1 Clearances and conductor spacings and a safe access for a.c. switchyards T R A N S P O W E R APPROVED S T A N D A R D Implementation date: March 2009 COPYRIGHT 2009 TRANSPOWER NEW ZEALAND LIMITED. ALL RIGHTS RESERVED. This document is protected by copyright vested in Transpower New Zealand Limited ( Transpower ). No part of the document may be reproduced or transmitted in any form by any means including, without limitation, electronic, photocopying, recording or otherwise, without the prior written permission of Transpower. No information embodied in the documents which is not already in the public domain shall be communicated in any manner whatsoever to any third party without the prior written consent of Transpower. Any breach of the above obligations may be restrained by legal proceedings seeking remedies including injunctions, damages and costs.

2 PREFACE of this standard is a major revision of the previous Issue 2. It has been re-developed to: 1. Include clearances and spacings for 400 kv a.c. switchyards. 2. Improve safety by requiring minimum maintenance access clearances to enable the use of mobile elevated work platforms (MEWPs) in order to reduce fall hazards. 3. Improve safety by requiring work plane heights to be aligned with the New Zealand Department of Labour Code of Practice for Manual Handling (the design principles for manual handling are identical to those considered for determining work platform heights). 4. Improve safety by up-dating minimum height to live metal clearances to improve access to circuit breaker mechanism boxes, and to prohibit designs based on the use of steps for this purpose as per Service Advisory TP.DS SA1 (now superseded by this document). 5. Improve safety by re-instating a minimum height requirement to the lowest insulating shed on insulating support columns. 6. Improve safety by requiring existing installations that do not comply with minimum clearances as determined by national and international standards to be remedied by restricting access and use of warning signs. 7. Improve circuit availability by requiring that routine maintenance and equipment change-outs can be carried without necessitating the shutdown of nearby energised circuits. 8. Include design criteria for extending and modifying existing a.c. switchyard structures. 9. Alignment with Australian practices except when this would involve conflict with IEC standards. The range of terms used has been significantly increased and these are defined in Appendix A Definitions. Because of the extensive nature of the changes in this third issue of TP.DS the Revision History log has been reset to restart again as at the date of issue. Keywords clearances protective barriers and obstacles walking access clearance (W) maintenance groups, zones, and access provision for inadvertent movement (Di) mobile elevating work platforms (MEWPs) spacings Transpower New Zealand Limited 2

3 Revision History Date Issue Amendments 3 Refer to Preface on page 2. CONTACT This document is the responsibility of Engineering Services Group, Transpower New Zealand Limited, Wellington. If you have any queries please contact the Engineering Services Manager. If you would like to make suggestions to improve this document, please use the Controlled Document Feedback Form located at the rear of this document or online via the Controlled Documentation homepage of the Transpower website at CONFIDENTIALITY All information disclosed in this document that is not general public knowledge must be treated as strictly confidential and may not be used or disclosed except for the purpose of developing documentation for the benefit of Transpower. LIMITATION OF LIABILITY AND DISCLAIMER OF WARRANTY Transpower New Zealand Limited makes no representation or warranties with respect to the accuracy or completeness of the information contained in the document. Unless it is not lawfully permitted to do so, Transpower specifically disclaims any implied warranties of merchantability or fitness for any particular purpose and shall in no event be liable for, any loss of profit or any other commercial damage, including, but not limited to, special, incidental, consequential or other damages. MINIMUM REQUIREMENTS The requirements set out in Transpower s standards are minimum requirements that must be complied with by contractors, including designers and other consultants. The contractor is expected to implement any practices which may not be stated but which can reasonably be regarded as good practices relevant to the purpose of this standard. Transpower expects contractors to improve upon these minimum requirements where possible and to integrate these improvements into their procedures and quality assurance plans Transpower New Zealand Limited 3

4 CONTENTS PREFACE PURPOSE POLICY COMPLIANCE REFERENCES AND BACKGROUND MATERIAL GENERAL REQUIREMENTS Design Drawings Continuity in Service Design Co-ordination Tables BASIC ELECTRICAL CLEARANCES Requirements Basic Electrical Clearances Increased Minimum Clearances Under Special Conditions Reduced Minimum Clearances Under Special Conditions CLEARANCES FOR SAFE ACCESS AND CONDUCTOR SPACINGS Fundamental Design Requirement for Safety Walking Access Clearances Minimum conductor heights Access for maintenance work Busbar Heights and Spacings Standard Clearances & Conductor Spacings Alternative Clearances & Conductor Spacings Low level equipment installations/ protective barriers (capacitors etc.) Access for Maintenance Vehicles and Plant Security Fence Clearances Safe Access to Operational Equipment EXISTING A.C. SWITCHYARDS Policy requirements Requirements for ground clearances and busbar heights Non-compliant existing structures Modifications or extensions IMPULSE TESTED EQUIPMENT Transformers...39 APPENDICES A DEFINITIONS B CONTROLLED DOCUMENT FEEDBACK FORM Transpower New Zealand Limited 4

5 1 PURPOSE This standard defines minimum clearances to protect personnel, vehicles and equipment against inadvertent contact, or hazardous proximity, to exposed conductors, and defines the minimum basic clearances required in a.c. switchyards. 2 POLICY All existing and new a.c. switchyards shall comply with New Zealand legal requirements and the requirements of international and national standards, and New Zealand industry documents as set out in Section 3, Compliance. New a.c. switchyards shall be designed so that the required continuity in service of energised equipment is maintained when nearby equipment is either maintained, or replaced. New a.c. switchyard layouts shall facilitate safe and efficient access by competent employees who are carrying out operations and maintenance work using mobile elevated work platforms where required. Where practical access for MEWPs shall also apply to modifications and extensions to existing a.c. switchyards. 3 COMPLIANCE The design of Transpower a.c. switchyards shall meet the minimum clearance requirements of the following documents: 1. IEC Power installations exceeding 1 kv a.c. Common rules 2. NZECP 34 New Zealand Code of Practice for Electrical Safe Distances 3. AS 2067 High voltage installations and ESAA NENS 04 National guidelines for safe approach distances to electrical apparatus 4. IEC Insulation co-ordination Part 2: Application guide 5. IEC Power transformers Part 3: Insulation levels, dielectric tests and external clearances in air Where conflict exists between the above documents they shall take precedence in the order listed. The design of Transpower a.c. switchyards shall facilitate compliance with the following documents: Electricity Regulations 1997 Regulations made under the HSE Act 1992 Safety Manual Electricity Industry (SM-EI) Code of Practice for Manual Handling, Department of Labour documents Existing a.c. switchyards that do not fully comply shall be brought into line with the requirements of Section 8 Existing a.c. switchyards.

6 4 REFERENCES AND BACKGROUND MATERIAL The following documents are referred to in this standard or provided background material for the development of this standard: TP.DG TP.DG TP.DG TP.DS DC 3.1.2:1974 AS 2067 BS 7354 ESAA NENS 04 ICNIRP IEC IEC IEC IEEE 979 NZECP 34 SM-EI Insulation co-ordination Electric and magnetic field design parameters for a.c. 50 Hz transmission lines, substations and underground, cables Safety by design strategy and application: elimination of hazards for people, plant and the environment during construction, operations, maintenance and disposal Station security physical and electronic requirements Electrical design standard High voltage installations Code of practice for design of high voltage open-terminal stations National guidelines for safe approach distances to electrical apparatus International Commission on Non-ionizing Radiation Protection Guidelines: Guidelines for limiting exposure to time-varying (1998) electric, magnetic and electromagnetic fields Insulation co-ordination Part 2: Application guide Power transformers Part 3: Insulation levels, dielectric tests and external clearances in air Power installations exceeding 1 kv a.c. Common rules Guide for substation fire protection Electrical Safe Distances Safety Manual Electricity Industry Electricity Regulations Electricity Regulations 1997 Code of Practice for Manual Handling New Zealand Department of Labour Code HSE Act Health and Safety in Employment Act Transpower New Zealand Limited 6

