John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

Size: px
Start display at page:

Download "John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619"

Transcription

1 E 8th St Chicago, IL 19 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank 2, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main ,3 $3,2, -Classroom Modular 23 1,9 $2,39 SITE $33,81 Campus Total 8,1 $3,28, Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video 1 EA Exterior Doors - Exterior FRP Door 11 EA $,9 Exterior Doors - Side lite EA $2,193 Exterior Doors - Store Front EA $3,2 Exterior Doors - Transom Lite EA $1,88 Exterior Stairs - Concrete 2 LF $1,92 Ramps - Concrete 3 LF $1 Ramps - Wood Ramp LF $,2 Foundation Lighting Roof System Foundation - Concrete 1,9 LF Superstructure - Steel 3,3 SF Exterior Lighting - Wall Mounted 1 EA $,99 Chimney - Metal Flue 18 LF $,9 Chimney - Metal Flue 9 LF $1,233 Coping - Metal 1,8 LF $3,32 PIRIE Page 1 of 1 Assessment Date: /3/21

2 Building: Main Category: Building Exterior Roof System E 8th St Chicago, IL 19 Coping - Metal 29 LF Downspouts - Interior Downspouts 2 LF $,311 Downspouts - Interior Downspouts 219 LF $,28 Roof - Modified Bitumen 2,9 SF $,11 Roof - Modified Bitumen 1,11 SF $31,9 Roof Structure - Steel / Metal Deck/ Concrete Topping 3,3 SF Walls Windows Cornice - Metal Projecting 1, LF $22,1 Cornice - Metal Projecting 1, LF $,1 Exterior Walls - Brick 1 SF $1 Exterior Walls - Brick 13,98 SF $9, Exterior Walls - Prefabricated Metal Panel Wall 238 SF $1,838 Exterior Walls - Prefabricated Metal Panel Wall 238 SF $1,2 Curtain wall - Insulated Panel 1,3 SF $11, Curtain wall - Louver 2 SF $1 Guard - Guards perforated 1,28 SF $1,93 Windows - Casement Aluminum Double-pane 1, SF $9,9 Windows - Casement Aluminum Double-pane 1, SF $11,18 Building Exterior Subtotal: $1,,892 Building: Main Category: Electrical System Emergency System Automatic Transfer Switch 2 EA $81 Emergency A/C Power - Corridors and Stairs, SF $2,11 Emergency A/C Power - Gym,32 SF $1,18 Emergency Battery Packs - Corridors and Stairs 13 EA $2,33 Emergency Battery Packs - Gym EA $81 Emergency Battery Packs - Lunchrooms 2 EA $ Exit Signs - Corridors and Stairs EA $1,9 Exit Signs - Gym EA $3 Exit Signs - Lunchroom 2 EA $299 Security System - CCTV 3,3 SF $33,89 PIRIE Page 2 of 1 Assessment Date: /3/21

3 Building: Main Category: Electrical System Emergency System E 8th St Chicago, IL 19 Security System - Intrusion Detection 3,3 SF $3,1 Main Service Power Distribution Independent Electrical Service for emergency power 1 EA $2,921 Main Electrical Service - 1 A /28/3PH 1 EA PA System 3,3 SF $29,8 Lighting and Power Panels - 1 A 1 EA $,89 Lighting and Power Panels - 1 A 2 EA $98 Lighting and Power Panels - Above 1 A EA $2,982 Main Distribution Panels - - amp 3 EA Electrical System Subtotal: $9,8 Building: Main Category: Safty System Fire Alarm Fire Alarm Panel 1 EA $, Fire Alarm Strobe Lights 3,3 SF $1,39 Fire Alarm_System 3,3 SF $2,93 Fire Pump Controller 1 EA $8,1 Pump Room Assembly Sprinkler System Fire Pump - Less than 2hp 1 EA $1,8 Jockey Pump 1 EA $8 Sprinkler Heads 3,3 SF Sprinkler Piping 3,3 SF Wet Sprinkler System 3,3 SF Safty System Subtotal: $3,1 Building: Main Category: Mechanical System PIRIE Page 3 of 1 Assessment Date: /3/21

