ELECTRICAL SAFETY INSPECTION REPORT

Size: px
Start display at page:

Download "ELECTRICAL SAFETY INSPECTION REPORT"

Transcription

1 ELECTRICAL SAFETY INSPECTION REPORT Zirabo Bazar, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Inspected by: Khan & Tapu Report Generated by: Khan Inspected on Feb 6 th 2015

2 SUMMARY factory building is a proposed six storied (proposed) building. The construction works started in July 2013 and they started their production in The six (G+5) storied building has an approval as an industrial structure. Only ground and first floor construction and installation is completed during inspection date. There are two separate sheds for utility and Dining purpose. There were 495 workers in the factory during the inspection. The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd. (WEC). The purpose of the survey was to identify significant electrical safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. The scope of this initial electrical safety inspection was limited to the review and identification of major electrical safety issues. The inspection did not include identification of minor deficiencies, which would be further dealt with as part of follow-up inspections. The table below summarizes the major electrical safety issues identified during the Recommendations have been provided to each finding. inspection. The implementation schedule shall be developed by the factory to remediate each of the findings. The specific timing of improvements, including any requested extensions due to design/installation constraints, shall be submitted to the Accord for an approval. Page 2 of 10

3 FINDINGS AND RECOMMENDATIONS FINDING NO: E- 1 CATEGORY: DESIGN, DRAWINGS & RECORDS Electrical Single Line Diagram (SLD) and electrical layouts are unavailable. Draw as-built electrical SLD and electrical layouts, mentioning all required information by qualified engineer and get it reviewed by Accord. REMEDIATION TIMEFRAME: 12 WEEKS FINDING NO: E- 2 CATEGORY: DESIGN, DRAWINGS & RECORDS Thermographic scanning of the entire electrical system has not been performed. Thermographic scanning of the entire electrical system must be performed twice in a year. REMEDIATION TIMEFRAME: 12 WEEKS Page 3 of 10

4 FINDING NO: E- 3 CATEGORY: DESIGN, DRAWINGS & RECORDS Insulation resistance test of electrical equipment is not performed. Insulation resistance test of all power cables (up to Floor distribution board or SDB) must be performed in a periodic manner and recorded. REMEDIATION TIMEFRAME: 12 WEEKS FINDING NO: E- 4 CATEGORY: DESIGN, DRAWINGS & RECORDS Electric safety program is not initiated. Electrical safety training and awareness program for the electrical personnel and workers must be initiated and recorded. REMEDIATION TIMEFRAME: 12 WEEKS FINDING NO: E- 5 CATEGORY: Lightning Protection & Earth Lightning Protection System (LPS) needed but has not been installed. Design and install Lightning Protection System (LPS) in the factory; the LPS designs must be submitted to Accord before starting installation. REMEDIATION TIMEFRAME: 16 WEEKS Page 4 of 10

5 FINDING NO: E- 6 CATEGORY: SERVICE LINE HT service cable dropping from pole not protected at the base of the pole above ground level. HT cable dropping from 11kV pole must be protected in steel pipe of required size at least 2m from the ground level to protect from physical injury by moving objects. Service line drawn from 11KV REB supply line. REMEDIATION TIMEFRAME: 5 WEEKS FINDING NO: E- 7 CATEGORY: TRANSFORMER ROOM Excess cable length not arranged and supported. Excess length of existing HT cables coiled near transformer must be protected and laid safely. REMEDIATION TIMEFRAME: 6 WEEKS HT cable coiled near transformer. FINDING NO: E- 8 CATEGORY: TRANSFORMER ROOM No fire rated barrier/protection between the transformer and other occupancy (LT panel & PFI plant i.e. control panel) Construct fire rated brick wall up to the ceiling around the transformer to separate it from other occupancy and install louvers and exhaust fan for cooling the transformer room. Power Transformer in Utility shed. REMEDIATION TIMEFRAME: 5 WEEKS Page 5 of 10

