1 INTRODUCTION This paper presents details about large diameter rotary drilling techniques typically employed in the civil engineering industry. These techniques have also been applied to the resources / mining industry where deep pre-sinks are sometimes required in soft ground prior to blind boring or raise boring for deep ventilation or access shafts. The traditional approach to excavating pre sinks for raise bored shafts was to blind sink with miners working on the floor of the shaft, with all the inherent risks. The methods described in this paper do not require any personnel to work inside the shaft. Piling Contractors was established in 1983 and is now part of the worldwide Keller Group, a UK based publically listed company. Piling Contractors operates in all Australian states offering large diameter drilling, piling, foundations, retaining walls and ground improvement work. The company has developed large diameter drilling techniques in soft ground with applications in the civil construction area such as : 1) Bridge construction where high bending moment capacity are required. 2) Man holes for sewers and stormwater drains 3) Sub surface pump stations. 4) Access shafts for tunnels. 5) Footings for structures such as cooling towers and power stations 6) Power pole foundations. Over recent years large diameter rotary drilling using the auger and bucket system has also been applied in the mining industry for excavating: 1) Shaft pre sinks in soft ground up to 7.5 m diameter and to depths of up to 100 m. 2) Access shafts. 3) Bulk sampling for iron ore, coal and diamonds. ROTARY DRILLING METHODS Development of large diameter augering and bucket drilling techniques In Australia up until the early 1990s, rotary drilling using the auger and bucket system was typically limited to 1800mm diameters by equipment capability and convention. Drills were either truck or crane mounted and their torque capacity ranged from 6 to 20 tonne metres. Most rigs were driven through conventional gear boxes and direct drive rotary tables. The drilling tools used were buckets and augers either fitted with steel flat teeth, tungsten tipped ripper teeth or tungsten tipped conical teeth. Page 1 of 12

2 Driven by market demand, diameters and rig capacities have increased rapidly. The common Euro rigs (self contained crawler mounted vertical mast rotary rig) are now manufactured with torque capacities 40 tonne metres or more and depth capability up to 90 metres using telescopic kelly bars. Rotation speeds are typically between 5 RPM and 25 RPM and crowd capacities vary, but are available up to 80 tonnes. Bucket diameters have also increased to in excess of 5m and with the availability of reaming arms, shaft diameters of up to 7.5m are now possible in suitable ground conditions (Figure 1 and Figure 6). Figure 1 Piling Contractors has a range of dedicated crane mounted rotary drill rigs designed and manufactured in Australia specifically for shaft drilling, with torque capacities up to 50 tonne metres and capable of drilling 7.5 m diameter shafts to depths of 100 metres (Figure 2). This equipment is suitable for drilling the clays, shales and weaker rocks that historically have proven unsuitable for raise bore equipment and other hard rock drilling systems. Figure 2 Page 2 of 12

3 Drilling method using Rotary Techniques The drill system of the augers and buckets comprises ground engaging tools equipped with teeth for cutting the formation by drag action. The auger drill bit, although many times larger, is similar to that of a carpenter s wood auger (Figure 3). As the formation is cut, the cuttings accumulate on the auger flights, and they are removed from the hole by withdrawing the auger to the surface and spinning it to dislodge the cuttings. Figure 3 The drilling bucket comprises a cylindrical container located immediately above a flat plate with the cutting bit. The formation cuttings are pushed into he bucket by the rotating action of the tool. Hinged metal flaps prevent cuttings from falling out as the container is withdrawn to the surface for spoil removal (Figure 4). Figure 4 Page 3 of 12

4 Rotary drilling can either remove spoil to the surface using conventional drill buckets or can allow spoil to bottom drop through pilot holes into adits or drives below for later removal. Pilot holes can be advantageous to either assist with accuracy or speed up drilling by bottom dumping. When pilot holes are used they are typically directionally drilled and the completed diameter of the pilot hole needs to be at least 600mm. The large diameter pilot hole is necessary to facilitate the cuttings from blocking the pilot hole and also to provide a strong guide for the drilling bucket. Figure 5 below shows a typical drilling tool with a guide stub which fits into the predrilled pilot hole. In situations where pilot holes are not available, the cuttings can be withdrawn in the drill bucket, efficiently, to the surface using the multistage telescopic kelly bars. There is no requirement to unscrew, remove and later replace drill rods, which is common place with other drilling systems. Figure 5 In order to drill to diameters of 4 m and greater, several passes are required by the drill tools and each successive pass utilises a slightly larger drilling tool. Techniques and drill tools vary with the geotechnical conditions but generally first passes would be carried out using a conventional drill bucket equipped with either steel or tungsten tipped teeth. A typical size on a first pass bucket would be 1500mm diameter to 2400mm diameter. Subsequent passes utilise reaming arms which fit to either conventional or specialist reaming buckets (Refer to Figure 6 and Figure 7). Typically a reamer blade cuts a larger diameter than the previous pass, Page 4 of 12

5 and the cuttings fall into an open topped bucket for removal. Figure 6 Figure 7 Page 5 of 12

