1 Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings and townhouses built in Knox County after the new code adoption in early 2007 will be required to meet the requirements of the 2006 International Residential Code which can be ordered online at or by calling the ICC store at The following is a list of significant changes from the previous code requirements of the 1995 CABO One and Two Family Dwelling Code and includes related administrative changes in the permitting and inspection processes. This is not an all inclusive list of all of the changes in the new code. Administrative Changes Other codes and ordinances Knox County will also adopt the other International Codes which will have some application to residential construction. The 2006 International Existing Building Code applies to the repair, alteration, change of occupancy, addition and relocation of existing buildings and the 2006 International Property Maintenance Code applies to all existing residential structures and premises. The 2006 International Codes for commercial construction will also be adopted and used for reference including the building, mechanical, plumbing, fuel gas, fire and energy codes. All existing Knox County Ordinances will continue to be enforced including the Zoning Ordinance for Knox County and the Minimum Subdivision Regulations for Knoxville and Knox County including storm drainage and erosion control regulations. Pre-approved plans All new permits will require 2 sets of plans to be submitted and reviewed under the new code before preapproved permits will be issued. No pre-approved permits will be issued based on plans reviewed under the old codes. Residential Building Code Changes Townhouse/Condo/Apartment - Page 1 - Section R101.2 Scope This code applies to the construction of multiple single-family dwellings (townhouses) not more than three stories in height with a separate means of egress and townhouse is defined as A single-family dwelling unit constructed in a group of three or more attached units in which each unit extends from foundation to roof and with open space on at least two sides. This now includes buildings that were previously considered to be condominiums. The International Codes do not recognize condominiums as a type of residential occupancy. Instead they classify the building as apartments which are regulated by the International Building Code and require a one-hour rated wall or as townhouses which are regulated by the International Residential Code and require a two-hour rated wall if they meet the definition above. Bottom line: Condominiums which are actually townhouses as defined in the code and are not apartments will now be required to have two one-hour fire rated walls or one two-hour fire rated wall with no plumbing or mechanical equipment, ducts or vents contained therein. Parapets extending above the roof line or fire rated roof sheathing or gypsum wrapbacks under the roof sheathing will also be required. Plan review and inspections by the Fire Prevention Bureau will not be required for townhouses. 1

2 Three stories above grade plus below grade basement - Page 1 - Section R101.2 Habitable space is permitted on four stories because basements will not count as a story if the first floor is: 1. Less than 6 ft. above the grade plane (avg. grade), 2. Less than 6 ft. above finished ground for more than 50% of the perimeter and 3. Less than 12 ft above finished ground at all points. CABO did not allow habitable space in a basement and 3 stories above grade. The Zoning Ordinance will still limit buildings to 3 stories with habitable basements or attics counting as a story. No permit required - Page 3 - Section R105.2 This section requires no permit for one story detached accessory structures less than 120 square feet in area but the building must still meet all zoning code requirements. CABO exempted no buildings. Retaining walls Page 3 Section R105.2 This section requires permits for retaining walls four feet or more in height or for any height retaining wall supporting a surcharge such as sloping backfill or buildings or other loads above. The CABO code did not specify when permits were required for retaining walls. Accessory structures - Page 9 - Section 202 Definitions This section limits accessory structures to 3000 square feet and 2 stories maximum. If larger they must be built by the International Building Code which has similar limits for Type V B (wood) U utility occupancy and requires larger accessory buildings to be classified as S storage occupancy and to be built of less combustible materials. There were no area limits under the CABO code. Rated exterior walls - Page 47 - Table R302.1 Exterior walls less than 5 feet to property line or fire separation distance must be one-hour fire rated. The distance was 3 feet in CABO. (note: 25% openings allowed from 3 to 5 & unlimited 5 & over) Garage separation - Page 52 - Section R309.2 This section requires 5/8 type x gypsum board on the garage ceiling if there is habitable space above. CABO required ½ gypsum board. Many builders use 5/8 type x already. Basement emergency egress - Page 52 - Section R310.1 Emergency egress directly to the outside is now required in a basement. This was not in CABO. Emergency egress opening size - Page 53 - Section R square feet is required for the second floor. Amended CABO allowed 5.5 square feet. The maximum sill height remains unchanged at 44. Emergency egress opening height - Page 53 - Section R A minimum net clear opening height of 24 is required. CABO was 22. Landings - Page 53 - Section R Exterior landings can only be 7 ¾ below the threshold. CABO allowed 8 ¼. Stair risers - Page 54 - Section R Amended section requires risers to be 8 maximum. Amended CABO was 8 ¼. The minimum tread depth will remain unchanged at 9 by amendment. Handrail height - Page 54 - Section R This section requires handrails to be a minimum of 34 in height. Amended CABO allowed 30. 2