6 FINDING NO: E-9 CATEGORY: TRANSFORMER ROOM HT cable is not firmly fixed with the ladder. HT cable must be firmly fixed by clamp with the ladder. HT cable Tied by unused wire. REMEDIATION TIMEFRAME: 6 WEEKS FINDING NO: E-10 CATEGORY: TRANSFORMER ROOM Transformer installed on floor not firmly supported. Transformer base must be rigidly fixed to the foundation, with appropriate fastening fixtures. Base of power transformer in the utility shed. REMEDIATION TIMEFRAME: 5 WEEKS FINDING NO: E- 11 CATEGORY: CABLE & CABLE SUPPORT Cable trench is not covered. Cable trench must be covered by rigid material (checkered plate) throughout the length of the cable. Cable trench in Utility shed. REMEDIATION TIMEFRAME: 8 WEEKS Page 6 of 10

7 FINDING NO: E- 12 CATEGORY: TRANSFORMER ROOM Panel baseplate not installed to allow cable entry. Install base plate of the panel and make hole into it then fit cable gland (required sized) for cable entry and exit to the panel and seal all the unused openings by suitable means to make the panel dust and vermin proof. REMEDIATION TIMEFRAME: 8 WEEKS LT panel utility Shed. FINDING NO: E- 13 CATEGORY: EQUIPMENT & MACHINE IPS battery directly lay on concrete floor. Battery must be placed on the battery stand made of noncombustible material (steel fabricated). REMEDIATION TIMEFRAME: 4 WEEKS IPS battery in utility shed. FINDING NO: E- 14 CATEGORY: DISTRIBUTION PANELS Phase separators/barriers between different phases not installed. Install separators between different phases of MCCB to prevent flashover. Standard separators provided by the MCCB manufacturer must be used. REMEDIATION TIMEFRAME: 3 WEEKS Inside LT panel in utility shed. Page 7 of 10

8 FINDING NO: E- 15 CATEGORY: DISTRIBUTION PANELS Wires in panel are spliced and insulated with PVC insulating tapes Wire joints in panels must be tightly connected using terminals or sockets crimped and insulated. PIB tape and heat-shrink tubes may be used for insulation. REMEDIATION TIMEFRAME: 3 WEEKS Wires joints found Inside PFI panel. FINDING NO: E- 16 CATEGORY: CABLE & CABLE SUPPORT Cables passing through wall/floor slab are not protected at the entry/exit point(s) Cable passing through wall Cables passing through permanent wall/floor slab must be protected. Seal the opening by fire rated material protecting power cables thus no smoke can pass through this REMEDIATION TIMEFRAME: 6 WEEKS Cables passing through permanent wall of utility shed and production floor. Page 8 of 10

9 FINDING NO: E- 17 CATEGORY: SWITCH BOARD & PANELS Excessive bent in cable Sharp cable bends shall be avoided such that no stress is imposed on the termination of the cable or insulation of the cable. REMEDIATION TIMEFRAME: 6 WEEKS Cable bent Inside distribution panel in production floor. FINDING NO: E- 18 CATEGORY: CABLE & CABLE SUPPORTS Cable duct/channels are filled with lint/dust Clean all the cable channels/ducts; then seal them for permanent (you may use checkered/perforated plate at the bottom). But ensure that you have used proper sized cable for all of your electrical loads. REMEDIATION TIMEFRAME: 1 WEEKS Wiring duct in production floor. FINDING NO: E- 19 CATEGORY: SWITCH BOARD & PANELS Combustible material inside panel. Remove all the combustible materials from electrical panel.establish a periodic cleaning program and maintain records of the activities Distribution panel in production floor. REMEDIATION TIMEFRAME: 1 WEEKS Page 9 of 10

10 FINDING NO: E- 20 CATEGORY: SWITCH BOARD & PANELS Panel doors not connected with earth bond. Provide earth connection for body and doors of metallic distribution boards using green cables preferably braid so that the metallic door remains at zero potential all the time REMEDIATION TIMEFRAME: 3 WEEKS Distribution panel board in production floor FINDING NO: E- 21 CATEGORY: SWITCH BOARD & PANELS Multiple cables terminated at busbar. Terminate each power cable at single terminal and use proper sized cable lug. Multiple cables termination is allowed if all are soldered properly and powering to a single circuit. REMEDIATION TIMEFRAME: 6 WEEKS Distribution panel board in production floor. Page 10 of 10

