PIP INSC1000 Cold Service Insulation Materials and Installation Specification

Size: px
Start display at page:

Download "PIP INSC1000 Cold Service Insulation Materials and Installation Specification"

Transcription

1 COMPLETE REVISION Ocber 2017 Insulation PIP Cold Service Insulation Materials and Installation Specification

2 PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort minimize the cost of process industry facilities, this Practice has been prepared from the technical requirements in the existing standards of major industrial users, contracrs, or standards organizations. By harmonizing these technical requirements in a single set of Practices, administrative, application, and engineering costs both the purchaser and the manufacturer should be reduced. While this Practice is expected incorporate the majority of requirements of most users, individual applications may involve requirements that will be appended and take precedence over this Practice. Determinations concerning fitness for purpose and particular matters or application of the Practice particular project or engineering situations should not be made solely on information contained in these materials. The use of trade names from time time should not be viewed as an expression of preference but rather recognized as normal usage in the trade. Other brands having the same specifications are equally correct and may be substituted for those named. All Practices or guidelines are intended be consistent with applicable laws and regulations including OSHA requirements. To the extent these Practices or guidelines should conflict with OSHA or other applicable laws or regulations, such laws or regulations must be followed. Consult an appropriate professional before applying or acting on any material contained in or suggested by the Practice. This Practice is subject revision at any time. Process Industry Practices (PIP), Construction Industry Institute, The University of Texas at Austin, 3925 West Braker Lane (R4500), Austin, Texas PIP Member Companies and Subscribers may copy this Practice for their internal use. Changes or modifications of any kind are not permitted within any PIP Practice without the express written authorization of PIP. Authorized Users may attach addenda or overlays clearly indicate modifications or exceptions specific sections of PIP Practices. Authorized Users may provide their clients, suppliers and contracrs with copies of the Practice solely for Authorized Users purposes. These purposes include but are not limited the procurement process (e.g., as attachments requests for quotation/ purchase orders or requests for proposals/contracts) and preparation and issue of design engineering deliverables for use on a specific project by Authorized User s client. PIP s copyright notices must be clearly indicated and unequivocally incorporated in documents where an Authorized User desires provide any third party with copies of the Practice. PUBLISHING HISTORY Ocber 1997 Issued July 2007 Edirial Revision April 2012 Edirial Revision November 2006 Complete Revision March 2011 Reaffirmation with Ocber 2017 Complete Revision Edirial Revision Not printed with State funds

3 COMPLETE REVISION Ocber 2017 Insulation PIP Cold Service Insulation Materials and Installation Specification Table of Contents 1. Scope References Process Industry Practices Industry Codes and Standards Definitions Requirements Project Scope Materials Srage and Handling of Insulation Materials Installation Requirements Quality Plan Inspection Repairs Data Forms -D1 Documentation Requirements Sheet The following data forms shall be part of this Practice only if indicated on the purchaser's completed Documentation Requirements Sheet. -D2 Cold Service Insulation System Project-Specific Requirements -D3 Extent of Cold-Service Insulation -D10 Cellular Glass Block and Fabricated Sections Insulation System -D11 Polyisocyanurate Insulation System -D12 Rigid Cellular Phenolic Thermal Insulation System for Pipe and Equipment -D13 Flexible Elasmeric Cellular Thermal Insulation System for Pipe and Equipment -D14 User-Defined Insulation System for Pipe and Equipment -F1 Insulation Thickness Table Cellular Glass Insulation for CC, ASTM C552 Grade I (inches) -F2 Insulation Thickness Table Cellular Glass Insulation for CP, ASTM C552 Grade I (inches) -F3 Insulation Thickness Table Cellular Glass Insulation, Combined Table, ASTM C552 Grade I (inches) -F4 Insulation Thickness Table Polyisocyanurate Insulation for CC, ASTM C591 Grade 2 (inches) -F5 Insulation Thickness Table Polyisocyanurate Insulation for CP, ASTM C591 Grade 2 (inches) Process Industry Practices Page 1 of 13

4 PIP COMPLETE REVISION Cold Service Insulation Materials and Installation Specification Ocber F6 Insulation Thickness Table Polyisocyanurate Insulation, Combined Table, ASTM C591 Grade 2 (inches) -F7 Insulation Thickness Table Rigid Cellular Phenolic Insulation for CC, ASTM C1126, Type III, Grade 1 (inches) -F8 Insulation Thickness Table Rigid Cellular Phenolic Insulation for CP, ASTM C1126, Type III, Grade 1 (inches) -F9 Insulation Thickness Table Rigid Cellular Phenolic Insulation, Combined Table, ASTM C1126, Type III, Grade 1 (inches) -F10 Insulation Thickness Table Flexible Elasmeric Cellular Insulation for CC, ASTM C534, Grade 1 (inches) -F11 Insulation Thickness Table Flexible Elasmeric Cellular Insulation for CP, ASTM C534, Grade 1 (inches) -F12 Insulation Thickness Table Flexible Elasmeric Cellular Insulation, Combined Table, ASTM C534, Grade 1 (inches) -F13 User-Defined Insulation for CC (inches) -F14 User-Defined Insulation for CP (inches) -F15 User-Defined Insulation Combined Table (inches) -FM1 Insulation Thickness Table Cellular Glass Insulation for CC, ASTM C552 Grade I (mm) -FM2 Insulation Thickness Table Cellular Glass Insulation for CP, ASTM C552 Grade I (mm) -FM3 Insulation Thickness Table Cellular Glass Insulation, Combined Table, ASTM C552 Grade I (mm) -FM4 Insulation Thickness Table Polyisocyanurate Insulation for CC, ASTM C591 Grade 2 (mm) -FM5 Insulation Thickness Table Polyisocyanurate Insulation for CP, ASTM C591 Grade 2 (mm) -FM6 Insulation Thickness Table Polyisocyanurate Insulation, Combined Table, ASTM C591 Grade 2 (mm) -FM7 Insulation Thickness Table Rigid Cellular Phenolic Insulation for CC, ASTM C1126, Type III, Grade 1 (mm) -FM8 Insulation Thickness Table Rigid Cellular Phenolic Insulation for CP, ASTM C1126, Type III, Grade 1 (mm) -FM9 Insulation Thickness Table Rigid Cellular Phenolic Insulation, Combined Table, ASTM C1126, Type III, Grade 1 (mm) -FM10 Insulation Thickness Table Flexible Elasmeric Cellular Insulation for CC, ASTM C534, Grade 1 (mm) -FM11 Insulation Thickness Table Flexible Elasmeric Cellular Insulation for CP, ASTM C534, Grade 1 (mm) -FM12 Insulation Thickness Table Flexible Elasmeric Cellular Insulation, Combined Table, ASTM C534, Grade 1 (mm) -FM13 User-Defined Insulation for CC (mm) -FM14 User-Defined Insulation for CP (mm) -FM15 User-Defined Insulation Combined Table (mm) Process Industry Practices Page 2 of 13

5 PIP COMPLETE REVISION Cold Service Insulation Materials and Installation Specification Ocber Scope This Practice provides requirements for materials and installation of cold service insulation systems. This Practice describes requirements for cold service insulation materials and accessories, srage and handling of materials, insulation application, extent of insulation, and documentation on the external surfaces of piping and equipment, ambient -179 C (-290 F). 2. References Comment: Use of this Practice for contractual purposes requires the purchaser make specific choices and assemble additional supporting documents. Listing of or reference supporting documents within this Practice does not imply suitability for specific designs. Applicable parts of the following Practices and industry codes and standards references shall be considered an integral part of this Practice. The edition in effect on the date of contract award shall be used, except as otherwise noted. Short titles are used herein where appropriate. 2.1 Process Industry Practices (PIP) PIP INTG1000 Insulation Inspection Checklist 2.2 Industry Codes and Standards 3. Definitions American Petroleum Institute (API) API 521 Pressure-Relieving and Depressuring Systems American Society for Testing and Materials (ASTM) ASTM C450 Standard Practice for Fabrication of Thermal Insulating Fitting Covers for NPS Piping, and Vessel Lagging ASTM C692 Standard Test Method for Evaluating the Influence of Thermal Insulation on External Stress Corrosion Cracking Tendency of Austenitic Stainless Steel ASTM C795 Standard Specification for Thermal Insulation for Use in Contact with Austenitic Stainless Steel ASTM C871 Standard Test Methods for Chemical Analysis of Thermal Insulation Materials for Leachable Chloride, Fluoride, Silicate and Sodium Ions owner: Party who owns the facility wherein the insulation system will be used purchaser: Party who awards the contract the supplier. The purchaser may be the owner or the owner s authorized agent. supplier: Party responsible for providing the insulation materials and installing the insulation system Process Industry Practices Page 3 of 13

6 PIP COMPLETE REVISION Cold Service Insulation Materials and Installation Specification Ocber Requirements 4.1 Project Scope Documents required define the scope of the work are listed on Purchaser s Data Sheet PIP -D Project specific insulation on piping and equipment shall be in accordance with Purchaser s Data Sheet PIP -D2. This data sheet describes the surfaces be insulated and the materials be used The extent of insulation is listed on Purchaser s Data Sheet PIP -D This data sheet defines the extent of insulation by surface or component for each insulation type code required for the project The extent of equipment insulation may also be defined by the purchaser for individual items Insulation materials shall be in accordance with Purchaser s Data Sheets PIP -D10 through PIP -D13 as required in accordance with Purchaser s Data Sheet PIP -D1. These data sheets define requirements for specific insulation materials and accessories Systems requiring additional insulation specifications beyond this Practice shall be covered by purchaser s documentation. 4.2 Materials Insulation and accessory materials shall be furnished in accordance with the requirements of this Practice, including the specific class, grade, or type Asbess shall not be used as a component in the manufacture of insulation and accessory materials Materials shall be new and shall be used before the expiration date Sealant, mastics, and adhesives shall be supplied in facry-sealed containers All materials shall be qualified for use on austenitic stainless steel in accordance with ASTM C If requested by purchaser, test reports shall be furnished A chemical analysis shall be provided in accordance with ASTM C871 for all materials. This chemical analysis shall not vary by more than 50 percent from the chemical analysis of the production lot tested in accordance with ASTM C Use of materials other than those specified in this Practice requires prior written approval of the purchaser Requests for substitutions of materials shall be included as an alternate in the proposal Requests for substitutions of materials after contract award are not permitted. Process Industry Practices Page 4 of 13

