1 JC Code & Construction Consultants, Inc. Advanced Training: The FBC & ASTM C

2 Welcome! This course was developed by : JC Code & Construction Consultants, Inc. DBPR Provider Number

3 Copyright Materials This presentation is protected by US and International Copyright laws. Reproduction, distribution, display and use of the presentation without written permission of the speaker is prohibited. JC Code & Construction Consultants, Inc All Rights Reserved 3

4 Seminar Information Seminar Name: Advanced Training: The FBC & ASTM C 1063 Approval # s: CILB: TBA BCAIB: TBA FBAID: TBA FBPE: TBA Instructor: John Farinelli, CBO, MCP, CFM, LEED AP Location:, Florida Date:, 2015 Credit: 1.0 CE hour 4

5 Seminar Overview This seminar is designed to provide building code administrators, plans examiners, inspectors, design professionals and contractors with 1.0 hour of advanced building code training. This seminar provides a review of the lathing and furring requirements of the 5 th Edition (2014) Florida Building Code, Building Volume and ASTM C : Standard Specification for Installation of Lathing and Furring to Receive Interior and Exterior Portland Cement-Based Plaster. 5

6 Code References The 2008 Edition of ASTM C 1063 is referenced in Ch. 35 of the 5 th Edition (2014) FBCB Exterior Finish - Adobe Construction Lathing and Furring for Cement Plaster (Stucco) Table Installation of Plaster Construction On Grade Floor Slab Construction

7 Adobe Construction Exterior Finish. Exterior walls constructed of unstabilized adobe units shall have their exterior surface covered with a minimum of two coats of Portland cement plaster having a minimum thickness of ¾ and conforming to ASTM C 926*. Lathing shall comply with ASTM C Fasteners shall be spaced at 16 inches o.c. maximum. Exposed wood surfaces shall be treated with an approved wood preservative or other protective coating prior to lath application. *ASTM C 926: Application of Portland Cement Based Plaster

8 2510 Lathing and Furring For Cement Plaster (Stucco) Installation. Installation of these materials shall be in compliance with ASTM C 926 and ASTM C 1063.

9 2511 Interior Plaster

10 2512 Exterior Plaster On-grade floor slab. On wood framed or steel stud construction with an ongrade concrete floor slab system, exterior plaster shall be applied in such a manner as to cover, but not to extend below, the lath and paper. The application of lath, paper and flashing or drip screeds shall comply with ASTM C 1063.

11 ASTM C Standard Specification for Installation of lathing and furring to Receive Interior and Exterior Portland Cement- Based Plaster

12 1. Scope 1.1 This specification covers the minimum requirements for lathing and furring for the application of exterior and interior portland cement-based plaster as in Specification C 926 or Specification C 841.

13 3.2 Definitions of Terms Specific To This Standard control joint, a joint that accommodates movement of plaster shrinkage and curing along predetermined, usually straight, lines expansion joint, a joint that accommodates movement beyond plaster shrinkage and curing.

14 3.2 Definitions of Terms Specific To This Standard continued hangers, wires or steel rods or straps used to support main runners for suspended ceilings beneath floor or roof constructions inserts, devices embedded in concrete structural members to provide a loop or opening for attachment of hangers. 14

15 3.2 Definitions of Terms Specific To This Standard continued saddle tie, see Figs. 1 and 2. 15

16 3.2 Definitions Of Terms Specific To This Standard self-furring, a metal plaster base manufactured with evenly-spaced indentations that hold the body of the lath approximately ¼ away from solid surfaces to which it is applied framing member, studs, joist, runners (track), bridging, bracing, and related accessories manufactured or supplied in wood or light gauge steel.

17 6. Materials 6.1 Metal Plaster Bases: Expanded Metal Lath Specification C 847, galvanized Wire Laths: Welded Wire Lath Specification C Woven Wire Lath Specification C Paper Backed Plaster Bases Specification C

18 Diamond Mesh Flat Lath Flat Lath is manufactured from prime quality steel sheets that are slit and expanded to form small diamond shaped openings. This large number of openings provides more plaster keys, providing better scratch coat bonding in either pumped or troweled applications. Each sheet has square ends and smooth parallel edges on sides for fast, easy handling and bending for curved surfaces.

19 Self-Furred Diamond Mesh Lath Self-Furred Lath is used extensively in exterior stucco and stone work over sheathing and as a plaster base over masonry walls. Self-furring dimples or embossed V grooves hold the lath approximately ¼ away from solid surfaces to aid in the keying of stucco to the lath.

20 1/8 Rib Lath (Flat Lath) 1/8 Flat Rib Lath has eighteen ribs, 1/8 high, spaced 1½ on center. The 2.75 lbs. product may be installed over horizontal spans up to 16 on center, and the 3.4 lbs. product may be installed over spans of 19 on center, when following ASTM C This lath sheet still requires furring on solid substrates.

21 3/8 Rib Lath (High Rib) 3/8 High Rib Lath is designed with seven longitudinal ribs (each 3/8 deep) and eight small flat ribs in between the high ribs. This product is used almost exclusively for ceiling and soffit applications. ASTM C-1063 allows High Rib Lath to span up to 24 on center between framing both vertically and horizontally.