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ACTIVE COMPOSITE MILLS LTD. Dewan Idris Road, Zirabo, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Active Composite Mills Ltd. Inspected by: Hemlal Report Generated

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT MAHID APPAREL LTD. Nowpara, Madhabdi, Narsingdi, Bangladesh Factory List: 1. MAHID APPAREL LTD. Inspected by: Nazmul Huda Report Generated by: Nazmul Huda Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ABIR FASHIONS Kutubail, Fatullah (Post Office Road), Narayangonj, Bangladesh Factory List: 1. Inspected by: Pema Wangdi & Mamun Report Generated by: Pema Wangdi Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT M/S. PROUD TEXTILE Plot 31/A, BSCIC Industrial Estate, Fatullah, Narayanganj, Bangladesh Factory List: 1. Inspected by: Pema Wangdi Report Generated by: Pema Wangdi

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AG s APPARELS LIMITED. Plot No. A/1&2 Block-B, BSCIC I/A Fouzderhat, Sagarika Road, Dhaka-1207, Bangladesh Factory List: 1. AG s Apparels Limited. Inspected by: Sherub

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT BOVS APPARELS LTD. JAMUR MUCHIPARA, HEMAYETPUR, SAVAR, DHAKA, BANGLADESH Factory List: 1. BOVS APPARELS LTD. Inspected on April 13, 2014 SUMMARY The Bovs Apparels Ltd

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AHMED FASHIONS 34/1, Darus Salam Road (Technical), Mirpur-1, Dhaka, Bangladesh. Factory List: 1. Inspected by: Yang Generated by: Yang Inspected on 06 March 2015 SUMMARY

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT METRO KNITTING & DYEING MILLS LTD.(FACTORY-02), CHARBAG, ASHULIA, SAVAR, DHAKA, BANGLADESH Factory List: 1. Inspected by: Younten Report Generated by: Das Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FRESH FASHION WEAR LTD. 638, Sharifpur, P.O-National University, Gazipur Sadar, Bangladesh Factory List: 1. Passion Apparels and Wears Ltd. 2. Inspected by: Jobair Ibna

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT K.L FASHION LTD. 75/1, Mudafa West, Master Bari, Tongi, Gazipur, Bangladesh Factory List: 1. Inspected by: Jobair Ibna Abdul Alim Report Generated by: Jobair Ibna Abdul

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FIRST WEAR LMITED 68/Y, Sagarika Road, Pahartoli, Chittagong, Bangladesh Factory List: 1. Inspected by: Moin Hasan Report Generated by: Moin Hasan Inspected on August

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ADVANCE WORLD LIMITED Lalkha Shair Char, Fatullah, Narayanganj, Dhaka, Bangladesh Factory List: 1.. Inspected by: Sherub Tenzin & Md. Moin Hasan Report Generated by:

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ADHUNIK POSHAK SHILPA LIMITED Civil Engineer Tower, Mirpur, Dhaka, Bangladesh Factory List: 1. Adhunik Poshak Shilpa Ltd. 2. Crazy Fashions Ltd. 3. Kazipur Fashion Ltd.

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. SREERAMPUR, DHAKA, BANGLADESH Factory List: Graphics Textiles Limited Inspected on May 20, 2014 SUMMARY Graphics Textiles Limited is located in Sreerampur, Dhaka. Reportedly,

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT TARATEX (BD) LTD. Plot 23/1, Sataish Road, Tongi, Gazipur, Bangladesh Factory List: 1) Taratex (BD) Ltd. 2) S. P. M Design Ltd. Inspected by : Luv Kumar Chhetri Report

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT SINCERE KNIT GARMENTS LIMITED UNIT-1 East Isdair, Chandmari, Fatullah, Narayangonj, Bangladesh Factory List: 1. Unit-1 2. Fakir Knit Ltd. Inspected by: Sherab Dorji

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. Plot # B-32,BSCIC I/E,Tongi,Gazipur Factory List: 1. Kento Asia Limited. Inspected on May 15, 2014 SUMMARY Kento Asia Ltd. factory is established in a rented premises

