1 Design studies of the Castle Bridge over Wislok River in Rzeszow with application of CAD System Author: Dariusz Alterman Superviser: Dr. Tomasz Siwowski, Civ. Eng. Chairman of the examination committee: Prof. Andrzej Jarominiak Technical University of Rzeszow, Poland Faculty of Civil Engineering Institute of Bridges Beginning of the study: April 1999 End of the study: June 2000 Presentation and final examination: July 5, 2000 Final evaluation: very good (the highest note) Contents: 1. Scope of the project 2. Location of the bridge and the transportation system 3. Main characteristics of the road on the bridge 4. Requirements concerning the environmental area 5. Research on the main structure of the bridge 6. Description of the selected solution of the bridge structure 7. Description of the piers and abutments 8. Technology of the erection of the bridge 9. Standard loads on the bridge 10. Computation of the main structure of the bridge 11. Verification of strength of the girders 12. Additional remarks and final conclusions References Computer programs used Acknowledgments Abstract In the paper the research is presented aimed at design of the stayed bridge over Wislok River in Rzeszow. The research covered various aspects of the bridge: its aesthetics and architecture in the historical part of the town, structure and safety, technology of execution, overall cost, etc. The research was based on local data and the final design was submitted to the Urban Development Office for consideration as one of possible solutions and as a reference for further analysis. The author s present address: Institute of Fundamental Technological Research, Polish Academy of Sciences, Swietokrzyska 21, Warsaw, Poland Rzeszow 2000

2 1. Scope of the project The subject of the final project for a degree of Master of Civil Engineering was a design of the Castle Bridge over the Wislok River in Rzeszow located between the existing streets and parks. All data concerning road and transport system, location of the bridge, quality of the soils, characteristic of the river and the cross-section of the road are based on the requirements and specifications obtained from the Urban Development Office (UDO) in Rzeszow. The aim of the project was to prepare a preliminary design of the cable-stayed bridge. Initial stage of the designing had to cover several solutions, prepared previously by the students and in the design offices. Finally, the project comprised the following operations: - Collection and analysis of all available proposals concerning the Castle Bridge; - Preparation of the photographic documentation of the bridge surroundings; - Preparation of basic data for designing; - Architectural studies of a cable-stayed bridge concerning the forms of pylon, intermediate piers and abutments, as well as selection of the final solution; - Static analysis and verification of the strength of main structural elements taking into account also erection stages; - Design of the bridge deck; - Description of all main elements and structural materials of the bridge; Complete design with detailing of the bridge and of the approaching spans; Architectural design of the bridge, including its presentation in perspective view; Analysis of the bridge from the aesthetical viewpoint, using photographic documentation of the surrounding area and animation technique. 2. Location of the bridge and the transportation system Fig.1 2

3 The designed new road and new bridge should fulfil several important functions: - Connection of the existing center of Rzeszow with the developing areas for habitation on the right side of the Wisłok River, (New Town side Fig.1). - Transportation of people between habitation areas and the center of the town by buses, cars and bicycles, also pedestrian traffic is accommodated. - Passage of the long distance traffic across the town. The design of the bridge and roads in the area is strongly limited by requirements due to: - Preservation of the old parts of town, including the Lubomirski s Castle; - Existing parks, gardens and sport halls; - Inundation zones at flooding; - Historical values of the existing buildings and other installations; - Status of private property of several parts of the surrounding area. 3. Main characteristics of the road on the bridge Imposed characteristics of the bridge deck cross-section are related to its function and are shown in Fig.2. Live load according to the Bridge Design Code PN-85/S-10030, Class A is adopted. Total length of the bridge is approximately 200 m m m m 3.5 m m 2.25 m 0.25 Sidewalk 2 % Safety lane 2 % Road 2 % Bike path Sidewalk 2 % 2 % Fig.2 4. Requirements concerning the environmental area On the left bank of the Wislok River there are zones with high historical value subjected to the rigorous preservation control. These are mainly the Lubomirski s Castle, old buildings in its vicinity and the town landscape. All belongs to the traditional zone of old Rzeszow of XIX century, where apart of the main transportation lanes, the road traffic should be restricted, leaving green space for the population. The zone was naturally shaped by the river, which modified its bed in the past centuries. The right bank of the river is flat. On the left bank, there are first the zones also frequently covered by floods and then higher flat plateau with the Castle. Historical and aesthetical values of the Castle should be preserved and emphasized, among others by the bridge single tall pylon. Adequate studies have shown that in the foundation zones the soil is composed of: - thin layers of 0.6m depth of cultivable soil, - river sedimentations layer 3-4m deep, with sand and gravel layers below. 5. Research of the main structure of the bridge Fig.3 3

4 In the design of the bridge seven different cable-stayed systems were considered; for the lack of space only three of them are shown in Figs.3-5. Fig.4 Fig.5 For further design and analysis the solution shown in Fig.6 was selected as the most elegant. Fig.6 The structure is composed of four-span steel girders stayed at six points and supported on three intermediate piers and two abutments. Cables are anchored on the pylon. All piers, abutments and the pylon are made of reinforced concrete. The bridge has total length of 191 m and angle between its axis and the river is equal to 90. Main criteria for selection of this system were: - Aesthetical requirements, - Values of the internal forces. In the design of the pylon itself mainly aesthetical arguments have been considered because of the neighbourhood of the Castle. Seven different solutions have been analysed that are shown in Fig. 7. Finally, the pylon of the H-shape has been selected (Fig.7g). Lower transversal beam supports the main girders and the upper beam ensures stability of the top branches where cables are anchored. 4