4 Building: Main Category: Mechanical System Air Conditioning E 8th St Chicago, IL 19 Chemical Pot Feeder 1 EA $2 Chiller-Water Cooled- Cetrifugal - Less than 1 tons EA $18,3 Condensing Unit- Roof Mounted - Less than tons 1 EA $3,33 Cooling Tower - Closed Cell 1 EA $1,1 Glycol Feed 1 EA $9 Air Handling Systems Boiler Systems Heating Devices Mechanical Plumbing Temperature Control Unit Ventilation Ventilation Air Handling Unit- Package Single Zone- Indoor- Daul Temperature Coils cfm 1 EA $2,2 Air Intake 1 EA $,1 Auxiliaries - -1 cfm 1 EA Boiler Auxiliary- on Condensing Hot Water MBH 2 EA $,93 Chemical Pot Feeder 1 EA $2 Combustion Dampers 2 EA $818 Glycol Feed System 1 EA $39 Cabinet Heaters - With Hot Water Coil 1 EA $,9 Unit Heater - Hot Water 1 EA $29 Wall Heater - Electric 2 EA $28 Condenser Pump HP 2 EA $2,8 Daul Temperature Pump HP 2 EA $2,8 Hot Water Pump HP 2 EA Hydronic Supply and Return - Steel LF $38,388 DDC System 3,3 SF $2,32 Thermostats - DDC 8 EA Unit Ventilators- Ceiling Mounted- Dual Temperature Coils (Hot/Chilled) Water 1 EA $, Unit Ventilators- Floor Mounted- Dual Temperature Coils (Hot/Chilled) Water 21 EA $2,89 Exhaust Fans- Roof Mounted CFM EA $,1 Exhaust Fans- Roof Mounted CFM EA $,19 Type I Exhaust Hood- Kitchen 1 EA $1,28 PIRIE Page of 1 Assessment Date: /3/21

5 Building: Main Category: Mechanical System E 8th St Chicago, IL 19 Mechanical System Subtotal: $1,22 Building: Main Category: Plumbing System Hot Water Gas Heater BTU/HR 1 EA $31 Piping Pumps Domestic Piping-Cold Water Horizontal Lines 3,3 SF $1,9 Domestic Piping-Hot Water Horizontal Lines 3,3 SF $8, Domestic Piping-Hot Water Return Lines 3,3 SF $,18 Sanitary Piping 3,3 SF $39,11 Storm Piping 3,3 SF $3, Vent Piping 3,3 SF $28,93 Pumps - Domestic Booster Pump-Simplex 1 EA $1, Plumbing System Subtotal: $132,3 Building: Main Category: Classrooms Art Room (1 room) Casework 2 LF Ceiling - Splined 1,23 SF $981 Chalk Board 9 LF $82 Doors - Wood Doors inclu hw 1 EA $31 Floor - Tile 1,23 SF $2,32 Lighting - Pendent/Surface EA Storage/ Closet SF $8 Walls - Concrete Block 1,2 SF $3,13 Walls - Metal Panel 38 SF $2,2 Computer Lab (1 room) Ceiling - Plaster/Drywall 21 SF $9 Ceiling - Splined 3 SF $92 PIRIE Page of 1 Assessment Date: /3/21

6 Building: Main Category: Classrooms Computer Lab (1 room) E 8th St Chicago, IL 19 Chalk Board 22 LF $2,2 Doors - Wood Doors inclu hw 1 EA $31 Floor - Carpet 8 SF $1,13 Lighting - Pendent/Surface 9 EA Storage/ Closet 9 SF $ Walls - Concrete Block 9 SF $1,3 Walls - Metal Panel 9 SF $, Wireless System 1 EA $32 Library (1 room) Music Room (1 room) Ceiling - Splined 1,23 SF $981 Doors - Wood Doors inclu hw 1 EA $31 Floor - Tile 1,23 SF $2,32 Lighting - Pendent/Surface EA Storage/ Closet 8 SF $8 Walls - Concrete Block 1,2 SF Walls - Metal Panel 38 SF $2,2 Ceiling - Splined 83 SF $38 Doors - Wood Doors inclu hw 1 EA $31 Floor - Tile 83 SF $1,13 Lighting - Pendent/Surface 9 EA Storage/ Closet 8 SF $8 Walls - Concrete Block 8 SF $2,33 Walls - Metal Panel 288 SF $2,1 (18 rooms) Casework 8 LF $1,3 Casework 8 LF $22 Ceiling - Plaster/Drywall 81 SF $3,1 Ceiling - Splined 13, SF $1,9 Chalk Board 192 LF $1,2 Doors - Wood Doors inclu hw 18 EA $,18 Floor - Tile 83 SF $3,1 Floor - Tile,83 SF $1,131 Floor - Tile/Sheet,28 SF $,3 Lighting - Pendent/Surface 18 EA $2,23 Lighting - Pendent/Surface 1 EA PIRIE Page of 1 Assessment Date: /3/21

