MITRE 3 Building McLean VA
|
|
- Augustus Franklin
- 6 years ago
- Views:
Transcription
1 Executive Summary: The MITRE 3 building is an eight story office building. Its current frame is composed of A992 wide flange shapes. The lateral resisting system is a moment frame. This moment frame consists of the exterior frame of the building, and a centrally located frame. The building has three main bays, the outer two at 42 feet in length, and the middle bay at 43 feet in length. There are three alternative structural systems that will be investigated in this thesis. All three will include a shortened bay length in order to reduced member sizes. Due to the cost of moment connections, the three alternate systems involve replacing the existing moment frame. The first alternative is to replace the existing moment frame with shear walls. This may come across problems with space to position them. The second alternative will be to have a braced frame. This alternative will require the rearrangement of floor spaces in order to accommodate for the new members. The third alternative will be a combination of the shear walls and the braced frame. These alternatives will require additional work to other systems within the building. The mechanical system will be looked at the most thoroughly. Many of the elements of the system will need to be moved in order to place new members. Also, if the new structure changes the floor to ceiling heights, the mechanical system will need to be analyzed to determine if it will be efficient for the new space. An alternate façade will also be added to reduce the weight of the building, and the mechanical system will again need to be analyzed for this change.
2 Background: The MITRE 3 building is an eight story square foot office building located in McLean Virginia. Its frame consists mainly of A992 wide flange steel shapes, with certain areas of the building having concrete members. A typical floor to floor height is 13.5 feet, with the first floor being greater at 16 feet. A composite metal deck with 3.25 lightweight concrete cover is used. There are three main bays in this building, the outer two spanning 42 feet, while the central bay spans 43 feet. The beams are spaced at 10 o.c typically. There are two elevator shafts, two stairwells, and one mechanical shaft in the building (see Figure 1). The façade of the building has both precast concrete panels and composite metal panels. The lateral loads are resisted by a moment frame. This moment frame consists of the exterior frame of the building, and one centrally located frame (see Figure 2). Figure 1: Red: Elevator Shaft Green: Stairwells Blue: Mechanical Shaft
3 Figure 2: Highlighted Moment Frame Foundation walls are 5000psi 28 day strength concrete, and range in height from 1 2 to Spread footings are 4000psi concrete and are supported on soils reinforced with geopiers due to poor soil conditions on site. Problem Statement: Due to the lengths of the bays, the options for alternate, possibly more cost efficient floor systems were limited. Large steel beams are needed to span that distance, in most cases the large size was due to deflection. Concrete beams are feasible, although the sizes would be considerable due to the lengths.
4 The lateral resisting system is a moment frame, which can become costly with the moment connections. Although certain moment connections are needed, for example, in the cantilevered sections, many can be eliminated if a different lateral system is used. Proposed Solutions: In order to find a floor system that can possibly reduce cost, and result in a lighter building, the bays will be shortened. The outer two bays, which are currently 42 feet in length, will be shortened to lengths determined by partition placements in order to reduce obstructions due to structural elements. The central bay will also be reduced to a smaller length. In the central bay there is a lot of mechanical equipment in the plenum space that will need to be taken into consideration while placing the new columns. Different lateral systems will also be looked at. The first will be incorporating shear walls around the existing vertical shafts in the building (see Figure 1). This solution may encounter problems with space for the walls. The second alternative for the moment frame is a braced frame. Although rearrangement of the floor space may need to be considered to allow for the diagonal elements. The third alternative would be a combination of the previous two. Breadth Options: Of the options present here, two or more will be decided upon at a later date: 1. With the addition of columns the architecture will need to be changed slightly to allow for them not to obstruct any areas. Also, since the building has a more open floor plan, the architecture will need to be changed to allow for the braced frame. These structural elements will be placed in a way to limit the amount of change needed to the layout of the floor space, but there will need to be some changes.
