TECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device

Size: px
Start display at page:

Download "TECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device"

Transcription

1 TECHNICAL SPECIFICATION DANTECO HERMANNS CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device 6058(20') x 2438(8') x 2591(8'6") MODEL NO. : CX09-20SNX1 SPEC. NO : CX09-20SNX1-S3 DATE OF ISSUE : May 2017 PREFACE This specification covers design, construction, testing, inspection, function target and performance requirement of model CX09-20SNX1 bulk powder tank containers equipped with HERMANNS Aeration and Conveyance Device manufactured by Danteco Industries BV. The containers specified herein are manufactured under sufficient quality control, which is approved by the authorized classification society: CCS (China Classification Society) 1. Specification and Function target1 Items Unit Parameter External dimension (L x W x H) mm 6,058(20 ) x 2,438(8 ) x 2,591(8 6 ) Internal size of tank L x D mm 6000 x2400 Load Capacity 1 22,500 Tank Volume 1 26,000 Design pressure MPa 0.22 Test pressure MPa 0.33 Design temperature -19 to +80 Max. Gross weight kg 32,000 Tare weight kg 4,200 Loading weight kg 28,000 Air source pressure MPa 0.2~0.3 Air supply m3/min 8 Allowable stacking weight. 1.8g kg 192,000 Manhole diameter mm 500 Air-inlet diameter mm 100mm cam lock type joint Outlet diameter mm 4" male adaptor Design temperature -19 to +80 Average speed of discharge t/min Cement: 1.0 ~1.5 (conveying cement to the silo 25m high, 10m far) Remnant ratio % Cement: 0.1 (Cement: Not more than 1kg) - 2 -

2 Materials 2.1 Main materials used for the container shall be of the best quality conforming to the requirements of this specification and classification society. 2.2 Materials of the main parts Parts Materials Remark Tank shell Dish end Q345B Yield Point: 33kg/mm2 Bottom side rail Tensile Strength : 52 kg/mm2 Top side rails End rails Structural steel: SS41(Q235) Internals Yield Point: 25 kg/mm2 Walk way Tensile Strength: 41 kg/mm2 Saddles Reinforcement Corner posts SM90A or Q345B Barrel supports Yield Point: 33kg/mm2 End arc support rings Tensile Strength: 50 kg/mm2 Casted Weldable Steel: SCW49 Corner fittings Yield Point: 28 kg/mm2 ISO/R1161 Tensile Strength: 49 kg/mm2 20-GB8163 Pipe Yield Point: 25kg/mm2 Seamless Pipe Tensile Strength: 40 kg/mm2 Valve Cast steel Ventilation layer Synthetic fabric Screws Structural steel: SS400 (Q235) Bolts Yield Point: 25 kg/mm2 Tensile Strength: 41 kg/mm2 3. Construction The bulk powder container is mainly composed of frame, tank and pipe system. The tank is connected to the frames by two-barrel supports and two saddles. 3.1 Tank container frame The container frame shall be composed of front and rear end frames, top and bottom side rails, two (2) barrel supports, two (2) saddle s, eight (8) corner fittings Each end frame is constructed by two (2) corner posts, top and bottom end rails, and four (4) thick diagonal corner plates The corner fittings made of weldable cast steel SCW49 will be designed in accordance with ISO 1161 and manufactured at the works approved by classification society Each corner post is made of two C shape steel pressings which weld together to form a hollow section with dimension of 174x154xt6.0 by continuous welding Each top and bottom rail is made of 120 x80 xt5.0 rectangular tubes Each thick diagonal corner plate is made of a t5.0 mm pressing Each bottom side rail is build of "H" type section steel with dimension of 200x100x8x5.5mm There are two pieces of top side rails at each side. Both the upper and the lower are made of 80x40xt3.0 rectangular tubes

