Demolition Permit has been issued by the City of Niagara Falls, the City has obtained the completed insurance forms and contractor safety checklist and all remediation works have been completed and authorization has been given from the City to proceed with demolition. 6. PUBLIC WAY PROTECTION AND FENCING a) All boundaries shall be fenced to the satisfaction of the City and as required by the appropriate Provincial requirements, to ensure that the entire site is protected against unauthorized entry. b) No work shall be permitted on the demolition project until the above measures are in place. The contractor will be responsible for the safety and security of the site for the duration of the project. 7. TRAFFIC CONTROL, PUBLIC SAFETY AND SECURITY a) For all work, the Contractor must provide traffic and pedestrian control in accordance with Book 7, latest edition, of the Ontario Traffic Manual. When required by the City of Niagara Falls, daily traffic plans are to be prepared by a qualified person and kept on the work site at all times. The Contractor will be required to submit documentation that all person assigned to traffic control have completed the required training per Book 7 as identified above. b) The Contractor shall ensure that all measure are taken to protect the public at all times including hoarding and other safety barriers per the applicable regulations as stated in this RFQ. c) The work shall be fully supervised and controlled to create as little disruption, dust and noise as possible consistent with the Contractor s stated dust abatement policy and the applicable City of Niagara Falls bylaws related to noise and public disturbances. The supervision will be the responsibility of the Contractor. Page 3 of 7

4 8. DISPOSAL OF MATERIALS a) Debris resulting from the demolition shall be removed from the site expeditiously and shall be dumped at an approved landfill site in accordance with Municipal Policy. The Contractor shall RECYCLE as many materials as possible. b) Any alternate location or other form of disposal shall be in accordance with the Ministry of Environment Guidelines, the Environmental Protection Act and the regulation thereunder. c) Salvage or materials from the demolition either within or outside the area shall not be sold at or near the demolition site. The general public shall be prohibited from accessing any part of the demolition area. 9. REMEDIATION OF HAZARDOUS MATERIALS The City of Niagara Falls has completed A Phase 1 Environmental Site Assessment of the subject property. The results are contained in the report prepared by Oakhill Environmental Inc. for Ontario Environmental & Safety Network Ltd. found in Appendix D. All hazardous materials are to be removed from the house and property as per the Designated Substances and Hazardous Materials Abatement Specification and Project Design prepared by Ontario Environmental & Safety Network Ltd in Appendix E. The demolition of any structures is not to begin without authorization from the City of Niagara Falls. Should the contractor find any additional hazardous materials on site, they shall notify the Project Manager immediately. All work shall stop until the material can be properly tested and a safe remediation plan put in place. 10. SAFE DRINKING WATER ACT The Safe Drinking Water Act, 2002 (SDWA) requires Owners and Operating Authorities of drinking water systems to have an accredited Operating Authority. In order to become accredited, an Operating Authority must establish and maintain a Drinking Water Quality Management System (DWQMS). Bidders shall make themselves aware of the SDWA and DWQMS in place. If requested by the owner of the drinking water system, bidders shall participate in relevant awareness/information sessions either before or after closing of the tenders (see Appendices F & G). The successful bidder and its sub-contractors working on a drinking water system shall comply with all applicable regulations under the SDWA and also meet all the requirements of the DWQMS. Page 4 of 7

5 11. ACCESSIBILITY REGULATIONS FOR CONTRACTED SERVICES Contracted employees, third party employees, agents and others that provide customer service on behalf of Owner are legally responsible to be in compliance with the provisions outlined in Section 6 of the Ontario Regulation 429/07 with respect to training under the Customer Service Standard of the Accessibility for Ontarians with Disabilities Act (2005). The Contractor shall ensure that such training includes, without limitation, a review of the purposes of the Act and the requirements of the Regulation, as well as instructions regarding all matters set out in Section 6 of the Regulation. By signing Statement C the bidder has agreed to be in full compliance with this regulation. The successful bidder will be expected to complete the confirmation form and submit the same at the Preconstruction Review Meeting. A City of Niagara Falls training pamphlet has been included in Appendix H. Contractors shall be responsible for notifying the general public when planning/implementing a disruption to any transportation walkway, pathway, driveway, roadway, etc. It shall be the Contractor s responsibility to notify the general public of any disruption to regular service; 24 hours prior to the commencement of the disruption. In the case where construction activities will cause a disruption to normal service, appropriate signage shall be installed. At the Owner s request, information relating to the disruption shall be supplied to allow for the posting of disruption notices on the Owner s web page of choice. The posted signage shall as a minimum include the headings listed below and shall be filled out by the Contractor and installed in advance of the service disruption. 12. CITY REQUIREMENTS The Contractor will be required to perform the following works, to be undertaken and completed on or before November 1, 2016, which shall form part of the demolition procedure: The footings, weeping tile and foundation walls shall be completely removed from the house and garage. The basement floor shall be broken and completely removed prior to backfilling along with any granular material and shall be inspected by the City prior to backfilling. All building materials and debris including sidewalks, patios, driveways, curbs are to be completely removed from site. The following items are to be removed and disposed of in accordance with all applicable regulations (See Appendix I for photos). All concrete stairs and landings outside the house are to be removed. The concrete front porch, stairs and walkway are to be removed. All concrete rubble on site is to be removed. All wood debris is to be removed. Various tree stumps and brush is to be removed. Page 5 of 7