7 PIP COMPLETE REVISION Cold Service Insulation Materials and Installation Specification Ocber All mastics, cements, adhesives, caulks, labels and marking pens that come in contact with stainless steel shall have a maximum leachable chloride content of less than 50 ppm, when tested in accordance with ASTM C Use curved segment and beveled lag materials manufactured specific inside diameters that assure complete inside and outside diameter closure Fabricated insulation shall be in accordance with ASTM C450 and the Adjunct Joint sealer and vapor sp materials shall remain flexible throughout their service temperature range. Joint sealer and vapor sp materials shall be compatible with vapor barrier material Reinforcing fabric for vapor barrier mastic shall be a synthetic fabric with a maximum 8 x 8 mesh density, unless otherwise specified by Purchaser. 4.3 Srage and Handling of Insulation Materials From delivery the installed finished product, insulation materials shall at all times be protected from the elements and have adequate drainage Insulation materials shall be handled and sred in accordance with the manufacturer s printed recommendations Mastics, adhesives, and sealers that are exposed temperatures outside the recommended temperature ranges during srage shall be removed from the site and replaced with new material Materials that have exceeded shelf life shall be removed from the site and replaced with new material. 4.4 Installation Requirements General All materials shall be sred, mixed, thinned, and applied in accordance with the manufacturer s printed instructions All conflicts between this Practice and the manufacturer s printed instructions shall be brought the attention of the purchaser for resolution Authorization proceed with application of insulation shall be obtained in writing from the purchaser Unless otherwise specified, insulation shall not be applied until completion of the following has been verified: a. Required hydrostatic and/or pneumatic pressure testing b. Application of required substrate protective coating systems, including uch-up of previously applied coatings c. Cleaning of surfaces that require insulation d. Installation and testing of required tracing systems Comment: If required by the purchaser, application of insulation shall proceed before pressure testing is complete, provided that all welds and flanged and Process Industry Practices Page 5 of 13

8 PIP COMPLETE REVISION Cold Service Insulation Materials and Installation Specification Ocber 2017 threaded connections are left exposed until the pressure testing is complete Temporary terminations of installed insulation shall be adequately protected at all times All insulation shall be smooth and free from cracks, voids, gaps and depressions greater than 3 mm (1/8 inch) All cracks, voids, gaps, and depressions in the insulation greater than 3 mm (1/8 inch) shall be refitted and not filled Purchaser shall identify areas that require bore coating of cellular glass such as the following: a. The surface being insulated has a cyclic or regeneration operating temperature of 200 C (400 F) or higher. b. The surface being insulated experiences high vibrations. c. The insulation is carrying the load of the pipe such as at a pipe hanger or supports Insulation Layering Multi-layer insulation in accordance with Table 1 is required for polyisocyanurate at temperatures of -20 C (-1 F) and below Multi-layer insulation in accordance with Table 1 is required for cellular glass thicknesses greater than 75 mm (3 inch) When applying insulation, the circumferential butt joints of each section shall be staggered When applying multi-layer insulation, each succeeding layer shall be staggered the longitudinal and circumferential joint of the layer beneath Joint sealer shall be applied all joints of single layer and only joints of the outer layer of multi-layer applications Each layer of double-layer or multiple-layer insulation shall be held in place separately. Process Industry Practices Page 6 of 13

9 PIP COMPLETE REVISION Cold Service Insulation Materials and Installation Specification Ocber 2017 Table 1 Layer Thicknesses for Multi-Layer Applications Total Thickness, mm (inch) Layer Thickness, mm (inch) Inner Middle Outer 50 (2.0) 25 (1.0) - 25 (1.0) 65 (2.5) 25 (1.0) - 40 (1.5) 75 (3.0) 40 (1.5) - 40 (1.5) 90 (3.5) 40 (1.5) - 50 (2.0) 100 (4.0) 50 (2.0) - 50 (2.0) 115 (4.5) 50 (2.0) - 65 (2.5) 125 (5.0) 65 (2.5) - 65 (2.5) 140 (5.5) 65 (2.5) - 75 (3.0) 150 (6.0) 75 (3.0) - 75 (3.0) 165 (6.5) 75 (3.0) - 90 (3.5) 175 (7.0) 50 (2.0) 65 (2.5) 65 (2.5) 190 (7.5) 65 (2.5) 65 (2.5) 65 (2.5) 200 (8.0) 65 (2.5) 65 (2.5) 75 (3.0) 215 (8.5) 65 (2.5) 75 (3.0) 75 (3.0) 225 (9.0) 75 (3.0) 75 (3.0) 75 (3.0) 0 (9.5) 75 (3.0) 75 (3.0) 90 (3.5) Insulation Protrusions Protrusions, other than nozzles, through the insulation on equipment and piping shall be insulated for a minimum distance equal 4 times the adjacent insulation thickness measured from the surfaces of the equipment or pipe The insulation thickness for protrusions shall be 1/2 the insulation thickness of the adjacent insulated surface but not less than 40 mm (1.5 inch) Vapor Sps Vapor sps that seal the insulation the pipe or equipment shall be installed at all insulation terminations and changes in configurations. These include, but are not limited, elbows, flanges, pipe supports, instrument connections, uninsulated vents, and relief valves Vapor sps shall consist of suitable joint sealant between pipe and insulation and between layers of insulation Vapor sps shall extend a minimum of 50 mm (2 inches) from insulation termination Vapor sps on insulation protrusions, instrument connections, and insulation extensions of uninsulated vents shall extend the length of insulation from the termination back the insulated surface. Process Industry Practices Page 7 of 13

10 PIP COMPLETE REVISION Cold Service Insulation Materials and Installation Specification Ocber Insulation Securement Rigid Insulation up 300 mm (12 inches) outside diameter (OD) shall be held in place with fiberglass reinforced pressure-sensitive tape or stainless steel tie wires applied over the tape. All cut ends of wire shall be embedded in the insulation Rigid Insulation 300 mm (12 inches) OD 600 mm ( inches) OD shall be held in place with 13 mm (0.5 inch) wide by 0.50 mm (0.020 inch) thick Type 304 stainless steel bands and wing seals Rigid Insulation above 600 mm ( inches) OD shall be held in place with 19 mm (0.75 inch) wide by 0.50 mm (0.020 inch) thick Type 304 stainless steel bands and wing seals Insulation securement shall be spaced on a maximum of 300 mm (12 inches) centers Flexible elasmeric insulation shall be secured in accordance with the Manufacturer s published instructions Metal Jacketing If fire protection is required in accordance with API 521, stainless steel jacketing shall be installed on equipment and piping Exposed edges of metal jacketing shall be machine-bent or rolled eliminate sharp edges Metal Jacketing Securement Metal jacketing 600 mm ( inches) OD shall be held in place with 13 mm (0.5 inch) wide by 0.50 mm (0.020 inch) thick Type 304 stainless steel bands and wing seals Metal jacketing above 600 mm ( inches) OD shall be held in place with 19 mm (0.75 inch) wide by 0.50 mm (0.020 inch) thick Type 304 stainless steel bands and wing seals Jacket banding shall be spaced on maximum 300 mm (12 inches) centers Insulation System Contraction Provisions Contraction joints shall be provided for rigid insulation materials on all piping and horizontal equipment in accordance with Table Contraction joints shall also be provided in uninterrupted straight pipe insulation where the run length is equal or greater than 1/2 the maximum allowed distance Contraction joints shall be provided below insulation supports on vertical piping, except if above an elbow at the botm of a pipe run or directly above the pipe flanges, and on vertical equipment, except the botm insulation support on the skirt The contraction joint spacing shown in Table 2 shall be the maximum distance allowable between restraint points in the insulation system. Process Industry Practices Page 8 of 13

11 PIP COMPLETE REVISION Cold Service Insulation Materials and Installation Specification Ocber 2017 Comment: Restraint points are typically pipe supports, pipe fittings, branch connections, flanges, and valves. Operating Temperature Table 2 Contraction Joints Maximum Contraction Joint Spacing, m (ft) C F Carbon Steel Stainless Steel (89) 20.4 (67) (52) 12.2 (40) N.A. 8.5 (28) N.A. 6.7 (22) N.A. 5.5 (18) N.A. 4.6 (15) N.A. 4.0 (13) Contraction joints shall be located at the approximate midpoint between the restraints and shall be installed in each layer Contraction joints shall be in accordance with the following requirements: a. Single layer applications shall have an additional layer of the same thickness insulation provided over contraction joints. The additional insulation shall be of sufficient length extend 75 mm (3 inches) beyond each side of the joints. b. Multiple layer insulation shall have contraction joints staggered between layers. Outer contraction joint shall be covered with a flexible vapor seal. c. Contraction joints shall be filled with unfaced low-density fiberglass blanket. d. The contraction joint filler shall at all times be protected from rainfall or water until such a time as it is covered with either an additional layer of insulation or the flexible rubber seal. e. The flexible vapor seal local the contraction joint insulation shall be cut from 125 mm (5 inches) wide butyl rubber sheet. The length of the butyl seal shall be adequate provide a 75 mm (3 inches) circumferential lap. f. Outer layer insulation surfaces within 50 mm (2 inches) from each side of the contraction joint shall have the surface cells filled with vapor retardant mastic. The coated surfaces shall be allowed dry the uch. g. The coated insulation on either side of the contraction joint shall be wrapped with 50-mm (2-inch) wide tape (ribbon sealant). The tape shall be cut the length required permit longitudinal tape edges butt tightly against each other without overlapping. Process Industry Practices Page 9 of 13

12 PIP COMPLETE REVISION Cold Service Insulation Materials and Installation Specification Ocber 2017 h. The flexible seal shall be wrapped over the contraction joint and pressed in the tape previously installed on both sides of the contraction joint. The seal shall be cut the length required provide a 75 mm (3 inches) circumferential lap and the lapped surfaces shall be bonded with adhesive. i. Secure both sides of the seal with 19 mm (0.75 inch) wide austenitic stainless steel bands Pipe Insulation Supports in Vertical Piping If specified by purchaser, vertical piping insulation supports shall be furnished shop-installed by the piping fabricar If additional vertical piping insulation supports are required, bolt-on supports shall be furnished and field-installed Design of vertical pipe insulation supports shall be provided in the proposal, and shall be subject review and approval by purchaser Location of pipe insulation supports in vertical piping shall consider: a. Maximum spacing of supports shall be 7.3 m ( ft) of uninterrupted length, but not less than specified in Table 2 for contraction joints in vertical pipe insulation. b. Insulation supports shall be provided above all flanged connections. c. Supports above flanged sections shall be located a minimum one stud bolt length plus 25 mm (1 inch) from the back face of the p flange. d. Insulation supports shall be provided above elbows and tees, if the vertical or diagonal run length is equal or greater than the maximum spacing allowed in Table 2 for contraction joints in vertical pipe insulation. e. If required above elbows or tees, supports shall be located 150 mm (6 inches) from the pipe--fitting weld Fitting, Flange and Valve Insulation Molded, or routed insulation fittings shall be used when commercially available Prefabricated insulation items shall be used in lieu of field fabricated items Insulation for all fittings shall be fitted and assembled with tight joints. Joining prefabricated assemblies shall be done with adhesives designed for use in low temperature applications Insulation for fittings, flanges, and valves shall be fabricated in accordance with ASTM C450 and the Adjunct Pipe elbow covers for multiple layer insulation require a 65 mm (2.5 inch) extension for the inner layer(s). The thickness of the projection shall match the thickness of the inner layer(s) of the adjacent pipe insulation. Process Industry Practices Page 10 of 13