3 Each barrel support is a short cylinder made of 4.0 mm thick high tensile steel Two saddles are welded to the bottom of the tank used as the tank auxiliary support and load transfer Each saddle support is build of a base plate, a vertical plate and several ribs. 3.2 Tank body The tank body is a weld structure consisting of one (1) cylindrical shell, two (2) dished ends, and two manholes. The HERMANNS Aeration and Conveyance fluidizing system for the discharge of powder is installed at the bottom of the inside of the tank The dia. 2400mm cylindrical shell is of Q345B, t4.5mm thick steel plate Each dished end is shaped by hot pressing with Q345 B, t5.0 mm steel plate The manhole of dia.500mm shall be composed of a short cylinder, a cover, six (6) swing locking-nuts, a hinge and a gasket. 3.3 Pipe system The dry compressed airflow via 100 mm cam-lock type joint enters into a main pipe with a 2.5" one-way valve, a 2" safety valve, 1/2"safety valve and a pressure gauge, then goes into two air cavities at each side of the inside of the tank through two branch pipes which separately connected to the tank and main pipe. Another airflow goes through a 1.2" ball valve and a 1.2" one-way valve into the unloading pipe in order to speed up unloading powder. The diameter of main pipe is 76mm and the branch pipe is 57mm The unloading pipe is made of 4" steel pipe. One discharge butterfly valve and one 4" male adaptor are fixed on the discharge pipe Two 1" ball valves shall be fitted on the top of the tank nearby the manholes side vent pipe from tank top terminated in a ball valve will be provided. 3.4 External fitting Walkways: Two longitudinal walkways made of steel-net shall be fixed at the each side of the manholes Ladder: One ladder is to be fitted at each end of the container and the inside of the tank at the position of the rear manhole Customs seal: Customs seal provision must be made on the air inlet, manholes, and unloading outlet in accordance with TIR requirements. 4. Preservation 4.1 Surface treatment All steel parts shall be shot-blasted to Swedish Standard Sa2.5, and immediately spraying 10 to 15 micron thick Zinc-Rich Primer. 4.2 Coating system After general assembly, all weld seams shall be shot-blasted to Swedish Standard Sa2.5. Any welding slag, spatters and foreign matters shall be removed The container has following paint system. Exterior coating system Zinc-rich primer: 30 um Epoxy primer: 40 um Polyurethane top coat: 40 um 110 um(tdft) The inside surface of the tank only coated with 20 to 25 um Zinc-rich primer

4 Marking 5.1 Materials Decal:self-adhesive cast plastic, or spraying letter Certification plate are made of 0.8m thick, 18-8 stainless steel sheets and treated by chemically etching. 5.2 Regulation The consolidated plate will be fitted to the regulated location of container end frames with stainless steel blind rivets. Blind rivets and nameplate perimeter are to be caulked with sealant The container s serial number and the manufacturer s number of 10mm high shall be separately printed on the side surfaces of left and right corner fittings with steels tamp. 6. Testing and Inspection 6.1 Prototype test A prototype container manufactured in accordance with this specification must be tested according to the procedures described in this specification, and shall be certificated by authorized classification society. Test items Uniformly distributed load Test load Stacking W=(1.8R-T) 86,400 kg / per post Lifting from top corner fittings 2R-T Vertically Lifting from bottom corner 2R-T Lifting forces 45. angle fittings Rigidity (transverse) 15,240 kg Rigidity (longitudinal) 7,620 kg Restraint R-T 32,000 kg / per side Inner inertia longitudinal: R-T transverse: R-T Walk way 300 kg / 600x300mm2 Ladder Pressure test Hydraulic: 0.33 Mpa Pneumatic: Mpa Note: R- max. gross weight P-max. Payload T- tare weight 200 kg 6.2 Inspection of production line In mass production, every tank must be carried out 0.33 Mpa. hydraulic pressure test, after the completion of the weld of the container to be carried out Mpa pneumatic test, and finally to be carried out 0.2Mpa. Air-leakage inspection. 7. Guarantee 7.1 All the containers shall be guaranteed by manufacturer to be free from defects in materials, workmanship and structure for a period of one (1) year from the date of inspection acceptance. 7.2 The paint system coated on the container surface shall be guaranteed to be free from corrosion and failure for a period of five (5) years from the date of the container by the buyer. During the period of - 5 -

5 - 5 - guarantee, if paint defect is more than ten (10) percent of the total paint area, the factory and paint supplier will respond for repair cost (all or partial cost). Normal wear and tear and corrosion caused by abrasion, impact, accident, acid, alkali or other chemicals are not covered by this guarantee. The paint supplier s letter of guarantee shall be attached with the contract. 7.3 Guarantee period for self-adhesive cast plastic is (5) years.

TECHNICAL SPECIFICATION FOR 20 x 8 x 8 6 ISO ICC TYPE TANK CONTAINER FOR BULK BITUMEN (UN T3 CODE) PREFACE CONTENTS

TECHNICAL SPECIFICATION FOR 20 x 8 x 8 6 ISO ICC TYPE TANK CONTAINER FOR BULK BITUMEN (UN T3 CODE) PREFACE CONTENTS Technical Specification: 23-T3 Bitutainer Tanks TECHNICAL SPECIFICATION FOR 20 x 8 x 8 6 ISO ICC TYPE TANK CONTAINER FOR BULK BITUMEN (UN T3 CODE) PREFACE This specification covers design, construction,

More information

T E C H N I C A L S P E C I F I C A T I O N

T E C H N I C A L S P E C I F I C A T I O N T E C H N I C A L S P E C I F I C A T I O N FOR 20' X 8' X 8'6" ISO 1CC TYPE STEEL DRY CARGO CONTAINER WITH ALL CORTEN WITH CORRUGATED DOOR CORRUGATED ROOF 1 PAIR OF FORKLIFT POCKET 2 VENTILATORS PLYWOOD

