1 Addendum Number 1 Request for Proposals No Various On-call Professional Design and Engineering Services To all prospective firms under specifications for Request for Proposals (RFP) No , Various On-call Professional Design and Engineering Services, which are to be received by the City of Rialto, California, by 3:00 P.M. on Thursday, September 15, 2016: This Addendum No. 1 addresses questions raised by potential bidders. Prospective firms shall acknowledge the following changes as part of their proposals: 1. Question: is it possible to get a list of the interested vendors so we can contact any of the respective firms? Answer: The City provides a list, constantly updated, of all of the firms who register to propose on this RFP. The list can be obtained by sending an to bidinfo@rialtoca.gov, and asking for a copy of the most current list. 2. Question: Is the person referred to in Attachment A, on page 14 of the RFP, a representative of the firm, or is that to be filled in by the City for the City staff who reviewed the proposal? Answer: Attachment A, Signature Authorization, is to be filled out by the proposing firm. 3. Question: Please clarify the direction provided on page 6 of the RFP: Qualified firms are invited to submit separate proposals in each or all of the following categories or disciplines of work: Please confirm that we are required to submit a separate proposal for each category or discipline and should not submit one proposal that combines or addresses multiple disciplines in one proposal. Answer: The City requires proposing firms to submit separate proposals for each category of on call work sought. For instance, should a firm wish to submit proposals for Architectural Design, and Engineering Design, those are two separate categories of work, and should be submitted as two complete and completely separate proposals. 4. Question: On page 4 of the RFP, under the heading 1. Purpose and Schedule, states that the selected Consultant agrees that it will not engage in any form of professional 335 W. Rialto Avenue, Rialto, California 92376
2 Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2 engineering services within the City of Rialto, or represent any private developer, property owner or other party in any manner relating to private development within the City, when engaged on a project under this RFP with that developer or property owner, during the term of the agreement. In reference to this statement: - Please clarify if the selected Consultant is still able to provide services within the City of Rialto while providing services on this contract if the consultant s project is not related to the scope of the project under this contract? Are we banned from working on any and all projects within the City of Rialto? - Please clarify if the statement also extends to sub-consultant team members of the selected Consultant. - Does this clause also extend to our existing contracts that we have within the City of Rialto? - Can the City provide a list of projects with addresses and project boundaries under this On-Call Services contract, to allow us to perform a proper Conflict of Interest check? Answer: The City requires that prime consultants, and their sub consultants, if awarded a contract, do not enter into a conflict of interest, as defined under this RFP No The City does not consider a proposer as being under a conflict of interest, when that proposer represents a private party, doing business with the city, so long as the proposer is not working for the City in another capacity on the same project. 5. Question: What type of inspections are anticipated for construction management and inspection services; more specifically are soils and materials testing to be included under this section or under Geotechnical Studies? Answer: Inspection services will be as is commonly required for the various types of civil construction work such as may be identified in the City s CIP (see answer to Question No. 11 below). Proposers may choose to, or not to enlist in house or sub consultant services for soils and/or materials testing, as appropriate to their firm or team, and strategic approach to this RFP, either in the Construction Management and Inspection Services, or Geotechnical Studies categories of work. 6. Question: Under Geotechnical Studies, can you please clarify if other activities associated with geotechnical support includes soils compaction testing and materials testing or if this section is specifically for geotechnical studies only? Answer: The City is interested in receiving proposals from qualifying firms, for each of the nine specified categories of work, with such services covering a broadly defined spectrum of work that could occur under that discipline. 7. Question: Page 4, the second line of the bold text near the bottom of the page, refers to ten (10) categories of work. How many categories of work are within this RFP? Answer: there are only nine (9) categories or disciplines of work within this RFP. 335 W. Rialto Avenue, Rialto, California 92376
