Connector Selector Guide
|
|
- Thomas Maxwell
- 6 years ago
- Views:
Transcription
1 Single Bottom Plate Plate to to Studs Studs on 4-in on 4-in and and 6-in 6-in Walls Walls USP See 160% Qty Stock No. Footnotes To Plates To Studs 1=Lowest;10=Highest RT4 -- (4).131 x 1-1/2-in (4).131 x 1-1/2-in RSPT4 -- (4).131 x 1-1/2-in (4).131 x 1-1/2-in HC (11).131 x 1-1/2-in (6).131 x 1-1/2-in HCPRS -- (5).131 x 1-1/2-in (6).131 x 1-1/2-in RT3A -- (4).131 x 1-1/2-in (4).131 x 1-1/2-in SPT22 -- (4).148 x 3-in (4).148 x 3-in RT8A -- (5).148 x 1-1/2-in (5).148 x 1-1/2-in RT4 -- (8).131 x 1-1/2-in (8).131 x 1-1/2-in SPT4 1 Not Required (6).148 x 1-1/2-in SPT6 2 Not Required (6).148 x 1-1/2-in RT3A -- (8).131 x 1-1/2-in (8).131 x 1-1/2-in SPTHW4 3 Not Required (12).148 x 1-1/2-in SPTHW6 4 Not Required (12).148 x 1-1/2-in SPTH4 1 Not Required (12).148 x 1-1/2-in SPTH6 2 Not Required (12).148 x 1-1/2-in 10 NOTE: Loads are for DF/SP lumber. Refer to USP's Product Catalog for load reduction for SPF lumber. 1) 2x4 Bottom Plate 2) 2x6 Bottom Plate 3) 2x4 Bottom Plate over 1/2-in Sheathing 4) 2x6 Bottom Plate over 1/2-in Sheathing Typical RSPT4 single plate
2 Double Top Plates to Studs 4-in and 6-in Walls USP See 160% Qty Stock No. Footnotes To Plates To Studs 1=Lowest;10=Highest RSPT4 -- (4).131 x 1-1/2-in (4).131 x 1-1/2-in RT5 -- (4).131 x 1-1/2-in (4).131 x 1-1/2-in RT7 -- (5).131 x 1-1/2-in (5).131 x 1-1/2-in RT7A -- (5).131 x 1-1/2-in (5).131 x 1-1/2-in RSPT6 -- (4).148 x 1-1/2-in (4).148 x 1-1/2-in RT8A -- (5).148 x 1-1/2-in (5).148 x 1-1/2-in LTW12 -- (6).148 x 1-1/2-in (6).148 x 1-1/2-in SPT4 2 Not Required (6).148 x 1-1/2-in SPT6 3 Not Required (6).148 x 1-1/2-in RSPT6-2 1 (6).148 x 1-1/2-in (8).148 x 1-1/2-in SPT24 -- (6).148 x 3-in (6).148 x 3-in RT5 6 (8).131 x 1-1/2-in (8).131 x 1-1/2-in RT7 6 (10).131 x 1-1/2-in (10).131 x 1-1/2-in MTW12 -- (7).148 x 1-1/2-in (7).148 x 1-1/2-in LFTA6 -- (8).131 x 1-1/2-in (8).131 x 1-1/2-in RT7A 6 (10).131 x 1-1/2-in (10).131 x 1-1/2-in HTW20 -- (12).148 x 1-1/2-in (12).148 x 1-1/2-in RT8A 6 (10).148 x 1-1/2-in (10).148 x 1-1/2-in LTW12 6 (12).148 x 1-1/2-in (12).148 x 1-1/2-in SPTH4 2 Not Required (12).148 x 1-1/2-in SPTH6 3 Not Required (12).148 x 1-1/2-in MTW12 -- (14).148 x 1-1/2-in (14).148 x 1-1/2-in HTW20 -- (24).148 x 1-1/2-in (24).148 x 1-1/2-in 10 1) Stud Size is (2) 2x 2) 2x4 Top Plate 3) 2x6 Top Plate 4) 2x4 Top Plate over 1/2-in Sheathing 5) 2x6 Top Plate over 1/2-in Sheathing 6) Install diagonally across plate from each other, to achieve twice to achieve twice the load (using identical anchors). See detail. Wall Top Plate Install diagonally across from each other for minimum 1-1/2" truss/rafter. Nailing into both sides of a single ply 2x truss/rafter may cause damages in wood. Typical SPT4 Typical SPT24 Anchor to achieve twice the load (using two identical anchors.)
