Meriter Heights Renovations Madison, Wisconsin
|
|
- Ira Norris
- 6 years ago
- Views:
Transcription
1
2 Urban Design Submittal s 12 ebruary 2007 Owner Developer W. Mifflin St. STATE CAPITOL SQUARE Meriter Retirement Services, LLC 333 West Main Street W. Washington Ave. S. airchild St. STATE CAPITOL Architects Planners SIMONSON GERMANY NONEMAKER + ASSOCIATES, INC West Druid Hills Drive, Suite T-65 Atlanta, Georgia Telephone (404) S. Broom St. W. Main St. W. Doty St. S. Henry St. Project Site W. Wilson St. S. Hamilton St. S. Carroll St. CITY / COUNTY BUILDING STATE OICE BLDG Martin Luther King Jr. Blvd. E. Doty St. MADISON MUNICIPAL BUILDING E. Wilson St. S. Pinckney St. North Location Map Interior Architecture BROWNHOUSE 202 W. Gorham Street Madison, WI MEP & Structural Engineers ARNOLD & O'SHERIDAN 1111 Deming Way, Suite 200 Madison, WI 53717
3 Meriter Heights Building West Doty Street Henry Street South Broom Street West Main Street Architectural Site Plan Scale: 1" = 30'-0" ebruary 12, 2007 A1
4 Covered Entry Reconfigured Exterior Seating Vestibule Expanded Seating Lobby Existing Pharmacy Cart & Buggy Storage Existing Toilet Room Existing Toilet Room Existing Exercise Existing Elevator Lobby Renovated Henry Street Lobby Plan Scale: 1/4" = 1'-0" ebruary 12, 2007 A2
5 Existing Residential Scale: 1/8" = 1'-0" ebruary 12, 2007 A3
6 show as 6' door with trim Unit Type B Unit Type B Unit Type B E E Unit Type C 1205 Unit Type B1 Unit Type A Proposed Renovations-s 12 & 14 Scale: 1/8" = 1'-0" ebruary 12, 2007 A4
7 Unit Type B Unit Type B Unit Type B E E Unit Type C 1505 Unit Type B1 Unit Type A MIDVALE PLAZA JOINT VENTURE May 17, 2006 Proposed Renovations- 15 Scale: 1/8" = 1'-0" Midvale Plaza Redevelopment and MSTSD
8 22'-0" 22'-0" 21'-11" 20'-0" 24'-1" 3'-1" 20'-0" 21'-10" 22'-0" 22'-1" 18'-0" 31'-0" B8 18'-4" 19'-5" 14'-3" New concrete where smoke hatch was removed. See Structural for connection and reinforcing New roof drain New steel stair with concrete treads from floor below New 6" CMU stair wall. See Structural for connection and reinforcing 3'-4" 17'-6" 13'-6" 29'-4" 9'-8" B9 Cooling Tower New steel beam framing to carry new mechanical equipment. See Structural. Column, below Existing RTU to remain 2'-6" 1'-1" Location of existing roof drain. Existing ladder to remain E B3 B2 B1 Expansion E Tank E P1 P2 New concrete where stair was removed. See Structural for connection & reinforcing E 9'-8" Existing ACCU, 40 Tons. 2'-6" 6'-7" 3'-4" 45'-4" 3'-4" Existing roof drain to remain Existing smoke hatch to remain Shroud and fan for bathroom exhaust stacks. Typical, 16 locations. 22'-10" 24'-0" 21'-0" 3'-4" 23'-0" 22'-0" 19'-4" Penthouse/Roof Plan Scale: 1/8" = 1'-0" ebruary 12, 2007 A6
9 Existing elevator penthouse. New weather resistant ventillation louver. Duct back to existing louver New EIS parapet wall New mechanical screen wall. Steel stud and EIS veneer. Reinforced CMU wall with EIS veneer. Existing Elevator Penthouse 198'-6 1/2" New Mechanical Screen 190'-8 1/2" Capitol View Limit 187'-2 1/2" 3'-6" Aluminum fascia Single hung windows w/insulating glass and insect screens New cantilevered decks with metal guardrails on steel tube & cable support system Glass spandrel panel Aluminum panels Alternate 1: EIS veneer with control joints at same locations Bent metal intermediate cornice line. Existing window to remain Existing concrete wall Existing brick veneer Existing score joints Existing spandrel and HVAC to remain Existing concrete to remain Paint or stain existing concrete Aluminum fascia Pre-finished metal wrap Wall mounted light to match MainGate Commons Double wythe cast stone wall with precast concrete cap. 9'-0" Existing storefront with sloped metal roof Existing canopy Existing planter Existing skylights Line of planter grade, not shown for clarity 6'-5" 13 8'-8 1/2" 12'-0" 12'-0" 12'-0" 113'-2 1/2" 9'-0" Existing Roof 179'-2 1/2" 15th 14th 12th 11th 10th 9th 8th 7th 6th 5th 4rd 3nd 2nd 1st Ground Aluminum panels Cast Stone base with precast band Basement Steel beam canopy Henry Street Elevation Scale: 3/32" = 1'-0" ebruary 12, 2007 A7