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. Sumilpara, Adamjee Nagar, Shiddirgonji, Narayangonj, Bangladesh Factory List: 1. Moonlux Kinit Garments Limited. 2. West knit Wear Limited. 3. West Fashion. 4. Moonlus

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. KAROTOA APPARELS LTD., TATKHANA ROAD, DHAKA, BANGLADESH. Factory List: 1. Inspected on May 14, 2014 ELECTRICAL SAFETY INSPECTION REPORT. KAROTOA APPARELS LTD., TATKHANA

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT LIBAS TEXTILES LTD., Mouchak, Kaliakoir, Gazipur, Bangladesh Factory List: 1. Libas Textiles Ltd. Inspected on April 6, 2014 SUMMARY The Libas Textiles Ltd., factory

More information

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th)

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Shashongaon, Plot - S, A-646, Enayet nagar, Fatullah,Narayanganj Factory ID 9468 Electrical Safety dates Initial Date 07/07/2014 20/09/2016 Date of 5 th Follow Up Report Received Date

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AKH APPARELS LIMITED 128 Hemayetpur, AKH Tower, Savar, Dhaka-1340, Bangladesh. Factory List: 1. AKH Apparels Limited Inspected by: Deonarayan Khatiwara Report Generated

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. House 8 & 10, Road 3, Section 7, Mirpur Industrial Area, Dhaka, Bangladesh Factory List: 1. Alliance Garments Ltd. Inspected on May 5, 2014 ELECTRICAL SAFETY INSPECTION

More information

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th)

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th) Factory Name Address Joyna Bazer Road, Jamirdia, Valuka Factory ID 9504 Electrical Safety dates Initial Date 06/07/2014 Date of 5 th Follow Up Report Received Date 07/27/2015 Date of 6 th Follow Up Date

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ALIF GARMENTS Ltd, Dhaka, Bangladesh Prepared for: JANUARY 14, 2014 Alif Garments Ltd. PAGE 1 SUMMARY The seven-story factory housing Alif Textiles Ltd. & Hexa Garments

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT, SOUTH VANGNAHATI, SREEPUR, GAZIPUR, BANGLADESH. Factory List: 1. Hams Garments Ltd. Inspected on April 03, 2014 ELECTRICAL SAFETY INSPECTION REPORT, GAZIPUR, BANGLADESH

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FASHION FORUM LTD. 53-54, Diakhali, Zamgara, savar, Dhaka, Bangladesh. Factory List: 1. Fashion Forum Ltd. 2. IDS Washing Ltd. Inspected by: Karma Report Generated by:

More information

ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH

ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH January 14, 2013 Redpoint Jackets Ltd. PAGE 1 SUMMARY The four-story factory housing Redpoint Jackets Ltd. located in Dhaka Export

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT (1ST FLOOR BOTH WINGS) CHITTAGONG EXPORT PROCESSING ZONE SOUTH HALISHAHAR, CHITTAGONG Factory List: 1. 2. Regency Garments Ltd. 3. ABC Camp Inspected on May 10, 2014

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. ANTIM KNIT COMPOSITE LTD., Barpa, Rupshi, Rupgonj, Narayangonj, Bangladesh. Factory List: 1. Antim Knit Composite Ltd. 2. Antim Knitting & Finishing Ltd. Inspected

More information

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION E11 : General Electrical Earthing and LIGHTNING Protection PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION 1 2009-05-12 Review of Mechanical / Electrical and Control

More information

ELECTRICAL WORKS RELATED TO AC & UPS OF CMP GOC & IAD, LINGAMPALLY, HYDERABAD IN TWO BID SYSTEM THROUGH E-TENDER PRICE BID

ELECTRICAL WORKS RELATED TO AC & UPS OF CMP GOC & IAD, LINGAMPALLY, HYDERABAD IN TWO BID SYSTEM THROUGH E-TENDER PRICE BID SBI INFRA MANAGEMENT SOLUTIONS PVT.LTD. 3 rd Floor, Local Head Office,Bank Street, Koti, Hyderabad- 500095 On behalf of On behalf of On behalf of Cash Management Product GOC (CMP GOC) & Internal Audit