5 2. The façade of the building will be changed to a different system. This is in order to lessen the overall weight of the structure. Also, if an energy efficient material is chosen, this can be compared to the original to see the effects that it has on the mechanical system of the building. 3. Due to the changes in the structure of the building, the mechanical system will need to be rearranged to accommodate the new structure. Also, if the floor to ceiling height changes with the new structure, the mechanical system will need to be analyzed to determine if it will be sufficient for the new volumes. In addition to that, the new façade s effects on the mechanical system will be determined. 4. For each system, including the existing, a cost analysis will be determined in order to compare the different options and arrive at a conclusion as to which system should be used. Solution Method: The design of the steel members will be based on the LRFD manual. The gravity and lateral loads, and the loading combinations will be determined using ASCE Initial members will be found using gravity loads. For the analysis of the frame a model using initial members will be built and analyzed using RAM. The braced frame will be built and designed using RAM. The shear wall design will be completed by hand once research in methods is completed. Tasks and Tools: Alternative 1: Shortened spans and Shear Walls Task 1: Gravity member sizes
6 a) Determine Loads b) Locate where additional columns will be added c) Build RAM model of new structure d) Obtain initial gravity members e) Check deflections f) Redesign as needed Task 2: Design of Shear wall a) Preliminary design of Shear walls b) Determine stiffness of walls c) Distribute Lateral Loads based on stiffness of walls d) Check strength e) Check Drift Task 3: Determine effect new structure has on mechanical system Task 4: Prepare a cost analysis for this system Task 5: Compare to existing structure and alternatives Alternative 2: Shortened spans and Braced Frame: Task 1: Gravity member sizes a) Determine Loads b) Locate where additional columns will be added c) Build RAM model of new structure d) Obtain initial gravity members e) Check deflections f) Redesign as needed Task 2: Design Braced Frame a) Locate where braced frames will be added b) Obtain initial members with RAM c) Check Strength
7 d) Check drift using e) Redesign as needed Task 3: Determine effect new structure has on mechanical system Task 4: Prepare a Cost analysis of this system Task 5: Compare to existing structure and alternatives Alternative 3: Shortened spans, and a combination of Shear walls and a Braced frame Task 1: Gravity member sizes a) Determine Loads b) Locate where additional columns will be added c) Build RAM model of new structure d) Obtain initial gravity members e) Check deflections f) Redesign as needed Task 2: Design braced Frame a) Locate where braced frames will be added b) Obtain initial members with RAM c) Check Strength d) Check drift using e) Redesign as needed Task 3: Design Shear Walls a) Preliminary design of Shear walls b) Determine stiffness of walls c) Distribute Lateral Loads based on stiffness of walls d) Check strength e) Check Drift f) Redesign as needed
8 Task 4: Redistribute lateral Loads based on Stiffness a) Determine Stiffness of braced frame b) Determine stiffness of shear walls c) Redistribute lateral loads based on stiffness d) Check member sizes for strength and drift e) Redesign as needed Task 5: Determine effect new structure has on mechanical system. Task 6: Prepare a Cost analysis of this system Task 7: Compare to existing structure and alternatives
9 Timetable: January 2005 Sunday Monday Tuesday Wednesday Thursday Friday Saturday Alternate facades researched Placement of new columns determined Alternate façade and it s load determined final loads RAM Model built for Gravity members 22 Final Gravity members obtained Initial Shear wall Designed Final Shear Wall Designed Location of braced frames determined
10 February 2005 Sunday Monday Tuesday Wednesday Thursday Friday Saturday RAM model of braced frame done 8 9 Final members of braced frame determined Combined shear wall and braced frame analyzed Final members of combined determined Cost analysis of existing structure Cost Analysis of Alternatives
11 March 2005 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 Compare 3 4 Final 5 Alternatives with existing option for building structure decided 6 7 Spring Break! Determine effects change in structure has in mechanical layout Prepare final report Analysis of mechanical system complete Prepare for final presentation
Thesis Proposal December 5, 2003
Executive Summary Thesis Proposal December 5, 2003 Brennan Hall is a five-story office/classroom building. It is located on a slightly sloping site, surrounded by other structures and a small green space.
More informationJonathan R. Torch Thesis Proposal Columbia University. Thesis Proposal. Columbia University Northwest Science Building
Thesis Proposal Columbia University Broadway & 120 th Street, New York, NY Jonathan R. Torch Pennsylvania State University Architectural Engineering Adviser: Ali M. Memari January 15 th, 2010 Pennsylvania
More informationFDA OC/ORA Office Building
FDA OC/ORA Office Building Table of Contents Executive Summary... 3 Introduction... 4 Structural System... 5 Foundation:... 5 Floor System:... 7 Building 31:... 7 Building 32:... 9 Columns... 10 Lateral
More informationChristopher McCune Structural Option 2006 Senior Thesis Penn State Architectural Engineering. Eight Tower Bridge Conshohocken, Pennsylvania
Christopher McCune Structural Option 2006 Senior Thesis Penn State Architectural Engineering Outline Project Original Proposal Structural Design Proposal Design Objectives Design Criteria Presentation
More informationBest Buy Corporate Building D (4) Richfield, MN
Best Buy Corporate Building D (4) Thesis Proposal Professor Boothby December 12 th, 2008 Executive Summary: The Best Buy Corporate Building D is a 6 story building with a total area of 304,610 square feet.