3 Portal Frame and Alternate Braced Wall Panel Tie Tie Down Device USP See Anchor Fasteners 160% Qty Stock No. Footnotes Diameter To Studs 1=Lowest;10=Highest Deflection LTS20B 4 & 5 (1) 3/4-in ATR (10).148 x 1-1/2-in PAHD42 1 Embed (15).162 x 3-1/2-in LSTAD8 2 Embed (24).148 x 3-1/4-in Sinker LSTAD8RJ 2 & 3 Embed (24).148 x 3-1/4-in Sinker PA18 6 Embed (12).162 x 2-1/2-in PA18 4 Embed (12).162 x 3-1/2-in PHD2A 4 (1) 5/8-in ATR (6) WS HTT45 (Min) 4 (1) 5/8-in ATR (18).162 x 2-1/2-in or.148 x 3-in or HTT45 (Max) 4 (1) 5/8-in ATR (26).162 x 2-1/2-in or.148 x 3-in or STAD14 2 Embed (38).148 x 3-1/4-in Sinker STAD14RJ 2 & 3 Embed (38).148 x 3-1/4-in Sinker STAD8 2 Embed (24).148 x 3-1/4-in Sinker STAD8RJ 2 & 3 Embed (24).148 x 3-1/4-in Sinker STAD10 2 Embed (28).148 x 3-1/4-in Sinker STAD10RJ 2 & 3 Embed (28).148 x 3-1/4-in Sinker ) Minimum 2,500 psi concrete, single pour 1/2-in minimum from corner. For edge loads, refer to USP's Product Catalog. 2) Refer to USP's Product Catalog complete specification details. 3) RJ = Rim Joist Application. 4) The designer must specify anchor bolt type, length, and embedment. 5) Refer to USP's Product Catalog for minimum required bolt end distance. 6) Minimum 2,500 psi concrete. Minimum concrete edge distance 4-in. Minimum concrete block edge distance 20-in. The loads represented are based on a 3-in thick vertical member. ATR = All Thread Rod or Anchor Bolt. WS3 = 3-in Self-drilling wood screw (included) with connector Common Common or 16 Sinker (.162) = 16d Common Concrete Block Installation Concrete Block Installation USP See Anchor Fasteners Rim Joist 160% Qty Stock No. Footnotes Diameter To Rim Joist 1=Lowest;10=Highest Size TA51 1 & 2 Embed (10).162 x 2-1/2-in 1 2x TA51 1 & 2 Embed (14).162 x 2-1/2-in 1 2x TA51 1 & 2 Embed (16).162 x 2-1/2-in 1 2x TA71 1 & 2 Embed (10).162 x 2-1/2-in 2 2x TA71 1 & 2 Embed (14).162 x 2-1/2-in 2 2x TA71 1 & 2 Embed (16).162 x 2-1/2-in 2 2x14 1) Require a 6-in minimum embedment into concrete foundations. 2) Minimum of (9) 16d nails per strap is required to meet IRC R (.162) = 16d Install (1) #4 rebar in shear cone 30" min rebar length 12" min rebar length 1/2" min from corner Typical HPAHD22 single pour corner and endwall 12" min rebar length Double 2 x 10 rim joist Edge distance 1/2" min from corner Nailed portion CS Install (1) #4 rebar in shear cone 30" min rebar length Typical STAD14RJ corner rim joist 6" min. Typical TA
4 Shear Wall Tie Down Device USP See Anchor Fasteners 160% Qty Stock No. Footnotes Diameter To Studs 1=Lowest;10=Highest Deflection PHD2A 4 (1) 5/8-in ATR (6) WS HPAHD22 1 Embed (23).162 x 3-1/ STAD14 2 Embed (38).148 x 3-1/4-in Sinker STAD14RJ 2 & 3 Embed (38).148 x 3-1/4-in Sinker HTT45 (Min) 4 (1) 5/8-in ATR (18).162 x 2-1/2-in or.148 x 3-in or HTT45 (Max) 4 (1) 5/8-in ATR (26).162 x 2-1/2-in or.148 x 3-in or PHD4A 4 (1) 5/8-in ATR (10) WS PHD2A 4 (2) 5/8-in ATR (12) WS PHD5A 4 (1) 5/8-in ATR (14) WS PHD8 4 (1) 7/8-in ATR (24) WS HTT45 (Min) 4 (2) 5/8-in ATR (36).162 x 2-1/2-in or.148 x 3-in or HTT45 (Max) 4 (2) 5/8-in ATR (52).162 x 2-1/2-in or.148 x 3-in or UPHD8 4 (1) 7/8-in ATR (24) WS PHD4A 4 (2) 5/8-in ATR (20) WS PHD5A 4 (2) 5/8-in ATR (28) WS UPHD11 4 (1) 1-in ATR (24) WS UPHD14 4 (1) 1-in ATR (30) WS UPHD8 4 (2) 7/8-in ATR (48) WS UPHD11 4 (2) 1-in ATR (48) WS UPHD14 4 (2) 1-in ATR (60) WS ) Minimum 2,500 psi concrete, single pour 1/2-in minimum from corner. For edge loads, refer to USP's Product Catalog. 2) Refer to USP's Product Catalog complete specification details. 3) RJ = Rim Joist Application. 4) The designer must specify anchor bolt type, length, and embedment. ATR = All Thread Rod or Anchor Bolt. WS3 = 3-in Self drilling wood screw (included) with connector (.162) = 16d Typical HTT45 Typical PHD5A Typical UPHD
5 Truss/Rafter to to Double Plate Installation USP See 160% Qty Stock No. Footnote To Plates To Truss/Rafter 1=Lowest;10=Highest RT15 -- (5).131 x 1-1/2-in (5).131 x 1-1/2-in RT5 -- (4).131 x 1-1/2-in (4).131 x 1-1/2-in RT7 -- (5).131 x 1-1/2-in (5).131 x 1-1/2-in RT7A -- (5).131 x 1-1/2-in (5).131 x 1-1/2-in RT8A -- (5).148 x 1-1/2-in (5).148 x 1-1/2-in RT5 1 (8).131 x 1-1/2-in (8).131 x 1-1/2-in RT (8).131 x 1-1/2-in (8).131 x 1-1/2-in RT7 1 (10).131 x 1-1/2-in (10).131 x 1-1/2-in RT7A 1 (10).131 x 1-1/2-in (10).131 x 1-1/2-in RT16A 2 (8).148 x 1-1/2-in (9).148 x 1-1/2-in RT8A 1 (10).148 x 1-1/2-in (10).148 x 1-1/2-in 7 1) Install diagonally across plate from each other, to achieve twice to achieve twice the load (using identical anchors). See detail. 2) For 2 Ply Rafter or Truss. Truss/Rafter to Double Plate Stud Installation Typical RT5 double plate Typical RT7 double plate Typical RT7A double plate Typical RT16-2 double plate Wall Top Plate Install diagonally across from each other for minimum 1-1/2" truss/rafter. Nailing into both sides of a single ply 2x truss/rafter may cause damages in wood. Anchor to achieve twice the load (using two identical anchors.)