More information

1 AND 2 FAMILY DWELLING REQUIREMENTS

1 AND 2 FAMILY DWELLING REQUIREMENTS PLAN REQUIREMENTS: 1 AND 2 FAMILY DWELLING REQUIREMENTS All residential plans including additions and attached garages shall be designed to the current edition of the International Residential Code. Plans

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 5 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 6 Services and service equipment Rule 6-102 Number of supply services permitted Row housing

More information

T. SUNDUPALLI BRANCH (04427)

T. SUNDUPALLI BRANCH (04427) STATE BANK OF INDIA T. SUNDUPALLI BRANCH (04427) REGION 2, KADAPA RURAL TIRUPATI (A.O) ELECTRICAL WORK BILL OF QUANTITIES SL. NO. DESCRIPTION QTY. UNIT RATE AMOUNT Rs. Rs. 1 Supply, installation, testing

More information

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS ISSUE DATE: 5/1/90 EFFECTIVE DATE: 2/4/92 REVIEW DATE:

More information

BILL OF MATERIALS Name of the work: F.T.S Modernisation Work

BILL OF MATERIALS Name of the work: F.T.S Modernisation Work 1 BILL OF MATERIALS Name of the work: F.T.S Modernisation Work Erection,Testing and commissioning of Converter transformer 3 PH,11 KV/2 X 1800 V,4000 KVA outdoor Transformer size of 3150 L X 2800 D X 3200

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

SUPPLY ERECTION TOTAL RATE AMOUNT RATE AMOUNT AMOUNT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)

SUPPLY ERECTION TOTAL RATE AMOUNT RATE AMOUNT AMOUNT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) SBI-AO2 Project Residency Rd Br-elect/RBO-4 SCHEDULE OF QUANTITIES FOR ELECTRICAL WORKS. DATE : 24/4/2018 Sl. No. DESCRIPTION OF WORK UNIT QTY 1 READYMADE FINAL DISTRIBUTION BOARDS Supply, Instillation,

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram

CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram 695 027 No. C-DIT/CG-Elec/18-19/T044 Date: 19.07.2018 TENDER NOTICE Sealed tenders are invited

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC). SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 280.21-300.50 CHANGES FROM 2011 TO 2014 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 280 Surge Arresters, Over 1000 volts II. Instillation III. Connecting Surge

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL 8.01 GENERAL This material is not intended to cover service from OPPD s network in the downtown Omaha area. See Chapter 12 for details

More information

SECTION FACILITY LIGHTNING PROTECTION

SECTION FACILITY LIGHTNING PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 41 00 FACILITY LIGHTNING PROTECTION SPEC WRITER NOTE: Delete between //----//if not applicable to project. Also delete any other item or paragraph not applicable

More information

QUOTATION FOR THE ELECTRICAL WORK OF BANK OF INDIA, CHERTHALA BRANCH.

QUOTATION FOR THE ELECTRICAL WORK OF BANK OF INDIA, CHERTHALA BRANCH. QUOTATION FOR THE ELECTRICAL WORK OF BANK OF INDIA, CHERTHALA BRANCH. PART-B Date:- Sl.No Description Qty Unit Rate Amount I METER BOX II Supply,installation,testing & commisioning of dust & vermine proof

More information

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /19/2011 PAGE 1 OF 4 FACILITY LIGHTING SYSTEMS INSTALLATION

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /19/2011 PAGE 1 OF 4 FACILITY LIGHTING SYSTEMS INSTALLATION Project Procedure 07/19/2011 PAGE 1 OF 4 1.0 PURPOSE The purpose of this procedure is to ensure that facility lighting system installations are accomplished in compliance with Project specifications, applicable

More information

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes.

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes. SECTION 16111 CONDUITS AND BOXES 1.01 DESCRIPTION PART 1- GENERAL A. Work covered by this section includes the furnishing and installation of conduits and boxes. 1.02 SUBMITTALS A. The Contractor shall

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

QUOTATION FOR THE ELECTRICAL WORK OF BANK OF INDIA, VALAKAM BRANCH.

