1 Former Chain of Ponds Inn & Outbuildings Old New England Highway Liddell NSW 2333 Prepared by EJE Heritage March DR-001 Issue C
2 TABLE OF CONTENTS 1. INTRODUCTION General Study Team The Site NSW Heritage register listing Heritage Act 1977 (NSW)- State Heritage Register Historical notes A Note as to Names Aboriginal Custodianship European Heritage Physical Condition Report BUILDING A EXTERNAL ELEVATIONS GROUND FLOOR INTERNAL FIRST FLOOR INTERNAL Physical Condition Report BUILDING B EXTERNAL ELEVATIONS GROUND FLOOR INTERNAL Physical Condition Report BUILDING C EXTERNAL ELEVATIONS GROUND FLOOR INTERNAL UPPER LEVEL INTERNAL Physical Condition Report BUILDING D Appendices Appendix A - Scale Drawings Page 1
3 1. INTRODUCTION 1.1 General This report, commissioned by Liddell Coal Operations Pty Ltd, represents a historical study and physical record of the former Chain of Ponds Inn, Liddell NSW, as at March Study Team The study was undertaken and documented by Renae Carlisle, Specialist Photographer, and David Campbell, Heritage Consultant, under the direction of Barney Collins, Heritage Architect. Page 2
4 2. THE SITE Figure 1. Liddell area. Figure 2. Site. Page 3
5 Figure 3. Heritage Council plan. Page 4
6 Figure 4. Overlay. Page 5
7 Figure 5- Site Plan (NTS). Building D is no longer extant. Page 6
8 2.1.1 Site Inspection The building was inspected on 6 March 2013, in association with Mr Ben de Somer as representative of Liddell Coal Operations Pty Ltd, and Mr Peter Bowman as representative of Coal and Allied Pty Ltd. This report is based on the written and photographic record constructed at that time Restrictions and Limitations This document represents a report of the visible condition and features of the building evident to the authors at the time of publication only, and does not predict any future condition, nor levels of deterioration. The report is based on a visual survey of the building fabric. No invasive exploration of the building structure was undertaken. Concealed fabric and structures, ceiling cavities and the like were not capable of inspection. Scaffolding, erected in compliance with occupational health and safety requirements, enabled the inspection of the first floor of the Inn itself (Building A), although advantage was not taken of access to the first floor of the Stables (Building C). EJE Heritage is not qualified to offer structural opinions. This survey is not intended to convey any opinion as to the structural adequacy or integrity of the building, nor should it in any way be construed as so doing. Similarly, the authors observations were limited to the building fabric only; they make not comment on the capacity, adequacy, or statutory compliance of any building services. Page 7
9 3. NSW HERITAGE REGISTER LISTING 3.1 Heritage Act 1977 (NSW)- State Heritage Register Listing as described at Item: Inn & Outbuildings (former) Other Name/s: Chain of Ponds Inn & Outbuildings Type of Item: Built Group/Collection: Commercial Category: Inn/Tavern Primary Address: Old New England Highway, Chain of Ponds, NSW Local Govt. Area: Singleton 4. HISTORICAL NOTES 4.1 A Note as to Names The subject property is more properly described as a former inn, rather than as a hotel, because of its situation under nineteenth century common law. The title of inn gave the public a right to demand lodging and refreshment, while also clarifying the extent of the innkeeper s duties to the guest. 4.2 Aboriginal Custodianship The Wonnarua people are recognised as the traditional custodians of the area now known as Liddell. There is ample archaeological evidence of their use of the local creeks, including Chain of Ponds, for purposes of subsistence European Heritage Henry Nowland What is today called the Chain of Ponds Inn stands on land granted by the Colonial government, in early 1842, to Henry Boshy Nowland, a Muswellbrook wheelwright, 2 coachbuilder and publican successful in winning extensive Northern government coaching contracts for the Royal Mail. 3 Coaching, of course, was vital to the Colony, particularly before the coming of the railways. Hostelries were essential not only for the stabling and changing of horses, but for the accommodation and refreshment of travellers tired from their often trying journeys along the primitive 1 See generally Umwelt Environmental Consultants, Liddell Colliery Aboriginal Cultural Heritage Management Plan. Toronto: Umwelt, January Keith Binney, Horsemen of the First Frontier ( ) and the Serpent s Legacy. Neutral Bay: Volcanic Productions, 2005, p Muswellbrook Local and Family Historical Society Inc., Personalities of the Past. Muswellbrook: The Society, 2008, p. 48. Page 8
10 roads. Conveniently situated at Chain of Ponds Creek on the Great North Road, and already recognised as being suitable for the spelling of both horses and riders, 4 the spot was approximately half-way between Singleton and Muswellbrook. Although the Surveyor General s department had laid out a town in the vicinity, this, called Liddell, was never properly established, perhaps because Henry Nowland had himself purchased a large proportion of the allotments. 5 In popular usage, the area continued to be known as Chain of Ponds. A newspaper correspondent, passing through the area in 1865, noted that For the information of persons who like myself may have often wondered, when looking at the map, where Liddell is, I may mention that Liddell and the Chain of Ponds are the same thing. Liddell is that name of a township laid out by the Government: no township however has been formed, and the public house and store, and a few huts round about, retain the original name of Chain of Ponds. To be explicit, there is no township here at all. 6 Nowland himself went on to considerable financial success, not only as the proprietor of Muswellbrook s Royal Hotel, but also as owner of perhaps two-thirds of the town s valuable property. 7 The Inn itself, known at first as the Lady Gipps Inn in honour of the wife of the Governor, Major Sir George Gipps, officially opened on New Year s Eve, 1843, 8 although Nowland had at an earlier stage constructed a stone lock-up nearby, which the Colonial government leased for the overnight accommodation of prisoners under escort. 9 It is likely that this was a comparatively small structure, sufficient only for the temporary accommodation of a limited number of individuals; it is, however, certain that it was not, as asserted elsewhere, 10 the structure now described as Building B. This was, instead, surely employed for the preparation of food and the handling of laundry and the like, while its first floor will have accommodated staff and servants. Anecdotal evidence claims that the Inn, incorporating the main building and servants quarters, was built with materials supplied by convict labour. 11 This may or may not be the case, but its likelihood is not increased by the fact that the assignment of prisoners to private parties ceased on 1 July The assertion that the stone was 4 Sue Rosen, The Chain of Ponds Inn: Historical Context Report, in Robert Brown, Chain of Ponds Inn, Liddell NSW: Conservation Plan prepared for the Electricity Commission of New South Wales, September 1990, Appendix B, p Elizabeth Parkinson, Former Half-Way House falls into Sad Disrepair. Hunter Valley News, 26 September Maitland Mercury, Notes of a Trip Through the Northern District by an Ex-Reporter, No. 2, 7 September Muswellbrook Local and Family Historical Society, Personalities of the Past, p See Elizabeth Parkinson, Former Half-Way House. 9 Ibid. Liddell Coal has been advised by Umwelt Environmental Consultants that the lock-up was situated to the south-west, on the opposite side of Chain of Ponds Creek, and not within the site as listed in the State Heritage Register. 10 See Environmental Resources Management Australia Pty Ltd, Chain of Ponds Inn Stabilisation Works (July 2012), p See Elizabeth Parkinson, Former Half-Way House. 12 New South Wales Government Gazette, 16 April Page 9
11 quarried at a location outside Muswellbrook is more solidly based, 13 for Nowland s Royal Inn was itself stone-built. The hostelry was leased from Nowland by James Watson, formerly of Anvil Creek (Greta). 14 A contemporary advertisement states that: James Watson who formerly kept the Shamrock Inn, Anvil Creek begs leave respectfully to inform his friends and the public that he has opened that commodious House built by Mr. Nowland, at the Chain of Ponds half way between Singleton and Muswellbrook and trusts by a strict attention to the comfort of travellers and moderate charges to merit a portion of their patronage. Splendid stabling and supply of horse provender. Chain of Ponds, Liddell. 15 By the time Watson received his publican s licence in April 1848, the hostelry had been renamed as the Lady Mary Fitzroy Inn. 16 This is said to have been an expression of public sympathy following the accidental death of Lady Mary, 17 long-suffering wife of the Governor, Colonel Sir Charles FitzRoy, a notorious womaniser. By April 1852, the licence had passed to James Nowland, son of Henry, who changed the name to The Coach and Horses Inn. 18 Having then been leased by several licensees, the hotel was once again taken over by James, who in 1854 once again changed the name of the premises, this time to the Star of the North Inn. 19 It also bore this name in April 1861, but not before having been called The Traveller s Inn during two periods in which the licence was held by Patrick Cullen. 20 Thomas Guest, who appears to have made efforts to make the inn a place of popular entertainment as much as a drinking hall, 21 perhaps reflecting more difficult business conditions, preferred the name of Star of the North. With so many changes of name, it was not surprising that the hostelry became known to some simply as the Chain of Ponds, 22 and to others as the Half-Way House. Henry Nowland died at his Royal Hotel, Muswellbrook, in February Changing Times Not long after, extension of the Great Northern Railway from Singleton to Muswellbrook began, and a navvy s camp was set up near the Inn; 24 this for a time considerably increased the local population. 13 See Elizabeth Parkinson, Former Half-Way House. 14 Maitland Mercury, 11 January Maitland Mercury, 11 January Maitland Mercury, 26 April Catherine Foggo, Inns and Hotels : Some Hunter Valley Innkeepers. Sydney: Australian Hotels Association, NSW Branch, 1990, pp Maitland Mercury, 23 April Maitland Mercury, 22 April Maitland Mercury, 26 June Sue Rosen, The Chain of Ponds Inn, p See, for example, Maitland Mercury, 21 August Maitland Mercury, 19 February See, for example, Maitland Mercury, 6 April Page 10