5 a) b) c) d) e) f) g) Fig.7 Different structural solutions of the composite steel-concrete bridge deck have been studied in detail as shown in Fig.8. Fig.8 The selected bridge deck is shown in Fig.9. It ensures acceptable aerodynamic characteristics and low weight, together with the adequate stability and strength at all stages of erection. It is made of the composite reinforced concrete slab 0.23 m deep, connected to the steel girders with welded bolts. The diaphragms are spaced by 8.00 m and cables are anchored at the edge longitudinal beams. Depth of the main girders is constant along the bridge and equal to 1.30 m. The sidewalks are covered with a layer of lightweight concrete type LB30. Fig.9 5

6 6. Description of the selected solution of the bridge The final selected solution is shown in Figs. 6, 7g and 9. Two abutments and three intermediate piers support four-span continuous welded girders made with steel 18G2A. The girders are suspended on six cables, anchored in the top of the pylon and in the edge beams of the deck. For the anchorages BBR CONA STAY CS5506 system is applied. Total length of the bridge with abutment wings is m. The abutments and piers are founded on piles. The solution was selected because of its following advantages: - Excellent architectural aspect taking into account all aesthetical requirements related to the existing historical buildings and the values of the landscape; - Tall pylon is an interesting modern accent in the landscape. - Long river span corresponds well to the recreational traffic along the banks of the river; 7. Description of the piers and abutments With respect to the soil and foundation conditions following constructions are selected: - Two reinforced concrete abutments No1 and 5, (Fig. 6), each founded on a slab 13 x 4 x 1.10 m and on large diameter piles; - Two piers No 2 and 3, composed of two columns of cross-section 1.26x1.05m, a cap beam with steel bearings and a lower slab as a capping for the piles, (Fig.10); - Pylon of m in width and of total height of 48.7m. also founded on piles. Fig.10 All piers and abutments are founded on large reinforced concrete piles φ 1.20 m. Concrete of quality B30 and reinforcing steel 18G2A are used except concrete B60 in the pylon. In both abutments special caverns 0.71 x 1.91 m are designed for revision and possible future replacements of the bridge bearings and expansion joints. Behind the abutments the approach slabs 7.40 x 3.50 m are located to ensure smooth passage between the embankment and the abutment. The embankment with the slope of 1:1.5 is reinforced with fibre mats GEOWEB. The slopes are covered with grass. On the external faces of the pylon branches the groves are designed to emphasize their slenderness. Each branch of the pylon is founded on 25 piles φ 1.20 m with a foundation slab 12.0 x 11.5 x 4.0 m. The number of the piles and other details of the bridge foundations should be verified in the final design. 8. Technology of erection of the bridge Following assumptions were accepted for the execution of the bridge: - Steel girders and diaphragrams are manufactured in a factory in the sections correlated with the available trucks. 6

7 - The girders are assembled in situ by welding and launched over the piers (Fig. 11). - The pylon is cast in climbing formwork system before the longitudinal launching of the main girders reaches the pylon itself. - The cables are installed and tensioned using BBR equipment at the final stage. Fig Standard loads on the bridge The bridge was designed according to the Polish Standard PN-85/S and the variable load on the bridge was applied as shown in Fig. 12. For the main girders and the deck the following load combinations were considered: Basic state: - own weight of the structure and permanent installations - variable load of a special vehicle K and uniformly distributed lane load q. Exceptional state: - as above and the wind action on loaded or unloaded spans. Fig Computation of the main structure of the bridge The bridge structure was computed as a three-dimensional (3D) frame using the program ROBOT V6, adequately defining virtual displacements of the selected nodes. Then, all the extreme values of internal forces and bending moments (Fig. 13) were determined in main girders and diaphragms, for various loading states. 7

8 Fig.13 The results are presented in the Table and as an example for the left main girder on the diagram in Fig. 14. Left girder Fig.14 Bending moments [knm] MAX MIN Cross section 11. Verification of strength of the main girders Verification of strength was carried out applying the limit state method, assuming elastic strain of structural materials: steel and concrete, according to the Polish Standard for Bridges PN-82/S All computations were made using MathCad 7.0 and Excel 7.0. As results, extreme values of stresses in the cross-sections were computed at appropriated points and for various loading states. Obtained values have been compared with the following admissible values: for steel 18G2A design strength f s = 295 MPa and for concrete B45 design strength f b = 26 MPa. Final results are shown in the Table for the main girders and for various elements of the bridge deck. For detailing, nine different sections of the main girder were considered, and the examples of the cross-sections of the main girders for different zones are shown in Fig.15. Fig.15 8

9 Fig.16 Fig.17 9

10 Table: verification of the stress values Structural element and cross-section stresses in steel [MPa] stresses in concrete [MPa] lower edge upper edge lower edge upper edge Composite cross-section - zone I Composite cross-section - zone II Composite cross-section - zone III Composite cross-section - zone IV Composite cross-section - zone V Composite cross-section - zone VI Composite cross-section - zone VII Composite cross-section - zone VIII Composite cross-section - zone IX Intermediary diaphragms Diaphragms at the cable Diaphragms above the supports Cantilver under the cable Cantilever above the supports Longitudinal beam at the cable line After the computation and verification of strength it is concluded that the design stress is everywhere lower than the admissible stress values: in the upper flange of the steel girder by 2 17 %, in the lower flange by 50% or more. Also design stresses in concrete B45 are lower than admissible values. 12. Additional remarks and final conclusions Beside the design of the structural elements of the bridge and their detailed analysis, the following operations have been performed to check the aesthetic values of the bridge: - Computer visualization of the selected bridge structure within the scanned landscape; - 3D modelling of the bridge and its elements with AutoCAD R14; - Modeling with 3D Studio MAX R2 for several views of the pylon, also using Photo-Paint and Microsoft Photo Editor to show the bridge in its neighbourhood. Animation of duration of appr. 100sec. showing the bridge from different observation points was also prepared, all figures were made using CorelDRAW 7.0. The final design of the bridge as shown in Figs.16 and 17 is submitted to the UDO in Rzeszow for possible studies and applications as a reference in evaluation of future projects. Humans were building bridges since always, showing not only their technical level but also their trend to beauty and perfection. At present, the bridges still express these feelings. References Computer programs used: AutoCAD R14. CorelDRAW 7.0. Mathcad 7.0 Professional. 3D Studio MAX R2. Robot V6. Microsoft Photo Editor. Photo Paint 7.0. Acknowledgements The author is grateful to Professor A. Jarominiak and Dr. T. Siwowski for their help and encouraging and to the UDO in Rzeszow for access to the technical data concerning the Castel Bridge location and neighbourhood. 10

New Pumarejo Bridge over the river Magdalena in Barranquilla. Colombia.