6 The tent trailer is to be removed from the site. The brick barbecue is to be removed from site. The deck footings are to be removed from site. Miscellaneous debris bricks, light poles, metal sheets etc shall be removed from site. All property line fences are to remain in place. All water services and Sewer lines shall be capped at the property line and the location marked with a 2x4 painted blue for water and green for sewer. The existing berm around the house is to be removed and used to fill in the excavation left from the basement. Any fill material used to backfill the excavation shall be compacted in 300mm lifts. The City reserves the right to perform any compaction testing deemed necessary. TCLIP testing has been performed and the results are provided in Appendix J. All asphalt, granular and curbs from the existing driveway are to be excavated and removed from site. The Contractor shall include in their unit price bid the allowance for one full day of excavation and the removal of five (5) loads of material from site to the Walkers hazardous material disposal facility. A representative from Oakhill Environmental Inc. will be on site to direct the Contractor and take soil samples. All required TCLIP testing will be provided by Oakhill Environmental Inc. 13. BACKFILL AND SURFACE MATERIALS a) The Contractor is encouraged to recycle as many materials as possible from the demolition. b) The Contractor is to supply clean fill material (soil) at no Additional cost to the contract. The Contractor must submit all soil testing results to the City before any material can be brought on site. c) All costs associated with the loading, transportation, placement and compaction of backfill material shall be included in the price bid. d) The finished site extending over the area of the demolished buildings shall be topped with 100mm of topsoil supplied by the Contractor and graded so that the surface drainage does not result in ponding or adversely affecting adjacent properties. Page 6 of 7

7 14. MISCELLANEOUS REQUIREMENTS a) The Contractor shall not burn any trash or debris on the demolition site. b) The Contractor shall not subcontract the work or any part thereof without the consent in writing by the Project Manager. c) The Contractor shall ensure the roads and sidewalks are kept clean at all times. d) The Contractor shall not obstruct or deposit any material on the Road allowance without first obtaining permission from the City of Niagara Falls and Niagara Region. e) The adjoining properties shall be protected in an adequate manner. No access over these properties will be permitted without first obtaining the City s and affected property owners consent. f) The hours of work shall be 7:00 AM to 6:00 PM Monday to Friday. Weekend work will only be permitted with the permission of the City and/or Niagara Region. Page 7 of 7

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE GENERAL Final restoration of areas within the public right-of-way associated with Street Excavation Permits shall be completed as determined

More information

DEMOLITION TRADE SPECIFICATION

DEMOLITION TRADE SPECIFICATION DEMOLITION TRADE SPECIFICATION GENERAL a) BDW Trading Limited Barratt Homes and David Wilson Homes are all trading names of BDW Trading Limited the Company. b) Site Condition The Contractor is to examine

More information

Demolition Permit Application

Demolition Permit Application Demolition Permit Application 2012 Michigan Building Code 2015 Michigan Residential Code City of Jackson 161 W. Michigan Avenue Jackson, MI 49201 (517) 788-4012 www.cityofjackson.org Project Information

More information

REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST

REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST MENDON, VT 05701 TOWN OF MENDON, VERMONT August, 2018 1 1. SUMMARY AND BACKGROUND The Town of Mendon s original Town

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 024116 - STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE

BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE BIDS DUE: December 22 nd 2016 @ 2:00 P.M. Belleville City Hall City Hall 1819

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission:

Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission: Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission: Copy of Alberta Government s New Home Registration

More information

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements RFP 2019-01 Reeta s Building Demolition City of Morgantown REQUEST FOR PROPOSALS Demolition Contractors INTRODUCTION A. Overview This Request for Proposals ( RFP ) is being issued by the City of Morgantown

More information

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment Ministry of the Environment Soil Management A Guide for Best Management Practices The Ministry of the Environment (ministry) encourages the beneficial reuse of excess soils in a manner promoting sustainability

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St.

