1 Ongoing and Future Project Work

2 New Broward County Courthouse Tower 1,000 Car Courthouse Garage Midrise Building Renovations

3

4 714,000 square foot, 20-story Civil/Family Courthouse replacing 1950 s era space Project Cost: $213 Million CBE Participation: 29% 77 courtrooms with 42,000 square feet of shelled floor space for future expansion Construction of courthouse tower scheduled for completion in car secure parking garage with solar panels and plaza scheduled for 2017 completion Improved security features

5 Separate circulation corridors and elevators for judges, prisoners and the public Additional screening stations at building entrances Secure parking garage for judges & constitutional officers Cameras to monitor building circulation including stairs Bullet proof Judge s benches in courtrooms Holding cells for prisoners Bullet proof glass at public information and service desks Emergency generator power for security and life safety systems in case of a power outage

6 Includes New Courthouse Tower, connecting bridge, East Wing façade & elevator, and demolition of West and Central Wings October 15, 2012 Construction Notice to Proceed issued to James A. Cummings, Inc. Completion of tower scheduled for 2015

7 Includes new plaza and secure 500-car garage with solar panels Separate construction solicitation will be required Completion scheduled for 2017

8 Pile Installation Approach is to minimize noise, disruption and vibration

9 Walkway Column Numerous utility conflicts affecting major ductbanks and smaller lines Concrete Pile Cap Piles (6-8 piles per column is typical)

10 Installing infrastructure & piles among multiple underground utilities. Excavation around additional electrical ductbank and sewer Revised location of drainage structure Interfering electrical ductbank avoided Designed location of drainage structure

11 Mix of heavy courthouse traffic, pedestrian access ways and the volume of construction traffic is problematic Contractors maintenance of traffic (MOT) measures are working and effective Additional measures are being considered and implemented to alleviate potential liabilities

12 Supplement the already numerous signs and barricades Provide police enforcement in addition to Contractor s safety guards Limit or eliminate on-street parking Create cell phone waiting area Look at potentially closing SE 6 th Street to traffic or further restricting lanes

13 Public Works Director approvals for critical path change orders - each individually valued at less than $500,000. Change orders have been coordinated with County Attorney and County Auditor. Estimated Change Order Item Amount* Civil Work $63,000 Architectural $232,000 Structural Concrete $487,000 Structural Steel $354,000 Fire Protection $195,000 Plumbing $298,000 Subtotal: $1.6 million *Staff is finalizing the change order value related to re-design by Spillis Candela & Partners/Heery/Cartaya Joint Venture

14 Board approval is required for the remainder of the change orders, which include the primary mechanical, electrical and time impacts. Change Order Item Mechanical Electrical Time Impact Subtotal: Estimated Amount* $6.4 million $2.4 million $1.0 million $9.8 million *Staff is finalizing the change order value related to re-design by Spillis Candela & Partners/Heery/Cartaya Joint Venture

15 Total Mechanical Redesign Impact Change Order Item Immediate Need Items Mechanical, Electrical & Time Impacts Total: Estimated Amount* $1.6 million $9.8 million $11.4 million *Staff is finalizing the change order value related to re-design by Spillis Candela & Partners/Heery/Cartaya Joint Venture

16

17 Project Cost: $29.5 million CBE Participation: 25% New 1,000 space parking garage and approximately 12,000 square feet of office space in support of the new Civil/Family Courthouse Scheduled Completion: November 2013

18 Cleared 1,000-car garage site New sewer lines under construction on Andrews Avenue Master Building Permit from City of Fort Lauderdale expected in December 2012

19 Four previously unidentified underground fuel storage tanks discovered The tanks and contaminated soils removed & groundwater remediation is in progress Elevator pit configuration is possibly impacted Staff does not anticipate major project delays or additional contract costs

20

21 Project Cost: $8.5 million CBE Participation: TBD Internal reconfiguration of all four floors to consolidate Public Defender, State Attorney, BSO and Clerk of Courts occupancies and provide a fire sprinkler system for life-safety Reduction in rental space Scheduled Completion: Late 2015 Project is not fully funded. Available budget: $6.8 million. Additional $1.7 million required to complete the project.