13 PIP COMPLETE REVISION Cold Service Insulation Materials and Installation Specification Ocber Pipe Supports Insulation terminations at cradle-type cold pipe supports with high density polyurethane foam shall be adhesive bonded the pipe for a minimum distance of 150 mm (6 inches) Multiple layer insulation requires only the inner layer be adhesive bonded Trunnion Insulation Interiors of horizontal trunnions and vertical trunnions on the botm of an insulated surface shall be fully filled with dispensed polyurethane foam Interiors of vertical trunnions on p of an insulated surface do not require filling Foam injection holes shall be plugged with joint sealant. Open ended trunnions shall have the exposed polyurethane foam surface finished with fabric reinforced vapor retardant mastic Vapor Barriers Before the application of weatherproof jacketing, all surfaces shall be sealed with a vapor barrier mastic or membrane type vapor barrier sheet, as indicated on the Material System Data Sheet Membrane type vapor barrier sheet shall be installed without fish mouthing gaps or folds and shall have a minimum 50-mm (2-inch) overlap at all joints Vapor barrier mastic and reinforcing fabric shall be installed in accordance with the manufacturer s printed instructions the minimum thickness indicated on the Material System Data Sheet Vapor barrier mastic shall be applied in a minimum of two coats: a tack coat followed by a minimum of one finish coat after installation of reinforcing fabric. Care shall be taken completely fill and seal the fabric openings Solvent-based elasmeric vapor barrier mastic shall be applied in three layers for operating temperatures below -18 C (0 F), in accordance with the manufacturer s published instructions All other commercially available vapor barrier systems shall be installed in accordance with the manufacturer s printed instructions Insulation Finish Weather jacketing shall be fitted tightly around vessel and piping attachments that pass through the weather jacketing RTV silicone sealant shall be applied the extent necessary prevent the entrance of water around penetrations through the weather jacketing Circumferential and longitudinal laps in weather jacketing shall be overlapped 50 mm (2 inches) 75 mm (3 inches) Non-metallic jacketing for flexible elasmeric insulation shall be installed in accordance with the Manufacturer s published instructions. Process Industry Practices Page 11 of 13

14 PIP COMPLETE REVISION Cold Service Insulation Materials and Installation Specification Ocber Protection of Installed Insulation Installed insulation shall have the required permanent protection or temporary protection applied before the conclusion of each work shift Installed insulation shall have temporary protection applied if rain or other forms of atmospheric moisture can damage the insulation during the work day Wet Insulation Insulation that becomes wet shall be removed and replaced with dry insulation Wet insulation shall be discarded Work Area Housekeeping Insulation materials shall be handled and disposed of in accordance with applicable federal, state, and local laws and regulations Insulation-related materials, such as mastics, shall be handled and applied with care prevent splattering on adjacent facilities, such as concrete foundations, paving, structural steel, equipment, piping, gauge glasses, instruments, machined surfaces, valve stems, and packing All mastic over-spray and splatter shall be removed immediately Flammable materials shall be sred away from ignition sources such as welding operations Debris from insulation application work shall be removed from the work area on a regular basis and placed in containers at the end of the workday. 4.5 Quality Plan A quality plan shall be provided with the proposal that includes the following: a. Quality assurance, quality control, and inspection criteria b. A method of providing the purchaser with verifiable evidence that all aspects of quality are accepted and found acceptable by the supplier s inspecr during the course of the insulation work c. All elements identified by PIP INTG1000 d. Inspection hold points as necessary assure work can be properly inspected before any additional work is performed that could obscure defective materials or installation 4.6 Inspection All materials, fabrication, and installation work is subject inspection by the purchaser or the owner The purchaser's inspecr shall review the quality procedures verify the following information: a. Quality procedures are appropriate for the work scope being performed and have been approved by purchaser. Process Industry Practices Page 12 of 13

15 PIP COMPLETE REVISION Cold Service Insulation Materials and Installation Specification Ocber 2017 b. The approved quality procedures have been implemented and are being administrated by the quality personnel Items that are not in accordance with the purchase order shall be subject rejection Rejected material, fabrication, or installation work shall be replaced at no cost purchaser Unless otherwise specified, INTG1000-F shall be used for inspection documentation. 4.7 Repairs Damage installed insulation shall be promptly reported the purchaser. The report shall include the location and nature of the damage Damage insulation weather jacketing shall be repaired immediately if the damage can result in additional damage the insulation because of water leakage in the system If permanent repair is not immediately practical, temporary repair of damaged weather jacketing shall be required Damaged insulation shall be replaced if the nature of the damage will adversely affect the thermal performance of the system Any disputes regarding the need for replacement of insulation shall be referred the purchaser for resolution. Process Industry Practices Page 13 of 13

16 DOCUMENT REQUIREMENTS SHEET PIP -D1 COLD SERVICE INSULATION MATERIALS AND INSTALLATION PAGE 1 OF 4 PROJECT NO. FACILITY NAME LOCATION PROJECT DOCUMENT NO. INEG1000 INEG2000 INTG1000 NUMBER TITLE REV DATE NOTES INIC1000 -D2 -D3 INSULATION DESIGN GUIDE GUIDELINES FOR USE OF INSULATION PRACTICES INSULATION INSPECTION CHECKLIST COLD INSULATION INSTALLATION DETAILS COLD SERVICE INSULATION SYSTEM PROJECT-SPECIFIC REQUIREMENTS EXTENT OF COLD-SERVICE INSULATION SELECTED MATERIALS SYSTEM DATA SHEETS -D10 YES NO CELLULAR GLASS BLOCK AND FABRICATED SECTIONS INSULATION SYSTEM -D11 YES NO POLYISOCYANURATE INSULATION SYSTEM -D12 YES NO RIGID CELLULAR PHENOLIC THERMAL INSULATION SYSTEM FOR PIPE AND EQUIPMENT -D13 YES NO FLEXIBLE ELASTOMERIC CELLULAR THERMAL INSULATION SYSTEM FOR PIPE AND EQUIPMENT -D14 YES NO USER-DEFINED INSULATION SYSTEM FOR PIPE AND EQUIPMENT YES YES YES YES NO NO NO NO SELECTED INSULATION THICKNESS TABLES -F1 YES NO CELLULAR GLASS INSULATION FOR CC ASTM C552 GRADE I (INCHES) -F2 YES NO CELLULAR GLASS INSULATION FOR CP ASTM C552 GRADE I (INCHES) -F3 YES NO CELLULAR GLASS INSULATION - COMBINED TABLE - ASTM C552 GRADE I (INCHES) -F4 YES NO POLYISOCYANURATE INSULATION FOR CC ASTM C591 GRADE 2 (INCHES) -F5 YES NO POLYISOCYANURATE INSULATION FOR CP ASTM C591 GRADE 2 (INCHES) -F6 YES NO POLYISOCYANURATE INSULATION COMBINED TABLE - ASTM C591 GRADE 2 (INCHES)

17 DOCUMENT REQUIREMENTS SHEET PIP -D1 COLD SERVICE INSULATION MATERIALS AND INSTALLATION PAGE 2 OF 4 PROJECT NO. FACILITY NAME LOCATION PROJECT DOCUMENT NO. -F7 YES NO RIGID CELLULAR PHENOLIC INSULATION FOR CC - ASTM C1126, TYPE III, GRADE 1 (INCHES) -F8 YES NO RIGID CELLULAR PHENOLIC INSULATION FOR CP - ASTM C1126, TYPE III, GRADE 1 (INCHES) -F9 YES NO RIGID CELLULAR PHENOLIC INSULATION - COMBINED TABLE - ASTM C1126, TYPE III, GRADE 1 (INCHES) -F10 YES NO FLEXIBLE ELASTOMERIC CELLULAR INSULATION FOR CC - ASTM C534, GRADE 1 (INCHES) -F11 YES NO FLEXIBLE ELASTOMERIC CELLULAR INSULATION FOR CP - ASTM C534, GRADE 1 (INCHES) -F12 YES NO FLEXIBLE ELASTOMERIC CELLULAR INSULATION - COMBINED TABLE - ASTM C534, GRADE 1 (INCHES) -F13 YES NO USER-DEFINED INSULATION FOR CC (INCHES) -F14 YES NO USER-DEFINED INSULATION FOR CP (INCHES) -F15 YES NO USER-DEFINED INSULATION COMBINED TABLE (INCHES) -FM1 YES NO CELLULAR GLASS INSULATION FOR CC ASTM C552 GRADE I (MM) -FM2 YES NO CELLULAR GLASS INSULATION FOR CP ASTM C552 GRADE I (MM) -FM3 YES NO CELLULAR GLASS INSULATION - COMBINED TABLE - ASTM C552 GRADE I (MM) -FM4 YES NO POLYISOCYANURATE INSULATION FOR CC ASTM C591 GRADE 2 (MM) -FM5 YES NO POLYISOCYANURATE INSULATION FOR CP ASTM C591 GRADE 2 (MM) -FM6 YES NO POLYISOCYANURATE INSULATION COMBINED TABLE - ASTM C591 GRADE 2 (MM) -FM7 YES NO RIGID CELLULAR PHENOLIC INSULATION FOR CC - ASTM C1126, TYPE III, GRADE 1 (MM) -FM8 YES NO RIGID CELLULAR PHENOLIC INSULATION FOR CP - ASTM C1126, TYPE III, GRADE 1 (MM) -FM9 YES NO RIGID CELLULAR PHENOLIC INSULATION - COMBINED TABLE - ASTM C1126, TYPE III, GRADE 1 (MM) -FM10 YES NO FLEXIBLE ELASTOMERIC CELLULAR INSULATION FOR CC - ASTM C534, GRADE 1 (MM) -FM11 YES NO FLEXIBLE ELASTOMERIC CELLULAR INSULATION FOR CP - ASTM C534, GRADE 1 (MM) -FM12 YES NO FLEXIBLE ELASTOMERIC CELLULAR INSULATION - COMBINED TABLE - ASTM C534, GRADE 1 (MM) -FM13 YES NO USER-DEFINED INSULATION FOR CC (MM)