6 For example, assuming a shaft of 4.6m diameter a typical drill pass sequence would be as follows :- o Initial pass using 2.2m bucket o Second pass reaming from 2.2m to 3.2m o Third pass reaming from 3.2m to 4m o Final pass reaming from 4m to 4.6m The rate of penetration for each pass is dependant on the geotechnical conditions, in particular rock or other strata strength, and hole stability. Other factors include the presence of and orientation of bedding planes, fracture spacing, faults and the like. Typical drilling advance rates in extremely weathered rock (assuming spoil falls into pilot holes) for the above reaming sequence will be in the order of: Initial pass Second pass Third pass Final pass 4 to 6 metres per hour 5 to 7 metres per hour 3 to5 metres per hour 2 to 4 metres per hour In medium strength rock (UCS 30MPa), the advance rates would reduce to values in the order of: Initial pass Second pass Third pass Final pass 0.8 to 1.5 metres per hour 1 to 2 metres per hour 1 to 2 metres per hour 0.5 to 1.5 metres per pass These examples should be treated as indicative only due to the many variables and generally the production rates will be reduced as rock strength increases; all other variables being equal. Production rates where the spoil is brought to the surface by the drilling bucket will be slower than quoted above. Buckets and reamer arms can be equipped with either flat steel, tungsten tipped ripper, tungsten tipped conical or tungsten roller bits to optimise the drilling progress. LIMITATIONS OF ROTARY SHAFT DRILLING 1) The physical capacity of the rotary drilling rigs limits drilled diameters to around 8.0m and depths of up to 100m with the telescopic Kelly bar. It is possible to use kelly bar Page 6 of 12

7 extensions on a project specific basis. 2) Rock strength is a major constraint on rotary drilling. The auger and bucket drill tools will generally become unproductive where rock strength exceeds 80MPa UCS although, it is possible to drill localised layers of stronger rock. Material up to 200MPa has been drilled with difficulty using conventional teeth. However, when roller bits are fitted, higher strength rock can be penetrated, but this is relatively slow and costly. ADVANTAGES OF ROTARY SHAFT DRILLING IN SOFT GROUND Ideal for use in low strength, weathered rock which is typically unsuitable for raise bore systems and other hard rock drilling methods. Much faster than conventional hand mining techniques so reducing the construction programme. Safer than conventional hand mining as there are no personnel required to enter the shaft. Capable of movement between multiple sites with little cost and time. Fast preparation and set up. All of the above can result in significant cost savings. RECENT LARGE DIAMETER ROTARY SHAFT DRILLING PROJECTS Piling Contractors has completed the following large diameter rotary shaft drilling projects in recent years: Eloise Mine Site ventilation shaft - depth to 57m and a diameter of 3.2m. Cannington Mine Site ventilation shafts (5 of.) from 4m to 5.5m diameter down to 50 m depths. Pajingo Mine Site, Queensland 4.2m diameter, with a depth of 42m Fosterville Mine Site, Victoria, 4.7m diameter, with a depth of 37m Mornabah Mine Site, Queensland, 6.0m diameter with a depth of 54m Utility Water, Victoria, numerous shafts to 6m diameter Ventilation and access shafts on the Transgrid Cable Tunnel project at Redfern in Sydney 4.5m diameter to RL-28m in Class 2 Sydney Sandstone. Piled foundations to 3.5m diameter and 40m deep on the Qantas Hanger at the Brisbane Airport. Manholes for the Inner City Bypass at Brisbane with diameters of up to 3.6m. Piles foundations in high strength rock to 2.2m diameter on the Wallaville Bridge at Wallaville. SPECIAL REQUIREMENTS FOR ROTARY SHAFT DRILLING Platform Preparation Large diameter rotary drill rigs are normally crawler based and very mobile, so terrain is Page 7 of 12

8 usually not an issue, but a firm, level self draining designed and certified platform is required at the drill site. The weight of the larger rigs can be in the order of 120 tonnes, plus tooling and spoil. It may also be necessary to elevate the drill rig to allow larger buckets to bottom open and also clear the upstand of the safety liner, Figure 8. Shaft Stability Figure 8 Dependant on near surface geotechnical conditions, the top section of shafts (0m to 10m) will most likely require some lining by either steel casings, secant piling or a sprayed concrete liner. Secant piling involves the installation of piles in a manner that they overlap (Figure 10). This is necessary to ensure long term stability of the shaft collar lining. In some cases, secant piles have been installed prior to drilling and then a steel liner has been installed after drilling down to 10 m depth. SHAFT WALL LINING One of the major considerations when rotary drilling large diameter shafts is the stability of the shaft itself. These shafts are often bored in weak to unstable ground. The ground types of most concern are granular materials such as sands or saturated clays that are inherently unstable. The most common techniques employed in the civil construction industry to stabilise these Page 8 of 12

9 unstable ground types include: 1. Concrete or steel liners that can be progressively sunk with the excavation. 2. Drilling fluid with polymer or bentonite. This may also be used in conjunction with liners. 3. Progressive shotcreting using remotely operated shotcrete equipment (this system was used extensively at both Cannington, Pajingo, Moranbah, Fosterville and Eloise Mine Sites). 4. Contiguous or secant pile walls. 5. Diaphragm walls. 6. Jet grouting. 7. Pressure grouting 8. Slurry wall construction. Two stabilisation methods that may be suitable for the mining sector, but to date have not been used extensively are the contiguous/secant pile wall and diaphragm wall processes. These two types of stabilisation methods are outlined below. Contiguous And Secant Pile Construction This technique is commonly used in the building and civil construction industry for retaining walls and was used at Cannington Mine Site to provide shaft collar stability on several vent shafts.. The prime uses for this type of retention system are in basement construction for multi storey buildings and retaining wall construction for roadworks and tunnels.figure 9 Figure 9 Page 9 of 12