7 Building: Main Category: Classrooms (18 rooms) E 8th St Chicago, IL 19 Marker Board 13 LF $2,913 Marker Board LF Storage/ Closet 13 SF $99 Storage/ Closet 8 SF Walls - Concrete Block 1,18 SF $2,83 Walls - Metal Panel,3 SF $8,2 Work Sink EA $2,3 Classrooms Subtotal: $29,988 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Exposed 9 SF $1 Ceiling - Splined 1,2 SF $,3 Ceiling - Splined 2,23 SF $1,9 Doors - Side-lite SF $1,3 Doors - Steel Doors incl hw 1 EA $31 Doors - Transom Window SF $ Doors - Wood Doors inclu hw 1 EA $3,1 Floor - Concrete 9 SF $1 Floor - Tile 8 SF $ Floor - Tile/Sheet 3,2 SF $3,21 Lighting - Lay-in 2 EA $238 Lighting - Pendent/Surface EA Power Distribution 1 EA $33,998 Power Distribution 8 EA Storage/ Closet 189 SF $1,3 Walls - Concrete Block,3 SF $1,2 Work SInk 1 EA $8 Gymnasia Ceiling - Splined,32 SF $3, Doors - Wood Doors inclu hw EA $1,2 Floor - Wood,32 SF $3,81 Lighting - Metal Halide/Sodium Vapor EA $1, PIRIE Page of 1 Assessment Date: /3/21

8 Building: Main Category: Rooms (Other Than Classrooms) Gymnasia E 8th St Chicago, IL 19 Scoreboards 1 EA $2,2 Sound System 1 EA $1, Stage 81 SF $2,9 Stage Curtain 8 EA $98,29 Stage Lighting System 1 EA Storage/ Closet 3 SF $2,2 Walls - Concrete Block 2,981 SF $8,39 Walls - Structural Glazed Tile 2,981 SF $9,38 Kitchen Locker/Shower Room Ceiling - Splined 1,1 SF $828 Doors - Wood Doors inclu hw 2 EA 2 Floor - Tile/Sheet 1,1 SF $1,1 Lighting - Pendent/Surface 1 EA $1,982 Serving Line 2 LF $1,88 Storage/ Closet SF $ Walls - Structural Glazed Tile 1, SF $3,39 Accessories SF $9 Ceiling - Splined (Moister Resistance) SF $19 Doors - Wood Doors inclu hw 1 EA $31 Floor - Tile Ceramic/ Porcelain SF $322 Lavatory 1 EA $32 Lighting - Lay-in 1 EA $119 Lighting - Pendent/Surface 1 EA $ Partitions 1 EA $29 Student Lockers EA Walls - Structural Glazed Tile 2 SF $1, Water Closet 1 EA $33 Lunch & Multipurpose Room Ceiling - Splined 1,8 SF $1,8 Chalk Board LF $1 Doors - Steel Doors incl hw 2 EA 2 Floor - Tile/Sheet 1,8 SF $1,82 Lighting - Pendent/Surface 3 EA $,32 Storage/ Closet 23 SF $1,11 Walls - Concrete Block 1 SF $1,1 PIRIE Page 8 of 1 Assessment Date: /3/21

9 Building: Main Category: Rooms (Other Than Classrooms) Lunch & Multipurpose Room E 8th St Chicago, IL 19 Walls - Structural Glazed Tile 1,3 SF $,2 MDF_IDF Doors - Wood Doors inclu hw 1 EA $31 Finishes 13 SF $1,2 Ventilation and Cooling 1 EA $1,8 Mechanical/ Service Rooms Boiler Room 1,39 SF $9,98 Janitor's Closet 138 SF $989 Mechanical/ Service Rooms 32 SF $2,293 Mechanical/ Service Rooms 1 SF Storage Room 92 SF $,21 Restroom Accessories 1,3 SF $11,991 Ceiling - Splined 1,3 SF $1, Doors - Steel Doors incl hw 1 EA $31 Doors - Wood Doors inclu hw 1 EA $3,1 Floor - Concrete 88 SF $ Floor - Tile Ceramic/ Porcelain 1,2 SF $2, Floor Drain EA $,29 Lavatory 19 EA $,2 Lighting - Pendent/Surface 1 EA $ Lighting - Pendent/Surface 31 EA Partitions 13 EA $3,8 Showers 1 EA $311 Student Lockers 3 EA Urinals 8 EA $2,88 Walls - Structural Glazed Tile 81 SF $,11 Walls - Structural Glazed Tile 3,23 SF $1,2 Water Closet 2 EA $2,88 Water Closet 18 EA $,8 Water Closet 1 EA Rooms (Other Than Classrooms) Subtotal: $38, Building: Main PIRIE Page 9 of 1 Assessment Date: /3/21