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. 531 N. Nash Street Hortonville, WI 54944-0099 Phone: 920-779-6011 Fax: 920-779-6552 www.hortonvillewi.org REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. Date Issued: February 5, 2016 Date Due: March

More information

Table of Contents. Section 10,010 - Demolition of Building Structures Section Includes Description of Work 1. 1.

Table of Contents. Section 10,010 - Demolition of Building Structures Section Includes Description of Work 1. 1. Table of Contents Page No. Part 1 - General 1.01 Section Includes 1 1.02 Description of Work 1 1.03 Submittals 1 1.04 Substitutions 1 1.05 Delivery, Storage, and Handling 1 1.06 Scheduling and Conflicts

More information

de-construction of Old City Hall

de-construction of Old City Hall de-construction of Old City Hall for the CITY OF GREEN COVE SPRINGS, FL 229 Walnut Street Green Cove Springs, Florida LOCATION MAP Sheet List Table T-1 COVER SHEET TEMPORARY FENCE PLAN LEGEND: GRAPHIC

More information

INVITATION FOR DEMOLITION BIDS IFB- CRA (DEMO of Structures, Asbestos Removal and Lot Clearing of 1.5 Acre Property)

INVITATION FOR DEMOLITION BIDS IFB- CRA (DEMO of Structures, Asbestos Removal and Lot Clearing of 1.5 Acre Property) INVITATION FOR DEMOLITION BIDS IFB- CRA 03-17-18 (DEMO of Structures, Asbestos Removal and Lot Clearing of 1.5 Acre Property) The Lake Worth CRA, is seeking bids/quotes for the complete demolition of the

More information

Management Plan: Hazardous Materials Removal & Demolition

Management Plan: Hazardous Materials Removal & Demolition Management Plan: Hazardous Materials Removal & Demolition Kingswood School (Upper Site), Corby 1.0 Introduction 1.1 Background Lambert Smith Hampton has been instructed by Northamptonshire County Council

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

Appendix 3. POLICY & PROCEDURE No

Appendix 3. POLICY & PROCEDURE No DEPARTMENT OF PUBLIC WORKS DIVISION: ENGINEERING SERVICES SECTION: ADMINISTRATIVE PAGE NO: 1 OF 10 REVISION NO: 3 DATE: 1995 05 01 ESTABLISHED: 1986 03 03 Appendix 3 POLICY & PROCEDURE No. 2.3.1-020 TITLE:

More information

DEMOLITION BID. BID OPENING November 20, 2018, 8:00pm. Village of Germantown 306 Prairie St. Germantown, IL 62245

DEMOLITION BID. BID OPENING November 20, 2018, 8:00pm. Village of Germantown 306 Prairie St. Germantown, IL 62245 DEMOLITION BID BID OPENING November 20, 2018, 8:00pm Village of Germantown 306 Prairie St. Germantown, IL 62245 Important Bids will not be reviewed without the following information fully completed and

More information

ASPEN LAKES DEVELOPMENT CORP.

ASPEN LAKES DEVELOPMENT CORP. DEVELOPMENT CORP. (hereinafter called the "Developer") DEVELOPMENT GUIDELINES A OBJECTIVES 1) Creation of a rural community atmosphere. 2) Thoughtful home designs with enhanced landscaping. 3) Professional

More information

CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS

CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 610 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS TABLE OF CONTENTS 610.01 SCOPE 610.02 REFERENCES 610.03

More information

Application for a Residential Building Permit

Application for a Residential Building Permit Town of Chevy Chase 301-654-7144 (phone) 4301 Willow Lane 301-718-9631 (fax) Chevy Chase, MD 20815 townoffice@townofchevychase.org Town Permit No.: Application for a Residential Building Permit Please

More information

Complying Development

Complying Development Complying Development Development Control Plan PART 1 - INTRODUCTION PREAMBLE This Development Control Plan (DCP) applies to complying development on lands zoned: For Residential Development: Residential

More information

KABA DEMOLITION INFORMATION PACKET

KABA DEMOLITION INFORMATION PACKET I. Demolition Process Checklist Structures Requiring No Permit Residential Structures 200 Square Feet or Less Commercial Structures 120 Square Feet or Less Structures Requiring No Bond 1 and 2 Family Residential