More information

TECHNICAL SPECIFICATION FOR A TYPICAL STEEL DRY CARGO CONTAINER. 20' x 8' x 8'6" ISO 1CC TYPE GENERAL PURPOSE

TECHNICAL SPECIFICATION FOR A TYPICAL STEEL DRY CARGO CONTAINER. 20' x 8' x 8'6 ISO 1CC TYPE GENERAL PURPOSE TECHNICAL SPECIFICATION FOR A TYPICAL STEEL DRY CARGO CONTAINER 20' x 8' x 8'6" ISO 1CC TYPE GENERAL PURPOSE 0 I N D E X Section Title Page 1 General... 2 2 Dimensions and Ratings... 4 3 Materials... 5

More information

6 CONTAINER TECHNICAL SPEC. BULLBOX

6 CONTAINER TECHNICAL SPEC. BULLBOX 6 CONTAINER TECHNICAL SPEC. BULLBOX STEEL DRY CARGO CONTAINER BULLBOX 6 1960 1920 MODELO NO: BULLBOX 6 CONTAINER DATE OF ISSUE: October,2017 Contenedores y Embalajes Normalizados S.A. P.I. Silvota, Peñasanta

More information

TECHNICAL SPECIFICATION FOR. 20' x 8' x 8'6" ISO 1CC TYPE STEEL DRY CARGO CONTAINER WITH

TECHNICAL SPECIFICATION FOR. 20' x 8' x 8'6 ISO 1CC TYPE STEEL DRY CARGO CONTAINER WITH TECHNICAL SPECIFICATION FOR 20' x 8' x 8'6" ISO 1CC TYPE STEEL DRY CARGO CONTAINER WITH CORTEN STEEL CONSTRUCTION, CORRUGATED DOOR, CORRUGATED ROOF, 1 PAIR OF FORKLIFT POCKET, 2 VENTILATORS & PLYWOOD FLOOR

More information

8 CONTAINER TECHNICAL SPEC. BULLBOX

8 CONTAINER TECHNICAL SPEC. BULLBOX 8 CONTAINER TECHNICAL SPEC. BULLBOX STEEL DRY CARGO CONTAINER 8 2200 2260 MODELO NO: BULLBOX 8 CONTAINER DATE OF ISSUE: October, 2017 Contenedores y Embalajes Normalizados S.A. P.I. Silvota, Peñasanta

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION FOR 40' X 8' X 8'6" ISO 1AA TYPE STEEL DRY CARGO CONTAINER WITH ALL SPA-H WITH CORRUGATED DOOR CORRUGATED ROOF GOOSENECK TUNNEL 2 VENTILATORS PLYWOOD FLOOR FOR CARU SPECIFICATION

More information

40 TECHNICAL SPEC. BULLBOX

40 TECHNICAL SPEC. BULLBOX 40 TECHNICAL SPEC. BULLBOX STEEL DRY CARGO CONTAINER ISO 40-40 8 8 6 MODELO NO: BULLBOX 40 DATE OF ISSUE: October, 2017 Contenedores y Embalajes Normalizados S.A. P.I. Silvota, Peñasanta 12, Llanera. 33192,

More information

T E C H N I C A L S P E C I F I C A T I O N

T E C H N I C A L S P E C I F I C A T I O N T E C H N I C A L S P E C I F I C A T I O N FOR 20' x 8' x 8'6" TYPE STEEL DRY CARGO CONTAINER - WITH DOUBLE DOORS ON BOTH ENDS - FOR Rainbow Containers GmbH - Hamburg DATE OF ISSUE : 19. February 2004

More information

20 OPEN SIDE BOTH SIDES CONTAINER TECHNICAL SPEC. BULLBOX

20 OPEN SIDE BOTH SIDES CONTAINER TECHNICAL SPEC. BULLBOX 20 OPEN SIDE BOTH SIDES CONTAINER TECHNICAL SPEC. BULLBOX STEEL DRY CARGO CONTAINER BULLBOX 20 8 x 8 6 TYPE MODELO NO: BULLBOX 2O OPEN SIDE BOTH SIDES CONTAINER DATE OF ISSUE: October, 2017 Contenedores

More information

1.2.2 To satisfy the requirements of Rules of B.V, LR, GL, CCS or A.B.S..

1.2.2 To satisfy the requirements of Rules of B.V, LR, GL, CCS or A.B.S.. 1. General 1.1 Operational Environment The container will be designed and constructed for the transportation of general cargo on sea ( above or under deck ) and on land ( road or rail ) throughout the

More information

1.0 INTRODUCTION GENERAL SUPPLIER S RESPONSIBILITY CODES AND STANDARDS... 4

1.0 INTRODUCTION GENERAL SUPPLIER S RESPONSIBILITY CODES AND STANDARDS... 4 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 1.1 GENERAL... 3 1.2 SUPPLIER S RESPONSIBILITY... 3 2.0 CODES AND STANDARDS... 4 2.1 CODES, STANDARDS AND REGULATIONS... 4 2.2 NEPTUNE ENERGY NETHERLANDS B.V. SPECIFICATIONS...