7 5 GENERAL REQUIREMENTS 5.1 Design drawings Design drawings for all new a.c. switchyards, and extensions, or modifications to existing a.c. switchyards shall be prepared by the designer and submitted to Transpower for approval. These drawings shall include critical dimensions and show: 1. The proposed equipment maintenance groups. 2. The proposed equipment maintenance zones. 3. The type of temporary access equipment that can be used for routine maintenance and the replacement of equipment. 4. Clearances and minimum spacings. 5. Access ways for routine maintenance/ equipment change-outs. Refer to the drawing series TP58394 for examples of points 1 to 5 above. 5.2 Continuity in service Routine maintenance All a.c. switchyards shall be designed so that routine maintenance can be safely carried out without the need to remove from service, nearby energized equipment in other circuits. Note that during replacement, upgrade or extension projects existing equipment within the associated maintenance group that does not meet this requirement shall, where practicable, be relocated to a position that does meet this requirement Equipment replacement Network security requirements Circuits shall be designed so that equipment can be safely replaced without the need to remove from service nearby energized equipment in other circuits Zero contingency circuits Where there is no back-up for circuits connected to a busbar (i.e. there is only n security), a new circuit connected to that busbar shall be designed so that circuit breakers can be safely replaced without the need to remove from service, either the busbar or nearby circuits Bus coupler installations Bus coupler installations shall be designed so that equipment can be safely replaced without the need to remove from service, nearby energized equipment in other circuits, including sections of bus. Example: To be able to replace the bus coupler circuit breaker and CTs with both adjacent busbars live. 5.3 Design co-ordination Switchyard layout and patterning Replicable layouts that can be readily related to the single line diagram shall be used. The equipment layouts and conductor dispositions in circuit bays of the same type (line, transformers, capacitor banks etc.) shall consistently conform to an established pattern Electric and magnetic fields Close proximity to high voltage conductors can result in unacceptable exposure to electric and magnetic fields Transpower New Zealand Limited 7

8 5.4 Tables Internal fences around air-cooled reactors and other areas of high magnetic fields shall protect personnel outside the fence from magnetic fields in excess of the ICNIRP guideline for occupational exposure. TP.DG Electric and magnetic field design parameters for a.c. 50 Hz transmission lines, substations and underground, cables provides more specific requirements with regard to the consideration of the limitation of EMF exposures during design. Table 1: Minimum clearances for voltage range I: 1 kv < U m up to and including 245 kv Nominal system voltage Highest equipment voltage LIWV 1 Minimum phase to earth (N) & phase to phase clearance U n U m (kv) (kv) (kv pk ) (mm) (150 see Note 2) (220 see Note 2) (320 see Note 2) (see Note 3) (see Note 4) Notes: 1 Clearances are determined by LIWV not by nominal system or highest equipment voltages. 2 Reduced clearances may be used if there is no practical alternative, if other means are provided to prevent flashovers by birds or vermin. The reduced clearances are not to be used to calculate maintenance clearances, protective barrier/obstacle clearances, or security fence clearances kv lines which have a LIWV of 450 kv pk have a corresponding minimum clearance of 900 mm kv lines and transformers which have a LIWV of 950 kv pk (or 900 kv pk for transformers prior to about 1982) have a corresponding minimum clearance of 1900 mm Transpower New Zealand Limited 8

9 Table 2: Minimum clearances for voltage range II: U m > 245 kv Nominal system voltage Highest equipment voltage Rated LIWV Rated SIWV Minimum phase to earth clearance SIWV Minimum phaseto-phase clearance U n U m N (V) (kv) (kv pk ) (kv pk ) (mm) (kv pk ) (mm) Note: The nearest IEC Nominal system voltage to 400 kv is 380 kv. Transpower has selected a nominal system voltage of 400 kv. As the nominal system voltage is defined as a suitable approximate value 400 kv is used in Table 2 as opposed to 380 kv. Table 3: Standard clearances for safe access and conductor spacings A.C. voltages from August 2008 Nominal system voltage U n Minimum height of live parts above fixed accessible surfaces 1, 2 W Minimum busbar (rigid type/ no sag) clearance height 1 Busbar spacing centre line to centre line for rigid busbars Minimum vertical work safety clearance 1,3 V (includes D i V of 1000 mm) Minimum horizontal work safety clearance 1,3 H (includes D i H of 1900 mm and M a of 1900 mm) (kv) (mm) (mm) (mm) (mm) (mm) Notes: 1. All clearances are surface to surface taut string distances, whereas conductor spacings are centre line to centre line measurements. 2. Refer to Figure 3 for installation example designed to achieve walking access clearance W. 3. The maintenance clearances H and V are based on the use of MEWPs as illustrated in Figure Because outdoor 33 kv and lower voltage level air insulated a.c. switchyards are no longer economic due to the comparatively low cost of indoor switchgear installations these are not included in the above table. 5. Because the trend is to phase out 50 kv lines and a.c. switchyards these are not included in the above table. Therefore for 50 kv installations design to 66 kv clearances Transpower New Zealand Limited 9

10 Table 4: Revised safety distances as from 20 th April 2005 to July 2008 Nominal system voltage U n Minimum height of live parts above fixed accessible surfaces Minimum busbar (rigid type/ no sag) clearance height assuming vehicle access (kv) (mm) (mm) Refer to Section 8. Table 5: Acceptable safety distances for installations built prior to 20 th April 2005 Nominal system voltage U n Minimum height of live parts above fixed accessible surfaces Minimum busbar (rigid type/ no sag) clearance height assuming vehicle access (kv) (mm) (mm) Refer to Section Transpower New Zealand Limited 10

11 6 BASIC ELECTRICAL CLEARANCES 6.1 Requirements The requirements of this section apply to both new and existing a.c. switchyards. Insulation coordination of electrical equipment is required to provide a level of protection for personnel and equipment by reducing flashovers caused by system over-voltages and lightning strikes. Basic electrical clearances are required in order to achieve this purpose. 6.2 Basic electrical clearances Tables 1 and 2 list Transpower nominal system voltages, highest equipment voltages, lightning impulse withstand voltage (LIWV) and corresponding minimum phase to earth clearances (N) and phase to phase clearances. These clearances are used for a.c. switchyard structures, conductors, and insulators etc. that, for practical reasons, have not been tested for compliance with the LIWV type tests, either individually or as a total built unit. The clearances are based on conservative criteria and are to be used for any outdoor equipment that has not passed the appropriate LIWV type test. Circumstances when increased clearances are, or may be required, are detailed in subsection Increased minimum clearances under special conditions Circumstances when the minimum clearances given in Tables 1 and 2 shall be or may require to be increased are as follows: (a) (b) Minimum clearances between conductors of an installation that may be subject to phase opposition shall be 20 % higher than the standard minimum values. Minimum clearances between conductors of an installation, which are assigned to different insulation levels, shall be 25 % higher than the standard minimum values established for the higher insulation level present. (c) Where conductors can move under the influence of short circuit forces, at least 50 % of the standard minimum clearances shall be maintained as a minimum. (d) Where conductors can move under the influence of wind, at least 75 % of the standard minimum clearances shall be maintained as a minimum. 6.4 Reduced minimum clearances under special conditions In cases where there is insufficient space available to achieve the minimum clearances then, subject to approval by Transpower, reduced clearances may be used provided that suitable measures are put in place such as barriers or obstacles to ensure the protection of personnel, and provided the achieved probability of flashover is controlled to a level acceptable to Transpower Transpower New Zealand Limited 11

12 7 CLEARANCES FOR SAFE ACCESS AND CONDUCTOR SPACINGS This section sets out the minimum clearances required for safe access to a.c. switchyards, and also includes the minimum conductor spacing requirements for new a.c. switchyards. 7.1 Fundamental design requirement for safety Designs must ensure that competent personnel can carry out operating and maintenance procedures without inadvertently encroaching within the danger zone. The danger zone is defined by the minimum phase to earth clearance (N) to live conductors. Figure 1: Danger zone concept Transpower New Zealand Limited 12

13 7.2 Walking access clearances New a.c. switchyards shall be designed to have minimum safe clearances from all surfaces that are accessible to competent employees walking throughout the substation. Figure 2: Minimum design dimensions for safe access Transpower New Zealand Limited 13

14 The minimum walking access clearance to live parts from accessible ground, or accessible platforms shall be W, where W = N + R V and R V = 2440 mm. 7.3 Minimum conductor heights (a) The minimum conductor height shall not be less than the greater of the minimum height of live conductors above fixed accessible surfaces given in Table 3 or the walking access clearance W, where W= N The clearance W is referenced to the maximum conductor sag. (b) The lowest part of any insulation, for example the upper edge of metallic insulator bases, shall not be less than 2440 mm above the accessible surface. Figure 3: Minimum design dimensions for walking access Note, as in the case of capacitor voltage transformers, attention to detail is required since the lowest live conductor is not always located at the equipment terminals Transpower New Zealand Limited 14

15 7.4 Access for maintenance work New a.c. switchyard designs shall be based on the provision of safe and efficient maintenance access from temporary elevated surfaces for all work that cannot be done from ground level. It shall be possible to locate temporary work platforms so that routine maintenance can be carried out without the need for outages of equipment in other equipment maintenance groups. Standard designs shall not be based on the use of scaffolding/ climbing /ladders for routine maintenance access. The exceptions to this are: 1. Ladders for inspection purposes. 2. Scaffolding which may be necessary due to the unique nature of the work, such as retermination of high voltage power cables. The preferred means of access for maintenance work is a MEWP. Junction boxes shall not be located such that they impede the positioning of temporary work platforms. For example, equipment should not be located in the area in front of a circuit breaker, or the area along the side adjacent to the access route for maintenance plant. It shall be possible to maintain equipment such as boundary fences, spare transformer units etc. without requiring shutdown of any primary electrical equipment Equipment maintenance access groups Equipment maintenance groups are formed by splitting the equipment into logical groups, any of which can be removed from service as a group for routine maintenance and inspection. A typical example of this is indicated in Figure Transpower New Zealand Limited 15