More information

The Corporation of The City of London

The Corporation of The City of London The Corporation of The City of London Legislative Health and Safety Requirements The following is a health and safety guide for those providing a tender to assist in determining legislative health and

More information

STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF COASTAL ENGINEERING

STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF COASTAL ENGINEERING INDEX OF DRAWINGS SHEET NO. DESCRIPTION 1 TITLE SHEET AND LOCATION PLAN 2 GENERAL NOTES AND SITE ACCESS AND STAGING AREA LAYOUT 3 EXISTING CONDITIONS AND DEMOLITION PLAN 4 CONSTRUCTION PLAN AND PROFILE

More information

TOWN OF ECKVILLE BYLAW 638/02 BUILDING PERMIT BYLAW

TOWN OF ECKVILLE BYLAW 638/02 BUILDING PERMIT BYLAW TOWN OF ECKVILLE BYLAW 638/02 BUILDING PERMIT BYLAW A BYLAW OF THE TOWN OF ECKVILLE OR REGULATING THE FORM, CONTENT, AND COST OF PERMITS FOR THE USE, RELOCATION, CONSTRUCTION, AND DEMOLOTION OF BUILDINGS.

More information

Demolition Information Packet

Demolition Information Packet Table of Contents I. Demolition Process Checklist II. III. IV. Approval for Demolition Demolition Permit Utility Disconnections V. Other Important Issues Asbestos and Lead VI. VII. Demolition Standards,

More information

NC STATE SURPLUS PROPERTY AGENCY BID CONTRACT. Bid # D03211 Bid Opening: 1:00PM Location: East Carolina University

NC STATE SURPLUS PROPERTY AGENCY BID CONTRACT. Bid # D03211 Bid Opening: 1:00PM Location: East Carolina University Bids will be publicly opened at the NC State Surplus Property Agency (SSPA) at the time and date specified. By signature, I certify that all bidder information is accurate and I agree to the Instructions,

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

HOW TO OBTAIN A BUILDING PERMIT

HOW TO OBTAIN A BUILDING PERMIT HOW TO OBTAIN A BUILDING PERMIT A GUIDE TO THE HOMEOWNER Copies of this Guide can be obtained from the Building Department upon request THE CORPORATION OF THE TOWNSHIP OF GEORGIAN BAY BUILDING DEPARTMENT

More information

Tree Protection Policy

Tree Protection Policy Appendix F Tree Protection Policy The following is according to the City of Hamilton s special provision SP-97. General Tree Protection shall be in accordance with OPSS 801 as amended by this special provision.

More information

COUNTY OF SUTTER ENCROACHMENT PERMIT

COUNTY OF SUTTER ENCROACHMENT PERMIT COUNTY OF SUTTER ENCROACHMENT PERMIT PERMIT No. Development Services Dept. Engineering Division 1130 Civic Center Blvd Yuba City, CA 95993 (530) 822-7400 Hours: 8 AM - 5 PM Upon completion, submit application

More information

INVITATION TO BID. Prospective bidders are encouraged to conduct a pre-bid site visit to aid in their bidding assessments.

INVITATION TO BID. Prospective bidders are encouraged to conduct a pre-bid site visit to aid in their bidding assessments. February 12, 2014 INVITATION TO BID The City of Coffeyville, Kansas, is accepting sealed bids for the demolition and removal of certain structures located within the City. The proposed work will be on

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

CONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the

CONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the CONTRACT AGREEMENT This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the "City") and Contractor as of the date the last party to this Contract Agreement signed below. W I T N E

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

The Regional Municipality of Peel Basis of Payment

The Regional Municipality of Peel Basis of Payment Page PS-1 THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR SANITARY SEWER CONSTRUCTION Page PS-2 INDEX Page No. PS.1. EXCAVATION...4 1.1. Trench Excavation...4 1.2. Asphalt/Concrete Removal...5 PS.2.