12 A well-used stockyard also stood nearby. 25 With the opening of the line to Muswellbrook in May 1869, however, and the gradual eclipse of the coaching trade thereafter, the Inn had lost its importance; its licence was, therefore, allowed to lapse, although the still-born village was at least later provided with a primitive railway platform. The carriage of mails by train instead of by coach at least prevented the quite daring bailing-up of the coaches that had sometimes taken place nearby. 26 In 1870s the former inn became a wine bar and shop, and long remained so under licensees such as Mary Whitten 27 and John Whitten. 28 By the time of James Nowland s death in March 1883, 29 Joseph Whitten, patriarch of his family, had purchased the property. Whitten, originally of County Tipperary, had come to the area as a member of a team surveying the railway route to Glen Innes, and had opened the store mentioned earlier. 30 Around the turn of the last century, Liddell again briefly tasted prosperity when a railway workers camp was again established there in association with deviation works. 31 In 1898 the former inn and a portion of the surrounding land was bought by Michael McMahon of Petersham, who appears to have renamed it as Liddell House, and to have constructed the brickbuilt additions at rear. 32 A new wine license was taken up by John McMahon, 33 perhaps Michael s brother. During this period, horses, sheep and cattle were run on the property, which from January 1890, because of its proximity to the Liddell railway platform, also served as the local post office, with Joseph Whitten as Post Master. 34 The estate was well known for the high quality of its wool, 35 which appears to have been its major source of income. It is the McMahons who appear to have been responsible for the addition of the decorative wrought or cast iron verandah balustrade and frieze work by which the house was strongly characterised by the 1920s. 36 This gave the former Inn more of the character of a private residence, although the continuing presence of the sign advertising wine sales may indicate that these continued. In any case, the formerly entirely rural character of the general area began to change from the 1920s, with the opening of collieries such as Liddell, Durham, Hazeldene and Foybrook. Open cut mining commenced in the 1940s, and since that time has considerably expanded. 25 Maitland Mercury, 21 August See, for example, Maitland Mercury, 2 November 1861, 24 September Singleton Argus, 24 July Singleton Argus, 10 July Maitland Mercury, 6 March Singleton Argus, 12 June Singleton Argus, 8 April Elizabeth Parkinson, Former Half-Way House. 33 Singleton Argus, 5 January Singleton Argus, 11 January For prices obtained per bale, see for example Singleton Argus, 1928, reproduced 30 January Elizabeth Parkinson, Former Half-Way House. Page 11
13 After Michael McMahon s death, the property passed to his son, Edward; following his own demise and the establishment of a trust over the property, 37 the former inn accommodated the estate manager, while members of the McMahon family appear also to have resided there at different times. Figure 6. The former Inn, showing decorative iron lace work balustrade and frieze work The Role of the Electricity Commission of NSW In 1961 the property was purchased by J. Cavanagh, the manager, whose widow in 1966 sold it to the Electricity Commission of New South Wales ( ELCOM ), 38 which planned to develop a power station and associated collieries nearby. By this time, the New England Highway had bypassed the former inn, leaving no opportunity for its use as commercial premises even on a modest scale. By this time, most of the iron lace work on the verandah appears to have been replaced by fibro sheeting. By this time, too, the three main buildings and the outbuilding had become rather rundown, with evidence of termite activity. The property was, nevertheless, leased to tenants. Following a legal dispute, the property was vacated in about By the end of that year, valuable fittings had been stolen, while in 1980 the internal cedar doors and much of the main hall stairway had also disappeared. The buildings had now become uninhabitable, with the roof no 37 Singleton Argus, 12 August Elizabeth Parkinson, Former Half-Way House. 39 Sue Rosen, The Chain of Ponds Inn, p. 18. Page 12
14 longer being watertight. 40 The last vestiges of iron work on the balcony or verandah is said to have been removed by Figure 7. This view shows the former Inn after its acquisition by Elcom. Note the former New England Highway bridge in the foreground Heritage Recognition Despite its dilapidation, the complex was placed under an Interim Conservation Order in 1981; this was made permanent in late In 1985 the Heritage Council authorised work to arrest the further decline of the buildings. This, completed in 1987, appears to have consisted mainly of the re-roofing of the three main buildings, shown in the plan as A, B and C. 43 Tie-rods, steel columns and timber pit props were used as necessary. Some re-rendering and re-pointing work was also performed, but this was counterproductive because of the use of inappropriate materials. The loss of second storey floor in Building B may substantially have detracted from its stability, although it is understood that termite damage had already had a similar effect. The fibro and weatherboard outbuilding (Building D), originally used for storage and ablutions, and possibly as a smithy, and dating from the McMahon 40 Ibid., p Elizabeth Parkinson, Former Half-Way House. 42 Sue Rosen, The Chain of Ponds Inn, p Ibid. Page 13
15 era, does not appear to have been included: by the turn of the present century it had fallen into ruin; it collapsed in a windstorm in Having been included in the State Heritage Register in April 1999, Buildings A, B and C now enjoy the protection of the Heritage Act 1977 (NSW), with the registered proprietor having consequent responsibilities for its maintenance. The Register of the National Estate (RNE) was closed in 2007, and is no longer a statutory list; it is now maintained on a non-statutory basis only, as a publicly available archive and educational resource. The National Heritage List is now its equivalent in so far as non-commonwealth property is concerned. The former Chain of Ponds Inn is not included in this List, although its previous inclusion in the RNE remains as evidence of its level of assessed heritage significance. Page 14
16 5. PHYSICAL CONDITION REPORT BUILDING A 5.1 EXTERNAL ELEVATIONS NORTHERN ELEVATION Figure 8- Northern Elevation. Page 15
17 Figure 9- Northern Elevation. Ground Level Northern Elevation: o Two symmetrically placed double hung sash windows with stone sill (no glass remaining in either side of central entry door sidelights). o Central arched entry door with sidelights (glass broken). o Smooth sandstone ashlar stonework. Stonework damaged by rising damp for full length of verandah from plinth to fourth course, evidence of cement render to attempt repair. Increased damage at Eastern end possibly originally caused by Eastern Facades downpipe that formerly finished approx. 1m from the ground. This was later remedied, but the pipe has been dislodged by a recent wind storm. o Damp continues to move higher past first three courses, although its progress has been somewhat slowed. o Painted timber verandah columns on stone bases show termite damage. o Mid-Victorian stone paving on verandah. Paver stone nosings are cracked and broken on east and west ends. o Downpipes have been connected to a storm water system. Page 16
18 Figure 10- Damage to stonework and paving. Page 17
19 Figure 11-Verandah columns damaged by termites. Figure 12- Cracked and damaged paver nosings. Page 18
20 Figure 13- Mid-Victorian stone pavers, damaged by weathering. Figure 14- First floor of verandah, showing pediment, two windows and door. Page 19
21 Figure 15- Eastern end of first floor. Figure 16- Western end of first floor. Page 20
22 5.1.2 EASTERN ELEVATION Figure 17- Eastern Elevation. Sandstone Block Building: o Four symmetrically placed double hung sash windows with stone lintels and stone sills. o Dampness apparent near lower northern window. o Stonework has a draughted and pointed finish. o New galvanised metal downpipes on either end of building, both intact. Evidence of dampness (affecting stonework) where downpipe once again finishes approximately one metre from the ground, following storm damage. o One stone chimney in the centre of the elevation. Second course from top slightly dislodged. Page 21
23 Figure 18- Image showing dampness around window, and inappropriate cement render repair to lower courses of sandstone. Portion of downpipe connecting to stormwater system has been dislodged by a recent wind storm, re-introducing the damp problems previously mitigated by drainage works. Vegetative re-growth is evident. Page 22
24 Figure 19- Draughted and pointed finish to stonework. Page 23
25 Figure 20- Eastern (Southern addition) elevation, showing entrance to cellar. Brick Addition: o Sandstock brickwork Colonial bond wall. Evidence of fretting and cracking in brickwork and verandah cement due to dampness; gutter requires inspection for potential problems. o Two upper level double hung sash windows. Stone sill and brick flat arch lintel. o One lower level window with stone sill and brick flat arch lintel. o Two lower level external doors. Both doors missing. o Severe cracking to brickwork above southern most door, cracking up to the window on upper level. o Verandah cement render cracking horizontally and vertically at base. Sections of cement render have come off wall in cellar courtyard area. o Large movement gap where the older and newer wings join. o Former power box has now been removed. o Electricity connector point on southern end of wall. o Base/plinth of brickwork cracking and broken. o Timber verandah posts intact. o Verandah roof sheeted in Zincalume, with timber structure. Page 24
26 5.1.3 SOUTHERN ELEVATION Figure 21- Southern Elevation showing brick (left) and sandstone (right) wings. Brick addition: o Sandstock brickwork Colonial bond wall. Evidence of fretting and cracking in brickwork below and above window. o One double hung sash window on lower level with stone lintel. o Foundation of two courses of stone blocks, showing signs of fretting. o Two galvanised iron downpipes at either end of wall emptying into drains. Page 25
27 Figure 22- Stonework foundation fretting, and fretting of brickwork. Sandstone Block Building: o Stonework wall has a draughted finish to the block edges and has been pointed, showing continuing fretting to eastern side. o Five double hung sash windows with stone sills and stone lintels. o Cement render over stonework breaking off at cellar entrance. o Foundation stonework has in places suffered severe fretting through dampness, primarily in the cellar. Figure 16A- Evidence of severe spalling in cellar area. Page 26
28 Figure 23- Stonework fretting. Note evidence of original handrail location. Figure 24- Stonework finish (draughted and pointed) and stone window lintels, showing cracking. Page 27
29 5.1.4 WESTERN ELEVATION Figure 25- Western Elevation. Brick Addition: o Solid sandstock brick wall in Colonial bond. Evidence of fretting and cracking in brickwork at lower level of wall. o Sandstone block foundation, missing one block, making an entry to the sub floor. o Sandstone footing blocks are spalling. o Two symmetrically placed double hung sash windows at upper level with stone lintel and brick flat arch lintel. o Three vents in wall, two on lower level, one on upper level. o Large crack in brickwork between northern window and joint of two buildings. o Movement joint between the two buildings has previously been concealed by metal trim. o Timber fascia on eaves has a broken board at southern end of wall. Page 28
30 Figure 26- Brick fretting, displacement and rising damp damage to sandstone footing blocks. Figure 27- Sub floor access due to missing sandstone block, allowing entry by water and vermin to subfloor area. Page 29
31 Figure 28- Ornate ventilator in sandstock brick wall. Figure 29- Large crack in brickwork; void between the original inn and the later brick-built wing is concealed by the metal trim. Page 30