3 Guardrails - Page 55 - Section R312.2 This section requires that guardrails shall not allow the passage of a 4 sphere (4 3/8 for open side of stairs). Amended CABO allowed 6. Townhouse 2 hour walls - Page 58 - Section R317.2 This section does not allow any plumbing, mechanical equipment, ducts or vents in a 2 hour wall separating townhouse units. Amended CABO did allow this. Foundation sill plate anchor bolts - Page 72 - Section R ½ diameter anchor bolts embedded 7 minimum spaced 6 ft. on center maximum or approved equivalent anchorage devices are required. Amended CABO allowed nails at 16 on center. Foundation wall bracing - Page 79 - Section R This section has been amended to allow foundation walls to be braced at the top as follows when the floor structure is parallel to the backfilled wall. If backfill is less than 4 feet, blocking is required at 4 feet on center in the first two joist spaces. If backfill is 4 feet or more, blocking is required 2 feet on center in the first three joist spaces. Foundation wall reinforcing condensed table - Pages 81, 82 & 84 - Tables R (1), (2) & (3) The reinforcing requirements based on wall heights, backfill heights and type of fill have changed. This is a simplified chart for walls up to 10 feet tall with 60 PSF per foot below grade lateral soil load. Reinforcing Required for Wall Heights Block Size Block Type Backfill Height Hollow Under 4-0 x None None None x x 8 Solid Under 5-0 None x x x x x 8 Hollow 4-0 x 8 Hollow 5-0 x 8 Hollow 6-0 x 8 Hollow 7-0 x x 8 Hollow 7-4 x x x x x 8 Hollow 8-0 x x x 8 Hollow 8-8. x x x x x 8 Hollow 9-0 x x x x x 8 Hollow 9-4 x x x x x 8 Hollow 10-0 x x x x x 12 Hollow 5-0 x x None None x x 12 Solid 6-0 x x None None x x 12 Hollow 4-0 x 12 Hollow 5-0 x 12 Hollow 6-0 x 12 Hollow 7-0 x x 12 Hollow 7-4 x x x x x 12 Hollow 8-0 x x 12 Hollow 8-8 x x x x x 12 Hollow 9-0 x x x x x 12 Hollow 9-4 x x x x x 12 Hollow 10 0 x x x x x x indicates fill higher than wall which is not allowed or no value given in code tables. Values given for total fill such as 10 foot fill on a 10 foot wall are not valid because the code requires the wall to extend 4 above grade for brick and 6 above grade otherwise. 3

4 Foundation wall reinforcing alternate table - Pages 81, 82 & 84 - Tables R (1), (2) & (3) The reinforcing requirements based on wall heights, backfill heights and type of fill have changed. This is a simplified chart for walls up to 10 feet tall with 60 PSF per foot below grade lateral soil load. Minimum 8 Block Maximum Heights 12 Block Maximum Heights Reinforcing Fill Ht. Wall Ht. Fill Ht. Wall Ht. Fill Ht. Wall Ht. Fill Ht. Wall Ht. None Hollow None Solid * * * * * * Blank fields indicate no values given in code tables. * Values given for total fill such as 10 foot fill on a 10 foot wall are not valid because the code requires the wall to extend 4 above grade for brick and 6 above grade otherwise. Backfill for solid block or solid filled - Page 81 - Table R (1) 8 solid block was allowed 7-0 maximum fill and is now 5-0 with a maximum wall height of solid block was allowed 8-0 maximum fill and is now 6-0 with a maximum wall height of 8-8. Unvented crawl spaces - Page 94 - Section R408.3 The new code has very specific and detailed requirements for insulation, moisture control and conditioned air supply for unvented crawl spaces. CABO had no provisions for this. Cantilevered floor joists - Page 97 - Section R Cantilevers were limited to 24 in CABO. New tables provide regulations allowing up to 48 with 3:1 backspan ratio for light-frame bearing wall & roof and up to 72 for balconies with no roof. Header Spans - Page Table R502.5(1) New expanded tables are similar to 1992 CABO. Spans allowed have been reduced. For example in a wall supporting only the roof above a double 2 x 10 can only span 8-5 max. in a 20 wide house where CABO allowed a span of Now a double 2 x 12 supporting the roof only in a 20 wide house can only span 9-9 where CABO allowed 12-0 Alternate wall bracing adjacent to doors or windows - Page Section R This section provides requirements for minimum sheathing width of 16 for 1 story & 24 for 2 stories on each side of a garage door. It requires 3/8 wood sheathing nailed 3 oc with 8d nails. Sheathing must extend over the header or tie downs must be used. Also requires at least one 5/8 anchor and stud tie down devices fastened to the foundation. CABO had nothing specifically for the bracing of narrow walls adjacent to openings such as garage doors. 4