6 Truss/Rafter to to Double Plate Stud Installation USP See 160% Qty Stock No. Footnotes To Plates/Stud To Truss/Rafter Stud 1=Lowest;10=Highest LTW12 1 (6).148 x 1-1/2-in (6).148 x 1-1/2-in MTW12 1 (7).148 x 1-1/2-in (7).148 x 1-1/2-in RT20 -- (4).148 x 1-1/2-in (9).148 x 1-1/2-in (9).148 x 1-1/2-in HTW20 1 (12).148 x 1-1/2-in (12).148 x 1-1/2-in LTW12 1 (12).148 x 1-1/2-in (12).148 x 1-1/2-in MTW12 1 (14).148 x 1-1/2-in (14).148 x 1-1/2-in HTW20 1 (24).148 x 1-1/2-in (24).148 x 1-1/2-in ) Fasteners shall be distributed equally on each end of connection. Typical LTW12 / MTW12 Typical RT20 double Girder Tiedowns Downs 2 Ply or > truss-to-top plate plate to stud USP See 160% Qty Stock No. Footnotes To Plates To Truss/Rafter Stud 1=Lowest;10=Highest LUGT2 -- (2).148 x 3-in (16).148 x 3-in (14).148 x 3-in LUGT3 -- (4).148 x 3-1/4-in (12) WS25 (24).148 x 3-1/4-in LUGT4 -- (5).148 x 3-1/4-in (16) WS3 (32).148 x 3-1/4-in MUGT15 1 (1) 5/8-in Threaded Rod (22).148 x 3-in pair RUSC 2 2 & (16) WS3 (16) WS HUGT2 (2 Ply) 4 (2) 5/8-in Threaded Rod (8).148 x 3-in (2) HTT HUGT3 (3 Ply) 4 (2) 5/8-in Threaded Rod (8).148 x 3-in (2) HTT HUGT4 (4 Ply) 4 (2) 5/8-in Threaded Rod (8).148 x 3-in (2) HTT5 6 1) For wood-to-wood, install with PHD2A underside of top plate with 5/8-in threaded rod. 2) The RUSC shall be installed in pairs. 3) Bolts shall conform to ASTM A 307 or better. 4) For wood-to-wood, install with (2) HTT45 each side of stud. 5) WS25 and WS3 are self-drilling structural wood screws and are supplied with connector. Typical RUSC Typical LUGT3 (LUGT4 similar) Typical LUGT2
7 Header to Studs USP See Min. Total 160% Qty Stock No. Footnotes Header Fasteners 1=Lowest;10=Highest LSTA in (10).148 x 3-in MSTA in (10).148 x 3-in (1) 12-in Piece RS in (8).148 x 3-in (1) 18-in Piece RS in (10).148 x 3-in (1) 24-in Piece RS in (12).148 x 3-in LSTA in (14).148 x 3-in LSTA in (16).148 x 3-in MSTA in (14).148 x 3-in MSTA in (16).148 x 3-in LSTA in (20).148 x 3-in MSTA in (20).148 x 3-in (2) 18-in Pieces RS150 1 & in (20).148 x 3-in (2) 24-in Pieces RS150 1 & in (24).148 x 3-in LSTA in (28).148 x 3-in LSTA in (32).148 x 3-in MSTA in (28).148 x 3-in MSTA in (32).148 x 3-in 10 1) RS gauge, 150-ft coil strapping length. 2) Install diagonally across plate from each other, to achieve twice the load (using identical anchors). See detail. RT7A SPT4 LSTA12 RT15 RT7A SPTH4 RT10 MSTA12 RT3A LSTA/MSTA 9" LSTA/MSTA 12" LSTA/MSTA 15" LSTA/MSTA 18" LSTA/MSTA 21" LSTA/MSTA 24" LSTA/MSTA 30" LSTA/MSTA 36" MSTA 48" (similar) LSTA/MSTA 1-1/4" RT3A Wall Top Plate PHD8 HPAHD22 FA4-TZ USP STB series Window/Door Opening ST1-TZ Install diagonally across from each other for minimum 1-1/2" truss/rafter. Nailing into both sides of a single ply 2x truss/rafter may cause damages in wood. Anchor to achieve twice the load (using two identical anchors.)