More informationTHE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA
THE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA Amy Graver, Structural Option - Dr. Hanagan, Advisor 12.16.2002 THESIS PROPOSAL Executive Summary Architecture The Plaza at PPL
More informationDesign- Lateral System:
Design- Lateral System: Investigation: When considering the design of the lateral load resisting system, first a look was taken at the existing shear walls. The existing lateral system in The Lexington
More informationDead Loads (psf): Concrete Floor Slab on Metal Deck 45 psf Mechanical and Ceiling 7 psf Miscellaneous 5 psf Exterior Wall 80 psf
CODES AND REQUIREMENTS The structural design of Northbrook Corporate Center was based on the International Building Code 2003, which incorporates many of the provisions of ASCE 7. The lateral load design
More informationLateral System Analysis and Confirmation Design
Andrew Covely Structural Dr. Linda Hanagan The Helena New York City, NY November 15, 2004 Pictures courtesy of Fox & Fowle Architects Lateral System Analysis and Confirmation Design Executive Summary This
More informationThesis Proposal. Matthew R Peyton
This Document is for 5th year senior thesis in the Architectural Engineering Departments at The Pennsylvania State University. S t r u c t u r a l O p t i o n P r o f e s s o r B e h r H o s p i t a l
More informationOffice Building-G. Thesis Proposal. Carl Hubben. Structural Option. Advisor: Dr. Ali Memari
Office Building-G Thesis Proposal Structural Option December 10, 2010 Table of Contents Executive Summary... 3 Introduction... 4 Gravity System...4 Lateral System:...6 Foundation System:...6 Problem Statement...
More information901 NEW YORK Avenue. Thesis Proposal. 901 New York Avenue. Washington, D.C. Advisor: Ali Memari Written by: Timothy H Park.
Proposal 901 NEW YORK Avenue Washington, D.C. Advisor: Ali Written by: Timothy H Park Page 1 of 7 Executive Summary This report is a summary of design options for. is an 11-story building rising 130-0
More informationTHESIS PROPOSAL. Page 1 of 20
THESIS PROPOSAL A. EXECUTIVE SUMMARY BUILDING DESCRIPTION The Comcast Center is located in downtown Philadelphia, Pennsylvania. The 57 story building functions primarily as office space with some retail
More informationTable of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8
WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 2 OCTOBER 29, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI 1 Table of Contents Table of Contents.2
More informationDAVID GEIGER BAE STRUCTURAL OPTION
DAVID GEIGER BAE STRUCTURAL OPTION SENIOR THESIS PRESENTATION 14 APRIL 2009 INTRODUCTION Building Overview Proposal Summary Goals Depth Study Structural System Redesign Breadth Study Cost Comparison Schedule
More informationBrent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan
Brief Building Overview: 200 Minuteman Park stands as a 200,000 square foot Class A office building in Andover, Massachusetts, worth roughly $15,000,000. Although the building has a large square footage,
More informationTemecula Medical Center Temecula, CA
Temecula Medical Center Temecula, CA Technical Assignment #2 Sean F. Beville The Pennsylvania State University Architectural Engineering Structural Option Senior Thesis Project Student Advisor: Thomas
More informationStructural Redesign Gravity System
Redesign Gravity System Design Considerations A composite floor system was used for this design to maximize the efficiency of the material being used. This type of system requires less material and provides
More informationThe Harry and Jeanette Weinberg Center Mercy Hospital Medical Office Building Baltimore, MD. Thesis Proposal
The Harry and Jeanette Weinberg Center Mercy Hospital Medical Office Building Baltimore, MD Thesis Proposal Kevin Clouser December 15, 2006 Structural Option Faculty Consultant: Dr. Boothby 1 Executive
More informationPeggy Ryan Williams Center. Ithaca, New York. AE Senior Thesis April 14, Angela Mincemoyer. Structural Option. Advisor Dr.
AE Senior Thesis April 14, 2014 Angela Mincemoyer Structural Option Advisor Dr. Boothby Ithaca, New York Ithaca, New York AE Senior Thesis April 14, 2014 Angela Mincemoyer Structural Option Advisor Dr.
More informationFranklin Square Hospital Center Patient Tower
Thomas Weaver Structural Option Franklin Square Hospital Center Patient Tower Baltimore, MD Thomas Weaver Structural Option AE 481W Senior Thesis Consultant: Professor M. Kevin Parfitt 12/14/2009 Page
More informationFDA CDRH Laboratory Silver Spring, Maryland. Executive Summary: Timothy Mueller Structural Option Walter Schneider
Executive Summary: The FDA-CDRH Laboratory is currently being built on the Food and Drug Administration s White Oak Consolidation Campus. It is a four story building with a full below grade ground floor
More information151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University
November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...