More information

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW Chapter 8 Building and Building Regulations, Article XIII Grading and Drainage and Article XV Soil Erosion and Sedimentation

More information

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested. Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure

More information

NEW CONSTRUCTION APPLICATION

NEW CONSTRUCTION APPLICATION NEW CONSTRUCTION APPLICATION CONSTRUCTION COMMITMENT AND CONTRACTOR GUIDELINES The General Contractor is solely responsible for the compliance of these guidelines by all subcontractors, suppliers, and

More information

DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS RADIANT LAKE ESTATES SUPPLEMENTAL ARCHITECTURAL GUIDELINES ARTICLE I INTRODUCTION AND POLICY

DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS RADIANT LAKE ESTATES SUPPLEMENTAL ARCHITECTURAL GUIDELINES ARTICLE I INTRODUCTION AND POLICY DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS RADIANT LAKE ESTATES SUPPLEMENTAL ARCHITECTURAL GUIDELINES ARTICLE I INTRODUCTION AND POLICY SECTION 1.1. Pursuant to the Declaration of Covenants,

More information

REQUEST FOR PROPOSAL Excavation / Site Services. Hamilton International Air Cargo Logistics Facility

REQUEST FOR PROPOSAL Excavation / Site Services. Hamilton International Air Cargo Logistics Facility REQUEST FOR PROPOSAL Excavation / Site Services Hamilton International Air Cargo Logistics Facility CLIENT: TradePort International Corporation, Operators of John C. Munro Hamilton International Airport

More information

CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C212 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C212 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL... 2 C212.01

More information

DEMOLITION OF BUILDING STRUCTURES. C. Protection of Public and Private Utilities

DEMOLITION OF BUILDING STRUCTURES. C. Protection of Public and Private Utilities DEMOLITION OF BUILDING STRUCTURES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Demolition of Building Structures B. Site Backfill, Grading, and Clean-Up C. Protection of Public and Private Utilities D. Soil

More information

Citizens Guide to Residential Building Permits

Citizens Guide to Residential Building Permits 1582 Kronenwetter Drive, Kronenwetter, WI 54455 - Phone: (715) 693-4200 - Fax: (715) 693-4202 - www.kronenwetter.org Citizens Guide to Residential Building Permits Why is a building permit required? The

More information

Corporate Policy and Procedure

Corporate Policy and Procedure Corporate Policy and Procedure POLICY CATEGORY AUTHORITY RELATED POLICIES APPROVED BY Safety Management When Outside Contractors are Retained (Contractor Safety Management Program) (the Policy ) Health

More information

DIVISION 02 SELECTIVE DEMOLITION

DIVISION 02 SELECTIVE DEMOLITION DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.

More information

LOT GRADING GUIDELINES

LOT GRADING GUIDELINES LOT GRADING GUIDELINES RESIDENTIAL PROPERTIES The Drainage Bylaw 16200 came into effect on June 1, 2013 replacing previous versions of the Surface Drainage Bylaw 11501. This Bylaw requires that all single

More information

Section Safety Section Cleanup. None Required

Section Safety Section Cleanup. None Required January 2000 Page 1 of 6 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED SECTIONS PART 2 PRODUCTS The General Conditions of the Contract, General Requirements, and Supplemental

More information

DURHAM DISTRICT SCHOOL BOARD. Property Report Former Grandview Public School Demolition Update

DURHAM DISTRICT SCHOOL BOARD. Property Report Former Grandview Public School Demolition Update DURHAM DISTRICT SCHOOL BOARD ADMINISTRATIVE REPORT REPORT TO: Standing Committee DATE: February 2, 2015 SUBJECT: Property Report Former Grandview Public School Demolition Update PAGE NO. 1 of 3 ORIGIN:

More information

Building Demolition - 46 Main St. (St. Andrews United Church)

Building Demolition - 46 Main St. (St. Andrews United Church) Request for Proposals Building Demolition - 46 Main St. (St. Andrews United Church) Stewiacke, N.S. Building Demolition Stew2018-06 1. INTRODUCTION: The Town of Stewiacke is inviting interested and qualified

More information

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL o PUBLIC WORKS DEPARTMENT PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL CIVIL ENGINEERING AND ARCHITECTURE 1. Offsite Improvements - Civil Engineering drawings may be required to show the following: Replacement

More information

REQUEST FOR PROPOSAL (RFP) June 2, 2016 DEMOLITION AND SITE STABILIZATION OF FLOOD-DAMAGED RESIDENTIAL PROPERTY. TOWN OF Windsor, Vermont

REQUEST FOR PROPOSAL (RFP) June 2, 2016 DEMOLITION AND SITE STABILIZATION OF FLOOD-DAMAGED RESIDENTIAL PROPERTY. TOWN OF Windsor, Vermont REQUEST FOR PROPOSAL (RFP) June 2, 2016 DEMOLITION AND SITE STABILIZATION OF FLOOD-DAMAGED RESIDENTIAL PROPERTY TOWN OF Windsor, Vermont 1. SUMMARY AND BACKGROUND The Town of Windsor is participating in