Building Division Informational Handout
CITY OF SAN JOSÉ, CALIFORNIA Building Division Informational Handout Conventional Light Frame Construction Design Provisions 2007 CBC Handout No. 2-21 Published: 1/1/08 Page 1 of 3 This document summarizes
More informationGARAGES/ONE-STORY City of Grand Rapids Building Safety Division
GARAGES/ONE-STORY City of Grand Rapids Building Safety Division 218-326-7601 www.cityofgrandrapidsmn.com This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building
More informationREPORT HOLDER: MITEK USA, INC. (FORMERLY USP STRUCTURAL CONNECTORS) SOUTHCROSS DRIVE, SUITE 200 BURNSVILLE, MINNESOTA EVALUATION SUBJECT:
0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-2787 Reissued 05/2017 This report is subject to renewal 05/2019. DIVISION: 03 00
More informationBuilding Guide. olorado Chapter of the International Conference of Building Officials. Lancaster County Building Department
olorado Chapter of the International Conference of Building Officials Lancaster County Building Department Single Family Residential One Story Detached Garage How to Use this Guide Provide two sets of
More informationConnect Easily to Insulated Concrete Forms
Connect Easily to Insulated Forms The ICF Ledger Connector System is engineered to solve the challenges of mounting wood or steel ledgers to walls built with insulated concrete forms (ICF). This flier
More informationConnect Easily to Insulated Concrete Forms
Connect Easily to Insulated Forms The ICF Ledger Connector System is engineered to solve the challenges of mounting wood or steel ledgers to walls built with insulated concrete forms (ICF). This flier
More informationHOLDOWN & STRAP SCHEDULE
SHEAR WALL SCHEDULE STRUCTURAL DESIGN CRITERIA GOVERNING CODE SOIL BEARING PRESSURE HOLDOWN & STRAP SCHEDULE MARK SHEATHING SHEATH BOTH SIDES NAILS EDGE SPACING NOTES MARK SW 7/" OSB NO 8d " OC - A SW
More informationOriginally Issued: 02/11/2011 Revised: 02/23/2018 Valid Through: 02/28/2019
MITEK USA, INC. USP HOLDOWN AND TENSION-TIE CONNECTORS CSI Section: 06 05 23 Wood, Plastic and Composite Fastenings 1.0 RECOGNITION MiTek USA, Inc. USP holdown and tension-tie connectors recognized in
More informationColorado Chapter of the International Conference of Building Officials. Building Guide. The Colorado Chapter of the International
Building Guide Colorado Chapter of the International Conference of Building Officials Colorado Building Chapter of the International Guide Code Council Single Family Residential One Story Detached Garage
More informationCOMPANION FOR THE 2001
COMPANION FOR THE 2001 af&pa WOOD-fRAME construction manual FOR wind DESIGN This document is designed to be used in conjunction with the 2001 edition of the Wood Frame Construction Manual (WFCM). The 2001
More information(800) (562) A Subsidiary of the International Code Council
ICC-ES Evaluation Report ESR-2089 Reissued September 2014 This report is subject to renewal September 2016. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council DIVISION:
More informationSupplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2014 LARC)
Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2014 LARC) Plan Check Submittal Date: Plan Check #: Permit App.# Job Address: Applicant: Phone: ( ) Plan Check Engineer:
More informationDIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: WOOD, PLASTIC, AND COMPOSITE FASTENINGS REPORT HOLDER:
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3448 Reissued 10/2018 This report is subject to renewal 10/2020. DIVISION: 06 00
More informationSupplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2011 LARC)
Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2011 LARC) Plan Check Submittal Date: Plan Check #: Permit App.# Job Address: Applicant: Phone: ( ) P.C. Engineer: Phone:
More informationMinimum required percentage of length of braced wall band on each storey 4
C-10 Supplementary Guidelines on Applicability and Scope Table C1 b (continued) Braced Wall Panels for High Wind or High Seismic Loads Building with normal weight construction: 0.8 kpa q 1/50 wind load
More informationACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings
ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory
More informationTITEN Screws. WM/WMI/WMU Hangers. Masonry Connectors. Titen Screw Anchors for Concrete. Titen Hex Head. Masonry Connectors
TITEN Screws Titen screws are 3 6" and 4" diameter masonry screws for attaching various components to concrete and masonry. Available in hex and phillips head and both carbon and stainless steel (see the
More informationThe parts of Report No.ESR-2089 marked by the asterisks are modified by the Los Angeles Building Department from this approval.
MiTek U.S.A., Inc. RESEARCH REPORT: RR 25759 14305 Southcross Drive, Suite # 200 (CSI # 06 12 19) Burnsville, MN 55306 BASED UPON ICC EVALUATION SERVICE Attn: Jim Collins REPORT NO. ESR-2089 (952) 898-8772
More informationR Code and Commentary for 2012 NC Residential Code final 03/06/13
R602.10 Code and Commentary for 2012 NC Residential Code final 03/06/13 Commentary italicized and printed in red 1. Section R602.10 -- provides charging language for two simplified bracing approaches (isolated
More informationESR ICC Evaluation Service, Inc. Issued May 1, 2008 This report is subject to re-examination in one year.