10 Existing penthouse. Reinforced CMU wall with EIS veneer. Existing penthouse. Aluminum fascia New metal stud with EIS veneer mechanical screen wall, beyond. Aluminum fascia Single hung windows w/insulating glass and insect screens Aluminum panels Alternate 1: EIS veneer with control joints at same locations Single hung windows w/insulating glass and insect screens Aluminum panels Alternate 1: EIS veneer with control joints at same locations New cantilevered decks with metal guardrails on steel tube and cable support structure New cantilevered decks with metal guardrails on steel tube and cable support structure Bent metal intermediate cornice line. Existing score joints Bent metal intermediate cornice line. Existing score joints Existing concrete wall Existing concrete wall Existing Lobby Doty Street Elevation Scale: 3/32" = 1'-0" Wests Main Street Elevation Scale: 3/32" = 1'-0" ebruary 12, 2007 A8
11 Existing Penthouse scsreen wall Existing elevator lobby New mechanical screen wall. Steel stud and EIS veneer. Reinforced CMU wall with EIS veneer. Aluminum fascia Aluminum panels Alternate 1: EIS veneer with control joints at same locations Single hung windows w/insulating glass and insect screens New cantilevered decks with metal guardrails on steel tube and cable support structure Existing score joints Spandrel glass Built up EIS banding and intermediate cornice line. Single hung windows w/insulating glass and insect screens Aluminum panels Existing concrete wall Existing brick veneer Existing concrete to remain Paint or stain existing concrete Existing Lobby Courtyard Elevation Scale: 3/32" = 1'-0" ebruary 12, 2007 A9
12 Waterproof roof membrane over tapered insualtion with minimum thickness to achieve R30. Extend membrane up wall and underneath cap flashing. 8'-8 1/2" 8'-8 1/2" 8'-8 1/2" 5'-8" 6'-9 5/8" 1'-11 1/4" 6'-9 5/8" 1'-11 1/4" 6'-9 5/8" 1'-11 1/4" 8" reinforced CMU parapet wall. with aluminum panel veneera at facade. Rear wall shall receive paint. See Structural for attachment to existing concrete slab. Spring lock clip flashing at perimeter Waterproof roof membrane over tapered insualtion with minimum ithickness to achieve R38. Extend membrane up wall 12" minimum. See 3/A7.1 for dimensions and notes on steel tube frame. 5/8" gypsum board on metal furring to conceal conduit and sprinkler piping run tight to underside of slab. Precast concrete slab with sloped top. Top shall receive 45 mil waterproof textured traffic topping. Bottom to receive paint. Provide 4 steel embed plates at bottom, 2 front, 2 rear and centered on 4x8 tubes for attachment. See Structural. Heavy commercial aluminum sliding door with thermally broken frame, insulating glass & insect screen. Deck rails not shown for clarity 8'-8 1/2" 8'-8 1/2" 8'-8 1/2" 1 1/2" 4'-11 1/2" 3'-9" 4'-11 1/2" 3'-9" 4'-11 1/2" 3'-9" 1" 5'-5" 1" 5'-5" 4 1/4" 1/2" 11 1/2" 4'-2" 1" 5'-5" 1/2" 11 1/2" 4'-2" 4" 1" 3" 2" 1 1/2" 2'-7 1/2" 1 1/2" 4" 1/2" steel plate, profile as indicated. Weld to steel tube with 3/16" fillet, full length, each side. Drill hole to receive pin of threaded coupling. 4"x12"x3/8" steel bearing plate. Weld to steel tube and epoxy bolt to slab using 2, 3 / 4" ø bolts with 3 1 / 2" embedment Steel tie rod with threaded coupling each end 1/2" steel plate, profile as indicated. Weld to steel tube with 3/16" fillet, full length, each side. Drill hole to receive pin of threaded coupling. 4"x8"x3/8" steel tube beam 4"x12"x3/8" steel tube with end cap. Provide one at each side of deck Precast deck not shown for clarity 4"x8"x3/8" steel tube beam Typical guardrail at each level, not shown for clarity. Core drill and epoxy posts into slab. Precast concrete deck sloped from 5 1 / 2" at building face to 4 1 / 2" at outer edge. 4"x4"x3/8" steel angle attachment clip, each side. Weld to tube with continuous 3/16" fillet. 