New Pumarejo Bridge over the river Magdalena in Barranquilla. Colombia. New Pumarejo Bridge over the river Magdalena in Barranquilla. Colombia. J. Manterola S. Fernández S. Fuente J. Muñoz-Rojas J. A. Navarro ABSTRACT The overall length of the new bridge over the River Magdalena

More information

THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN

THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN A.J.Reis 1,J.J.Oliveira Pedro 2 ABSTRACT The Europe bridge is a cable stayed bridge with a main span of 186m. A 3D stay cable arrangement

More information

The Europe Bridge in Portugal: concept and structural design

The Europe Bridge in Portugal: concept and structural design Journal of Constructional Steel Research 60 (2004) 363 372 www.elsevier.com/locate/jcsr The Europe Bridge in Portugal: concept and structural design A.J. Reis a,b,, J.J. Oliveira Pedro a,b a GRID-Consulting

More information

Design and construction of Hechang Bridge, Quanzhou, China

Design and construction of Hechang Bridge, Quanzhou, China Design and construction of Hechang Bridge, Quanzhou, China G. Peng and B. Chen College of Civil Engineering, Fuzhou University, Fuzhou 302, China ABSTRACT: Hechang Bridge is a pedestrian bridge, located

More information

Recent Major Cable-Stayed Bridges in Shanghai

Recent Major Cable-Stayed Bridges in Shanghai 34 Recent Major Cable-Stayed Bridges in Shanghai Q.E. Deng, C.Y. Shao Shanghai Municipal Engineering Design General Institute, China ABSTRACT: This paper presents three major cable-stayed bridges completed

More information

STRESS-RIBBON BRIDGES STIFFENED BY ARCHES OR CABLES

STRESS-RIBBON BRIDGES STIFFENED BY ARCHES OR CABLES 2nd Int. PhD Symposium in Civil Engineering 1998 Budapest STRESS-RIBBON BRIDGES STIFFENED BY ARCHES OR CABLES Tomas Kulhavy Technical University of Brno, Department of Concrete and Masonry Structures Udolni

More information

Basarab Cable Stayed Bridge in Bucharest

Basarab Cable Stayed Bridge in Bucharest Basarab Cable Stayed Bridge in Bucharest Javier MANTEROLA Pr. Dr. Civil Engineer Carlos Fernández Casado,S.L. Madrid, SPAIN jmanterola@cfcsl.com Antonio MARTÍNEZ Dr. Civil Engineer Carlos Fernández Casado,S.L.

More information

BRIDGES WITH PROGRESSIVELY ERECTED DECKS

BRIDGES WITH PROGRESSIVELY ERECTED DECKS Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey BRIDGES WITH PROGRESSIVELY ERECTED DECKS P. Novotny 1, P. Svoboda 2 and J. Strasky 3 ABSTRACT Two types of bridges with progressively erected

More information

Construction of the Nhat Tan Bridge (Vietnam-Japan Friendship Bridge)

Construction of the Nhat Tan Bridge (Vietnam-Japan Friendship Bridge) Construction of the Nhat Tan Bridge (Vietnam-Japan Friendship Bridge) Chodai Co., Ltd., Nippon Engineering Consultants Co., Ltd., IHI Infrastructure Systems Co,. Ltd., and Sumitomo Mitsui Construction

More information

Modjeski and Masters, Inc. Consulting Engineers 04/18/06 St. Croix River Bridge 3D Analysis Report Introduction

Modjeski and Masters, Inc. Consulting Engineers 04/18/06 St. Croix River Bridge 3D Analysis Report Introduction Introduction This memo presents a summary of a three dimensional (3D) analysis of the Organic concept for the proposed St. Croix River bridge project. The Organic concept has several attributes that are

More information

Design of Steel-Concrete Composite Bridges

Design of Steel-Concrete Composite Bridges Design of Steel-Concrete Composite Bridges to Eurocodes Ioannis Vayas and Aristidis Iliopoulos CRC Press Taylor & Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis

More information

AREMA 2008 Annual Conference. LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota

AREMA 2008 Annual Conference. LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota AREMA 2008 Annual Conference LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota 55904 507-281-5188 Steve K. Jacobsen, PE 2 LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE

More information

Long Railway Viaducts with Special Spans: Part-1. Arch Construction by Balanced Cantilever with Auxiliary Cables

Long Railway Viaducts with Special Spans: Part-1. Arch Construction by Balanced Cantilever with Auxiliary Cables Long Railway Viaducts with Special Spans: Part-1. Arch Construction by Balanced Cantilever with Auxiliary Cables J. Manterola A. Martínez Carlos Fernández Casado S.L., Spain B. Martín J.A. Navarro M. A:

More information

Launching technique for the Viaduc de Millau

Launching technique for the Viaduc de Millau Launching technique for the Viaduc de Millau Introduction The Viaduc de Millau is part of the A75 linking Paris with Barcelona (Figure 1). It is currently the highest bridge in the world at 343m high with