10 Contiguous piles comprise of a series of small to medium diameter piles drilled almost side by side (contiguous) to form a retaining wall (Refer to Figure 10). This type of wall does not provide a barrier to groundwater inflow or loose sands which can flow between the piles, causing adjacent ground surface settlement. All Piles, strong (40MPa) mix concrete and structurally reinforced. TYPICAL PLAN VIEW OF A CONTIGUOUS PILE WALL Figure 10 A more sophisticated version is the secant pile wall where adjacent piles overlap and cut into each other (Refer to Figure 11). This type of wall provides a better cut-off for groundwater and loose sands, than the contiguous wall. The secant wall is usually constructed by using the hard/soft method where primary piles are constructed of weaker concrete and secondary piles which cut into the primary piles are cast from stronger concrete. If required, secondary piles can be steel reinforced. Secant pile walls are formed by one of these methods:- a) Conventional piles drilled with an auger where the ground is stable and does not require a temporary liner for support. b) Standard secant pile drilling techniques using a temporary hole liner for stability, and placing the concrete while withdrawing the liner. Segmental casings can also be used c) Continuous flight auger drilling using a hollow stem auger and pumping concrete down through the centre of the auger. Secant and contiguous walls are normally limited to depths of about 15m metres due to accuracy of installation. For shaft construction a circular wall can be formed using the structural strength of a hoop effect. Page 10 of 12

11 Secondary Pile, generally strong (40MPA) concrete and structurally reinforced Primary Pile, generally weak mix concrete and no structural reinforcement TYPICAL PLAN VIEW OF A SECANT PILE Figure 11 Diaphragm Walls Diaphragm walls are used for retaining significant depths of soil. Unlike the secant pile solution, verticality is relatively accurate due to the self plumbing system of the equipment, and the finished surface of the retaining wall is smooth. The wall is made of concrete with reinforcement as required, depending on the availability of hoop stresses, Figure 12. Construction of the wall is carried out using a clam shell, which can be either rope or kelly suspended and operated mechanically or hydraulically. Hydraulic cutters can be used to excavate significant depths into hard rocks. The walls comprise panels typically 5m wide, 600mm to 1200mm thick and as deep as required, although generally the depths are limited to 50m or to top of rock. The top 30 m of the vent shaft on the M5 road tunnel in Sydney was excavated inside a diaphragm wall as was the top 50 m of the access shaft for the gas caverns at Botany Bay. Similar Diaphragm wall shafts, 13 m in internal diameter were constructed for the Tugin Desalination Plant on the Gold Coast. Figure 12 Page 11 of 12

12 CONCLUSION The conventional system of auger and bucket drilling has rapidly expanded over the past few years to allow the economical drilling of large shafts with diameters up to 8.0m and depths of 100m. The auger and bucket system is ideal in weaker ground where raise bore systems and other hard rock cutting methods bog down. The system is safer than hand mining due to the absence of personnel in the shaft. Localised layers of rock with strengths of up to 200MPa can be drilled and the nature of the jointing and discontinuities in the rock will influence the speed of drilling. The conventional tungsten carbide drilling teeth can be replaced with roller cutters in high strength rock. Man access is not required for the auger and bucket drilling system. The drill cuttings can be raised quickly to the surface using the multi stage telescopic kelly bar, or alternatively, the cuttings can be allowed to fall down a predrilled pilot hole. The drilling rigs are crawler mounted and capable of moving between drill sites with little cost and time. The system has been proven on numerous sites already including the Cannington, Pajingo, Fostervile, Moranbah and Eloise Mine Sites. Stabilisation of the loose soil profile using systems other than steel liners is possible and these stabilisation methods include contiguous/secant piled walls and diaphragm walls. Page 12 of 12

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch SEMINAR Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013 Facilitator: Martin Larisch 1 Brief History of Piling Contractors, its capabilities and market Introduction to CFA piling

More information

Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New Zealand

Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New Zealand Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New Zealand N Wharmby 1 ABSTRACT In recent years in New Zealand there have been a number of tunnelling and deep directionally drilled

More information

* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high

* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high 1 2 Demand for space in cities often makes it essential to use space below buildings. The concept of deep basement technology has been employed since the middle of last century, but is becoming more popular

More information

SHAFT CONSTRUCTION SECANT PILE

SHAFT CONSTRUCTION SECANT PILE by Rob jameson and eric lindquist feature story SECANT PILE SHAFT CONSTRUCTION Modern Tools and Techniques Allow Excavation to Depths Previously Considered Infeasible By Rob Jameson and Eric Lindquist

More information

SECANT PILE. Introduction:

SECANT PILE. Introduction: SECANT PILE Introduction: Over the last few decades construction of retaining walls in urban areas has grown significantly, as a result of territorial and economical development of the cities. In most

More information

Specialising in Ground Engineering & Slope Stabilisation

Specialising in Ground Engineering & Slope Stabilisation Specialising in Ground Engineering & Slope Stabilisation Ground Engineering & Slope Stabilisation for the Road, Rail, Construction & Mining Industries Company Profile Warner Company is proudly an Australian

More information

Diaphragm wall Construction

Diaphragm wall Construction Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support

More information

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

ABERGELDIE MINING PTY LTD

ABERGELDIE MINING PTY LTD ABERGELDIE MINING PTY LTD WHITE PAPER AND CASE STUDY OF DENDROBIUM MINE SHAFTS 2 AND 3 Sydney Brisbane Newcastle Canberra 5 George Young St, Regents Park NSW 97 Old Toombul Rd, Northgate QLD 1/16 Huntingdale