22 Website link:

23

Courthouse Update August 19, 2014

Courthouse Update August 19, 2014 1 Courthouse Update August 19, 2014 2 Project Discussions Courthouse Tower Project Status Forthcoming Agenda Items Courthouse Campus Parking 1,000-Car Garage 500-Car Garage Parking Strategy & Rates 3 The

More information

BOARD OF TRUSTEES OCTOBER 13, 2014

BOARD OF TRUSTEES OCTOBER 13, 2014 Measure E BOARD OF TRUSTEES OCTOBER 13, 2014 FACILITIES UPDATE Measure Q 1 RECENTLY COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements Building G Renovation Artesia Street Improvements Property

More information

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality Executive Summary: Thesis Proposal Final Draft The following pages contain a final draft of the thesis proposal for the South Baltimore District Court House. The basic layout consists of focusing on Knowledge

More information

Administration Building Needs Assessment

Administration Building Needs Assessment Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural

More information

Civil District Court Parish of New Orleans. Image Courtesy of EDR MA. Renovation & Utilization Feasibility

Civil District Court Parish of New Orleans. Image Courtesy of EDR MA. Renovation & Utilization Feasibility Civil District Court Parish of New Orleans Image Courtesy of EDR MA Renovation & Utilization Feasibility Challenges with Courthouse Design Courthouse Space Standards and Requirements Charity Hospital Building

More information

MTA CAPITAL CONSTRUCTION NEW YORK BUILDING CONGRESS NOVEMBER 7, MTA Capital Construction 0

MTA CAPITAL CONSTRUCTION NEW YORK BUILDING CONGRESS NOVEMBER 7, MTA Capital Construction 0 MTA CAPITAL CONSTRUCTION NEW YORK BUILDING CONGRESS NOVEMBER 7, 2013 MTA Capital Construction 0 UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS Presented by David K. Cannon Sr. Director and Chief Procurement

More information

Stevens & Associates, Inc. Building Construction Projects. Fact Sheets

Stevens & Associates, Inc. Building Construction Projects. Fact Sheets Stevens & Associates, Inc. Building Construction Projects Fact Sheets Stevens & Associates, Inc. 4 Knights Court Newbury, MA 01951 978-764-9886 glen@stevensai.com Mount Washington Resort Spa & Conference

More information

Construction Look Ahead February 2018

Construction Look Ahead February 2018 To our 9 th and Colorado redevelopment neighbors: Construction Look Ahead February 2018 Block 7South Exterior Bridge walkway between Block 7 South building and the existing Parking Garage the installation

More information

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201 Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING 1727 Oak Avenue Evanston, IL 60201 General Contractor Owner Architect Construction Management Plan Phase 1 3 October

More information

STILLWATER COUNTY COURTHOUSE ALTERNATE 1

STILLWATER COUNTY COURTHOUSE ALTERNATE 1 STILLWATER COUNTY COURTHOUSE ALTERNATE 1 ALTERNATE 1: The current plan developed for the Old Hospital will bring all County services into this facility except for the following: 1. Sheriff, 2. County Attorney,

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 25, 2009 DATE: April 13, 2009 SUBJECT: SP #401 Site Plan amendment to revise Conditions #6, 19, 21, 36, and 45 and other modifications

More information

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016 FACILITIES COMMITTEE MEETING OCTOBER 18, 2016 1 ACTIVE PROJECTS Santa Ana College Central Plant, Infrastructure and Mechanical Upgrades 2 COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements

More information

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014 Program Summary: This project involves renovating 80,000 SF of an existing warehouse to provide new classrooms, internal medicine clinics, radiology clinics, and laboratory. Program Statement: The first

More information

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16 New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16 Date: March 1, 2010 From: Gary Claar Engineering Services 355-1660 Gary.Claar@NationwideChildrens.org More and more

More information

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 BUSINESS REVIEW TOP CONTRACTORS 1 ENR NEW YORK TOP CONTRACTORS 18 ENR TOP 100 DESIGN-BUILD FIRMS 66 ENR TOP 400 CONTRACTORS 215 Corporate

More information

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014 Program Summary: This project involves renovating 80,000 SF of an existing warehouse to provide new classrooms, internal medicine clinics, radiology clinics, and laboratory. Program Statement: The first

More information

West Construction, Inc.