10 Category: Building Interior Corridor E 8th St Chicago, IL 19 Ceiling - Lay-in, SF $21,19 Doors - Steel Doors incl hw EA $1,2 Drinking Fountains - Double Fountain 2 EA $2 Drinking Fountains - Single Fountain 1 EA $2 Floor - Tile/Sheet, SF $3,829 Lighting - Lay-in EA Student Lockers - Two Tiers 18 EA $8,3 Walls - Concrete Block 9,1 SF $2,83 Walls - Structural Glazed Tile 3, SF $9,1 Safety Camera Viewing Station 1 EA $,1 Security Cameras 3 EA $3,9 Building Interior Subtotal: $81,2 Total Building Cost $3,2, Building: -Classroom Modular Category: Building Exterior Entrance Exterior Doors - Exterior Steel Door EA $1,922 Foundation Lighting Roof System Walls Foundation - Masonry 28 LF Superstructure - Steel,9 SF Exterior Lighting - Wall Mounted 8 EA $2,31 Coping - Metal 28 LF $8,993 Downspouts - Exterior Downspouts LF $1,2 Roof - PVC Membrane,9 SF $93,2 Roof Structure - Steel / Metal Deck/ Concrete Topping,9 SF Exterior Walls - Wood Siding 3,8 SF $22,18 PIRIE Page 1 of 1 Assessment Date: /3/21

11 Building: -Classroom Modular Category: Building Exterior Windows E 8th St Chicago, IL 19 Guard - Guards perforated 2 SF $3,29 Windows - Sash Aluminum Double-pane 2 SF $1,911 Building Exterior Subtotal: $13,3 Building: -Classroom Modular Category: Electrical System Emergency System Emergency Battery Packs - Corridors and Stairs EA Exit Signs - Corridors and Stairs EA $898 Power Distribution Lighting and Power Panels - Above 1 A 2 EA $99 Electrical System Subtotal: $1,893 Building: -Classroom Modular Category: Safty System Fire Alarm Fire Alarm Panel 1 EA $, Fire Alarm_System,9 SF $2, Sprinkler System Sprinkler Heads,9 SF Sprinkler Piping,9 SF $92 Wet Sprinkler System,9 SF $1,23 Safty System Subtotal: $11, Building: -Classroom Modular Category: Mechanical System Unit Ventilation Unit Ventilators- Floor Mounted- Electric Heating & DX Cooling Coil W/ Self Contained Compressor EA $,991 PIRIE Page 11 of 1 Assessment Date: /3/21

12 Building: -Classroom Modular Category: Mechanical System Unit Ventilation E 8th St Chicago, IL 19 Mechanical System Subtotal: $,991 Building: -Classroom Modular Category: Plumbing System Hot Water Electric Heater - Less than 2 KW 1 EA $82 Piping Domestic Piping-Cold Water Horizontal Lines,9 SF Domestic Piping-Hot Water Horizontal Lines,9 SF Domestic Piping-Hot Water Return Lines,9 SF Sanitary Piping,9 SF Storm Piping,9 SF Vent Piping,9 SF Plumbing System Subtotal: $82 Building: -Classroom Modular Category: Classrooms District Office (1 room) Ceiling - Lay-in 89 SF $2,9 Chalk Board LF $1, Doors - Wood Doors inclu hw 1 EA $31 Floor - Tile/Sheet 89 SF $898 Lighting - Lay-in 1 EA $1,9 Lighting - Pendent/Surface 1 EA $ Storage/ Closet 8 SF $31 Walls - Metal Panel 1,13 SF $8,32 Kindergarten (2 rooms) Ceiling - Lay-in 1, SF $,2 Chalk Board LF $1, Chalk Board LF $28 Doors - Steel Doors incl hw 2 EA 2 PIRIE Page of 1 Assessment Date: /3/21