More information

Lesson 2 Substructure. Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD

Lesson 2 Substructure. Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD Lesson 2 Substructure Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD Outline Syllabus 1. Demolition 2. Site problems 3. Substructure 4. Basements 5. Structural Frames 6. Floors 7. External walls

More information

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 The Institution of Engineers of Ireland Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 MODULE 4 RETAINING STRUCTURES DEEP EXCAVATIONS

More information

INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT

INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT Tracy Brettmann, P.E., D.GE, Vice President, A. H. Beck Foundation Company, Houston, Texas, (713) 413-3800, tracy.brettmann@ahbeck.com

More information

Construction Technology B (CON4313)

Construction Technology B (CON4313) 3 - Basement 1 Quick Revision 1.1 Problems arising from basement construction a. Excavation method. b. Surface and ground water control c. Lateral stability of basement excavation. d. Stability of adjoining

More information

Pipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2

Pipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2 Slide 1 PIPE JACKING An introduction to pipe jacking prepared by the Pipe Jacking Association This introduction to pipe jacking has been prepared by the Pipe Jacking Association as an aid to engineers

More information

Civil Engineering Construction I (CBE5031)

Civil Engineering Construction I (CBE5031) Civil Engineering Construction I (CBE5031) Basement 1 1 Quick Revision 1.1 Problems arising from basement construction a) Excavation method. b) Surface and ground water control c) Lateral stability of

More information

TECHNOLOGY. Continuous Flight Auger

TECHNOLOGY. Continuous Flight Auger TECHNOLOGY Continuous Flight Auger CFA (Continuous Flight Auger) technology joins the advantages of driven piles with the versatility of application of drilled piles. Moreover, a wide range of diameters

More information

An Introduction to Keller in the UK COLCRETE EURODRILL GETEC PHI GROUP. Piling and Ground Improvement. Grouting, Soil Nails and Anchors

An Introduction to Keller in the UK COLCRETE EURODRILL GETEC PHI GROUP. Piling and Ground Improvement. Grouting, Soil Nails and Anchors An Introduction to Keller in the UK Piling and Ground Improvement Grouting, Soil Nails and Anchors Retaining Walls Equipment Manufacture Monitoring and Instrumentation PHI GROUP GETEC COLCRETE EURODRILL

More information

Earth Retention Systems

Earth Retention Systems haywardbaker.com Earth Retention Systems Mark W. Goodsell, P.E., D.GE Senior Engineer 2 Earth Retention Systems Focus of Presentation Different Types and Purposes of Earth Retention Systems Design Considerations/Geotechnical

More information

ISO INTERNATIONAL STANDARD. Building construction machinery and equipment Terms and definitions

ISO INTERNATIONAL STANDARD. Building construction machinery and equipment Terms and definitions INTERNATIONAL STANDARD ISO 11375 First edition 1998-04-01 Building construction machinery and equipment Terms and definitions Machines et matériels pour la construction des bâtiments Termes et définitions

More information

CAPABILITY STATEMENT RAISE BORE DIVISION CAPABILITIES FLEET SPECIALIST EXPERIENCE LEADERS IN UNDERGROUND MINING

CAPABILITY STATEMENT RAISE BORE DIVISION CAPABILITIES FLEET SPECIALIST EXPERIENCE LEADERS IN UNDERGROUND MINING CAPABILITY STATEMENT RAISE BORE DIVISION 05 07 20 CAPABILITIES SPECIALIST EXPERIENCE LEADERS IN UNDERGROUND MINING PYBAR is a nationwide provider of mining services with core competencies in underground

More information

CAPABILITY STATEMENT RAISE BORE DIVISION CAPABILITIES FLEET SPECIALIST EXPERIENCE LEADERS IN UNDERGROUND MINING

CAPABILITY STATEMENT RAISE BORE DIVISION CAPABILITIES FLEET SPECIALIST EXPERIENCE LEADERS IN UNDERGROUND MINING CAPABILITY STATEMENT RAISE BORE DIVISION 05 07 20 CAPABILITIES FLEET SPECIALIST EXPERIENCE LEADERS IN UNDERGROUND MINING PYBAR is a nationwide provider of mining services with core competencies in underground

More information

An Introduction to. By Michael L. Schumaker, P.E. An Introduction to Shaner Industries Metal Foundation System

An Introduction to. By Michael L. Schumaker, P.E. An Introduction to Shaner Industries Metal Foundation System An Introduction to Metal Foundation System By Michael L. Schumaker, P.E. Introduction Various types of deep foundations are routinely used to support structures. Selection of the appropriate type of deep

More information

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo. Pipe Jacking/Microtunnelling Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods

More information

GEOTECHNICAL SERVICES

GEOTECHNICAL SERVICES GEOTECHNICAL SERVICES Aarsleff Ground Engineering EXPERIENCE: Aarsleff s expertise as Ground Engineers is evidenced not only by its 25 years in UK construction and its dedicated staff, but in the decades

More information

Singapore Safety Day. Keller civil works team for a large petrochemical project, Malaysia

Singapore Safety Day. Keller civil works team for a large petrochemical project, Malaysia Singapore Safety Day Keller civil works team for a large petrochemical project, Malaysia Bored Piling Bored Pile Pile Piles Piles Diaphragm Walls (D Walls) D Walls are constructed using grabs or cutters

More information

DEFINITIONS. A shallow bored hole under the derrick substructure in which the kelly is temporarily stored during tripping operations.