ESR-275 Issued May 1, 08 This report is subject to re-examination in one year. ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 530 Workman Mill Road, Whittier, California 9001 #
More informationDIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: WOOD, PLASTIC, AND COMPOSITE FASTENINGS REPORT HOLDER:
0 ICC ES Report ICC ES (800) 423 6587 (562) 699 0543 www.icc es.org 000 Most Widely Accepted and Trusted ESR 3448 Reissued 10/2016 This report is subject to renewal 10/2018. DIVISION: 06 00 00 WOOD, PLASTICS
More informationREPORT HOLDER: MITEK USA, INC. EVALUATION SUBJECT:
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2089 Reissued 09/2018 This report is subject to renewal 09/2019. DIVISION: 05 00
More informationTypical Deck. CONSTRUCTION TIP SHEET 5 Basic Decks w/ 60 psf Live Loading
CONSTRUCTION TIP SHEET 5 Basic Decks w/ 60 psf Live Loading April 1, 2017 This Tip Sheet reflects code requirements of the 2015 International Residential Code (IRC) with Washington State Amendments which
More informationTypical Deck. CONSTRUCTION TIP SHEET 5 Basic Decks w/ 60 lb Live Loading
CONSTRUCTION TIP SHEET 5 w/ 60 lb Live Loading April 1, 2017 This Tip Sheet reflects code requirements of the 2015 International Residential Code (IRC) with Washington State Amendments which update the
More informationCHAPTER 3 BUILDINGS WITH WOOD FRAMED EXTERIOR WALLS 301 SCOPE
CHAPTER 3 BUILDINGS WITH WOOD FRAMED EXTERIOR WALLS WOOD CHAPTER 3 301 SCOPE This chapter prescribes construction requirements for buildings where all exterior walls above the foundation are wood framed
More informationSTEEL FRAMING INDUSTRY ASSOCIATION OBSERVATION REPORT PROTOCOL STRUCTURAL FRAMING GUIDELINES FOR THE INSPECTOR
STEEL FRAMING INDUSTRY ASSOCIATION OBSERVATION REPORT PROTOCOL STRUCTURAL FRAMING GUIDELINES FOR THE INSPECTOR 1. On site Observation Report by Recognized Engineer (PE) every year (prior to issuance of
More informationESR ICC Evaluation Service, Inc. Reissued July 1, 2006 This report is subject to re-examination in two years.
ESR-1178 Reissued July 1, 2006 This report is subject to re-examination in two years. ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California
More informationGARAGE MAIN FLOOR PLAN
BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. SHED TO BE BUILT AS PER IRC, UBC OR CURRENT LOCAL CODE To the best of my knowledge
More informationExterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Overview Revised 11/17/2016
Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Overview Revised 11/17/2016 SBCA has been the voice of the structural building components industry since 1983, providing
More informationExterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Design Guide Revised 11/17/2016
Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Design Guide Revised 11/17/2016 SBCA has been the voice of the structural building components industry since 1983,
More informationGARAGE MAIN FLOOR PLAN
30 year dimensional shingles and Metal Verticle siding over structural sheathing. Nailing schedule is " on ends 12" on centers d nails. Trusses are engineered on 24" and framing is 2" x " on 1" centers.
More informationPulaski County, Virginia Practical Wall Bracing
Pulaski County, Virginia Practical Wall Bracing Based on the 2012 Virginia Residential Code The information herein provides guidelines for complying with the most common Practical Wall Bracing provisions
More informationGARAGE MAIN FLOOR PLAN
BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. SHED TO BE BUILT AS PER IRC, UBC OR CURRENT LOCAL CODE To the best of my knowledge
More informationSITE AND BUILDING NEW CONSTRUCTION FOR: BUSH'S CHICKEN RESTAURANT EXTERIOR COOLER/FREEZER PROTOTYPE. Contact Information:
SITE AND BUILDING NEW CONSTRUCTION FOR: RESPONSIBILITY MATRIX SCOPE ITEM PROVIDED BY: INSTALLED BY: REMARKS BUSH'S CHICKEN RESTAURANT EXTERIOR COOLER/FREEZER PROTOTYPE Contact Information: Architect: Mike
More informationProduct Guide Specification
Norplex-Micarta October 2007 665 Lybrand Street Postville, Iowa 52162 Toll Free (800) 568-8108 Phone (817) 329-6191 Fax (817) 421-4208 Website www.stormblocker.com E-mail support@stormblocker.com Product
More informationSHEAR BRACE. Featuring ilevel Shear Braces for Engineered and Prescriptive Applications iLevel8 (
WALL SOLUTIONS SHEAR BRACE 2006 IBC/IRC Code Accepted* *Achieved code evaluation report recognition (ICC ES ESR-2652) for compliance with the 2006 IBC/IRC Featuring ilevel Braces for Engineered and Prescriptive
More informationESR ICC Evaluation Service, Inc. Issued May 1, 2008 This report is subject to re-examination in one year.
ESR- Issued May 1, 00 This report is subject to re-examination in one year. ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 30 Workman Mill Road, Whittier, California 9001 # () 99-03
More informationStrong-Drive SDWS TIMBER Screw
Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections including Ledgers Designed to provide an easy-to-install, high-strength alternative to through-bolting and traditional lag screws.