32 Sandstone Block Building: o Sandstone wall with a draughted and pointed finish. o Wall showing signs of fretting and spalling. o Damage to bottom three courses and foundation on northern end of wall from rising damp (south-west corner has been appropriately repaired with new sandstone), parts have been cement rendered however, damp is remaining to rise past level of render. o Two double hung symmetrically placed sash windows, two on upper floor, and one on lower floor. Windows all have stone sills and stone lintels. o Lintel above lower floor window has large crack at centre. Sill of same window also cracking. o One external door with timber and metal sheet awning with three stairs and a small path to same. o Two galvanised iron downpipes at either end of wall are connected to drains. Figure 30- Joint of two buildings showing draughted and pointed finish on sandstone blocks, also note metal trim. Page 31
33 Figure 31- Crack in stone lintel, stone sill and damage to lower three courses of stonework (which has been rendered and coursed) from rising damp. Note termite bait. Page 32
34 Figure 32- Detail of sandstone wall. Page 33
35 5.2 GROUND FLOOR INTERNAL ROOM 1 North Wall: o Two symmetrically placed double hung sash windows. o Western-most window retains cedar frame except upper architrave. o Crack in wall above same. o Eastern most window cedar frame is missing. o Both windows have no intact glass remaining. o Partial cedar skirting remains. o Lined with wallpaper which is peeling and has damage from past water ingress. o Electrical cable from ceiling near western-most window. South Wall: o Fireplace surround missing, including mantle, hearth, pilaster and fender. o Wallpaper showing signs of past dampness and peeling. o Skirting boards missing. East Wall: o One internal door. Door and door frame missing. o Wallpaper showing signs of past dampness and peeling. Page 34
36 West Wall: o One symmetrically placed double hung sash window. Two cracks above window. o Cedar window frame remains except the upper architrave. o Wallpaper showing signs of dampness. o No skirtings. Ceiling: o Lathe and plaster with decorative battens. o Evidence of apparent water damage and sagging. o Missing ceiling lining section showing apparent termite damage to first floor framing and ceiling battens under. o No light fixtures. Floor: o Timber floorboards. o Hole in South-East corner where floorboards have been previously removed. Figure 33- North Wall showing damage to windows, missing frame and glass. Note cracks above western window head. Damp-damaged wallpaper. Page 35
37 Figure 34- Detail of wallpaper. Figure 35- Damage to fireplace on South Wall. Cracking plaster and missing elements of fireplace. Page 36
38 Figure 36- Past water damage to ceiling, and missing plaster. Page 37
39 Figure 37- Termite damage to joists and battens in ceiling. Page 38
40 Figure 38- Western Wall window missing upper architrave and wall architrave. Note crack in wall above window. Page 39
41 Figure 39- Damaged floorboards, concealed by plywood sheeting, in front of fireplace. Page 40
42 5.2.2 ROOM 2 North Wall: o Two symmetrically placed double hung sash windows. o Both windows missing upper architrave. Remainder of cedar window frame intact. o Neither window has any intact glass remaining. o No skirtings remain. o Wallpaper showing signs of dampness and peeling. o Apparent water damage to lower section of wall. o Crack above eastern-most window. South Wall: o Fireplace surround missing including mantle, hearth, pilaster and fender. o Wallpaper showing signs of dampness and peeling. o No skirtings remain. o One small section of skirting remains in front of fireplace. o Signs of dampness on lower and upper parts of wall. East Wall: o One symmetrically placed double hung sash window. o Window missing internal frame. o Evidence of past water damage in south-east corner. o No skirtings remain. Page 41
43 West Wall: o One internal door. o Door and door frame missing. o Damaged wallpaper lining. o Some dampness near bottom of wall. o Large crack from ceiling height to top of door frame. o Skirting missing. Ceiling: o Corrugated iron lining to ceiling. o One light fitting, no fixture. Floor: o Timber floorboards. o Small void in north-east corner from missing boards. Page 42
44 Figure 40- North wall showing damaged window, missing plaster and added battens. Page 43
45 Figure 41- North-east corner showing water damage, missing skirtings, peeling wallpaper, missing plaster, added battens, void in floor and missing window frame parts. Page 44
46 Figure 42- South wall showing damaged fireplace and remaining skirting. Page 45
47 Figure 43- Western wall showing past water damage, and crack above door. Page 46
48 Figure 44- Eastern wall showing missing skirtings and plaster, added battens and damaged wallpaper. Note termite bait. Page 47
49 Figure 45- Floorboards and damaged fireplace. Page 48
50 Figure 46- Corrugated ripple iron ceiling lining. Note remains of electric light fitting. Page 49
51 5.2.3 ROOM 3 North Wall: o Fireplace surround missing including mantle, hearth, pilaster and fender. o Wallpaper showing signs of dampness and peeling. o Skirtings missing. o May be some dampness to lower and upper parts of wall. o Plaster chipping from above fireplace. South Wall: o Two symmetrically placed double hung sash windows. o Eastern window retains cedar frame. Crack in wall above same window. o Western window missing cedar internal frame. Both windows have no intact glazing. o No cedar skirting remains. o Wallpaper peeling and showing signs of past water damage. West Wall: o One internal door opening, missing its door. o Wallpaper is peeling and showing signs of apparent water damage. East Wall: o One symmetrically placed double hung sash window. o Window missing cedar on reveal and internal frame. o Wallpaper lining peeling may have signs of dampness. Page 50
52 Ceiling: o Fibrous plaster ceiling with stained timber battens, possibly Douglas Fir ( Oregon ). o Showing signs of past dampness. Floor: o Timber floorboards. Figure 47- North wall showing dismantled fireplace, missing skirtings and peeling wallpaper. Page 51
53 Figure 48- South East corner showing damage to windows, missing skirting boards, peeling wallpaper and signs of past dampness in ceiling. Page 52
54 Figure 49- Western wall with missing doorframe and past water damage to wall. Page 53
55 Figure 50- Southern wall with peeling wallpaper and missing window lights. Skirting boards are missing. Page 54
56 Figure 51- Fibrous plaster ceiling with decorative cedar battens, still in fair condition. Page 55
57 Figure 52- Rodent nest in north-eastern corner has been removed. Skirting boards are missing. Some floorboards have apparently been repaired. Page 56
58 5.2.4 ROOM 4 North Wall: o Fireplace surround, including mantle, hearth, pilaster and fender, missing. o Wallpaper showing signs of past dampness and peeling. o Signs of dampness in wall from ceiling to picture rail. South Wall: o Two symmetrically placed double hung sash windows. o Painted timber window frames bars. o Both windows missing partial internal frame. West Wall: o External doorway opening, missing door leaf. o Large amount of water damage from ceiling to picture rail. East Wall: o Internal doorway opening, missing door leaf. o Large triangular crack above door from ceiling to door frame. o Wallpaper showing signs of dampness and peeling. Ceiling: o Painted timber boards, missing boards in centre of room. Floor: Timber floorboards, missing in North East corner forming void. Page 57
59 Figure 53- Fireplace missing including mantle, hearth, pilaster and fender. Note added battens. Page 58
60 Figure 54- Window furniture for southern window is missing; note view to 1890s extension, and missing plaster. Page 59
61 Figure 55- Western wall showing past water damage, missing plaster and added battens. Page 60
62 Figure 56- Missing and broken floor boards now covered by plywood sheeting. Page 61
63 Figure 57- Missing and broken boards in ceiling, showing termite damage. Page 62
64 5.2.5 ROOM 5 (Hallway) North Wall: o Central arched entry door with sidelights. Door leaf missing. o Glass broken in sidelights. o Large cracks in plaster above Mid-Victorian flat arch. o Cedar dado boards remain on either side of doorway. o Internal door frame missing. South Wall: o One external door. Door leaf now detached, lying on ground. Door frame missing. o Dado boards missing. o Upper half of stairway and landing missing. Balustrade missing. o Termite damage evident on underside of stairs. o No skirting boards remain. East Wall: o Two internal doors, both missing frames and door leaves. o Dado boards remain in northern half of hallway and missing in southern half of room. o Large cracks above both doorways. o Wallpaper showing signs of dampness and peeling. o No skirtings remain. o Plaster cracking and breaking away from mid-victorian flat archway columns in centre of room. Page 63
65 West Wall: o Two internal doors, both missing frames and door leaves. o Dado boards remain in Northern half of room and missing in southern half of room. o Large crack above northern most doorway. Large amount of apparent termite damage above southern most doorway. o Wallpaper showing signs of past dampness and peeling. o No skirtings remain. o Plaster cracking and breaking away from Mid-Victorian archway columns in centre of room. Ceiling: o Northern half of room has two ceiling roses, both largely intact and painted. o Southern half of room has an intact painted pressed metal ceiling. Floor: o Timber floorboards, missing in some sections, leaving voids. o Large void in floor at entrance to Room 2. Page 64
66 Figure 58- North wall showing mid-victorian arch, cracking plaster around arch, peeling wallpaper and missing door frames. Front door has been better secured. Page 65
67 Figure 59- View to southern external door, showing archway with peeling paint and some loss of plaster. Note temporary scaffolding providing access to first floor. Page 66
68 Figure 60- Stair missing balustrade and dado boards (note dado also missing on eastern wall). Note temporary scaffolding providing access to first floor. Page 67
69 Figure 61- Eastern wall showing remaining dado boards, missing door frame, missing plaster with added battens, and peeling wallpaper. Void in floor now covered by plywood sheeting. Page 68
70 Figure 62- Western wall showing damaged door frame, missing dado boards and skirting boards, and peeling wallpaper. Page 69
71 Figure 63- Termite damage at entrance to Room 4. Page 70
72 Figure 64- Damaged door frame to room 4. Note temporary scaffolding providing access to first floor. Page 71
73 Figure 65- Pressed metal ceiling rose in northern half of hallway. Page 72
74 Figure 66- Pressed metal ceiling in southern half of hallway. Page 73
75 Figure 67- Damage timber floorboards. Page 74
76 Figure 68- Large void (concealed) in floor at entrance to Room 2. Page 75
77 5.2.6 ROOM 6 North Wall: o Two symmetrically placed double hung sash windows opening internally. o Painted window frames. Both windows missing partial frame. o Stone block work with lime wash finish. South Wall: o One internal doorway, missing door. o Sandstock brickwork with lime wash finish. East Wall: o Sandstock brickwork with lime wash finish. o One external door, missing door leaf which has fallen to the floor. Door frame remains intact. o Large vertical crack above doorway. West Wall: o Sandstock brickwork with lime wash finish. o Large cracks evident in corner above stair landing. o Termite damage to staircase, rendering it potentially unsound. No balustrade. Handrail displaced. Staircase unstable. Ceiling: o Painted timber boards. Page 76
78 o Cracks evident in timber boards. Floor: o Timber floorboards intact. Figure 69- Western wall, showing damaged staircase. Page 77
79 Figure 70- Painted timber ceiling showing signs of past dampness, and severe termite damage. Page 78