3"x3"x5/16" steel tube. 3'-7 1/2" 4"x12"x3/8" steel tube bottom chord with end cap 6x6x 3 / 8" steel angle, 12" length. Weld to end of 4x12 tube with continuous 3 / 16" fillet. Epoxy bolt to slab using 2, 3 / 4" ø bolts with 3 1 / 2" embedment 8'-8 1/2" 8'-8 1/2" 8'-8 7/8" 6'-9 1/4" 1'-11 1/4" 6'-9 1/4" 1'-10 7/8" 6'-9 1/4" 1'-10 7/8" Aluminum panel. Provide backer rod & sealant at joint w/window. TYP. SINGLE HUNG WINDOW TYP. EXTERIOR WALL WITH ALUMINUM PANEL VENEER 5/8" gypsum board on metal furring to conceal conduit and sprinkler piping run tight to underside of slab. Spandrel glass in heavy commercial, thermally broken aluminum frame. Metal stud header. See Structural. ill header with R19 batt insulation. Bent metal flashing over 3 / 4" exterior grade plywood sheathing on 6" metal 16" o.c. Extend flashing up wall, 12" minimum. Double stud edge at window locations. Anchor to cornice with kickers at each end. Prefinished aluminum drip flashing Bent metal w/flat lock seam at bottom & screw attachment at top. Bent metal cornice with kickers, beyond 12'-6" 2'-6" 8'-0" 3'-0" Coordinate louver size with Mechincal sub-contractor and actual equipment 1'-4" 8" 6" 1'-0" luid cooler on vibration isolation dampers. Coordinate with Mechanical sub contractor Prefinished aluminum cap flashing over pressure treated blocking EIS over exterior sheathing on 6" metal 16" o.c. Backer rod & sealant. Prefabricated louver. Coordinate size with Mechanical contractor. EIS over exterior sheathing on 6" metal 16" o.c. Steel support beams 60 Mil liquid applied waterproof membrame Existing concrete roof deck 5/8" gypsum board on metal furring to conceal conduit and sprinkler piping run tight to underside of slab. Wall Section at Decks Scale: 3/4" = 1'-0" Structural Section at Decks Scale: 1/2" = 1'-0" Wall Section at Mechanical Screen Scale: 3/4" = 1'-0" Wall Section at Windows Scale: 3/4" = 1'-0" ebruary 12, 2007 A10
CONSULTING PROJECT LOCATION
LOCATION Drawing Index: GENERAL NOTES: COVER SHEET Drawing Cover Sheet INDE D Drawing Index O.B.C. Matrix ARCHITECTURAL DRAWINGS A0 First Floor Plan, Basement Plan, Washrooms A0 Second Floor Plan, Washrooms
More informationROOF DETAIL RD-16 CONSTRUCTION DOCUMENTS - PHASE / PENNSYLVANIA HOUSING FINANCE AGENCY/ MAY 22, 2017 MURRAY ASSOCIATES ARCHITECTS, P.C.
3 4" ARRISCRAFT VENEER " NOMINAL AIR SPACE 2" RIGID INSULATION 8" CMU REINFORCED CONCRETE SLAB OVER METAL DECK - REFER TO STRUCTURAL DWGS 20 FIRST FLOOR 343' - 5" CONTINUOUS SEALANT TERMINATION BAR STAINLESS
More informationUniversity of Colorado Colorado Springs. National Cybersecurity Center Roof Replacement Package CSNA Project Number
ADDENDUM NUMBER 0 TO PROJECT MANUAL AND DRAWINGS August 9, 6 OWNER: ARCHITECT: University of Colorado Colorado Springs CSNA Architects PROJECT: National Cybersecurity Center Roof Replacement Package CSNA
More informationSite Data. Site Area per Bedroom 450 square feet per bedroom. Site Area: 13,132 s.f.
Specific Implementation Plan Settlement Place May 26, 2010 Site A Residential Development at 517-523 East Main Street Madison, Wisconsin Owner/Developer LT McGrath, LLC 3849 Caribou Rd. Verona, Wisconsin
More informationThe Reconstruction of the Tony Dapolito Recreation Center 1 Clarkson Street New York, NY March 20, 2018
The Reconstruction of the Tony Dapolito Recreation Center 1 Clarkson Street New York, NY 10014 March 20, 2018 Table of Contents: Site Location Historical Context Existing Conditions Scope of Work Roof
More informationATTACHMENT 2 DRC Page 1 of 13
Page 1 of 13 CLEAR GLASS 7' - 6" SPANDREL GLASS CLEAR GLASS SOLID PHENOLIC PANEL MEAT PREP 206 EMPLOYEE LOCKERS 181 VARIES 8' - 1" 2' - 9" 3' - 1" 2' - 8" 2' - 5" 0'-0" 19' - 6" SECTION @ SOUTH WALL Scale:
More informationSPACE TYPE: OUTSIDE PARKING (STRUCTURE)
SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.
More informationWCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS
SCO #: 8-8-0 TABLE OF CONTE COV DESCRIPTION COVER SHEET ALUMNI TOWER ELEVATIONS & PLAN VIEWS REPAIR DETAILS - M TO REPAIR DETAILS - TO M0 & C TO REPAIR DETAILS - A & F TO F VICINITY MAP ALUMNI TOWER ALUMNI
More informationG0.1 BURR OAKS SENIOR HOUSING. Architecture & Engineering: Dimension IV Madison Design Group 6515 Grand Teton Plaza, Suite 120 Madison, WI 53719
655 Grand Teton Plaza, Suite 20, dimesnionivmadison.com Architecture & Engineering: Co Developer: Dimension IV Madison Design Group 655 Grand Teton Plaza, Suite 20 Madison, WI 5379 Horizon Design. Build.
More informationBuilding Systems and Design Elements included in SliDeRulE
Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation
More informationRESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST
This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general
More informationItem 2.3 Unit pricing GC to provide a square foot unit cost for material and labor to replace plywood decking beneath new concrete walkway slab.
Willow Glen Housing Repairs Project #9-59 Addendum Item. Change to bid date The bid date will be extended to March 8, 09, :00pm at the Housing Authority of Columbus Central Office,000 Wynnton Road Columbus,
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationOverall Existing Conditions Summary
September 12, 2002 Overall Executive Summary: The multi-use project on 250 West Street is a 7-story building with space for offices, retail, storage and parking. The project is a small part of the development
More informationOAK TREE LIQUOR STORE
DRAWING LIST ARCHITECTURAL A000 - COVER SHEET D0 - DEMOLITION PLANS & ELEVATIONS A0 - PLANS, ELEVATIONS & DETAILS A40 - BUILDING S A40 - BUILDING S ARCHITECT: Engineering (00) Inc. 6 Great George Street,
More informationFraming Methods Structural Components
Framing Methods Structural Components Balloon Framing *Balloon framing or Eastern framing the exterior studs run from the top of the foundation to the top of the highest level. Benefits of this type of
More informationTABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS
AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding
More informationTP: 89'-0" BP: 86'-6 1/4" 2'-0" Typ TP: 89'-0" BP: 86'-6 1/4" 2'-0" Typ S201 TW: 89'-0" TF: 86'-0" S201 TW: 87'-11 1/4" S201 TF: 86'-10 1/4" S201
Resource reginc.com 0.. '-" P: '-" 0'-0" " P: '- /" 0'-" '-" '-0" '-0" 0'-0" '-0" '-" '- /" TF: '-0" TW: '-0" TF: '-0" TW: '-0" TF: '-0" TW: '- /" TF: '-" " Typ Sim. P: '-" " TF: '-0" C '- /" '-" Varies
More informationNEW ILLUMINATED LED SIGNAGE PAINTED STOREFRONT W/ VINYL GRAPHIC AND NEW LED SIGNAGE PAINT FINISHES (PROVIDE (2) COATS FOR ALL PAINTING) PT-1
MTA RR APPARATUS NEW ILLUMINATED LED SIGNAGE LIGHTWEIGHT REMOVABLE ALUMINUM PANEL FENCE 88 NORTH AVE CDR JOB NO. 60 NORTH AVE NORTH AVE CURRENT VIEW OF 88 NORTH AVENUE PROPOSED FACADE AT 88 NORTH AVENUE
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary
More informationAIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7
AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting
More informationAdministrative Changes
Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee Hill Elementary
More informationSee attached sketches showing clarifications to Gaylord Entry Roof and Bridge Roof per review and on site and with Central States Roofing.
ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS AIA DOCUMENT G710 (Instructions on reverse side) Owner 1 Architect 1 Consultant 1 Contractor 1 Field 0 Other 0 PROJECT: OWNER: The Edge @ City Park 1855 Gaylord Street
More informationEXISTING CONDITIONS BTA PROJECT NO: 1722
1 CAROLINE STREET PUTNAM STREET 3 2 PROJECT SITE LOCATION PLAN 1. INTERSECTION OF CAROLINE ST AND PUTNAM ST - LOOKING SOUTHEAST 2. PUTNAM ST - LOOKING NORTHEAST 3. CAROLINE ST - LOOKING WEST EXISTING CONDITIONS
More informationNew Raised Courtyard Terrace Pavers and Retaining Walls. Line of Steps Above. New Wood Framed Stair
Building Program Wall Construction to Remain Religious Education New Wall Construction New Furring on Wall Construction, See Partition Types, Community Room New Galvanized Steel Window Well Patch Wall
More informationResidential Building Inspections
Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved
More informationTABLE OF CONTENTS Public Safety Building
DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary
More informationAccellent Cardiology Expansion Brooklyn Park, Minnesota EXTERIOR ENCLOSURE - PART Exterior Wall Construction
EXTERIOR ENCLOSURE - PART 4 4.1 Exterior Wall Construction A. The exterior wall systems consist of the assemblies outline below. Drawings will indicated the acronym associated with each of the wall system
More informationGARAGE MAIN FLOOR PLAN
12'-0" 4'-6" 3'-0" 4'-6" 3040 14'-0" LADDER LT LINE BUNK CABIN 11'-4" x 13'-4" 14'-0" BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS.