3 Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 3 8. Question: On Page 10 of the RFP, text reads, Fees by consultant or sub consultants for inspection of private development shall be based upon the City s standard fee schedule, dated March 15, Can the City provide this schedule or a link to the City s site? Answer: Click on the following link: for access to the City s current roster of fees. 9. Question: Our firm is proposing for the Geotechnical Studies portion of the RFP. In Section 4. Proposal Requirements, Project Management and Quality Control, how much of these requirements apply to our services? Answer: It is up to each proposer to determine the level of effort that their firm or team will apply, and applicability of the components of the RFP, to each of the subject components the City wishes addressed in each proposal. 10. Question: For the Cost Proposal do you want the first year s rates with an adjustment for each of the three years or a fee which will be used for the 3 years? Answer: Per the text on pages 10 and 11 of the RFP, The City shall include a provision in the final agreement with the selected firm(s) for annual CPI adjustments of the hourly rates after the base three year period, covering contract years four and five, if exercised by the City, at the City s sole discretion. 11. Question: We would like a copy of the City s Capital Improvement Program, which it is assumed lists specific projects. The City s website only lists the CIP plan. Is a more current CIP available? Answer: The City s CIP can be found at the following link: Also attached, is a CIP list that represents a sampling of current city projects; this is the most current available. 12. Question: Item 4. Proposal Requirements, on page 8 of the RFP requires that each proponent submit a detailed work plan of a typical, complex project similar to those performed by the firm for other municipal clients. The proposal should identify and address the typical issues, problems and delays that may result in such project categories or disciplines of work, and discuss how the proponent resolves such issues, problems and delays in a timely and cost effective manner Does the City prefer that this work plan be placed within a specific section of the RFP? Answer: It is up to each consultant firm/ team to determine how they may wish to respond to the specific requirements of this RFP. 335 W. Rialto Avenue, Rialto, California 92376
4
5 City of Rialto Capital Improvement Projects 1 - Construction Alder Ave Widening Phase I Project Title Description Budget, in 000's Construct two northbound lanes and two southbound lanes on Alder from Miro Way to Renaissance Parkway, including the storm drain. Phase I requires acquisition of one parcel for ROW 6,426 Ayala Drive widening Widen Ayala Driver from Baseline Road to 9,200 Renaissance Parkway Cultural Center & Museum Exterior Paint the exterior of the Cultural Center & 161 Painting Museum Building Curb, Gutter, Sidewalk - Zone 1 Curb, Gutter and Sidewalk Repairs (Zone 1) 269 Curb, Gutter, Sidewalk - Zone 2 Curb, Gutter and Sidewalk Repairs (Zone 2) 243 Curb, Gutter, Sidewalk - Zone 3 Curb, Gutter and Sidewalk Repairs (Zone 3) 232 Curb, Gutter, Sidewalk- CDBG & Maple Ave Improvements Maple Avenue Street Improvements; and Curb, Gutter and Sidewalk Repairs in the CDBG Areas 457 Easton Development Parking Lot Install additional Parking Lot at Easton - Development Miro Way Improvements [LHR] Extend Miro Way to Industrial Circle 13,900 Pepper SCE Relocation Southern California Edison utility relocation at the new Pepper Avenue Extension 47 Riverside/San Bernardino Improvements Street Widening and Improvement on Riverside & San Bernardino Avenues 6,736 Safe Route To School Plan (ATP Grant) Provide a Safe Route to School program that will include 29 schools (19 elementary, 5 middle, and 5 HS) within the Rialto Unified School District. 1,450 (ATP Grant) Street Slurry Seal Perform Street Slurry and Crack Seal Maintenance on roadway for various locations; FY2015/2016 1,560 Traffic Signal Upgrade- Baseline Road /Acacia Avenue HSIP Grant Upgrade Traffic Signal at Baseline/Acacia (HSIP Grant) 1 - Construction Total 40, Bidding Community Center Fence Construct perimeter fence at Community Center 373 PD Training Annex Bldg. Addition of training room at 429 W. Rialto Avenue 420 Traffic Signal at Riverside/Linden and Traffic Signal Installation & Road Widening at 1,550 Widening Riverside Avenue and Linden Avenue 2 - Bidding Total 2, Public Works Page 1 9/7/2016
6 City of Rialto Capital Improvement Projects Project Title Description Budget, in 000's 3 - Design Alder Ave Widening: Phase II City Facilities Xeriscape Project- Bloomington and Riverside Medians (including SAWPA Grant) Construct remaining portions of the full four lane roadway improvements on Alder from Baseline to Renaissance Parkway, including a raised median island and all curb and gutter and roadway improvements. Phase II requires acquisition of numerous parcels for ROW. Convert street median turf to drought tolerant landscaping Community Center Exterior Painting Community Center Exterior Painting 150 2,100 1,092 Community Center Rehab Building 300 Community Center Rehab Building 300 1,000 Community Garden & Bloomington Recommend, design and construct additional 510 Median Community Gardens Curb, Gutter, Sidewalk - Prior Year Curb, Gutter and Sidewalk Repairs 816 Remaining Funds & Current FY DESIGN OF CACTUS/RANDALL PARKS Design of Cactus/Randall Park 200 DESIGN OF FRISBIE PARK Design of Frisbie Park Expansion 200 Metrolink Station Improvements - Phase Stations upgrade 2,696 2 Parks Concession & Restroom Upgrade {include surface ADA} Upgrade Concession and Restroom facilities at the parks 1,310 Randall Street Widening: from Riverside Widen a segment of Randall Avenue 1,700 to Cactus Riverside I-10 Bridge over UPRR Bridge Replacement at Riverside Avenue and 75 Union Pacific Railroad Tracks Senior Center Parking Lot Resurfacing Refurbish the parking lot at the Senior Center. 