80 5.2.7 ROOM 7 North Wall: o One internal doorway, door leaf missing. o Sandstock brickwork with lime wash finish. South Wall: o One symmetrically placed external double hung sash window. o Window glass broken. Window frame remains intact. o Sandstock brickwork with lime wash finish. East Wall: o One external door, missing door leaf. Frame remains intact. o Sandstock brickwork with lime wash finish. West Wall: o Fireplace surround, including mantle, hearth, pilaster and fender, completely missing. o Displaced bricks lying inside fireplace. o Sandstock brickwork with lime wash finish. o Large cracks in brickwork above fireplace. o Large crack in brickwork on southern side of fireplace. Ceiling: o Ceiling coming away from roof. o Large amount of apparent termite damage present. Page 79
81 Floor: o Timber floorboards remain intact. Figure 71-South west corner showing damage to fireplace and large cracks above same. Faux tiling boards dislodged. Page 80
82 Figure 72- Majority of ceiling lining boards have now collapsed due to termite damage. Page 81
83 Figure 73- North-east corner showing debris from collapsed ceiling boards. Plywood sheeting was clearly installed during the Elcom period. Page 82
84 Figure 74- Faux tiling boards dislodged; cupboards have been removed. Page 83
85 5.3 FIRST FLOOR INTERNAL ROOM 1 North Wall: o Two symmetrically placed double hung sash windows. o Window frames remain; glazing bars removed. o Crack in wall above same. o Skirting boards missing. o Only a small portion of plaster remains. o Some cracking is evident. South Wall: o Plaster remains largely intact. o Wallpaper is missing, although small remnants remain. o Skirting boards are also missing. East Wall: o One internal doorway. Door leaf and frame missing. o Some door architraves remain. o Plaster is missing. o Wallpaper is missing. o Skirting boards have been removed. Page 84
86 West Wall: o One symmetrically placed double hung sash window. o Cedar window frames remain; some glazing bars damaged or missing. o Plaster is missing. o Wallpaper is missing. o Skirting boards have been removed, but some are stored proximally. o Cracking is evident. Ceiling: o Varnished tongue in groove boards. o Evidence of past water damage and sagging, although some areas are in fair condition. o No light fixture, although a portion of electrical lead remains. Floor: o Timber floorboards. o Floor is covered with debris. Figure 75- Western Wall showing substantially intact frame and some damaged or missing glazing bars. Cracking is evident. Note varnished tongue in groove ceiling boards. Page 85
87 Figure 76- Northern wall. Glazing bars are missing. A small portion of plaster remains. Some cracking is evident. Page 86
88 5.3.2 ROOM 2 North Wall: o Two symmetrically placed double hung sash windows. o Both windows missing cedar architraves. o One sash of western-most window missing. o Frames and glazing bars of sashes are missing. o Skirting boards missing. o Wallpaper showing signs of past dampness and peeling. o Some plaster is missing. o Some cracking is evident. South Wall: o Most plaster is missing. o Skirting boards are missing. o Battens have been fitted. o Signs of past dampness. East Wall: o One symmetrically placed double hung sash window. o Window architraves missing. o One window sash missing. o Skirting boards are missing. o Plaster has been removed. o Battens have been fitted to wall. Page 87
89 West Wall: o One internal doorway. o Door leaf, and architraves missing. o Remaining portion of door frame is damaged. o Some cracking evident. o Skirting missing. Ceiling: o Some tongue in groove ceiling boards have been damaged by damp, or are missing o Signs of termite damage. o Remaining boards are varnished. Floor: o Timber floorboards. o Signs of past dampness and rot. Figure 77- North wall showing damaged window and water damage. Page 88
90 Figure 78- North East corner showing water damage, missing skirtings, peeling wallpaper, hole in floor and missing window frame parts. Page 89
91 5.3.3 ROOM 3 North Wall: o Much plaster remains extant, and is in fair condition. o Wallpaper has been removed. o Skirting boards are missing. o Little sign of past dampness. o Painting appears to have occurred during later period of residential occupancy. South Wall: o Two symmetrically placed double hung sash windows. o Cedar window frames and glazing bars are in danger of collapse. o Most plaster has been removed. o Wallpaper has been removed. o Cracking is evident. West Wall: o One internal doorway, missing its door leaf. o Most architraves are missing. o Some signs of past dampness. o Cracking is evident. East Wall: o One symmetrically placed double hung sash window. o Window frame and glazing bars are substantially intact. o Plaster has been removed. o Battens have been fitted to support stonework. Page 90
92 Ceiling: o Tongue in groove ceiling boards have partially collapsed. o Termite damage and past effects of dampness evident. o Remaining boards are painted. o Some electrical leads are in place; steel conduit. Floor: o Timber floorboards, partially obscured by debris. Figure 79- East wall, showing missing plaster, added battens, and some cracking. Page 91
93 Figure 80- South-east corner showing damage to ceiling, remnant plaster and electric light fitting. Shingle roof battens can be seen on rafters. Page 92
94 5.3.4 ROOM 4 North Wall: o Plaster substantially intact. o Wallpaper is missing. o Some small spots of remnant wallpaper remain. o Signs of past dampness. o Skirting boards remain. South Wall: o Two symmetrically placed window apertures. o Cedar frames almost completely missing. o Sashes are missing. o Window architraves are missing. o Most plaster remains extant. o Wallpaper is missing. o Skirting boards remain. West Wall: o Symmetrically placed double hung sash window. o Window frames, glazing bars and lights are intact. o Much plaster above and below is missing. o Wallpaper is missing. o Skirting boards remain. East Wall: o Internal doorway, missing door leaf. o Door architraves are missing. o Some cracking evident. Page 93
95 o o Most plaster remains. Wallpaper has been removed. Ceiling: o Painted timber boards, missing boards in centre of room. Floor: o Timber floorboards. Some signs of damp and termite damage; some voids present. Figure 81- South wall, showing missing window frames and sashes. Page 94
96 Figure 82- South-western and western walls, showing difference in the condition of windows. Page 95
97 5.3.5 ROOM 5 North Wall o External Wall: o Plaster mostly intact. o Wallpaper missing. o Verandah door missing, replaced by Elcom-era timber door. o Door frame mostly removed. o Architraves missing. o Some cracking is evident. o Cedar dado boards are missing. o Skirting boards are missing. o Vestibule: o Plaster mostly intact. o Wallpaper missing. o Internal door leaf remains, but may not be original. o Severe termite damage to internal timber studs and laths. South Wall: o Symmetrically placed double-hung sash window. o Window frames, architraves, sill, sashes and glazing bars are intact, protected from theft by void formerly occupied by stairway (stolen c. 1980). o Upper stairway, balustrade and landing missing. o Plaster remains extant, with signs of dampness. o Single electrical fitting remains. Page 96
98 East Wall: o Two internal doors, both missing architraves and door leafs. o Dado boards are missing. o Cracks above both doorways. o Much plaster remains extant, but with some voids. o Remaining wallpaper showing signs of past dampness and peeling. o No skirtings remain. o Some cracking is evident. West Wall: o Two internal doors, both missing architraves and door leafs. o Remaining door frames are termite damaged. o Dado boards are missing. o Remaining wallpaper showing signs of past dampness and peeling. o Skirting boards are missing. o Plaster is mostly extant, with some voids. Ceiling: o Many varnished tongue in groove ceiling boards remain, with some past water damage and termite damage evident. Floor: o Timber floorboards, with voids in some sections, mainly from termite damage although some rot present. o Large hole in floor at entrance to Room 2. Figure 83. View to Northern external wall, showing doorways to Vestibule and Room 2. Page 97
99 Figure 84- Figure 85- Ceiling lining boards, showing water and termite damage. Page 98
100 Figure 86- Doorframe leading to Room 3, showing termite damage and missing architraves. Page 99
101 Figure 87. Northern internal wall, showing Elcom-era door. Note missing door jamb, frame and architraves. Page 100
102 Figure 88. Internal wall between hallway and vestibule, showing severe termite damage to studs and laths. Page 101
103 Figure 89. Detail of southern window, showing its relatively good condition. Page 102
104 Figure 90. The substantially intact southern window, protected from theft/damage by the void of the stolen staircase. Note remnant architrave at top of doorway to Room 3. Page 103
105 Figure 91. Damaged doorway to room 2; note peeling wallpaper. A surviving portion of architrave is seen at right. Page 104
106 Figure 92. Northern vestibule, showing largely intact door frame and architraves, with missing door leaf. Note battens, and water damage to wallpaper. Page 105
107 5.3.6 ROOM 6 o Inspection of this room was not possible, due to the instability of the connecting staircase. Page 106
108 Figure 93- Western wall showing unstable staircase. Figure 94- Painted timber ceiling showing signs of dampness. Page 107
109 5.3.7 ROOM 7 o Inspection of this room was not possible, due to the instability of the existing staircase. Page 108
110 6. PHYSICAL CONDITION REPORT BUILDING B 6.1 EXTERNAL ELEVATIONS Northern Elevation Figure 95-Northern Elevation o o o o Sandstone block wall with draughted and pointed finish. Two large vertical cracks from ground to roof. First three stone courses plus foundation damaged by rising damp. Endplates of two horizontal steel tie supports through wall. Page 109
111 Figure 96- Damaged stonework and steel tie support in wall. Figure 97- Vertical cracks and steel tie supports. Page 110
112 6.1.2 Eastern Elevation Figure 98- Eastern Elevation o o o o o o o Five windows, three on upper level and two on lower level. Southern two windows unable to be inspected/visualised due to ivy growth. Ivy should be removed to assist in maintaining normal moisture level in stonework behind. Windows have stone lintels and stone sills. One external door with stone lintel. Sandstone block wall has a draughted and pointed finish. Large vertical cracks from centre upper window to door. Rising damp evident in lower six courses of stonework. Patchy hard cement render on lower third of wall shows a previous attempt to repair damage from rising damp. Page 111
113 Figure 99- Ivy growth on Eastern Elevation has been removed. Downpipe has been dislodged by recent windstorm. Page 112
114 Figure 100- Rising damp visible on northern end of wall. Page 113
115 Figure 101- Vertical cracking below upper window. Page 114
116 6.1.3 Southern Elevation Figure 102- Southern Elevation o o o Sandstone block wall with draughted and pointed finish. Endplates of two horizontal steel tie supports through wall. Rising damp damage evident to lower three courses of stonework. Page 115
117 Figure 103-Rising damp damage. Page 116
118 6.1.4 Western Elevation Figure 104- Western Elevation o o o o o o o Sandstone block wall with draughted and pointed finish. Evidence of severe movement in wall, large vertical crack from roof to doorway opening head. Endplates of four horizontal steel tie supports through wall. Three symmetrically placed upper level double hung windows. Two lower double hung windows. Windows have stone sills and stone lintels. One lower level external doorway with timber door. Stonework damaged by rising damp for full length of wall from foundation to fourth course, evidence of cement render to attempt repair. Damp continues to move higher past first three courses. Sound Zincalume roof sheeting. Page 117