West Construction, Inc. West Construction, Inc. Presentation prepared for: Broward County Evaluation Committee Wednesday, May 2th, 2018 / 2:00PM 3:00PM / Governmental Center Building, 115 S. Andrews Avenue, Fort Lauderdale, Fl

More information

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 BUSINESS REVIEW TOP CONTRACTORS 1 ENR NEW YORK TOP CONTRACTORS 18 ENR TOP 100 DESIGN-BUILD FIRMS 66 ENR TOP 400 CONTRACTORS 215 Corporate

More information

CITY COUNCIL MEETING INTRODUCTION

CITY COUNCIL MEETING INTRODUCTION CIVIC CENTER MASTER PLAN CITY COUNCIL MEETING INTRODUCTION CITY OF CUPERTINO OCTOBER. 21, 2014 ATTACHMENT L CIVIC CENTER MASTER PLAN WHY WE ARE HERE City Hall Options Library Expansion Parking Options

More information

Second Avenue Subway

Second Avenue Subway Second Avenue Subway Community Board 8 Second Avenue Subway Task Force Update January 22, 2015 Tom Peyton Second Avenue Subway Project Director 0 Scope: Q train service Tunnels from 92nd St to 63rd St

More information

City of Roanoke. Commercial Permit Submittal Guidelines

City of Roanoke. Commercial Permit Submittal Guidelines City of Roanoke Commercial Permit Submittal Guidelines These guidelines are for information purposes only. The contractor is obligated to comply with all adopted codes and ordinances BUILDING INSPECTIONS

More information

Phase 2 Exposition Metro Line Project

Phase 2 Exposition Metro Line Project Phase 2 Exposition Metro Line Project Monthly Project Status Report December 2013 TABLE OF CONTENTS PHASE 2 EXPO LINE PROJECT STATUS TABLE OF CONTENTS... 2 Phase 2 Exposition Metro Line Construction Authority

More information

Draft Feasibility Study for the Expansion of Southeast Library

Draft Feasibility Study for the Expansion of Southeast Library DC public Library KH KEAST & HOOD METROPOLITAN E N G I N E E R I N G I N C S H A P I RO-O BRIEN Draft Feasibility Study for the Expansion of Southeast Library Draft Submission: November 4, 2016 1 OVERVIEW

More information

Abington Memorial Hospital Abington, PA. Project Description

Abington Memorial Hospital Abington, PA. Project Description Project Description Project Description Project Background The expansion is a seven story, 360,000 SF addition with a total project cost of $98 million. Construction began in February 2003 and the project

More information

Construction Project Briefing. June 14, 2017

Construction Project Briefing. June 14, 2017 Construction Project Briefing June 14, 2017 Today s Presentation 95 th Street Terminal Improvement Program Wilson Transfer Station, Track, and Structure Reconstruction Ravenswood Loop Signals Upgrade Project

More information

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord. ARTICLE 987. PD 987. SEC. 51P-987.101. LEGISLATIVE HISTORY. PD 987 was established by Ordinance No. 30512, passed by the Dallas City Council on June 14, 2017. SEC. 51P-987.102. PROPERTY LOCATION AND SIZE.

More information

Exhibit A: Detailed Scope Summary

Exhibit A: Detailed Scope Summary Exhibit A: Detailed Scope Summary As detailed in the RFP, the ( CIT ), on behalf of and in collaboration with the City of Chicago ( City 2FM ), will oversee the procurement of a Design-Build-Finance contract

More information

MCER Study for Little Powder K-8

MCER Study for Little Powder K-8 MCER Study for Little Powder K-8 CCSD #1 Little Powder K-8 Weston, WY Wyoming School Facilities Department Cheyenne, WY TSP, Inc. Sheridan, WY May 16, 2016 Table of Contents Introduction 3 Goals and Objectives

More information

Project Parameters. Project Timeline. APS Strategic Plan - Design Principles. Adjourn