13 Building: -Classroom Modular Category: Classrooms Kindergarten (2 rooms) E 8th St Chicago, IL 19 Floor - Tile/Sheet 1, SF $1,2 Lighting - Lay-in 32 EA Lighting - Pendent/Surface 2 EA Storage/ Closet 13 SF $93 Walls - Metal Panel 2,19 SF $1,3 Pre School (1 room) Ceiling - Lay-in 89 SF $2,9 Chalk Board LF $1, Doors - Wood Doors inclu hw 1 EA $31 Floor - Tile/Sheet 89 SF $898 Lighting - Lay-in 1 EA Lighting - Pendent/Surface 1 EA Storage/ Closet 8 SF $31 Walls - Metal Panel 1,13 SF $8,32 Classrooms Subtotal: $,1 Building: -Classroom Modular Category: Rooms (Other Than Classrooms) Mechanical/ Service Rooms Mechanical/ Service Rooms 2 SF $33 Restroom Accessories 331 SF $3,3 Ceiling - Lay-in 331 SF $99 Doors - Wood Doors inclu hw 2 EA 2 Floor - Tile/Sheet 331 SF $331 Floor Drain 2 EA $2,118 Hand Dryer 2 EA $ Lavatory EA $1,28 Lighting - Pendent/Surface 3 EA Partitions EA $1,82 Urinals 2 EA $2 Walls - Metal Panel 9 SF $,3 Water Closet EA $2,1 PIRIE Page 13 of 1 Assessment Date: /3/21

14 Building: -Classroom Modular Category: Rooms (Other Than Classrooms) E 8th St Chicago, IL 19 Rooms (Other Than Classrooms) Subtotal: $2,2 Building: -Classroom Modular Category: Building Interior Corridor Ceiling - Lay-in SF $1,3 Doors - Steel Doors incl hw EA $1,2 Drinking Fountains - Double Fountain 1 EA $33 Floor - Tile/Sheet SF $29 Lighting - Lay-in EA Walls - Metal Panel 1,2 SF $1,988 Building Interior Subtotal: $1, Total Building Cost $2,39 SITE Category: Site Civil/Drainage Fencing Landscape Civil/ Drainage - Catch Basin EA $,9 Civil/ Drainage - Site Manhole EA $, Fencing - Chain Link LF $3,9 Fencing - Chain Link 18 LF $2,9 Fencing - ew Standard Ornamental 1,11 LF $3, Benches 2 EA $8 Landscape - Grass 38,8 SF $32,1 Parkway trees 2 EA Planting Beds/ Area 1, SF $1, Play Area - Asphalt/ Hardscape, SF $3, Walking Path - Crushed Stone 1,92 SF $2,93 PIRIE Page 1 of 1 Assessment Date: /3/21

15 E 8th St Chicago, IL 19 SITE Category: Site Parking Lot Playground Sidewalks Signage Concrete Curbs 8 LF $1,2 Interior Plantings 3 LF $1,2 Surface - Asphalt,2 SF $,33 Surface - Concrete 2 SF $1 Trash Enclosure - Chain Links SF $9,931 Vehicular Screening 11 LF $2,3 Equipment - School Age - 1 EA $3, Surface - Square Rubber Mats 2,39 SF $2,2 Sidewalks - Internal Walks 2 LF $1,9 Sidewalks - Internal Walks 3 LF $1,33 Sidewalks - Internal Walks LF $,8 Sidewalks - Perimeter Sidewalks 3 SF $2,8 Sidewalks - Perimeter Sidewalks, SF $1,2 Flag Pole - Flag Pole 1 EA $1, Marquee - Free Standing Back Lighted 1 EA Site Subtotal: $33,81 Total Site Cost $33,81 Campus Total ² ³ $3,28, ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. PIRIE Page 1 of 1 Assessment Date: /3/21

16 Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. E 8th St Chicago, IL 19 Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. PIRIE Page 1 of 1 Assessment Date: /3/21

17 E 8th St Chicago, IL 19 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Art Room Computer Lab Library Music Room Kindergarten Kindergarten ,23 8 1, Classroom Modular District Office Kindergarten Kindergarten Pre School Kindergarten Kindergarten Kindergarten PIRIE Page 1 of 1 Assessment Date: /3/21

James E McDade Elementary Classical School 8801 S Indiana Ave Chicago, IL 60619

James E McDade Elementary Classical School 8801 S Indiana Ave Chicago, IL 60619 880 S Indiana Ave Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621 2 S Morgan St Chicago, IL 21 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645 030 Sacramento Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Charles H Wacker Elementary School 9746 S Morgan St Chicago, IL 60643

Charles H Wacker Elementary School 9746 S Morgan St Chicago, IL 60643 9 S Morgan St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Jane Addams Elementary School S Avenue H Chicago, IL 60617

Jane Addams Elementary School S Avenue H Chicago, IL 60617 00 S Avenue H Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Frederic Chopin Elementary School

Frederic Chopin Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Charles H Wacker Elementary School