16 Figure 4: SLD primary equipment maintenance groups Equipment maintenance zones Maintenance zones are based upon the maintenance access width, the volume occupied by the equipment, and the work plane heights. Refer to Figures 5, 6 and 7 below Transpower New Zealand Limited 16

17 Figure 5: CB/CT maintenance access envelope and zone plan view The required height of the temporary work platform is determined by the highest work plane height. Generally, the highest work plane shall be at the same height as the highest equipment point, and for ergonomic reasons, is taken as being located 1000 mm above the work platform. For circuit breakers the highest work plane shall be at the same height as the highest terminals, and taken as being located 1000 mm above the work platform for ergonomic reasons Transpower New Zealand Limited 17

18 Figure 6: Maintenance access envelope and zone vertical view A maintenance access width plus sufficient room to facilitate replacement of major components, as well as replacement of the entire unit of equipment, shall be provided around the periphery of all large equipment items such as transformers Transpower New Zealand Limited 18

19 Figure 7: Transformer maintenance access It may not always be practical to provide an access width along each side of an item of equipment in order to meet general requirements. The maintenance access series of drawings TP58394 (refer subsection 5.1 above) is being extended to show maintenance access arrangements as they become available for various types of equipment Positioning of temporary elevated work platforms Temporary elevated work platforms shall be able to be safely moved into the work position without requiring outages of equipment other than the equipment to be worked on. The component distances in Figures 8 and 9 have been selected to cater for a reasonably wide range of MEWPs as used by contractors Transpower New Zealand Limited 19

20 Figure 8: Mobile elevating work platforms minimum design requirements Transpower New Zealand Limited 20

21 7.4.4 Work Position of Temporary Elevated Work Platforms Once in position the required minimum clearances are as per Figure 9 below. Figure 9: Boom type EWPs heights and clearances Transpower New Zealand Limited 21

22 7.4.5 Access using ladders Where it is not possible to gain access using MEWPs, then access using ladders is permissible for inspection purposes, but ladders are not to be used as work platforms. Figure 10: Use of ladders heights and clearances Transpower New Zealand Limited 22

23 7.4.6 Work safety clearances formula For definitions of D i, (including D i V and D i H), R v, and R h, refer to the distance for inadvertent movement, vertical reach and horizontal reach respectively in the definitions section. (a) The vertical work safety clearance, V = N + D i V + R v Work plane height, where: Vertical reach (R v ) = 2440 mm Work plane height = 1000 mm (b) The horizontal work safety clearance, H = N + Ma + D i H D i values to be used: MEWP boom or stick type Scissor lift platform Ladder Vehicle, or mobile plant in transit (subsection 7.9) All other applications, unless the type of equipment justifies the use of a value of D i 1000 mm for D i V and 1900 mm for D i H 1000 mm for D i V and 1500 mm for D i H 300 mm for D i V (allows for one step) and 0 m for D i H 1000 mm for D i H, and 0 mm for D i V 0 mm Ma values to be used: MEWP boom or stick type Scissor lift platform Ladder Security fence spacing (subsection 7.10) Protective barriers and obstacles All other applications 1900 mm 1900 mm 25 % of working length of ladder (mm) 1000 mm 1000 mm 1000 mm 7.5 Busbar heights and spacings Busbar mounting heights Generally busbar mounting heights are to comply with Table 3 to allow vehicles and plant to pass underneath. The required height is to the lowest part of the busbar. For vertically spaced busbars the required height is the height to the lowest part of the lowest busbar. Mounting heights for flexible busbars and other sections of live conductor shall be designed such that under the worst combination of conditions the minimum height at any point shall not be less than that required by Table 3. Busbars mounted in a special enclosure, which prevents access to personnel while the equipment is live, may be mounted at any height sufficient to give phase to earth clearances in accordance with Table 1 and 2. In such cases protective barriers shall be installed in accordance with subsection Transpower New Zealand Limited 23

24 7.5.2 Busbar horizontal spacings The centre line to centre line spacings in Table 3 allow for the installation of the typical designs of disconnectors and earth switches in line with the busbars. The typical disconnectors are rocking and vertical break types at 33 kv and vertical break at 72.5 kv, 123 kv and 245 kv. Centre rotating disconnectors and some centre break are also accommodated at 72.5 kv, 123 kv and 245 kv. For single side break disconnectors the spacings must be increased. The spacings are also suitable for in-line installation of current transformers and circuit breakers. Vertically-spaced busbars must meet the requirements of Table 1 and 2, after making due allowance for flexibility, etc. Flexible or strung busbars require greater spacings to allow for side swing and the separation of bundled conductors. 7.6 Standard clearances and conductor spacings Table 3 summarizes the above subsections and gives the minimum vertical and horizontal work safety clearances (V and H) for new a.c. switchyards. 7.7 Alternative clearances and conductor spacings Alternatives to the above standard clearances and conductor spacings may be proposed to Transpower provided they meet the policy requirements, and meet: 1. The walking access and minimum equipment height requirements as set out in Table 3 above. 2. The maintenance clearances formulae and values as set out above. The selection of alternative options is to be based on the following hierarchy: 3. Use of boom or stick type elevating work platforms as set out above. 4. Use of other types, e.g. scissor type MEWPs. 5. Other options. Drawings of the proposed alternative shall be submitted to Transpower for approval by the Manager responsible for this standard and approval of the manager responsible for equipment maintenance Transpower New Zealand Limited 24

25 7.7.1 Scissors elevating work platforms Figure 11: Scissor lifts heights and clearances fall back option 1 Where the provisions of this Standard cannot be practicably achieved, the designer may propose an alternative solution for Transpower s consideration, or request advice from Transpower on alternative acceptable solutions. For example, in the case of scissor type Transpower New Zealand Limited 25

26 MEWPs a value of Ma less than 1900 mm may be proposed if suitable narrower mobile equipment would suit the work. 7.8 Low level equipment installations/ protective barriers (capacitors etc.) Where necessary the designs shall incorporate earthed protective barriers, and/or protective obstacles and appropriate warning signage to ensure that competent employees can walk safely as intended and gain access where necessary throughout the substation. Figure 12: Protection against direct contact Protective barriers shall be of substantial construction and shall be suitable for the environment in which they are located. They shall limit the approach of personnel carrying out routine inspections, operations or maintenance to a safe distance from the live parts Transpower New Zealand Limited 26

27 Either solid or mesh barriers shall be used as per Figure 12. Barriers with openings exceeding 50 mm shall not be used. For non-rigid protective barriers and wire meshes, the clearance values shall be increased to take into account movement or deflection of the protective barrier or mesh and meet the worst case seismic and wind design loads. 7.9 Access for maintenance vehicles and plant Clearances The access envelopes designed for maintenance vehicles and plant shall include provision for inadvertent movement, provision for door opening, and shall have a clearance from overhead conductors and other live parts, equal to, or greater than the reduced minimum approach distance given in NZECP 34 Table 6 plus 100 mm. (Refer to Figures below) Under station busbars Mounting heights for flexible busbars and other sections of live conductor under which vehicles may pass shall be designed such that under the worst combination of conditions the minimum height at any point shall not be less than that given in Table 3. This is for the passage of maintenance equipment underneath busbars on the basis that such equipment movements are carried out in accordance with SM-EI Rule Busbars mounted in a special enclosure, to which access by personnel is prevented while the equipment is live, may be mounted at any height sufficient to give phase to earth clearances in accordance with Tables 1 and Primary equipment excluding transformers To ensure equipment maintenance and replacement of typical bay equipment such as CBs, CTs etc. can be undertaken safely and efficiently, access routes shall be provided that meet the following criteria: 1. As a minimum straight through access shall be available between every second diameter from one side of the structure to the other. 2. The access route and area provided shall be suitable for the following MEWPs and crane: (a) Genie Z-45/ 25J RT (b) Genie S-45 (c) Franna AT-20 (20 tonne crane, required clearance height 3100 mm). The minimum turning radii shall be based on the largest specified turning radii of these types plus 1000 mm. 3. In combination with the maintenance zones and available area enable equipment change-outs to be carried out safely and efficiently. 4. Meet the minimum access route profile requirements as indicated in the figures below. Note, the above crane and MEWPs have been selected solely for the purpose of ensuring that design access envelopes cater for a reasonable range of mobile plant that the maintenance contractors may need to use for typical bay equipment Transformer or heavy item access Formed heavy transport routes shall be provided for the installation and removal of transformers or other heavy items. Access routes for transformer transporters and cranes intended for lifting transformers shall meet the requirements of Figures 13 to 16 except that the vehicle envelope shall have a minimum width of 3000 mm and a minimum height of 4500 mm. Actual transformer Transpower New Zealand Limited 27