22 Striplath Striplath is galvanized, diamond mesh lath, produced in 4 and 6 wide strips with smooth edges. Striplath is used to reinforce plaster around door and window corners, reducing cracks caused by stress. 22

23 6. Materials 6.2 Accessories: General - All accessories shall have perforated or expanded flanges or clips shaped to permit complete embedment in the plaster, to provide means for accurate alignment, and to secure attachment of the accessory to the underlying surface. Accessories shall be designed to receive application of the specified plaster thickness.

24 6. Materials Accessories shall be fabricated from Zinc Alloy (99 % pure zinc), galvanized (zinc coated) steel, rigid PVC or CPVC plastic, or anodized aluminum alloy. See Specification B 221. (See Table 1 for minimum allowable thicknesses). NOTE 2 - The selection of an appropriate type of material for accessories shall be determined by applicable surrounding climatic and environmental conditions specific to the project location, such as salt air, industrial pollution, high moisture, or humidity.

25 6. Materials Steel - Specification A 653/A 653M and shall have a G60 coating PVC Plastic - Specification D 1784 or D Zinc Alloy - Specification B 69, 99 % pure zinc Thickness of base material shall be as shown in Table 1.

26 6. Materials 26

27 6. Materials Cornerite lb/yd2(0.059 kg/m2), galvanized expanded metal lath, galvanized, 1.7 lb/yd2(0.057 kg/m2) galvanized woven or welded wire fabric of in. wire. When shaped for angle reinforcing, it shall have outstanding flanges (legs) of not less than 2 in.

28 6. Materials 6.3 Channels - Shall be cold-formed from steel with minimum psi (228 MPa) yield strength and in. minimum bare steel thickness. 28

29 6. Materials Channel shall have a protective coating conforming to Specification A 653/A 653M G60, or have a protective coating with an equivalent corrosion resistance for exterior applications, or shall be coated with a rust inhibitive paint, for interior applications, and shall have the following minimum weights in pounds per 1000 linear feet (kg/m). 29

30 6. Materials External Corner Reinforcement - Expanded lath, welded wire, or woven wire mesh bent to approximately 90 used to reinforce portland cement stucco at external corners. This accessory shall be fully embedded in the stucco.

31 Typical Corner Bead The standard accessory for providing exterior corner protection and providing A reliably straight ground for screeding. The 3 expanded mesh wings are easily flexed to adapt to framing irregularities and to match appropriate screed heights.

32 Typical PVC Corner Bead

33 6. Materials Foundation Weep Screed - Accessory used to terminate portland cement based stucco at the bottom of exterior walls. This accessory shall have a sloped, solid, or perforated, ground or screed flange to facilitate the removal of moisture from the wall cavity and a vertical attachment flange not less than 3½ in. long.

34 Foundation Weep Screed Foundation Weep Screeds are required at the base of walls as part of a drainage system for exterior stucco or veneer stone applications. The 3½ nailing flange serves as flashing when Grade D building paper or starter strips are installed over the flange. Holes are punched into the nailing flange for easy attachment to the wall. Holes are also placed in the V stop to provide keying of the stucco mud when wet. As the mud cures, it will shrink slightly away from the V stop, allowing moisture to flow down the building paper and exit the sloped V stop surface. 34

35 Typical Foundation Weep Screed

36 Mid-Wall Weep Screed Mid-Wall Weep Screed performs as an unpunched weep screed allowing excess moisture to escape the back of a stucco membrane. This screed also performs as an expansion joint with twin grounds. Installed where a framed stucco surface meets a masonry stucco surface.

37 Typical Expansion Joint Vinyl M-Type Expansion Joint is designed to relieve stress in the stucco membrane caused by typical stucco shrinkage and thermal movement.

38 Two Piece Expansion Joint Designed to relieve stresses in stucco wall and ceiling areas where a greater than normal degree of movement might occur. Allows for movement in two different planes. Used where two different framing materials meet and at through wall construction joints.

39 Two Piece Expansion Joint Designed to relieve stress in stucco at inside or outside corners where excess movement or shrinkage might result in cracked stucco.

40 6. Materials 6.4 Wire - As specified in Specification A 641/A 641M with a Class I zinc coated (galvanized), soft temper steel. Wire diameters (uncoated) specified herein correspond with United States Steel Wire Gauge numbers as follows:

41 6. Materials

42 6. Materials 6.5 Rod and Strap Hangers - Mild steel, zinc or cadmium plated, or protected with a rustinhibiting paint. 6.6 Clips - Form from steel wire, Specification A 641/A 641M zinc-coated (galvanized), Specification A 641/A 641M or steel sheet, Specification A 653/A 653M, depending on use and manufacturer s requirements.

43 6.7 Fasteners Nails - For attaching metal plaster bases to wood supports, in. 11 gauge (3.06- mm) diameter, 7 16-in. head, barbed, galvanized roofing nails or galvanized common nails Nails - For attaching metal plaster bases to solid substrates shall be not less than ¾ in. long.