More information

Presentation to IMO as mentioned in the ST/SG/AC.10/C.3/2017/40 - (Russian Federation): Fibrereinforced plastics portable tanks

Presentation to IMO as mentioned in the ST/SG/AC.10/C.3/2017/40 - (Russian Federation): Fibrereinforced plastics portable tanks Committee of Experts on the Transport of Dangerous Goods and on the Globally Harmonized System of Classification and Labelling of Chemicals UN/SCETDG/52/INF.44 Sub-Committee of Experts on the Transport

More information

External Reinforcement System

External Reinforcement System (Revised October 2013) Specifications of SMC Water Tank Product External Reinforcement System DOHA INDUSTRY CO., LTD. Table of Contents 1. General Matters A. Scope of Application B. Product Requirements

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

SECTION 13. A. Extent of Work: The requirements of this section apply to the piping systems specified elsewhere in these specifications.

SECTION 13. A. Extent of Work: The requirements of this section apply to the piping systems specified elsewhere in these specifications. SECTION 13 PIPE, TUBE AND PART 1 - GENERAL 1.01 DESCRIPTION A. Extent of Work: The requirements of this section apply to the piping systems specified elsewhere in these specifications. 1.02 QUALITY ASSURANCE

More information

DANGEROUS GOODS PETRO INDUSTRIAL TANK COMPLIANCE CHECKLIST FORM

DANGEROUS GOODS PETRO INDUSTRIAL TANK COMPLIANCE CHECKLIST FORM DANGEROUS GOODS PETRO INDUSTRIAL TANK COMPLIANCE CHECKLIST FORM Tank Manufacturer : Consultant Ref No. File No. PETRO Industrial Pty Ltd Kelvin Cooper - Accreditation Number 6IM055 KGC 150213 Proposed

More information

80/90/100/120/mm POST Standard Medium Heavy Extra Heavy

80/90/100/120/mm POST Standard Medium Heavy Extra Heavy Upright Profiles 75mm upright pitch Cold Forming Process on a high speed rolling mill Omega section, Front-Centre-Ribbed Powder coated finish Profile width: 80x70, 90x70, 100x70, 120x70mm Standard JIS

More information

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows

More information

DEXION RACKING. The Product picture Effect of picture. 80/90/100/120/mm POST. Standard Medium Heavy Extra Heavy

DEXION RACKING. The Product picture Effect of picture. 80/90/100/120/mm POST. Standard Medium Heavy Extra Heavy DEXION RACKING Upright Profiles 75mm upright pitch Cold Forming Process on a high speed rolling mill Omega section, Front-Centre-Ribbed Powder coated finish Profile width 80x70, 90x70, 100x70, 120x70mm

More information

SECTION TAPPING SLEEVES AND VALVES

SECTION TAPPING SLEEVES AND VALVES SECTION 33 12 16.17 TAPPING SLEEVES AND VALVES PART 1: GENERAL 1.01 SCOPE Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings. 1.02 RELATED WORK

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for

More information

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2 ~ 05-1 ~ 05 00 00 Metals 05 00 00 METALS... 2 05 08 00 Commissioning of Metals... 2 05 12 00 Structural Steel Framing... 2 05 12 30 Steel Studs... 2 05 45 00 METAL SUPPORT ASSEMBLIES... 2 05 50 00 METAL

More information

QUALITY ASSURANCE PROTOCOL (QAP)

QUALITY ASSURANCE PROTOCOL (QAP) PREFACE This Standard details the level of documentation that PVT.LTD (IET) will provide during a contract for fabricating tank(s) or portable equipment s. Extensive documentation is required for this

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

Code Compliance Research Report CCRR-0238

Code Compliance Research Report CCRR-0238 Code Compliance Research Report CCRR-0238 Issue Date: 11-09-2016 Revision Date: 11-29-2018 Renewal Date: 11-09-2019 DIVISION: 05 00 00 METALS Section: 05 52 00 Metal Railings CPG Building Products LLC

More information

Meridian Manufacturing Group. Workmanship Meridian Quality Assurance Program

Meridian Manufacturing Group. Workmanship Meridian Quality Assurance Program www.meridianmfg.com Meridian Manufacturing Group Meridian Manufacturing Group is the proud innovator of the all-welded, smooth-wall hopper bottom storage silo with offices and production facilities in

More information

complete with pallet support bars, column guards, safety barriers, pallet back stopper painting

complete with pallet support bars, column guards, safety barriers, pallet back stopper painting DESCRIPTION / SPECIFICATIONS OF GOODS The Goods to be supplied by the Supplier include the following: The scope of works including:- 1. Supply, delivery and installation of pallet racking system as follow:-

More information

º to 150º F In accordance with this specification and

º to 150º F In accordance with this specification and SPEC-3006 2016/0/18 1/10 1.0 PURPOSE This specification describes the minimum requirements gland water piping systems operating at or below 400 PSIG. Gland water systems are to be constructed either of

More information

Stainless Steel Aeration Equipment Specification

Stainless Steel Aeration Equipment Specification Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion

More information

SECTION SOUND CONTROL DOORS

SECTION SOUND CONTROL DOORS SECTION 08380 SOUND CONTROL DOORS 1.0 GENERAL 1.1 DESCRIPTION OF WORK A. Furnish and install Sound Control Doors specified herein and per the locations and orientations shown on the Contract Documents.