18 DOCUMENT REQUIREMENTS SHEET PIP -D1 COLD SERVICE INSULATION MATERIALS AND INSTALLATION PAGE 3 OF 4 PROJECT NO. FACILITY NAME LOCATION PROJECT DOCUMENT NO. -FM14 YES NO USER-DEFINED INSULATION FOR CP (MM) -FM15 YES NO USER-DEFINED INSULATION COMBINED TABLE (MM) YES YES YES YES YES YES YES NO NO NO NO NO NO NO COLD INSULATION INSTALLATION DETAILS (REF. INIC1000) INIC0001 YES NO GENERAL ARRANGEMENT PIPING INSULATION INIC0002 YES NO PIPING - LAYERED INSULATION INIC0003 YES NO PIPING - VERTICAL INSULATION SUPPORT - SINGLE LAYER INIC0004 YES NO PIPING - VERTICAL INSULATION SUPPORT - MULTIPLE LAYERS INIC0005 YES NO PIPING - SINGLE LAYER HORIZONTAL CONTRACTION JOINT INIC0006 YES NO PIPING - MULTIPLE LAYER HORIZONTAL CONTRACTION JOINT INIC0008 YES NO PIPING - FLANGE INSULATION INIC0009 YES NO PIPING - INSULATION CONNECTIONS INIC0010 YES NO VALVES WITH EXTENDED BONNETS INIC0011 YES NO VALVES WITHOUT EXTENDED BONNETS INIC0050 YES NO VERTICAL VESSELS WITH OUTSIDE DIAMETERS OVER 900 mm (36 ) INIC0051 YES NO VERTICAL VESSELS WITH OUTSIDE DIAMETERS 900 mm (36 ) AND LESS INIC0052 YES NO VESSEL HEAD INIC0054 YES NO VERTICAL VESSEL BOTTOM HEAD INSULATION INIC0055 YES NO NOZZLE INIC0056 YES NO VESSEL STIFFENER INSULATION DETAIL INIC0059 YES NO TYPICAL CLIP DETAILS INIC0061 YES NO LAP SEAM DETAIL INIC0062 YES NO HORIZONTAL VESSELS W/ OUTSIDE DIAMETERS OVER 00 mm (96 ) INIC0063 YES NO APPLICATION OF METAL GORES ON HORIZONTAL VESSEL HEADS INIC0064 YES NO HEAD INSULATION SECUREMENT

19 DOCUMENT REQUIREMENTS SHEET PIP -D1 COLD SERVICE INSULATION MATERIALS AND INSTALLATION PAGE 4 OF 4 PROJECT NO. FACILITY NAME LOCATION PROJECT DOCUMENT NO. YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO

20 DATA SHEET COLD SERVICE INSULATION MATERIALS AND INSTALLATION PIP -D2 PROJECT NO. FACILITY NAME LOCATION PROJECT DOCUMENT NO. OPERATING TEMP SERVICE OR ITEM DESCRIPTION TYPE CODE C F MATERIAL THICKNESS TABLE SPECIAL REQUIREMENTS

21 DATA SHEET PIP -D3 EXTENT OF COLD-SERVICE INSULATION PROJECT NO. FACILITY NAME LOCATION PROJECT DOCUMENT NO. INSULATION REQUIREMENTS FOR PIPING AND EQUIPMENT (NOTE: PROJECT PIPING AND EQUIPMENT INSULATION SPECIFICATIONS MAY MODIFY THESE REQUIREMENTS.) CC COLD SERVICE INSULATION FP FIRE PROTECTION INSULATION CP CONDENSATION CONTROL (USER DEFINED) ITEMS CC CP STRAIGHT OR BEND PIPE; SOCKETWELD, THREADED OR YES YES BUTTWELD PIPE FITTINGS; SOCKETWELD, THREADED OR BUTTWELD VALVES PIPE UNIONS YES YES FLANGED PIPE FITTINGS, FLANGED VALVES, FLANGE YES YES ORIFICE SETS, PIPING FLANGES CONNECTED TO EQUIPMENT NOZZLES, AND FLANGED SPECIAL ITEMS (I.E., STRAINERS) PRIMARY PIPING FOR INSTRUMENT YES YES CONNECTIONS, SAMPLE PIPING, VENT AND DRAIN PIPING EXPANSION OR ROTATION JOINTS, SLIDE VALVES, ETC. YES YES INSTRUMENTS AND ASSOCIATED TUBE YES YES RELIEF VALVES YES YES CONTROL VALVES YES YES TEE AND INLINE STRAINERS YES YES VESSELS, SHELL AND HEAD SURFACES YES YES VESSEL HANDHOLES YES YES VESSEL MANWAYS YES YES VESSEL INSTRUMENT TRIM YES YES SHELL AND TUBE HEAT EXCHANGERS, EXCLUDING FLANGED YES YES JOINTS HEAT EXCHANGER FLANGED JOINTS YES YES PUMP CASINGS, CANNED YES NO PUMP CASINGS, OTHER NO NO COMPRESSORS NO NO

22 DATA SHEET CELLULAR GLASS BLOCK AND FABRICATED SECTIONS INSULATION SYSTEM PIP -D10 PAGE 1 OF 3 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Cellular glass block and fabricated sections shall conform ASTM C552, Grade 6. Fabrication shall be in accordance with ASTM C450, C585, C1639. Asphalt shall be used for fabrication. Other fabrication techniques are acceptable as specified by Purchaser. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME WEATHERPROOF JACKETING All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be smooth finish. Metal jacketing on vessels less than 1200 mm (48 in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.020-in.) thick and machine-rolled for circumferential fit. Metal jacketing on horizontal equipment 1200 mm (48 in.) and larger in diameter shall be aluminum 0.6 mm (0.0-in.) thick. Metal jacketing on vertical equipment 1200 mm (48 in.) and larger in diameter shall be aluminum sheets, 0.6 mm (0.0-in.) thick with 32 mm (1-1/4-in.) pitch corrugations. Corrugated jacketing shall be approximately 825 mm (33-in.) 1200 mm (48-in.) wide by 3000 mm (10-ft) long. The length of corrugated jacketing shall be modified minimize waste and cutting. Stainless steel jacketing, if required, shall be 0.25 mm (0.010-in.) thick.

23 DATA SHEET PIP -D10 CELLULAR GLASS BLOCK AND FABRICATED SECTIONS INSULATION SYSTEM PAGE 2 OF 3 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Cellular glass block and fabricated sections shall conform ASTM C552, Grade 6. Fabrication shall be in accordance with ASTM C450, C585, C1639. Asphalt shall be used for fabrication. Other fabrication techniques are acceptable as specified by Purchaser. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME VAPOR BARRIER Vapor retardant finish for straight pipe and shell sections shall be butyl rubber aluminum laminate film, 1.2 mm (0.050 in.) thick. Vapor retardant finish for compound shapes (e.g. fittings, flanges, valves, heads, etc) shall be fibrated asphalt cut-back mastic with ASTM E84 flame spread not greater than 35. Mastic shall be applied in two coats, tal 3 mm (0.125 in.) film thickness. Reinforcing membrane for vapor retardant mastic shall be a leno weave, synthetic fabric, with a maximum 8 x 8 mesh density. SEALANTS Joint sealant shall be a single component, off white color, non-hardening vapor barrier sealant with a service temperature range of -157 C 71 C (-251 F 160 F). Joint sealant for insulation subject steam out shall be a single component, aluminum color butyl rubber based material having an average solids content of 52 58% by volume and a service temperature range of -73 C 121 C (-100 F 250 F). Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 204 C (400 F) and intermittent service 260 C (500 F).

24 DATA SHEET CELLULAR GLASS BLOCK AND FABRICATED SECTIONS INSULATION SYSTEM PIP -D10 PAGE 3 OF 3 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Cellular glass block and fabricated sections shall conform ASTM C552, Grade 6. Fabrication shall be in accordance with ASTM C450, C585, C1639. Asphalt shall be used for fabrication. Other fabrication techniques are acceptable as specified by Purchaser. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME FASTENERS All banding shall be Type 304 austenitic stainless steel conforming ASTM A0/A0M and be furnished deburred. Banding seals shall be Type 304 stainless steel, conforming ASTM A0/A0M, heavy duty wing type for all applications. Glass filament tape shall be 25 mm (1 in.) wide with pressure-sensitive adhesive. OTHER Insulation contraction joint material shall be a 16 kg/m³ ( lb/ft³) nominal density unfaced fiberglass blanket, consisting of random oriented fiberglass, suitable for service from -198 C 232 C (-325 F 450 F). Flexible seal over outer layer insulation contraction joints shall be 125 mm (5 inch) nominal width x 0.8 mm (0.03 inch) nominal thickness butyl rubber sheet. Tape used seal between the insulation adjacent contraction joints and the rubber sheet contraction joint seal shall be a 3 mm (0.125 inch) thickness x 50 mm (2 inch) width 100% solids synthetic rubber sealant in rolled ribbon form. Adhesive for bonding insulation substrates where use of mechanical fasteners is not practical shall be a light brown colored, two component, high strength urethane adhesive with an average solids content of 97% by volume when mixed.

25 DATA SHEET PIP -D11 POLYISOCYANURATE INSULATION SYSTEM PAGE 1 OF 6 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: CELLULAR GLASS BLOCK AND FABRICATED SECTIONS SHALL CONFORM TO ASTM C552, GRADE 1, TYPES I, II, AND III, INCLUDING ANNEXES, AND BE FABRICATED TO THE DIMENSIONS OF ASTM C450. ASPHALT SHALL BE USED FOR FABRICATION. OTHER FABRICATION TECHNIQUES ARE ACCEPTABLE AS SPECIFIED BY PURCHASER. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME WEATHERPRO OF JACKETING All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco embossed finish. Head segments, fitting and valve covers shall be smooth finish. Jacketing shall be furnished mill finish. Metal jacketing on vertical equipment 1200 mm (48 in.) and larger in diameter shall be aluminum sheets, 0.6 mm (0.0-in.) thick with 32 mm (1-1/4-in.) pitch corrugations. Corrugated jacketing shall be approximately 825 mm (33-in.) 1200 mm (48-in.) wide by 3000 mm (10-ft) long. The length of corrugated jacketing shall be modified minimize waste and cutting. Metal jacketing on horizontal equipment 1200 mm (48 in.) and larger in diameter shall be aluminum 0.6 mm (0.0-in.) thick. Metal jacketing on vessels less than 1200 mm (48 in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.020-in.) thick and machine-rolled for circumferential fit. Stainless steel jacketing, if required, shall be 0.25 mm (0.010-in.) thick.

