PRE FEASIBILITY REPORT

Size: px
Start display at page:

Download "PRE FEASIBILITY REPORT"

Transcription

1 PRE FEASIBILITY REPORT Of Stone Quarry (Area 2.01 ha) Survey No: - 161/2 & 162 (Part) Village Mandavghorad,Taluka Hingana, Dist - Nagpur (M.S). Owner & Lessee M/s Saikrupa Stone Crusher (LLP) Through Partner Shri. Ashish Umeshrao Tonde & Shri. Amit Kishor Sunkarwar Prepared by NABET Accredited EIA Consultant EARTHCARE LABS PVT. LTD, C-11, Amar Enclave Commercial Wing, Jog Layout, Prashant Nagar, Near Ajni Square, Nagpur earthcare2000@gmail.com May-2017

2 Prefeasibility Report (PFR) (as per MoEF Guidelines vide O.M. J-11013/41/2006-IA.II (I) dtd ) 1. EXECUTIVE SUMMARY Nagpur district is rich in mineral resources. Apart from the important minerals such as coal and manganese, the district possesses abundant supplies of minerals like dolomitic limestone, clays, and wolfram and building stones. District is well endowed with various kinds of rocks suitable for building construction, roads, etc. The Deccan Trap Basalt Rock is being extensively quarried roundabout Nagpur for road construction and building purposes. The basalts are usually dark grey to grey in color and are hard compact and tough and fine to medium grained structure. It is completely impervious to percolation and causing an accuse shortage of water in summer. Basalt rock/stone quarrying is a important activity in the District. Basalt stone material is used for a wide variety of purposes. It is used as main construction material in the district in the form of rubble, murum, metal, aggregate etc. It is most commonly crushed for use as an aggregate in construction projects. Crushed basalt is required for road base, concrete aggregate, and asphalt pavement aggregate, railroad ballast, filter stone in drain fields and many other purposes. The scientific development of stone quarry can lead to use of basalt rock for infrastructure and construction development activities and also rain water harvesting can be maximized by developing water storage ponds at the closure of quarry. During stone quarrying, it is necessary to strike a balance between the development and ecology. The impacts on the environment during stone quarrying can be minimized by implementing a well-planned mitigation measures & Environment Management Plan. The stone quarry under consideration will be further developed scientifically by opencast mining method. The operations at quarry will be manual and semi mechanized type. The mining operations will be carried out on a single shift basis. Drilling and blasting operations will be carried out scientifically through experienced & licensed contractors. The drilling will be carried out by compressed air operated jack hammer drill. Emulsion explosive cartridges and electric detonator will be the charge in hole. All the holes will be connected in series and by giving optimized electric charge to the circuit through experienced

3 blaster the scientific blasting will be carried out such that there will be minimum vibration, noise & dust generation. The rubble will be shifted to crusher. The output as various grades will be supplied to consumers. The scientific development of stone quarry leads to use of basalt rock for developmental projects viz. infrastructure and housing/building construction activities. During stone quarrying, it is necessary to strike a balance between the development and ecology. The impacts on the environment during stone quarrying can be minimized by implementing a well-planned mitigation measures as suggested in Environment Management Plan (EMP). The stone quarry owner is well experienced in operation of stone quarry and about implementation of various environmental measures. The stone quarry under consideration will be further developed scientifically by opencast mining method. The operation at quarry is manual and semi mechanized type. The mining operations will be carried out on a single shift basis. Drilling and blasting operations will be carried out scientifically through experienced & licensed contractors. The various aspects of the Pre-Feasibility Report as per MoEF Guidelines vide O.M. J /41/2006-IA.II (I) dtd is given in the subsequent sections. 2. Introduction of the Project/Background Information (i) Identification of Project and Project Proponent Stone quarry of (Owner & Lessee) M/s Saikrupa Stone Crusher (LLP) through Partner Shri. Ashish Umeshrao Tonde & Shri. Amit Kishor Sunkarwar exists on pvt. land (Area 2.01ha). The stone quarry is located near Mandavghorad village of Taluka Hingana Dist- Nagpur (M.S). The location maps of the stone quarry are enclosed as Enclosure - 1. The District Collector, Nagpur has granted lease to this stone quarry regularly in view of compliances including environmental mitigation measures. The copy of the Mining Order, NOC from Grampanchayat, 7/12 documents etc are enclosed as Enclosure - 2. The project proponent M/s Saikrupa Stone Crusher (LLP) through Partner Shri. Ashish Umeshrao Tonde & Shri. Amit Kishor Sunkarwar the business of stone quarrying since last several years. The project proponent has office At+Post- Mhalgi Nagar, Ta+Dist: Nagpur. The project proponent has wide experience in the field of stone quarrying & crushing. He is operating the stone quarry with all precautionary measures and taking measures for