5 Exterior wall covering water-resistive barrier required - Page Section R703.2 This section now requires felt paper or housewrap to be applied over studs or sheathing behind siding of all kinds. CABO did not require this. Masonry veneer requires extra wall bracing - Page Section R703.7 This code requires the wall bracing to be increased 1.5 times the minimum on the first story of a two story and on the first two stories of a three story building. CABO did not require this. Masonry veneer over wood roof - Page Section R This code requires a 4 x 6 x 5/16 steel angle with long leg vertical fastened to each stud with two 7/16 x 4 lag screws and a tripled roof structural member. The first rafter must have three 5/8 x 5 lag screws into each stud and the adjacent rafters must be nailed to it with two 10d nails every 16 oc. For slopes over 7:12 up to 12:12 the code requires 3 x 3 x 1/4 steel stops welded to the angle every 24. The code limits the height of the veneer over the roof to CABO had no provisions for this. Triple rafters with a steel angle has been accepted but no specific design information was available. Masonry veneer wall ties - Page Section R Brick or stone veneer wall ties are required for each 2.67 square feet of wall area. CABO allowed 3.25 square feet per tie. For 24 horizontal spacing the maximum vertical spacing will be 16. For 16 horizontal spacing the maximum vertical spacing will be 24. Rafter ties and collar ties both required - Page Section R This section requires a ridge beam or girder if there are no ceiling joists or rafter ties parallel to the rafters at the level of the top plate or in the lower one-third of the attic height. Ceiling joists or rafter ties in the lower one-third of the attic height are required for every rafter. Collar ties in the upper one-third of the attic height or ridge straps to resist wind uplift are also required at no more than 4 feet on center. The previous code required rafter ties as close to the top plate as practical and did not require collar ties. Rafter spans - Page Section R802.5 This section reduces allowable rafter spans by the ratio of the height of rafter ties above the top plate divided by the height of the ridge. CABO had nothing. For example 2 x 10 rafters at 16 on center with no ceiling attached are allowed to span 23-2 with rafter ties/ceiling joists at the top plate but the maximum span is reduced to 15-6 if the rafter ties are raised up to the maximum one-third of the height of the attic. Rafter tie connection fasteners - Page Table R (9) The new code requires more 16d common nails to fasten the rafter ties to the rafters as they are raised higher above the top plate. Unvented conditioned attics - Page Section R806.4 The new code has very specific and detailed insulation, moisture control and air supply requirements for conditioned attics. CABO had no provisions for unvented attics. Reroofing - Page Section R907.3 No more than two layers of roofing are allowed. CABO allowed 3 layers. Loose fill, blown or sprayed insulation - Page Section N This section requires certification of R-value, installed thickness, settled thickness, coverage area and number of bags of insulation. It also requires depth markers with inches for each 300 square feet in the attic. The old Model Energy Code had no provisions for this. 5

6 R-value certificate - Page Section N This code requires a permanent certificate to be posted on or near the electrical distribution panel listing the predominant R-values for insulation including duct insulation and listing U-factors and SHGC for fenestration (glass) and listing the type and efficiency of the HVAC and water heating units. Insulation - Page Table N Amended IRC now requires R-13 for walls and floors. Previously R-11 was acceptable. Duct insulation - Page Section N Amended section requires ducts in crawl or attic to have R-6 insulation. CABO required R-4.2. Appliance vent termination - Page Section M Power exhauster (not direct vent) terminations are required to be at least 10 feet from lot lines and adjacent buildings. CABO had no provisions for this. Log lighters - Page Section G Log lighters must be listed and marked as complying with CSA 8 standard and manufacturers installation instructions must be on site. CABO had no provisions allowing log lighters. Plumbing test - Page Section P This code changed the air test on supply piping to 50 PSI. CABO required 75 PSI. Radon Control - Page Appendix F This section specifically adopts the appendix on radon control methods that require radon-resistant construction and a passive depressurization system. This will include a 3 pipe from under a slab or membrane extending into the attic and only through the roof if tests show radon. All potential entry points in floors and foundation walls must be sealed. A radon system is not required in crawl spaces with mechanical ventilation or other approved system. This was not previously adopted. This document is available online at 6

2003 International Residential Building Code

2003 International Residential Building Code 2003 International Residential Building Code Section R305 Ceiling Height Habitable rooms, hallways, corridors, bathrooms, toilet rooms, laundry rooms and basements shall have a ceiling height of not less

More information

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division GARAGES/ONE-STORY City of Grand Rapids Building Safety Division 218-326-7601 www.cityofgrandrapidsmn.com This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building

More information

One and Two Family Additions

One and Two Family Additions One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri

More information

General Residential Code Requirements

General Residential Code Requirements Residential building code review will be based on compliance with the requirements of the Louisiana State Uniform Construction code in accordance with ACT 12 of the 2005 First Extraordinary Session of

More information

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general

More information

FACT SHEET #2 DECK INFORMATION

FACT SHEET #2 DECK INFORMATION Borough of Doylestown Building and Zoning Department 57 West Court Street, Doylestown, PA 18901 215.345.4140 FACT SHEET #2 DECK INFORMATION BACKGROUND The provisions of the PAUCC. ICC Property Maintenance

More information

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person

More information

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction. Plan Examination 1 Plan ExaminationPurpose 2 Catch problems in advance of construction. 3 1 Discovery of problems in the field results in higher cost. 4 Can a good plan review eliminate all problems in

More information

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT SAMPLE GUIDE FOR RESIDENTIAL DECKS revised 7 16 Call before you dig! 1 800 272 1000 New Jersey One Call. Utility Mark Out. THIS GENERIC GUIDE IS NOT ALL INCLUSIVE