More information

LOT GRADING GUIDELINES

LOT GRADING GUIDELINES LOT GRADING GUIDELINES RESIDENTIAL PROPERTIES The Drainage Bylaw 18093 came into effect on January 1, 2018 replacing previous versions of the Drainage Bylaw 16200. This Bylaw requires that all single family,

More information

1. Division 01 Section General Requirements Temporary Facilities and Controls.

1. Division 01 Section General Requirements Temporary Facilities and Controls. PAGE 024210-1 SECTION 024210 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 180 NOVEMBER 2005 GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS TABLE OF CONTENTS 180.01 SCOPE 180.02 REFERENCES 180.03 DEFINITIONS

More information

ADDENDUM 1. Request for Proposals City of Minot, North Dakota Structure Demolition and Site Restoration Project, # Round 3.

ADDENDUM 1. Request for Proposals City of Minot, North Dakota Structure Demolition and Site Restoration Project, # Round 3. ADDENDUM 1 Request for Proposals City of Minot, North Dakota Structure Demolition and Site Restoration Project, #3755.2 Round 3 April 14, 2016 Proposals Due: 11:00 A.M., Tuesday, April 19, 2016, Minot

More information

City of Brampton. Planning and Infrastructure Services Department. Builders Information Manual

City of Brampton. Planning and Infrastructure Services Department. Builders Information Manual City of Brampton Planning and Infrastructure Services Department Builders Information Manual For Subdivision Development 1 Date: Attention: Dear Sir: Re: Street Sweeping/Cleaning Subdivision: File No.:

More information

ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS

ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS 4-101. FIRE DISTRICTS. The following described area is the city fire district: beginning at a point at the southwest corner of Lot 1, Block 11, Original

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

THE CITY OF KENOSHA, WISCONSIN REQUEST FOR PROPOSAL TO REMOVE ASBESTOS AND OTHER PARTICULATES / RAZE MULTI-FAMILY RESIDENTIAL STRUCTURE / RESTORE LOT.

THE CITY OF KENOSHA, WISCONSIN REQUEST FOR PROPOSAL TO REMOVE ASBESTOS AND OTHER PARTICULATES / RAZE MULTI-FAMILY RESIDENTIAL STRUCTURE / RESTORE LOT. THE CITY OF KENOSHA, WISCONSIN REQUEST FOR PROPOSAL TO REMOVE ASBESTOS AND OTHER PARTICULATES / RAZE MULTI-FAMILY RESIDENTIAL STRUCTURE / RESTORE LOT. AT 5902-5TH AVENUE, Kenosha. WI. 53140 WITH INSTRUCTIONS

More information

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 02 41 14 SELECTIVE BUILDING DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for systematic removal of site improvements or portions of exterior and interior of buildings

More information

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/ CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA 34695 PHONE: 727/724-1555 FAX: 727/724-1566 RIGHT-OF-WAY / EASEMENT USE PERMIT DATE SUBMITTED: EXPIRATION DATE: Submit the following to the

More information

Fill out all sections or mark with N/A (not applicable)

Fill out all sections or mark with N/A (not applicable) TOWN of PLAINVILLE 142 South St Plainville, MA. 02762 508-695-3010 ext#12 / fax # 508-695-1857 Commercial Building Permit BUILDING PERMIT INSTRUCTIONS and APPLICATION Please be advised that any incomplete

More information

District of Ucluelet Building Permit Guide

District of Ucluelet Building Permit Guide District of Ucluelet Building Permit Guide The purpose of this guide is to advise on the applicable regulations within the District of Ucluelet regarding construction, repairs, alterations or additions

More information

SPECIFICATIONS FOR EPHESUS PARK IMPROVEMENTS 1501 EPHESUS CHURCH ROAD CHAPEL HILL, NORTH CAROLINA 27517

SPECIFICATIONS FOR EPHESUS PARK IMPROVEMENTS 1501 EPHESUS CHURCH ROAD CHAPEL HILL, NORTH CAROLINA 27517 SPECIFICATIONS FOR EPHESUS PARK IMPROVEMENTS 1501 EPHESUS CHURCH ROAD CHAPEL HILL, NORTH CAROLINA 27517 SPECIFICATIONS FOR ADA AND PARKING LOT IMPROVEMENTS AT EPHESUS PARK 1501 EPHESUS CHURCH ROAD CHAPEL