More informationCrossroads at Westfields Building II
Crossroads at Westfields Building II Chantilly, Va STEPHEN LUMPP Structural option Faculty Consultant: Dr. Andres Lepage Technical Report 2 EXECUTIVE SUMMARY This report is a study of alternate floor systems
More informationTechnical Report #2. Matthew R Peyton
Technical Report #2 This Document is Technical Report #2 for 5th year senior thesis in the Architectural Engineering Departments at The Pennsylvania State University. This Report is to prepare a study
More informationThesis Proposal. La Jolla Commons Phase II Office Tower San Diego, California. December 13, 2013
Thesis Proposal December 13, 2013 La Jolla Commons Phase II Office Tower San Diego, California Alyssa Stangl Structural Option Advisor: Dr. Linda Hanagan Table of Contents Executive Summary... 3 Purpose
More informationTEMECULA MEDICAL CENTER PRESENTATION OUTLINE
TEMECULA MEDICAL CENTER TEMECULA, CA STRUCTURAL SYSTEM OPTIMIZATION IMAGE COUTESY OF THE HKS INC. THE DEPARTMENT OF ARCHITECTURAL ENGINEERING AT THE PENNSYLVANIA STATE UNIVERSITY DUCTION STRUCTURE CHANGES
More informationMOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS
MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS PARKERSBURG, WEST VIRGINIA DOMINIC MANNO STRUCTURAL OPTION FACULTY CONSULTANT: DR. ANDRES LEPAGE PROPOSAL 12-12-08 TABLE OF CONTENTS TABLE OF CONTENTS.
More informationTechnical Report 3. Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R
Technical Report 3 Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R Site and Location La Jolla Commons, San Diego, California General
More informationThesis Proposal Structural Redesign / Cost, Schedule and Coordination Analysis / Architectural Impact
Thesis Proposal Structural Redesign / Cost, Schedule and Coordination Analysis / Architectural Impact Executive Summary:, located in Pigeon Forge, Tennessee, is designed as a multifunctional space and
More informationImaging Research Building
University of North Carolina s Imaging Research Building Thesis Proposal, LEED AP Structural Option Consultant- Dr. Thomas Boothby January 15, 2010 Table of Contents Executive Summary... 3 Architectural
More informationXyston Inn. NY. Proposal. Xiaodong Jiang. Structure Option. Advisor: Dr. Linda Hanagan
Proposal Xiaodong Jiang Structure Option Advisor: Dr. Linda Hanagan December 12, 2014 Executive Summary Xyston Inn is a 17-story hotel building that will be located in Brooklyn, New York. The design of
More informationXyston Inn. NY. Proposal. Xiaodong Jiang. Structure Option. Advisor: Dr. Linda Hanagan
Proposal Xiaodong Jiang Structure Option Advisor: Dr. Linda Hanagan December 12, 2014 Executive Summary Xyston Inn is a 17-story hotel building that will be located in Brooklyn, New York. The design of
More informationCE 3150 Reinforced Concrete Design Design Project
Problem Description For this design project you will work in your project groups to complete a partial design of an office building. Specifically, you will design and fully detail three components: 1.
More informationORANGE REGIONAL MEDICAL CENTER
ORANGE REGIONAL MEDICAL CENTER Middletown, New York Ryan Blatz Structural Option AE 482 Senior Thesis Advisor: Dr. Linda Hanagan ORANGE REGIONAL MEDICAL CENTER PRESENTATION OBJECTIVES Introduction Proposal
More informationSIGNAL HILL PROFESSIONAL CENTER Manassas, Virginia Morabito Consultants EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Like most suburban office building in Northern Virginia, the Signal Hill Professional Center, a four-story office structure in Manassas features composite steel construction for both
More informationThesis Proposal 12/13/06
Photo courtesy of OTO Development, http://www.otodevelopment.com/ Dr. Memari Thesis Advisor Thesis Proposal 12/13/06 Executive Summary Structural System The in, is an eleven story hotel complex which reaches
More informationKaleida Health Global Heart and Vascular Institute University at Buffalo CTRC/Incubator. Buffalo, New York. Revised Thesis Proposal
University at Buffalo CTRC/Incubator Buffalo, New York Revised William McDevitt January 14, 2011 Table of Contents Executive Summary...2 Introduction...3 Structural System Overview...4 Foundation...4 Floor
More informationThesis Proposal. Student Health Center Penn State University. Prepared By: Jacob Brambley (Structural Option) Prepared For: Dr.