More information

Design of Izmir Bay Crossing Bridge

Design of Izmir Bay Crossing Bridge Design of Izmir Bay Crossing Bridge Burak Kurtman Dpt. Manager of Bridge Group, Yüksel Project International, Ankara, Turkey Tel: +90 (312) 4957000 E-mail: bkurtman@yukselproje.com.tr Abstract The Izmir

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Field and Laboratory Performance of FRP Bridge Panels

Field and Laboratory Performance of FRP Bridge Panels Field and Laboratory Performance of FRP Bridge s D. Stone, A. Nanni, & J. Myers University of Missouri Rolla, Rolla, Missouri, USA ABSTRACT: The objective of this research project is to examine the use

More information

This precast prestressed concrete pedestrian

This precast prestressed concrete pedestrian The Rockach Boulevard Pedestrian Bridge by ELIEZER SHAMIR Partner, E. Shamir - H. Posner Consulting Engineers Tel-Aviv, Israel This precast prestressed concrete pedestrian bridge crosses the Rockach Boulevard,

More information

MIDAS Training Series

MIDAS Training Series MIDAS midas Civil Title: All-In-One Super and Sub Structure Design NAME Edgar De Los Santos / MIDAS IT United States 2016 Substructure Session 1: 3D substructure analysis and design midas Civil Session

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Roberto Gómez, Raul Sánchez-García, J.A. Escobar and Luis M. Arenas-García Abstract In this paper we study the

More information

Structural Behaviors of Long-Span Cable-Stayed Bridge With A-Shaped Tower Due to Three Wind Speeds

Structural Behaviors of Long-Span Cable-Stayed Bridge With A-Shaped Tower Due to Three Wind Speeds Structural Behaviors of Long-Span Cable-Stayed Bridge With A-Shaped Due to Three Wind Speeds Aye Nyein Thu department of civil engineering mandalay technological university Mandalay, Myanmar Dr. San Yu

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

Engineering Design Process: Structural Design

Engineering Design Process: Structural Design Engineering Design Process: Structural Design Introduction Structural engineering is the design of structural elements and their connections that work together to support loads and maintain stability within

More information

Progressive Erection Applied to Box Girder with Strutted Wing Slab

Progressive Erection Applied to Box Girder with Strutted Wing Slab Progressive Erection Applied to Box Girder with Strutted Wing Slab Koji Osada 1, Taketo Kanamoto 1, Kimito Saito 2, Takahiro Arai 2 1 Introduction The Uchimaki Viaduct is a multi-span continuous box girder

More information

RESEARCH FOR THE MECHANICAL BEHAVIOR OF SIMPLE-SUPPORTED IRREGULAR REINFORCED CONCRETE SLAB BRIDGE

RESEARCH FOR THE MECHANICAL BEHAVIOR OF SIMPLE-SUPPORTED IRREGULAR REINFORCED CONCRETE SLAB BRIDGE RESEARCH FOR THE MECHANICAL BEHAVIOR OF SIMPLE-SUPPORTED IRREGULAR REINFORCED CONCRETE SLAB BRIDGE Wei Chen 1, Guojing He 1 1 Central South University of Forestry and Technology No. 498 Shaoshan Road,

More information

Construction and design features of the Bridge over the Danube River. Bulgaria

Construction and design features of the Bridge over the Danube River. Bulgaria Construction and design features of the Bridge over the Danube River. Bulgaria Javier MANTEROLA Pr. Dr. jmanterola@cfcsl.com Antonio MARTÍNEZ Dr. amartinez@cfcsl.com Juan Antonio NAVARRO janavarro@cfcsl.com

More information

PRESENTATION OF SHORT SPAN REINFORCED CONCRETE BRIDGES

PRESENTATION OF SHORT SPAN REINFORCED CONCRETE BRIDGES Bulletin of the Transilvania University of Braşov Vol. 10 (59) Special Issue No. 1-2017 Series I: Engineering Sciences PRESENTATION OF SHORT SPAN REINFORCED CONCRETE BRIDGES A. LANDOVIĆ 1 M. BEŠEVIĆ 2

More information

CABLE STAYED FOOTBRIDGE MADE OF UHPC

CABLE STAYED FOOTBRIDGE MADE OF UHPC CABLE STAYED FOOTBRIDGE MADE OF UHPC J.L. Vitek (1), M. Kalný (2) and R. Coufal (3) (1) Metrostav a.s. and CTU Prague, Prague, Czech Republic (2) PONTEX, Ltd., Prague, Czech Republic (3) TBG Metrostav,

More information

The construction technology of Chongqing Chaotianmen Bridge

The construction technology of Chongqing Chaotianmen Bridge The construction technology of Chongqing Chaotianmen Bridge Zhongfu Xiang School of Civil Engineering & Architectures, Chongqing Jiaotong University, Chongqing, China Wei Xu China zhongtie major bridge

More information

Stay Tuned! Practical Cable Stayed Bridge Design

Stay Tuned! Practical Cable Stayed Bridge Design midas Civil Stay Tuned! Practical Cable Stayed Bridge Design 2017 Francesco Incelli I. Introduction II. Modeling of the cable-stayed bridge a. Bridge wizard b. Girder Cross Section III. Nonlinear Effect

More information

The New, Balanced Cantilever, Bridge over Acheloos River in Greece

The New, Balanced Cantilever, Bridge over Acheloos River in Greece The New, Balanced Cantilever, Bridge over Acheloos River in Greece Chrysanthos Maraveas 1, Konstantina Tasiouli 1 and Konstantinos Miamis 1 1 C. MARAVEAS PARTNERSHIP Consulting Engineers, Athens, Greece.