4 environmental conservation. The stone material is supplied for infrastructure development, construction activities etc. (ii) Brief description of nature of the project The stone quarry is basically a very small scale project in which quarrying of minor mineral stone is carried out. The stone quarries exist in clusters, as it depends on availability of stone in the particular area. The murum and stone is excavated out from the rocky land area during day time. The stone quarry under consideration existing on Pvt. land at Survey No.161/2 & 162 Village Mandavghorad, Taluka Hingana Dist- Nagpur (M.S.) and its production rate is low. As per EIA Notification 2006, the stone quarrying falls under Schedule in serial No. 1(a) (i) Mining of Minerals. Based on lease area and general conditions mentioned in the amendments of EIA Notification, the project is categorized as Category B 2. (iii) Need for the project and its importance to the country and or region The Stone (Rubble, Murum, Metal etc.) is the basic material required for infrastructure development and construction activities. The rapid development of the country is directly related to stone quarrying. Though the capacity of each stone quarry is very small, there local existence (shortest distance from developmental activity) is very important in view of low transportation cost and comparatively smaller investment in environmental conservation. The existence of stone quarry at each village and taluka level plays important role in getting the regular employment to the locals also. In the Nagpur District many developmental activities are going on. There is huge demand to stone material and its regular supply can keep the prices in control. The occurrence of Deccan trap is proved a beneficial factor. The stone quarry under consideration is need of the region. (iv) Demand Supply Gap Nagpur district has Nagpur City in which many housing construction are going on and there is regular demand of stone material. The taluka and village level building construction is also at good level. Road network of the district is also very good. National highway No. 6 which connects Mumbai and Kolkata and NH No.7 which connects Varanasi to Kanyakumari cuts through the district which provides link with commercial and industrial centers of the of the country. A

5 good network of 982 km of state highway connects the interior parts of the district with the major marketing centers and district headquarters. Besides the above, a network of major district roads, village roads and other roads facilitates smooth transportation. In the Nagpur District, National Highways are of 319 km length, State Highway are of 982 km length, District Road (Major) are of 1028 km length, Other district roads are of 1458 km length, Village roads are of 3419 km length in the district. There are 12 MIDC Industrial Estate in Nagpur. Butibori Industrial Area is one of the biggest industrial areas in Maharashtra. There are many large, medium and small-scale industries in the District. Five major Thermal Power Plants existing in the district and construction/expansion of some of them is going on. Gosikhurd dam near adjacent district is under construction has huge requirement of stone material. There are many ready mixed concrete plants in the District and they require sized stone metal regularly. In general there is huge demand of stone material in the district and its demand is increasing day by day due to developmental activities. The supply of stone material solely depends on the stone quarries & crushers of the District. This quarry area is the major source of supply of this stone material supply in the district. The Stone quarry under consideration is part of it and it can be helpful in fulfilling the demand on regular basis. (v) Imports Vs. Indigenous Production The stone materials cannot be imported as it is abundantly available indigenously in the District. The transportation cost and distance criteria for immediate supply are the major factors of these small scale enterprises/units. Deccan trap basalt deposits of Nagpur are good in quality and indigenous production is only better option in view of its economy, fuel conservation, environmental conservation etc. (vi) Export Possibility At present, the stone materials are not exported out. (vii) Domestic/Export Markets The market in the district for stone materials is well established and regular demand is fulfilled to the possible extent by the stone quarries. The local associations of the stone quarries