Thesis Proposal Penn State University Prepared By: Jacob Brambley () Prepared For: Table of Contents Executive Summary..3 Introduction 4 Structural Systems. 5 Foundation....5 Floor System/Beams...5 Columns...6
More informationThe building on 250 West Street is a 7-story multi-use that provides space for parking,
December 5, 2002 Thesis Executive Summary The proposal for the investigation of the building on 250 West Street will include an in depth look at the floor and lateral systems. A continuation of the Pro-Con
More informationMOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS
MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS PARKERSBURG, WEST VIRGINIA DOMINIC MANNO STRUCTURAL OPTION FACULTY CONSULTANT: DR. ANDRES LEPAGE Technical Report 3 11-21-08 TABLE OF CONTENTS TABLE OF
More informationStructural Technical Report 1 Structural Concepts / Structural Existing Conditions Report
Michael A. Troxell Structural Option Advisor: Professor Parfitt College of Business Administration Oct. 5, 2005 Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report
More informationStructural Breadth. Landmark Façade
Jessica Lucas Hearst Tower Mechanical Option New York, NY Structural Breadth Landmark Façade As mentioned before, the building has two distinct pieces: the historic landmark façade and the new office tower.
More informationGlobal Village Rochester Institute of Technology Rochester, New York
Presentation Outline Welcome Introduction Architecture Existing Structure Problem Statement Arch. Breadth Structural Depth Conclusion Questions Global Village Rochester Institute of Technology Rochester,
More informationMEMORIAL SLOAN-KETTERING CANCER CENTER
MEMORIAL SLOAN-KETTERING CANCER CENTER SENIOR THESIS PRESENTATION THE PENNSLYVANIA STATE UNIVERSITY DEPARTMENT OF ARCHITECTURAL ENGINEERING PRESENTATION OUTLINE INTRODUCTION BUILDING DESCRIPTION EXISTING
More informationSENIOR THESIS PROPOSAL STRUCTURAL REDESIGN USING STEEL FRAMING
SENIOR THESIS PROPOSAL STRUCTURAL REDESIGN USING STEEL FRAMING THE TOWERS AT THE CITY UNIVERSITY OF NEW YORK NEW YORK CITY, NEW YORK ROBIN SCARAMASTRO AE 481 W DR. MEMARI EXECUTIVE SUMMARY The Towers at
More informationCaitlin Ferrell Structural Option Dr. Boothby, AE Faculty Consultant. Erie Convention Center and Sheraton Hotel
Caitlin Ferrell Structural Option Dr. Boothby, AE Faculty Consultant Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Technical Report #2: Pro-Con Structural Study of Alternate Floor Systems
More informationThesis Proposal. University Hospitals Case Medical Center Cancer Hospital. Daniel C. Myers. December 12, 2009
Thesis Proposal University Hospitals 11100 Euclid Avenue Cleveland, Ohio December 12, 2009 Daniel C. Myers Advisor: Dr. Ali Memari http://www.engr.psu.edu/ae/thesis/portfolios/2009/dcm234 Executive Summary
More informationTHESIS PROPOSAL. Aubert Ndjolba Structural Option PENN COLLEGE OF TECHNOLOGY. Faculty advisor: Dr. Boothby. Date: 12/09/11
THESIS PROPOSAL Aubert Ndjolba Structural Option PENN COLLEGE OF TECHNOLOGY Faculty advisor: Dr. Boothby Date: 12/09/11 Table of Contents: Executive Summary.3 Building Introduction.....4 Existing System
More informationTable of Contents Executive Summary 2 Introduction 3 Structural Systems Problem Statement 9 Proposed Solution 10 Breadth Topics 11 Tasks and Tools
Table of Contents Executive Summary...2 Introduction...3 Structural Systems Foundation System...4 Gravity System...6 Lateral System...7 Problem Statement...9 Proposed Solution...10 Breadth Topics...11
More informationOF THREE NEW BUILDINGS BEING CONSTRUCTED TO REPLACE THE EXISTING COMPLEX. THE FLOOR SYSTEM OF GEORGE READ HALL IS A HAMBRO COMPOSITE SYSTEM
EXECUTIVE SUMMARY: GEORGE READ HALL IS A FIVE STORY DORMITORY ON THE UNIVERSITY OF DELAWARE S CAMPUS. EMCOMPASSING 129,000 SQUARE FEET, IT IS THE LARGEST OF THREE NEW BUILDINGS BEING CONSTRUCTED TO REPLACE
More informationThesis Proposal Executive Summary Depth and Breadth Analysis
Mathew Nirenberg Structural Option Metropolis at Dadeland Adviser: Schneider Proposal Executive Summary 12/12/05 Thesis Proposal Executive Summary Depth and Breadth Analysis The Metropolis at Dadeland
More informationTHESIS PROPOSAL. Aubert Ndjolba Structural Option PENN COLLEGE OF TECHNOLOGY. Faculty advisor: Dr. Boothby. Date: 01/13/12
THESIS PROPOSAL Aubert Ndjolba Structural Option PENN COLLEGE OF TECHNOLOGY Faculty advisor: Dr. Boothby Date: 01/13/12 Table of Contents: Executive Summary.3 Building Introduction.....4 Existing System
More informationThesis Proposal. Piez Hall Extension. Oswego, NY
Thesis Proposal Piez Hall Extension Oswego, NY Min Gao Li Structural Option Faculty Advisor: Dr. Thomas E. Boothby December 14, 2012 TABLE OF CONTENTS EXECUTIVE SUMMARY... 2 BUILDING INTRODUCTION... 3
More informationHilton Baltimore Convention Center Hotel Western Podium
Hilton Baltimore Convention Center Hotel Western Podium CHRIS SIMMONS Structural Option Faculty Consultant: Dr. Ali M. Memari Technical Report 2 TABLE OF CONTENTS EXECUTIVE SUMMARY. Page 3 INTRODUCTION..