More information

TEST AND ANALYSIS OF A SHORT-SPAN RAILWAY BRIDGE

TEST AND ANALYSIS OF A SHORT-SPAN RAILWAY BRIDGE Proceedings of the 6th International Conference on Mechanics and Materials in Design, Editors: J.F. Silva Gomes & S.A. Meguid, P.Delgada/Azores, 26-30 July 2015 PAPER REF: 5756 TEST AND ANALYSIS OF A SHORT-SPAN

More information

Development of New PSC Box Girder Bridge with Concrete-filled FRP Struts

Development of New PSC Box Girder Bridge with Concrete-filled FRP Struts Development of New PSC Box Girder Bridge with Concrete-filled FRP Struts Park, Jong-Hwa Associate Director, Civil & Environment Division Hyundai Engineering & Construction Co.,LTD. parkjh@hdec.co.kr Jang,

More information

SOFiSTiK. for BRIDGES Company presentation. Georg Pircher SOFiSTiK International sales

SOFiSTiK. for BRIDGES Company presentation. Georg Pircher SOFiSTiK International sales SOFiSTiK for BRIDGES Georg Pircher SOFiSTiK International sales 23.05.2016 Company presentation Bridge Types Any structural bridge system is supported. Including: Box girder bridges. Slab bridges. Composite

More information

BALANCED CANTILEVER GIRDER BRIDGE OVER THE DANUBE-BLACK SEA CHANNEL

BALANCED CANTILEVER GIRDER BRIDGE OVER THE DANUBE-BLACK SEA CHANNEL DOI: 10.1515/rjti-2015-0017 BALANCED CANTILEVER GIRDER BRIDGE OVER THE DANUBE-BLACK SEA CHANNEL Aldo Giordano, PH.D. Professor of Structural Engineering, ITALROM Inginerie Internationala, e-mail: a.giordano@italrominginerie.com

More information

CAIYUANBA BRIDGE, CHONGQING, CHINA. Man-Chung Tang, Chairman, T.Y. Lin International. Guolei Ren, Vice President, T.Y. Lin International (China)

CAIYUANBA BRIDGE, CHONGQING, CHINA. Man-Chung Tang, Chairman, T.Y. Lin International. Guolei Ren, Vice President, T.Y. Lin International (China) CAIYUANBA BRIDGE, CHONGQING, CHINA Zhonggui Jiang, Chief Engineer, T.Y. Lin International (China) Man-Chung Tang, Chairman, T.Y. Lin International Guolei Ren, Vice President, T.Y. Lin International (China)

More information

Design, fabrication and construction of Railway Bridge over Södertälje canal

Design, fabrication and construction of Railway Bridge over Södertälje canal NSCC2009 Design, fabrication and construction of Railway Bridge over Södertälje canal Michael B. Thulstrup 1, Mattias Nilsson 2, Robert Hällmark 3 & Jens P. Nielsen 4 1 Project Manager, MT Højgaard a/s,

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2015

More information

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure C.Y. Shao Shanghai Municipal Engineering Design & Research General Institute (Group) Co. Ltd.,

More information

6. Design of Portal Frames (For class held on 20 th, 26 th and 27 th March 07)

6. Design of Portal Frames (For class held on 20 th, 26 th and 27 th March 07) 6. Design of Portal Frames (For class held on 0 th, 6 th and 7 th March 07) By Dr. G.S.Suresh, Professor, Civil Engineering Department, NIE, Mysore (Ph:934188467, email: gss_nie@ yahoo.com) 3.1 Introduction:

More information

(laboratory) (fall semester)

(laboratory) (fall semester) Civil Engineering Courses-1 CIV 211/Surveying Prerequisite: MAT 127 An introduction to the theory and applications of modern surveying processes. Students use optical and digital land surveying instruments

More information

Design and Rating of Steel Bridges

Design and Rating of Steel Bridges 2014 Bentley Systems, Incorporated Parametric and Integrated Bridge Design LEAP Bridge Steel Steve Willoughby Design and Rating of Steel Bridges 2 WWW.BENTLEY.COM 2014 Bentley Systems, Incorporated 1 Discussion

More information

2014 HDR, all rights reserved.

2014 HDR, all rights reserved. 2014 HDR, all rights reserved. That s No Ordinary Bridge Ben Zeman, P.E. Lance Peterman, P.E.,S.E. Caahlen McAtee, P.E. 2014 HDR, all rights reserved. Presentation Outline Project Overview Design Behavior

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

Contents. Foreword 1 Introduction 1

Contents. Foreword 1 Introduction 1 Contents Notation x Foreword xiii 1 Introduction 1 1.1 Aims of the Manual 1 1.2 Eurocode system 1 1.3 Scope of the Manual 3 1.4 Contents of the Manual 4 1.5 Notation and terminology 4 2 General principles

More information

Drexel University Race Street Dormitory REVISED THESIS PROPOSAL Doug Tower Structural Advisor: Kevin Parfitt 2/7/07

Drexel University Race Street Dormitory REVISED THESIS PROPOSAL Doug Tower Structural Advisor: Kevin Parfitt 2/7/07 Drexel University Race Street Dormitory REVISED THESIS PROPOSAL Doug Tower Structural Advisor: Kevin Parfitt 2/7/07 Table of Contents I. Executive Summary... 3 II. Introduction... 4 III. Background...