Charles H Wacker Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Henry R Clissold Elementary School 2350 W 110th Pl Chicago, IL 60643

Henry R Clissold Elementary School 2350 W 110th Pl Chicago, IL 60643 30 W 0th Pl Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Harold Washington Elementary School 9130 S University Ave Chicago, IL 60619

Harold Washington Elementary School 9130 S University Ave Chicago, IL 60619 930 S University Ave Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This

More information

George Armstrong International Studies ES 2110 W Greenleaf Ave Chicago, IL 60645

George Armstrong International Studies ES 2110 W Greenleaf Ave Chicago, IL 60645 W Greenleaf Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

John D Shoop Math-Science Technical Academy ES S Bishop St Chicago, IL 60643

John D Shoop Math-Science Technical Academy ES S Bishop St Chicago, IL 60643 S Bishop St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Walter S Christopher Elementary School 5042 S Artesian Ave Chicago, IL 60632

Walter S Christopher Elementary School 5042 S Artesian Ave Chicago, IL 60632 42 S Artesian Ave Chicago, IL 2 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Minnie Mars Jamieson Elementary School 5650 N Mozart St Chicago, IL 60659

Minnie Mars Jamieson Elementary School 5650 N Mozart St Chicago, IL 60659 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Perkins Bass Elementary School 1140 W 66th St Chicago, IL 60621

Perkins Bass Elementary School 1140 W 66th St Chicago, IL 60621 0 W th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630 Linder Ave Chicago, IL 030 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Inter-American Elementary Magnet School 851 W Waveland Ave Chicago, IL 60613

Inter-American Elementary Magnet School 851 W Waveland Ave Chicago, IL 60613 8 W Waveland Ave Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Donald Morrill Math & Science Elementary School 6011 S Rockwell St Chicago, IL 60629

Donald Morrill Math & Science Elementary School 6011 S Rockwell St Chicago, IL 60629 0 S Rockwell St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Louis A Agassiz Elementary School

Louis A Agassiz Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Velma F Thomas Early Childhood Center

Velma F Thomas Early Childhood Center Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Edgar Allan Poe Elementary Classical School S Langley Ave Chicago, IL 60628

Edgar Allan Poe Elementary Classical School S Langley Ave Chicago, IL 60628 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

Thomas J Higgins Elementary Community Academy S Morgan St Chicago, IL 60643

Thomas J Higgins Elementary Community Academy S Morgan St Chicago, IL 60643 Facility Assessment Report Thomas J Higgins Elementary Community Academy This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors

More information

Horace Greeley Elementary School 832 W Sheridan Rd Chicago, IL 60613

Horace Greeley Elementary School 832 W Sheridan Rd Chicago, IL 60613 832 W Sheridan Rd Chicago, IL 3 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each

More information

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630 544 Linder Ave Chicago, IL 60630 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate

More information

Eugene Field Elementary School 7019 N Ashland Ave Chicago, IL 60626

Eugene Field Elementary School 7019 N Ashland Ave Chicago, IL 60626 79 Ashland Ave Chicago, IL 6626 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each

More information

Walter Q Gresham Elementary School

Walter Q Gresham Elementary School Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Ole A Thorp Elementary Scholastic Academy 6024 W Warwick Ave Chicago, IL 60634

Ole A Thorp Elementary Scholastic Academy 6024 W Warwick Ave Chicago, IL 60634 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls

More information

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3 School and Site Level Deficiencies Site Concrete Walks Are Damaged And Require Replacement 5539 4,000 SF 3 Bus drop-off area does not have a canopy. 14005 250 LF 5 Paved Play Requires Recoating And Resurfacing

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2 School and Site Level Deficiencies Site K Play Area Requires Impact Resistant Material 1320 1 Ea. 2 Exterior Basketball Goals Are Damaged And Require Replacement 1322 1 Ea. 4 Bus drop-off area does not

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

Timberglen Recreation Center Summary

Timberglen Recreation Center Summary Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

SEATON ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000

More information

POWELL ELEMENTARY SCHOOL

POWELL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

Harry Stone Recreation Center Summary

Harry Stone Recreation Center Summary Harry Stone Recreation Center Summary Address Building Purpose 2400 Millmar Drive Dallas, TX 75228 Recreation Center Original Year of Construction 1957 (Expansion 2013) Building Area 22,281 SF Inspection

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1951 3,813 Page 1 of 25 1. Architectural / Structural & Site Exec Summary Hillcrest Public School is a two storey structure of masonry