More informationAlexis Pacella Structural Option Dr. Schneider Lexington II, Washington D.C. Technical Report #2 October 31,
1 Executive Summary: Pro-Con Structural Study of Alternate Floor Systems is an investigation into possible alternative structural systems for Lexington II in Washington, D.C. For this report, several structural
More informationState Street New Haven CT Structural Sabrina Duk T. Boothby
360 State Street New Haven CT 06510 360 State Street New Haven CT 06510 Breadth Study Cost & Schedule Comparison About 360 State Street Project Team Owner/Architect: Becker + Becker Associates Structural
More informationBoyds Bear Country Pigeon Forge, TN
Technical Report 3 Lateral System Analysis and Confirmation Design Executive Summary:, located in Pigeon Forge, Tennessee, is designed as a multifunctional space and tourist attraction for Boyds Collections
More informationCampus Square Buildings C & D Lehigh University, Bethlehem, PA
Depth Study: Structural Redesign As noted previously, Building C is the focus of the spring semester redesign, though the proposed alternatives could be applied to the other buildings in the complex, including
More informationStephan Northrop Structural Option Dr. Linda Hanagan. North Shore Equitable Building Pittsburgh, PA Senior Thesis Proposal
Stephan Northrop NORTHROP THESIS PROPOSAL PAGE - 1 TABLE OF CONTENTS Executive Summary.. 3 1. Introduction.. 4 2. Structural Systems.. 5 Foundation.. 5 General Floor Framing.. 6 Turret Framing.. 7 Roof
More informationThese systems are evaluated on the basis of serviceability issues such as:
1 Traci Peterson Option: Structural Faculty Consultant: Memari The Del Monte Center at The North Shore Pittsburgh, PA Structural Technical Report 2 Pro Con Structural Study of Alternate Floor Systems Date
More informationDavid A. Walenga Technical Assignment #1
Executive Summary Contained in this report is design information related to the structural system of the Residence Inn by Marriot located in Stamford, Connecticut. Specifically, this report covers: code
More informationBrent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan
Executive Summary: 200 Minuteman Park currently stands as a three story commercial building. The original design was limited to three stories by an industrial zoning law in Andover, Massachusetts. If this
More informationLa Jolla Commons Phase II Office Tower
La Jolla Commons Phase II Office Tower San Diego, California Alyssa Stangl Structural Option Faculty Advisor Dr. Hanagan Preliminary Vibrations and Layout Building Introduction Location San Diego, California
More informationThesis Proposal. Aquablue at the Golden Mile. Hato Rey, Puerto Rico
Thesis Proposal Hato Rey, Puerto Rico Lindsay Lynch Structural Option Dr. Andres Lepage 20 January 2009 Table of Contents Executive Summary.......................................................... 2 General
More informationTraci Peterson Option: Structural Faculty Consultant: Memari. Executive Summary
1 Traci Peterson Option: Structural Faculty Consultant: Memari The Del Monte Center at The North Shore Pittsburgh, PA Structural Technical Report 3 Lateral System Analysis and Confirmation Design Date
More informationTECHNICAL REPORT III LATERAL STRUCTURAL SYSTEM ANALYSIS
TECHNICAL REPORT III LATERAL STRUCTURAL SYSTEM ANALYSIS Chris Vanaskie Structural Peninsula Regional Medical Center Salisbury, MD January 10, 2009 TABLE OF CONTENTS Executive Summary... 3 Introduction...
More informationPennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis- 2011 Thesis Advisor: Dr. Boothby Existing Building Overview Introduction Existing
More informationPark Potomac Office Building E
Kyle Wagner (IP) Advisor: Professor Kevin Parfitt 12/11/2009 Table of Contents I. Executive Summary. 3 II. Introduction / Material Strengths. 4 III. Codes and Design Standards.. 5 IV. Existing Structural
More informationHilton Baltimore Convention Center Hotel Western Podium
Hilton Baltimore Convention Center Hotel Western Podium CHRIS SIMMONS Structural Option Faculty Consultant: Dr. Ali M. Memari Thesis Proposal TABLE OF CONTENTS EXECUTIVE SUMMARY. Page 3 INTRODUCTION..