More information

SECTION / STC 52 METAL SOUND CONTROL DOORS

SECTION / STC 52 METAL SOUND CONTROL DOORS SECTION 08 34 73 / 08 34 73.13 STC 52 METAL SOUND CONTROL DOORS PART 1 GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of the Contract, including general and Supplementary Conditions

More information

(G) DOORS & WINDOWS LIST OF BUREAW OF INDIAN STANDARD CODE OF PRACTICE (ISI)

(G) DOORS & WINDOWS LIST OF BUREAW OF INDIAN STANDARD CODE OF PRACTICE (ISI) (G) DOORS & WINDOWS LIST OF BUREAW OF INDIAN STANDARD CODE OF PRACTICE (ISI) 4021 : Specification for teak wood. 287 : Recommendation for maximum permissible moisture content 1141 : Specification for code

More information

Code Compliance Research Report CCRR-0238

Code Compliance Research Report CCRR-0238 Code Compliance Research Report CCRR-0238 Issued: 11-09-2016 Renewal Due: 11-09-2018 Revised: 11-10-2017 DIVISION: 05 00 00 METALS Section: 05 52 00 Metal Railings CPG Building Products LLC 894 Prairie

More information

DETENTION / SECURITY WINDOWS SECTION 08660

DETENTION / SECURITY WINDOWS SECTION 08660 SWI Steel Window Specifications DETENTION / SECURITY WINDOWS SECTION 08660 Steel Window Institute, Inc. 1300 Sumner Ave. Cleveland, OH 44115-2851 Phone: 216-241-7333 Fax: 216-241-0105 E-Mail: swi@steelwindows.com

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for

More information

DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS

DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS General All Materials shall be EN, ISO or equivalent standard and shall be supplied from approved manufacturers. According to the International

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 8 SECTION 083919 WATERTIGHT DOORS **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for your specific project

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Part 1 General 1. RELATED SECTIONS 1. Section 07 92 10 Joint Sealing 2. Section 08 71 00 Door Hardware 2. REFERENCES 1. American Society

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

(Name and address of Manufacturer) (Name and address of Purchaser) (Name and address)

(Name and address of Manufacturer) (Name and address of Purchaser) (Name and address) FORM U-3P MANUFACTURER'S CERTIFICATE OF COMPLIANCE FOR PLATE HEAT ECHANGERS COVERING PRESSURE VESSELS TO BE STAMPED WITH THE UM DESIGNATOR [SEE U-1(j)] As Required by the Provisions of the ASME Boiler

More information

SECTION 1043 FENCE MATERIAL

SECTION 1043 FENCE MATERIAL SECTION 1043 FENCE MATERIAL 1043.1 Scope. This specification covers the material required in the construction of chainlink fence and woven wire fence. 1043.2 Basis of Acceptance. The basis of acceptance

More information

INVITATION TO BID B I D F O R M. Please submit bid on or before 2:15 pm 101 North Halagueno Street June 6, 2013, at the office of the

INVITATION TO BID B I D F O R M. Please submit bid on or before 2:15 pm 101 North Halagueno Street June 6, 2013, at the office of the BID NO.: 2013-30 INVITATION TO BID B I D F O R M Refuse Containers, Roll-Out Refuse Containers, Lids, Lid Assemblies, Front & Rear Replacement Lids, Piano and Loop Hinges City of Carlsbad Please submit

More information

Ductile Iron Pipes (Socket & Spigot Pipes)

Ductile Iron Pipes (Socket & Spigot Pipes) Ductile Iron Pipes (Socket & Spigot Pipes) Al-Saad Engineering Consulting Pipeline supply a High Quality and specifications with good Prices for the customers. The Range of Diameter that Al-Saad Engineering

More information

SECTION GROUND WATER STORAGE TANKS

SECTION GROUND WATER STORAGE TANKS SECTION 33 16 13 GROUND WATER STORAGE TANKS PART 1: GENERAL 1.01 SCOPE A. Section includes requirements for designing, fabricating, and erecting a welded steel ground storage tank. 1.02 SYSTEM DESCRIPTION

More information

SECTION METAL ATHLETIC LOCKERS

SECTION METAL ATHLETIC LOCKERS SECTION 10 51 13 - METAL ATHLETIC LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Progressing Cavity Pump C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Progressing Cavity Pump C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11938 - Progressing Cavity Pump C O N T E N T S PART 1 - GENERAL... 1 1.01 GENERAL... 1 1.02 RELATED SPECIFICATION SECTIONS... 1 1.03 MANUFACTURERS... 1 PART

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11294 - Stainless Steel Sluice Gates C O N T E N T S PART 1 - GENERAL... 1 1.01 SUMMARY... 1 1.02 REFERENCES... 1 1.03 DEFINITIONS... 1 1.04 DESIGN REQUIREMENTS...