75 SR2S-Cedar Sidewalk Improvement Construction missing Sidewalk and Metrolink Crossing between Metrolink & Merrill Ave 496 Street Overlay Perform Street Overlay Maintenance on roadway 3,600 Valley Boulevard/ Cactus Avenue/ Street Widening at Valley Blvd & Cactus Ave 1,400 Linden Avenue Widening 3 - Design Total 11,352 Public Works Page 2 9/7/2016
7 City of Rialto Capital Improvement Projects 4 - Planning Storm Drain Improvements Project Title Description Budget, in 000's Install storm drains from Fitzgerald to Cactus Basin 3 as per Master Plan Bud Bender Park Field Complete concrete walking path, remove and install a backstop for unimproved baseball field, purchase equipment designed as exercise stations along the concrete pathway and replace unimproved fencing in southeasterly part of the park Cactus Trail along Flood Control to Construct a multi-use trail on Cactus, along the Baseline Road flood control channel to Baseline. City Facilities Roof Replacement Roof Replacement - Carl Johnson Center Gymnasium, Fitness Center Roof area over courts, Fire Station #1, Fire Station #4 City Parks Improvements Park Projects upgrade concession, restroom facilities, parking lot renovations, ADA deficient path of travel, irrigation replacement, bench/picnic table replacement, BBQ grill replacement, replace park signage, repaint buildings/restrooms at the following Parks: Andreson Park, Birdsall Park, Ferguson Park, Flores Park, Frisbie Park, Jerry Eaves Park, and Rialto City Park. Etiwanda Corridor Improve safety and path of travel for six schools along the Etiwanda Avenue Corridor Fire Station 201 LED Lighting Retrofit Replace all interior lights at the Fire Station 201 with LED lights Fleet Carport Replacement & Install Replace the carport located behind the Fleet Shade Structure for Vehicle Lift services garage and install a shade structure for vehicle lift Foothill Blvd improvements Widen Foothill City limits to City Limits 1,000 Pacific Electric Trail Improvements To Be Determined TBD Parking for Cactus Trail Construct a parking lot for Trail users and other 500 enhancements to the trails such as adding an additional access gate for the adjacent residential tracks. Police Annex Secure Equipment Storage Secure storage facility for vehicles and equipment 250 Facility Regional Facilities- Cactus & Rialto Construct improvements to the Cactus Basin and 10,000 Channel Improvements Rialto Channel to increase capacity allowing for planned and future development. 2, , Rialto Park ADA (announcer booth) Replace an existing announcer's booth located inside Rialto City Park on John Silva Field 130 Street Overlay Street Slurry Seal Perform Street Overlay Maintenance on roadway at various locations; FY2016/2017 Perform Street Slurry and Crack Seal Maintenance on roadway at various locations; FY2016/2017 3,305 1, Planning Total 21,659 TOTAL RIALTO CAPITAL PROJECTS 158,748 PROGRAM Public Works Page 3 9/7/2016
2016/2017 Organizational Chart. Effective 7/1/2016 Budgeted 29 FTE Positions Budgeted 1 Part-Time Position Budgeted 4 Intern Positions
2016/2017 Organizational Chart Effective 7/1/2016 ed 29 FTE Positions ed 1 Part-Time Position ed 4 Intern Positions Ricardo Sandoval Administrative Secretary (1) Transportation/Land Development Project
More informationCapital Investment Program CAPITAL BUDGET
Capital Investment Program 2012-2014 CAPITAL BUDGET Table of Contents Page CAPITAL BUDGET FUNDING ALLOCATION 3 S Asset Management Projects Roadway Maintenance 4 Downtown ADA Ramp Upgrades 5 Storm Drain
More informationFROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07
TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 SUBJECT: APPROVAL OF A CONTRACT WITH BOND BLACKTOP, INC., IN THE AMOUNT OF $556,812 FOR PHASE 1 AND
More informationPinellas County Capital Improvement Program, FY FY2016 Project Summary Report
Function : Transportation Activity : Road & Street Facilities Category : Arterial Roads Pinellas County Capital Improvement Program, FY2011 - FY2016 Project No: 1618 Title: 118th Avenue Expressway Cost
More informationChapter 4: Transportation and Circulation
Chapter 4: Transportation and Circulation 4.1 Introduction Circulation improvements constructed for the West Valley Logistics Center will improve the functional efficiency of the circulation system in
More informationLong-Term Capital Improvement Funding Plan. March 18, 2014 City Council Study Session