More information

PROJECT OF TWO METAL ARCH BRIDGES WITH TUBULAR ELEMENTS AND NETWORK SUSPENSION SYSTEM

PROJECT OF TWO METAL ARCH BRIDGES WITH TUBULAR ELEMENTS AND NETWORK SUSPENSION SYSTEM PROJECT OF TWO METAL ARCH BRIDGES WITH TUBULAR ELEMENTS AND NETWORK SUSPENSION SYSTEM Francisco Millanes Mato a, Miguel Ortega Cornejo b, Antonio Carnerero Ruiz c a Prof., PhD., Eng., Universidad Politécnica

More information

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee The Structural Redesign of Boyds Bear Country and its Related Systems Included in this Presentation: Background and Existing System Proposal Problem / Solution Structural System Redesigns Pre-cast Concrete

More information

Sabah Shawkat Cabinet of Structural Engineering 2017

Sabah Shawkat Cabinet of Structural Engineering 2017 3.1-1 Continuous beams Every building, whether it is large or small, must have a structural system capable of carrying all kinds of loads - vertical, horizontal, temperature, etc. In principle, the entire

More information

Cable stayed bridges with a 3D truss composite deck

Cable stayed bridges with a 3D truss composite deck Cable stayed bridges with a 3D truss composite deck Pedro Ricardo Chainho Sequeira Department of Civil Engineering, Architecture and Georesources, Instituto Superior Técnico, Technical University of Lisbon,

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update July 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The entails the construction of a cast in place

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

Comparative Study of R.C.C and Steel Concrete Composite Structures

Comparative Study of R.C.C and Steel Concrete Composite Structures RESEARCH ARTICLE OPEN ACCESS Comparative Study of R.C.C and Steel Concrete Composite Structures Shweta A. Wagh*, Dr. U. P. Waghe** *(Post Graduate Student in Structural Engineering, Y.C.C.E, Nagpur 441

More information

UHPC Connection of Precast Bridge Deck

UHPC Connection of Precast Bridge Deck Jan L. Vitek, Metrostav, a.s. and CTU in Prague Jiri Kolisko, CTU in Prague, Klokner Institute David Citek, CTU in Prague, Klokner Institute Stanislav Rehacek, CTU in Prague, Klokner Institute Robert Coufal,

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Analysis and Design of Steel

Analysis and Design of Steel Analysis and Design of Steel and Composite Structures Qing Quan Liang CRC Press Taylor & Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an informa business

More information

BS EN :2004 EN :2004 (E)

BS EN :2004 EN :2004 (E) Contents List 1. General 1.1 Scope 1.1.1 Scope of Eurocode 2 1.1.2 Scope of Part 1-1 of Eurocode 2 1.2 Normative references 1.2.1 General reference standards 1.2.2 Other reference standards 1.3 Assumptions

More information

Design and Construction of the Nan-Tien Pedestrian Bridge, a Continuous Super-T Bridge over Princes Motorway.

Design and Construction of the Nan-Tien Pedestrian Bridge, a Continuous Super-T Bridge over Princes Motorway. Design and Construction of the Nan-Tien Pedestrian Bridge, a Continuous Super-T Bridge over Princes Motorway. ABSTRACT James Nasr, Senior Bridge Engineer, Cardno The Nan-Tien Pedestrian Bridge project

More information

xiii Preface to the Fifth Edition Preface to the Second Edition Factors for Conversion to SI Units of

xiii Preface to the Fifth Edition Preface to the Second Edition Factors for Conversion to SI Units of Structural Steel Designer's Handbook Table Of Contents: Contributors xiii Preface to the Fifth Edition xv Preface to the Second Edition xvii Factors for Conversion to SI Units of xix Measurement Chapter

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

Loading Tests of Thin-Walled Ferro-Cement Panels for Horizontal Slab Structures

Loading Tests of Thin-Walled Ferro-Cement Panels for Horizontal Slab Structures Loading Tests of Thin-Walled Ferro-Cement Panels for Horizontal Slab Structures MARCELA KARMAZÍNOVÁ, JINDRICH MELCHER and MICHAL ŠTRBA Faculty of Civil Engineering Brno University of Technology Veveří

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update September 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: September

More information

Challenging Skew: Higgins Road Bridge over I-90

Challenging Skew: Higgins Road Bridge over I-90 Challenging Skew: Higgins Road Bridge over I-90 Lance Peterman, P.E.,S.E. 13th Annual Midwest Bridge Symposium April 28, 2016 2014 HDR, all rights reserved. Presentation Outline Project Overview Design

More information

STRESS-RIBBON PEDESTRIAN BRIDGES SUPPORTED OR SUSPENDED ON ARCHES

STRESS-RIBBON PEDESTRIAN BRIDGES SUPPORTED OR SUSPENDED ON ARCHES STRESS-RIBBON PEDESTRIAN BRIDGES SUPPORTED OR SUSPENDED ON ARCHES Jiri STRASKY Prof., DSc., Brno University of Technology, Brno, Czech Republic Technical Director, Strasky, Husty and partners Brno, Czech

More information

Development of an Efficient Tapered Slip-Form System Applying BIM Technology

Development of an Efficient Tapered Slip-Form System Applying BIM Technology Engineering, 2013, 5, 693-699 http://dx.doi.org/10.4236/eng.2013.59082 Published Online September 2013 (http://www.scirp.org/journal/eng) Development of an Efficient Tapered Slip-Form System Applying BIM

More information

2016 DESIGN AND DRAWING OF REINFORCED CONCRETE STRUCTURES

2016 DESIGN AND DRAWING OF REINFORCED CONCRETE STRUCTURES R13 SET - 1 DESIGN AND DRAWING OF REINFCED CONCRETE STRUCTURES 1 Design a simply supported rectangular beam to carry 30kN/m superimposed load over a span of 6m on 460mm wide supports. Use M20 grade concrete

More information

4/14/2015 INTRODUCTION. Dr. AZ Department of Civil Engineering Brawijaya University BRIDGES

4/14/2015 INTRODUCTION. Dr. AZ Department of Civil Engineering Brawijaya University BRIDGES INTRODUCTION Dr. AZ Department of Civil Engineering Brawijaya University BRIDGES A bridge is a structure built to span a valley, road, body of water, or other physical obstacle, for the purpose of providing

More information

Potential Solutions- Background: Current Designs. Potential Solutions. Goals for Design What are we concerned about?