More information

WCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS

WCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS SCO #: 8-8-0 TABLE OF CONTE COV DESCRIPTION COVER SHEET ALUMNI TOWER ELEVATIONS & PLAN VIEWS REPAIR DETAILS - M TO REPAIR DETAILS - TO M0 & C TO REPAIR DETAILS - A & F TO F VICINITY MAP ALUMNI TOWER ALUMNI

More information

ARCHITECTURAL SPECIFICATIONS

ARCHITECTURAL SPECIFICATIONS ARCHITECTURAL SPECIFICATIONS I. GENERAL 1. System Description: 1.1 Size The raised access floor system shall consist of 600mm x 600mm x 3mm modular steel cement panels/ cementitious panels / cement filled

More information

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651 SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows as

More information

SECTION DOWNSTREAM DEFENDER

SECTION DOWNSTREAM DEFENDER SECTION 02631 DOWNSTREAM DEFENDER PART 1 - GENERAL 1.01 SCOPE A. Work described in this section includes furnishing all labor, equipment, materials, tools and incidentals required for a complete and operable

More information

CONSANI ENGINEERING (PTY) LTD

CONSANI ENGINEERING (PTY) LTD CONSANI ENGINEERING (PTY) LTD TECHNICAL SPECIFICATION CLIENT : OCI 3 SPECIFICATION NO. : ST22-31.4.36 ENQI6421 WO 8116 Rev3 (AS BUILT) DESCRIPTION : 20 x 31000 LITRE SWAP TANK SERIAL NUMBERS TASU 231001

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 8 SECTION 083921 PEDESTRIAN FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for your

More information

SPECIFICATION FOR FIBERGLASS REINFORCED PLASTIC CHEMICAL STORAGE TANKS

SPECIFICATION FOR FIBERGLASS REINFORCED PLASTIC CHEMICAL STORAGE TANKS The following specification for FRP Chemical Storage Tanks has been developed to assist the specifier and the buyer in detailing their own specification for equipment that meets the minimum design parameters

More information

SECTION METAL EQUIPMENT LOCKERS

SECTION METAL EQUIPMENT LOCKERS SECTION 10 51 13 - METAL EQUIPMENT LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified

More information

Standard Installation Fire Damper Models: 119, 119(F), 119(SS), D19

Standard Installation Fire Damper Models: 119, 119(F), 119(SS), D19 Standard Installation Fire Damper Models: 119, 119(F), 119(SS), D19 Page 1 or 8 APPLICATION This fi re damper is intended to restrict the passage of fl ame. The standard installation requires that the

More information

SECTION METAL ATHLETIC LOCKERS

SECTION METAL ATHLETIC LOCKERS SECTION 10 51 13 - METAL ATHLETIC LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified

More information

FMB15678 Steel Deck Cargo Barge

FMB15678 Steel Deck Cargo Barge FMB15678 Steel Deck Cargo Barge 2 Barges, originally built in 2012 to the specification below are now available for purchase. Section 1 General 1.1 Intent & Definition This specification together with

More information

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section. SECTION 10 5300 ALUMINUM WALKWAY COVERS Part 1 General 1.01 Related Documents A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.02 References A. International

More information

Bucket Elevators and Conveyors Commercial Series Material Handling

Bucket Elevators and Conveyors Commercial Series Material Handling Agri/Industrial Division Bucket Elevators and Conveyors Commercial Series Material Handling Agri/Industrial Division Chief bucket elevators are built to last and are easy to maintain. Our head section

More information

Bucket Elevators and Conveyors Commercial Series Material Handling

Bucket Elevators and Conveyors Commercial Series Material Handling Agri/Industrial Division Bucket Elevators and Conveyors Commercial Series Material Handling Agri/Industrial Division Chief bucket elevators are built to last and are easy to maintain. Our head section

More information

ONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,

ONE PIPE LENGTH MAX (REFER TO 1/4/FT SLOPE (MIN) 5'-0 (MIN) OR 4 LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4x6 REFER TO TYPICAL EXCAVATION, VENT CAP (MUSHROOM TYPE) SOLID CAP EXIST GRADE MIN BUILDING REFER TO NOTE #4 MIN CONCRETE SIDEWALK CURB OR EDGE OF SIDEWALK STREET CLEANOUT (REFER TO NOTE #3) VENT PIPE 4" PVC 6" PVC CLEANOUT CONCRETE

More information

REGIONAL CONSTRUCTION STANDARDS

REGIONAL CONSTRUCTION STANDARDS REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.1 (Full Committee Approved Proposed Revision 6.1 Ductile Iron Pipe Protections - Section 200 As Publication Update 6.1) March 27, 2018

More information

Section 4. Annex to IAEA Request for Proposal STATEMENT OF WORK. Primary/Secondary cooling water Heat Exchangers