6 are active in the District. Association regularly monitors market requirement, production targets and other activities for environmental conservation. (viii) Employment Generation (Direct and Indirect) due to the project The stone quarry under consideration has about 8-10 persons on regular basis. 3. Project Description (i) Type of project including interlinked and interdependent project, if any In this stone quarry, mining of minor minerals (stone) is carried out by opencast method in one shift only. The crushing of stone in crusher is an interlinked and interdependent project. (ii) Location (map showing general location, specific location and project boundary & project site layout) with coordinates The stone quarry lease area is covered in Survey of India Toposheet No.55 K/16. The location maps viz. topographic location map is attached herewith Enclosure -I. (iii) Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental consideration gone into should be highlighted The stone quarry is a site-specific activity and it is in operation since last several years. The site is selected mainly due to availability of basalt stone in plenty. The site is well connected by road to city and distance is also within the range. There was no tree cutting involved. The site land is completely barren with no vegetation. The rights of the site are with mine owner and agricultural activities were not possible on the selected land. (iv) Size or Magnitude of operation The stone quarry is small scale activity and magnitude of operation is also low. The activity is carried out during day time only. The operations are also not carried out simultaneously and all are scattered. The production rates are totally dependent on market demand and there is no point in maintaining stock of the material, as it is very low margin product. (v) Project description with process details (a schematic diagram/flow chart showing the project layout, components of the project etc. should be given) The stone quarry operation involves site clearing, drilling, blasting, loading/unloading, crushing, screening, loading of finished stone materials etc. Initially site is cleared for any unwanted objects/dust. As per plan, the internal roads are earmarked. For the development of benches, the drilling site is selected. In a stretch, drilling is carried out by compressed air operated jack hammer drill. The depth of holes is kept to 1.5 m. Burden & spacing is kept to 1.0 x 1.0 m. The diameter of hole is 32 mm. In each hole, two emulsion explosive cartridge of

7 size 25 mm dia x 150 mm length are inserted. In one of the cartridge, electric detonator is inserted and its wire is taken out of the hole. The hole is then completely filled by dust and stone bags are kept for muffling. All the holes are connected in series by additional wire to all detonators. The circuit of the all detonators is completed and wire ends are then connected to charge box. The charge to circuit is given as per requirement by experienced & licensed blaster in terms of charge rotations required. Once the circuit is completely charged, the light in the box blows and by pressing the knob, blasting is carried out. All the precautionary measures during blasting are taken out. Due to blasting the compact stone material became loose in the form of rubble. The rubble is removed by JCB/manually and taken to suitable place for sorting. The rubble pieces are then sized to 8 to 10 inch and shifted by tractor trolley to crusher. In the feeding pocket of crusher, all sized stone material is unloaded. The material moves downward in to crusher. The crushed stone through conveyor is taken to screens. At screens, various sizes of material are separated out including dust and oversized material. The sized material is conveyed through conveyor to different places and oversized material is again charged to feeding hopper of crusher. The sized material as various grades of metal are loaded by loader to trucks / trolley and transported to the construction sites as per order. (vi) Raw material along with estimated quantity, likely source marketing area of final products, mode of transport of raw material and finished product In the stone quarry, as such no raw material is required. For 3.0 T of stone material excavation, 0.25 kg of emulsion explosive cartridges is consumed with one electric detonator. There is less consumption of diesel in the tractor mounted compressor, JCB, loader, tractor trolley, trucks etc as applicable. The major market to the stone material is building construction, road construction sites, industrial areas, dam under construction etc. Stone material is transported by existing roads through covered trucks. (vii) Resource optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined In stone quarry, waste material does not generate. All the materials are salable as rubble, boulder, murum, metal, dust etc. Hence, there is total resource optimization. (viii) Availability of water its source, energy/power requirement and source should be given In the stone quarry, due to compact nature of basalt rock, ground water does not exist at shallow depths. The seam of the basalt rock goes deep. The ground water may exist below this rock. The intersection of total seam of stone is not feasible and it is not carried out in any stone