More informationADDENDUM 2 - JULY 14, 2015
7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures
More informationConnection Design Assistance Manual
Connection Design Assistance Manual Architectural Precast Concrete Glass Fiber Reinforced Concrete Cast Stone Architectural Precast Association 6710 Winkler Road, Suite 8 Fort Myers, FL 33919 Phone: 239-454-6989
More information2003 International Residential Building Code
2003 International Residential Building Code Section R305 Ceiling Height Habitable rooms, hallways, corridors, bathrooms, toilet rooms, laundry rooms and basements shall have a ceiling height of not less
More informationEXW3 EXISTING DOWEL NEW FOOTING TO EXISTING WALL WITH 3-15M DOWELS, DOWEL THE NEW
-4 /4" 8" 4'-9 /" 6'-4" '-8" DEPRESS TO ACCOMODATE DOOR ABOVE DOWEL NEW FOOTING TO WITH 3-5M DOWELS, DOWEL THE NEW S TO THE S WITH 5M @ 4" O.C. VERTICALLY, PROVIDE -5M BARS 6" LONG IN THE FOOTING 4'-9"
More informationBuilding Architecture
The front of the building consists of the three story town homes with facades to remain, as well as one leg of the condominium tower that reaches the street. The main condo portion of the building is L
More informationCustom 22' x 40' - 16' Tall Garage Plan #g227 By SDS-CAD Specialized Design Systems
P O Box 34 Mendon, Utah Custom 22' x 40' - 16' Tall Garage Plan #g22 By Page 1 Title Page Page 2 Main Floor Plan Page 3 Foundation Plan Page 4 Elevation Views Page 5 Framing and Details Page 6 Typical
More informationEAST 128TH AVENUE CASE NUMBER: DP XXXX-XXX 7 V 12" 14" Engineering Associates, Inc. SHEET NUMBER F W
COT Current Planning 1st submittal comments 2-12-2014 Lori Hight 0-58-7670 Vacant The landscape plan lists this as 18,05 SF %? 2014-001 DEVELOPMENT PERMIT COUNTRY HILLS OFFICE CAMPUS CHILDREN'S LEARNING
More informationSeattle Public Schools Building Excellence IV Projects Under Construction
Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee
More informationSGN+A Planning Architecture Landscape Architecture
35 West Ponce de Leon Avenue Decur, Georgia 30030 Description: 0'-0" 3'-6" Building Type I, st Floor 7 July 0 A '-0" '-" 7'-" 8'-3 /" " 8'-3 /" 9'-0" 8'-3 /" " 8'-3 /" /" 6'-8 /" '-" D W 8'-5 /" 30'-"
More informationMAYMONT FOUNDATION ARCHITECT 1840 WEST BROAD ST SUITE 400 RICHMOND, VA
80 West Broad Street Suite 00 Richmond, Virginia 2220 80.788.77 phone 80.788.0986 fax 000 WESTOVER ROAD RICHMOND, VA 2220 BH ARCHITECTS /9/20 BH VAN YARHES STUDIO VANASSE HANGEN BRUSTLIN, INC DUNBAR MILBY
More informationJ.DAVID POUNDER LIMITED CONSULTING ENGINEER AND ARCHITECT
J.DAVID POUNDER LIMITED CONSULTING ENGINEER AND ARCHITECT Using a Multidisciplinary Approach to Projects for Over 0 Years Project 5 Mapleview Terrace Apartments, 59 South Pelham Road, Welland Addendum
More informationCustom 30 x 48-14' Tall Garage Plan #g226 By SDS-CAD Specialized Design Systems
P O Box 34 Mendon, Utah Custom 30 x 48-14' Tall Garage Plan #g226 By Page 1 Title Page Page 2 Main Floor Plan Page 3 Foundation Plan Page 4 Elevation Views Page 5 Framing and Details Page 6 Typical Section
More informationWall Panels. Structural wall panel. Architectural wall panel. Cladding wall panel. Sandwich wall panel
Wall Panels Structural wall panel Architectural wall panel Cladding wall panel Sandwich wall panel Wall Panels Assorted styles and colours Reveals and other patterns Painted finish Bolted, welded and knife
More informationOn Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)
TECHNICAL NOTE On Cold-Formed Steel Construction $5.00 Light Gauge Steel Engineers Association Washington, D.C. 20005 Toll Free (866) 465-4732 www.lgsea.com DESIGN OF BY-PASS SLIP CONNECTORS IN COLD-FORMED
More informationMAIN FLOOR PLAN. #G x 14 x 8 Shed - Chicken Coop By SDS-CAD Specialized Design Systems 10'-0" 3'-0" 1'-0" 14'-0" 14'-0" 1'-0" 6'-0" 3'-0"
10'-0" BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. BARN TO BE BUILT AS PER LOCAL CODE REQUIREMENTS 14'-0" BWP BWP BWP ABWP 101
More informationUCC Permit Application Procedures
How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.