QUOTATION FOR THE ELECTRICAL WORK OF BANK OF INDIA, VALAKAM BRANCH. QUOTATION FOR THE ELECTRICAL WORK OF BANK OF INDIA, VALAKAM BRANCH. PART-B Date: Sl.No Description Qty Unit Rate Amount I METER BOX II Supply,installation,testing & commisioning of dust & vermine proof

More information

BILL OF QUANTITIES - PROJECT ELECTRICAL WORK OF PH-I FOR ASSAM RIFLES, DWARKA, NEW DELHI

BILL OF QUANTITIES - PROJECT ELECTRICAL WORK OF PH-I FOR ASSAM RIFLES, DWARKA, NEW DELHI Page 1 BILL OF QUANTITIES - PROJECT ELECTRICAL WORK OF PH-I FOR ASSAM RIFLES, DWARKA, NEW DELHI-110075 I. INSTALLATION OF SUB-STATION EQUIPMENT The rates shall include the following : 1. Assembling loose

More information

Building Construction Occupations

Building Construction Occupations Job Ready Assessment Blueprint Building Construction Occupations Test Code: 2011 / Version 01 Measuring What Matters Specific Competencies and Skills Tested in this Assessment: Safety and General Knowledge

More information

TECHNICAL SPECIFICATIONS ELECTRICAL WORKS

TECHNICAL SPECIFICATIONS ELECTRICAL WORKS ELECTRICAL & ALLIED REPAIR WORK FOR STAFF HOSTEL AT IIT BOMBAY TECHNICAL SPECIFICATIONS ELECTRICAL WORKS Sheet 1 of 18 SECTION 1 INTRODUCTION: 1.0 GENERAL 1.1 This specification covers in brief the technical

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

Desktop Computer Model 1 (without. DVD RW and Front USB) Desktop Computer Model 2 ( with DVD. RW and Front USB) Dot Matrix Printer with one printer

Desktop Computer Model 1 (without. DVD RW and Front USB) Desktop Computer Model 2 ( with DVD. RW and Front USB) Dot Matrix Printer with one printer Line Item Description of Goods Quantity Physical unit Unit Price 1 2 3 4 5 6 7 8 9 1 11 12 Desktop Computer Model 1 (without 3839 DVD RW and Front USB) Desktop Computer Model 2 ( with DVD 36 RW and Front

More information

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS SECTION 26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

HT-406 Specification Guide

HT-406 Specification Guide 2.101 Part 1 - General Pre-insulated HDPE-Jacketed Steel Piping Systems suitable for Steam, Condensate Return, and High Temperature Heating Water. 1.1 Pre-insulated Piping - Furnish a complete HDPE jacketed

More information

CS-21 STREET STRUCTURES TABLE OF CONTENTS

CS-21 STREET STRUCTURES TABLE OF CONTENTS TABLE OF CONTENTS CS-21.0 Street Structures... 1 CS-21.1 Road Signs... 1 CS-21.2 Safety Barriers... 1 CS-21.3 Bollards and Removable Bollards... 1 CS-21.4 Pedestrian Barrier Rails and Handrails... 1 CS-21.5

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14 SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION

CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 604 NOVEMBER 2004 CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used

More information

Rate (Rs.) Description Unit Qty PART I : REMOVING & RESHIFTING OF EXISTING. Amount (Rs.) INSTALLATION

Rate (Rs.) Description Unit Qty PART I : REMOVING & RESHIFTING OF EXISTING. Amount (Rs.) INSTALLATION REVISED BOQ FOR ELECTRICAL WORK FOR ESTABLISHMENT OF MUSEUM AT BANK'S BUILDING AT 70/80, M.G. ROAD, FORT, MUMBAI Note : The rates quoted shall include supply, installation, testing, commissioning of complete

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. This Section includes steel cable trays and accessories.

A. This Section includes steel cable trays and accessories. SECTION 26 05 36 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 614 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT TABLE OF CONTENTS 614.01 SCOPE 614.02 REFERENCES 614.03 DEFINITIONS

More information

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD.