119 Figure 105-Damage from damp, showing attempted repairs. Page 118
120 6.2 GROUND FLOOR INTERNAL All internal walls and floors have been removed, leaving only steel cross tie bracing and roof supports. North Wall: o Sandstone block wall with lime wash finish. o Evidence of a previously collapsed or removed northsouth wall. o First three courses have been repaired with bricks (damage caused by rising damp). o Openings in between stonework on lower three courses, damage from rising damp. o Evidence of a previously collapsed or removed upper floor level. South Wall: o Sandstone block wall, with lime wash finish. o Evidence of a previously collapsed or removed northsouth wall. o First three courses have been repaired with bricks and stone blocks (damage caused by rising damp). o Evidence of a previously collapsed or removed upper floor level. East Wall: o Three upper and two lower level symmetrically placed windows. No galzing in situ. o One external door, missing its door leaf. o Ivy entering building via roof eave. o First four courses have been repaired with bricks (damage caused by rising damp). o Damp is continuing to rise above repaired bricks. West Wall: o Three upper and two lower level windows. No glazing in situ. o One external door with painted timber door leaf. o First three-five courses have been repaired with bricks and stonework (damage caused by rising damp). Ceiling: o Exposed underside of roof structure. o Non-original steel and timber framing in roof structure, and sound Zincalume metal roof sheeting. o Original roof framing appears to have previously collapsed from apparent former termite damage. Floor: o Partial remains of brick and concrete slab. o Concrete slab has been removed to decrease the amount of rising damp. o Floor consists of dirt and debris. Page 119
121 Figure 106- Northern Wall, showing repairs to lower courses as a result of rising damp damage. Page 120
122 Figure 107- Southern wall, with repairs to lower courses. Page 121
123 Figure 108- Eastern wall showing previous repairs to stonework Page 122
124 Figure 109- Past repairs to Western wall. Page 123
125 7. PHYSICAL CONDITION REPORT BUILDING C 7.1 EXTERNAL ELEVATIONS Northern Elevation Page 124
126 Figure 110- Northern Elevation. o o o o Sandstock brickwork with sandstone block quoining on a sandstone foundation. One narrow fixed steel framed louvre window without glass with possibly recent tooled render lintel. Cement render to western end of wall in apparent poor attempt to repair damage caused by rising damp. Rising damp evident along bottom 1m of wall. Page 125
127 Figure 111- Damage from rising damp up to window. Figure 112- Rising damp damage to foundation and evidence of use of inappropriate cement, rather than lime, render at western end of wall. Page 126
128 7.1.2 Eastern Elevation Figure 113- Eastern Elevation. o o o o o o o Sandstock brickwork with sandstone block quoining, on a sandstone foundation. Four symmetrically placed upper level windows and one external lower level door. Three sandstone quoins on the northern end are oversized, extending approx. 300mm from the building. Damage to window frames, bricks chipped and evidence of brick replacement. Evidence of rising damp on the lower 2m of the wall. Large crack with significant gap from upper level window to doorway. Chimney is inadequately supported, and is out of true. Page 127
129 Figure 114- Large crack extending from window sill to door lintel. Page 128
130 Figure 115- Oversized quoins and rising damp repairs. Page 129
131 7.1.3 Southern Elevation Figure 116- Southern Elevation. o o o o o o Sandstock brickwork with sandstone block quoining, on a sandstone foundation. One upper level window with flat stone arched lintel, previously a door, evidence of brick infill to convert door to window. Infill now showing large vertical cracking. One lower level narrow fixed steel framed louvre window without glass. Three lengths of timber projecting from upper level below window, most probably the landing of a former external staircase. One galvanised steel downpipe continuing into drain. Evidence of previous repairs to areas damaged by rising damp. Page 130
132 Figure 117- Cracking to infill brickwork. Figure 118- Previous repairs to areas damaged by rising damp. Page 131
133 7.1.4 Western Elevation Figure 119- Western Elevation. o o o o o o Sandstock brickwork with sandstone block quoining on a sandstone foundation. Four symmetrically placed upper level windows with sandstone sills and flat stone arched lintels. Three lower level external doors with flat stone arched lintels. Evidence of rising damp at lower 1.5m of wall, particularly to the northern sandstone foundation which has previously been cement rendered. Evidence of brick repair, possibly to attempt to stabilise bowing of the wall. Numerous vertical cracks from window sills to door lintels. Page 132
134 Figure 120- Damage caused by rising damp and cracks above doors. Page 133
135 Figure 121 Rising damp damage to southern end of wall. Page 134
136 Figure 122- Sandstock brick infill and bowing wall. Page 135
137 7.2 GROUND FLOOR INTERNAL ROOM ONE North Wall: o Sandstock brick wall with lime wash finish and one narrow fixed steel framed louvre window without glass. o Cement render to lower 1/3 of wall, repair of damage caused by rising damp. South Wall: o Internal stud framed partition wall visible, lining of wall has been removed. o Large amount of breakage in southern side of Room 2 s northern wall lining. West Wall: o Sandstock brick wall with lime wash finish. o Cement render to lower 1/3 of wall, repair of damage caused by rising damp. East Wall: o Sandstock brick wall with lime wash finish. o Large crack in brickwork above doorframe to ceiling. Ceiling: o No ceiling lining. o Timber structure visible. Floor: o Square stone slabs uneven level, all intact. Page 136
138 Figure 123- North-eastern perspective, showing wood-fired washing copper to the left and damaged wall lining to the right. Figure 124- Eastern wall with large crack in brickwork from doorframe to ceiling Page 137
139 Figure 125- Cement render to lower 1m of Western wall. Page 138
140 7.2.2 ROOM TWO (Stairway Hall) North Wall: o Ripped and broken wall lining. South Wall: o Vertical timber boards and flat sheet timber lining. West Wall: o Sandstock brick wall with partial lime wash finish. o One external timber door that jams when shut. o Evidence of newer bricks around doorway, most likely to be repairs to damage caused from rising damp. East Wall: o Sandstock brick wall with partial lime wash finish and cement render to lower 1/3 of wall, possibly repair of damage caused by rising damp. o Outer string of staircase is the only remaining evidence of a former stair in this room. Ceiling: o No ceiling, due to need for stair opening. Floor: o Stone slabs uneven level, all intact. Page 139
141 Figure 126- Eastern wall showing repairs to rising damp and the remainders of the collapsed staircase. Page 140
142 7.2.3 ROOM THREE North Wall: o Timber stud wall without lining. o Unable to visually inspect entire wall due to large stack of bricks blocking views. o Small opening in wall to allow access into room. South Wall: o Lower wall, vertical timber boards. o Upper wall, horizontal timber boards with square opening to allow access to Room 4. West Wall: o Sandstock brick wall with partial lime wash finish and one timber external door opening. o Newer bricks evident around doorway, suggesting door opening was originally larger than current size. East Wall: o Sandstock brick wall with partial lime wash finish. o Evidence of previous door opening that has been bricked in. o Fireplace and chimney above are inadequately supported by colliery roof props. o Rising damp damage evident at base of wall. Ceiling: o Timber structure visible. o Termite damage and termite nest located in joists. Floor: o Stone slab paving. Uneven level, all remain intact. Page 141
143 Figure 127- Termite nest in joists. Note timber roof props supporting the fireplace and chimney above. Figure 128- Rising damp and bricked in door opening. Props again in evidence. Page 142
144 7.2.4 ROOM FOUR North Wall: o Lower wall, vertical timber boards. o Upper wall, horizontal timber boards with square opening to allow access to Room 3. South Wall: o Sandstock brick wall with lime wash finish, on a sandstone block foundation. o One narrow fixed steel bar louvred window without glass. West Wall: o Sandstock brick wall with lime wash finish with one timber external door opening. o Newer bricks evident around doorway, suggesting door opening was originally larger than current size. East Wall: o Sandstock brick wall with lime wash finish on sandstone block foundation. o Evidence of repairs to lower 1m of wall, most likely damage caused by rising damp. Ceiling: o Exposed timber structure, no lining. o Evidence of termite damage and one termite nest located. Floor: o Stone slabs uneven level, all intact. Page 143
145 Figure 129- Evidence of repair work completed to damage caused by rising damp. Figure 130- Termite nest in joists. Page 144
146 Figure 131- Southern wall showing lime washed wall and newer brickwork. Page 145
INSPECT DIRECT Pty Ltd
Web Page: www.inspectdirect.com.au INSPECT DIRECT Pty Ltd Property Address: Sample.Dilapidation.Report Victoria Building Status / Dilapidation Report This is not a Pest Inspection The Building Status /
More informationSCHEDULE OF CONDITION IN RESPECT OF HEN & CHICKENS 143 DEANSGATE BOLTON BL1 1EX ON BEHALF OF PUNCH TAVERNS. Prepared by:
SCHEDULE OF CONDITION IN RESPECT OF HEN & CHICKENS 143 DEANSGATE BOLTON BL1 1EX ON BEHALF OF Prepared by: McBains Cooper Consulting Ltd 120 Old Broad Street London EC2N 1AR Tel No: 020 7786 7900 Fax No:
More information6.0 GLENTHORNE FARM. 6.1 Description of Glenthorne Farm/Campus
76 6.0 GLENTHORNE FARM 6.1 Description of Glenthorne Farm/Campus Glenthorne Campus is based on the former Glenthorne Farm, later the CSIRO property and is essentially rural agricultural setting which retains
More informationSTRUCTURAL ASSESSMENT REPORT HOFFMAN BRICKWORKS FORMER BRICK PRESS BUILDING CORNER DAWSON STREET AND BRICKWORKS DRIVE BRUNSWICK, VICTORIA PREPARED BY
STRUCTURAL ASSESSMENT REPORT HOFFMAN BRICKWORKS FORMER BRICK PRESS BUILDING CORNER DAWSON STREET AND BRICKWORKS DRIVE BRUNSWICK, VICTORIA PREPARED BY THE O NEILL GROUP PTY LTD 2 OXFORD STREET SOUTH YARRA
More informationThe Butler Gallery at the Evans Home CONSERVATION REPORT. McCullough Mulvin Architects. September 2016
The Butler Gallery at the Evans Home CONSERVATION REPORT McCullough Mulvin Architects September 2016 To be read in conjunction with impact statement and condition survey / recommendations in Carrig reports
More informationDr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018
G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake
More informationObservations and suggestions, rehabilitation and re-use of stable building, 12, Back Newton Grove, Chapeltown, Leeds,
Observations and suggestions, rehabilitation and re-use of stable building, 12, Back Newton Grove, Chapeltown, Leeds, 12, Back Newton Grove is a brick-built stable building formerly attached to 12 Newton
More informationBUILDING SURVEYOR S INSPECTION REPORT OLD CO-OP BAKERY SUBSTATION - WEST CALDER FOR COMMUNITY DEVELOPMENT TRUST WEST CALDER.