More information

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION Permit No. 175 Beaver Drive, P.O. Box 486 DuBois, PA 15801 Phone: 814-375-1111 Fax: 814-375-1117 Toll Free: 855-PENNSAF LOCATION OF PROPOSED

More information

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY

More information

CARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS

CARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS CARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS Code Reference: Chapter 97, Code of Public Local Laws and Ordinances of Carroll County and The International

More information

Building Guide. Colorado Chapter of the International Code Council

Building Guide. Colorado Chapter of the International Code Council 12/29/16 Building uide Colorado Chapter of the International Code Council How to Use this uide Check with your jurisdiction regarding type of submittal (paper or electronic) and for additional requirements.draw

More information

Minimum Requirements For One & Two Family Structures FBC 6 th Edition (2017)

Minimum Requirements For One & Two Family Structures FBC 6 th Edition (2017) Pinellas County Building Department Reviewed : Date: Phone: Owner s Name: Permit Number: CB_ - Property Address: Contractor: Phone: Minimum Requirements For One & Two Family Structures FBC 6 th Edition

More information

R CODE CHANGE PROPOSAL FORM (See instructions on page 2)

R CODE CHANGE PROPOSAL FORM (See instructions on page 2) CODE CHANGE PROPOSAL FORM (See instructions on page 2) Code: IRC 12/13 Sections 301.2.2.2.1 Proponent: Charles S. Bajnai, Chesterfield County, VA, ICC Building Code Action Committee 1. Delete as shown

More information

Inspection of New One- and Two- Family Dwellings

Inspection of New One- and Two- Family Dwellings Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Inspection of New One- and Two- Family Dwellings Planning and Development

More information

R Code and Commentary for 2012 NC Residential Code final 03/06/13

R Code and Commentary for 2012 NC Residential Code final 03/06/13 R602.10 Code and Commentary for 2012 NC Residential Code final 03/06/13 Commentary italicized and printed in red 1. Section R602.10 -- provides charging language for two simplified bracing approaches (isolated

More information

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC. 320-226.5189 www.101developmentresources.com While every attempt has been made to insure the correctness of this handout, no guarantees are made to its accuracy

More information

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1% CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that

More information

TOWN OF SOUTH KINGSTOWN REQUIREMENTS FOR BUILDING PERMITS RESIDENTIAL SINGLE FAMILY

TOWN OF SOUTH KINGSTOWN REQUIREMENTS FOR BUILDING PERMITS RESIDENTIAL SINGLE FAMILY TOWN OF SOUTH KINGSTOWN REQUIREMENTS FOR BUILDING PERMITS RESIDENTIAL SINGLE FAMILY ACCESSORY STRUCTURES (Barn, Garage, Shed) ********************************* BUILDING PERMIT APPLICATIONS FOR ACCESSORY

More information

The Inspection Process. Waxhaw N.C.

The Inspection Process. Waxhaw N.C. The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

RESIDENTIAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING REQUIREMENTS RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell

More information

RESIDENTIAL BUILDING PLAN REQUIREMENTS

RESIDENTIAL BUILDING PLAN REQUIREMENTS CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us RESIDENTIAL BUILDING PLAN REQUIREMENTS

More information

Boulder City NV Prepared by (Print Name) Signature Date

Boulder City NV Prepared by (Print Name) Signature Date City of Boulder City Community Development Department Building & Safety Division 401 California Avenue Boulder City, NV 89005-2600 702-293-9282 (Main Line) 702-293-9392 (Fax) 2009 International Energy

More information

CONSTRUCTION CODE PERMIT INFORMATION

CONSTRUCTION CODE PERMIT INFORMATION CONSTRUCTION CODE PERMIT INFORMATION INTRODUCTION The Lebanon County Planning Department is a Pennsylvania Certified 3 rd Party Inspection Agency. The Lebanon County Planning Department is under contract

More information

Each proposed project will be reviewed for compliance with the following codes as applicable.

Each proposed project will be reviewed for compliance with the following codes as applicable. VILLAGE OF PALATINE DEPARTMENT OF BUILDING AND INSPECTION SERVICES 200 EAST WOOD STREET PALATINE, IL 60067-5339 Telephone (847)359-9042 Obtaining a Residential Building Permit: Submittal Requirements The

More information

Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11

Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11 Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11 Residential Inspector s Guide Building and Energy Based on the 2009 IRC, Chapters 1-11

More information

Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11

Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11 Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11 Residential Inspector s Guide Building and Energy Based on the 2009 IRC, Chapters 1-11

More information

R vertical and horizontal.

R vertical and horizontal. CITY OF WENTZVILLE RESIDENTIAL CODE PLAN REVIEW CHECK LIST Items indicated with an X are to be addressed by incorporation into revised plans. A checkmark indicates O.K. Date: Lot # Subdivision: Address:

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210) Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address

More information

CITY OF FRUITLAND DIVISION OF PLAN REVIEW & PERMITTING DECK GUIDE. This design guide assumes all lumber to be pressure-treated Southern Pine.