More information

ARCHITECTURAL GUIDELINES FOR LAKE ZACHARY LAKE ZACHARY HOME OWNERS ASSOCIATION

ARCHITECTURAL GUIDELINES FOR LAKE ZACHARY LAKE ZACHARY HOME OWNERS ASSOCIATION FOR LAKE ZACHARY BY LAKE ZACHARY HOME OWNERS ASSOCIATION THESE ARE WRITTEN PRIMARILY FOR NEW CONSTRUCTION, BUT THESE STANDARDS ALSO APPLY TO ANY ALTERATIONS, ADDITIONS OR REPAINTING OF EXISTING STRUCTURES

More information

STREET ADDRESS OF EVENT: Description of Event:

STREET ADDRESS OF EVENT: Description of Event: TEMPORARY USE PERMIT STREET ADDRESS OF EVENT: Description of Event: To Run from: (Date) (Hour) AM PM To: (Date) (Hour) AM PM Applicant: (Print) Applicant address: (Print) City, State Zip: Phone: Fax: Email:

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF

More information

Request For Proposals

Request For Proposals Request For Proposals Watauga County seeks Proposals from individuals or firms interested in providing services for the demolition and removal of a 237,000 square foot building located in Boone, NC. The

More information

CONSTRUCTION SPECIFICATION FOR REMOVAL

CONSTRUCTION SPECIFICATION FOR REMOVAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 510 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR REMOVAL TABLE OF CONTENTS 510.01 SCOPE 510.02 REFERENCES 510.03 DEFINITIONS 510.04 SUBMISSION AND

More information

Huntington Building Inspection

Huntington Building Inspection Huntington Building Inspection George W. Peterson Building Inspector PHONE 4136675763 APPLICATION Other Than One and Two Family Dwelling For ALL other projects use One and Two Family Dwelling (Residence)

More information

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS Revised: June 4, 2014 Requirements for obtaining a site alteration permit vary depending on the type of project being proposed. This information

More information

CONSTRUCTION SPECIFICATION FOR REMOVAL

CONSTRUCTION SPECIFICATION FOR REMOVAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 510 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR REMOVAL TABLE OF CONTENTS 510.01 SCOPE 510.02 REFERENCES 510.03 DEFINITIONS 510.04 DESIGN AND

More information

ARCHITECTURAL CONTROL COMMITTEE NEW CONSTRUCTION AND EXISTING HOMES RULES AND REGULATIONS

ARCHITECTURAL CONTROL COMMITTEE NEW CONSTRUCTION AND EXISTING HOMES RULES AND REGULATIONS ARCHITECTURAL CONTROL COMMITTEE NEW CONSTRUCTION AND EXISTING HOMES RULES AND REGULATIONS Purpose and Authority: Mountain Creek Hollow is an architecturally controlled community, so established to protect

More information

REPORT ON RESIDENTIAL INFILL HOUSING. City of Des Peres, Missouri. By Malcolm Drummond, AICP. Gartenberg Consulting Services. Creve Coeur, Missouri

REPORT ON RESIDENTIAL INFILL HOUSING. City of Des Peres, Missouri. By Malcolm Drummond, AICP. Gartenberg Consulting Services. Creve Coeur, Missouri REPORT ON RESIDENTIAL INFILL HOUSING City of Des Peres, Missouri By Malcolm Drummond, AICP Gartenberg Consulting Services Creve Coeur, Missouri March, 2005 1 TABLE OF CONTENTS Page INTRODUCTION... 3 INFILL

More information

GENERAL SPECIFICATION FOR THE MANAGEMENT AND DISPOSAL OF EXCESS MATERIAL

GENERAL SPECIFICATION FOR THE MANAGEMENT AND DISPOSAL OF EXCESS MATERIAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 180 JANUARY 1994 GENERAL SPECIFICATION FOR THE MANAGEMENT AND DISPOSAL OF EXCESS MATERIAL 180.01 SCOPE 180.02 REFERENCES 180.03 DEFINITIONS TABLE OF

More information

RESIDENTIAL BUILDING PERMIT INSTRUCTIONS Town of Liberty 120 North Main Street Liberty, New York 12754

RESIDENTIAL BUILDING PERMIT INSTRUCTIONS Town of Liberty 120 North Main Street Liberty, New York 12754 RESIDENTIAL BUILDING PERMIT INSTRUCTIONS Town of Liberty 120 North Main Street Liberty, New York 12754 INTRODUCTION This brochure has been prepared to help guide persons through the building permit process,

More information

SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017

SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017 SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017 I. CONSTRUCTION PREREQUISITES 1.0 Pre-construction Survey A pre-construction survey of all existing infrastructure within

More information

Beaumont Lot Grading Guidelines

Beaumont Lot Grading Guidelines Beaumont Lot Grading Guidelines Updated: 2019-01-14 CONTENTS LOT GRADING OVERVIEW... 3 INTRODUCTION... 3 PURPOSE... 3 DEFINITIONS... 3 LOT GRADING REQUIREMENTS... 3 DESIGN GRADES AND EXISTING GRADES...