Project Parameters. Project Timeline. APS Strategic Plan - Design Principles. Adjourn Project Parameters Project Timeline Project included in the FY09-8 Capital Improvement Plan (CIP) Renovate the Education Center to both increase the capacity of WashingtonLee initially, and later to adapt

More information

RE: Jackson Row - truck route

RE: Jackson Row - truck route Will Rasbach From: Sent: To: Cc: Subject: Mayor Pat Patterson Tuesday, January 13, 2015 3:46 PM Will Rasbach; Bart Robinson; Randy Barber (rbarber@oxfordms.net); jowens@oxfordpolice.net

More information

CITY OF TROY, MISSOURI Building Permit Application. Type of Permit: Residential Commercial. Company: Contact person: Address # Street Name:

CITY OF TROY, MISSOURI Building Permit Application. Type of Permit: Residential Commercial. Company: Contact person: Address # Street Name: CITY OF TROY, MISSOURI Building Permit Application Instructions: Please print clearly and complete the entire form or the application will not be processed and the permit will not be issued. Date of Application

More information

Delaware Street

Delaware Street A t t a c h m e n t 1 F i n d i n g s a n d C o n d i t i o n s 2004-06 Delaware Street Use Permit #09-10000052 JULY 22, 2010 CEQA FINDINGS 1. The project is categorically exempt from the provisions of

More information

Stevens High School Pre Bond Presentation Claremont, NH

Stevens High School Pre Bond Presentation Claremont, NH Stevens High School Pre Bond Presentation Claremont, NH Existing Conditions Existing Conditions Existing Conditions Existing Conditions Proposed site features New main entry that is ADA accessible New

More information

Progress update (November to March) 03/23/2009 2

Progress update (November to March) 03/23/2009 2 Second Avenue Subway Construction Progress Update (November to March) Presented by S3 Tunnel Constructors AND MTA CAPITAL CONSTRUCTION March 23, 2009 1 Topics Covered Progress update (November to March)

More information

Phase 2 Exposition Metro Line Project

Phase 2 Exposition Metro Line Project Phase 2 Exposition Metro Line Project Monthly Project Status Report November 2013 TABLE OF CONTENTS PHASE 2 EXPO LINE PROJECT STATUS TABLE OF CONTENTS... 2 Phase 2 Exposition Metro Line Construction Authority

More information

LAKE + FOREST CONSTRUCTION TIMELINE

LAKE + FOREST CONSTRUCTION TIMELINE LAKE + FOREST CONSTRUCTION TIMELINE Below is a construction timeline in connection with the project at Lake Street and Forest Avenue. All dates are approximate and subject to change based on weather and

More information

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING # 5 ) UN-74-16 THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: November 9, 2016 Item: UN-74-16 Prepared by: Marc

More information

Application. Village of Morton Grove Department of Buildings 6101 Capulina, Morton Grove, IL Phone: 847/ Fax: 847/

Application. Village of Morton Grove Department of Buildings 6101 Capulina, Morton Grove, IL Phone: 847/ Fax: 847/ Village of Morton Grove Department of Buildings 6101 Capulina, Morton Grove, IL 60053 Phone: 847/ 470-5214 Fax: 847/ 663-6185 Application All information below must be filled in prior to submission (Please

More information

Constructability Guidelines

Constructability Guidelines Constructability Guidelines The Constructability Guidelines offer a list of items that should be considered by Constructability function personnel during the Concept Development Phase through the Final

More information

CITY OF LAKE FOREST PARK BUILDING CHECKLIST FOR NEW CONSTRUCTION, ADDITION, AND REMODEL BUILDING PERMIT

CITY OF LAKE FOREST PARK BUILDING CHECKLIST FOR NEW CONSTRUCTION, ADDITION, AND REMODEL BUILDING PERMIT CITY OF LAKE FOREST PARK BUILDING CHECKLIST FOR NEW CONSTRUCTION, ADDITION, AND REMODEL BUILDING PERMIT The following checklist identifies the minimum requirements for acceptance of an application for