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Included are selected sections of codes taken directly from: 1997 Uniform

More information

City of Westerville Guide to Commercial Inspections

City of Westerville Guide to Commercial Inspections City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing

More information

SECTION EARTHING AND EARTH FAULT PROTECTION

SECTION EARTHING AND EARTH FAULT PROTECTION SECTION 16660 PART 1 - GENERAL 1.01 DESCRIPTION A. The work to be performed includes, but is not necessarily limited to, all work involved with the construction and assembly of a complete electrical earthing

More information

Details of technical leaflets/write-up on various pieces of equipment.

Details of technical leaflets/write-up on various pieces of equipment. Details of technical leaflets/write-up on various pieces of equipment. (1) Insulator Designs: The insulators are provided in one, two, three, or four insulator designs per location and spaced to provide

More information

1.2 REFERENCES.1 CSA C22.2 No.0.3, Test Methods for Electrical Wires and Cables.

1.2 REFERENCES.1 CSA C22.2 No.0.3, Test Methods for Electrical Wires and Cables. Issued 2005/06/01 Section 16122 Wire and Cables (0 1000V) Page 1 of 5 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 16151 Wire and Box Connectors 0 1000 1.2 REFERENCES.1 CSA C22.2 No.0.3, Test Methods

More information

CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT

CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 623 JANUARY 1990 CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT 623.01 SCOPE 623.02 REFERENCES 623.05 MATERIALS TABLE OF CONTENTS 623.05.01

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 Page 1 of 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General

More information

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR FINANCIAL BID Item DSR Item Description Qty Units No No. Total 1.1.1 Excavating trenches of

More information

Temporary Wiring. Low-Voltage Electrical Safety Orders

Temporary Wiring. Low-Voltage Electrical Safety Orders Temporary Wiring Low-Voltage Electrical Safety Orders 2405.1. Scope. Except as specifically modified in this Article, all other requirements of this Order for permanent wiring shall also apply to temporary

More information

How to Prepare Your LSE Report

How to Prepare Your LSE Report LSE Rule Category Required Documentation Information Comments / Applicable Code Sections/ 10.1 Building Height Provide the Building height in Feet Provide the number of stories above grade Helpful Hints

More information

Please check with your local inspection authority for any additional requirements before installation.

Please check with your local inspection authority for any additional requirements before installation. Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must

More information

CHAPTER 13 GROUNDING AND BONDING

CHAPTER 13 GROUNDING AND BONDING GROUNDING AND BONDING CHAPTER 13 GROUNDING AND BONDING Grounding and bonding must be in accordance with Article 250 of the National Electrical Code (NEC). Bonding is defined in the NEC as the permanent

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 604 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used

More information

SECTION ELECTRICAL CABLE. 1. Trench excavation, backfill, and compaction; Section

SECTION ELECTRICAL CABLE. 1. Trench excavation, backfill, and compaction; Section 02735-1 of 5 SECTION 02735 ELECTRICAL CABLE 02735.01 GENERAL A. Description Electrical cable installation shall include, but not necessarily be limited to, furnishing and placing electrical cable as shown

More information

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) PERMIT SUBMITTAL CHECKLIST: Signed and completed Building Permit application form. A separate Electrical permit is required from

More information

SDCS-02 CONSTRUCTION STANDARD FOR

SDCS-02 CONSTRUCTION STANDARD FOR الشركة السعودية للكهرباء DATE: November 2016 CONSTRUCTION STANDARD FOR UNDERGROUND DISTRIBUTION NETWORK This specification is property of SEC and subject to change or modification without any notice الشركة

More information

PRICE BID FOR TENDER NOTICE NO- CONSTRUCTION OF 11KV LINE, LT LINE & SUBSTATION FOR SAMBALPUR FLYOVER PROJECT- WESCO / INSTALLATION / WORKS

PRICE BID FOR TENDER NOTICE NO- CONSTRUCTION OF 11KV LINE, LT LINE & SUBSTATION FOR SAMBALPUR FLYOVER PROJECT- WESCO / INSTALLATION / WORKS PRICE BID FOR TENDER NOTICE NO- CONSTRUCTION OF 11KV LINE, LT LINE & SUBSTATION FOR SAMBALPUR FLYOVER PROJECT- / INSTALLATION / A - DIG BUILDING TO LAXMI TALKIES CHOWK 1 2 Supply & of 3-ph 3-wire 11KV

More information

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp, TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2011 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.