8 quarry. The rain water collected in pit also remains in the pit as it is difficult to percolate through impermeable layer of the stone. The rain water collected in the pits is the source of water for various purposes of stone quarry such as sprinkling of water on haulage roads, dust suppression during crushing, sprinkling on conveyor belts, fixed sprinklers installed in the quarry, green belt development etc. Drinking water is normally brought from the dugwells existing away from the quarry area as there are no dugwell or borewell exist in quarry area. (ix) Quantity of waste to be generated (liquid and solid) and scheme for their management/disposal In stone quarry, there is no industrial effluent generation as such. The water table is not intercepted in the stone quarry due to basalt rock deepness. The rain water accumulated in the pit during monsoon is uncontaminated. The silt is settled down under gravity. Normally in the mine, deepening of one of the corner of the pit is carried out and rain water is collected throughout the year in it. The excess rain water collected in the pit is pumped out during nonmonsoon season and this mine discharge water becomes the source of water for agricultural purposes in the nearby area. the market. (x) In stone quarry, there is no solid waste generation. All the forms of stones are salable in Schematic representation of the feasibility drawing which give information of EIA purpose The stone quarry is small scale activity and operations have very less negative impacts on environment as there are no contaminations of chemicals or similar substances addition to the environment, the fugitive dust generated is inert and inorganic in nature. 4. Site Analysis (i) (ii) Connectivity The stone quarry under consideration has very well connectivity to city. Land Form, Land use and Land ownership The land form of the stone quarry area is rocky and it is a wasteland. The land is barren and it is under the control of mine owner. The area of 2.01 ha of Khasra No. 161/2 & 162 Village Mandavghorad, Tah- Hingana, Dist - Nagpur is in use for stone quarrying as per NOC and permission from Concerned Authorities (Enclosure-2). This Pvt. land is owned by M/s Saikrupa Stone Crusher (LLP) through Partner Shri. Ashish Umeshrao Tonde & Shri. Amit Kishor Sunkarwar (iii) Topography (along with map)

9 The stone quarry area is in general plain at an altitude of about 311 m above msl. The topographic map of the stone quarry area is enclosed in Enclosure-1. (iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ), shortest distances from the periphery of the project to periphery of the forest, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be given. The existing land use of the stone quarry area is non-agriculture. The land is barren, wasteland, rocky and without vegetation. Surface area is murmad type and unsuitable for agricultural purposes. In the 10 km radius area from the boundary of the stone quarry, notified forests, national park, notified wild life sanctuary, notified eco sensitive areas, notified water bodies, notified CRZ areas do not exist. (v) Existing Infrastructure There are other stone quarries adjacent to each other forming cluster of stone quarries in the area. Road infrastructure to the cluster area is developed. Power distribution network is also developed. (vi) Soil classification There are six types of soils found in Nagpur district. Soils are classified on basis of colour are as follows: i) Kali soils: These are black cotton soils which are fine grained clayey in texture and varies in depth from 1 m to 6 m or more and retain moisture. They are found around Kalmeshwar, Saoner and Nagpur. ii) Morand soils: These are predominant in the district. They are black cotton soils with higher percentage of lime than the Kali soils. They are black, grey or light to dark brown in colour, clayey in texture. iii) Khardi soils: They are shallow soils mixed with sand and found mainly in hills. These are grey in colour, clay loam in texture. iv) Bardi soils: They are red gravel covered with boulders found on summits and slopes of trap hills and are less fertile in nature. v) Kachchar soils: They are mainly found in the banks of River Kanhan and are alluvial soils, loamy in nature and vary in depth from 1 to 3 m. vi) Wardi soils: They are red soils with a large amount of sand. They are shallower and clayey loam in nature. They are mainly found in the paddy tracts in the eastern part of the district.