More information

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California PROGRAM COST MODEL for PEER Tall Buildings Study Concrete Structural Option Los Angeles, California March 8, 2010 PEER Tall Buildings Study Concrete Structural Option March 8, 2010 CONTENTS Page Nos. Overall

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

GFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1

GFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1 GFW Schools Task Force Meeting 1/23/19 1 AGENDA 1. Introductions 2. Review of building tours Primary Needs 3. Review Space Programs 4. Review Concept Options District and Facility needs 5. Review Concept

More information

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School HERITAGE MIDDLE SCHOOL Overview: The is located at 20 Foxcroft Drive and consists of a three-story building with Three-Story Classroom and Multi-Purpose Room Additions completed in 2002. The building has

More information

NALLE ELEMENTARY SCHOOL

NALLE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Asset Overview Report By Asset Name

Asset Overview Report By Asset Name School District: Coast Mountains Asset: STEWART ELEMENTARY Facility: STEWART ELEMENTARY Asset Number: 107177 Assets are ordered by Asset Name Currency: CAD Statistics FCI Cost: 2,543,413 FCI: 0.59 RI Cost:

More information

BALLOU SENIOR HIGH SCHOOL

BALLOU SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE

More information

KEY ELEMENTARY SCHOOL

KEY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 52,000 SF CURRENT PROGRAM CAPACITY 320 ENROLLMENT 2008 328 WARD 3 PROPOSED PROGRAM CAPACITY 325 Site Plan KEY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements SECTION A CM INSTRUCTIONS TO BIDDERS SECTION B BID CATEGORY DESCRIPTIONS & BID FORMS BC-07: Building HVAC and Plumbing BC-08: Building Electric BC-09: General Trades BC-10: Masonry BC-11: Precast Structural

More information

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School HILLSIDE ELEMENTARY SCHOOL Overview: The is located at 98 Belmont Drive and consists of a two-story building which has had a number of additions added to it over the years, the latest of which was a two-story

More information

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017 Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School

More information

Facilities Management Services & Funding Guide Centrally Funded and Recharge Services

Facilities Management Services & Funding Guide Centrally Funded and Recharge Services Facilities Management Services & Funding Guide Centrally Funded and Recharge Services Table of Contents About the Funding Guide Page 3 Carpenter Shop Page 4 Custodial Services Page 5 Electrical Shop Page

More information

SHEPHERD ELEMENTARY SCHOOL

SHEPHERD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

GARFIELD ELEMENTARY SCHOOL

GARFIELD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1910 BUILDING AREA 58,908 SF CURRENT PROGRAM CAPACITY 446 ENROLLMENT 2008 278 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan GARFIELD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Reilly Elementary School Site Summary

Reilly Elementary School Site Summary 1 Reilly Elementary School Site Summary Address 405 Denson Drive Austin, TX 78752 Number of Permanent Campus Facilities 1 Original Year of Construction 1954 Total Campus Building Area (combined) 41,622

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

K.B. Polk Recreation Center Summary

K.B. Polk Recreation Center Summary K.B. Polk Recreation Center Summary Address Building Purpose 6801 Roper Street Dallas, TX 75209 Recreation Center Original Year of Construction 1988 Building Area 14,305 SF Inspection Date July 20, 2016

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Foothills School Div #38 Sheep River School B3839A Okotoks Report run on: February 27, 29 2:28 PM Building Name: Address: Location: Building Id: Gross Area (sq. m): Replacement

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS 1 2 3 4 Existing corridors will receive new

More information

6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After

6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After Contents 1 Program Outline Gymnasium Restrooms Storage rooms IDF 2 Finish Outline Walls Flooring Ceiling Roof 3 MEP Outline Plumbing Mechanical Electrical 4 Communication and Security Guideline Communication

More information

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free / / Paperport 2000 official estimating report Work Write Up / Specification of Repairs Toll Free 1-877-932-7177 Clients Name. GREAT CLIENT Property Address. NUMBER ONE GOOD ROAD METRO, VA 20000 Primary

More information

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in

More information

Delco Activity Center Site Summary

Delco Activity Center Site Summary 1 Site Summary Address 4601 Pecan Brook Austin, TX 78724 Number of Permanent Campus Facilities 1 Original Year of Construction 2003 Total Campus Building Area (combined) 60,294 SF Introduction The is located

More information

Corsicana High School

Corsicana High School Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0

More information

2016 BOND INFORMATION

2016 BOND INFORMATION 2016 BOND INFORMATION This publication is provided as a public service by the offices of Operations and Maintenance, Communications and Financial Services. www.svvsd.org @svvsd 395 South Pratt Parkway,