BUILDING SURVEYOR S INSPECTION REPORT OF OLD CO-OP BAKERY SUBSTATION - WEST CALDER FOR COMMUNITY DEVELOPMENT TRUST WEST CALDER Prepared by SEPTEMBER 2017 Accessibility Statement In accordance with the
More informationMAINTENANCE PLAN Wing Village Hall, Morcott Road, Wing, Oakham LE15 8SA
MAINTENANCE PLAN Roof Covering Roof slates Yearly Maintenance & Finishes 1 1, 8 & 13 Timber fascia and soffit boards Slates in good condition, some have been replaced during routine maintenance of roof.
More informationChapter 4 Rehabilitation
Chapter 4 Rehabilitation A. Introduction B. Facades & Storefronts C. Windows D. Entrances, Porches, & Doors E. Foundation F. Roof G. Masonry H. Wood I. Paint J. Rear of Buildings Jamaica NationalHeritage
More informationEnabling and Temporary Works CHAPTER 15
Enabling and Temporary Works CHAPTER 15 15.1 Enabling Works 15.1.1 Situations will arise where there are concealed elements within a building whose condition needs to be assessed in advance of proposals
More informationSECTION 6.3 DOWNTOWN HISTORIC DISTRICT (DTH)
SECTION 6.3 DOWNTOWN HISTORIC DISTRICT (DTH) A. Purpose Wylie's downtown has been identified by the Comprehensive Plan as a valuable resource worthy of preservation as a historic district. This district
More informationMAJOR DEFECTS BUILDING SURVEY REPORT
MAJOR DEFECTS BUILDING SURVEY REPORT XXXXXX Road Bedminster Bristol BS3 XXX Prepared for Mr XXXXXXX July 2017 T J Maggs MRICS MAGGS AND ALLEN 22 Richmond Hill Clifton Bristol BS8 1BA 0117 973 4049 survey@maggsandallen.co.uk
More informationDenis Creedon, B.E., MIEI. CONSULTING ENGINEER
Denis Creedon, B.E., MIEI. CONSULTING ENGINEER PROPERTY INSPECTION REPORT PROPERTY: CLIENT: DATE: Denis Creedon, B.E., MIEI, CONSULTING ENGINEER Tel: 02221157, 0868072327 N0.6 Chapel Lane, Mallow, Co.
More informationThis report has been prepared at the request of the Client, Mr & Mrs A Bellamy. Its purpose is to:
The Brewery Hook Norton Banbury Oxfordshire OX15 5NY SITE VISIT REPORT Telephone: 0845 241 4705 Email: info@solid-structures.com www.solid-structures.com Project Name:- 6 The Square, Aynho Project Address:-
More informationBenefited Land means all the lots created when the Land is subdivided in accordance with the Deposited Plan;
TAYLOR PRIVATE ESTATE STAGE 15B RESTRICTIVE COVENANT 1. Definitions 1.1 In this Deed: Benefited Land means all the lots created when the Land is subdivided in accordance with the Deposited Plan; Benefited
More informationSTRUCTURAL ASSESSMENT SURVEY REPORT
Level 6, River Park House, 225 High Road, Wood Green, London N22 8HQ Tel: 020 8489 5504 Fax: 020 8489 5229 Email: building.control@haringey.gov.uk www.haringey.gov.uk Head of Building Control Robert McIver
More informationThe Australian Catalog Content is compiled by Cadsoft Australia, for any further information contact:
The Australian Catalog Content is compiled by Cadsoft Australia, for any further information contact: don@cadsoftaustralia.com.au Phone 0412 410003 Walls Internal Walls Catering for Pre Fab and Stick built
More informationSCHEDULE OF CONDITION
SCHEDULE OF CONDITION Public House Bucks Mr C INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Internal Rooms page 8 Other Matters page 27-28 FIRE REGULATIONS
More information100 SUNSET AVENUE. DHR RESOURCE NUMBER: Primary: Double/Duplex (non-contributing) DATE/PERIOD: Architectural Description
100 SUNSET AVENUE 100 Sunset Avenue DHR RESOURCE NUMBER: 104-5084-0216 Primary: Double/Duplex (non-contributing) DATE/PERIOD: 1965 Vernacular Site Description: This vernacular duplex is located along the
More informationSCHEDULE OF CONDITION
SCHEDULE OF CONDITION West Hampstead, London NW6 FOR Mr J Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Limitations page 28 Signature Document
More informationSlave Housing Data Base
Slave Housing Data Base Building Name: Tuckahoe Plantation, Quarter B Evidence Type: Extant Site ID: Historical Site Name: Tuckahoe Plantation City or Vicinity: County: Goochland State: Virginia UTM: @NW
More informationREINSTATEMENT VALUATION
REINSTATEMENT VALUATION Marylebone, London W1U FOR Mr K Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS INTRODUCTION AND INSTRUCTION SYNOPSIS CONSTRUCTION SUMMARY EXECUTIVE SUMMARY
More informationHANDOVER INSPECTION PRE-PURCHASE BUILDING INSPECTION REPORT
PPDoesn t Apply HANDOVER INSPECTION PRE-PURCHASE BUILDING INSPECTION REPORT This Report» Building Inspection Report» House ONLY» House AND Unit» All inspections are standard visual reports in accordance
More informationSCHEDULE OF CONDITION Prepared October The White Hart Prepared By email: mail@1stassociated.co.uk 0800 298 5424 ASSOCIATED OFFICES NATIONWID was setup to market a privately owned Independent Chartered
More informationBlast Management Strategy Chain of Ponds Inn
Blast Management Blast Management Strategy Chain of Ponds Inn Document Table of Contents 1 Background... 3 2 Purpose... 3 3 Scope... 4 4 ning... 6 4.1 Studies Undertaken... 6 4.2 Consultation... 6 5 Implementation...
More informationKEVIN BURNS BUILDING INSPECTIONS REGISTERED BUILDER PRE-PURCHASE VISUAL STRUCTURAL INSPECTION REPORT No. 822
KEVIN BURNS BUILDING INSPECTIONS REGISTERED BUILDER 6163 PRE-PURCHASE VISUAL STRUCTURAL INSPECTION REPORT No. 822 CLIENT: Talavera PROPERTY ADDRESS: Mindarie DATE: 20 April 2017 TIME: 9.00am WEATHER: Fine
More informationSchedule of Condition
Schedule of Condition Prepared with regard to The Drill Hall, High Street, Wellingborough Produced for and on behalf of The Borough Council of Wellingborough 2nd October 2014 BS1715 Contents Page 1 Preliminaries
More informationVictorian Period. Style Description. Features. Materials. Western Australian House Styles Information Page
Victorian 1850 1900 Some houses were still built along Colonial lines, but this period saw a break from symmetry. In most cases, a section of the house was thrust forward to produce an L- shaped plan.
More informationHomebuyers Survey. Final Report. Mr Client. A Home, A Street, A Town. 3rd July 2014
Homebuyers Survey Final Report Mr Client A Home, A Street, A Town 3rd July 2014 Alpine Water Management Ltd Dorset House Regent Park Kingston Road Leatherhead KT22 7PL Tel: 0845 319 9 319 www.alpinedamp.co.uk
More informationTOFT HOUSE, THRESHFIELD Heritage Statement Feature: Window frames in South Elevation - windows 5,6,7,12,13 Description Softwood painted casements with side hung opening lights. Single glazed. Simply constructed
More informationCONDITION SURVEY Punch Taverns Angel Inn North Street Scarborough CONDITION SURVEY
CONDITION SURVEY 200090 Angel Inn 44-46 North Street Scarborough UK CONDITION SURVEY 25 June 2018 Gleeds Wilford House 1 Clifton Lane Wilford Nottingham NG11 7AT CONTENTS 1. Property Overview... 3 2. Element
More informationRegarding the refusal to issue a code compliance certificate for a 13-year-old house at 14 Patsy O Hara Place, Swanson, Auckland
Determination 2011/077 Regarding the refusal to issue a code compliance certificate for a 13-year-old house at 14 Patsy O Hara Place, Swanson, Auckland 1. The matter to be determined 1.1 This is a determination
More informationSCHEDULE OF CONDITION
SCHEDULE OF CONDITION A Public House in Surrey FOR Mrs R INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Internal Rooms page 15 GROUND FLOOR TRADING AREA
More information6. Guidelines for Special Building Types
6-1 6. Guidelines for This chapter concerns building types that are characterized by special features that reflect their original or adaptive use. The rehabilitation of such buildings will be reviewed
More informationBUILDING SURVEYOR S INSPECTION REPORT OLD CO-OPERATIVE BAKERY, WEST CALDER FOR WEST CALDER AND HARBURN COMMUNITY DEVELOPMENT TRUST LTD.