Potential Solutions- Background: Current Designs. Potential Solutions. Goals for Design What are we concerned about? Potential Solutions Potential Solutions- Background: Current Designs Goals for Design What are we concerned about? Primary Goal: Get the deck on successfully Stability during deck pour Girder plumbness

More information

Steel Expansion. Located along the Grand River in

Steel Expansion. Located along the Grand River in Steel Expansion by Michael Gustafson, P.E. The DeVos Place convention center in Grand Rapids, MI, is undergoing a multi-year expansion featuring steel-framed column-free exhibit space. Located along the

More information

DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD

DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD 2018 Purdue Road School Transportation Conference Rendering by Touchstone Architecture Martin Furrer, PE, SE March 6, 2018 DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD Project Location

More information

Preflex Prestressing Technology on Steel Truss Concrete-Composite Bridge with Medium Span

Preflex Prestressing Technology on Steel Truss Concrete-Composite Bridge with Medium Span Modern Applied Science; Vol. 8, No. 1; 14 ISSN 1913-1844 E-ISSN 1913-185 Published by Canadian Center of Science and Education Preflex Prestressing Technology on Steel Truss Concrete-Composite Bridge with

More information

Masonry and Cold-Formed Steel Requirements

Masonry and Cold-Formed Steel Requirements PC UFC Briefing September 21-22, 2004 Masonry and Cold-Formed Steel Requirements David Stevens, ARA Masonry Requirements Composite Construction Masonry is often used in composite construction, such as

More information

Concrete Bridge Design and Construction series

Concrete Bridge Design and Construction series www.thestructuralengineer.org 41 CBDC series July 2014 Concrete Bridge Design and Construction series This series is authored by the Concrete Bridge Development Group (CBDG). The group aims to promote

More information

DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY

DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY ABSTRACT Jugesh Kapur, PE, SE 1 The seismic design and detailing of bridges made of precast prefabricated members

More information

ST7008 PRESTRESSED CONCRETE

ST7008 PRESTRESSED CONCRETE ST7008 PRESTRESSED CONCRETE QUESTION BANK UNIT-I PRINCIPLES OF PRESTRESSING PART-A 1. Define modular ratio. 2. What is meant by creep coefficient? 3. Is the deflection control essential? Discuss. 4. Give

More information

STUDIES ON LONG-SPAN CONCRETE ARCH BRIDGE FOR CONSTRUCTION AT IKARAJIMA IN JAPAN

STUDIES ON LONG-SPAN CONCRETE ARCH BRIDGE FOR CONSTRUCTION AT IKARAJIMA IN JAPAN Arch Bridges ARCH 4 P. Roca and E. Oñate (Eds) CIMNE, Barcelona, 24 STUDIES ON LONG-SPAN CONCRETE ARCH BRIDGE FOR CONSTRUCTION AT IKARAJIMA IN JAPAN Kazuto Kamisakoda *, Hikaru Nakamura and Atsushi Nakamura

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

Case study of the effect on foundation of changing an arch bridge to a slab and girder bridge

Case study of the effect on foundation of changing an arch bridge to a slab and girder bridge Case study of the effect on foundation of changing an arch bridge to a slab and girder bridge Climent Molins Universitat Politècnica de Catalunya Barcelona Tech, Spain ABSTRACT: This paper presents the

More information

Odin s Bridge Northern Europe s Longest Twin Swing Bridge.

Odin s Bridge Northern Europe s Longest Twin Swing Bridge. Odin s Bridge Northern Europe s Longest Twin Swing Bridge. CEO, MSc. Civ. Eng. Kjeld Thomsen, ISC Consulting Engineers A/S, Denmark ODINS BRIDGE Europe s longest twin Swing Bridge. Summary Kjeld Thomsen,

More information

2. Outline of the bridge 3-span continuous deck extradosed bridge Bridge length

2. Outline of the bridge 3-span continuous deck extradosed bridge Bridge length Construction of Extradosed Bridge in the Government Financed Section EUI-NAM PARK, PM, Incheon Bridge Section 5, Doosan Construction & Engineering corporation KYUNG-KUK JUNG, GM, Incheon Bridge Section

More information

The Design and Construction of Geogeum Grand Bridge

The Design and Construction of Geogeum Grand Bridge The Design and Construction of Geogeum Grand Bridge Woo Jong Kim, Kyung Sik Cho DM Engineering Co., Ltd, Seoul, Seoul, KOREA wjkim@dm-eng.com, drchoks@dm-eng.com Abstract The Geoguem bridge was recently

More information

Level 6 Graduate Diploma in Engineering Structural analysis

Level 6 Graduate Diploma in Engineering Structural analysis 9210-111 Level 6 Graduate Diploma in Engineering Structural analysis Sample Paper You should have the following for this examination one answer book non-programmable calculator pen, pencil, ruler, drawing

More information

Assess steel cable stayed bridges in viet nam

Assess steel cable stayed bridges in viet nam Assess steel cable stayed bridges in viet nam Prof.Dr. Nguyen Viet Trung Header of Urban Transport Engineering Section General assessment of steel cable stayed bridge The assessment of cable stayed bridges

More information

REHABILITATION OF TWO HISTORICAL BRIDGES IN BAILE HERCULANE ROMANIA

REHABILITATION OF TWO HISTORICAL BRIDGES IN BAILE HERCULANE ROMANIA Bulletin of the Transilvania University of Braşov CIBv 2015 Vol. 8 (57) Special Issue No. 1-2015 REHABILITATION OF TWO HISTORICAL BRIDGES IN BAILE HERCULANE ROMANIA I. BADEA1 D. BADEA2 Abstract: The paper