DEFINITIONS. A shallow bored hole under the derrick substructure in which the kelly is temporarily stored during tripping operations. DEFINITIONS 1. Conductor Hole A large diameter hole bored to facilitate steel pipe. May be cemented in place to allow conventional oil and gas well drilling operations,and also allows fluid returns to

More information

Water for the World. Methods of Developing Sources

Water for the World. Methods of Developing Sources Water for the World Methods of Developing Sources Ground water is water that is stored underground in porous layers called aquifers. It is found in most parts of the world and can be a reliable source

More information

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 The Institution of Engineers of Ireland Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 MODULE 4 RETAINING STRUCTURES DEEP EXCAVATIONS

More information

RIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil.

RIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil. H A Y W A R D B A K E R I N C. RIGID INCLUSIONS Rigid Inclusions offer an economical approach for building on sites underlain by soft soil. Above: HBI installed Rigid Inclusions on a congested downtown

More information

Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more.

Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more. TECHNOLOGY Diaphragm walls Diaphragm walls are one of the most important technologies of special foundation engineering. A diaphragm wall is constructed using a trench excavated in ground and supported

More information

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction

More information

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA) Advantages / Disadvantages of Piling Methods In this Piling Advice Note we will explore the advantages and disadvantages of differing types of piling methods. Continuous Flight Auger (CFA) The pile is

More information

Aveng Ground Engineering Profile

Aveng Ground Engineering Profile Aveng Ground Engineering Profile Contents Overview 1 2 Piling 2 Renewable Energy 6 Lateral Support 8 Grouting 10 Geotechnical investigations 12 Flagship projects 12 Contact us 12 Visit our website for

More information

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January Program: Title: Author: 2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January 29-31. Successful Technology for Utility Installations

More information

Building the Foundations of Australia

Building the Foundations of Australia Building the Foundations of Australia Welcome SAFETY, QUALITY, CAPACITY & TECHNICAL EXCELLENCE. These are the foundation values that Piling Contractors embraces. Safety is our highest priority and it s

More information

Compaction and Jet Grouting

Compaction and Jet Grouting Compaction and Jet Grouting Alan Ringen, PE Senior Vice President Breakthroughs in Tunneling Short Course August 16, 2017 Grouting Principles Geotechnical Grouting: The injection of pumpable fluid materials

More information

BAUER. Diaphragm and Cut-off Walls

BAUER. Diaphragm and Cut-off Walls BAUER Diaphragm and Cut-off Walls BAUER Diaphragm and Cut-off Walls High degree of leak tightness great depths 2 BAUER Diaphragm and Cut-off Walls Content Areas of application Diaphragm walls... 4 Cut-off

More information

Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding)

Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding) Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding) Always Try To Do The Best In Your Life TYPES OF FOUNDATION TYPES OF FOUNDATION a) Shallow Foundation System i) Spread Foundation

More information

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization www.malcolmdrilling.com Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning

More information

Ground Freezing for Tunnel, Shafts, and Adits

Ground Freezing for Tunnel, Shafts, and Adits Ground Freezing for Tunnel, Shafts, and Adits Joseph A. Sopko, Adam Curry Moretrench American Corporation Bianca Messina Skanska USA Civil Stephen Njoloma McMillen Jacobs Associates ABSTRACT Construction

More information

Secoroc Rock Drilling Tools CASING ADVANCEMENT SYSTEMS

Secoroc Rock Drilling Tools CASING ADVANCEMENT SYSTEMS Secoroc Rock Drilling Tools CASING ADVANCEMENT SYSTEMS PRODUCTIVITY IN A PIPE Creating stability Drilled casings, or casing advancement systems, are today's preferred method for drilling in difficult ground

More information

THE APPLICATION OF NEW GENERATION SUPPORT PRODUCTS IN A TYPICAL SUB-LEVEL BLOCK CAVE MINING METHOD TO REDUCE SAFETY RISKS AND ENHANCE PRODUCTIVITY

THE APPLICATION OF NEW GENERATION SUPPORT PRODUCTS IN A TYPICAL SUB-LEVEL BLOCK CAVE MINING METHOD TO REDUCE SAFETY RISKS AND ENHANCE PRODUCTIVITY THE APPLICATION OF NEW GENERATION SUPPORT PRODUCTS IN A TYPICAL SUB-LEVEL BLOCK CAVE MINING METHOD TO REDUCE SAFETY RISKS AND ENHANCE PRODUCTIVITY P H FERREIRA Pr. Eng (Mining), Managing Director, Minova

More information

Ching Guan Kee ABSTRACT

Ching Guan Kee ABSTRACT Japanese Geotechnical Society Special Publication The 15th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering Effects of base grouting and deep cement mixing on deep foundation bored

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA) Advantages / Disadvantages of Piling Methods In this Piling Advice Note we will explore the advantages and disadvantages of differing types of piling methods. Continuous Flight Auger (CFA) The pile is

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS SECTION 31 63 29 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03

More information

No-Dig Technology is the art and science of pipes, ducts and cables using techniques that minimizes / eliminates the need for excavation, i.e.