26 DATA SHEET PIP -D11 POLYISOCYANURATE INSULATION SYSTEM PAGE 2 OF 6 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: CELLULAR GLASS BLOCK AND FABRICATED SECTIONS SHALL CONFORM TO ASTM C552, GRADE 1, TYPES I, II, AND III, INCLUDING ANNEXES, AND BE FABRICATED TO THE DIMENSIONS OF ASTM C450. ASPHALT SHALL BE USED FOR FABRICATION. OTHER FABRICATION TECHNIQUES ARE ACCEPTABLE AS SPECIFIED BY PURCHASER. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME VAPOR BARRIER SEALANTS FASTENERS Vapor retardant finish for straight pipe and shell sections shall be butyl rubber aluminum laminate film, 1.2 mm (0.050 in.) thick. Vapor retardant finish for compound shapes (e.g. fittings, flanges, valves, heads, etc) shall be fibrated asphalt cut-back mastic with ASTM E84 flame spread not exceeding 35. Mastic shall be applied in two coats, tal 3 mm (0.125 in.) film thickness. Reinforcing membrane for vapor retardant mastic shall be a leno weave, synthetic fabric, with a maximum 8 x 8 mesh density. Joint sealant shall be a single component, off white color, non-hardening vapor barrier sealant with a service temperature range of -157 C 71 C (-251 F 160 F). Joint sealant for insulation subject steam out shall be a single component, aluminum color butyl rubber based material having an average solids content of 52 58% by volume and a service temperature range of -73 C 121 C (-100 F 250 F). Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 204 C (400 F) and intermittent service 260 C (500 F). All banding shall be Type 304 austenitic stainless steel conforming ASTM A167 and A480 and be furnished deburred. Banding seals shall be Type 304 stainless steel, conforming ASTM A167, heavy duty wing type for all applications. Glass filament tape shall be 25 mm (1 in.) wide with pressure-sensitive adhesive.

27 DATA SHEET PIP -D11 POLYISOCYANURATE INSULATION SYSTEM PAGE 3 OF 6 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: CELLULAR GLASS BLOCK AND FABRICATED SECTIONS SHALL CONFORM TO ASTM C552, GRADE 1, TYPES I, II, AND III, INCLUDING ANNEXES, AND BE FABRICATED TO THE DIMENSIONS OF ASTM C450. ASPHALT SHALL BE USED FOR FABRICATION. OTHER FABRICATION TECHNIQUES ARE ACCEPTABLE AS SPECIFIED BY PURCHASER. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME OTHER Insulation contraction joint material shall be a 16 kg/m³ ( lb/ft³) nominal density unfaced fiberglass blanket, consisting of random oriented fiberglass, suitable for service from -198 C 232 C (-325 F 450 F). Flexible seal over outer layer insulation contraction joints shall be 125 mm (5 inch) nominal width x 0.8 mm (0.03 inch) nominal thickness butyl rubber sheet. Tape used seal between the insulation adjacent contraction joints and the rubber sheet contraction joint seal shall be a 3 mm (0.125 inch) thickness x 50 mm (2 inch) width 100% solids synthetic rubber sealant in rolled ribbon form. Adhesive for bonding insulation substrates where use of mechanical fasteners is not practical shall be a light brown colored, two component, high strength urethane adhesive with an average solids content of 97% by volume when mixed.

28 DATA SHEET PIP -D11 POLYISOCYANURATE INSULATION SYSTEM PAGE 4 OF 6 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: RIGID PREFORMED CELLULAR POLYISOCYANURATE SHALL CONFORM TO ASTM C591, GRADE 2, AND SHALL BE FABRICATED TO THE DIMENSIONS OF ASTM C450 AND ASTM C585. MINIMUM DENSITY PER ASTM C591: kg/m³ lbs/ft³ APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME WEATHERPROOF JACKETING All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco embossed finish. Head segments, fitting and valve covers shall be smooth finish. Jacketing shall be furnished mill finish. Metal jacketing on vertical equipment 1200 mm (48 inches) and larger in diameter shall be aluminum sheets, 0.6-mm (0.0-inch) thick with 32-mm (1-1/4-inch) pitch corrugations. Corrugated jacketing shall be approximately 825 mm (33-in.) 1200 mm (48-in.) wide by 3000 mm (10-ft) long. The length of corrugated jacketing shall be modified minimize waste and cutting. Metal jacketing on horizontal equipment 1200 mm (48 inches) and larger in diameter shall be aluminum 0.6-mm (0.0-inch) thick. Metal jacketing on vessels less than 1200 mm (48 inches) in diameter, and all piping, shall be aluminum, 0.5-mm (0.020-inch) thick and machine-rolled for circumferential fit. Stainless steel jacketing, if required, shall be 0.25-mm (0.010-inch) thick.

29 DATA SHEET PIP -D11 POLYISOCYANURATE INSULATION SYSTEM PAGE 5 OF 6 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: RIGID PREFORMED CELLULAR POLYISOCYANURATE SHALL CONFORM TO ASTM C591, GRADE 2, AND SHALL BE FABRICATED TO THE DIMENSIONS OF ASTM C450 AND ASTM C585. MINIMUM DENSITY PER ASTM C591: kg/m³ lbs/ft³ APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME VAPOR BARRIER SEALANTS FASTENERS Vapor retardant finish for straight pipe and shell sections shall be butyl rubber aluminum laminate film, 1.2 mm (0.050 in.) thick. Vapor retardant finish for compound shapes (e.g. fittings, flanges, valves, heads, etc) shall be elasmeric, solvent-borne mastic, min. 40% solids by vol., ASTM E84 flame spread less than 20. Mastic applied in two coats, tal 1.3 mm (0.05 in.) DFT Reinforcing membrane for vapor retardant mastic shall be a leno weave, synthetic fabric, with a maximum 8 x 8 mesh density. Joint sealant shall be a single component, off white color, non-hardening vapor barrier sealant with a service temperature range of -157 C 71 C (-251 F 160 F). Joint sealant for insulation subject steam out shall be a single component, aluminum color butyl rubber based material having an average solids content of 52 58% by volume and a service temperature range of -73 C 121 C (-100 F 250 F). Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 204 C (400 F) and intermittent service 260 C (500 F). All banding shall be Type 304 austenitic stainless steel conforming ASTM A0 and A480 and be furnished deburred. Banding seals shall be Type 304 stainless steel, conforming ASTM A0, heavy duty wing type for all applications. Glass filament tape shall be 25 mm (1 in.) wide with pressure-sensitive adhesive.

30 DATA SHEET PIP -D11 POLYISOCYANURATE INSULATION SYSTEM PAGE 6 OF 6 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: RIGID PREFORMED CELLULAR POLYISOCYANURATE SHALL CONFORM TO ASTM C591, GRADE 2, AND SHALL BE FABRICATED TO THE DIMENSIONS OF ASTM C450 AND ASTM C585. MINIMUM DENSITY PER ASTM C591: kg/m³ lbs/ft³ APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME OTHER Insulation contraction joint material shall be a 16 kg/m³ ( lb/ft³) nominal density unfaced fiberglass blanket, consisting of random oriented fiberglass, suitable for service from -198 C 232 C (-325 F 450 F). Flexible seal over outer layer insulation contraction joints shall be 125 mm (5 inch) nominal width x 0.8 mm (0.03 inch) nominal thickness butyl rubber sheet. Tape used seal between the insulation adjacent contraction joints and the rubber sheet contraction joint seal shall be a 3 mm (0.125 inch) thickness x 50 mm (2 inch) width 100% solids synthetic rubber sealant in rolled ribbon form. Adhesive for bonding insulation substrates where use of mechanical fasteners is not practical shall be a light brown colored, two component, high strength urethane adhesive with an average solids content of 97% by volume when mixed.

31 DATA SHEET PIP -D12 RIGID CELLULAR PHENOLIC THERMAL INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE 1 OF 3 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: RIGID CELLULAR PHENOLIC THERMAL INSULATION SHALL CONFORM TO ASTM C1126, TYPE III, GRADE 1. FACINGS SHALL BE SUPPLIED AS INDICATED. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME WEATHERPROOF JACKETING All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco embossed finish. Head segments, fitting and valve covers shall be smooth finish. Jacketing shall be furnished mill finish. Metal jacketing on vertical equipment 1200 mm (48 inches) and larger in diameter shall be aluminum sheets, 0.6-mm (0.0-inch) thick with 32-mm (1-1/4-inch) pitch corrugations. Corrugated jacketing shall be approximately 825 mm (33-in.) 1200 mm (48-in.) wide by 3000 mm (10-ft) long. The length of corrugated jacketing shall be modified minimize waste and cutting. Metal jacketing on horizontal equipment 1200 mm (48 inches) and larger in diameter shall be aluminum 0.6-mm (0.0-inch) thick. Metal jacketing on vessels less than 1200 mm (48 inches) in diameter, and all piping, shall be aluminum, 0.5-mm (0.020-inch) thick and machine-rolled for circumferential fit. Stainless steel jacketing, if required, shall be 0.25-mm (0.010-inch) thick.

32 DATA SHEET PIP -D12 RIGID CELLULAR PHENOLIC THERMAL INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE 2 OF 3 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: RIGID CELLULAR PHENOLIC THERMAL INSULATION SHALL CONFORM TO ASTM C1126, TYPE III, GRADE 1. FACINGS SHALL BE SUPPLIED AS INDICATED. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME VAPOR BARRIER SEALANTS FASTENERS Vapor retardant finish for straight pipe and shell sections shall be butyl rubber aluminum laminate film, 1.2 mm (0.050 in.) thick. Vapor retardant finish for compound shapes (e.g. fittings, flanges, valves, heads, etc) shall be elasmeric, solvent-borne mastic, min. 40% solids by vol., ASTM E84 flame spread less than 20. Mastic applied in two coats, tal 1.3 mm (0.05 in.) DFT. Reinforcing membrane for vapor retardant mastic shall be a leno weave, synthetic fabric, with a maximum 8 x 8 mesh density. Joint sealant shall be a single component, off white color, non-hardening vapor barrier sealant with a service temperature range of -157 C 71 C (-251 F 160 F). Joint sealant for insulation subject steam out shall be a single component, aluminum color butyl rubber based material having an average solids content of 52 58% by volume and a service temperature range of -73 C 121 C (-100 F 250 F). Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 204 C (400 F) and intermittent service 260 C (500 F). All banding shall be Type 304 austenitic stainless steel conforming ASTM A0 and A480 and be furnished deburred. Banding seals shall be Type 304 stainless steel, conforming ASTM A0, heavy duty wing type for all applications. Glass filament tape shall be 25 mm (1 in.) wide with pressure-sensitive adhesive.