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Quantity Estimated Mobilization 1 LS

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Quantity Estimated Mobilization 1 LS 010100-01 Mobilization 1 LS 010500-01 Construction Surveying 1 LS 015000-01 Temporary Construction Fence 1 LS 029100-01 Tree Retention and Protection 1 LS 015150-01 Erosion and Sediment Control 1 LS Division

More information

Minuteman Regional Vocational Technical School

Minuteman Regional Vocational Technical School Minuteman Regional Vocational Technical School List of Recommendations L1 AAB compliance: Improvements to front entrance (concrete ramps, railings, etc.) Required by AAB cost trigger L2 AAB compliance:

More information

The Report: Priority 1 thru 5 $ 2,933,064 New Construction $ 6,797,031 Less Redlined Items $ 218,060

The Report: Priority 1 thru 5 $ 2,933,064 New Construction $ 6,797,031 Less Redlined Items $ 218,060 Building Condition Assessment Facilities Feasibility Study 124 - Leonelo H. Gonzalez Elementary Educational Needs $ 6,881,962 Safety & Security Needs $ 532,225 Exterior Needs $ 893,302 Needs $ 471,995

More information

CODE COMPLIANCE PLAN REVIEW PROCEDURES

CODE COMPLIANCE PLAN REVIEW PROCEDURES CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

NYC Department of Education

NYC Department of Education Asset: Building Assessment Survey 2017-2018 PRE-K CENTER @ 132-10 JAMAICA AVENUE - QUEENS, 132-10 JAMAICA AVENUE, New York, 11418 Inspection Id Inspection Type Time In Last Edited SA : Architectural -

More information

Hinsdale Township High School District 86 Referendum Project Listing April 2, Approved

Hinsdale Township High School District 86 Referendum Project Listing April 2, Approved Hinsdale Township High School District 86 Referendum Project Listing April 2, 2019 - Approved 1-12-2019 Project Category and Description Central South Total Security Replace Intercom System Install a completely

More information

Nevada Joint Union HSD Facilities Improvement Plan - DRAFT ITEM NO. ITEM DESCRIPTION AREA (SF) PROJECT COST $/SF

Nevada Joint Union HSD Facilities Improvement Plan - DRAFT ITEM NO. ITEM DESCRIPTION AREA (SF) PROJECT COST $/SF PROJECT SUMMARY PROJECT: - DRAFT DATE: 6/19/2015 LEVEL: Conceptual ESTIMATOR: Javier Silva /DLM CLIENT: DLM Architecture SCHEDULE: 24 Months ITEM NO. ITEM DESCRIPTION AREA (SF) PROJECT COST $/SF 1 Bear

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

BARNARD ELEMENTARY SCHOOL

BARNARD ELEMENTARY SCHOOL INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Collins Middle School

Collins Middle School Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0

More information

Administrative Offices

Administrative Offices CUYAHOGA COUNTY PUBLIC LIBRARY EXISTING FACILITY ASSESSMENT December 2009 Administrative Offices 2111 Snow Road, Parma, Ohio 44134 Location Entry Site View of Staff Entrance ADM Administrative Offices

More information

WILKINSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1964 3,035 Page 1 of 27 1. Architectural / Structural & Site Exec Summary Warnica Public School is a one storey structure of masonry construction

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

INSPIRE each student to develop a strong

INSPIRE each student to develop a strong DEL PASO MANOR ELEMENTARY SCHOOL Valuing a culturally and academically DIVERSE COMMUNITY, Del Paso Manor Elementary School s Mission is to EDUCATE and INSPIRE each student to develop a strong A C A D E

More information

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012 Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap

More information

Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014

Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014 Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014 Measure T DEFINED: Measure T is a local ballot measure on the November 2014 ballot seeking voter authorization

More information

DENNIS TOWNSHIP FEASIBILITY STUDY

DENNIS TOWNSHIP FEASIBILITY STUDY DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

Exhibit A Library Shell Construction

Exhibit A Library Shell Construction Exhibit A Library Shell Construction Library Component Building Requirements Approximately 15,000-17,000 square feet plus 900 square feet for mechanical room and additional space on roof for installation

More information

March 2018 Progress. Work Completed, Week Ending 3/23/18:

March 2018 Progress. Work Completed, Week Ending 3/23/18: March 2018 Progress Work Completed, Week Ending 3/23/18: Continued draft curtains and liner panels. Continued running power to hangar doors. Continued installation of bath accessories in the gang bathrooms.

More information