44 6.7 Fasteners Screws - For attaching metal plaster base shall be fabricated in accordance with either Specification C 954 or C 1002 and shall have a 7 16 in. diameter pan wafer head and a in. diameter shank. Screws used for attachment to metal framing members shall be self-drilling and self-tapping. Screws used for attachment to wood framing members shall be sharp-point.

45 7. Installation 7.1 Workmanship - Metal furring and lathing shall be erected so that the finished plaster surfaces are true to line (allowable tolerance of ¼ in. in 10 ft), level, plumb, square, or curved as required to receive the specified plaster thickness.

46 7.2. Hangers and Inserts Hangers shall be of ample length and shall conform to the requirements of Table 2 both as to size and maximum area to be supported, except as modified in this section.

47 TABLE 2 Allowable Support or Hanger Wire Spacing ft-in. and Cold-Rolled Channel Main Runner Spans, ft-in.

48 7.2. Hangers and Inserts When 1 by 3/16 in. flat inserts and hangers are used, 7 16 in. diameter holes shall be provided on the center line at the lower end of the insert and upper end of the hanger to permit the attachment of the hanger to the insert. The edge of the holes in both the inserts and the hangers shall be not less than ⅜ in. from the ends.

49 7.2. Hangers and Inserts Flat, steel hangers shall be bolted to 1 by 3/16 inserts with 3/8 diameter round-head stove bolts.

50 7.3 Installation of Hangers for Suspended Ceilings Under Wood Construction Hangers shall be attached to supports by any of the following methods: A hole drilled through the member Figure 4 Three 12d nails, min. 1¼ penetration Figure 5 Four 1 1/2, 9 gage wire staples Figure 6

51 Methods of Attachment

52 7.5 Installation of Main Runners Minimum sizes and maximum spans and spacings of main runners shall be in accordance with Table 2. Minimum 1 clearance required between the ends of the main runners and the abutting construction. A main runner shall be located within 6 of the paralleling walls to support the ends of the cross furring.

53 7.5 Installation of Main Runners Where the main runners are spliced, the ends shall be overlapped not less than 12 with flanges interlocked and securely tied with double loops Hanger wires shall hang straight down. If an obstacle is encountered, a trapeze type device shall be used.

54 7.6 Installation of Cross Furring Minimum sizes and maximum spans and spacings of cross runners shall be in accordance with Table Cross furring shall be saddle tied to main runners with 16 gage galvanized wire, a double strand of 18 gage galvanized wire or with galvanized clips or equivalent attachments.

55 7.6 Installation of Cross Furring Where cross furring members are spliced, the ends shall be overlapped not less than 8 with flanges interlocked and securely tied near each end with double loops of 16 gage galvanized wire or twin strands of 18 gage galvanized wire.

56 7.8 Lapping of Metal Plaster Bases Side laps of metal plaster bases shall be secured to framing members. They shall be tied between supports with.0475 wire at intervals not more than 9. Metal lath shall be lapped ½ at the nearest sides, or nest the edge ribs. Lap metal lath 1 ; lace with wire if between supports.

57 7.9 Spacing of Attachments Attachments for securing metal plaster bases to framing members shall be spaced not more than 7 apart for diamond mesh and flat rib laths and at each rib for 3/8 rib lath.

58 7.10 Application of Metal Plaster Bases The spacing of framing members for the type and weight of metal plaster base used shall conform to the requirements of Table 3. Metal plaster bases shall be attached to framing members at not more than 7 in. along framing members except for ⅜ in. rib metal lath that shall be attached at each rib.

59 TABLE 3 Types and Weights of Metal Plaster Bases and Corresponding Maximum Permissible Spacing of Supports

60 Attachments for Metal Plaster Bases to Wood Framing Lath shall be attached to framing members with attachments spaced not more than 7 o.c Diamond-mesh expanded metal lath, flat rib lath and wire lath shall be attached to horizontal framing members 1 ½ roofing nails and to vertical framing members with 6d common nails or 1 roofing nails or 1 wire staples with a ¾ crown.

61 Attachments for Metal Plaster Bases to Wood Framing Expanded ⅜ rib lath shall be attached to horizontal and vertical wood framing members with nails or staples to provide less than 1 ¾ penetration into horizontal wood framing members and ¾ into vertical wood framing members.

62 Attachments for Metal Plaster Bases to Wood Framing Common nails shall be bent over to engage not less than three strands of lath or be bent over a rib when rib lath is installed Screws used to attach metal plaster base to horizontal and vertical framing members shall penetrate not less than ⅝, engage not less than three strands of lath. When installing rib lath, the screw shall pass through, but not deform, the rib.

63 Attachments for Metal Plaster Bases to Metal Framing Metal plaster bases shall be attached to metal framing members with.0475, 18 gage wire ties, clips or other approved means Rib lath shall be attached to open web steel joists by single ties of galvanized wire not less than.0475 with the ends of each tie twisted together 1½ times.