33 DATA SHEET PIP -D12 RIGID CELLULAR PHENOLIC THERMAL INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE 3 OF 3 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: RIGID CELLULAR PHENOLIC THERMAL INSULATION SHALL CONFORM TO ASTM C1126, TYPE III, GRADE 1. FACINGS SHALL BE SUPPLIED AS INDICATED. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME OTHER Insulation contraction joint material shall be a 16 kg/m³ ( lb/ft³) nominal density unfaced fiberglass blanket, consisting of random oriented fiberglass, suitable for service from -198 C 232 C (-325 F 450 F). Flexible seal over outer layer insulation contraction joints shall be 125 mm (5 inch) nominal width x 0.8 mm (0.03 inch) nominal thickness butyl rubber sheet. Tape used seal between the insulation adjacent contraction joints and the rubber sheet contraction joint seal shall be a 3 mm (0.125 inch) thickness x 50 mm (2 inch) width 100% solids synthetic rubber sealant in rolled ribbon form. Adhesive for bonding insulation substrates where use of mechanical fasteners is not practical shall be a light brown colored, two component, high strength urethane adhesive with an average solids content of 97% by volume when mixed.

34 DATA SHEET PIP -D13 FLEXIBLE ELASTOMERIC CELLULAR THERMAL INSULATION SYSTEM FOR PIPE AND EQUIPMENT FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: FLEXIBLE ELASTOMERIC CELLULAR THERMAL INSULATION SHALL CONFORM TO ASTM C534, GRADE 3, TYPE I (TUBULAR) AND TYPE II (SHEET). APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME NONMETALLIC JACKETING Liquid-applied coating and reinforcing membrane, as recommended by manufacturer. Sheet material, thickness and composition as recommended by manufacturer. ADHESIVES Application adhesives shall be as recommended by manufacturer.

35 DATA SHEET USER-DEFINED INSULATION SYSTEM FOR PIPE AND EQUIPMENT PIP -D14 PAGE 1 OF 2 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME WEATHERPROOF JACKETING VAPOR BARRIER SEALANTS FASTENERS

36 DATA SHEET USER-DEFINED INSULATION SYSTEM FOR PIPE AND EQUIPMENT PIP -D14 PAGE 2 OF 2 FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME OTHER ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME

37 INSULATION THICKNESS TABLE CELLULAR GLASS INSULATION FOR CC ASTM C552 Grade I (inches) PIP -F1 FACILITY NAME: PROJECT NO.: LOCATION: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

38 INSULATION THICKNESS TABLE CELLULAR GLASS INSULATION FOR CP ASTM C552 Grade I (inches) PIP -F2 FACILITY NAME: PROJECT NO.: LOCATION: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

39 INSULATION THICKNESS TABLE CELLULAR GLASS INSULATION - COMBINED TABLE ASTM C552 Grade I (inches) PIP -F3 FACILITY NAME: PROJECT NO.: LOCATION: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

40 INSULATION THICKNESS TABLE POLYISOCYANURATE INSULATION FOR CC ASTM C591 Grade 2 (inches) PIP -F4 FACILITY NAME: PROJECT NO.: LOCATION: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

41 INSULATION THICKNESS TABLE POLYISOCYANURATE INSULATION FOR CP ASTM C591 Grade 2 (inches) PIP -F5 FACILITY NAME: LOCATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

42 INSULATION THICKNESS TABLE POLYISOCYANURATE INSULATION - COMBINED TABLE ASTM C591 Grade 2 (inches) PIP -F6 FACILITY NAME: LOCATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

43 INSULATION THICKNESS TABLE RIGID CELLULAR PHENOLIC INSULATION FOR CC ASTM C1126, Type III, Grade 1 (inches) PIP -F7 FACILITY NAME: LOCATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

44 INSULATION THICKNESS TABLE RIGID CELLULAR PHENOLIC INSULATION FOR CP ASTM C1126, Type III, Grade 1 (inches) PIP -F8 FACILITY NAME: LOCATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

45 INSULATION THICKNESS TABLE RIGID CELLULAR PHENOLIC INSULATION - COMBINED TABLE ASTM C1126, Type III, Grade 1 (inches) PIP -F9 FACILITY NAME: LOCATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

46 INSULATION THICKNESS TABLE FLEXIBLE ELASTOMERIC CELLULAR INSULATION FOR CC ASTM C534, Grade 1 (inches) PIP -F10 FACILITY NAME: LOCATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

47 INSULATION THICKNESS TABLE FLEXIBLE ELASTOMERIC CELLULAR INSULATION FOR CP ASTM C534, Grade 1 (inches) PIP -F11 SEPTEMBER 2017 FACILITY NAME: LOCATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

48 INSULATION THICKNESS TABLE FLEXIBLE ELASTOMERIC CELLULAR INSULATION - COMBINED TABLE ASTM C534, Grade 1 (inches) PIP -F12 FACILITY NAME: LOCATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

49 INSULATION THICKNESS TABLE USER-DEFINED INSULATION FOR CC (Inches) PIP -F13 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

50 INSULATION THICKNESS TABLE FLEXIBLE ELASTOMERIC CELLULAR INSULATION - COMBINED TABLE ASTM C534, Grade 1 (inches) PIP -F12 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

51 INSULATION THICKNESS TABLE USER-DEFINED INSULATION FOR CC (Inches) PIP -F13 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

52 INSULATION THICKNESS TABLE USER-DEFINED INSULATION FOR CP (Inches) PIP -F14 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

53 INSULATION THICKNESS TABLE USER-DEFINED INSULATION FOR COMBINED TABLE (Inches) PIP -F15 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

54 INSULATION THICKNESS TABLE CELLULAR GLASS INSULATION FOR CC ASTM C552 Grade I (mm) PIP -FM1 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

55 INSULATION THICKNESS TABLE CELLULAR GLASS INSULATION FOR CP ASTM C552 Grade I (mm) PIP -FM2 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

56 INSULATION THICKNESS TABLE CELLULAR GLASS INSULATION COMBINED TABLE ASTM C552 Grade I (mm) PIP -FM3 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

57 INSULATION THICKNESS TABLE POLYISOCYANURATE INSULATION FOR CC ASTM C591 Grade 2 (mm) PIP -FM4 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

58 INSULATION THICKNESS TABLE POLYISOCYANURATE INSULATION FOR CP ASTM C591 Grade 2 (mm) PIP -FM5 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

59 INSULATION THICKNESS TABLE POLYISOCYANURATE INSULATION COMBINED TABLE ASTM C591 Grade 2 (mm) PIP -FM6 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

60 INSULATION THICKNESS TABLE RIGID CELLULAR PHENOLIC INSULATION FOR CC ASTM C1126, Type III, Grade 1 (mm) PIP -FM7 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

61 INSULATION THICKNESS TABLE RIGID CELLULAR PHENOLIC INSULATION FOR CP ASTM C1126, Type III, Grade 1 (mm) PIP -FM8 FACILITY NAME: LOCATION: INSULATION: PROJECT NO.: PROJECT DOCUMENT NO.: Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

62 INSULATION THICKNESS TABLE RIGID CELLULAR PHENOLIC INSULATION COMBINED TABLE ASTM C1126, Type III, Grade 1 (mm) PIP -FM9 Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

63 INSULATION THICKNESS TABLE RIGID CELLULAR PHENOLIC INSULATION FOR CC ASTM C534, Grade 1 (mm) PIP -FM10 Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

64 INSULATION THICKNESS TABLE FLEXIBLE ELASTOMERIC CELLULAR INSULATION FOR CP ASTM C534, Grade 1 (mm) PIP -FM11 Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

65 INSULATION THICKNESS TABLE FLEXIBLE ELASTOMERIC CELLULAR INSULATION - COMBINED TABLE ASTM C534, Grade 1 (mm) PIP -FM12 Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

66 INSULATION THICKNESS TABLE USER-DEFINED INSULATION FOR CC (mm) PIP -FM13 Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

67 INSULATION THICKNESS TABLE USER-DEFINED INSULATION FOR CP (mm) PIP -FM14 Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

68 INSULATION THICKNESS TABLE PIP -FM15 USER-DEFINED INSULATION FOR COMBINED TABLE (mm) Pipe Size or O.D. (NPS) (in.) 1/2 3/ / Flat Operating Temperature, F

PIP INSH1000 Hot Service Insulation Materials and Installation Specification

PIP INSH1000 Hot Service Insulation Materials and Installation Specification REAFFIRMATION WITH EDITORIAL REVISION February 0 Process Industry Practices Insulation PIP Hot Service Insulation Materials and Installation Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES

More information

PIP INSA1000 Acoustic Insulation Systems Specification

PIP INSA1000 Acoustic Insulation Systems Specification TECHNICAL REVISION April 2015 Insulation PIP INSA1000 Acoustic Insulation Systems Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

PIP INSR1000 Installation of Flexible, Removable/Reusable Insulation Covers for Hot Insulation Service

PIP INSR1000 Installation of Flexible, Removable/Reusable Insulation Covers for Hot Insulation Service TECHNICAL REVISION August 2015 Insulation PIP INSR1000 Installation of Flexible, Removable/Reusable Insulation Covers for Hot Insulation Service PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort

More information

10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2

10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2 SECTION 10: 10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING 2 10.2 FINISHES 2 10.3 PIPING FORMAT 3 A. PIPE INSULATION 3 B. PIPE INSULATION 3 C. INSULATION ATTACHMENT 3 D. INSULATION

More information

EDITORIAL REVISION August Process Industry Practices Insulation. PIP INEG2000 Guidelines for Use of Insulation Practices

EDITORIAL REVISION August Process Industry Practices Insulation. PIP INEG2000 Guidelines for Use of Insulation Practices August 2013 Process Industry Practices Insulation PIP INEG2000 Guidelines for Use of Insulation Practices PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry

More information

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT Specification for Acoustical Insulation (Lagging) for Piping and Equipment 1 of 5 TABLE OF CONTENTS 1.0SCOPE..... 3 2.0REFERENCED PUBLICATIONS...