CITY OF FRUITLAND DIVISION OF PLAN REVIEW & PERMITTING DECK GUIDE. This design guide assumes all lumber to be pressure-treated Southern Pine. City of Fruitland Building Inspections 208 South Division Street Fruitland, Maryland 21826 410.548.2804 CITY OF FRUITLAND DIVISION OF PLAN REVIEW & PERMITTING DECK GUIDE GENERAL NOTES This design guide

More information

City of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)

City of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209) City of Hughson Building Safety Division 7018 Pine Street Hughson, CA 95326 (209) 883-4054 RESIDENTIAL ATTACHED PATIO COVERS Patio covers are one story roofed structures not more than 12 feet above grade,

More information

Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses

Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses Released May 20, 2009 Updated March 9, 2011 Introduction: Wood frame structures with attached brick masonry veneer

More information

Radon Vent Pipe System. Labeling Performance Indicators

Radon Vent Pipe System. Labeling Performance Indicators Section 6 Radon Vent Pipe Labeling Performance Indicators Radon Vent Pipe System Connected after sub-grade system installed Pipe cannot be trapped Provide space in chases Support at each floor level Discharge

More information

TYPICAL BEARING WALL FRAMING

TYPICAL BEARING WALL FRAMING BASIC WOOD FRAMING City of Grand Rapids Building Safety Division 218-326-7601 www.grandrapidsmn.org This handout is intended only as a guide and is based in part on the 2007 Minnesota State Building Code,

More information

City Planning & Development - Development Services (CPD-DS) 414 E. 12th Street 5 th Floor Kansas City, Missouri Telephone (816)

City Planning & Development - Development Services (CPD-DS) 414 E. 12th Street 5 th Floor Kansas City, Missouri Telephone (816) The purpose of this document is to advise you of the information needed to properly evaluate a permit application for your residential project. Please submit your completed permit application at the following

More information

POST FRAME BUILDING STANDARDS

POST FRAME BUILDING STANDARDS CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT 30508 S. West Outer Road, Harrisonville, MO 64701 P- (816) 380-8134 F- (816) 380-8130 POST FRAME BUILDING STANDARDS 201.3

More information

Georgia State Amendments to the International Residential Code for One- and Two- Family Dwellings

Georgia State Amendments to the International Residential Code for One- and Two- Family Dwellings Georgia State Amendments to the International Residential Code for One- and Two- Family Dwellings (2006 Edition) Georgia Department of Community Affairs Planning and Environmental Management Division 60

More information

Residential Accessory Structures & Room Additions

Residential Accessory Structures & Room Additions Residential Accessory Structures & Room Additions Planning and Development Services Department Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email:

More information

CHAPTER 3 BUILDINGS WITH WOOD FRAMED EXTERIOR WALLS 301 SCOPE

CHAPTER 3 BUILDINGS WITH WOOD FRAMED EXTERIOR WALLS 301 SCOPE CHAPTER 3 BUILDINGS WITH WOOD FRAMED EXTERIOR WALLS WOOD CHAPTER 3 301 SCOPE This chapter prescribes construction requirements for buildings where all exterior walls above the foundation are wood framed

More information

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................

More information

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines The following list of code requirements is intended to assist you in complying with the Code of Public Local Laws

More information

The following are details of the code requirements of the 2015 International Residential Code for single-story decks.

The following are details of the code requirements of the 2015 International Residential Code for single-story decks. The following are details of the code requirements of the 2015 International Residential Code for single-story decks. The 2015 International Residential Code Section R507 contains additional information

More information

Chapter 2 EARTHQUAKE-RESISTANCE REQUIREMENTS

Chapter 2 EARTHQUAKE-RESISTANCE REQUIREMENTS Chapter 2 EARTHQUAKE-RESISTANCE REQUIREMENTS This chapter explains the International Residential Code s (IRC s) general earthquake-resistance requirements as well as specific IRC requirements concerning

More information

2012 IECC Residential with State Adopted Changes

2012 IECC Residential with State Adopted Changes 2012 IECC Residential with State Adopted Changes Salt Lake County Townships 385-468-6694 801-381-1449 bursenbach@slco.org bursenbach@yahoo.com BUILDING TALK 1 2 The Family of I-Codes International Building

More information

Building Guide. Colorado Chapter of the International Conference of Building Officials. Building Guide

Building Guide. Colorado Chapter of the International Conference of Building Officials. Building Guide 12/29/2016 Building Guide Colorado Chapter of the International Conference of Building Officials Building Guide Colorado Chapter of the International Code Council Single Family Residential Uncovered Decks

More information

IRC 2012 Key Changes

IRC 2012 Key Changes IRC 2012 Key Changes Overview of changes between the 2009 and 2012 IRC A Webinar Provided by The Pennsylvania Housing Research Center November 4, 2011 Presented by Mike Turns; Associate Director, PHRC

More information

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) PERMIT SUBMITTAL CHECKLIST: Signed and completed Building Permit application form. A separate Electrical permit is required from