64 Attachments for Metal Plaster Bases to Metal Framing Screws used to attach metal plaster base to metal framing members shall project not less than ⅜ through the metal framing member when the lath is installed and shall engage not less than 3 strands of lath. When installing rib lath, the screw shall pass through, but not deform, the rib.

65 7.11 Application of Accessories All metal accessories shall be installed in such a manner that flanges and clips provided for their attachment are completely embedded in the plaster Accessories shall be attached to substrate in such a manner as to ensure proper alignment with flanges secured at not more than 7 intervals along supports.

66 Control Joints Control (expansion and contraction) joints shall be installed in walls to delineate areas not more than 144 sq. feet and to delineate areas not more than 100 sq. feet for all horizontal applications: ceilings, curves or angle type structures.

67 No Control Joints 67

68 Control Joints The distance between control joints shall not exceed 18 0 in either direction or a length to width ratio of 2½ to 1. A control joint shall be installed where the ceiling framing or furring changes direction.

69 Control Joints A control joint shall be installed where an expansion joint occurs in the base exterior wall Wall or partition height door frames shall be considered as control joints.

70 Control Joints Foundation weep screed shall be installed at the bottom of all steel or wood framed exterior walls to receive lath and plaster. Bottom edge not < 1 below the joint. Nose not < 4 above raw earth or 2 above paved surfaces. Weather resistive barrier and lath shall cover the vertical flange attachment and terminate at the top edge of the nose or ground flange.

71 Foundation Weep Screed 71

72 End of Presentation JC Code & Construction Consultants, Inc Mystic Way Wellington, FL

Galvanized Steel Bead Accessories for Stucco and Plaster Installations ALABAMA METAL INDUSTRIES CORPORATION. Contract Number:

Galvanized Steel Bead Accessories for Stucco and Plaster Installations ALABAMA METAL INDUSTRIES CORPORATION. Contract Number: SUBMITTAL SUBMITTAL TRANSMITTAL DETAILS AMICO Galvanized Steel Bead Accessories for Stucco and Plaster Installations Project Submittals as manufactured by Submittal Date: Contract : Project Name: Section

More information

WHATEVER THE CHALLENGE, PHILLIPS HAS YOU COVERED.

WHATEVER THE CHALLENGE, PHILLIPS HAS YOU COVERED. WHATEVER THE CHALLENGE, PHILLIPS HAS YOU COVERED. Build walls and ceilings with a strong base, sturdy reinforcements and much more with Phillips extensive line of high quality products. As a single source

More information

Zinc Alloy Bead Accessories for Stucco and Plaster Installations ALABAMA METAL INDUSTRIES CORPORATION

Zinc Alloy Bead Accessories for Stucco and Plaster Installations ALABAMA METAL INDUSTRIES CORPORATION SUBMITTAL SUBMITTAL TRANSMITTAL DETAILS AMICO Zinc Alloy Bead Accessories for Stucco and Plaster Installations Project Submittals as manufactured by Submittal Date: Contract : Project Name: Section : Contractor

More information

Stone and Masonry Veneer

Stone and Masonry Veneer Stone and Masonry Veneer R703.7 Stone and masonry veneer, general. Stone and masonry veneer shall be installed in accordance with this chapter, Table R703.4 and Figure R703.7. These veneers installed over

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS DAVIS, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS DAVIS, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1 16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

1. Non-load-bearing steel framing systems for interior gypsum board assemblies. 2. Suspension systems for interior gypsum ceilings and soffits.

1. Non-load-bearing steel framing systems for interior gypsum board assemblies. 2. Suspension systems for interior gypsum ceilings and soffits. SECTION 09 2216 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Non-load-bearing steel framing systems for interior gypsum board assemblies. 2. Suspension systems for interior gypsum ceilings and

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 092216 - COLD FORMED STEEL FRAMING - NON-STRUCTURAL (CFSF-NS) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 ACTION

More information

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING DIVISION 5 METALS SECTION 05 40 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

BULLETIN FROM THE FIRST COAST CHAPTER ICC~BOAF

BULLETIN FROM THE FIRST COAST CHAPTER ICC~BOAF FIRST COAST CHAPTER INTERNATIONAL CODE COUNCIL (ICC) AND BUILDING OFFICIALS ASSOCIATION OF FLORIDA, INC. (BOAF) SERVING BAKER, BRADFORD, CLAY, DUVAL, NASSAU, PUTNAM, ST. JOHNS & UNION COUNTIES BULLETIN

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05 40 00 COLD-FORMED METAL FRAMING SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the

More information

SECTION NON--STRUCTURAL METAL FRAMING

SECTION NON--STRUCTURAL METAL FRAMING The Collective Voice of America s Steel Framing Industry The Steel Framing Industry Association (SFIA) is dedicated to expanding the market for cold-formed steel in construction through programs and initiatives

More information

Product Specification

Product Specification General Specification Notes: SECTION 09210 / 09 21 00\ Finish Coat Plasters References in blue are general indicators to the specifier. References in red relate to fire-rated assemblies and/or code related

More information

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights 1 Exam Prep Application and Finishing of Gypsum Board GA-216-2013 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2013 Application and Finishing of Gypsum Panel Products. Each