No-Dig Technology is the art and science of pipes, ducts and cables using techniques that minimizes / eliminates the need for excavation, i.e. No Dig Technology Introduction: No-Dig Technology is the art and science of installing, repairing or renewing underground pipes, ducts and cables using techniques that minimizes / eliminates the need for

More information

Hydraulic Excavators

Hydraulic Excavators Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose

More information

UNDERPINNING A CRANE FOUNDATION

UNDERPINNING A CRANE FOUNDATION UNDERPINNING A CRANE FOUNDATION Donald R. McMahon, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New York, USA Andrew J. Nichols, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 22475-1 First edition 2006-09-15 Geotechnical investigation and testing Sampling methods and groundwater measurements Part 1: Technical principles for execution Reconnaissance

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 02370 AUGER CAST PILES PART 1 - GENERAL 1.1 SECTION INCLUDES: The work covered by these specifications consists of furnishing all labor, equipment and materials for the installation of auger cast

More information

CONSTRUCTION SPECIFICATION FOR TUNNELLING

CONSTRUCTION SPECIFICATION FOR TUNNELLING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR TUNNELLING 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS TABLE OF CONTENTS 415.04 SUBMISSION AND

More information

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division Drilled Shaft Inspection HQ Construction Office HQ Geotechnical Division Drilled Shafts: What are Drilled Shafts Drilled Shaft Construction Challenges of Drilled Shaft Construction The WSDOT SHAFT Special

More information

1. Introduction Selection of Pile Type Soil Report / Boreholes Obstructions Design and Installation of Piling Mat 3

1. Introduction Selection of Pile Type Soil Report / Boreholes Obstructions Design and Installation of Piling Mat 3 Contents 1. Introduction 3 2. Selection of Pile Type 3 3. Soil Report / Boreholes 3 4. Obstructions 3 5. Design and Installation of Piling Mat 3 6. Permit to Dig 4 7. Setting out 4 8. Water 5 9. Attendant

More information

Ground Improvement Piling Piled Retaining Walls Enlarged Head Piles Innovations.

Ground Improvement Piling Piled Retaining Walls Enlarged Head Piles Innovations. Ground Improvement Piling Piled Retaining Walls Enlarged Head Piles Innovations www.keller-foundations.co.uk 4 Ground Improvement Solutions Introduction Ground Improvement Solutions Keller Ground Engineering

More information

Concrete Pipe Jacking

Concrete Pipe Jacking Concrete Pipe Jacking Technical Brief CPAA Introduction Concrete pipe jacking is a method of installing pipelines without disrupting existing surface facilities or activities. Pipe jacking has been used

More information

Tel: Neil: Tony: Website:

Tel: Neil: Tony: Website: Australian Tunnelling Services are a consortium that has been formed to offer specialist underground services to both clients and contractors in the Civil Engineering, Mining & Building Industries. The

More information

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by Construction Technology B (CON4313) Self Assessment Questions: Chapter 1 Prestressed Concrete 1. How does the prestressing of steel tendons in prestressed concrete offer a higher loading capacity than

More information

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment rotary drill hydro-mill backhoe Clamshell + Kelly bar VERTICAL BARRIERS SLURRY

More information

The new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump

The new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump The new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump Simon Herrenknecht, Product Manager Pipeline, Herrenknecht AG Herrenknecht Introduction Herrenknecht AG, Germany Founded

More information

Earth Retaining Walls CIVL455 CHAPTER I: INTRODUCTION

Earth Retaining Walls CIVL455 CHAPTER I: INTRODUCTION Earth Retaining Walls CIVL455 CHAPTER I: INTRODUCTION Earth retaining structures are designed to overcome significant variation in ground levels to provide either a sloping or flat ground on the retained

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

Stabilisation/Solidification of Manufactured Gas Plant Wastes: Pilot Test Study Part 2

Stabilisation/Solidification of Manufactured Gas Plant Wastes: Pilot Test Study Part 2 Stabilisation/Solidification of Manufactured Gas Plant Wastes: Pilot Test Study Part 2 M.A. Fleri, P.E., G.T. Whetstone, & J.P. Bauman, P.E. Williams Environmental Services, Inc. A Compass Environmental,

More information

Case Study. The Challenge. Deep Micropile Installation Under Existing Multistory Building

Case Study. The Challenge. Deep Micropile Installation Under Existing Multistory Building The Challenge The Owners of a former warehouse located in the vibrant tech start-up area south of Market St. in San Francisco made the decision to bring the building up to current earthquake standards

More information

A Division of River Sands Pty Ltd. Concrete Accelerators, Admixtures, Dry Shotcrete and Grouts for Mining and Tunnelling Applications

A Division of River Sands Pty Ltd. Concrete Accelerators, Admixtures, Dry Shotcrete and Grouts for Mining and Tunnelling Applications A Division of River Sands Pty Ltd Concrete Accelerators, Admixtures, Dry Shotcrete and Grouts for Mining and Tunnelling Applications High Performance Accelerators New Generation Accelerators for Shotcrete

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

Wet Speed-Mixing WSM - Soil Mixing Procedure in Twinmix Design

Wet Speed-Mixing WSM - Soil Mixing Procedure in Twinmix Design Wet Speed-Mixing WSM - Soil Mixing Procedure in Design Method description WSM - a fast alternative for shoring applications What is WSM? WSM stands for Wet Speed-Mixing, a fast soil mixing procedure. The

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5 Turbine Foundation Construction Method Statement Copyright ESB International Limited, all rights reserved. Farm Contents 1 Introduction