28 dimensions, and lifting arrangements etc. should be specified during the design phase, and appropriate increases in height/ width made to the vehicle envelope as necessary. Corners for the transport route shall have an outside radius of not less than 10,000 mm. An appropriate increase in turning radius shall be used where it is foreseen that required turning radius could exceed 10,000 mm. The transport route shall provide for a minimum loaded vehicle clearance to live conductors of RMAD mm. Equipment shall be located so that no outages are required during movement of the transporter with or without the transformer loaded. If the required space for access is not possible because of site restrictions, warning signs shall be attached to structures at a height of approximately 2,400 mm to their underside and stop lines shall be painted across the access route Equipment mounted on high structures Safe access for MEWPs having sufficient reach shall be provided for work on equipment items such as light fittings, lightning spires etc. without the need to remove primary equipment from service. For example in some cases a high reaching type MEWP such as a Genie S-65 may be required Calibration vehicle and trailer access At sites where revenue metering is carried out at voltages above 33 kv, access shall be provided for the calibration vehicle and trailer to be safely parked within 4,000 mm of the instrument transformers that require calibration Transpower New Zealand Limited 28

29 Figure 13: Vehicle access between non-live equipment Transpower New Zealand Limited 29

30 Figure 14: Vehicle access between de-energised bay and live bay Transpower New Zealand Limited 30

31 Figure 15: Vehicle access between live bays Transpower New Zealand Limited 31

32 7.9.7 Vehicle & plant access around structure perimeters Wherever practicable, a vehicle access route shall be provided all the way around the inside of the substation security fence of minimum dimension as per Figure 16 below. Figure 16: Vehicle access around inside of security fence Corners of access routes around structure perimeters shall, where practical, have an outside radius of not less than 10,000 mm Transpower New Zealand Limited 32

33 7.9.8 Stable access and work surface for MEWPs and crane A stable durable surface that is capable of carrying a fully loaded MEWP of any of the types listed in clause shall be provided for maintenance access/ equipment change outs: Genie Z-45/ 25J RT Genie S-45 The surface layer properties shall be such that: (a) (b) Significant damage does not occur to the surface, and that Unforeseen movement of the MEWP does not occur when the MEWP is fully loaded and turning/ slewing, or when a crane is lifting an equipment item such as a circuit breaker onto a transport truck Security fence clearances The clearances/ distance between switchyard perimeter security fences and equipment shall comply with the minimum requirements of Figure 16. Where this is not possible the minimum security fence clearances shall be based on one of the following alternatives: (a) N mm, when boundary fence is a solid wall; (b) N mm, when boundary fence is mesh/ with openings construction. For alternatives (a) and (b) the fence must be of a low maintenance type to minimise equipment outages for maintenance work. For maintenance purposes the top of the security fence is to be treated as a work plane, and the overhead live conductor limit designed to be no less than V (refer to Figure 16). Vertically above and beyond the outside of the security fence the provisions of NZECP 34 apply with regard to vertical height of the conductor above the ground and the top of the fence Safe access to operational equipment Equipment mechanism boxes Safe access from an accessible surface (normally at ground level) shall be provided for operational or in-service inspection purposes of equipment mechanisms, counters, gauges, mechanism boxes etc Transpower New Zealand Limited 33

34 Figure 17: Live tank CB installation Transpower New Zealand Limited 34

35 Safe access to equipment at 50 kv and lower voltage level Figure 18: 33 kv / 415 kv local service transformer (new installation) Transpower New Zealand Limited 35

36 8 EXISTING A.C. SWITCHYARDS 8.1 Policy requirements Existing a.c. switchyards shall meet the policy compliance requirements set out in Section 3, in order to ensure a consistency of approach to safety. 8.2 Requirements for ground clearances and busbar heights The minimum heights of live metal/conductors above ground for walking access and for vehicle access under busbars, as scheduled in Tables 4 and 5 in subsection 5.4, apply to existing structures. The clearances and heights in Table 4 apply to structures designed after 20 th April 2005 to July 2008, while those in Table 5 apply to structures designed before 20 th April Tables 4 and 5 give the height above normally accessible ground for access within a fenced structure area, in which live metal other than busbars, i.e. not exceeding 1 m in any horizontal dimension, may be mounted. This permits some flexibility to cater for different arrangements of the connections between equipment terminals and overhead busbars, but the transition to the busbar height should be made as close as reasonably possible to the equipment terminals. Ideally vertical droppers onto the equipment terminals would be used, but in practice this may not be possible in a significant number of cases. 8.3 Non-compliant existing structures Where existing structures do not comply with the above requirements appropriate permanent signage and protective obstacles (fences and bollards) shall be put in place to achieve compliance/ control the hazards to safe levels, until such time as replacement can be justified Transpower New Zealand Limited 36

37 8.3.1 Protective obstacle clearances (for mitigation of substandard clearances) Figure 19: Protection against direct contact Within outdoor installations a minimum protective obstacle clearance of N mm (minimum 600 mm) shall be maintained from live parts to the internal surface of any protective obstacle (see Figure 19 above). Protective obstacles shall be located so that the minimum clearance from where an operator may stand on the accessible side of the obstacle to the live part. This is determined by a taut string distance of W. Protective obstacles shall be a minimum height of 1200 mm and a maximum height of 1400 o mm to be effective. Appropriate warning signage shall be provided Transpower New Zealand Limited 37

38 8.4 Modifications or extensions Modifications/extensions to existing electrical structures must meet the requirements, spacings and distances in place at the time they were originally installed, and also meet the following requirements: 1. Minimum phase phase and phase earth clearances as per Table 1 of this standard (the clearance values in brackets at the lower voltage levels may be applied for this purpose). Note: Table 1 clearances are generally lower than those in the predecessor documents. There have been a number of significant reductions in clearances since Electrical Design Standard DC 3.1.2, 1974 was issued. 2. The minimum heights of live metal above ground level specified in Electrical Design Standard DC 3.1.2, 1974 are satisfied. Note: Minimum heights of live metal above ground level were revised by Transpower to accept the values specified in Electrical Design Standard DC 3.1.2, 1974 for existing older structures. Service Advisory TP.DS SA1 which was issued on 20 th April 2005 for this purpose, is now superseded by this Issue of TP.DS 62.01, and which includes DC as an appendix. 3. Maintenance access spacings as per original design shall not be reduced. Note: It is particularly important that when bulk oil circuit breakers are being replaced, care is taken to ensure that there are sufficient clearances for inspection and testing of the replacement circuit breaker. This is because modern SF 6 live tank circuit breakers typically have a greater height profile than designed for when bulk oil circuit breakers were installed in older structures. The clearances to the terminals of the SF 6 live tank circuit breakers must be sufficient to allow for connection of test equipment with adjacent equipment in service. 4. The original layout and patterning of equipment shall not be varied if the variation means that safety is compromised. Note: Replacing existing equipment with equipment that requires more space in structures that have minimal clearance is not permitted where the minimal clearances are significantly reduced. Minimal clearances typically occur in older structures where the voltage is < 50 kv. As a guide, if the clearance between ground and any part of the equipment and live metal is less than N then the clearance is considered to be minimal. For example it is considered unsafe practice to replace a 33 kv circuit breaker with a larger 66 kv circuit breaker if this results in the distance between the nearest live metal at the point of isolation and where earths are to be applied is reduced. 5. Wherever reasonably practical compliance with the latest standard shall be achieved during modification or extension Transpower New Zealand Limited 38

39 9 IMPULSE TESTED EQUIPMENT The minimum basic electrical clearances in this standard are for untested equipment and may differ from clearances offered on purchased equipment. There are fundamental differences between the requirements for buswork and connections, and the requirements for the individually specified, works tested, equipment to which the busbars and connections are attached. However, to achieve consistency of applied clearances and conductor spacings throughout outdoor switchyard structures the minimum phase to earth, and phase to phase clearances given in Tables 1 and 2 shall apply to all new equipment items. 9.1 Transformers The minimum phase to phase and phase to earth clearance and terminal spacings for transformers shall comply with IEC except that the minimum phase to phase and phase to earth clearance and spacings for 33 kv and below shall be 500 mm respectively. Spacings shall include an additional allowance of 150 mm for the space taken up by the terminal connection. The minimum distance from a transformer to another transformer, building or other equipment shall comply with IEC (see also IEEE 979 Guide for substation fire protection). This only applies to new transformer bays. If an existing transformer bay is being upgraded then the opportunity should be taken to include a fire resistant wall if this is practicable Transpower New Zealand Limited 39