More informationCustom 22' x 40' - 16' Tall Garage Plan #g227 By SDS-CAD Specialized Design Systems
P O Box 34 Mendon, Utah Custom 22' x 40' - 16' Tall Garage Plan #g22 By Page 1 Title Page Page 2 Main Floor Plan Page 3 Foundation Plan Page 4 Elevation Views Page 5 Framing and Details Page 6 Typical
More informationCustom 30 x 48-14' Tall Garage Plan #g226 By SDS-CAD Specialized Design Systems
P O Box 34 Mendon, Utah Custom 30 x 48-14' Tall Garage Plan #g226 By Page 1 Title Page Page 2 Main Floor Plan Page 3 Foundation Plan Page 4 Elevation Views Page 5 Framing and Details Page 6 Typical Section
More informationSample Plan Not for Construction for pricing
26' x 48' Screen Porch Garage Plans Trussed Roof, 2x Construction, 8' Walls Asphalt Shingles, Garage Space Office Space, Screened Porch 48'-0" 4" 5" 12'-0" 5" 4" 4'-0" 12'-0" 4'-0" 4'-0" 10'-0" 24'-0"
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More information#G445 Plans, 48'x28' x 10' detached garage with bonus room By SDS-CAD Specialized Design Systems
Architectural asphalt shingles and horizontal True Wood 7" Reveal siding over structural panel. Nailing schedule is 6" on ends 12" on centers 6d nails. Trusses are engineered on Bonus attic trusses 24"
More informationTHE ASHTON PERSPECTIVE VIEW
THE ASHTON PERSPECTIVE VIEW TYPICAL DETAILS GENERAL DESIGN NOTES: 1. THESE DRAWINGS ARE OF A GENERAL NATURE AND ARE NOT INTENDED TO CONVEY THE METHOD OR MEANS OF CONSTRUCTION. IT IS ASSUMED THAT ALL WORK
More informationSTANDARD RESIDENTIAL DECK DETAILS
STANDARD RESIDENTIAL DECK DETAILS GUARD DECKING FLASHING OVER LEDGER BOARD EXISTING HOUSE FLOOR CONSTRUCTION GUARD POST ATTACHEMENT LEDGER BOARD ATTACHMENT TO HOUSE RIM JOIST JOIST BEAM FOOTING JOIST TO
More informationGARAGE MAIN FLOOR PLAN
#G389 14' X 24' X 8', Custom detached garage By Page 1 Page 2 Page 3 Page 4 Page BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. GARAGE
More informationTYPICAL BEARING WALL FRAMING
BASIC WOOD FRAMING City of Grand Rapids Building Safety Division 218-326-7601 www.grandrapidsmn.org This handout is intended only as a guide and is based in part on the 2007 Minnesota State Building Code,
More informationMAIN FLOOR PLAN. #G x 14 x 8 Shed - Chicken Coop By SDS-CAD Specialized Design Systems 10'-0" 3'-0" 1'-0" 14'-0" 14'-0" 1'-0" 6'-0" 3'-0"
10'-0" BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. BARN TO BE BUILT AS PER LOCAL CODE REQUIREMENTS 14'-0" BWP BWP BWP ABWP 101
More informationTrusted by Architects and Builders throughout the country, Marino\WARE has always been an industry leader in quality, service and new product development. Marino\WARE is pleased to present our FrameRite
More informationOriginally Issued: 01/13/2012 Revised: 02/05/2018 Valid Through: 02/28/2019
EVALUATION SUBJECT: USP STRUCTURAL CONNECTORS FOR WOOD-FRAMED CONSTRUCTION REPORT HOLDER: Mitek USA, Inc. 14305 Southcross Drive, Suite 200 Burnsville, Minnesota 55306 (952) 898-8772 www.uspconnectors.com
More informationLAMINATED VENEER LUMBER
LAMINATED VENEER LUMBER Kerto LVL Beams, Headers, Rafters and Columns for Floor and Roof Applications. USA VERSION KERTO LAMINATED VENEER LUMBER TABLE OF CONTENTS Design Properties... 2 Allowable Uniform
More informationDECK PERMIT APPLICATION
DECK PERMIT APPLICATION APPLICANT S INFORMATION Name: Company Name: Current address: City: State: ZIP Code: Phone: Email: PROPERTY OWNER S INFORMATION Name: Property Address: Phone: E-mail: City: State:
More informationGARAGE MAIN FLOOR PLAN
12'-0" 4'-6" 3'-0" 4'-6" 3040 14'-0" LADDER LT LINE BUNK CABIN 11'-4" x 13'-4" 14'-0" BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS.
More informationTypical Deck Details Based on the 2009 International Residential Code (Designed and Printed August 2010)
1307 West Lehigh Street Bethlehem, PA 18018 610-866-9663 Office info@keycodes.net www.keycodes.net Typical Deck Details Based on the 2009 International Residential Code (Designed and Printed August 2010)
More informationFLOOR TRUSSES: 1. Trusses to be designed by truss engineer employed by truss manufacturer and in accordance with
NAILING SCHEDULE: GENERAL: WOOD FRAMING: WOOD FRAMING: (continued) FLOOR TRUSSES: DRAINAGE, WATERPROOFING AND VENTILATION: REINFORCED CONCRETE: DESIGN DATA joist to sill or girder, "x6" subfloor or less
More informationMIDPLY Portal Frame as Lateral Bracing System in Light- Frame Wood Buildings
3 rd International Structural Specialty Conference 3 ième conférence internationale spécialisée sur le génie des structures Edmonton, Alberta June 6-9, 2012 / 6 au 9 juin 2012 MIDPLY Portal Frame as Lateral
More informationDIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: SHEAR WALL PANELS REPORT HOLDER: SIMPSON STRONG TIE COMPANY INC.
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1267 Reissued 10/2017 This report is subject to renewal 10/2018. DIVISION: 06 00
More informationESR ICC Evaluation Service, Inc. Issued October 1, 2007 This report is subject to re-examination in one year.