Section 4. Annex to IAEA Request for Proposal STATEMENT OF WORK. Primary/Secondary cooling water Heat Exchangers Section 4 Annex to IAEA Request for Proposal 25919 STATEMENT OF WORK Primary/Secondary cooling water Heat Exchangers WWR-SM Research Reactor, UZBEKISTAN Page 1 of 17 1. Scope 1.1 This Statement of Work

More information

M C I C. MAERSK Container Inspection Criteria. (All Lines) (For use with all DRY Containers in-service) Version 7: 2016

M C I C. MAERSK Container Inspection Criteria. (All Lines) (For use with all DRY Containers in-service) Version 7: 2016 M C I C MAERSK Container Inspection Criteria (All Lines) (For use with all DRY Containers in-service) Version 7: 2016 MCIC Version 7 (English) revised December 2015 Page 1 of 9 1. INTRODUCTION 1.1 General

More information

SECTION CHAIN LINK FENCES AND GATES (PARK)

SECTION CHAIN LINK FENCES AND GATES (PARK) SECTION 02821 CHAIN LINK FENCES AND GATES (PARK) PART I GENERAL 1.1 SECTION INCLUDES A. Installation of chain link fences, and gate units provided by single source including erection accessories, fittings,

More information

Nylofor Swing Gate. Figure 1: Single Nylofor Swing Gate

Nylofor Swing Gate. Figure 1: Single Nylofor Swing Gate 1 Scope This specification specifies requirements for swing gates with Nylofor infill. The gate consists of different components: - Gate posts with square fixation strip (hinge post and latch post) - Wing

More information

M-03 HEAT EXCHANGERS

M-03 HEAT EXCHANGERS Guideline No.: M-03(201610) M-03 HEAT EXCHANGERS Issued date: October 28, 2016 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection

More information

SAMPLE SPECIFICATIONS FOR PREFABRICATED FRP LIFT STATIONS

SAMPLE SPECIFICATIONS FOR PREFABRICATED FRP LIFT STATIONS SECTION 1-GENERAL 1 DESCRIPTION a. Scope of Work: i. Contractor shall furnish labor, materials, equipment, and performance of all work necessary or incidental to furnish and install a simplex/duple x-prefabricated

More information

INSULATED JOINTS. Monolithic Joints for Electrically Isolating Pipelines

INSULATED JOINTS. Monolithic Joints for Electrically Isolating Pipelines INSULATED JOINTS Monolithic Joints for Electrically Isolating Pipelines INSULATED JOINTS TUBE TURNS INSULATED JOINTS are a pre-fabricated, non-separable, union used to isolate specific sections of pipelines

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 10505 - METAL STUDENT LOCKERS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE

CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE 1000.1 DESCRIPTION These specifications shall govern the furnishing of glass-fiber reinforced

More information

STANDARD SPECIFICATION FOR

STANDARD SPECIFICATION FOR SEA BOX, INC. Shipping and Storage Containers Sales and Rentals Corporate Office 802 Industrial Highway East Riverton NJ 08077 Tel (856) 303-1101 Fax (856) 303-1501 www.seabox.com STANDARD SPECIFICATION

More information

All definitions are defined according to ANSI/AWWA C

All definitions are defined according to ANSI/AWWA C SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR REDUCED-WALL, RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE 4 IN. THROUGH 48 IN. ANSI/AWWA C515-01 July 2017 1. SCOPE This product specification

More information

GRAIN STORAGE SYSTEMS

GRAIN STORAGE SYSTEMS GRAIN STORAGE SYSTEMS FOPRO Grain Systems is a market leader in the design and manufacture of grain storage silo and handling systems. FOPRO has earned an excellent reputation worldwide with superior system

More information

1. ARI 410 Standard for chilled water, hot water and steam coils. 2. ARI 430 Central Station Air Handling Units

1. ARI 410 Standard for chilled water, hot water and steam coils. 2. ARI 430 Central Station Air Handling Units PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Materials : Carbon steel or Stainless steel MERXTRADE BV.

Materials : Carbon steel or Stainless steel MERXTRADE BV. ADE B.V. Size : DN 1/4 to DN 2 Ends : Threaded female BSP, NPT or S.W. Min Temperature : - 30 C in S.S. and - 20 C in carbon steel Max Temperature : + 180 C Max Pressure : 138 Bars (Class 800) Specifications

More information

AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS Works and Emergency Services CITY OF TORONTO WATER AND WASTEWATER SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 408 November 2010 AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING

More information

TM Series Induced Draft Cooling Tower Specifications

TM Series Induced Draft Cooling Tower Specifications Delta Cooling Towers, Inc. 41 Pine Street P.O. Box 315 Rockaway, New Jersey 07866-0315 Telephone 973.586.2201 Fax 973.586.2243 www.deltacooling.com sales@deltacooling.com TM Series Induced Draft Cooling