40 APPENDIX A TP.DS A DEFINITIONS Terms in this standard are used as defined in TP.AG Transpower Glossary. Other definitions are: clearance: The distance between two conductive parts or between a live part and earth along a string stretched the shortest way between these conductive parts (the taut string distance). (See also definition of taut string distance). competent: An employee is competent when they can demonstrate to Transpower, at any time, that they have the necessary knowledge, skills and experience to carry out work within a switchyard safely, to the standards used by Transpower. danger zone: The zone defined by the minimum phase to earth clearance (N) around exposed live parts. Note: Exposed includes insulated but not to full working voltage. distance for inadvertent movement (D i ): The distance, vertical (D i V) and/or horizontal (D i H), which is allowed for the inadvertent movement of both personnel and machines. earthed: Effectively connected to the general mass of earth. enclosure: The part providing protection of equipment against certain external influences and protection against direct contact from any direction. highest equipment voltage: The highest r.m.s value of phase to phase voltage for which the equipment is designed in respect of its insulation as well as other characteristics that relate to this voltage in the relevant equipment standards. horizontal reach (R h ): The horizontal reach of a person allowed for the purposes of working from a fixed work platform shall be 1440 mm. horizontal work safety clearance (H): The minimum distance measured horizontally between live parts and the equipment to be worked on. This distance includes an allowance of 300 mm for use of hand held tools. LIWV: Lightning Impulse Withstand Voltage. live: Connected to a source of electrical supply or subject to hazardous induced or capacitive voltage. maintenance access width (M a ): The access width provided for maintenance access, and within which ladders and mobile elevating work platforms (MEWPs) from which maintenance is carried out are located. maintenance clearance: A collective term for horizontal work safety clearance (H), vertical work safety clearance (V), and walking access clearance (W). maintenance zone: A zone comprising the equipment to be worked on, the surrounding maintenance access width, and the associated space required for maintenance work, and within which work from pre-planned work platform locations may be carried out. minimum height: The smallest permissible vertical clearance between accessible surfaces and live parts without protection against direct contact, or those parts that may be subject to a hazardous voltage. minimum phase to earth clearance (N): The smallest permissible clearance in air between live parts and earth or between live parts and parts at earth potential (values of N as per IEC are used in this design standard). minimum phase to phase clearance: smallest permissible clearance in air between live parts of different phases or between the same phase that are electrically separate from another Transpower New Zealand Limited 40

41 APPENDIX A TP.DS network security: A term used to describe the ability or capacity of a network to provide service after one or more equipment failures. It can be defined by deterministic planning criteria such as (n), (n-1), (n-2) security contingency. A security contingency of (n-m) at a particular location in the network means that m component failures can be tolerated without loss of service. nominal value: The value of a quantity used to designate and identify a component, device, equipment or system. nominal system voltage: A suitable approximate value of voltage used to designate or identify a system Note: Any reference to nominal voltage means nominal system voltage. protection against direct contact: Measures that prevent the body of a person or an object (reaching into the danger zone) persons coming into hazardous proximity to live parts or those parts that could carry a hazardous voltage. protective barrier: The part providing protection against direct contact from any usual direction of access. protective obstacle: The part preventing unintentional access to an area where safety clearances will be infringed, but not preventing access to this area by deliberate action. security fence clearance: The smallest permissible clearance, measured horizontally, between an external fence and live conductors. SIWV: Switching Impulse Withstand Voltage. spacings: The distances measured between centre lines of conductors or equipment. standard person: Figure 2 shows the height and reach of the standard person. This is based on AS switchyard: An area, enclosed by a security fence, containing normally live conductors and/or other exposed live material. taut string distance: The distance between two parts measured along a taut string stretched the shortest way between those parts. vertical reach (R v ): The maximum vertical reach of a person (2440 mm) measured from the accessible surface or temporary work platform floor. The accessible surface is either ground level, or a fixed walkway. (This is based on AS 2067, and includes an allowance of 300 mm for use of a hand held tool) vertical work safety clearance (V): The minimum distance measured vertically between live parts and the work plane. This distance includes an allowance of 300 mm for use of a hand held tool. voltage range I: Voltage in the range 1 kv < U m up to and including 245 kv. voltage range II: Voltage in the range U m > 245 kv. walking access clearance (W): The minimum safe clearance distance, measured as a taut string distance to be observed between normally exposed live parts and any accessible surface which a person may walk on (normally ground level) in an outdoor installation of open design. Work plane: The work plane is taken to be at waist height (1000 mm) above the accessible surface or temporary work platform mm is a nominal value that may be varied, but should not be increased without careful consideration of the nature and duration of the work to be undertaken Transpower New Zealand Limited 41

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 INDEX Page SECTION 1.0: SCOPE 1 1.1 Toronto Hydro Requirements 1 1.2 Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 SECTION 3.0: DEFINITIONS AND THE INTERNATIONAL SYSTEM OF UNITS 1 3.1 Definitions

More information

Approved Tasks for the Application of Safe Approach Distance Special

Approved Tasks for the Application of Safe Approach Distance Special In the Victorian Electricity Supply Industry October 2013 Approved Tasks for the Application of Safe Approach Distance Special This guideline has been developed by the Victorian Electricity Supply Industry

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and Guidance NSI 6 DEMARCATION IN SUBSTATIONS Copyright National Grid plc 2016, all rights reserved. No part of this publication

More information

Technical Guideline for. Section 8. Inspection and Approval of Construction

Technical Guideline for. Section 8. Inspection and Approval of Construction Technical Guideline for Section 8. Inspection and Approval of Construction Ontario Regulation 22/04 Electrical Distribution Safety January 12, 2005 Technical Guideline Section 8 General Legal Disclaimer

More information

METERING GUIDE PART 1 METERING GENERAL

METERING GUIDE PART 1 METERING GENERAL 1 METERING GUIDE PART 1 METERING GENERAL 2 METERING GUIDE 1 INTRODUCTION 3 PURPOSE OF THIS GUIDE 3 METERING GENERAL 4 ELECTRICITY SUPPLY - INDUSTRY PLAYERS 4 1.1.2 Generators 4 1.1.3 Networks 4 1.1.4 Retailers

More information

Apply earths to and remove earths from electrical conductors, plant and equipment

Apply earths to and remove earths from electrical conductors, plant and equipment Page 1 of 5 Apply earths to and remove earths from electrical conductors, plant and equipment Level 3 Credits 2 Purpose People credited with this unit standard are able to: demonstrate knowledge of earthing

More information

Title Requirements for Work Using Cranes and Plant. Reference Number PMP 04 - (RIC Standard: EP SI)

Title Requirements for Work Using Cranes and Plant. Reference Number PMP 04 - (RIC Standard: EP SI) Discipline Engineering Standard - NSW Category Electrical Title Reference Number PMP 04 - (RIC Standard: EP 95 00 00 03 SI) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

ACS OTHER PRIMARY EQUIPMENT

ACS OTHER PRIMARY EQUIPMENT ACS OTHER PRIMARY EQUIPMENT Fleet Strategy Document 31/10/2013 Transpower New Zealand Limited 2013. All rights reserved. Page 1 of 70 C O P Y R I G H T 2013 T R A N S P O W E R N E W Z E A L A N D L I

More information

Iron Ore Company of Canada Health, Safety & Environment

Iron Ore Company of Canada Health, Safety & Environment Barricading 1 PURPOSE To protect personnel by preventing or controlling access to hazards in work areas by the installation and maintenance of barricades, demarcation and restricting access. This work

More information

Civil Engineering Technical Requirement CIVIL-SR-008 PROTECTION SCREENS. Revision: 3 Updated: 13/01/2017

Civil Engineering Technical Requirement CIVIL-SR-008 PROTECTION SCREENS. Revision: 3 Updated: 13/01/2017 Civil Engineering Technical Requirement CIVIL-SR-008 PROTECTION SCREENS Revision: 3 Updated: 13/01/2017 Queensland Rail 2017 Reproduction by any means (including electronic, mechanical, photocopying, microcopying

More information

Field Instruction. Any part of a person (body). Any conducting object, tool or equipment being held or carried.

Field Instruction. Any part of a person (body). Any conducting object, tool or equipment being held or carried. 2.17 Safe Approach Distances Purpose This instruction outlines the safe approach distances (SAD) for authorised Horizon Power Workers, Mobile Plant and Vehicles working near live electrical apparatus.