More informationJonathan R. Torch Technical Report 2 Columbia University. Technical Report 2. Pro-Con Structural Study of Alternate Floor Systems
Technical Report 2 Pro-Con Structural Study of Alternate Floor Systems Columbia University Broadway & 120 th Street, New York, NY Jonathan R. Torch Pennsylvania State University Architectural Engineering
More informationNATIONAL HARBOR BUILDING M
NATIONAL HARBOR BUILDING M 120 Waterfront St. Oxon Hill, Maryland Ryan Sarazen Structural Option Senior Thesis Presentation Spring 2008 Faculty Consultant Dr. Lepage BUILDING LOCATION BUILDING M SITE PLAN
More informationREVISED PROPOSAL. University Academic Center. Eastern USA. Alexander Altemose. Structural Option. Advisor: Thomas E. Boothby
REVISED PROPOSAL University Academic Center Eastern USA Alexander Altemose Structural Option Advisor: Thomas E. Boothby January 11, 2013 Table of Contents Executive Summary 3 Introduction 4 Structural
More informationStructural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Building B
Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Executive Summary The proposed thesis will include an investigation of two different alternative structural
More informationShear Wall Analysis. Introduction. The Medical Office Building Malvern, PA 7
The Medical Office Building Malvern, PA 7 Shear Wall Analysis Introduction The current lateral system in the Medical Office Building consists of cast-in-place (CIP) concrete moment frames and torsion beams.
More informationTraci Peterson Option: Structural Faculty Consultant: Memari. Executive Summary
1 Traci Peterson Option: Structural Faculty Consultant: Memari The Del Monte Center at The North Shore Pittsburgh, PA Thesis Proposal Date of Submission: 12/10/04 Executive Summary Currently under construction
More informationECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari December 12 th, 2011
ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis 2011 Class: Subject: Faculty Consultant: Submitted: AE 481W Thesis Proposal Dr. Ali Memari December 12 th, 2011 Table of Contents Executive
More informationHOTEL NORTHEAST U.S. JORDAN RUTHERFORD STRUCTURAL OPTION FACULTY ADVISOR DR. THOMAS BOOTHBY AE SENIOR THESIS APRIL 8, 2013
HOTEL NORTHEAST U.S. JORDAN RUTHERFORD STRUCTURAL OPTION FACULTY ADVISOR DR. THOMAS BOOTHBY AE SENIOR THESIS APRIL 8, 2013 HOTEL N.E.U.S. BUILDING INFORMATION SITE Located in the Northeast United States
More informationECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari January 13 th, 2012
ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis 2011 Class: Subject: Faculty Consultant: Submitted: AE 481W Thesis Proposal Dr. Ali Memari January 13 th, 2012 Table of Contents Executive
More informationGEN*NY*SIS CENTER FOR EXCELLENCE IN CANCER GENOMICS Rensselaer, NY
Existing Typical Floor Plan The typical floor plan of the Gen*NY*Sis Center for Excellence in Cancer Genomics (CFG) consists of mainly laboratories and offices with an atrium in the center. The hallway
More informationCorporate Headquarters
Great Lakes Region, USA AE Senior Thesis April 13 th, 2015 Mary Julia Haverty Structural Option Advisor H. Sustersic Image Courtesy: RTKL Building Height: 83.33 Cost: Withheld at owner s request Project
More informationTrump Taj Mahal Hotel
Trump Taj Mahal Hotel Atlantic City, New Jersey Thesis Proposal Prepared By: Stephen Reichwein, Structural Option Faculty Advisor: Dr. Andres Lepage The Pennsylvania State University Department of Architectural
More informationfifteen design for lateral loads Lateral Load Resistance Load Direction Lateral Load Resistance
APPLIED ARCHITECTURAL STRUCTURES: STRUCTURAL ANALYSIS AND SYSTEMS DR. ANNE NICHOLS SPRING 2017 lecture fifteen design for lateral loads Lateral Load Resistance stability important for any height basic
More information1000 CONTINENTAL SQUARE
1000 CONTINENTAL SQUARE KING OF PRUSSIA, PENNSYLVANIA Carter Davis Hayes Structural Option January 13, 2008 Advisor: Dr. Hanagan TABLE OF CONTENTS TABLE OF CONTENTS... 2 EXECUTIVE SUMMARY... 3 I. STRUCTURAL
More informationJanuary 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options
River Tower at Christina Landing Wilmington, DE Joseph Bednarz Structural Option Faculty Advisor: Dr. Boothby Executive Summary January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign
More informationErie on the Park. Timothy Moore Penn State University Architectural Engineering Structural Emphasis Advisor: Prof. Ali Memari
Timothy Moore Penn State University Architectural Engineering Structural Emphasis Advisor: Prof. Ali Memari Thesis Presentation - Spring 2006 Contents Introduction Building Professionals Existing Structure
More informationFINAL REPORT. Structural Redesign of Hershey Medical Center Children s Hospital. Penn State Hershey Medical Center Children s Hospital
FINAL REPORT Structural Redesign of Hershey Medical Center Children s Hospital Penn State Hershey Medical Center Children s Hospital The Pennsylvania State University Architectural Engineering Adviser:
More informationWilliam W. Wilkins Professional Building Columbus, Ohio
William W. Wilkins Professional Building Columbus, Ohio Technical Assignment 1 October 5, 2006 Michelle Structural Option AE 481W Senior Thesis Faculty Advisor: Dr. Boothby Table of Contents Executive
More informationBoyds Bear Country Pigeon Forge, TN
Technical Report 1 Structural Concepts / Structural Existing Conditions Report Executive Summary:, located in Pigeon Forge, Tennessee, is designed as a multifunctional space and tourist attraction for
More informationTechnical Report 1. Kingstowne Section 36A 5680 King Center Drive Kingstowne, VA James Chavanic. Structural Option. Advisor: Dr.
Technical Report 1 Rendering provided by DCS Design 5680 King Center Drive Kingstowne, VA 22315 Advisor: Dr. Boothby September 17, 2012 TABLE OF CONTENTS Executive Summary 3 Building Introduction 4 Structural
More informationTHESIS PROPOSAL. Dominick Lovallo Dr. Hanagan Advisor The Pennsylvania State University. Embassy Suites Hotel, Springfield Virginia
THESIS PROPOSAL Dominick Lovallo The Pennsylvania State University Embassy Suites Hotel, Springfield Virginia Table of Contents Executive Summery... 2 Introduction:... 3 Structural Systems... 4 Existing
More informationTHESIS PROPOSAL. Dominick Lovallo Dr. Hanagan Advisor The Pennsylvania State University. Embassy Suites Hotel, Springfield Virginia
THESIS PROPOSAL Dominick Lovallo The Pennsylvania State University Embassy Suites Hotel, Springfield Virginia Table of Contents Executive Summery... 2 Introduction:... 3 Structural Systems... 4 Existing
More informationPro-Con Structural Study for Alternative Floor Systems October 27, 2004
Ismail Al-Hadhrami Structural Option Faculty Consultant: Dr. Thomas Boothby Agricultural Hall and Annex East Lansing, MI Pro-Con Structural Study for Alternative Floor Systems October 27, 2004 Executive
More informationFDA OC/ORA Office Building
FDA OC/ORA Office Building Adam Love Page 2 of 158 Table of Contents Executive Summary... 6 Introduction... 7 Structural System... 8 Foundation:... 8 Floor System:... 10 Building 31:... 10 Building 32:...
More informationU.S. Pharmacopeia Headquarters Consolidation. Rockville, MD
Consolidation Jeff Rothermel Structural Option Advisor: Dr. Ali Memari Technical Report 2 Submitted: Oct. 24 th, 2008 Table of Contents Executive Summary.1 Floor Systems Existing Two Way Slab with Drop
More informationSTRUCTURAL TECHNICAL REPORT 1
Technical Report 1 Page 1 David Lee AE 481W Structural Option Advisor: Andres Lepage URS Office Building October 5, 2006 STRUCTURAL TECHNICAL REPORT 1 Structural Concepts / Structural Existing Conditions
More informationPro-Con Structural Study of Alternate Floor Systems
Andrew Covely Structural Dr. Linda Hanagan The Helena New York City, NY October 27, 2004 Pictures courtesy of Fox & Fowle Architects Pro-Con Structural Study of Alternate Floor Systems Executive Summary
More informationKeywords: Discrete Staggered Shear Wall, High-Rise Building, Response Spectrum Analysis, Storey Drift.
www.semargroup.org, www.ijsetr.com ISSN 2319-8885 Vol.03,Issue.09 May-2014, Pages:1830-1835 Seismic Response of High-Rise Structure with Staggered Shear Wall AUNG MON 1, TIN TIN HTWE 2 1 Dept of Civil
More informationNorth Shore at Canton Baltimore, MD Beau Menard Technical Report 1
North Shore at Canton Baltimore, MD Beau Menard Technical Report 1 Structural Schneider 10/05/05 Structural Concepts Executive Summary North Shore at Canton is a 4 story town home and parking garage structure