Issued October 1, 2007 This report is subject to re-examination in one year. ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 #
More informationZ4 PRODUCT CATALOG
Z4 PRODUCT CATALOG 08-01-17 At MiTek, we believe that better processes can empower your business; and we ve learned three important things over the years: We ve learned that when people collaborate well,
More informationPOST FRAME BUILDING STANDARDS
CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT 30508 S. West Outer Road, Harrisonville, MO 64701 P- (816) 380-8134 F- (816) 380-8130 POST FRAME BUILDING STANDARDS 201.3
More informationResidential Deck Safety, Construction and Repair. Juneau Permit Center, 4 th Floor Marine View Center,(907) February 2016
February 2016 Residential Deck Safety, Construction and Repair Juneau Permit Center, 4 th Floor Marine View Center,(907)586-0770 This handout is designed to help you build your deck to comply with the
More informationMurphy LVL Limit States Design Guide 2.0 E-LVL 2.2 E-LVL
Murphy LVL Limit States Design Guide 2.0 E-LVL 2.2 E-LVL Our Company At Murphy Company we take pride in providing our customers with premium quality products and services. Our LVL is manufactured to provide
More informationWall bracing panel requirements
Wall bracing panel requirements Building Inspections Exterior and interior walls must be braced in accordance with Minnesota State Building Code section R602 to resist wind loads and racking. Locations,
More informationTHE CUNNINGHAM HOME PERSPECTIVE VIEW
THE CUNNINGHAM HOME PERSPECTIVE VIEW TYPICAL DETAILS 59 BRIAR CREEK LN STE E IDAHO FALLS, ID 8401 TELPHONE: (208) 542-900 FAX: (208) 542-9 GENERAL DESIGN NOTES: 1. THESE DRAWINGS ARE OF A GENERAL NATURE
More informationAPPENDIX A1 WIND AND SEISMIC BRACING GUIDELINE FOR ONE AND TWO FAMILY DWELLINGS AND TOWNHOUSES
ST. LOUIS COUNTY DEPARTMENT OF PUBLIC WORKS DIVISION OF CODE ENFORCEMENT APPENDIX A1 WIND AND SEISMIC BRACING GUIDELINE FOR ONE AND TWO FAMILY DWELLINGS AND TOWNHOUSES Lateral Loads All buildings are subject
More information1¾" VERSA-LAM WESTERN HEAdER GuidE
1¾" VERSA-LAM 1.7 2400 WESTERN HEAdER GuidE for products manufactured in White City, Oregon 11/29/2012 1¾" 1.7 2400 VL Guide 2 VERSA-LAM Products 1¾" VERSA-LAM 1.7 2400 An Introduction to VERSA-LAM Products
More informationExterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses. DD No
Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses. DD No. 1608-01 Structural Building Components Association (SBCA) Issue Date: August 8, 2016 6300 Enterprise Lane Madison,
More informationSTRONG-WALL SB SHEARWALL C-L-SWSB13
STRONG-ALL SB SHEARALL C-L-SSB3 (800) 999-5099 www.strongtie.com Design Flexibility Delivering Customization to Factory-Built Shearwalls Pre-fabricated shearwalls from Simpson Strong-Tie are synonymous
More informationWALL CONSTRUCTION CHAPTER 6
CHAPTER 6 WALL CONSTRUCTION SECTION R601 GENERAL R601.1 Application. The provisions of this chapter shall control the design and construction of all walls and partitions for all buildings. R601.2 Requirements.
More informationCustom 24 x 26 Garage Plan Roy Hartmann Plan #g218 By SDS-CAD Specialized Design Systems CLIENT
P O Box 34 Mendon, Utah Custom 24 x 26 Garage Plan Plan #g218 By Page 1 Title Page Page 2 Main Floor Plan Page 3 Foundation Plan Page 4 Elevation Views Page 5 Framing and Details Page 6 Typical Section
More informationWALL CONSTRUCTION CHAPTER 6
CHAPTER 6 WALL CONSTRUCTION SECTION R601 GENERAL R601.1 Application. The provisions of this chapter shall control the design and construction of all walls and partitions for all buildings (see Section
More informationGARAGE MAIN FLOOR PLAN
7'-0" 0 year architectural asphalt shingles and horizontal siding over structural panel. Nailing schedule is 6" on ends 12" on centers 6d nails. Trusses are engineered on 24" and framing is 2" x 6" on
More informationREPORT HOLDER: MITEK USA, INC. (FORMERLY USP STRUCTURAL CONNECTORS) SOUTHCROSS DRIVE, SUITE 200 BURNSVILLE, MINNESOTA EVALUATION SUBJECT:
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 43 6587 (56) 699 0543 www.icc es.org ESR 3754 Reissued 09/07 This report is subject to renewal 09/09. DIVISION: 03 00 00 CONCRETE
More information14' x 24' Garage Plan
14' x 24' Garage Plan SDS-CAD Specialized Design Systems www.sdscad.com email sdscad@pcu.net Copyright 2002 14'-0" (vert)-g 24'-0" 12 in 12 GARAGE 13'-4" x 23'-4" 12 in 12 3068 19'-0" 3'-0" 2'-0" 24'-0"
More informationAttachment A. USG Minimum Design and Construction Requirements for Wood Framed Structures
Attachment A USG Minimum Design and Construction Requirements for Wood Framed Structures 1. General Design Criteria 1.1. Per Adopted Georgia State Minimum Standard Building Code 1.2. Minimum Live Loads
More informationSECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.
SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied
More informationPS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION.
C.9. DOOR AND WINDOW OPENINGS Openings for doors and windows are formed with bucks, or frames, which are constructed to the rough opening dimensions required for the doors and windows to be installed.
More informationQuickTie System (QTS) TER No
QuickTie System (QTS) TER No. 0910-01 QuickTie Products, Inc. 13300 Vantage Way Jacksonville, FL 32218 904-281-0525 904-281-0526 (fax) quicktieproducts.com Issue Date: October 20, 2009 Updated: January
More informationTYPICAL BEARING WALL FRAMING Joints in plates must be offset by 24 min.