More information

NTW.1 Network Utilities

NTW.1 Network Utilities NTW.1 Network Utilities NOTE: The following provisions apply district wide in addition to any other provisions in this Plan applicable to the same areas or site. Index NTW.1 Network Utilities NTW.1.1 NTW.1.2

More information

2 3 4 Distance from centre of reactor (m)

2 3 4 Distance from centre of reactor (m) ONE OPTIMISED NETWORK EQUIPMENT 12 January 2016 c 0MPRMF-4 Magnetic fields and air core reactors 1 Introduction Air core reactors are commonly used as shunt reactors, fault current limiting reactors, tuning

More information

Persons Working On or Near to AC Electrified Lines

Persons Working On or Near to AC Electrified Lines Persons Working On or Near to AC Electrified Lines Synopsis This document defines the requirements for the production of safe systems of work to prevent injury from electrical causes to persons working

More information

NPS/003/015 Technical Specification for 33kV, 66kV and 132kV Post Insulators

NPS/003/015 Technical Specification for 33kV, 66kV and 132kV Post Insulators Version:- 3.1 Date of Issue:- June 2014 Page 1 of 13 NPS/003/015 Technical Specification for 33kV, 66kV and 132kV Post Insulators 1. Purpose This document is the technical specification for 33kV, 66kV

More information

AS/NZS 7000:2010 AS/NZS

AS/NZS 7000:2010 AS/NZS AS/NZS 7000:2016 Australian/New Zealand Standard Overhead line design Superseding AS/NZS 7000:2010 AS/NZS 7000:2016 AS/NZS 7000:2016 This joint Australian/New Zealand standard was prepared by joint Technical

More information

For the 2008 Code, the minimum clear distances were revised to reflect an accurate metric conversion (also known as a soft conversion).

For the 2008 Code, the minimum clear distances were revised to reflect an accurate metric conversion (also known as a soft conversion). II. 600 Volts, Nominal, or Less 110.26 Spaces About Electrical Equipment. Sufficient access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation

More information

Interface between Station Platforms, Track and Trains

Interface between Station Platforms, Track and Trains Interface between Station Platforms, Track Synopsis This document mandates requirements for the design and maintenance of station platforms for their safe interface with trains. Signatures removed from

More information

Assessment of Compatibility of Rolling Stock and Infrastructure Gauging and Stepping Distances

Assessment of Compatibility of Rolling Stock and Infrastructure Gauging and Stepping Distances Uncontrolled When Printed Railway Group Standard Assessment of Compatibility of Rolling Stock and Infrastructure Gauging and Stepping Distances Synopsis This document mandates specific requirements and

More information

Specifications. Level 1 Essential Energy Works for the Warialda Truck Wash

Specifications. Level 1 Essential Energy Works for the Warialda Truck Wash Specifications Request for Quotation (RFQ) RFQ Title RFQ Number Level 1 Essential Energy Works for the Warialda Truck Wash GWY_1819_Q03 Issue Date 21st December 2018 This document contains the specification

More information

ELECTRICAL INSPECTION BULLETIN (Effective )

ELECTRICAL INSPECTION BULLETIN (Effective ) ELECTRICAL INSPECTION BULLETIN (Effective 2009-02-01) Rule 36-000 Customer Owned High Voltage Installations With the increase in customer own high voltage equipment there appears to be confusion over which

More information

TABLE OF CONTENTS. FOREWORD... Error! Bookmark not defined. INTRODUCTION SCOPE NORMATIVE REFERENCES DRAWING...4

TABLE OF CONTENTS. FOREWORD... Error! Bookmark not defined. INTRODUCTION SCOPE NORMATIVE REFERENCES DRAWING...4 TITLE SPECIFICATION FOR FREE- STANDING 11 DATE: AUGUST 2006 PAGE: 1 OF 15 TABLE OF CONTENTS Page FOREWORD... Error! Bookmark not defined. INTRODUCTION...3 1 SCOPE...3 2 NORMATIVE S...3 3 DRAWING...4 4

More information

HEALTH AND SAFETY GUIDANCE NOTE OVERHEAD POWER LINES

HEALTH AND SAFETY GUIDANCE NOTE OVERHEAD POWER LINES HEALTH AND SAFETY GUIDANCE NOTE OVERHEAD POWER LINES INTRODUCTION People are killed and seriously injured each year in incidents involving live overhead power lines (OHPLs). Incidents are sometimes down

More information

UNITED COOPERATIVE SERVICES. SPECIFICATIONS FOR SELF-CONTAINED METER INSTALLATIONS August 2014

UNITED COOPERATIVE SERVICES. SPECIFICATIONS FOR SELF-CONTAINED METER INSTALLATIONS August 2014 UNITED COOPERATIVE SERVICES SPECIFICATIONS FOR SELF-CONTAINED METER INSTALLATIONS August 2014 A member may obtain a new, single phase service from the Cooperative by providing or purchasing a meter loop.

More information

VALE # MSPEC LAST REVISION. Name: Brian Koltun Position: Process Superintendent Department: Power Department, Ontario Operations

VALE # MSPEC LAST REVISION. Name: Brian Koltun Position: Process Superintendent Department: Power Department, Ontario Operations 27-05-12 1 of 10 Training Code (If applicable): Document Owner: Name: Brian Koltun Position: Process Superintendent Department:, Ontario Operations Table of Contents 1.0 PURPOSE... 2 2.0 SCOPE... 2 2.1.

More information

TasNetworks Distribution Connection Pricing Policy Final AER approved Commencing 1 July 2017

TasNetworks Distribution Connection Pricing Policy Final AER approved Commencing 1 July 2017 TasNetworks Distribution Connection Pricing Policy Final AER approved Commencing 1 July 2017 Page 1 of 54 Copyright This document is protected by copyright vested in Tasmanian Networks Pty Ltd. No part

More information

ELECTRIC METERING GENERAL

ELECTRIC METERING GENERAL 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for

More information

NSP/007/002 Guidance on Substation Design: Design Risk Assessment

NSP/007/002 Guidance on Substation Design: Design Risk Assessment Version:- 2.0 Date of Issue:- January 2018 Page 1 of 19 NSP/007/002 Guidance on Substation Design: Design Risk Assessment 1. Purpose The Construction (Design and Management) Regulations ( CDM ) and the

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

2007 Title 24 Accessibility Code Updates and ADA Issues

2007 Title 24 Accessibility Code Updates and ADA Issues 2007 Title 24 Accessibility Code Updates and ADA Issues C.A.S.H. Workshop June 2007 Introduction Update on ADA Certification of the California Building Code Overview of significant changes to accessibility

More information

A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS

A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS Willy LORD SwedPower AB Sweden willy.lord@swedpower.com Lennart AHNLUND Vattenfall Eldistribution AB Sweden B. WALLBING-LÖVGREN Vattenfall Eldistribution

More information

ORION NEW ZEALAND LIMITED NOTICE OF REQUIREMENT BROMLEY ZONE SUBSTATION, CHRISTCHURCH

ORION NEW ZEALAND LIMITED NOTICE OF REQUIREMENT BROMLEY ZONE SUBSTATION, CHRISTCHURCH ORION NEW ZEALAND LIMITED NOTICE OF REQUIREMENT BROMLEY ZONE SUBSTATION, CHRISTCHURCH Date of Issue: 15 July 2014 ORION NEW ZEALAND LIMITED NOTICE OF REQUIREMENT BROMLEY ZONE SUBSTATION, CHRISTCHURCH Prepared

More information

a) Line and load compartments must be separated by a stable barrier.

a) Line and load compartments must be separated by a stable barrier. 1.00 GENERAL 1.01 The electric utility shall furnish and connect all meters, instrument transformers, test switches, and meter control wiring necessary to complete the meter installation. 1.02 The customer

More information

Northern Powergrid Appendix B for ENA Engineering Recommendation G81 Part 4: Design and Planning

Northern Powergrid Appendix B for ENA Engineering Recommendation G81 Part 4: Design and Planning Version:- 2.0 Date of Issue:- Sept 2013 Page 1 of 10 Northern Powergrid Appendix B for ENA Engineering Recommendation G81 Part 4: Design and Planning Framework for design and planning, materials specification,

More information

Reference Number PCS 03 - (RIC Standard: EP SP)

Reference Number PCS 03 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title Reference Number PCS 03 - (RIC Standard: EP 20 00 04 05 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

ECP SECONDARY COMMISSIONING REQUIREMENTS

ECP SECONDARY COMMISSIONING REQUIREMENTS Document Number: ECP 11-0002 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0002 SECONDARY COMMISSIONING REQUIREMENTS EPN, LPN, SPN This standard details the commissioning requirements

More information

Distribution Information Exchange Code

Distribution Information Exchange Code Distribution Information Exchange Code Version 5.1 Approved September 2007 Comments to this document can be forwarded to: The RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission

More information

4. GENERAL REQUIREMENTS

4. GENERAL REQUIREMENTS 4. GENERAL REQUIREMENTS 4.1 APPLICATION FOR SERVICE Application for service must be made to, and accepted by, the Company before service will be furnished. At the time of application, the Customer shall

More information

NZS 4334:2012. New Zealand Standard. Platform lifts and low-speed lifts NZS 4334:2012