More information

BANK OF INDIA. TENDER DOCUMENT PART B (Financial Bid) Last Date of submission of Tenders: BOQ

BANK OF INDIA. TENDER DOCUMENT PART B (Financial Bid) Last Date of submission of Tenders: BOQ BANK OF INDIA ELECTRICAL & DATA CABELING WORK OF CHANDIGARH SME CITY CENTRE/ BRANCH/ZONAL OFFICE OF BANK OF INDIA AT SCO 76-82, SECTOR 31-A, CHANDIGARH TENDER DOCUMENT PART B (Financial Bid) Last Date

More information

THIRUVANANTHAPURAM DIVISION-ELECTRICAL/SOUTHERN RLY TENDER DOCUMENT. Tender No: V-EG-OT slNo4 Closing Date/Time: 06/02/ :00

THIRUVANANTHAPURAM DIVISION-ELECTRICAL/SOUTHERN RLY TENDER DOCUMENT. Tender No: V-EG-OT slNo4 Closing Date/Time: 06/02/ :00 Senior Divisional Electrical Engineer acting for and on behalf of The President of India invites E-Tenders against Tender No V-EG-OT-05-2016-17slNo4 Closing Date/Time 06/02/2017 14:00 Hrs. Bidders will

More information

ELECTRIFICATION WORK, SCHEDULE OF QUANTITIES FOR THE AIR FORCE SCHOOL, SUBROTO PARK, NEW DELHI CORRIGENDUM

ELECTRIFICATION WORK, SCHEDULE OF QUANTITIES FOR THE AIR FORCE SCHOOL, SUBROTO PARK, NEW DELHI CORRIGENDUM ELECTRIFICATION WORK, SCHEDULE OF QUANTITIES FOR THE AIR FORCE SCHOOL, SUBROTO PARK, NEW DELHI 110010 CORRIGENDUM Reference is made to Advertisement in r/o Tender and BOQ for RENEWAL AND REPLACEMENT OF

More information

legend. #1 is a gas relief valve? If so does Enbridge supply with station?

legend. #1 is a gas relief valve? If so does Enbridge supply with station? Michael Pacholok, Director Purchasing and Materials Management Division City Hall, 8 th Floor, West Tower 00 Queen Street West Toronto, Ontario M5H N Joanne Kehoe Manager Construction Services May 4, 06

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION CONDUITS AND BOXES

SECTION CONDUITS AND BOXES PART 1 GENERAL 1.01 DESCRIPTION A. Work covered by this section includes the furnishing and installation of conduits and boxes and the testing of the completed electrical systems 1.02 SUBMITTALS A. The

More information

FIELD COPY ATTACHMENT

FIELD COPY ATTACHMENT FIELD COPY ATTACHMENT The released plans for the project must be on site and available to the inspectors at all times. No inspection will be done without the released field plans. If you have any questions,

More information

INFORMATIONAL HANDOUT FOR FINISHING A BASEMENT

INFORMATIONAL HANDOUT FOR FINISHING A BASEMENT 7100 147 th Street West Telephone (952) 953-2588 Apple Valley, MN 55124-9016 Fax (952) 953-2515 www.cityofapplevalley.org INFORMATIONAL HANDOUT FOR FINISHING A BASEMENT 1. Submit plan showing the proposed

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) 4-Tayebpur, Nischintapur Zirabo, Savar Savar Dhaka Bangladesh The Alliance for Bangladesh Worker Safety Page 1/5 Introduction to the Report The following

More information

Regulations of Connecticut State Agencies

Regulations of Connecticut State Agencies This document was prepared by the Connecticut State Library and is provided for the convenience of the reader. This is not the official version of the regulations. The official regulations are published

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES... DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements

More information