More information

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd. The Technical and Contractual Matters of Bored Piling Works By Wallace Yeung Vibro (H.K.) Ltd. What is large diameter bored pile? How to construct a large diameter bored pile? Its advantages and limitation

More information

CS-13 TRENCHLESS TECHNOLOGY TABLE OF CONTENTS

CS-13 TRENCHLESS TECHNOLOGY TABLE OF CONTENTS TABLE OF CONTENTS CS-13.0 Trenchless Technology... 1 CS-13.1 Location of Existing Services... 1 CS-13.2 Alignment... 1 CS-13.3 Directional Drilling... 1 CS-13.4 Pipe Thrusting... 2 CS-13.5 Guided Boring/Auger

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

REQUIREMENTS FOR SERVICES UNDER THE RAILWAY CORRIDOR (NON-QR SERVICES)

REQUIREMENTS FOR SERVICES UNDER THE RAILWAY CORRIDOR (NON-QR SERVICES) SYSTEMS AND CAPABILITY TECHNICAL REQUIREMENT NO: MCE-SR-16 ISSUE: Initial DATE: 14-10-2009 PAGE: 1 of 19 REQUIREMENTS FOR SERVICES UNDER THE RAILWAY CORRIDOR (NON-QR SERVICES) ISSUE DATE DESCRIPTION /

More information

INTRODUCTION TO INNOVATIVE PILING SOLUTIONS

INTRODUCTION TO INNOVATIVE PILING SOLUTIONS INTRODUCTION TO INNOVATIVE PILING SOLUTIONS 2019 WWW.MOVAX.COM HIGHER PRODUCTIVITY SIGNIFICANT SAVINGS EFFICIENT - FAST - VERSATILE - ACCURATE - SAFE 2 INTRODUCTION FORERUNNER IN PILING EXPERTIZE Movax

More information

An indicative program for works to be conducted within the Sydney Park construction compound is provided in Table 6-20.

An indicative program for works to be conducted within the Sydney Park construction compound is provided in Table 6-20. The land required for the Sydney Park construction compound would be used temporarily throughout construction only. The construction compound site would be rehabilitated at the completion of construction,

More information

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS DUCTILE IRON PILES DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS Designed to resist both compression and tension loads in either end-bearing or friction,

More information

Contents. Glossary 9. Foreword 10

Contents. Glossary 9. Foreword 10 Glossary 9 Foreword 10 1 Design considerations 11 1.1 Introduction 11 1.2 Client's general requirements 11 1.3 The ground 11 1.3.1 The concept of effective stress 11 1.3.2 Ground profile 13 1.3.3 Groundwater

More information

Company Profile 1300 SHOTCRETE

Company Profile 1300 SHOTCRETE 1300 SHOTCRETE Company Profile RIX Specialist Contracting can tailor solutions to meet even the most demanding project requirements. From initial consultation right through to completion, the team at RIX

More information

SUSTAINABLE FOUNDATION ENGINEERING MIXED-IN- PLACE TECHNIQUES FOR DURABLE CUT-OFF WALLS

SUSTAINABLE FOUNDATION ENGINEERING MIXED-IN- PLACE TECHNIQUES FOR DURABLE CUT-OFF WALLS SUSTAINABLE FOUNDATION ENGINEERING MIXED-IN- PLACE TECHNIQUES FOR DURABLE CUT-OFF WALLS Peter, BAUER Spezialtiefbau GmbH, Schrobenhausen, Germany, +49 8252 974266, +49 8252 971496, peter.banzhaf@bauer.de

More information

Golder Associates Innovative Applications (GAIA) Inc.

Golder Associates Innovative Applications (GAIA) Inc. Golder Associates Innovative Applications (GAIA) Inc. Environmental and Geotechnical Applications of Cutter Soil Mixing RemTech October, 2007 Presented by: Brian Wilson www.gaiacontractors.com What is

More information

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Overall Information Location: Singapore Date of Completion: 2010 Cost: $5.7 billion Architect: Moshe Safdie Executive Architect: Aedas, Pte

More information

Influence of Deep Foundation Installation Methods Presented by: Morgan NeSmith, PE

Influence of Deep Foundation Installation Methods Presented by: Morgan NeSmith, PE Influence of Deep Foundation Installation Methods Presented by: Morgan NeSmith, PE Director or Engineering mnesmith@berkelapg.com http://www.berkelandcompany.com To 2⁰ Congresso Internacional de Fundaciones

More information

Martha Lake Gateway Sewer. An Introduction to Trenchless Methods and Evaluation for the Installation of New Pipelines

Martha Lake Gateway Sewer. An Introduction to Trenchless Methods and Evaluation for the Installation of New Pipelines Trenchless Crossing Evaluation on the Martha Lake Gateway Sewer An Introduction to Trenchless Methods and Evaluation for the Installation of New Pipelines Introduction Purpose Provide engineers and owners

More information

PIPE JACKING. An introduction to pipe jacking prepared by the Pipe Jacking Association

PIPE JACKING. An introduction to pipe jacking prepared by the Pipe Jacking Association PIPE JACKING An introduction to pipe jacking prepared by the Pipe Jacking Association Pipe Jacking Pipe Jacking Microtunnelling Pipe Jacking - General Arrangement Pipe Jacking is an integrated system linking:

More information

ROCK HAWG TECHNOLOGY. Hardcore Solutions for the Toughest Applications

ROCK HAWG TECHNOLOGY.     Hardcore Solutions for the Toughest Applications Hardcore Solutions for the Toughest Applications Unit 3F Lyncastle Way Appleton Thorn Trading Estate Warrington Cheshire WA4 4ST Telephone +44 (0) 1925 265333 Fax; +44 (0) 1925 211700 Enquiries@westquaytrading.co.uk

More information

Pipe Jacking. Japan Sewage Works Association

Pipe Jacking. Japan Sewage Works Association Pipe Jacking Japan Sewage Works Association June, 2013 1 Pipe Jacking Yosuke Matsumiya y.matsumiya@ngsk.or.jp Japan Sewage Works Association Suisui Bldg. 2-10-12 Uchikanda, Chiyodaku Tokyo 101-0047 Japan,

More information

JET GROUTING Implenia Spezialtiefbau GmbH

JET GROUTING Implenia Spezialtiefbau GmbH JET GROUTING Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com www.foundation-engineering.implenia.com

More information

Company Profile. projects, with values in excess of 500K, and technically complex projects.

Company Profile. projects, with values in excess of 500K, and technically complex projects. Company Profile BAUER Technologies is the UK contracting arm of the BAUER Group. We perform deep foundation works on major projects in the UK. We specialise in the design and installation of large diameter

More information

Overview Sonic Drilling Technology

Overview Sonic Drilling Technology Overview Sonic Drilling Technology Overview Sonic Rig/Tooling Manufacturer Sonic Drill Service Provider (2012) - 10 Sonic Drill Rigs (Trucks, Crawlers, Compact Crawlers) - 11 th in production - Experienced

More information

Lesson 4. Construction Techniques and Materials. Learning Outcomes. Basic Construction

Lesson 4. Construction Techniques and Materials. Learning Outcomes. Basic Construction Lesson 4 Construction Techniques and Materials schnabel-eng.com Learning Outcomes Describe sequence of construction for a micropile Identify materials used to construct a micropile Describe principle function

More information

LOAD CAPACITY OF AUGER DISPLACEMENT PILES

LOAD CAPACITY OF AUGER DISPLACEMENT PILES International Conference on Ground Improvement and Ground Control (ICGI 2012), 30 Oct. 2 Nov. 2012, University of Wollongong, Australia B. Indraratna, C. Rujikiatkamjorn and J S Vinod (editors) LOAD CAPACITY

More information

TECHNOLOGY. Hydromill

TECHNOLOGY. Hydromill TECHNOLOGY Hydromill Everywhere the diaphragm wall market is moving to higher and higher targets in terms of depth and verticality control. Metro stations, new foundations for residential and commercial

More information

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe. STANDARD SPECIFICATIONS SECTION 02445 BORING AND JACKING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for boring and jacking casing pipe. 1.2 DEFINITIONS A. Carrier Pipe: Sewer or water

More information

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig Roger E. Renner, MGWC MUD ROTARY TECHNIQUES Presenter: Roger E. Renner Master Groundwater Contractor President of E.H. RENNER & SONS, INC. Past President of NGWA 2001 Past President of Minnesota Water

More information

BASEMENT CONSTRUCTION PREPARED BY PN NOOR AISYAH ASYIKIN

BASEMENT CONSTRUCTION PREPARED BY PN NOOR AISYAH ASYIKIN BASEMENT CONSTRUCTION PREPARED BY PN NOOR AISYAH ASYIKIN BASEMENT CONSTRUCTION 01 content 1.DEFINITION 2. CONSTRUCTION CONSIDERATION 3. DESIGN REQUIREMENT 4.METHOD OF CONSTRUCTION a. Open Cut Construction

More information

Grouting Bilfinger Spezialtiefbau GmbH

Grouting Bilfinger Spezialtiefbau GmbH Grouting Bilfinger Spezialtiefbau GmbH Goldsteinstrasse 114 D-60528 Frankfurt Phone: +49 69 6688-345 Fax: +49 69 6688-277 Email: info.spezialtiefbau@bilfinger.com www.foundation-engineering.bilfinger.com

More information

Table of Contents 18.1 GENERAL Overview Responsibilities References

Table of Contents 18.1 GENERAL Overview Responsibilities References Table of Contents Section Page 18.1 GENERAL... 18.1-1 18.1.1 Overview... 18.1-1 18.1.2 Responsibilities... 18.1-1 18.1.3 References... 18.1-2 18.2 MISCELLANEOUS FOUNDATION DESIGNS... 18.2-1 18.2.1 Buildings...

More information

Innovation in the mining industry Derisking access to underground mines using Tunnel Boring Machines

Innovation in the mining industry Derisking access to underground mines using Tunnel Boring Machines Innovation in the mining industry Derisking access to underground mines using Tunnel Boring Machines GHD Energy & Resources Brendan Henry Manager, Tunnels and Underground Spaces Safety Commitment Safety

More information

Ground Improvement. Cutter Soil Mixing Multi-Axis Soil Mixing Deep Soil Mixing Jet Grouting Vibro Systems Specialized Geotechnical Grouting

Ground Improvement. Cutter Soil Mixing Multi-Axis Soil Mixing Deep Soil Mixing Jet Grouting Vibro Systems Specialized Geotechnical Grouting Ground Improvement Cutter Soil Mixing Multi-Axis Soil Mixing Deep Soil Mixing Jet Grouting Vibro Systems Specialized Geotechnical Grouting www.malcolmdrilling.com Cutter Soil Mixing Multi-Axis Soil Mixing

More information