10 The stone quarry area is barren with wasteland. The pit in the stone quarry area is existing. The soil cover is very less to the majority of the stone quarry area. However, soil cover at some places is murum type. (vii) Climatic data from secondary sources The area has very dry or semi-humid climate throughout the year excepting the monsoon months of June to September. The climate is broadly divided into three important seasons of summer, winter and monsoon. The climate witnesses a very hot weather during the months of summer. It reaches the pinnacle in the month of May. Dry winds blow making the climate scorching. Almost throughout the summer, the temperature remains beyond 40 0 C. Sometimes it may be as high as 48 0 C. Monsoons take its charge in the month of June. It showers maximum in the months of July and August. The rain is heavily dominated by the south-westerly monsoon winds. However the winters are spine chilling. The temperature hovers around 12 C and sometimes even dips down below that level. In the month of February to May-end, the climate experiences a low pressure resulting in the wind blowing at a speed of 20 km per hour. But, for the rest part of the year, the speed remains below 6 km per hour. It may be concluded that the area witnesses a tremendous climatic variation with scorching summers and chilling winters. (viii) Social Infrastructure available In 2011, Nagpur District had population of 46, 53,570 of which male and female were 23, 84,975 and 22, 68,595 respectively. Nagpur District population constituted 4.14 percent of total Maharashtra population. The initial provisional data released by census India 2011, shows that density of Nagpur district for 2011 is 470 people per sq. km. Average literacy rate of Nagpur in 2011 was %. If things are looked out at gender wise, male and female literacy were and respectively. With regards to Sex Ratio in Nagpur District, it stood at 951 per 1000 male.

11 Nagpur City is a part of District and due to it adequate social infrastructure is available. The social infrastructure comprising hospitals, schools, colleges, community halls, places of worship, cemetery, crematory etc are existing and within hour these facilities can be availed. 5. Planning Brief (i) Planning concept (type of industries, facilities, transportation, etc.) Town and country planning/development authority classification The area is dominantly covered by stone quarries & stone crusher. The ancillary activities as transport, engineering workshops, fabrication shops etc. are also developed. The area will be further developed in the quarrying activities. At the closure of quarry, the pits will be converted to ponds or sloppy area will be covered by green belt. The district authority has issued lease with conditions for safe operation and environmental conservation. (ii) Population Projection In the stone quarry, local villagers are employed and direct employment is very low. The local manpower is already trained in quarry and crusher operation. There is direct and indirect employment in terms of drivers, mechanics, contract laborers etc. The manpower from the nearby village(s) is already engaged and trained in these jobs. Hence, additional population increase in the area is not anticipated. (iii) Land use planning (breakup along with green belt etc.) The quarry and crusher activities are carried out in the leased area. At the closure of quarry, the pit land will be converted to pond or sloppy land will be covered by plantation. (iv) Assessment of Infrastructure Demand (physical & social) The road infrastructure is already developed in the area, which requires for the transport of the stone material to the consumers. The manpower is local and their social infrastructure is also developed. The inflow of money in terms of taxes to grampanchayat and salaries to the manpower will further improve the physical and social infrastructure. (v) Amenities/Facilities At the stone quarry under consideration have facilities as drinking water, first aid box, communication facilities, emergency vehicle for shifting the workers during accident etc. are available. 6. Proposed Infrastructure (i) Industrial Area (Processing Area) The infrastructural facilities are already developed in the area for the unit operations as required in stone quarrying.

12 (ii) Residential Area (Non-Processing Area) The local villagers are employed in the stone quarrying activities and the development of residential area is not needed. (iii) Green belt At present, a few trees are existing. At the closure of mine about 7.5 m or more of the lease area will be converted to green belt. (iv) quarries. (v) Social Infrastructure The social infrastructure in the cluster area has been improved due to activities of stone Connectivity (Traffic and Transportation Road/Rail/Metro/Water ways etc.) The connectivity in terms of traffic, transportation road is already developed and good. There are well connected roads in the area. The nearest railway station is existing at Nagpur. (vi) Drinking Water Management (Source & Supply of Water) The dugwell / borewell water existing in the nearby areas is brought to the site for drinking purposes through tankers. (vii) Sewerage System The manpower requirement at the stone quarry is very less and hence sewerage system is not required. (viii) Industrial Waste Management (ix) Industrial waste generation from the stone quarry under consideration is nil. Solid Waste Management Except insignificant amount of municipal solid wastes, no solid waste is generated from the stone quarry under consideration. (x) Power Requirement & Supply/Source The power requirement is fulfilled by MSEDCL and its network is well developed. Power supply to the area is also regular. 7. Rehabilitation and Resettlement (R & R) Plan (i) Policy to be adopted (central/state) in respect of the project affected person including home oustees, land oustees and landless laborers (a brief outline to be given) The rehabilitation and resettlement (R&R) is not required for the stone quarry under consideration as it is located in the notified mining zone.