More information

City of Owatonna Residential Plan Submittal Checklist

City of Owatonna Residential Plan Submittal Checklist City of Owatonna Residential Plan Submittal Checklist This checklist has been provided for an efficient plan review and permit issuance process. If details are omitted or plans are submitted incomplete,

More information

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals. As a customer service initiative, the Kansas City, Missouri, City Planning and Development Department/Development Services, in cooperation with the Greater Kansas City Home Builders Association, has developed

More information

Formulating a Korea Industrial Standard for light-frame wood construction

Formulating a Korea Industrial Standard for light-frame wood construction Formulating a Korea Industrial Standard for light-frame wood construction Jang, Sang Sik 1, Dong Ho Kim 2 ABSTRACT Light-frame wood construction has been widely recognized by Korean people since it was

More information

Applying for Permits to build a new house in Linn County

Applying for Permits to build a new house in Linn County Planning & Development Linn County, Iowa Building Division Linn County Building Code Residential Guidelines Single Family Dwellings Page 1 of 4 Applying for Permits to build a new house in Linn County

More information

2014 Florida Residential Code Advanced 5th Edition: Overview Internet

2014 Florida Residential Code Advanced 5th Edition: Overview Internet 2014 Florida Residential Code Advanced 5th Edition: Overview Internet Table of Contents Introduction... 4 Course Overview... 4 Code Administration & Enforcement... 4 Scope... 4 Dwellings, Townhouses &

More information

INSPECTION GUIDELINES: JOIST AND UNDERFLOOR COMBO

INSPECTION GUIDELINES: JOIST AND UNDERFLOOR COMBO Joist and Underfloor Combo Page 1 of 7 Revision Date: 10/02/2017 DEVELOPMENT SERVICES BUILDING INSPECTION INSPECTION GUIDELINES: JOIST AND UNDERFLOOR COMBO INSPECTION CODE: 212, 213 SCOPE: RESIDENTIAL

More information

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES A deck/patio permit is required for all construction including decks, renovation of existing decks/patio, paver patios, and retaining walls (over 30 inches).

More information

BUILDING CODES & DESIGN CRITERIA

BUILDING CODES & DESIGN CRITERIA BUILDING CODES & DESIGN CRITERIA Adopted Building Codes: 2006 International Building Code (IBC) 2006 International Residential Code (IRC) 2006 International Mechanical Code (IMC) 2006 International Plumbing

More information

Chapter 2: Foundation

Chapter 2: Foundation Chapter 2: Foundation Crawlspace [V502.1.2] [V502.1.2] [V502.1.3] Vents. Vents in the crawlspace help keep floor insulation and floor framing dry. Crawlspace vents also reduce the potential for radon buildup

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

COVERED AND SCREENED PORCHES: WHAT YOU NEED TO KNOW

COVERED AND SCREENED PORCHES: WHAT YOU NEED TO KNOW COVERED AND SCREENED PORCHES: WHAT YOU NEED TO KNOW Mecklenburg County Code Enforcement Hal Marshall County Services Center 700 North Tryon Street Charlotte, NC 28202 Residential Technical Answer Center

More information

MBOIA IRC Wall Bracing. Mark Halverson. Maine Building Officials and Inspectors Association. First Last

MBOIA IRC Wall Bracing. Mark Halverson. Maine Building Officials and Inspectors Association. First Last Wall Bracing This document was prepared for the MBOIA and based on the wind speeds and Seismic Design Categories for Maine and shall only be used as a reference since the Wind Speeds and the Seismic Design

More information

Hardin County Planning and Development Commission

Hardin County Planning and Development Commission Location by Climate Zone: Hardin County (per Table N1101.2), and the entire state of Kentucky is located in Climate Zone 4, the HDD is 4000 to 4999. Building Requirements; Building Thermal Envelope The

More information

NEW HOME CONSTRUCTION June 2017

NEW HOME CONSTRUCTION June 2017 NEW HOME CONSTRUCTION June 2017 A City of Rochester Hills Building Department Guide to Building a New Home Rochester Hills Building Department 1000 Rochester Hills Dr. 248-656-4615 Effective 061917 i INTRODUCTION

More information

BUILDING BULLETIN One and Two Family Dwellings Decks and Residential Access Ramps

BUILDING BULLETIN One and Two Family Dwellings Decks and Residential Access Ramps BUILDING BULLETIN One and Two Family Dwellings Decks and Residential Access Ramps City of Virginia Beach Building Permits & Inspections Updated 4/30/09 Table of Contents I. Introduction... 1 II. Tips

More information

Residential Detached Garage Handout

Residential Detached Garage Handout Residential Detached Garage Handout Getting Started 1. Please read this handout in its entirety. If you have specific questions after reading the handout, please contact the Altoona Building Department

More information

130 MPH EXPOSURE B WFCM GUIDE. Guide to Wood Frame Construction in High Wind Areas for One- and Two-Family Dwellings 2015 EDITION

130 MPH EXPOSURE B WFCM GUIDE. Guide to Wood Frame Construction in High Wind Areas for One- and Two-Family Dwellings 2015 EDITION 130 MPH EXPOSURE B WFCM GUIDE Guide to Wood Frame Construction in High Wind Areas for One- and Two-Family Dwellings 2015 EDITION Updates and Errata While every precaution has been taken to ensure the accuracy