More information

Auburn University Construction Project April

Auburn University Construction Project April Small Animal Teaching Hospital Phase I: Construction Cost: $8.8 million. Phase I consists of (1) constructing an addition to the Overton-Rudd Auditorium to expand classroom and lecture hall capacity, (2)

More information

Transformer Vault Placement and Space Requirements

Transformer Vault Placement and Space Requirements Transformer Vault Placement and Space Requirements Consolidated Edison Company of New York, Inc. 4 Irving Place New York NY 10003 www.coned.com Transformer Vault Placement and Space Requirements Whether

More information

IMMC SCHOOL OF NURSING BUILDING IMPLOSION

IMMC SCHOOL OF NURSING BUILDING IMPLOSION IMMC SCHOOL OF NURSING BUILDING IMPLOSION Demolition of the School of Nursing Building is underway. Phase 1 is being razed with traditional methods of demolition. However, Phase 2 Demo is a good candidate

More information

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION REQUEST FOR INFORMATION AGENCY: Enterprise Technology Services Division RFI NO.: D0844402F2 TITLE: Electronic and Digital Trial Courtroom and Courthouse Presentation Technology Platform CONTACT: Name:

More information

Site Selection Process

Site Selection Process AECOM 06 Site Selection Process Baltimore City Circuit Courthouse 06-1 Introduction The site selection study for the new Baltimore City Circuit Courthouse focused upon clearly established criteria and

More information

Installing sidewalk pavers along Race Street.

Installing sidewalk pavers along Race Street. Installing sidewalk pavers along Race Street. THE BANKS PROJECT MONTHLY REPORT: SEPTEMBER 2014 The Banks Monthly Report: September 2014 In September, Public Parties construction work continued on Bid Packages

More information

Building Architecture

Building Architecture The front of the building consists of the three story town homes with facades to remain, as well as one leg of the condominium tower that reaches the street. The main condo portion of the building is L

More information

DEVELOPMENT PERMIT ITEM NO: 11 DP NO:

DEVELOPMENT PERMIT ITEM NO: 11 DP NO: REPORT TO THE CALGARY PLANNING COMMISSION DEVELOPMENT PERMIT ITEM NO: 11 CPC DATE: 2005 October 20 DP NO: DP2005-1841 ST. ANDREWS HEIGHTS (Ward 7 - Alderman Farrell) Page 1 DP2005-1841 CPC 2005 October

More information

Questions and Answers Construction of New Amenities At Folly Beach County Park

Questions and Answers Construction of New Amenities At Folly Beach County Park Questions and Answers Construction of New Amenities At Folly Beach County Park 2019-003 1. A410, Keynotes 11.34 Responsibility Chart -stainless steel table does not indicate if it is provided by the owner

More information

BARRY S CORNER. Draft Construction Management Plan

BARRY S CORNER. Draft Construction Management Plan 1. Introduction Project description BARRY S CORNER Draft Construction Management Plan 11-21-2013 Prepared for: Boston Transportation Department Project Proponent: Samuels & Associates Construction Manager

More information

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project PHASE 2 MONTHLY COST AND SCHEDULE UPDATE AS OF DECEMBER 31, 2015 FEBRUARY 2016 Phase 2 Cost Summary December Expenditures $ 62.9 Million Total Expenditures $ 655.6 Million

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 2-1 Issue date: September 2012 1. General SITEWORK OVERVIEW This Directive outlines the Fund s requirements for the Consultant relative to the development, design and presentation of documents

More information

Hale Allen Jones The Institution of Structural Engineers East Anglian Branch Award for Structural Excellence Submission

Hale Allen Jones The Institution of Structural Engineers East Anglian Branch Award for Structural Excellence Submission The Institution of Structural Engineers East Anglian Branch Award for Structural Excellence - 2003 Submission Details of Project Location Jarrold Whitefriars Office Development Whitefriars, Norwich. Project

More information

COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018

COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018 COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018 CONSTRUCTION CODES The City of Colleyville has adopted and enforces the following codes which are applicable to building construction activities within the

More information

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey Tech Assignment 1 University Medical Center of Princeton Plainsboro Road, Township of Plainsboro, New Jersey David Bodnar CM Chris Maget 10/5/2009 Table of Contents Executive Summary...3 Project Schedule

More information

DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING

DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING Multi family housing is an increasingly popular form of infill development in Shaker Heights because of the city s built out

More information

Kaiser Permanente Largo Medical Office Building Largo, MD

Kaiser Permanente Largo Medical Office Building Largo, MD Kaiser Permanente Largo Medical Office Building Largo, MD Christopher Pozza - CM B u i l d i n g S t a t i s t i c s S e p t e m b e r 1 7, 2 0 1 2 A d v i s o r R o b L e i c h t Table of Contents Architecture...