More informationHIGHLANDVIEW CEMETERY CHAPEL
HIGHLANDVIEW CEMETERY CHAPEL CONTACT: Ferris State University Small Town Studio Christopher Cosper, AIA, LEED, AP, Assistant Professor cosperc@ferris.edu 23.59.33 Sheet List Sheet Name Sheet # COVER A00
More informationOne and Two Family Additions
One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri
More informationRe.: Dollar Tree D10236 Startown Crossing, Newton, NC Structural Report on Findings, Site Visit (September 21, 2016)
508 Baylor Court Suite C Chesapeake, VA 23320 757.436.0610 phone 757.436.2070 fax Mr. Steven McMahon Manager of Architectural Services Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320 Re.:
More informationSFR SUBMITTAL REQUIREMENTS
A. FEES DUE AT TIME OF PERMIT APPLICATION The following non-refundable fees will be collected at the time of application for all residential projects. 1. Building Plan Check Fee B. CODES The City of Oak
More information260,000 SF Building Profile
Expanding Your Development & Investment Perspectives 260,000 SF Building Profile Precast & Brick Exterior Finish 245,000 SF Production/Warehouse 7,500 SF Office & 7,500 SF Mezzanine 50 x 50 Bays, 24 Clear
More informationC P A. Presented By Jason G. Smith, CCM, LEED AP. Founder and Principal of Construction Analysis and Planning, LLC
C P A CONSTRUCTION ANALYSIS AND PLANNING, LLC Presented By Jason G. Smith, CCM, LEED AP Founder and Principal of Author of Construction Management: Subcontractor Scopes of Work 1 Division of work: Primary
More informationDATE: 4/1/2014 SCALE: 3/16"=1'- 0" SHEET:
Terrace Level First Floor Second Floor Total Back Porch Front Porch Finished NA 1397 SF 743 SF 2140 SF 63 SF 195 SF Unfinished NOTES: All dimensions are framing dimensions, NOT finished dimensions Exterior
More informationSITE / BUILDING PLAN 10/18/16 10/18/16 A+M ARCHITECTS, LLC REINF. ANGLE REQUIRED AT ALL ROOFTOP UNITS WHERE "X" EXCEEDS 8"
10'-7" 4 7/8" 30'- 20'-7 3/8" WH WH A+M ARCHITECTS, LLC TO THE BEST OF MY KNOWLEDGE AND BELIEF, ALL OCCUPANTS WITHIN THE BUILDING ARE IN COMPLIANCE WITH APPLICABLE ILLINOIS STATE PLUMBING CODES PERTAINING
More informationStaff Review Date: May 11, 2016 HDC # PID# , ,
Charlotte Historic District Commission Application for a Certificate of Appropriateness Staff Review Date: May 11, 2016 HDC #2016-08 PID# 0710160, 071016, 0710161 LOCAL HISTORIC DISTRICT: PROPERTY ADDRESS:
More informationSECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.
SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied
More informationMCCARTY ARCHITECTS, P.A. POST OFFICE BOX 440 / 533 WEST MAIN STREET TUPELO, MS / FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON
ADDENDUM NUMBER FROM: MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 0 / 533 WEST MAIN STREET TUPELO, MS 3880 / 3880 FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON PHONE: -8-00 PROJECT: ACADEMIC STUDENT
More information6'-0" G-4 ADJUSTABLE SHELVING 2'-0" 4'-5" MOP SINK STORAGE '-0" 2'-0" 26'-6" G-4 6' X 4' OPENING WITH SHUTTER BASE CABINETS 34" FOR ADA 20'-0"
2 G1 3'4" 4'0" ROOM FINISH SCHEDULE 4'0" F.F. WINDOW DETAILS GROUT CORES SOLID GROUT CORES SOLID 3 G1 #5 BARS HOLLOW METAL FRAME INSULATED GLASS 1" CLEAR INSULATED (U=0.45) CAULKING & BACKER ROD PREFORMED
More informationMinimum Residential Plan Submittal Requirements
Minimum Residential Plan Submittal Requirements BI-24 CRC 2016 In order to make your permit application and the plan review process go as smooth as possible it is important to have a general understanding
More informationHILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District
HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District Facilities and School Safety Committee Meeting October 25, 2018 Progress Update PROGRESS UPDATE Rien Construction (General
More informationADDITIONS BUILDING AND ZONING REQUIREMENTS (REVISED 4/22/2008)
ADDITIONS BUILDING AND ZONING REQUIREMENTS (REVISED 4/22/2008) PERMIT SUBMITTAL CHECKLIST: Signed completed Building Permit application form. Two (2) Copies of a Certificate of Survey. Draw to scale the
More informationOne & Two Family Residential ADDITIONS
City of St. Petersburg Development Services One & Two Family Residential ADDITIONS (Effective Date: 5/1/03) This checklist is subject to change and improvement at any time. Please determine that you have
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary
More informationI.C.E. BLOCK (U.S. Patent No. 4,223,501) Detail Manual
I.C.E. BLOCK (U.S. Patent No. 4,223,501) Detail Manual An energy efficient - cost effective building system, designed for contractors and property owners alike. 1 TYPICAL WOOD FRAME TO CONCRETE FLOOR 1"
More informationWeatherSmart Air Barrier Installation Guide
WeatherSmart Air Barrier Installation Guide 1 The intent of this document is to provide a guide for the installation of WeatherSmart as both a Weather Resistive Barrier (W.R.B.) and an Air Barrier Material
More informationAPPENDIX 3E HAZELWOOD HOTEL SPECIFICATIONS
APPENDIX 3E HAZELWOOD HOTEL SPECIFICATIONS 1. GENERAL 1.1 Refer to Section 2.1 of Schedule 3 [Design and Construction Specifications] regarding compliance with Schedule 3 and this Building Specification.
More informationCITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements
CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY
More informationGARAGE MAIN FLOOR PLAN
BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. SHED TO BE BUILT AS PER IRC, UBC OR CURRENT LOCAL CODE To the best of my knowledge
More informationPROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California
PROGRAM COST MODEL for PEER Tall Buildings Study Concrete Structural Option Los Angeles, California March 8, 2010 PEER Tall Buildings Study Concrete Structural Option March 8, 2010 CONTENTS Page Nos. Overall
More informationUpdate on FCPS Construction/Renovation Projects. June 2016
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section )
8-1200. International Residential Code. ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section 6-9-40) NOTE-This article
More informationAPPLICATION AND CERTIFICATE FOR PAYMENT
AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in
More informationGENERAL BUILDING CODE AND ZONING REQUIREMENTS: Post and spread footings shall be designed and constructed below the minimum frost depth of 42 inches
GENERAL BUILDING CODE AND ZONING REQUIREMENTS: Post and spread footings shall be designed and constructed below the minimum frost depth of 42 inches and shall be sized to carry the applicable roof and
More information* RESIDENTIAL PLAN REVIEW *
CITY OF DES MOINES, IOWA COMMUNITY DEVELOPMENT DEPARTMENT PERMIT AND DEVELOPMENT CENTER 602 Robert D. Ray Drive DES MOINES, IOWA 50309 Phone: 515.283.4200 Facsimile: 515.283.4270 Based on the scope of
More informationTHE SPENCER RESIDENCE J&S ARCHITECT
THE SPENCER RESIDENCE J&S ARCHITECT 75 POURED CONCRETE FOUNDATION WALL (0MPa) 97.94 50Ø WEEPER TILE C/W SOCK W/MIN. 50 GRANULAR COVER F.D. E.P.B. F.D. 00 POURED CONCRETE FOUNDATION WALL (0MPa) 475 X 00
More informationNortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1
16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationRoof Replacement. Notes: T-1 (Title Page) 709 Bull Street Columbia, South Carolina. University of South Carolina. Callcott Social Science
Notes: Drawing Index T-1 Title R-1 Roof Plan - Existing Conditions R-2 Roof Plan - New D-1 Roof Details D-2 Roof Details S1.0 Safety Anchor Plan Building 709 Bull Street Columbia, 1 10/13 T-1 (Title Page)
More informationELEVATION GENERAL NOTES: 1. ALL PAINT / FINISH SYMBOL DEFINITIONS FOUND ON A8.1. 2. ALL NEW GLAZING WITHIN 18" OF GROUND OR ADJACENT TO DOOR(S) TO BE TEMPERED. 3. REMOVE ALL EXISTING METLA COPING CAPS
More informationEXTERIOR WALLS. exterior wall systems, cladding w/ masonry. chapters SUBJECT
SUBJECT EXTERIOR WALLS chapters 19 + 20 exterior wall systems, cladding w/ masonry DATE SPRING 2014 PROFESSOR MONTGOMERY CLADDING W/ MASONRY & PRE CAST CONCRETE CLADDING W/ BRICK MASONRY CLADDING W/ BRICK
More informationLonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN (507) fax (507)
Lonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN 55046 (507) 744-2327 fax (507) 744-5554 2006 RESIDENTIAL CONSTRUCTION CHECKLIST The following checklist has been designed
More informationEast Lyme Middle School EAST LYME MIDDLE SCHOOL
Description: N EAST LYME MIDDLE SCHOOL The school consists of a multi story building with lower, main and upper level floors. The typical floor framing for the main and upper levels is wide flange steel
More informationGENERAL FLOOR PLAN NOTES. REFER TO ADDITIONAL NOTES AND REQUIREMENTS ON ALL OTHER DOCUMENTS AND OTHER DISCIPLINES DOCUMENTS. A A.3 4' - 0" 5' - " B. ALL SITE INFO, FURNITURE, FIXTURES AND EQUIPMENT SHOWN
More informationRESIDENTIAL BUILDING PLAN REQUIREMENTS
CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us RESIDENTIAL BUILDING PLAN REQUIREMENTS
More informationPulaski County, Virginia
Pulaski County, Virginia Typical Carport Enclosure Details Based on the 2009 International Residential Code CONTENTS General Requirements... 2 Emergency Escape and Rescue... 2 Foundation and Floor... 3
More informationSECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing.