13 8. Project Schedule & Cost Estimates (i) Likely date of start of construction and likely date of completion (Time schedule for the project to be given) The lessee has vast experience of stone quarrying and crushing operations. All the plant, machinery and infrastructural facilities are provided. All necessary statutory permissions are taken by lessee. Adequate reserves are available. Market is well established. Manpower is available with lessee. The operation can be continued subject to the grant of Environmental Clearance and renewal of mining lease. (ii) Estimated project cost along with analysis in terms of economic viability of the project The gross capital investment of the stone quarry is about Rs. 15 lacs and recurring expenditure including crusher activity is about 1.5 Lacs / month. Though there are fewer margins in the business due to competition, the economic viability is still good due to availability of stone materials, market and infrastructural facilities. 9. Analysis of Proposal Final Recommendations (i) Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area The stone quarry area development has widened financial transaction in the area. The land prizes are increased for wasteland and it has benefited locals to great extent. Some of them have started their own stone queries as well as allied business. Overall, the socioeconomic status of the local population has been improved in many ways including direct and indirect employment due to stone quarries existing in the area.

14 Enclosure I Location of Quarry FIGURE: LOCATION DETAILS OF STONE QUARRY (Singardeep (Rithi)

15 Enclosure I Contd

16 Enclosure-I Contd Stone Quarry of M/s Saikrupa Stone Crusher (LLP) through Partner Shri. Ashish Umeshrao Tonde & Shri. Amit Kishor Sunkarwar Village Mandavghorad, Taluka Hingana, Dist - Nagpur

17 Enclosure-II

18 Enclosure-II Contd

19 Enclosure-II Contd

20 Enclosure-II Contd

21 Enclosure-II Contd

22 Enclosure-II Contd

23 Enclosure-II Contd

24 Enclosure-II Contd

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Stone Quarry (Area 1.00 ha) Survey No: - 526, 527 & 528 (Part) Village Raimoha, Taluka Shirur (Kasar), Dist - Beed (M.S). Owner & Lessee Shri. Chakradhar Subhash Dhakane Prepared

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

PRE-FEASIBILIY REPORT

PRE-FEASIBILIY REPORT BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PRE-FEASIBILITY PROJECT REPORT. Captive Power Plant 25 MW (Under Construction)

PRE-FEASIBILITY PROJECT REPORT. Captive Power Plant 25 MW (Under Construction) PRE-FEASIBILITY PROJECT REPORT o f Captive Power Plant 25 MW (Under Construction) o f M/s Grace Industries Limited. to be located at A-23 MIDC Industrial Area, Tadali Growth Centre, Tadali, Dist. - Chandrapur

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF 0.80.0Ha IN ANAIMALLUR VILLAGE, ARCOT TALUK, VELLORE DISTRICT, TAMILNADU OF THIRU.R.VINOTHKUMAR, (Under

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY PRE FEASIBILITY REPORT OF AZHAGAPPAPURAM EARTH FOR OVER AN EXTENT OF 0.61.0HA IN AZHAGAPPAPURAM VILLAGE, AGASTEESWARAM TALUK, KANNIYAKUMARI DISTRICT, TAMIL NADU OF, (Under the Guidelines of Ministry of

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

PRE-FEASIBILITY REPORT GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS)

PRE-FEASIBILITY REPORT GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS) 20 PRE-FEASIBILITY REPORT OF GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS) 1. EXECUTIVE SUMMARY: The project is for mining of Ghodach soapstone & Dolomite Mine M.L. No. 69/2010 Near