More information

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI 49315 616-878-9155/Fax 616-878-0699 Applicant to complete all items in Section I, II, III, IV, V Note: Separate applications

More information

Indirect and Cumulative Effects

Indirect and Cumulative Effects Indirect and Cumulative Effects 19.1 INTRODUCTION This chapter discusses potential indirect and cumulative effects of the Modified Design, in comparison to the 2004 FEIS Design. The White House Council

More information

COMMUNITY BOARD EIGHT

COMMUNITY BOARD EIGHT SECOND AVENUE SUBWAY PROJECT COMMUNITY BOARD EIGHT PROJECT UPDATE February 15, 2011 SECOND AVENUE SUBWAY - PHASE 1 Scope: Tunnels from 92 nd St to 63 rd St Stations at 96 th St, 86 th St, 72 nd St and

More information

Village of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL

Village of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL COMMERCIAL Building Permit Application 16033 S. 94th Avenue, Orland Hills, IL. 60487-4623 (PRINT or TYPE to complete this form only) Construction Address: {Construction Cost } Owner's Name: Applicant:

More information

Photos by Susie Fitzhugh. BEX IV Projects Update: Arbor Heights, Genesee Hill, Pinehurst, Thornton Creek

Photos by Susie Fitzhugh. BEX IV Projects Update: Arbor Heights, Genesee Hill, Pinehurst, Thornton Creek Photos by Susie Fitzhugh BEX IV Projects Update: Arbor Heights, Genesee Hill, Pinehurst, Thornton Creek Arbor Heights Elementary School Site Plan July 1, 2015 July 10, 2015 Arbor Heights Elementary School

More information

RECOMMENDED CONCEPT COLLEGE COMMUNITY CAMPUS IMPROVEMENTS INTERNAL ROADWAY COST ANALYSIS MAY 9, 2014

RECOMMENDED CONCEPT COLLEGE COMMUNITY CAMPUS IMPROVEMENTS INTERNAL ROADWAY COST ANALYSIS MAY 9, 2014 8"' PCC CURB AND GUTTER KIRKWOOD BLVD SW 76TH AVENUE SW 76TH AVENUE SW PRAIRIE CREST ELEMENTARY 6' PRAIRIE PERFORMING ARTS CENTER PRAIRIE HIGH SCHOOL TIE INTO FROM PRAIRIE HILL FUTURE SITE OF PRAIRIE HILL

More information

Voigt 1. Russell Voigt Construction Option Advisor Ed Gannon Louis at 14 th Washington, D.C. 16 September 2013 Technical Report #1.

Voigt 1. Russell Voigt Construction Option Advisor Ed Gannon Louis at 14 th Washington, D.C. 16 September 2013 Technical Report #1. Voigt 1 Russell Voigt Construction Option Advisor Ed Gannon Louis at 14 th Washington, D.C. 16 September 2013 Technical Report #1 Executive Summary Located in northwest Washington, D.C. at the corner of

More information

Construction Project Briefing. November 19, 2014

Construction Project Briefing. November 19, 2014 Construction Project Briefing November 19, 2014 Today s Presentation Traction Power Farwell/Armitage/Hill Substations Kimball/Princeton/State Substations O Hare Blue Line Station Improvements (Damen, Western,

More information

RATIONALE AND REASONING The following information is provided in response to the issues raised by the Board of Regents at the September 2012 meeting:

RATIONALE AND REASONING The following information is provided in response to the issues raised by the Board of Regents at the September 2012 meeting: a contract within the Total Project Cost budget of $123.2 million, and to proceed with project construction not to exceed a Total Project Cost of $62.6 million. This motion is effective September 27, 2012.