FRAMING TIPS City of Grand Rapids Building Safety Division 218-326-7601 www.grandrapidsmn.org This handout is intended only as a guide and is based in part on the 2007 Minnesota State Building Code, Grand
More informationTOP FLANGE HANGERS JB/LB/BA/B/HHB Joist, Beam and Purlin Hangers
TOP FLANGE HANGERS JB/LB//B/HHB Joist, Beam and Hangers This product is preferable to similar connectors because of a) easier installation, b) higher loads, c) lower installed cost, or a combination of
More informationFIGURE R502.2 FLOOR CONSTRUCTION
CHAPTER 5 FLOORS 11 I SECTION R501 GENERAL R501.1 Application. The provisions of this chapter shall control the design and construction of the floors for all buildings including the floors of attic spaces
More informationPHOTO 1: View from Inside the Structure. Note the Rotation of the WSP, Failure at the Lower Leading Edge and Deformation of the Top Plate
2009 International Residential Code (IRC) Braced Wall Panel Design Value Comparative Equivalency Testing Braced Wall Panel Design Values July 15, 2010 Introduction: SBCRI undertook 39 tests resulting in
More informationAcknowledgments. Abstract
January 2018 Acknowledgments The authors would like to thank Andrew Payne, Yang Du, Mary Alexander, Nicholle Miller, and Conroy Murray, for their review and recommendations to the document. Abstract Masonry
More informationBuilding for Energy Efficiency Part 2 Advanced Framing Workshop. Objectives for this presentation...
Building for Energy Efficiency Part 2 Advanced Framing Workshop Aaron Grin Corporation www.buildingscience.com Objectives for this presentation... 1. Brief History of Advanced Framing 2. Overview 3. Benefits
More informationThe better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................
More informationOpenings in Walls I: Reinforcement
Openings in Walls I: Reinforcement INTRODUCTION These general construction techniques are chosen to introduce low-tech and low-cost construction. Combined with good quality control, they can create buildings
More informationAcknowledgments. Abstract
January 2018 Acknowledgments The authors would like to thank Andrew Payne, Yang Du, Mary Alexander, Nicholle Miller, and Conroy Murray, for their review and recommendations to the document. Abstract Masonry
More informationWALL CONSTRUCTION CHAPTER 6
CHAPTER 6 WALL CONSTRUCTION SECTION R601 GENERAL R601.1 Application. The provisions of this chapter shall control the design and construction of all walls and partitions for all buildings (see Section
More informationPOST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
More informationTable of Contents NOTE:
Table of Contents 1.0 General Information... 1 2.0 Zoning Bylaw Information... 4 3.0 Foundations... 8 4.0 Structural... 9 5.0 Handrails, Guards, Stairs... 13 6.0 Decking... 17 7.0 Checklist... 18 NOTE:
More informationJoint Evaluation Report
0 Joint Evaluation Report ICC-ES (800) 423-6587 (562) 699-0543 www.icc-es.org 000 ESR-1040 Reissued 09/2016 This report is subject to renewal 09/2018. DIVISION: 06 00 00 WOOD, PLASTICS AND COMPOSITES SECTION:
More informationJoint Evaluation Report
0 Joint Evaluation Report ICC-ES (800) 423-6587 (562) 699-0543 www.icc-es.org 000 ESR-1040 Reissued 09/2018 This report is subject to renewal 09/2019. DIVISION: 06 00 00 WOOD, PLASTICS AND COMPOSITES SECTION:
More informationI-Joist and LVL Installation Guide
Engineered wood products WOOD The miracle Material Wood is the right choice for a host of construction applications. It is the earth s natural, energy efficient and renewable building material. Engineered
More informationRB104-09/10 R602.7, R (New), Table R (New), Figures R (1)-(2) (New)
RB104-09/10 R602.7, R602.7.1 (New), Table R602.7.1 (New), Figures R602.7.1(1)-(2) (New) Proposed Change as Submitted Proponent: Joseph Lstiburek, Building Science Corporation 1. Revise as follows: R602.7
More informationGARAGE MAIN FLOOR PLAN 1
30 year dimensional shingles and structural panel siding running vertical with 8" on center groove and horizontal siding in eaves. Nailing schedule is " on ends 12" on centers d nails. Trusses are engineered
More informationTypical Deck Details. Shenandoah County, Virginia. Based on the 2012 Virginia Residential Code
Shenandoah County, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code The design details in this document apply to residential decks only. Framing requirements are limited to single
More information2005 ERRATA to the Edition of. the Allowable Stress Design (ASD) Manual for Engineered Wood Construction (printed version dated M)
AMERICAN FOREST & PAPER ASSOCIATION American Wood Council Engineered and Traditional Wood Products June 2005 2005 ERRATA the Allowable Stress Design (ASD) Manual for Engineered Wood Construction 93 In
More informationTypical Deck Details. Shenandoah County, Virginia. Based on the 2012 International Residential Code
Shenandoah County, Virginia Typical Deck Details Based on the 2012 International Residential Code The design details in this document apply to residential decks only. Framing requirements are limited to
More informationGARAGE MAIN FLOOR PLAN 1
30 year dimensional shingles and structural panel siding running vertical with 8" on center groove and horizontal siding in eaves. Nailing schedule is " on ends 12" on centers d nails. Trusses are engineered
More information2003 International Residential Building Code
2003 International Residential Building Code Section R305 Ceiling Height Habitable rooms, hallways, corridors, bathrooms, toilet rooms, laundry rooms and basements shall have a ceiling height of not less
More information