More information

CONSTRUCTION SPECIFICATION FOR REMOVAL

CONSTRUCTION SPECIFICATION FOR REMOVAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 510 APRIL 2010 CONSTRUCTION SPECIFICATION FOR REMOVAL TABLE OF CONTENTS 510.01 SCOPE 510.02 REFERENCES 510.03 DEFINITIONS 510.04 DESIGN AND SUBMISSION

More information

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION Standard Specifications for Restoration INDEX PAGE R.1 GENERAL...1 R.2 SCOPE...1 R.3 MATERIALS...1 R.4 CONSTRUCTION...2 R.4.1 General...2

More information

CONSTRUCTION SPECIFICATION FOR REMOVAL

CONSTRUCTION SPECIFICATION FOR REMOVAL ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 510 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR REMOVAL TABLE OF CONTENTS 510.01 SCOPE 510.02 REFERENCES 510.03 DEFINITIONS 510.04 DESIGN AND SUBMISSION

More information

The Tender Documents shall be amended and will become part of the Contract Documents.

The Tender Documents shall be amended and will become part of the Contract Documents. Tender No. MET17-103 Mulgrave Park Exterior Upgrades: Repairs to Retaining Walls, Stairs, and Rail ADDENDUM NO. 04 11 October 2017 The Tender Documents shall be amended and will become part of the Contract

More information

CONSTRUCTION SPECIFICATION FOR REMOVAL

CONSTRUCTION SPECIFICATION FOR REMOVAL ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 510 NOVEMBER 2018 CONSTRUCTION SPECIFICATION FOR REMOVAL TABLE OF CONTENTS 510.01 SCOPE 510.02 REFERENCES 510.03 DEFINITIONS 510.04 DESIGN AND SUBMISSION

More information

Town of Whitby Public Works Department

Town of Whitby Public Works Department Town of Whitby Public Works Department Guide to Site Alteration Pre-Screening Questionnaire and Site Alteration / Haul Route Permit Application NOTE: FOR AN ACCESSIBLE VERSION OF THIS DOCUMENT PLEASE CONTACT

More information

SPECIFICATIONS SCOPE OF WORK

SPECIFICATIONS SCOPE OF WORK SPECIFICATIONS SCOPE OF WORK The intent of this contract is for the supply of all necessary labour, materials, and equipment to install underground traffic signal plant, vehicles detection loops, installation

More information

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Project Name: Project Location: Date Submitted: TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Last Revised January 31, 2014 Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( )

More information

The Standards referred to shall be the most recent edition.

The Standards referred to shall be the most recent edition. Page 1 of 7 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described hereunder shall consist of the excavation of trenches and tunnels; the supply and installation of pipe and/or encasement pipe; the

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...

More information

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 180 NOVEMBER 2011 GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS TABLE OF CONTENTS 180.01 SCOPE 180.02 REFERENCES 180.03 DEFINITIONS

More information

TITLE 17 REFUSE AND TRASH DISPOSAL REFUSE

TITLE 17 REFUSE AND TRASH DISPOSAL REFUSE 17-1 TITLE 17 REFUSE AND TRASH DISPOSAL CHAPTER 1. REFUSE. CHAPTER 1 REFUSE SECTION 17-101. Powers of the director of public works. 17-102. Premises to be kept clean. 17-103. Definitions. 17-104. Accumulation

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

Fill out all sections or mark with N/A (not applicable)

Fill out all sections or mark with N/A (not applicable) TOWN of PLAINVILLE 142 South St Plainville, MA. 02762 508-695-3010 ext#12 / fax # 508-695-1857 Commercial Building Permit BUILDING PERMIT INSTRUCTIONS and APPLICATION Please be advised that any incomplete

More information

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 180 NOVEMBER 2016 GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS TABLE OF CONTENTS 180.01 SCOPE 180.02 REFERENCES 180.03 DEFINITIONS

More information

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003 ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES Special Provision No. 199S38 March 2003 The following MTO specification is not based on or referenced to an OPS Specification.

More information