Long-Term Capital Improvement Funding Plan March 18, 2014 City Council Study Session Overview Long-term 10 year view to know what s planned Project Overview Focus on FY 2014-15 and FY 2015-16 Funding Plan
More informationThird Mutual Project Log (January 2019)
Priority Rating Third Mutual Project Log (January ) # Type Name Description Status Estimated Completion/Ongoing s Budget 1 904 Maint Svc Waste line Remediation The Waste Line Remediation 's objective is
More informationProject Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial
Planning Commission Staff Report Planning Commission Hearing November 14, 2016 Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial Request: A request to develop a 15,996 square foot
More informationREQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA
REQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA The City of San Mateo hereby requests proposals for engineering design services
More informationADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012
ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle
More informationPublic Works Department Five Year Capital Improvement Plan FY PROPOSED
Public Works Department Five Year Capital Improvement Plan FY 2019-2023 PROPOSED Capital Improvement Plan Summary STREET DIVISION PROJECTS 141 Asphalt Sidewalk Replacement Program Funding Source Adopted
More informationSTAFF REPORT. Kevin Rohani, P.E. Public Works Director/City Engineer. FY 2017/18 First Quarter Report on the Capital Improvement Program
STAFF REPORT DATE: November 14, 2017 TO: Bryan Montgomery, City Manager Approved and Forwarded to the City Council FROM: SUBJECT: Kevin Rohani, P.E. Public Works Director/City Engineer FY 2017/18 First
More informationTRANSPORTATION. Governmental Projects
TRANSPORTATION Governmental Projects Function: Activity: Category: Transportation Road & Street Facilities Arterial Roads Project No: 1618 Title: 118th Avenue Expressway Cost Center: 841418 Department:
More informationRequest for Qualifications for Engineering Services for Projects for
DATE: January 3, 2018 TO: FROM: SUBJECT: Honorable Mayor Jerry Smith City Council Anne Marie Gaura, City Manager Tim Holdeman, Public Works Director Patrick DiDiana, Management Analyst Request for Qualifications
More informationWoodlake General Plan Draft Environmental Impact Report
5.0 UNAVOIDABLE ADVERSE ENVIRONMENTAL EFFECTS The following potential adverse environmental effects appear to be unavoidable if the Woodlake General Plan is implemented, even if certain mitigation measures
More informationCurtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer
Life Cycle Cost Analysis Considerations in Pavement Type Selection in Red Deer and Construction Challenges Bozena Czarnecki, Ph.D., P.Eng., Principal Specialist, Engineering Practice, Tetra Tech Canada
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationHILLS CITY OF BEVERLY HILLS BEVERLY PUBLIC WORKS DEPARTMENT MEMORANDUM. Public Works Commission TO: FROM: Rob Welch, Acting City Engineer
April 18, 2018 MEMORANDUM PUBLIC WORKS DEPARTMENT HILLS BEVERLY CITY OF BEVERLY HILLS Public Works Commission Rob Welch, Acting City Engineer Capital Projects Update Capital Improvement Projects Update
More informationSADDLE CREEK CSD LANDSCAPE ARCHITECT REQUEST FOR PROPOSALS. (Boilerplate language, map and other contract language to be added on approval of Board)
October 17, 2017 SADDLE CREEK CSD LANDSCAPE ARCHITECT REQUEST FOR PROPOSALS (Boilerplate language, map and other contract language to be added on approval of Board) PROPOSAL SUBMITTALS DUE NOVEMBER 17,
More informationGloucester Parkway Extension RFQ Information Meeting
Gloucester Parkway Extension RFQ Information Meeting May 24, 2013 Tim Hartzell, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC Topics Project Location & Overview RFQ Information
More informationCITY OF EL MIRAGE Solicitation No.: EM12-ST03 & EM12-ST04. PRE-BID CONFERENCE MINUTES November 19, 2015, 1:00 PM
CITY OF EL MIRAGE Solicitation No.: EM12-ST03 & EM12-ST04 INTRODUCTIONS: Thunderbird Road from 127 th Avenue to El Frio Street El Mirage Road from Cactus Road to Grand Avenue PRE-BID CONFERENCE MINUTES
More informationWelcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.
1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement
More informationDecember 19, 2012 ADDENDUM NO. 11. To Prospective Bidders and Others on:
601096-12 December 19, 2012 ADDENDUM NO. 11 To Prospective Bidders and Others on: Technical/Price Proposals Postponed To: Thursday, January 17, 2013 @ 2:00 PM Transmitting the following Documents and Clarifications:
More informationREQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR DESIGN OF RECHARGE BASIN ON VICTORIA SITE
REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR DESIGN OF RECHARGE BASIN ON VICTORIA SITE General Provisions Western Municipal Water District (WMWD) requests a qualified Design Consultant
More informationPerimeter Site Improvements
Perimeter Site Improvements Phase 1-5 Architect: W+W Architects and Planners Anticipated Milestone Activities: Phase 1, 2 & 3 Construction Manager: Bernards 08.08.13 Directional Signage Contractor: Woodcliff
More informationSPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.