More information

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights 1 Exam Prep Application and Finishing of Gypsum Board GA-216-2016 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2016 Application and Finishing of Gypsum Panel Products. Each

More information

GYPSUM BOARD AND PLASTER

GYPSUM BOARD AND PLASTER CHAPTER 25 SECTION 2501 GENERAL 2501.1 Scope. 2501.1.1 General. Provisions of this chapter shall govern the materials, design, construction and quality of gypsum board, lath, gypsum plaster and cement

More information

Section Metal Lath and Accessories

Section Metal Lath and Accessories Section 09 22 36.23 Metal Lath and Accessories This master specification has been prepared by AMICO, Alabama Metal Industries Corporation to assist design professionals in specifying This may be used as

More information

GA APPLICATION OF GYPSUM SHEATHING

GA APPLICATION OF GYPSUM SHEATHING 1. Scope 1.1 This specification describes the minimum requirements for, and the methods of handling, storage, and application of, gypsum sheathing for use as a substrate for exterior claddings. 1.1.1 Exterior

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES 1 PART ONE - GENERAL 1.1 COORDINATION SECTION 09260 GYPSUM BOARD ASSEMBLIES A. Drawings and General provisions of the Contract including General and Supplementary Conditions and Division 1 Specification

More information

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board. 1.2 RELATED WORK A. Installation of steel framing members for walls, partitions,

More information

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES SECTION 05440- PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section includes pre-engineered, pre-fabricated cold formed steel framing elements. Work includes:

More information

BEARING METAL STUD FRAMING

BEARING METAL STUD FRAMING L-1 Section 05410 Long Form Specification LOAD BEARING METAL STUD FRAMING This section includes axially loaded steel studs, with unique slotted top channels, usually of 0.91, 1.2 and 1.5 mm (16, 18, or

More information

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC CALIFORNIA BUILDING CODE MATRIX ADOPTION TABLE CHAPTER 25 GYPSUM BOARD AND PLASTER (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority

More information

SECTION PORTLAND CEMENT PLASTER (STUCCO) WITH ACRYLIC FINISH

SECTION PORTLAND CEMENT PLASTER (STUCCO) WITH ACRYLIC FINISH SECTION 09 24 23 - PORTLAND CEMENT PLASTER (STUCCO) WITH ACRYLIC FINISH PART I - GENERAL 1.01 SECTION INCLUDES A. Building paper B. Lath and accessories C. Plaster materials D. Acrylic finish E. Exterior

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-09 24 23 (August 2017) Change 1-08/18 ------------------------- Preparing Activity: USACE Superseding UFGS-09 24 23 (May 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SPECIFICATION GUIDELINE

SPECIFICATION GUIDELINE SPECIFICATION GUIDELINE Environmental Stoneworks Corporate Office 6300 East Stapleton Drive South Denver, CO 80216 Phone (303) 309-3040 Fax (303) 309-3059 www.estoneworks.com Environmental Stoneworks specification

More information

OCS ONE COAT STUCCO A custom blend of Portland cement, sand, extenders, fiber reinforcement and modifiers.

OCS ONE COAT STUCCO A custom blend of Portland cement, sand, extenders, fiber reinforcement and modifiers. OCS ONE COAT STUCCO A custom blend of Portland cement, sand, extenders, fiber reinforcement and modifiers. Designed to save material by functioning as an exterior cladding in thicknesses ranging from 3/8

More information

SECTION METAL STUDS, METAL LATH, SUSPENSION CEILINGS, PLASTER, AND STUCCO

SECTION METAL STUDS, METAL LATH, SUSPENSION CEILINGS, PLASTER, AND STUCCO PART 1 GENERAL 1.01 SUMMARY SECTION 09200 METAL STUDS, METAL LATH, SUSPENSION CEILINGS, PLASTER, AND STUCCO A. Section Includes: 1. Non-load bearing steel studs. 2. Metal furring and lath. 3. Ceiling suspension

More information

SPECIFICATION GUIDELINE

SPECIFICATION GUIDELINE Environmental StoneWorks specification guideline should be used to assist design professionals in the preparation of projects. Edit and delete items that may not be applicable. Verify all referenced section

More information

ICC-ES Evaluation Report Reissued November 2014 This report is subject to renewal November 2016

ICC-ES Evaluation Report Reissued November 2014 This report is subject to renewal November 2016 ESR-1215* Reissued November 2014 ELDORADO STONE, ELDORADO BRICK AND ELDORADO ADOBE VENEERS 1.0 EVALUATION SCOPE Compliance with the following codes: 2015 International Building Code (IBC) 2015 International

More information

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: IRC CODE UPDATES TO: RESIDENTIAL BUILDING CONTRACTORS FROM: GARY STABER, BUILDING OFFICIAL SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: 6/1/2003 INTERNATIONAL RESIDENTIAL CODE (IRC) APPLICABILITY:

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05.40.00 COLD-FORMED METAL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Cold-formed metal framing for: B. Exterior load-bearing steel stud walls. 1. Interior load-bearing steel stud walls. 2.