More information

CHAPTER 5 FLOORS SECTION R501

CHAPTER 5 FLOORS SECTION R501 CHAPTER 5 FLOORS SECTION R501 GENERAL R501.1 Application. The provisions of this chapter shall control the design and construction of the floors for all buildings including the floors of attic spaces used

More information

STAIRWAYS, HANDRAILS, AND GUARDRAILS (RESIDENTIAL)

STAIRWAYS, HANDRAILS, AND GUARDRAILS (RESIDENTIAL) 01/25/08 STAIRWAYS, HANDRAILS, AND GUARDRAILS (RESIDENTIAL) City of Austin International Residential Code: 500 Fourth Avenue NE R314.1 Width. Stairways shall not be less than 36 in clear width at all points

More information

Advanced Ventilation for Residential applications FBC Res 2010.

Advanced Ventilation for Residential applications FBC Res 2010. Advanced Ventilation for Residential applications FBC Res 2010. Course Description Review of the Residential Ventilation requirements in the Florida Building Code, Residential 2010. I. Introduction Dean

More information

Chapter 1: Compliance

Chapter 1: Compliance Chapter 1: Compliance [101] Who Must Comply? All new residential construction must comply with the Washington State Energy Code (WSEC). Exceptions. Exempt from envelope requirements but needing to comply

More information

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Franklin County Septic & Zoning permit application: A septic and zoning permit is required for residential or commercial

More information

RESIDENTIAL DETACHED STORAGE STRUCTURES (GARAGE)

RESIDENTIAL DETACHED STORAGE STRUCTURES (GARAGE) City Of Austin 500 Fourth Avenue N.E. Austin, Minnesota 55912-3773 Building Department 507-437-9950 Fax 507-437-7101 RESIDENTIAL DETACHED STORAGE STRUCTURES (GARAGE) *A Building permit is required for

More information

Table of Contents. Page Title

Table of Contents. Page Title Page Title Table of Contents 1 Floor plan/ Room utilization 2 Elevation (EAST) 3 Elevation (SOUTH) 4 Elevation (WEST) 5 Elevation (NORTH) 6 Foundation plan details 7 Foundation cross sections A Main grade

More information

RESIDENTIAL DETACHED GARAGE HANDOUT

RESIDENTIAL DETACHED GARAGE HANDOUT TOO RESIDENTIAL DETACHED GARAGE HANDOUT GETTING STARTED 1. Please read this handout in it's entirety. If you have specific questions after reading the handout, please contact the Altoona Building Department

More information

Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017

Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017 City of Republic Community Development Department Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017 Insulation Requirements Insulation (2012 IRC Section R302.10.1):

More information

Building Design Data

Building Design Data Building Design Data.. 1. Building Design The KORE ICF System is designed to meet the requirements of the Building Regulations 1997-2006, in the case of two storeys, single occupancy dwellings. If the

More information

INTERIOR ENVIRONMENT

INTERIOR ENVIRONMENT CHAPTER 12 INTERIOR ENVIRONMENT > SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern ventilation, temperature control, lighting, yards and courts, sound transmission, room dimensions,

More information

Residential Building Permit Application

Residential Building Permit Application City of Twin Falls Building Department 324 Hansen Street East P.O. Box 1907 Twin Falls, ID 83303-1907 208-735-7238 208-736-2256 www.tfid.org PROJECT INFORMATION Project Residential Building Permit Application

More information

Basement Renovation Guide For Residential Dwellings

Basement Renovation Guide For Residential Dwellings 1 Development Services Department Building Permit & Inspection Services Basement Renovation Guide For Residential Dwellings This document is a guide for home owners and does not cover all possible conditions.

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

Requirements for Additions/Enclosed Deck/Finished Bonus Room/Dormer

Requirements for Additions/Enclosed Deck/Finished Bonus Room/Dormer Requirements for Additions/Enclosed Deck/Finished Bonus Room/Dormer Architectural prints one (1) set floor plan addressing the following items: o Decay-resistant sill plates o Show how and where combustion

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements General Information Site Card. Before starting construction, post the site card (issued by the City) in a front window visible from the street. Miss Dig. Before you dig, call Miss Dig at 800.482.7171 This

More information

Custom 24 x 26 Garage Plan Roy Hartmann Plan #g218 By SDS-CAD Specialized Design Systems CLIENT

Custom 24 x 26 Garage Plan Roy Hartmann Plan #g218 By SDS-CAD Specialized Design Systems CLIENT P O Box 34 Mendon, Utah Custom 24 x 26 Garage Plan Plan #g218 By Page 1 Title Page Page 2 Main Floor Plan Page 3 Foundation Plan Page 4 Elevation Views Page 5 Framing and Details Page 6 Typical Section

More information

WFCM 130 MPH GUIDE EXPOSURE B WOOD FRAME CONSTRUCTION MANUAL GUIDE TO WOOD CONSTRUCTION IN HIGH WIND AREAS FOR ONE- AND TWO-FAMILY DWELLINGS