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 13 34 00 FABRICATED ENGINEERED STRUCTURES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1
More informationBuilding Envelope
9.36.2. Building Envelope Module 2 BCBC 9.36. 2014 1 Richard Kadulski Architect 9.36.2. Building Envelope Focus is on total building performance, not just thermal insulation Heat transfer and air leakage
More informationINFORMATIONAL HANDOUT FOR FINISHING A BASEMENT
7100 147 th Street West Telephone (952) 953-2588 Apple Valley, MN 55124-9016 Fax (952) 953-2515 www.cityofapplevalley.org INFORMATIONAL HANDOUT FOR FINISHING A BASEMENT 1. Submit plan showing the proposed
More information1 BASE HOME CONSTRUCTION SPECIFICATIONS: TOWNHOMES 5-13-2015 Note: Specifications noted below may change based on selected options. Verify upgrades from the base specifications with the option sheets and
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationExpanding Your Development & Investment Perspectives 159,000 SF Building Profile
Expanding Your Development & Investment Perspectives 159,000 SF Building Profile Metal & EIFS Exterior Finish 150,000 SF Production/Warehouse 4,500 SF Office & 4,500 SF Mezzanine 50 x 50 Bays, 24 Clear
More informationTABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE
TABLE OF CONTENTS SECTION TITLE DATE Division 00 Procurement and Contracting Requirements 000101... Project Title Page 000116... CAD Standards 001116... Invitation to Bid 002113... Instructions to Bidders
More informationDIVISION 5 - STRUCTURAL STEEL AND IRON WORK
DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete
More informationARTSPACE LOFTS - DMC DESIGN REVIEW OCTOBER 21, 2015
OCTOBER 21, 2015 1 S. MAIN ST ST. PAUL AVE GE PATTERSON AVE PROPOSED SITE Vicinity Plan Not To Scale NORTH 2ND ST Existing Site - 138 St. Paul Avenue 2 southwest corner west facade west dock west dock
More informationSUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:
IRC CODE UPDATES TO: RESIDENTIAL BUILDING CONTRACTORS FROM: GARY STABER, BUILDING OFFICIAL SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: 6/1/2003 INTERNATIONAL RESIDENTIAL CODE (IRC) APPLICABILITY:
More informationSection : 100 TRESHOLD STAIRS DEPARTMENT NGL HALLWAY TOWARDS MUSEUM FFL DISABLED WC FEMALE WC MALE WC FFL 95.
Section 3-3 1 : 100 TRESHOLD STAIRS DEPARTMENT NGL 100.000 FEMALE WC DISABLED WC MALE WC HALLWAY TOWARDS MUSEUM FFL 98.100 FFL 95.400 GROUND WATER COLLECTIONAND PUMP ROOM LOWER DOORS TO AUDITORIUM LOWER
More informationSECTION GYPSUM BOARD
SECTION 092900 GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationGARAGE MAIN FLOOR PLAN
#G389 14' X 24' X 8', Custom detached garage By Page 1 Page 2 Page 3 Page 4 Page BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. GARAGE
More informationDIVISION 07 THERMAL AND MOISTURE PROTECTION ROOFING
07 00 00 PART 1 - GENERAL 1.01 DESIGN CRITERIA A. Preferred roofing types include Membrane, Metal, and Composition Shingles. 1. Membrane roofing is preferred for flat roof decks. 2. Use of asphalt-based
More informationNEWS LETTER MARCH 27, 2009
PLANNING, BUILDING & DEVELOPMENT SERVICES DEPARTMENT 580-1 Street S.E. Medicine Hat, Alberta T1A 8E6 Telephone: 529-8374 FAX 502-8038 1 NEWS LETTER MARCH 27, 2009 GENERAL As you are probably aware there
More informationCOOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.
SECTION 092900 GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More information