2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction
More informationRECOMMENDED CONCEPT COLLEGE COMMUNITY CAMPUS IMPROVEMENTS INTERNAL ROADWAY COST ANALYSIS MAY 9, 2014
8"' PCC CURB AND GUTTER KIRKWOOD BLVD SW 76TH AVENUE SW 76TH AVENUE SW PRAIRIE CREST ELEMENTARY 6' PRAIRIE PERFORMING ARTS CENTER PRAIRIE HIGH SCHOOL TIE INTO FROM PRAIRIE HILL FUTURE SITE OF PRAIRIE HILL
More informationSemi-Annual Report on the Measure T1 City Infrastructure Bond Program. December 6, 2018 City Council Worksession
Semi-Annual Report on the Measure T1 City Infrastructure Bond Program December 6, 2018 City Council Worksession 1 Presentation Agenda Background Projects Overview Specific Projects Update Key Issues T1
More informationMaster RFI List: March 22, 2013 Version # 1, 2 & 3
Master RFI List: March 22, 2013 Version # 1, 2 & 3 1. Can the City confirm the completion and occupancy dates for the Main Street Garage (February 2003?) and Transit Center Garage facilities? Main Street
More informationROSEMEAD OVERSIGHT BOARD STAFF REPORT
ROSEMEAD OVERSIGHT BOARD STAFF REPORT TO FROM THE HONORABLE CHAIR AND BOARD MEMBERS CURTIS CANNON SPECIAL PROJECTS MANAGER DATE APRIL 18 2016 SUBJECT ZAPOPAN PARK IMPROVEMENTS PROJECT PROJECT No 41008
More informationSMITHCO. ENGINEERING GROUP, INC.
SMITHCO. ENGINEERING GROUP, INC. BOROUGH OF LAWNSIDE STATUS UPDATE FOR CAUCUS MEETING APRIL 24, 2017 ABANDONED PROPERTY PROGRAM CDBG FY 36 WARWICK ROAD - STREET LIGHTING PROJECT PHASE I NJDOT MUNICIPAL
More informationPort KC RFP NORTHLAND PARK BUILDING V
Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?
More informationHIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November,
HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November, 18 2016 1 VICINITY MAP Site Data Land Use Statistics o Proposed Developed Site 55 acres 22.8% o Flood Plain 6 acres 2.4% o Open Space 100.6 acres
More informationAny discussions or marketing activities related to this specific project.
04-11-19 Posting Date South Sandusky Street Widening and Relocation PID No. Not Assigned City of Mount Vernon Response Due Date: 04-24-19 Communications Restrictions Please note the following policy concerning
More informationt 1 Budgeted Expenditure to Date Total Project Cost: $ 1,228,440 $ 1,000,222
Water Projects Maple Wells Project (CIP No. 0916) Scope of Work: Construction of two municipal supply wells at the Maple Yard (342 Foothill Road) and a pipeline to convey well water to the water treatment
More informationFoundations for the new pumps have been constructed. Contractor is constructing emergency connection to LADWP system.
Water Projects Pump Station No. 8 Rehabilitation (CIP No. 0796) Scope of Work: Rehabilitation of aging mechanical equipment and the associated piping at the existing pump station adjacent to Reservoir
More informationNEW SINGLE-FAMILY, MAJOR MODIFICATION, AND ACCESSORY DWELLING UNIT Submittal Checklist
NEW SINGLE-FAMILY, MAJOR MODIFICATION, AND ACCESSORY DWELLING UNIT Submittal Checklist All new single-family residences, major modifications to existing single-family residences, and accessory dwelling
More informationDepartment of Street Services
Department of Street Services FY 07-08 Proposed Budget Briefing to the City Council September 5, 2007 Purpose An overview of the Department of Street Services Scope of operation and maintenance activities
More informationENGINEERING UPDATE MAY 16, 2016
ENGINEERING UPDATE MAY 16, 2016 CRAN BE RRY TO WNSHI P, PENNSYL V ANI A Jason Kratsas, P.E., Director of Engineering 724-776-4806 x 1148 PROJECT: GRANTS, PERMITS & REPORTS Timeline: June through September
More informationRequest for Proposal Design Engineering Services City of Glendale 2019 Road Projects August 2018
Request for Proposal Design Engineering Services City of Glendale 2019 Road Projects August 2018 The City of Glendale, Wisconsin is requesting engineering proposals from qualified consultants for the design
More informationADDENDUM NO 1. TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP B)
Office of the Capital Planning, Design & Construction Phone: 973-720-2352 Fax: 973-720-2829 WWW.WPUNJ.EDU ADDENDUM NO 1 TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP-16-01-99-B)
More informationPublic Works designs, manages and builds more than $4 billion in construction projects across San Francisco. DOING BID ON OUR PROJECTS. JOIN THE CITY TEAM. BUSINESSwith BUILDINGS PLAYGROUNDS STREET RESURFACING
More informationTRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM
VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Americans with Disabilities Act Requirements of Maintenance and Operational
More informationFY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT
FY 15-20 CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT Department of Public Works Robert B. Boxer, Director PROJECT MODEL PROFESSIONAL SERVICES STUDIES FEASIBILITY CLAIMS 1- PROJECT DEFINITION 2-