More information

Structural - Engineering Review Checklist

Structural - Engineering Review Checklist Structural - Engineering Review Checklist Project: List Corridor Criteria ID Review Priority (H,M,L) TOPICS S-_-## Structural Design Codes, Manuals and Specifications 6.1.0 REFERENCES DESIRED Criteria

More information

Solutions for the Construction of steel bridges using the example of the Hochmoselübergang

Solutions for the Construction of steel bridges using the example of the Hochmoselübergang Solutions for the Construction of steel bridges using the example of the Hochmoselübergang Dipl.-Ing. Michael Hagedorn, Eiffel Deutschland Dr.-Ing. Thomas Klähne, Klähne Ingenieure Dipl.-Ing. Uwe Heiland,

More information

Park Potomac Office Building E

Park Potomac Office Building E Kyle Wagner (IP) Advisor: Professor Kevin Parfitt 12/11/2009 Table of Contents I. Executive Summary. 3 II. Introduction / Material Strengths. 4 III. Codes and Design Standards.. 5 IV. Existing Structural

More information

Lattice Plate Flooring

Lattice Plate Flooring Lattice Plate Flooring Introduction Pekso Precast manufacturers and supplies a range of precast concrete structural building products ranging from foundations and flooring systems that includes Lattice

More information

Possible solution to past CM examination question. Question 3 - April Footbridge over a waterfall. by Saprava Bhattacharya

Possible solution to past CM examination question. Question 3 - April Footbridge over a waterfall. by Saprava Bhattacharya Possible solution to past CM examination question Question 3 - April 2013 Footbridge over a waterfall by Saprava Bhattacharya The information provided should be seen as an interpretation of the brief and

More information

Finite Element Analysis of Bridge Deck Girders under Load Model 1 (EN ) Using Staad Pro

Finite Element Analysis of Bridge Deck Girders under Load Model 1 (EN ) Using Staad Pro Finite Element Analysis of Bridge Deck Girders under Load Model 1 (EN 1991-2) Using Staad Pro Abstract Ubani Obinna Uzodimma Works/Engineering Services Department Ritman University, PMB 1321, Ikot Ekpene,

More information

ARCHITECTURAL ENGINEERING (ARCE)

ARCHITECTURAL ENGINEERING (ARCE) Architectural Engineering (ARCE) 1 ARCHITECTURAL ENGINEERING (ARCE) ARCE Courses ARCE 106. Introduction to Building Systems. 2 units Introduction to building systems and materials. Use and application

More information

Contents. Tables. Notation xii Latin upper case letters Latin lower case letters Greek upper case letters Greek lower case letters. Foreword.

Contents. Tables. Notation xii Latin upper case letters Latin lower case letters Greek upper case letters Greek lower case letters. Foreword. Tables x Notation xii Latin upper case letters Latin lower case letters Greek upper case letters Greek lower case letters xii xiv xvi xvi Foreword xviii 1 Introduction 1 1.1 Aims of the Manual 1 1.2 Eurocode

More information

1. THE PROJECT Introduction to The Project History and status of The Tender for the D&B contract... 3

1. THE PROJECT Introduction to The Project History and status of The Tender for the D&B contract... 3 TABLE OF CONTENTS 1. THE PROJECT... 2 1.1 Introduction to The Project... 2 1.2 History and status of The Tender for the D&B contract... 3 1.3 The Tender documents for the D&B Contract... 3 1.4 Special

More information

Modeling and Design of Bridge Super Structure and Sub Structure

Modeling and Design of Bridge Super Structure and Sub Structure Topic 3 Day 2 Modeling and Design of Bridge Super Structure and Sub Structure Naveed Anwar 1. Over view of Bridge Design Process and Bridge Types 2. Advances and recent trends in Modeling and Analysis

More information

Influence of Depth in Single Cell & Twin Cell Box Girder

Influence of Depth in Single Cell & Twin Cell Box Girder Influence of Depth in Single Cell & Twin Cell Box Girder V. Raja Srinivasa Reddy 1, P. Veerabhadra Rao 2 P.G student, Dept. of Civil Engineering, GVP College of Engineering (A), Visakhapatnam, India 1

More information

OXFORD ENGINEERING COLLEGE (NAAC Accredited with B Grade) Department of Civil Engineering LIST OF QUESTIONS

OXFORD ENGINEERING COLLEGE (NAAC Accredited with B Grade) Department of Civil Engineering LIST OF QUESTIONS OXFORD ENGINEERING COLLEGE (NAAC Accredited with B Grade) Department of Civil Engineering LIST OF QUESTIONS Year/ Sem. : IV / VII Staff Name : S.LUMINA JUDITH Subject Code : CE 6702 Sub. Name : PRE STRESSED

More information

Chapter 2 Notation and Terminology

Chapter 2 Notation and Terminology Reorganized 318 Chapter Titles Chapter 1 General 1.1 Scope 1.2 Purpose 1.3 Interpretation 1.4 Drawings and Specifications 1.5 Testing and Inspection 1.6 Administatration and Enforcement 1.6.1 Retention

More information

VIADUCTS BY PUSHING: INCREMENTALLY LAUNCHED BRIDGES

VIADUCTS BY PUSHING: INCREMENTALLY LAUNCHED BRIDGES Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey VIADUCTS BY PUSHING: INCREMENTALLY LAUNCHED BRIDGES J. E. Erdoğan 1 and Ö. Özkul 2 ABSTRACT Despite its widespread use around the world, constructing

More information

Palma del Río Arch Bridge, Córdoba, Spain

Palma del Río Arch Bridge, Córdoba, Spain Palma del Río Arch Bridge, Córdoba, Spain Francisco Millanes, Dr, Eng., Prof., University Politécnica de Madrid; President, IDEAM, S.A., Madrid, Spain; Miguel Ortega, Eng., Prof., University Europea de

More information