BUILDING SURVEYOR S INSPECTION REPORT OF OLD CO-OPERATIVE BAKERY, WEST CALDER FOR WEST CALDER AND HARBURN COMMUNITY DEVELOPMENT TRUST LTD Prepared by SEPTEMBER 2017 Building Surveyor s Inspection Report
More information37004 Charles Town Pike ca Charles Town Pike ca. 1770
IV.11 Building Materials Used in Historic Structures Materials, details, and colors contribute significantly to the architectural character of Hillsboro. These materials are sensitive to the human scale
More informationAccepted Architectural Styles 1. Classical Revival 2. French 3. Texas Regional Vernacular 4. Tudor 5. Mediterranean 6. Modern Classical Revival Classical Revival design seeks to emulate elements of Ancient
More informationSCHEDULE OF CONDITION
SCHEDULE OF CONDITION Nottinghamshire Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations Internal Rooms GROUND FLOOR BASEMENT FIRST FLOOR Other Matters/Services FIRE REGULATIONS DISABILITY DISCRIMINATIONS
More informationHistoric Scodand Board Meeting 26 th April 2007 HSB 08/ 07
Historic Scodand Board Meeting 26 th April 2007 HSB 08/ 07 Appendix M - Tabulation of proposed works, by room 24 Tabulation of proposed works, by room. Room Room Name Analysis of significant elements In
More informationTHE SAILORS HOME, O CURRY STREET, LIMERICK
As described in the Buildings of Ireland Database (Reg. No. 21517010) 1.0 Description Detached five-bay two-storey stucco enriched former sailor's house, built c. 1857, and later in use as a military barracks
More information0331 Brick and block construction
0331 BRICK AND BLOCK CONSTRUCTION 1 GENERAL 1.1 STANDARDS Materials and construction: To AS 4773.1 and AS 4773.2. 2 PRODUCTS 2.1 DURABILITY Exposure environment: [complete/delete] Exposure locations: To
More informationRegarding the code-compliance of a channel drain around the foundation of a house and garage at 533 Waitoki Road, Wainui, Auckland
Determination 2011/095 Regarding the code-compliance of a channel drain around the foundation of a house and garage at 533 Waitoki Road, Wainui, Auckland 1. The matter to be determined 1.1 This is a determination
More informationSchedule of Condition
Schedule of Property Address: Outlet Number: 300228 Document Reference: Old Comical 15 St. John s Road Isle of Wight PO36 8ES N/A Document Date: 21st March 2018 Rev. Contents Page 2 A. Document Control
More informationSchedule of Condition
Schedule of Property Address: Outlet Number: 200903 Document Reference: The Kings Arms Hotel Station Road Stanstead CM24 8BE Document Date: 9th June 2018 G18-7009 Rev. Contents Page 2 A. Document Control
More informationDesign Guidelines for Construction and Renovation in the Longmeadow Historic District
Design Guidelines for Construction and Renovation in the Longmeadow Historic District Revision 2008.1 The following list of Guidelines has been compiled to facilitate the homeowner's planning for projects
More informationSCHEDULE OF CONDITION
SCHEDULE OF CONDITION A Public House In Somerset FOR Ms M Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Internal Rooms page 17 Limitations
More informationSCHEDULE OF CONDITION. Fulham, London SW6 FOR. Mr S Of XXXX Limited. Prepared by: INDEPENDENT CHARTERED SURVEYORS
SCHEDULE OF CONDITION Fulham, London SW6 FOR Mr S Of XXXX Limited Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Internal Rooms page 12 GROUND
More informationTarquin, 10 Hilltop Crescent, Fairlight. January Celebrating 10 years. SE elevation and low rises before works began
Celebrating 10 years January 2016 Dear clients and friends: Welcome to our latest newsletter, providing information on some of our more interesting projects of 2015. Having celebrated 10 years in business,
More informationHorticulture Building
005 Horticulture Building University of Saskatchewan Heritage Register November 2014 005 Horticulture Building Alternate Names Header Houses Figure 1. A window sill of Indiana limestone set into a greystone
More informationWhat you need to know about. Maintenance of Balconies
What you need to know about Maintenance of Balconies 2 Inspection statistics have revealed numerous rotting balconies that could cause severe injury or death in the event of a collapse. Why is there a
More informationINTERNATIONAL BUILDING CODE
INTERNATIONAL BUILDING CODE MODEL BUILDING CONDITIONS ASSESSMENT The Reid and Hughes building is a four-story, four-bay, brick building, constructed in 1869 with a later addition known as the Williams
More informationCABONNE COUNCIL DEVELOPMENT CONTROL PLAN NO. 15 RELOCATABLE AND TRANSPORTABLE HOMES
CABONNE COUNCIL DEVELOPMENT CONTROL PLAN NO. 15 RELOCATABLE AND TRANSPORTABLE HOMES As approved by Council at the meeting of 20 June 2005 Came into effect on 14 July 2005 I, G. L. P. Fleming, General Manager,
More informationSCHEDULE OF CONDITION
SCHEDULE OF CONDITION Buckinghamshire Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Internal Rooms page 10 GROUND FLOOR FIRST FLOOR Other Matters page 28 FIRE REGULATIONS DISABILITY AND
More informationDESIGN GUIDELINES. (Stages 10, 11, 12 & 13)
DESIGN GUIDELINES (Stages 10, 11, 12 & 13) November 2014 Contents 1.0 Vision for Waterhaven Point Cook... 3 2.0 Purpose of these Guidelines... 3 3.0 Approval Process... 3 4.0 Site Layout and Building Setbacks...
More information306 6th Street SW
306 6th Street SW 104-0213-0132 Primary Resource Information: Single Dwelling, Stories 2.00, Style: Other, ca 1890 July 2006: This 1890s, 2-story, 2-bay, cross-gabled, side-passage vernacular frame dwelling
More informationFINAL DRAFT. Buildings Fort Monroe. resource inventory FORT MONROE HISTORIC PRESERVATION DESIGN STANDARDS RESOURCE INVENTORY 4C.
Buildings 151 209 4C Fort Monroe resource inventory FORT MONROE HISTORIC PRESERVATION DESIGN STANDARDS RESOURCE INVENTORY 4C.231 FAMILY HOUSING NCO DATE OF CONSTRUCTION 1911 ARCHITECTURAL STYLE Colonial
More informationRhondda Tunnel RSB 1m 44c
Rhondda Tunnel RSB 1m 44c Special Examination - 17 April 2015 1. Background 1.1 Rhondda Tunnel was built in 1887-1890. It was nearly 2 miles long and connected the village of Blaencwm in the Rhondda Valley
More informationInclusions FRAMING GARAGE FIXED SITE COSTS & CONNECTIONS EXTERNAL. 90mm pine wall frames with stabilised pine roof trusses
Inclusions FRAMING 90mm pine wall frames with stabilised pine roof trusses GARAGE Brick veneer garage including sectional overhead door to front (garage size product specific) Painted fibrous cement sheet
More informationExample Schedule of Condition Report
1 INTERIOR Ground Garage Ceiling Timber members. Members appear to be in a fair and reasonable condition with no signs of any penetration marks noted. Walls Flank wall Brickwork. Part solid construction,
More information$50,800 COUNTRY HOME 252. owner builder. ease of construction. in mind. Designed for. 252m 2. x4 x2 x2. with the STEEL KIT HOME INCLUSIONS
COUNTRY HOME 252 252m 2 x4 x2 x2 $50,800 STEEL KIT HOME INCLUSIONS External and internal stud frame walls and roof trusses Internal framing predrilled for electrical and plumbing Horizontal COLORBOND steel
More informationSAMPLE. Building Inspection Report. Inspection Date: Thu, 11 Feb 2016 Property Address:
Page 1 Building Inspection Report Inspection Date: Thu, 11 Feb 2016 Property Address: Page 2 Contents Section A Section B Section C Section D Section E Section F The parties Results of inspection - summary
More informationRepairing Obligations
Repairing Obligations Investment Lease Investment Lease Publican Roof coverings Repairs to and replacement at life expiry of flat roofs, pitched roofs, slates, fascia s, downpipes and gutters Cleaning
More informationBUILDING SURVEYOR S INSPECTION REPORT THE STABLES, WEST CALDER FOR WEST CALDER AND HARBURN COMMUNITY DEVELOPMENT TRUST LTD.
BUILDING SURVEYOR S INSPECTION REPORT OF THE STABLES, WEST CALDER FOR WEST CALDER AND HARBURN COMMUNITY DEVELOPMENT TRUST LTD Prepared by SEPTEMBER 2017 Building Surveyor s Inspection Report Old Co-Operative
More informationCONSULTING CIVIL AND STRUCTURAL ENGINEERS. Preben Naidoo And Associates. Tel: (033) , Fax: (033) , E mail:
CONSULTING CIVIL AND STRUCTURAL ENGINEERS Preben Naidoo And Associates Tel: (033) 342 2705, Fax: (033) 342 6480, E mail: preben@pnaengineers.co.za STATUS QUO REPORT: COGTA: WHITBY LODGE Prepared For: DEPARTMENT
More informationBUILDING CONDITION REPORT THE OLD COTTAGE 35 MIGHELL STREET BRIGHTON
THE OLD COTTAGE 35 MIGHELL STREET BRIGHTON Prepared for: American Express STILES HAROLD WILLIAMS Prepared by: Mark Haskell BSc (Hons) MRICS BUILDING CONSULTANCY Our Ref: BN08050018/MH/SH STERLING HOUSE
More informationGAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT STRUCTURAL FOR 75 FOX STREET AUGUST 2014 i P a g e Table of Contents 1. INTRODUCTION 3 1.1 Design Criteria and Specifications..