More information

PRE FEASIBILITY REPORT OF R.PUDUPATTI ROUGH STONE QUARRY UNDER EIA NOTIFICATION 2006

PRE FEASIBILITY REPORT OF R.PUDUPATTI ROUGH STONE QUARRY UNDER EIA NOTIFICATION 2006 LEASE APPLIED AREA FOR OVER AN EXTENT OF 1.49.0Ha IN R.PUDUPATTI VILLAGE, RASIPURAM TALUK, NAMAKKAL DISTRICT, TAMILNADU OF THIRU.K.K.PERUMAL, (Under the Guidelines of Ministry of Environment and Forest

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

SHRI.LAKSHMAN NAMDEV KOLI

SHRI.LAKSHMAN NAMDEV KOLI PRE-FEASIBILITY REPORT (PFR) FOR PROPOSED STONE QUARRY BY SHRI.LAKSHMAN NAMDEV KOLI AREA. 1.00 HA., GAT. NO. 811/2 PART, VILLAGE BASTAWADE, TAL.: TASGAON, DIST.: SANGLI PREPARED BY EQUINOX ENVIRONMENTS

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING BLACK TRAP MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 15/01/2016 TO REKHABEN YOGESHKUMAR JOSHI

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR STONE QUARRY - 3.40 ha VILLAGE - MARSUL T. SENDURSENA, TALUKA VASMAT DISTRICT HINGOLI MR. ASHISH ASHOK KASAT ENVIRO TECHNO CONSULT PVT.LTD. 68, MAHAKALI NAGAR MANEWADA HINGOLI

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY Kacari Silica Sand,Khanda,Stone And Moram Project at Khsara No.-144,145,146,147, 148,150, 309, 310, 311,312,313,314,315,316,317,318,320,399,403,404,405,

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY Kacari Silica Sand,Khanda,Geeti And Moram Project at Khasra No.-10,11,12,13,101, 102,122, 126, 127,128,129,130,131, 167,568,570,571,572,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description

More information

PREFEASIBILITY REPORT OF EXISTING BENTONITE PROJECT OF

PREFEASIBILITY REPORT OF EXISTING BENTONITE PROJECT OF PREFEASIBILITY REPORT OF EXISTING BENTONITE PROJECT OF TRICHEMIN ASSOCIATES AT VILLAGE:- SATAPAR, TALUKA:- KALYANPUR, DIST.:- DEVBHUMI DWARKA 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

S. No Parameter Details 1 Name & Address of the Applicant

S. No Parameter Details 1 Name & Address of the Applicant 1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

Pre-Feasibility Report for Granite Building stone Quarry

Pre-Feasibility Report for Granite Building stone Quarry Pre-Feasibility Report for Granite Building stone Quarry SURVEY NO. : 53/6 & 53/8-1, 53/8-2 & 53/13 VILLAGE TALUK DISTRICT STATE EXTENT : AYYAMPUZHA : ALUVA : ERNAKULAM : KERALA : 0.9842 HA LAND STATUS

More information

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent PRE FEASIBILITY REPORT PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent M/s Veet Rag Homes Pvt. Ltd. 267, Ganesh Phadnavis Bhavan,

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

Grey Granite (Paradiso) Mine

Grey Granite (Paradiso) Mine Grey Granite (Paradiso) Mine PROJECT PROPONENT M/s. Karunai Granites Private Limited., Jagadevipalayam Village & Post, Krishnagiri Taluk, Krishnagiri District 635 203. Extent : 11.59.0 Hectares S.F. No.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P. PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.O, Ernakulam (Dist.) Survey No. 129/1-4,129/2-1, Arakuzha Village,

More information

PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF

PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF Indulal C. Vora AT VILLAGE:- Palakhda, TALUKA:- Porbandar, DIST.:-Porbandar 1 (B) CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT This is an existing mine, proposal for obtaining Environmental Clearance for Masonry Stone with production capacity 37,300 TPA Near Village: Velangri, Tehsil-Sirohi,