WFCM 130 MPH GUIDE EXPOSURE B WOOD FRAME CONSTRUCTION MANUAL GUIDE TO WOOD CONSTRUCTION IN HIGH WIND AREAS FOR ONE- AND TWO-FAMILY DWELLINGS 130 MPH EXPOSURE B GUIDE WFCM WOOD FRAME CONSTRUCTION MANUAL GUIDE TO WOOD CONSTRUCTION IN HIGH WIND AREAS FOR ONE- AND TWO-FAMILY DWELLINGS A F & P A American Forest & Paper Association American Wood

More information

Residential Decks 1 & 2 Family Dwellings and Townhouses City of Owatonna BUILDING DEPARTMENT

Residential Decks 1 & 2 Family Dwellings and Townhouses City of Owatonna BUILDING DEPARTMENT Residential Decks 1 & 2 Family Dwellings and Townhouses City of Owatonna BUILDING DEPARTMENT 507-444-4370 www.ci.owatonna.mn.us This handout is intended only as a guide and is based in part on the 2007

More information

PRESENTATION OUTLINE MUBEC & IRC APPLICABILITY & ADMIN. 6/17/2015 RESIDENTIAL STRUCTURAL SYSTEMS. Carmen B. Bombeke, P.E.

PRESENTATION OUTLINE MUBEC & IRC APPLICABILITY & ADMIN. 6/17/2015 RESIDENTIAL STRUCTURAL SYSTEMS. Carmen B. Bombeke, P.E. MUBEC & IRC APPLICABILITY & ADMINISTRATION RESIDENTIAL STRUCTURAL SYSTEMS Carmen B. Bombeke, P.E. IRC FLOORS QUESTIONS & ANSWERS PRESENTATION OUTLINE Maine Uniform Building & Energy Code (MUBEC) IRC 2009

More information

E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e

E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e I N D E X E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e Title Course Number *Seminar Length (days) Pg. Class Scheduling Policies 8 International Building Code

More information

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire Additional Instructions and Clarifications 1. Please review ARC 4496 before beginning the project identification

More information

RESIDENTIAL WOOD DECK CONSTRUCTION GUIDE

RESIDENTIAL WOOD DECK CONSTRUCTION GUIDE RESIDENTIAL WOOD DECK CONSTRUCTION GUIDE Based on The 2009 Michigan Residential Code Revised September 25, 2014 Wood Deck Construction in accordance with this guide is acceptable in the following Michigan

More information

Typical Finished Basement Details

Typical Finished Basement Details Albemarle County, Virginia Typical Finished Basement Details Based on the 2012 Virginia Residential Code Finished basements must be constructed in conformance with these details. For requirements, details

More information

CUSTOMER ASSISTANCE GUIDE BUILDING PERMIT APPLICATION SUBMITTAL REQUIREMENTS COMMERCIAL AND MULTI-FAMILY

CUSTOMER ASSISTANCE GUIDE BUILDING PERMIT APPLICATION SUBMITTAL REQUIREMENTS COMMERCIAL AND MULTI-FAMILY CUSTOMER ASSISTANCE GUIDE BUILDING PERMIT APPLICATION SUBMITTAL REQUIREMENTS COMMERCIAL AND MULTI-FAMILY Please read all of the following information. The following is a check list. You must have a checkmark

More information

WINDOW AND DOOR REPLACEMENT SAMPLE PLAN

WINDOW AND DOOR REPLACEMENT SAMPLE PLAN To aid in communication between yourself, the inspectors, and the plans examiners, we have prepared this sample plan to assist in the preparations of your plan for window and door replacement. Follow the

More information

Michigan Energy Code Training and Implementation Program

Michigan Energy Code Training and Implementation Program Michigan Energy Code Training and Implementation Program 1.0 Hour Advanced Program Course Number 16202 Residential Energy Plan Review School of Planning, Design & Construction Michigan State University

More information

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION CHAPTER 26 PLASTIC SECTION BC 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic

More information

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS) 1102 4 th Street Telephone: 306-634-1819 Estevan, Saskatchewan, Canada Fax: 306-636-2199 S4A 0W7 INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

More information

PRE-FABRICATED HOUSING

PRE-FABRICATED HOUSING Building Department 200 W. Oak Street 3 rd Floor Fort Collins, CO 80521 970-498-7700 www.larimer.org/building PRE-FABRICATED HOUSING PRE-FABRICATED HOUSING When you are buying a pre-fabricated home, you

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

Technical Notes 43G - Brick Passive Solar Heating Systems - Part 7 - Details and Construction [Mar./Apr. 1981] (Reissued Sept.

Technical Notes 43G - Brick Passive Solar Heating Systems - Part 7 - Details and Construction [Mar./Apr. 1981] (Reissued Sept. Technical Notes 43G - Brick Passive Solar Heating Systems - Part 7 - Details and Construction [Mar./Apr. 1981] (Reissued Sept. 1986) Abstract: Details and construction of brick masonry for passive solar

More information