More informationSCHEDULE OF CONDITION XXXX City of London, EC3V XXX
SCHEDULE OF CONDITION XXXX City of London, EC3V XXX XXXX JOB REFERENCE: XXXX FOR Mr X Prepared by: XXXX INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 6 Front
More informationREPORT ON DOMESTIC BUILDING WORK
justinspections building inspection service 1234 SAMPLE STREET CITY REPORT ON DOMESTIC BUILDING WORK Page 1 of 7 Pre-Purchase Inspections Owner-Builder Reports Quality Assurance Dispute Resolution Litigation
More informationCopyright of 1stAssociated.co.uk, not to be used in any format without express written permission
Divide Into groups of six. Move the tables Pick a Role Landlord Landlord s Surveyor Landlord s Solicitor Or Tenant Tenant s Surveyor Tenant s Solicitor Pick a Building Pick a local building, which could
More informationSchedule of Condition
Schedule of Property Address: Outlet Number: 201780 Document Reference: The Bowling Green Tavern 164 Church Path Deal CT14 9UD N/A Document Date: 6th May 2018 Rev. Contents Page 2 A. Document Control Sheet
More informationExample Building Condition Survey & Summary Report Address Address Address London
Example Building Condition Survey & Summary Report on Address Address Address London Date 2016 Ref. no. London Building Surveyors Ltd, 20 Stanmore Road, London. E11 3BU Tel: 020 8257 5766 Mob: 07854 755
More information20 THINGS YOU NEED TO KNOW ABOUT LOFT CONVERSIONS
01 IS THERE A MINIMUM HEADROOM REQUIREMENT TO THE NEW LOFT ROOM? Not to the room itself, although of course you need to be able to use the space. However, the new stairs will need a minimum 2.0m clear
More informationBUILDING REPORT. 123 Anywhere Street Suburb City. Prepared for: Client NON INVASIVE
0 NON INVASIVE BUILDING REPORT 123 Anywhere Street Suburb City Prepared for: Client 1 Following your instructions we visited the above property on the 11/06/12 to carry out a non-invasive building inspection
More informationGarage Conversions. Technical Issues
Garage Conversions Introduction: if you need more space and you do not want to move house you may wish to consider converting your garage. Your home is probably your most valuable asset so it is important
More information28, 32 and Campbell Street St Peters
28, 32 and 42-44 Campbell Street St Peters Catalogue of Historic Building Fabric Final Prepared for CPB Dragados Samsung Joint Venture December 2016 EXTENT HERITAGE / Salvage Report / 28, 32 and 42-44
More informationSPECIFIC DEFECTS REPORT
SPECIFIC DEFECTS REPORT Harrow HA3 Relating to Problems with Suspended Timber Floor near Bay Window FOR Mr S Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS INTRODUCTION AND INSTRUCTION
More informationJAY E. BUTLER, being first duly sworn deposes and states as follows: 1. I am a Professional Engineer licensed in the State of New York.
SUPREME COURT OF THE STATE OF NEW YORK COUNTY OF NEW YORK In the Matter of DEVELOP DON T DESTROY BROOKLYN; Index No. DANIEL GOLDSTEIN; ATLANTIC AVENUE BETTERMENT ASSOCIATION; RJI No. FORT GREENE ASSOCIATION;
More informationSPECIFICATION. for REMEDIAL WORKS. Sparrow Hall Farm Stonea March PE15 0DU
SPECIFICATION for REMEDIAL WORKS to Sparrow Hall Farm Stonea March PE15 0DU Carried out by: PRP UK Limited Catherine House Old Harborough Road Brixworth Northampton NN6 9BH Tel : 01604 889870 Project Number:
More informationDetermination 2011/056
Determination 2011/056 Regarding compliance of brick veneer and proposed remedial work to windows to a house at 50 Karner Drive, RD6, Te Puke (to be read in conjunction with Determination 2008/100) 1.
More informationDesign Review Subcommittee Of the Elgin Heritage Commission. November 12, 2013
Design Review Subcommittee Of the Elgin Heritage Commission November 12, 2013 The meeting of the Design Review Subcommittee was called to order at 6:05 p.m. in the City Council Chambers (Located on the
More informationFix Leaking Balconies Balcony Assessment
Fix Leaking Balconies Balcony Assessment Customer Details: Mr May 45 Anystreet Melbourne Assessments Repairs Date of inspection: Conditions: Assessor: 26 June 2017 Dry Luke O'Neill Registered Builder DBL-C
More informationOctober 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6
October 26, 2017 Ref.: 351-1 Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 Attention: Mr. Jim Sinnott Director of Facilities & Custodial Management Dear Sir:
More informationSTAFF BRIEF. Project Scope and Staff Summary Under Review:
Community Planning and Development Denver Landmark Preservation 201 West Colfax, Dept. 205 Denver, CO 80202 p: 720.865.2709 f: 720.865.3050 www.denvergov.org/preservation STAFF BRIEF This document is the
More informationExterior Elevations and Materials
PAGE 01 1. Design Approval. Exterior elevations and related materials, finishes and colors shall be shown on plans submitted for approval by the DRC as part of Design Review or Modifications Review [as
More informationREMEDIAL WORKS REQUIRED. Allow to clean down brickwork and repoint/repair brick elevations.
2.0 SCHEDULE OF DILAPIDATIONS External Areas 2.1 Rear elevation 2.1.1 Rear brickwork elevations 3.5 Brickwork is lightly soiled and stained at low level with some minor repointing required. Allow to clean
More informationREPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR. Prepared by: Global Village Engineers
REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR Prepared by: Global Village Engineers 23 JANUARY, 2001 23 January 2001 Senor Carlos Cortez Hernandez Alcaldia Municipal de Tecoluca San Vicente, El
More informationFacade retention. HSE Health & Safety Executive. Guidance Note GS 51 from the Health and Safety Executive
HSE Health & Safety Executive Guidance Note GS 51 from the Health and Safety Executive Facade retention General Series 51 (January 1992) These Guidance Notes are published under five subject headings:
More informationFASAD: First Floor Existing Condition Report. October 30 th 2015
FASAD: First Floor Existing Condition Report October 30 th 2015 Report Summary Contained in this document are analytical reports which detail the current conditions of the main structural components of
More informationElgin Closes Refurbishment
Elgin Closes Refurbishment July 2016 Introduction The historic fabric of Elgin spans between its ancient castle site to the west and the cathedral to the east. Following the Royal Charter of David I in
More informationSTRUCTURAL ASSESSMENT REPORT
STRUCTURAL ASSESSMENT REPORT FOR WASHINGTON PARK NATIONAL BANK 6300 South Cottage Grove Ave. Chicago, Illinois 60637 Prepared For: Cook County Land Bank Authority 69 W. Washington, Chicago Illinois April
More informationSTRUCTURAL ENGINEER S REPORT
STRUCTURAL ENGINEER S REPORT at 40 Cawdor Road, Fallowfield, Manchester Ref: SMM-22331-002SER Date: 29/10/18 1. INTRODUCTION 1.1 Client Student Cribs, 81 Palace Gardens Terrace, LONDON W8 4AT 1.2 Location
More informationStructural Engineers Report
Consulting Civil and Structural Engineers 68D Swan Yard King Street Norwich NR1 1PG Tel 01603 760588 Fax 01603 760598 e-mail: burrell@paston.co.uk www.theburrellpartnership.co.uk Structural Engineers Report
More informationStonework Renovation
Stonework Renovation Cathedral Church of the Advent Birmingham, Alabama 2001-2005 Stonework Committee: Dr. Thomas A. S. Wilson John C. Carraway Lowell K. Christy Bryan F. Helm John Morse Matt Owen Rick
More informationINTRODUCTION. Photo 1: View of the Pulda House from the northwest. Pulda Farm Conditions Assessment Page 1 HMR Architects
INTRODUCTION Photo 1: View of the Pulda House from the northwest. The Pulda Farm is located at 300 Old Georges Road, North Brunswick Township, Middlesex County, New Jersey. It is situated on the south
More informationBLOCKWORK All reinforced concrete blockwork is be constructed in accordance with AS 3700 and a relevant engineers report. A damp proof course ( DPC ) is to be provided 150mm above ground. BRICKWORK All
More informationCALEDON ESTATE BOGMORE HOME OWNERS ASSOCIATION ARCHITECTURAL AND BUILDING CODE
CALEDON ESTATE BOGMORE HOME OWNERS ASSOCIATION ARCHITECTURAL AND BUILDING CODE 1. INTRODUCTION In Bogmore Residential Estate, Cold Creek Investments 29 (Pty) Ltd affords the opportunity to participate
More informationWhether you re buying or investing, a Buy-Wise Building & Pest Inspection will tell you of everything you need to know about your new property.
1 Introducing. Whether you re buying or investing, a Buy-Wise Building & Pest Inspection will tell you of everything you need to know about your new property. Our Building Inspectors are all Registered
More informationCITY OF SAVANNAH HISTORIC DISTRICT BOARD OF REVIEW REQUEST FOR CERTIFICATE OF APPROPRIATENESS
CITY OF SAVANNAH HISTORIC DISTRICT BOARD OF REVIEW REQUEST FOR CERTIFICATE OF APPROPRIATENESS STAFF RECOMMENDATION PETITIONER: FILE NUMBER: ADDRESS: Brenda K. Pearson Neil Dawson Architects, PC 1020 Bryan
More informationSCHEDULE OF CONDITION XXXXXXXXXXXX XXXXXXX XXXXXXXXXXX XXXXXXXX XXXXXX
JOB REFERENCE: XXXXXXXXXX SCHEDULE OF CONDITION XXXXXXXXXXXX XXXXXXX XXXXXXXXXXX XXXXXXXX XXXXXX FOR XXXXXXXXXXX Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION
More information