More information

PRE FEASIBILTY REPORT

PRE FEASIBILTY REPORT PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

CONTENTS 3.0 INTRODUCTION OF THE PROJECT /BACKGROUND INFORMATION 8.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

CONTENTS 3.0 INTRODUCTION OF THE PROJECT /BACKGROUND INFORMATION 8.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY 3.0 INTRODUCTION OF THE PROJECT /BACKGROUND INFORMATION 4.0 PROJECT DESCRIPTION 4.0 AVAILABLITY OF RAW MATERIAL 5.0 SELECTION OF SITE & LOCATION

More information

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA)

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) PRE FEASIBILITY REPORT ON GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) Lease Area: 18.687 acres or 7.562 Ha. of Sri Rama chandra Dash Polasara CHAPTER 1 EXECUTIVE SUMMARY Ghodapalana sand Quarry

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

Table 1-1:- Salient Features of the Project

Table 1-1:- Salient Features of the Project PRE FEASIBILITY REPORT OF LAMBA & BHATIA BAUXITE MINE MINERALS - BAUXITE LAMBA SURVEY. NO. 30/P, 415/A, 949, BHATIA-358 (LEASE PERIOD 14.06.2000 TO 13. 06.2020) LEASE AREA 54.0861 HECTARE MINING PROJECT

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

CONTENT LIST 3.0 PROJECT DESCRIPTION 7 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY

CONTENT LIST 3.0 PROJECT DESCRIPTION 7 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY CONTENT LIST S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION OF NATURE

More information

M/s. Lakeland Chemicals (India) Ltd.

M/s. Lakeland Chemicals (India) Ltd. FOR THE PROPOSED EXPANSION PROJECT FOR MANUFACTURING OF SPECALITY CHEMICALS Category: 5(f) A OF Located at: Plot no 63,6A,6B, Rasayani Road, Vill. Madap, Tq. Khalapur, Dist. Raigad.( Maharashtra) 1 Project

More information

EXECUTIVE SUMMARY. 1.1 Executive Summary

EXECUTIVE SUMMARY. 1.1 Executive Summary 1.1 Executive Summary EXECUTIVE SUMMARY Chobe ki Guwari Sand Stone Mining Project (M.L. No- 26-R-01/2001) is situated near village Chobe ki Guwari, Tehsil Sapotra, District Karoli, State Rajasthan over

More information

J.K. Cement WORKS, NIMBAHERA (RAJ)

J.K. Cement WORKS, NIMBAHERA (RAJ) A. SPECIFIC CONDITIONS : J.K. Cement WORKS, NIMBAHERA (RAJ) Compliance report of Environment Clearance for Nimbahera - Ahirpura Lime Stone Mine (For the Period from April 2013 to September 2013) Reference

More information

Environmental Policy Statement:

Environmental Policy Statement: 1 Environmental Policy Statement: Coal India Limited (CIL) is committed to protect the environment through prevention, mitigation of pollution, proper disposal and recycling of wastes, conservation of

More information

Shree Swami Samarth Stone Crusher

Shree Swami Samarth Stone Crusher PREFEASIBILITY STUDY FOR SHREE SWAMI SAMARTH STONE CRUSHER. Sadekar Enviro Engineers Pvt. Ltd Page 1 Executive summary Shree Swami Samarth Stone Crusher. has been granted a quarrying over an area 1.00

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT The proposal for obtaining Environmental Clearance for Marble Mining Project M. L. No. 56/02, Area 4.0 ha with production capacity 40,000 TPA Near Village:

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

[FORM-V] PART-A PART-B

[FORM-V] PART-A PART-B [FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT 1. PRE FEASIBILITY REPORT (As per EIA Notification 2006) & Ministry of Environment,Forest & Climate Change (MoEF & CC) Notification No 141 (E) dated 15th January 2016 For OBTAINING ENVIRONMENT CLEARANCE

More information

M/s.NEERAJ KUMAR JAIN

M/s.NEERAJ KUMAR JAIN EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND

More information

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006 Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur

More information

Environment Management Plan

Environment Management Plan Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded

More information