NZS 4334:2012. New Zealand Standard. Platform lifts and low-speed lifts NZS 4334:2012 New Zealand Standard Platform lifts and low-speed lifts NZS 4334:2012 COMMITTEE REPRESENTATION This Standard was prepared under the supervision of the P 4334 Committee the Standards Council established

More information

MTM REQUIREMENTS SPARES FOR NEW ASSETS

MTM REQUIREMENTS SPARES FOR NEW ASSETS MTM REQUIREMENTS L1-CHE-STD-006 Version: 1 Effective from: 14 th November 2011 Approval Amendment Record Approval Date Version Description 14/11/2011 1 Initial Version Disclaimer Metro Trains Melbourne

More information

Title Transmission Line Maintenance Standards. Reference Number PMP 17 - (RIC Standard: EP SP)

Title Transmission Line Maintenance Standards. Reference Number PMP 17 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title Reference Number PMP 17 - (RIC Standard: EP 10 01 00 02 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,

More information

4. GENERAL REQUIREMENTS

4. GENERAL REQUIREMENTS 4. GENERAL REQUIREMENTS 4.1 APPLICATION FOR SERVICE Application for service must be made to, and accepted by, the Company before service will be furnished. At the time of application, the Customer shall

More information

CHAPTER 5 METERING REQUIREMENTS

CHAPTER 5 METERING REQUIREMENTS CHAPTER 5 METERING REQUIREMENTS CHAPTER 5 METERING REQUIREMENTS 5.1 General 1. All installations connected to, or intended to be connected to HK Electric s supply of electricity must comply with HK Electric

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NGUK/PM/ETSR/NSI/33/GN Issue 2 National Grid UK Electricity Transmission plc Uncontrolled when printed NATIONAL SAFETY INSTRUCTION and Guidance NSI 33 THE

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

Supervision Guideline for Apprentice Lineworkers (Distribution)

Supervision Guideline for Apprentice Lineworkers (Distribution) Supervision Guideline for Apprentice Lineworkers (Distribution) This Guideline has been developed by the Victorian Electricity Supply Industry (VESI) Skills and Training Reference Committee to provide

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

Information Document Service Proposals and Cost Estimating ID # R

Information Document Service Proposals and Cost Estimating ID # R Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document

More information

ISO Rules Part 500, Facilities Division 502, Technical Requirements Section Bulk Transmission Technical Requirements

ISO Rules Part 500, Facilities Division 502, Technical Requirements Section Bulk Transmission Technical Requirements Part 500, Facilities Division 502, Technical Requirements Section 502.2 Bulk Transmission Technical Requirements Applicability 1 This section 502.2 applies to: Requirements the legal owner of any bulk

More information

Safe planning and operation for Mobile Elevated Working Platforms (MEWPs)

Safe planning and operation for Mobile Elevated Working Platforms (MEWPs) Safe planning and operation for Mobile Elevated Working Platforms (MEWPs) This document sets out the Morgan Sindall standards for the control of Mobile Elevated Work Platforms (MEWP) on its projects. It

More information

Title Transmission Line Base Safety and Operating Standards. Reference Number POS 01 - (RIC Standard: EP SP)

Title Transmission Line Base Safety and Operating Standards. Reference Number POS 01 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title Transmission Line Base Safety and Operating Standards Reference Number POS 01 - (RIC Standard: EP 10 01 00 03 SP) Document Control Status

More information

4.8 ENVIRONMENTAL HEALTH - ELECTRIC AND MAGNETIC FIELDS

4.8 ENVIRONMENTAL HEALTH - ELECTRIC AND MAGNETIC FIELDS 4.8 ENVIRONMENTAL HEALTH - ELECTRIC AND MAGNETIC FIELDS This section provides project-level discussion and analysis of potential health and safety impacts related to power frequency electric and magnetic

More information

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install the primary unit substation(s) complete from the incoming line terminals to the

More information

SECTION 5 CLEARANCES. Unless otherwise noted, all clearances are from surface-to-surface and all distances are measured center-to-center.

SECTION 5 CLEARANCES. Unless otherwise noted, all clearances are from surface-to-surface and all distances are measured center-to-center. SECTION 5 The electric line clearances shown in Tables 5-1 are required for buildings, structures, and surfaces to comply with requirements of the National Electric Safety Code, the Wisconsin Administrative

More information

SECTION 200 CLEARANCES

SECTION 200 CLEARANCES SECTION 200 CLEARANCES 200.01 Texas Law & OSHA Regulations To ensure safety and the protection of the public, Chapter 752 of the Texas Health and Safety Code makes it unlawful for unauthorized persons

More information

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies

More information

Insulated sheath power cable systems

Insulated sheath power cable systems PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation C55 Insulated sheath power cable systems www.energynetworks.org PUBLISHING AND COPYRIGHT INFORMATION 2014

More information

Transmission Losses Report 2017

Transmission Losses Report 2017 SP Energy Networks October 2017 Transmission Losses Report 2017 1. INTRODUCTION Special condition 2K of the SP Transmission plc (SPT) transmission licence requires SPT to publish an annual transmission

More information

SECTION BUSWAYS

SECTION BUSWAYS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and

More information

Contractors Code of Practice

Contractors Code of Practice Estates and Facilities Department of the University of Bradford In partnership with ICT Services Contractors Code of Practice Issue Date Comments 1 st Draft 2 nd Draft Issued 19/5/2010 Distributed as per

More information

Ontario ENGINEERING STANDARD SPECIFICATION 1/10 REV. ELECTRICAL DISTRIBUTION HIGH VOLTAGE SUBSTATION GROUNDING AND BONDING. Approved by.

Ontario ENGINEERING STANDARD SPECIFICATION 1/10 REV. ELECTRICAL DISTRIBUTION HIGH VOLTAGE SUBSTATION GROUNDING AND BONDING. Approved by. /0 Rev Description Revision by Approved by Issue Date YYYY/MM/DD New Format Replaces 5322-0.0. T.C. 206/02/09 T.C. 206/03/02 206/03/02 2/0.0 PURPOSE This specification describes the minimum requirements

More information

MTM REQUIREMENTS METROPOLITAN TRAIN MAINTENANCE DEPOT

MTM REQUIREMENTS METROPOLITAN TRAIN MAINTENANCE DEPOT Approval Amendment Records Approval Date Version Description 14/11/2011 1 Initial Version Disclaimer Metro Trains Melbourne makes no warranties, express or implied, that compliance with the contents of

More information

Transmission Losses Report 2015

Transmission Losses Report 2015 SP Energy Networks October 2015 Transmission Losses Report 2015 1. INTRODUCTION Special condition 2K of SPT s transmission licence requires SPT to publish an annual transmission losses report detailing

More information

SERVICES - SERVICE EQUIPMENT- PANELBOARDS

SERVICES - SERVICE EQUIPMENT- PANELBOARDS NO: D-E3 101110 1 THIS DIRECTIVE SUPERSEDES DIRECTIVES D-E3 070302 5 & D-E3 070302 6 SERVICES - SERVICE EQUIPMENT- PANELBOARDS This Directive is being issued by a provincial safety manager pursuant to

More information

SAFE WORKPLACE PROCEDURE No. 222 WORKING NEAR OVERHEAD & UNDERGROUND SERVICES

SAFE WORKPLACE PROCEDURE No. 222 WORKING NEAR OVERHEAD & UNDERGROUND SERVICES SAFE WORKPLACE PROCEDURE No. 222 WORKING NEAR OVERHEAD & UNDERGROUND SERVICES 1. PURPOSE This procedure is intended to assist Southern Rural Water (SRW) to meet its Occupational Health and Safety obligations

More information

MATERIAL STANDARD FOR ELECTRICAL HEAT TRACING ORIGINAL EDITION JAN. 1996

MATERIAL STANDARD FOR ELECTRICAL HEAT TRACING ORIGINAL EDITION JAN. 1996 MATERIAL STANDARD FOR ELECTRICAL HEAT TRACING ORIGINAL EDITION JAN. 1996 This Standard is the property of Iranian Ministry of Petroleum. All rights are reserved to the owner. Neither whole nor any part

More information

Transmission System Security and Planning Standards

Transmission System Security and Planning Standards ver. 1.4 page 1 from 13 Transmission System Security and Planning Standards April 2014 ver. 1.4 page 2 from 13 TABLE OF CONTENTS 1 Introduction... 4 2 Definitions... 4 2.1 Transmission System... 4 2.2

More information

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the secondary unit substation(s) complete from the incoming line terminals

More information

GN7 Amendment 3-5 Agricultural and horticultural premises

GN7 Amendment 3-5 Agricultural and horticultural premises GN7 Amendment 3-5 Agricultural and horticultural premises 5.1Introduction Amendment No. 3 to the 17th Edition Sect 705 There are no significant changes introduced in Section 705by Amendment No. 3 to the

More information

SECTION MOTOR CONTROL CENTER

SECTION MOTOR CONTROL CENTER SECTION 16445 MOTOR CONTROL CENTER PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Motor Control Center (MCC). The contract item includes demolition and removal of existing MCC;

More information

Please check with your local inspection authority for any additional requirements before installation.