More informationTraffic Engineering Projects. Ashley Golden, Development Services Director Jason Samonte, Traffic Engineer
Traffic Engineering Projects Ashley Golden, Development Services Director Jason Samonte, Traffic Engineer City 1 Council Meeting, May 10, 2016 Overview Projects: Intelligent Transportation System (ITS)
More informationAl Behrman Elementary School
Mulberry Street Al Behrman Elementary School Relocate reception and principal s office to be adjacent to main entrance doors; provide secure entrance sequence and increase transparency to the exterior
More informationstudy for 2018 include:
MEMORANDUM TO: Mayor and City Council gk FROM: Shawn Sanders irector of Public Works DATE: March 15, 2018 RE: Feasibility Study for the 2018 Street Improvement Project Project No. 2018-02 INTRODUCTION
More informationSECTION 7. Public Infrastructure, Facilities and Services. 8Chapter 8 INFRASTRUCTURE ELEMENT
SECTION 7 Public Infrastructure, Facilities and Services 8Chapter 8 INFRASTRUCTURE ELEMENT INF-2 CHAPTER 8 Infrastructure Element INTRODUCTION Cupertino s public infrastructure works in tandem with the
More informationCPC GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL
CPC-2014-3808-GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL Pursuant to Los Angeles Municipal Code Section 12.32 G, the T Tentative Classification shall
More informationCapital Improvement Summary by Fund
Capital Improvement Summary by Fund Central Services Fund Desciption F Y 2017 F Y 2018 F Y 2019 F Y 2020 F Y 2021 Total 2017-2021 Cost Revenues: Pay as you Go 1,000,000 1,000,000 Vehicle Leases - 1,250,000
More informationWINTERHAVEN PUBLIC SAFETY FACILITY PROJECT
WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT Funded by: California Department of Housing and Community Development (HCD) through its Community Development Block Grant (CDBG) Program and the County of Imperial.
More information5 YEAR CAPITAL IMPROVEMENT PROGRAM
5 YEAR CAPITAL IMPROVEMENT PROGRAM 329 City of Hermosa Beach Department of Public Works Capital Improvement Program For Fiscal Years 2015-16 Thru 2019-20 PROJECT NAME FY15-16 1 FY16-17 FY 17-18 FY 18-19
More informationCOMMUNICATIONS RESTRICTIONS:
02-18-18 Posting Date SUM-SR 91 and SR 303/Ravenna Signal and Roadway Improvements PID No. 102692 City of Hudson Engineering Department Response Due Date: Friday, March 16, 2018 The City of Hudson s Engineering
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,
More informationVan Ness BRT CAC April 26
Van Ness BRT CAC April 26 Agenda 1. Call to order. Van Ness BRT Community Advisory Committee members please sit at table. 2. Public comment for matters within BRT CAC jurisdiction not on today s calendar.
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK
HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 1 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK
More informationSPRR TUPELO ST. R UNION CITY BLVD. ZON PADRE PASEO DEEP CREEK ROAD ARDENWOOD COYOTE HILLS REGIONAL PARK PROJECT LIMITS PATTERSON RANCH ROAD BLVD. COMM
SPRR TUPELO ST. R UNION CITY BLVD. ZON PADRE PASEO DEEP CREEK ROAD ARDENWOOD COYOTE HILLS REGIONAL PARK PROJECT LIMITS PATTERSON RANCH ROAD BLVD. COMMERCE DR. PASEO PADRE PARKWAY KAISER DRIVE DUMBARTON
More informationENGINEERING DEPARTMENT
ENGINEERING DEPARTMENT Additional information about the Engineering Department may be obtained by calling Tim Bailey, P.E., Director of Engineering, at (919) 469-4030, through email at tim.bailey@townofcary.org
More informationRFP for Professional Consultant Services City of Missoula Parks & Recreation
RFP for Professional Consultant Services City of Missoula Parks & Recreation Project: Renovation, Replacement and Improvement Plan support The City of Missoula Parks & Recreation Department is developing
More informationSECTION 9000 MAINTENANCE SERVICES
SECTION 9000 MAINTENANCE SERVICES 9000 MAINTENANCE SERVICES... 1 9001 LEGISLATIVE AUTHORITY... 1 9002 GENERAL MAINTENANCE... 1 9003 PEDESTRIAN OVERPASSES... 1 9003.1 GENERAL MAINTENANCE... 1 9003.2 WINTER
More informationTorbram Road Improvements From Queen Street East to Bovaird Drive
Torbram Road Improvements From Queen Street East to Bovaird Drive Municipal Class EA Study Public Information Centre No. 1 November 16 2017 6:30 pm 8:30 pm Please sign in so we can keep you updated on
More information65 East Project (P18-045) Addendum to an Environmental Impact Report
65 East Project (P18-045) Addendum to an Environmental Impact Report File Number/Project Name: 65 East Project (P18-045) Project Location and Surrounding Land Uses: The proposed project site consists of
More informationENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM
ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM Each applicant needs to thoroughly review the conditions of development issued by the Planning Division in the format of a Resolution approving your project
More informationThe Year Ahead: ARLINGTON COUNTY, VIRGINIA
The Year Ahead: ARLINGTON COUNTY, VIRGINIA Locality Information Upcoming A&E Contracts- Multimodal Annual Services On-Call Contract Renewal: Planning Complete Streets Engineering and Design Bicycle and
More informationFor Public Input Period
20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,
More informationCHARLES COUNTY GOVERNMENT ITB NO GROUNDS MAINTENANCE SERVICES
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 7, 2014 ITB NO. 14-29 GROUNDS MAINTENANCE SERVICES ADDENDUM NUMBER THREE
More informationENGINEERING DEPARTMENT
ENGINEERING DEPARTMENT ADMINISTRATION Engineering Services/ Traffic and Transportation Engineering Services/ Stormwater Engineering Services/ Utilities Engineering Technical Services Engineering Field
More informationEvanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201
Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING 1727 Oak Avenue Evanston, IL 60201 General Contractor Owner Architect Construction Management Plan Phase 1 3 October
More informationECONOMIC DEVELOPMENT FULLY FUNDED PROJECTS Capital Improvement Program FY FY 2016
ECONOMIC DEVELOPMENT FULLY FUNDED PROJECTS Capital Improvement Program FY 2012 - FY 2016 Project Number Total Funds Appropriated Project Completion Date Annual Operating Cost 30-09 Conference Center Equipment
More informationOhio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director
Ohio Contractor Association Annual Work Forecast Program John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director John R. Kasich, Ohio Governor Jerry Wray, ODOT Director ODOT S
More informationSTAFF REPORT FOR MENDOCINO HISTORICAL REVIEW BOARD PERMIT MHRB # APRIL 4, LAKE MENDOCINO DRIVE UKIAH, CA 95482
STAFF REPORT FOR MENDOCINO HISTORICAL REVIEW BOARD PERMIT MHRB #2016-01 APRIL 4, 2016 APPLICANT/OWNER: AGENT: MENDOCINO COUNTY DEPARTMENT OF TRANSPORTATION 340 LAKE MENDOCINO DRIVE UKIAH, CA 95482 HOWARD
More informationPatrick Prescott, Community Development Director By: David L. Kriske, Assistant Community Development Director
DATE: April 26, 2016 TO: FROM: Ron Davis, Interim City Manager Patrick Prescott, Community Development Director By: David L. Kriske, Assistant Community Development Director SUBJECT: Modification of two
More informationENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project
VILLAGE OF LISLE REQUEST FOR QUALIFICATIONS ( RFQ ) #1267 ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project DUE BY: FEBRUARY 5, 2018 @ 11:00
More informationFuller /Fuller Heights Road Improvements
Transportation Fuller /Fuller Heights Road Improvements Total Cost - $4.4M Description This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of
More informationStormwater Control Plan for Post Construction Requirements Exhibit 4
Stormwater Control Plan for Post Construction Requirements Exhibit 4 Application Submittal Where directions state Done that means no additional information or forms below that point needs to be filled
More informationTexas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements
Texas Department of Transportation Book 2 Technical Provisions Grand Parkway Project Work Breakdown Structure Requirements Table 1 represents the minimum levels of the WBS that all schedule information
More informationPLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL
o PUBLIC WORKS DEPARTMENT PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL CIVIL ENGINEERING AND ARCHITECTURE 1. Offsite Improvements - Civil Engineering drawings may be required to show the following: Replacement
More informationSILVER LEVEL AWARD WINNER. City of Artesia Sustainability Best Practices Activities
SILVER LEVEL AWARD WINNER City of Artesia Sustainability Best Practices Activities SPOTLIGHT AWARD Areas of Accomplishment SILVER LEVEL GOLD LEVEL PLATINUM LEVEL Agency GHG Reduc ons Community GHG Reduc
More informationItem 5.01 STAFF REPORT JANUARY 9, 2014
Item 5.01 STAFF REPORT JANUARY 9, 2014 TO: FROM SUBJECT: RECOMMENDATION Planning Commission Jenny Liaw, Senior Planner 1748 WEST FREMONT STREET; APPLICATION NO. P13-204; USE PERMIT FOR THE CONSTRUCITON
More informationGrottoes. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation
2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration
More informationREQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320
REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE 2015 2016 ROOF AND HVAC REPLACEMENT PROJECT PW1320 Issued by: City of Stockton Public Works Department 22 E. Weber Avenue, Room 301 Stockton, CA 95202
More informationSYLVAN. inspire MIDDLE SCHOOL. which is to. instruction and programs. in a safe, caring, and. collaborative learning community.