More information

THE STEELFORM GOLD STANDARD. Product Data Sheet. Non-loadbearing Steel Studs (NLB)

THE STEELFORM GOLD STANDARD. Product Data Sheet. Non-loadbearing Steel Studs (NLB) THE STEELFORM GOLD STANDARD Product Data Sheet Non-loadbearing Steel Studs (NLB) SPECIFICATION OF NON-LOADBEARING STEEL STUDS (NLB) Steelform provides Prime Materials that are listed below and the profiles

More information

ACCEPTANCE CRITERIA FOR METAL PLASTER BASES (LATH) PREFACE

ACCEPTANCE CRITERIA FOR METAL PLASTER BASES (LATH) PREFACE ICC EVALUATION SERVICE, INC. Evaluate P Inform P Protect ACCEPTANCE CRITERIA FOR METAL PLASTER BASES (LATH) AC191 Approved May 2008 Effective June 1, 2008 Previously approved February 2008, October 2007,

More information

Home Depot Page 1 of 5 HDPB Humacao, PR 10/19/09

Home Depot Page 1 of 5 HDPB Humacao, PR 10/19/09 PART 1 - GENERAL 1.01 SUMMARY A. Types of cold-formed metal framing units include the following: 1. C-shaped steel studs B. Related work specified elsewhere includes but may not be limited to: 1. Section

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05.40.00 COLD-FORMED METAL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Cold-formed metal framing for: B. Exterior load-bearing steel stud walls. 1. Interior load-bearing steel stud walls. 2.

More information

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6 DECEMBER, 2016 Page 1 of 6 1 GENERAL 1.01 RELATED SECTIONS.1 Section 01 33 00 - Submittal Procedures..2 Section 07 21 16 - Batt and Blanket Insulation..3 Section 07 92 10 - Sealants..4 Section 09 91 00

More information

Design No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1

Design No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1 FIRESTOP JOINT SPRAY CFS-SP WB SILICONE JOINT SPRAY CFS-SP SIL F-RATING 2-HR. 2-HR. T-RATING -HR. -HR. APPLICATION THICKNESS PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table /8" WET FILM (/6"

More information

Building Division Informational Handout

Building Division Informational Handout CITY OF SAN JOSÉ, CALIFORNIA Building Division Informational Handout Conventional Light Frame Construction Design Provisions 2007 CBC Handout No. 2-21 Published: 1/1/08 Page 1 of 3 This document summarizes

More information

Structalath Twin Trac 316 System Section Corporate P.O. Box 397 Fortson Georgia FAX Technical

Structalath Twin Trac 316 System Section Corporate P.O. Box 397 Fortson Georgia FAX Technical PART 1 GENERAL 1.01 SECTION INCLUDES A. Materials and installation of a Master Wall Cemplaster Fiberstucco system. B. System shall consist of the following components: Item WRB01 CFS03 Description Weather

More information

STRATUM GUARD I AND II An Exterior Insulation and Finish System with Drainage DSC106C. Stratum Guard I and II System Installation Details

STRATUM GUARD I AND II An Exterior Insulation and Finish System with Drainage DSC106C. Stratum Guard I and II System Installation Details STRATUM GUARD I AND II An Exterior Insulation and Finish System with Drainage DSC106C Stratum Guard I and II System Installation Details Stratum Guard I and II DETAIL Table of Contents NOTE SG.0.0.01 SG.0.0.02

More information

EDGEWATER, FLORIDA JUNE 14, 2010

EDGEWATER, FLORIDA JUNE 14, 2010 SECTION 09 2116 - NON-LOAD-BEARING STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1

More information

A. Product Data: For each type of cold-formed steel framing product and accessory.

A. Product Data: For each type of cold-formed steel framing product and accessory. SECTION 05400 - COLD-FORMED METAL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Exterior non-load-bearing wall framing. 1.2 ACTION SUBMITTALS A. Product Data: For each type of cold-formed

More information

SECTION GYPSUM BOARD PART 1 - GENERAL

SECTION GYPSUM BOARD PART 1 - GENERAL SECTION 09250 - GYPSUM BOARD PART 1 - GENERAL 1.01 DESCRIPTION: A. Work under this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary Conditions

More information

SECTION Fiber Reinforced Stucco 1

SECTION Fiber Reinforced Stucco 1 CSI SECTION 09200 FIBER REINFORCED STUCCO PART 1 GENERAL 1.01 SUMMARY A. Section Description: Provided lath and plaster where shown on the Drawings, as specified herein, and as needed for complete and

More information

EDGEWATER, FLORIDA JUNE 14, 2010

EDGEWATER, FLORIDA JUNE 14, 2010 SECTION 09 2400 - PORTLAND CEMENT PLASTER PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700 SECTION 09 5113 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Product Data: Submit manufacturer's product data for cementitious materials, lath, metal support components, and accessories.