More information

INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION

INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ Temperature Range 34 F to 167 F INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION PERMATHERM,

More information

REAFFIRMATION WITH EDITORIAL REVISION October Process Industry Practices Insulation. PIP INIC1000 Cold Insulation Installation Details

REAFFIRMATION WITH EDITORIAL REVISION October Process Industry Practices Insulation. PIP INIC1000 Cold Insulation Installation Details REAFFIRMATION WITH EDITORIAL REVISION October 2012 Process Industry Practices Insulation PIP INIC1000 Cold Insulation Installation Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS Dyplast Products Copyright 2014 1 Rev 0414 DYPLAST PRODUCTS INSTALLATION GUIDELINES ISO-C1 POLYISOCYANURATE

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS Dyplast Products Copyright 2018 1 Rev 0618 DYPLAST PRODUCTS INSTALLATION GUIDELINES ISO-C1 POLYISOCYANURATE

More information

REAFFIRMATION WITH EDITORIAL REVISION September Process Industry Practices Insulation. PIP INIH1000 Hot Insulation Installation Details

REAFFIRMATION WITH EDITORIAL REVISION September Process Industry Practices Insulation. PIP INIH1000 Hot Insulation Installation Details REAFFIRMATION WITH EDITORIAL REVISION September 2012 Process Industry Practices Insulation PIP INIH1000 Hot Insulation Installation Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to

More information

PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping

PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping July 2017 Piping PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

PIP PNSM0115 Purchasing Requirements for Pipe

PIP PNSM0115 Purchasing Requirements for Pipe December 2016 Piping PIP Purchasing Requirements for Pipe PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared

More information

ITW INSULATION SYSTEMS

ITW INSULATION SYSTEMS ITW INSULATION SYSTEMS 1SCOPE TRYMER RIGID POLYISOCYANURATE INSULATION IN LIQUEFIED NATURAL GAS APPLICATIONS (-260 F) 1.1 This guideline covers the installation of Trymer* Rigid Polyisocyanurate Insulation

More information

INSTALLATION GUIDELINES FOR COLD/CRYOGENIC PIPE INSULATION

INSTALLATION GUIDELINES FOR COLD/CRYOGENIC PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ Temperature Range -310 F to 32 F INSTALLATION GUIDELINES FOR COLD/CRYOGENIC PIPE INSULATION PERMATHERM,

More information

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

1. Division 23 Section Hangers and Supports for HVAC Piping and Equipment for pipe insulation shields and protection saddles. SECTION 23 07 19 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

This specification describes the minimum requirements for industrial thermal insulation.

This specification describes the minimum requirements for industrial thermal insulation. 016/09/7 1/7 1.0 PURPOSE This specification describes the minimum requirements for industrial thermal insulation. Read it in conjunction with the applicable insulation and insulation finish specifications

More information

ITW INSULATION SYSTEMS

ITW INSULATION SYSTEMS ITW INSULATION SYSTEMS 1SCOPE TRYMER RIGID POLYISOCYANURATE INSULATION IN LIQUEFIED NATURAL GAS APPLICATIONS (Cryogenic to -70 F) 1.1 This guideline covers the installation of TRYMER Rigid Polyisocyanurate

More information

COMPLETE REVISION October Process Industry Practices Piping. PIP PNSC0036 High Density Polyethylene (HDPE) Piping Installation Specification

COMPLETE REVISION October Process Industry Practices Piping. PIP PNSC0036 High Density Polyethylene (HDPE) Piping Installation Specification Piping High Density Polyethylene (HDPE) Piping Installation Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has

More information

SECTION HVAC INSULATION

SECTION HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY SECTION 23 07 00 HVAC INSULATION A. Section Includes: 1. Ductwork insulation. 2. Duct liner. 3. Insulation jackets. 4. Equipment insulation 5. Piping system insulation. 6. Insulation

More information

SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT

SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT Page 1 of 15 Ver. 3-0 March 2010 TABLE OF CONTENTS 1. Scope... 3 2. General System Requirements... 3 3. Installation Details...

More information

SPECIFICATION FOR COLD INSULATION

SPECIFICATION FOR COLD INSULATION SPECIFICATION FOR COLD INSULATION Specification for Cold Insulation 1 of 21 TABLE OF CONTENTS 1.0. SCOPE..... 3 2.0. REFERENCED PUBLICATIONS... 3 3.0. GENERAL CONDITIONS... 3 4.0. MATERIALS... 5 5.0. APPLICATIONS...

More information

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS TRYMER RIGID POLYISOCYANURATE INSULATION IN HOT APPLICATIONS (80 F to 300 F) 1 SCOPE 1.1 This guideline covers the installation of TRYMER

More information

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Refer to Division 33 and Division 23 - Underground Steam and Condensate Piping.2 Refer to Division 23 - Steam and Condensate Piping Above Grade 1.2

More information

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds.

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds. SECTION 230713 DUCT INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER Dyplast Products Copyright 2012 1 Rev 0112 DYPLAST PRODUCTS

More information

A. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket.

A. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket. SECTION 230719 - HVAC PIPING INSULATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Piping insulation. B. Jackets and accessories. 1.2 RELATED REQUIREMENTS A. Section 07813 - Fire Procection, HVAC & Plumbing

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS TRYMER RIGID POLYISOCYANURATE INSULATION IN HOT APPLICATIONS (80 F to 300 F) 1 SCOPE 1.1 This guideline covers the installation of Trymer*

More information

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated.

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated. SECTION 23 07 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Addendum to Specifications

Addendum to Specifications Addendum to Specifications SOW #: Construction Specification #: Date: Additions to Specifications: Deletions to Specifications: Engineer Date Design Engineering Manager Date Page 2 of 7 PART 1 - GENERAL

More information

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION MECHANICAL INSULATION. A. Types of insulation specified in this section include the following:

SECTION MECHANICAL INSULATION. A. Types of insulation specified in this section include the following: SECTION 15250 PART I - GENERAL 1.01 WORK INCLUDED A. Types of insulation specified in this section include the following: 1. Piping System Insulation: a. Domestic Cold Water b. Domestic Hot water c. Heating

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 23 07 00_ HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Piping system insulation. 2. Equipment insulation. 3.

More information

ITW INSULATION SYSTEMS

ITW INSULATION SYSTEMS Installation Guidelines for TRYMER Insulation ITW INSULATION SYSTEMS TRYMER Rigid Polyisocyanurate Insulation in Refrigeration Applications (-70 F to 35 F) 1 SCOPE 1.1 This guideline covers the installation

More information

COMPLETE REVISION September Process Industry Practices Piping. PIP PNSM0120 Purchasing Requirements for Bolting

COMPLETE REVISION September Process Industry Practices Piping. PIP PNSM0120 Purchasing Requirements for Bolting September 2013 Process Industry Practices Piping Purchasing Requirements for Bolting PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this

More information

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

FIRE STATION 55 June 14, 2010

FIRE STATION 55 June 14, 2010 SECTION 15250 MECHANICAL INSULATION PART 1 - GENERAL 1.01 DESCRIPTION A. Work Includes 1. Insulation of Domestic Water Piping. 2. Pipe Insulation of refrigerant piping. 3. Insulation of ductwork. 4. Aluminum

More information

INSTALLATION GUIDELINE FOR TRYMER INSULATION

INSTALLATION GUIDELINE FOR TRYMER INSULATION INSTALLATION GUIDELINE FOR TRYMER INSULATION TRYMER RIGID POLYISOCYANURATE INSULATION IN CHILLED WATER APPLICATIONS (35 F to 60 F) 1 SCOPE 1.1 This guideline covers the installation of Trymer Rigid Polyisocyanurate

More information

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS TRYMER RIGID POLYISOCYANURATE INSULATION IN REFRIGERATION APPLICATIONS (-70 F to 35 F) 1 SCOPE 1.1 This guideline covers the installation

More information

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces TECHNICAL CORRECTION January 2017 Structural PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness.

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness. SECTION 15250 PIPING AND EQUIPMENT INSULATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification

More information

PROJ. NO SECTION HVAC DUCT INSULATION

PROJ. NO SECTION HVAC DUCT INSULATION SECTION 23 07 13 HVAC DUCT INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials

A. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION PLUMBING INSULATION

SECTION PLUMBING INSULATION SECTION 22 07 00 PLUMBING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes equipment insulation, covering, and thermal insulation for piping systems including vapor retarders, jackets and accessories.

More information

Mechanical Insulation for Refrigeration Systems

Mechanical Insulation for Refrigeration Systems Mechanical Insulation for Refrigeration Systems INDUSTRIAL REFRIGERATION CONSORTIUM RESEARCH & TECHNOLOGY FORUM MAY 2-3, 2012 Peter Gauchel, President/CEO L&C Insulation Inc. Overview Current trends in

More information

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

PIP PCEPA003 Process Analyzer System Field Installation Guidelines January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION PART 1 GENERAL 1.01 SUMMARY Section 15145 This Section includes insulation for piping and equipment as called out on the Plans. 1.02 MEASUREMENT AND PAYMENT No separate payment will be provided for the

More information

SECTION 07530CP EPDM MEMBRANE ROOFING

SECTION 07530CP EPDM MEMBRANE ROOFING PART 1 GENERAL 1.1 SUMMARY SECTION 07530CP EPDM MEMBRANE ROOFING A. Section includes: 1. Adhered membrane roofing and flashing 2. Mechanically fastened roof insulation 3. Walkway pads 1.2 ARCHITECTURAL

More information

UBC Technical Guidelines Section Edition Insulation of Tanks, Steam and Condensate Piping Page 1 of 6

UBC Technical Guidelines Section Edition Insulation of Tanks, Steam and Condensate Piping Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 Refer to Division 33 and Division 23 - Underground Steam and Condensate Piping.2 Refer to Division 23 - Steam and Condensate Piping Above Grade.3 Section

More information

GENERAL SPECIFICATION FOR FIRE RATED APPLICATIONS

GENERAL SPECIFICATION FOR FIRE RATED APPLICATIONS I N SULROCK FIRE RATED METAL PANELS GENERAL SPECIFICATION FOR FIRE RATED APPLICATIONS 1. GENERAL 1.1. Summary Fire-rated panels as shown on the drawings shall be INSULROCK brand panels as supplied by Green

More information

B. Refer to Section : Air Distribution for lined ductwork requirements.

B. Refer to Section : Air Distribution for lined ductwork requirements. SECTION 230700 MECHANICAL INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

.1 Thermal insulation for insulated piping and piping accessories affected by construction and new pipe sections as indicated on drawings.

.1 Thermal insulation for insulated piping and piping accessories affected by construction and new pipe sections as indicated on drawings. BID OPPORTUNITY NO. 253-2011 PAGE 1 OF 8 PART 1 GENERAL 1.1 SUMMARY.1 Section Includes: 1.2 REFERENCES.1 Thermal insulation for insulated piping and piping accessories affected by construction and new

More information

COMPLETE REVISION April Process Industry Practices Piping. PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.