SYLVAN MIDDLE SCHOOL The mission of Sylvan Middle School is consistent with that of the San Juan Unified School District, which is to inspire each student tosucceed and responsibly contribute to a radically
More informationCITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES
The City Engineer, under the authority of the Public Works Director and recommendations from the Traffic Engineer, will make the final decision on the need for a traffic study. The purpose of the traffic
More informationLONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17
LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17 1 PROJECT TEAM & COLLABORATORS 2 OPEN HOUSE SERIES Tuesday, May 16, 2017 6-8:00 pm La Verne City Council Chambers 3660 D Street La
More informationSANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016
FACILITIES COMMITTEE MEETING OCTOBER 18, 2016 1 ACTIVE PROJECTS Santa Ana College Central Plant, Infrastructure and Mechanical Upgrades 2 COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements
More informationSECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS
SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING
More informationextent feasible. Per the and low constructability,
RELEVANT PUBLIC PROJECTS AND REFERENCES TranTech is proud of its accomplishments in structural engineering. Our staff members have provided design servicess to numerous public agencies on very successful
More informationRequest for Proposals. 42nd Avenue Pump Station Rehabilitation. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403
42nd Avenue Pump Station Rehabilitation Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 May 24, 2015 The City of San Mateo (City) is accepting proposals to select a qualified
More informationExposition Light Rail Transit Project
Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could
More informationMoving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements
Moving Ruston Forward City of Ruston Infrastructure Maintenance and Improvements MLK Extension Project will be done in conjunction with proposed water and sewer improvements Connect Martin Luther King
More informationBoster, Kobayashi & Associates NEVIN Q. SAMS, P.E., T.E., P.T.O.E.
Boster, Kobayashi & Associates 59 Rickenbacker Circle Office: (925) 447-6495 P.O. Box 2049 Fax: (925) 447-6589 Livermore, CA 94551-2049 NEVIN Q. SAMS, P.E., T.E., P.T.O.E. Curriculum Vitae EDUCATION: B.S.
More informationLehigh Valley Transportation Study
ITEM: IV-A Lehigh Valley Transportation Study SUBJECT: PA 33 Preservation SR 22-Belfast COUNTY... Northampton FED.-AID SYSTEM... On-NHS S.R./SEC.... 33/07M DECADE OF INVESTMENT... No A.D.T.... 25,463 CAPITAL
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 2: Roof 2 DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)
More informationPUTNAM COUNTY Public Works Department Projects For Additional Information Call Public Works at PH ROADWAY IMPROVEMENT PROJECTS
ROADWAY IMPROVEMENT PROJECTS CR 216 From SR 100 to US 17, FDOT CIGP project. Pomona Park SCOP Roads Moody Rd/St. Johns Re- Alignmnet Feagle Ave (Resurface), Keown (Resurface), Lake Street (Resurface),
More informationCity of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)
City of St. Catharines Standard Drawings JULY 2017 Revised July 21, 2017 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 1 Monolithic Curb-Faced Sidewalk for Concrete Road 110-2002
More informationPARKING REQUIREMENT TOTAL PARKING REQUIRED PER CITY OF ALBUQUERQUE ZONING CODE: BUILDING DATA LEGEND SITE FURNISHINGS VICINITY MAP 7.31.
GENERAL NOTES 1. SEE CIVIL PLANS FOR ADDITIONAL GRADING, DRAINAGE AND UTILITY INFORMATION. 2. SEE CIVIL PLANS FOR ON-SITE BUILDING LOCATION, CURBS AND GUTTERS DIMENSIONS, AND OTHER DIMENSIONS NOT SHOWN
More informationProjects Under Construction Relocation of Fire Station #2: moving to near NW corner of 15 th & Kelly, decrease response time by being west of RR,
Projects Under Construction Relocation of Fire Station #2: moving to near NW corner of 15 th & Kelly, decrease response time by being west of RR, March 14, 2018 groundbreaking, 14-16 months for construction.
More informationDATE: March 31, 2017 NO. OF PAGES: 15 (Including Cover Page) CITY OF ARVIN SYCAMORE ROAD STORM DRAINAGE IMPROVEMENT PROJECT
WATER & WASTEWATER MUNICIPAL INFRASTRUCTURE LAND DEVELOPMENT AGRICULTURAL SERVICES DAIRY SERVICES LAND SURVEYING & GIS PLANNING & ENVIRONMENTAL DISTRICT MANAGEMENT 1800 30th Street, Suite 280 Bakersfield,
More information