Please check with your local inspection authority for any additional requirements before installation. Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must

More information

FAC Mapping to Proposed NERC Reliability Standard FAC RBS Draft 4 August 22, 2011

FAC Mapping to Proposed NERC Reliability Standard FAC RBS Draft 4 August 22, 2011 Standard FAC-003-1 Proposed Standard FAC-003-2 RBS Draft 4 Observations Definitions of Terms Definitions of Terms Used in Standard Right of Way A corridor of land on which electric lines may be located.

More information

WIND ENERGY CONVERSION SYSTEMS

WIND ENERGY CONVERSION SYSTEMS CHAPTER 159 WIND ENERGY CONVERSION SYSTEMS 159.01 Purpose and Intent 159.05 Location 159.02 Definitions 159.06 Design and Technical Standards 159.03 General Regulations 159.07 Abandonment and Removal Procedure

More information

Stack Parking Surface Mounted Stackers

Stack Parking Surface Mounted Stackers 1 / 6 Stack Parking Surface Mounted Stackers swiss-park V-2 Comfort The V-2 is designed to park cars of any size thanks to its vertical adjustability. It will accommodate cars as tall as the garage ceiling

More information

56-SDMS-01 REV. 01 SPECIFICATIONS FOR

56-SDMS-01 REV. 01 SPECIFICATIONS FOR 56-SDMS-01 REV. 01 SPECIFICATIONS FOR 13.8KV UNIT SUBSTATIONS This specification is property of SEC and subject to change or modification without any notice CONTENTS PAGE No. 1.0 SCOPE 3 2.0 CROSS REFERENCES

More information

Wenger Corporation 2011 Printed in USA 02/11 Part #185A462-01

Wenger Corporation 2011 Printed in USA 02/11 Part #185A462-01 User Instructions Diva Air Transporter contents Introduction.......................................2 General......................................2 Manufacturer.................................2 European

More information

Engineering Recommendation G39 Issue

Engineering Recommendation G39 Issue PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation G39 Model code of practice covering electrical safety in the planning, installation, commissioning and maintenance

More information

Standard. Extra High Voltage (EHV) Post Insulators Standard R Version 1.0, June Tasmanian Networks Pty Ltd (ABN )

Standard. Extra High Voltage (EHV) Post Insulators Standard R Version 1.0, June Tasmanian Networks Pty Ltd (ABN ) Standard Extra High Voltage (EHV) Post Insulators Standard R574184 Version 1.0, June 2018 Tasmanian Networks Pty Ltd (ABN 24 167 357 299) Authorisations Action Name and title Date Prepared by Michael Verrier,

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

Pre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network

Pre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network Electricity Specification 220 Issue 3 December 2016 Pre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network Contents 1 Introduction

More information

Infrastructure Based Train Detection Systems

Infrastructure Based Train Detection Systems Infrastructure Based Train Detection Synopsis This document sets out requirements and guidance on infrastructure based train detection systems. Copyright in the Railway Group documents is owned by Rail

More information

Dear Customer. Section Old F4 January 2017 Amendment 2. Remove title page and document history page 1-2B

Dear Customer. Section Old F4 January 2017 Amendment 2. Remove title page and document history page 1-2B Dear Customer Please find enclosed Amendment 2, effective 1 January 2017, to the Acceptable Solution and Verification Method for Clause F4 Safety from Falling of the New Zealand Building Code. The previous

More information

DRAFT. GUIDELINES FOR Usage of AIR INSULATED SUBSTATION (AIS) or GAS INSULATED SUBSTATION(GIS)

DRAFT. GUIDELINES FOR Usage of AIR INSULATED SUBSTATION (AIS) or GAS INSULATED SUBSTATION(GIS) DRAFT GUIDELINES FOR Usage of AIR INSULATED SUBSTATION (AIS) or GAS INSULATED SUBSTATION(GIS) CENTRAL ELECTRICITY AUTHORITY 2018 1. Introduction Substations are an important part of the electrical distributions.

More information

INCLINATOR ELEVETTE. Planning Guide. CABLE DRUM 1000 lb. (454 Kg) AMERICA S MOST CUSTOMIZABLE ELEVATOR

INCLINATOR ELEVETTE. Planning Guide. CABLE DRUM 1000 lb. (454 Kg) AMERICA S MOST CUSTOMIZABLE ELEVATOR INCLINATOR ELEVETTE Planning Guide CABLE DRUM 1000 lb. (454 Kg) AMERICA S MOST CUSTOMIZABLE ELEVATOR Introduction It started over 90 years ago with a passion to help an ailing friend access his multi-level

More information

Information Document Protection System Information ID# R

Information Document Protection System Information ID# R Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between the Information Document and the related authoritative document(s)

More information

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES MANUALLY OPERATED / REMOTELY OPERATED DEAD FRONT PADMOUNTED SWITCHGEAR WITH VACUUM LOAD INTERRUPTING

More information

Indianapolis Power & Light Company

Indianapolis Power & Light Company Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis

More information

Company Directive ENGINEERING SPECIFICATION EE SPEC : 20/4. Relating to Substation Security Fences

Company Directive ENGINEERING SPECIFICATION EE SPEC : 20/4. Relating to Substation Security Fences Company Directive ENGINEERING SPECIFICATION EE SPEC : 20/4 Relating to Substation Security Fences Policy Summary This Specification sets out installation requirements and specifications for substation

More information

Distribution System Design General Requirements

Distribution System Design General Requirements Electricity Policy Document 279 Issue 7 September 2017 Distribution System Design General Requirements Contents 1 Introduction 2 Scope 3 Definitions 4 General Requirements 5 Documents Referenced 6 Keywords

More information

ISO INTERNATIONAL STANDARD. Mobile elevating work platforms Design, calculations, safety requirements and test methods

ISO INTERNATIONAL STANDARD. Mobile elevating work platforms Design, calculations, safety requirements and test methods INTERNATIONAL STANDARD ISO 16368 Second edition 2010-05-15 Mobile elevating work platforms Design, calculations, safety requirements and test methods Plates-formes élévatrices mobiles de personnel Conception,

More information

Specification for Prefabricated Glass Reinforced Plastic Enclosures

Specification for Prefabricated Glass Reinforced Plastic Enclosures 1. SCOPE This document outlines a technical specification for prefabricated Glass Reinforced Plastic (GRP) enclosures designed to house outdoor rated equipment in secondary substations installed on the

More information

Name: Phil Langlois Position: Lead Electrical Engineer, Ontario Operations

Name: Phil Langlois Position: Lead Electrical Engineer, Ontario Operations Page of 8 Training Code (N/A): Document Owner: Name: Phil Langlois Position: Lead Engineer, Ontario Operations Table of Contents.0 PURPOSE... 2 2.0 APPLICATION... 2 2.. EXCEPTIONS... 2 3.0 REFERENCES...

More information

Facility Interconnection Requirements

Facility Interconnection Requirements Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents

More information

GB Requirements for Platform Height, Platform Offset and Platform Width

GB Requirements for Platform Height, Platform Offset and Platform Width GB Requirements for Platform Height, Platform Offset and Platform Width Synopsis This document sets out Great Britain (GB) requirements in scope of National Technical Rules for platform height, platform

More information

NSP/ 007/ 008 Guidance on Substation Design: 33kV Switchgear

NSP/ 007/ 008 Guidance on Substation Design: 33kV Switchgear Version:- 1.0 of Issue:- March 2016 Page 1 of 6 NSP/ 007/ 008 Guidance on Substation Design: 33kV Switchgear 1. Purpose The purpose of this document is to provide guidance on the selection and application

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Bridges and Structures Title Safety Refuges and Handrail Devices for Trackside Structures Reference Number BSS 01 (RIC Standard: C 4010) Document Control Status

More information

Specification for UDC Electrical Testing

Specification for UDC Electrical Testing Ergon Energy Corporation Limited Specification for UDC Electrical Testing RSC10 Abstract: Electrical Testing for Underground Distribution Construction (UDC) Specification RSC10 Ver 5 Contents 1. Purpose

More information

SCHEDULE ONE TO CUSTOMER CONTRACT DOCUMENT

SCHEDULE ONE TO CUSTOMER CONTRACT DOCUMENT SCHEDULE ONE TO CUSTOMER CONTRACT DOCUMENT STANDARD INSTALLATION CONDITIONS DUCTED EVAPORATIVE COOLING 1. Type of Installation 1.1 These Standard Installation Conditions apply where the Installation comprises

More information