COMPLETE REVISION April Process Industry Practices Piping. PIP PNC00004 Piping Stress Analysis Criteria for ASME B31. April 2012 Process Industry Practices Piping PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.3 Metallic Piping PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost

More information

SECTION PIPING INSULATION

SECTION PIPING INSULATION SECTION 23 07 19 PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Piping insulation for refrigerant piping within building envelope. 2. Furnishing and installation of insulation.

More information

COMPLETE REVISION November Process Industry Practices Architectural. PIP ARS08111 Standard Steel Doors and Frames Supplier Specification

COMPLETE REVISION November Process Industry Practices Architectural. PIP ARS08111 Standard Steel Doors and Frames Supplier Specification November 2012 Process Industry Practices Architectural PIP ARS08111 Standard Steel Doors and Frames Supplier Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost

More information

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 075423 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Division 00 Bidding Requirements and other Division

More information

PIP STF05521 Details for Angle Railings for Walking and Working Surfaces

PIP STF05521 Details for Angle Railings for Walking and Working Surfaces TECHNICAL CORRECTION January 2017 Structural PIP STF05521 Details for Angle Railings for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of

More information

SECTION (15081) - HVAC INSULATION

SECTION (15081) - HVAC INSULATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: SECTION 23 07 00 (15081) - HVAC INSULATION 1. Insulation Materials 2. Jackets 3. Accessories and Attachments 4. Vapor Retarders B. Related Sections: 1.02

More information

Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe

Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe 1 SCOPE 1.1 This guideline covers the installation of ITW Insulation Systems Pabco-Childers brand aluminum and

More information

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 230719 - PART 1 - GENERAL 1.1 SUMMARY A. Section includes insulating the following HVAC piping systems: 1. Chilled-water and brine piping, [indoors] [and] [outdoors]. 2. Heating hot-water piping,

More information

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems. Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to provide design guidelines for Utility Direct Buried

More information

PIP ARS08111 Standard Steel Doors and Frames Supplier Specification

PIP ARS08111 Standard Steel Doors and Frames Supplier Specification May 2018 Architectural PIP ARS08111 Standard Steel Doors and Frames Supplier Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

FOAMGLAS INSULATION SPECIFICATION

FOAMGLAS INSULATION SPECIFICATION FOAMGLAS INSULATION SPECIFICATION PITTSBURGH CORNING CORPORATION FOAMGLAS Products Technical Support 800 Presque Isle Drive Pittsburgh, PA 15239 724-327-6100 SPECIFICATION # I-H/C-89-02-01 REVISION 06/28/2004

More information

Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines

Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines February 2017 Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

D-10 OUTLINE SPECIFICATION FOR PRE FAB Undergrd Piping System

D-10 OUTLINE SPECIFICATION FOR PRE FAB Undergrd Piping System D-10 OUTLINE SPECIFICATION FOR PRE FAB Undergrd Piping System PREFABRICATED CONDUIT PIPING SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL WALL PANELS This Guide Specification

More information

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin PART 1: GENERAL 1.01 Purpose: This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin 1.02 Scope: A. Extent of mechanical insulation

More information

PIP RFTA1000 Refractory Anchor and Accessory Installation Qualification, Inspection, and Testing

PIP RFTA1000 Refractory Anchor and Accessory Installation Qualification, Inspection, and Testing January 2017 Refractory PIP RFTA1000 Refractory Anchor and Accessory Installation Qualification, Inspection, and Testing PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost

More information

Addendum 1 Section THERMAL INSULATION FOR PIPING Burrow Avenue Pumping Station Upgrades Page 1 of 5

Addendum 1 Section THERMAL INSULATION FOR PIPING Burrow Avenue Pumping Station Upgrades Page 1 of 5 Burrow Avenue Pumping Station Upgrades Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Section Includes:.1 Thermal insulation for piping and piping accessories in commercial type applications. 1.2 REFERENCES.1

More information

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Pipe and Equipment Insulations Zeston PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Zeston PVC Insulated Fitting Covers Installation Instructions for Hot,

More information

1 of 17. PO Box Bellevue Rd, Newark, DE V F

1 of 17. PO Box Bellevue Rd, Newark, DE V F 1 of 17 Raw Material Manufactured from 4 8-foot sheets Fiber-reinforced 1-mil aluminumfaced polyisocyanurate panels 0.032 embossed aluminum Other patterns and stainless steel are available Necessary supplies

More information

RECOMMENDED DESIGN SPECIFICATION

RECOMMENDED DESIGN SPECIFICATION RECOMMENDED DESIGN SPECIFICATION SILICONE COATED SPF ROOFING 1 General 1.1 Section Includes A. Silicone coated SPF roofing system, including substrate board, roof insulation boards, foam insulation materials,

More information

University of New Hampshire Scholars' Repository

University of New Hampshire Scholars' Repository University of New Hampshire University of New Hampshire Scholars' Repository Division 07 Thermal and Moisture Protection Chapter 5 Technical Construction and Renovation Standards 1-25-2013 075423 - TPO

More information

ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL

ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulation, membrane roofing, base flashings roofing membrane accessories joints, and counter flashings.

More information

PIP VEFV1100 Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units)

PIP VEFV1100 Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units) TECHNICAL CORRECTION February 2014 Process Industry Practices Vessels PIP VEFV1100 Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units) PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an

More information

NCCER Progress Blvd, Alachua, Florida Tel: (888)

NCCER Progress Blvd, Alachua, Florida Tel: (888) NCCER 13614 Progress Blvd, Alachua, Florida 32615 Tel: (888) 622-3720 E-mail: info@nccer.org INSULATING Competencies / Objectives Level One MODULE 19101 - ORIENTATION 1. Explain what insulation is and

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION SECTION 230713 DUCT INSULATION PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 233113 Ductwork and Accessories 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. E84-96a Test Method

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

INSTALLATION GUIDELINE FOR TRYMER SUPERCEL PHENOLIC INSULATION

INSTALLATION GUIDELINE FOR TRYMER SUPERCEL PHENOLIC INSULATION INSTALLATION GUIDELINE FOR TRYMER SUPERCEL PHENOLIC INSULATION TRYMER SUPERCEL PHENOLIC INSULATION IN CHILLED WATER APPLICATIONS (35 F to 60 F) Vers. 1.0 1 SCOPE 1.1 This guideline covers the installation

More information

PIP VEFV1100 Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units)

PIP VEFV1100 Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units) TECHNICAL REVISION October 2017 Vessels PIP VEFV1100 Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units) PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of

More information

EDITORIAL REVISION January Process Industry Practices Vessels. PIP VEFV1100M Vessel/S&T Heat Exchanger Standard Details (Metric Units)

EDITORIAL REVISION January Process Industry Practices Vessels. PIP VEFV1100M Vessel/S&T Heat Exchanger Standard Details (Metric Units) Vessels PIP VEFV1100M Vessel/S&T Heat Exchanger Standard Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared

More information

079 Quick Installation Guide

079 Quick Installation Guide INSULATION 2212 W. 5th Pl., Tempe, AZ 85268 (480) 967-8888 Step 1: 079 Quick Installation Guide Step 2: *see attached literature for complete installation instructions Step 3: Position the next piece and

More information

SECTION HVAC DUCTS AND CASINGS

SECTION HVAC DUCTS AND CASINGS SECTION 23 31 00 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Ductwork, Joints and Fittings 2. Type I, Grease Hood Ductwork 3. Type II, Vapor Hood Ductwork 4. Laundry Clothes Dryer Vent 5. Insulated

More information

PIP INEG1000 Insulation Design Guide

PIP INEG1000 Insulation Design Guide December 2017 Insulation PIP INEG1000 Insulation Design Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT PART 1 GENERAL SECTION 22 0553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 1.01 SECTION INCLUDES A. Pipe markers. 1.02 REFERENCE STANDARDS A. ASME A13.1 - Scheme for the Identification of Piping

More information

SECTION HVAC PIPING INSULATION

SECTION HVAC PIPING INSULATION SECTION 23 0719 HVAC PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install insulation on above ground refrigerant piping and fittings as described in Contract

More information

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700 SECTION 22 0700 - PLUMBING INSULATION PART 1 - GENERAL 1.1 DESCRIPTION OF WORK: A. All work covered in this section consists of furnishing all labor, equipment, materials and accessories, and performing

More information

REAFFIRMATION WITH EDITORIAL REVISION October Process Industry Practices Insulation. PIP INEG1000 Insulation Design Guide

REAFFIRMATION WITH EDITORIAL REVISION October Process Industry Practices Insulation. PIP INEG1000 Insulation Design Guide REAFFIRMATION WITH EDITORIAL REVISION October 2010 Process Industry Practices Insulation PIP INEG1000 Insulation Design Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the

More information

MECHANICAL INSULATION

MECHANICAL INSULATION MECHANICAL INSULATION GENERAL INFORMATION 1.1 Comply with more stringent of following latest edition of Energy Conservation and Construction Code of New York City, ASHRAE and this Guideline. DESIGN REQUIREMENTS

More information

March Process Industry Practices Refractory. PIP RFIA1000 Refractory Anchor and Accessory Installation Details

March Process Industry Practices Refractory. PIP RFIA1000 Refractory Anchor and Accessory Installation Details March 2014 Process Industry Practices Refractory PIP RFIA1000 Refractory Anchor and Accessory Installation Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION The specification guideline in the three-part

More information

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulatepipe.com PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION The specification guideline in the three-part

More information

SPECIFICATION FOR FIBERGLASS REINFORCED PLASTIC CHEMICAL STORAGE TANKS

SPECIFICATION FOR FIBERGLASS REINFORCED PLASTIC CHEMICAL STORAGE TANKS The following specification for FRP Chemical Storage Tanks has been developed to assist the specifier and the buyer in detailing their own specification for equipment that meets the minimum design parameters

More information

Recommended Installation and Repair Guide

Recommended Installation and Repair Guide Revision 1 7/20/2017 Insulation Jacketing Products Recommended Installation and Repair Guide Pipe and Equipment Insulation Jacketed with Factory and Field Installed Products Table of Contents 1. Scope...

More information

PIP STF05511 Fixed Industrial Stairs

PIP STF05511 Fixed Industrial Stairs TECHNICAL CORRECTION January 2017 Structural PIP STF05511 Fixed Industrial Stairs PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

SECTION FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE

SECTION FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE PART 1 - GENERAL 1.1 SUMMARY SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit

More information

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,

More information

PERMATHERM PIPE INSULATION PRODUCTS

PERMATHERM PIPE INSULATION PRODUCTS PERMATHERM PIPE INSULATION PRODUCTS PERMATHERM, INC. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.pipe-insulation.net September 2012 This Specification Guideline in the 3-Part Format

More information

A. Source Limitations: Obtain each type of building insulation through one source.

A. Source Limitations: Obtain each type of building insulation through one source. SECTION 07210 - BUILDING INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information