More information

ONTARIO PROVINCIAL STANDARD SPECIFICATION

ONTARIO PROVINCIAL STANDARD SPECIFICATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1850 NOVEMBER 2003 MATERIAL SPECIFICATION FOR FRAMES, GRATES, COVERS, AND GRATINGS TABLE OF CONTENTS 1850.01 SCOPE 1850.02 REFERENCES 1850.03 DEFINITIONS

More information

HALLOWELL FORT KNOX Modular Utility Storage and Workbench System Specifications

HALLOWELL FORT KNOX Modular Utility Storage and Workbench System Specifications General: All modular components shall be "FORT KNOX Modular Utility Storage and Workbench System" components as manufactured by Hallowell or approved equal. All workbench pedestals, cabinets and lockers

More information

SECTION ALUMINUM HANDRAIL SYSTEMS

SECTION ALUMINUM HANDRAIL SYSTEMS SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American

More information

SECTION DUCTS PART 1 GENERAL 1.01 SUMMARY

SECTION DUCTS PART 1 GENERAL 1.01 SUMMARY 1 1 1 1 1 1 1 1 0 1 0 1 SECTION 1 DUCTS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Duct Materials.. Insulated flexible ducts.. Single wall spiral round ducts.. Ductwork fabrication.. Duct cleaning.

More information

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

DRY BULK STORAGE TANK SPECIFICATION PREMIER POWDER COATED BOLTED STEEL TANK

DRY BULK STORAGE TANK SPECIFICATION PREMIER POWDER COATED BOLTED STEEL TANK DRY BULK STORAGE TANK SPECIFICATION PREMIER POWDER COATED BOLTED STEEL TANK 1. GENERAL 1.1 Scope of Work 1.1.1 Furnish and erect bolted RTP (rolled, tapered panel) steel tank for dry bulk storage. Scope

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Concrete Steps B. Handrails C. Safety Rail 1.02 DESCRIPTION OF WORK A. Construction of concrete steps. B. Furnishing

More information

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10.

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10. 21-02 SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE ANSI/AWWA C509-01 3 IN., 4 IN., 6 IN., 8 IN., 10 IN., 12 IN., 16 IN., & 20 IN. Revised

More information

7. New railings for existing buildings shall be designed to match any existing railings unless there is a compelling reason for change.

7. New railings for existing buildings shall be designed to match any existing railings unless there is a compelling reason for change. Division 05. Metals 05 50 00. Metal Fabrications 05 50 00. Roof - Fall Protection The contractor shall provide a horizontal cable lifeline system on steel posts complying with applicable regulatory requirements.

More information

SECTION VIBRATION ISOLATION

SECTION VIBRATION ISOLATION SECTION 15240 VIBRATION ISOLATION PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15450 - Plumbing Equipment. 2. 15510 - Piping (HVAC). 3. 15515 Valves, Hangers, and Specialties. 4. 15540 - Pumping

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

50948-RHN Putney. Friday, 15 December This document includes: Code Section Revision Dated

50948-RHN Putney. Friday, 15 December This document includes: Code Section Revision Dated 50948-RHN Putney Friday, 15 December 2017 This document includes: Code Section Revision Dated Z11 Purpose made metalwork 1 Table of Contents Title Z11 Purpose made metalwork Page 3 Z11 Purpose made metalwork

More information

Flotation Docking Systems, Inc.

Flotation Docking Systems, Inc. GENERAL SPECIFICATIONS The following data outlines the design calculations and specifications around which Flotation Docking Systems, Inc. products are constructed. The use of such information for contract

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

OLYMPIC VIEW WATER AND SEWER DISTRICT APPROVED MATERIALS LIST FOR USE ON NEW CONSTRUCTION OF WATER AND SEWER FACILITIES

OLYMPIC VIEW WATER AND SEWER DISTRICT APPROVED MATERIALS LIST FOR USE ON NEW CONSTRUCTION OF WATER AND SEWER FACILITIES OLYMPIC VIEW WATER AND SEWER DISTRICT APPROVED MATERIALS LIST FOR USE ON NEW CONSTRUCTION OF WATER AND SEWER FACILITIES This form is intended for use by developers or contractors constructing potable water

More information

UBC Technical Guidelines Section Edition Fume Hoods Page 1 of 5

UBC Technical Guidelines Section Edition Fume Hoods Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Section 12 35 53 Laboratory Casework.2 Section 23 38 16 Fume Hood Exhaust Systems.3 Section 20 00 08 Mechanical Identification for the details for fume

More information

SECTION METAL FABRICATIONS FOR STEAM UTILITY DISTRIBUTION

SECTION METAL FABRICATIONS FOR STEAM UTILITY DISTRIBUTION PAGE 055015-1 SECTION 055015 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

ATI Evaluation Service A Division of Architectural Testing Certification Services

ATI Evaluation Service A Division of Architectural Testing Certification Services ATI Evaluation Service A Division of Architectural Testing Certification Services PCA-125 Subject to Renewal: 02/21/2018 Issued: 02/28/2017 Visit www.ati-es.com for current status Page 1 of 7 Trex Company,

More information