A. Product Data: Submit manufacturer's product data for cementitious materials, lath, metal support components, and accessories. 09200 METAL STUDS, METAL LATH, SUSPENSION CEILINGS, PLASTER, AND STUCCO *************************************************************************************************************** SPECIFIER: CSI MasterFormat

More information

Senergy Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor GPS Plus Rigid Insulation Board

Senergy Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor GPS Plus Rigid Insulation Board Senergy Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor GPS Plus Rigid Insulation Board NOTES Senergy Platinum CI Stucco Typical details for an

More information

SECTION GYPSUM BOARD

SECTION GYPSUM BOARD SECTION 09250 GYPSUM BOARD PART 1GENERAL 1.1 SUMMARY A. Related Documents: General and Supplementary Conditions of the Contract, Division 1 - General Requirements, and Drawings are collectively applicable

More information

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board Perimeter Relief and Control Joints in Fire-Rated Gypsum Board In multi-family residential construction, involving fire-rated assemblies stress relief in the firerated assemblies is important, but often

More information

SECTION UNIT MASONRY

SECTION UNIT MASONRY SECTION 04200 UNIT MASONRY PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, and equipment and perform functions required in the installation and maintenance of the work covered by this Section.

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

SECTION NON-LOAD BEARING WALL FRAMING. B. Section Furring and Lathing: Lath and furring for interior plaster applications.

SECTION NON-LOAD BEARING WALL FRAMING. B. Section Furring and Lathing: Lath and furring for interior plaster applications. SECTION 09.22.16 NON-LOAD BEARING WALL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Non-load bearing metal studs for wall assemblies. B. Area Separation and shaft wall framing products. 1.2 RELATED SECTIONS

More information

Construction Standards PAGE

Construction Standards PAGE Construction Standards PAGE 092613-1 SECTION 092613 - PART 1 - GENERAL 1.1 M.S.U. ISSUES A. It is the intent of MSU that all gypsum veneer plaster used on its projects will comply with LEED NC 3 Credit

More information

Inspection Fundamentals: Stucco & EIFS

Inspection Fundamentals: Stucco & EIFS Inspection Fundamentals: Stucco & EIFS By Ben Gromicko To be able to identify the stucco system you must understand system components. You should understand the basic components of the most common stucco

More information

SECTION PORTLAND CEMENT PLASTERING

SECTION PORTLAND CEMENT PLASTERING SECTION 09 2400 PORTLAND CEMENT PLASTERING This section includes editing notes to assist the user in editing the section to suit project requirements. These notes are included as hidden text, and can be

More information

Full-Line Product Catalog from PHILLIPSmfg.com. Download a FREE

Full-Line Product Catalog from PHILLIPSmfg.com. Download a FREE Download a FREE Full-Line Product Catalog from PHILLIPSmfg.com Also available online: - LEED Form - Installation Instructions - Packaging Sheets - Assembly Drawings - And much more! Metal Beads & Trims

More information

The better way to build TM. Installation Manual NAILBASE PANELS

The better way to build TM. Installation Manual NAILBASE PANELS The better way to build TM Installation Manual PANELS November 2018 SIPs Installation Manual Table of Contents Topics General Requirements................................... 3 Materials..............................................

More information

Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2011 LARC)

Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2011 LARC) Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2011 LARC) Plan Check Submittal Date: Plan Check #: Permit App.# Job Address: Applicant: Phone: ( ) P.C. Engineer: Phone:

More information

SECTION 1043 FENCE MATERIAL

SECTION 1043 FENCE MATERIAL SECTION 1043 FENCE MATERIAL 1043.1 Scope. This specification covers the material required in the construction of chainlink fence and woven wire fence. 1043.2 Basis of Acceptance. The basis of acceptance

More information

Ultrakote Cementitious Finish System

Ultrakote Cementitious Finish System Part 1 GENERAL 1.01 SECTION INCLUDES A. Ultrakote exterior wall system: one coat stucco, acrylic primer, cementitious finishes and protective coatings. 1.02 RELATED SECTIONS 1. 2. 3. 4. 5. 6. 7. 8. 9.

More information

Insulated Concrete Forms (ICFs)

Insulated Concrete Forms (ICFs) Insulated Concrete Forms (ICFs) Cover of Walls & Ceilings Magazine May 2006 ICFs Getting Attention Cover of Construction Dimensions Magazine June 2006 Table of Contents Construction Dimensions Magazine

More information

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,

More information

A. Product Data: For each type of product specified.

A. Product Data: For each type of product specified. SECTION 09260 - GYPSUM BOARD ASSEMBLIES PART 1 - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Preassembled steel stairs with concrete-filled treads.

Preassembled steel stairs with concrete-filled treads. SECTION 055113 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 23 - STEEL ROOF DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

Application Instructions

Application Instructions Application Instructions 3.01 INSPECTION A. Prior to the application of Master Wall Inc. Cemplaster Fiberstucco, the substrate shall be examined for compliance with the contract documents and Master Wall

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Interior Hangers. Application

Interior Hangers. Application Application Interior bridge deck hangers are typically fabricated using two heavy duty sheet metal end clips that have been electrically resistance welded to an appropriate sized wire or formed metal connecting

More information

HOTEL SPECIFICATION SECTION 08100

HOTEL SPECIFICATION SECTION 08100 Part 1 General HOTEL SPECIFICATION SECTION 08100 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified including, but not limited

More information

2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE:

2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE: SECTION 07651 FLEXIBLE COPPER SHEET FLASHINGS Advanced Building Products, Inc. manufacturer many types of flexible copper sheet flashings. Due to their ductility, high tensile strength, and resistance

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING The Collective Voice of America s Steel Framing Industry The Steel Framing Industry Association (SFIA) is dedicated to expanding the market for cold-formed steel in construction through programs and initiatives

More information

SECTION Specification for Building Limes Specification For Building Sands from Natural Sources Methods of Tests for Paints.

SECTION Specification for Building Limes Specification For Building Sands from Natural Sources Methods of Tests for Paints. SECTION 09200 PART 1 - GENERAL 1.01 DESCRIPTION A. Extent of Work: The extent of lath and plaster work is shown on the drawings and in schedules and includes interior and exterior plaster work, and fibreglass

More information

SECTION COMPOSITE METAL DECKING

SECTION COMPOSITE METAL DECKING PART 1 GENERAL 1.1 DESCRIPTION SECTION 05 36 00 1. Use this section only for NCA projects. 2. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION GYPSUM BOARD

SECTION GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 29 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Gold Bond BRAND Gypsum Sheathing

Gold Bond BRAND Gypsum Sheathing BRAND 09 06 29 16 00/NGC 43/NGC brand is a moisture-resistant sheathing installed on the outside of exterior framing as a substrate for exterior claddings. It is manufactured with a treated water-resistant

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2014 LARC)

Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2014 LARC) Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2014 LARC) Plan Check Submittal Date: Plan Check #: Permit App.# Job Address: Applicant: Phone: ( ) Plan Check Engineer:

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 09260 - A. Metal stud wall framing. Denoted on drawings as "metal studs". B. Metal channel ceiling framing. C. Acoustic insulation and sealant. D. Cementitious

More information

SECTION GYPSUM BOARD & SHEATHING SYSTEMS

SECTION GYPSUM BOARD & SHEATHING SYSTEMS PART 1!GENERAL! 1.01! SECTION INCLUDES SECTION 09260 GYPSUM BOARD & SHEATHING SYSTEMS! Metal stud wall framing. Metal channel ceiling framing.! Gypsum board.! Sheathing.! Taped and sanded joint treatment.!

More information

SECTION 1208 CHAIN LINK FENCING DESCRIPTION

SECTION 1208 CHAIN LINK FENCING DESCRIPTION SECTION 1208 CHAIN LINK FENCING 1208-1 DESCRIPTION This item covers the requirements for furnishing materials and constructing new chain link fences and gates in accordance with the details included herein

More information

Match The Product To The Purpose.

Match The Product To The Purpose. Copper Stockton Products' New Moisture Management Products Provide Solutions Stockton Products offers several profiles for water management and protection. One and two-piece products offer design features

More information

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details

More information

CONCRETE MASONRY VENEERS TEK 3-6C

CONCRETE MASONRY VENEERS TEK 3-6C An information series from the national authority on concrete masonry technology CONCRETE MASONRY VENEERS TEK 3-6C Construction (2012) INTRODUCTION In addition to its structural use or as the exterior

More information

Acrocrete Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor rigid insulation board

Acrocrete Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor rigid insulation board Acrocrete Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor rigid insulation board Acrocrete Platinum CI Stucco Typical details for an impact resistant

More information

Retain "Preinstallation Conference" Paragraph below if Work of this Section is extensive or complex enough to justify a conference.

Retain Preinstallation Conference Paragraph below if Work of this Section is extensive or complex enough to justify a conference. SECTION 05 40 00 - COLD-FORMED METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION COLD-FORMED METAL TRUSSES

SECTION COLD-FORMED METAL TRUSSES SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION STEEL DECKING

SECTION STEEL DECKING SECTION 05 31 00 STEEL DECKING SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Refer to Section 05 36 00, COMPOSITE METAL DECKING for floor

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 095133 - ACOUSTICAL METAL PAN CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05 51 00 METAL STAIRS PART 1 GENERAL 1.1 SUMMARY A. Section includes steel stair frame of structural sections, with closed risers; pan to receive concrete fill stair treads and landings; integral

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.

More information

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories. SECTION 02830 CHAIN LINK FENCES AND GATES (GALVANIZED) 1.0 GENERAL 1.1 Section Includes A. Fence framework, fabric, gates, and accessories. B. Excavation for post bases; concrete footing for posts. C.

More information

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied

More information

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2 ~ 05-1 ~ 05 00 00 Metals 05 00 00 METALS... 2 05 08 00 Commissioning of Metals... 2 05 12 00 Structural Steel Framing... 2 05 12 30 Steel Studs... 2 05 45 00 METAL SUPPORT ASSEMBLIES... 2 05 50 00 METAL

More information

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4 City of Columbia Engineering Regulations PART 25: SPECIFICATIONS FOR ALTITUDE VALVE VAULT Table of Contents Paragraph Description Page No. 25.1 General 25-1 25.2 Materials 25-1 25.3 Concrete Masonry Work

More information