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

TOWN OF BRUNSWICK, MAINE

TOWN OF BRUNSWICK, MAINE TOWN OF BRUNSWICK, MAINE INCORPORATED 1739 DEPARTMENT OF PLANNING AND DEVELOPMENT 85 UNION STREET, SUITE 216 BRUNSWICK, ME 04011 ANNA M. BREINICH, FAICP PHONE: 207-725-6660 DIRECTOR OF PLANNING & DEVELOPMENT

More information

Application for Building Permit St. Charles Township 1003 N. Saginaw St St. Charles, MI Phone (989) Fax (989)

Application for Building Permit St. Charles Township 1003 N. Saginaw St St. Charles, MI Phone (989) Fax (989) Application for Building Permit St. Charles Township 1003 N. Saginaw St St. Charles, MI 48655 Phone (989) 865-9010 Fax (989) 865-9099 Authority: 1972 PA 230 Completion: Mandatory to Obtain Permit Penalty:

More information

Planned Procurement Opportunities Report. November 2017

Planned Procurement Opportunities Report. November 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Planned Procurement Opportunities Report. December 2017

Planned Procurement Opportunities Report. December 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Briefing Session: A406 STRATEGIC PROJECTS PROGRAM MANAGEMENT. January 24, 2019

Briefing Session: A406 STRATEGIC PROJECTS PROGRAM MANAGEMENT. January 24, 2019 Briefing Session: A406 STRATEGIC PROJECTS PROGRAM MANAGEMENT January 24, 2019 BRIEFING SESSION 1. Introduction to strategic projects at Logan B to C Roadway Improvements Terminal C Canopy and Curbside

More information

Level 1 Level 2 Level 3 Level 4 Level 5 Level 6 1 1.1 Construction Schedule of TCS-IT SEZ Park Issue of LOI 1.2 Pre-Construction Stage 1.2.1 Approvals 1.2.1.1 Approval from SWID/HIDCO for borewell 1.2.1.2

More information

El Dorado Avenue

El Dorado Avenue A t t a c h m e n t 1 F i n d i n g s a n d C o n d i t i o n s 1995-1999 El Dorado Avenue Use Permit #08-10000055 JULY 10, 2008 CEQA FINDINGS 1. The project is categorically exempt from the provisions

More information

PREPARED TESTIMONY OF LEE LISECKI. Q. Please state your name, professional position, and business address.

PREPARED TESTIMONY OF LEE LISECKI. Q. Please state your name, professional position, and business address. Application 06-12-005 et al. Exhibit Date: August, 2008 PREPARED TESTIMONY OF LEE LISECKI Q. Please state your name, professional position, and business address. A. My name is Lee Lisecki. I am a principal

More information

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630) C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) 353-8115 Fax: (630) 852-4709 BUILDING PERMIT INFORMATION PACKET Revised: October 2018 Building Codes: International Residential

More information

P.C. RESOLUTION NO

P.C. RESOLUTION NO Exhibit A P.C. RESOLUTION NO. 2017-653 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CALABASAS TO APPROVE FILE NO. 170000357, A REQUEST FOR A SITE PLAN REVIEW TO: (1) CONSTRUCT A 330 SQUARE-FOOT

More information

Jackson Miracle Building Plan Outreach Roundtable. February 14, 2017

Jackson Miracle Building Plan Outreach Roundtable. February 14, 2017 Jackson Miracle Building Plan Outreach Roundtable February 14, 2017 $1.8 billion Expanded Footprint Improved Patient Experience World-Class Facilities Innovative, Leading-Edge Care A Stronger, More Competitive

More information

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company James P. Hyland Page 1 ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING Kansas City Terminal Railway Company James P. Hyland, P.E. Senior Bridge Engineer TranSystems Corporation James P. Hyland Page 2

More information

MANHATTAN COLLEGE STUDENT COMMONS

MANHATTAN COLLEGE STUDENT COMMONS MANHATTAN COLLEGE STUDENT COMMONS BUDGET CHECK USING GILBANE S COSTADVISOR MODEL OCTOBER 29, 2010 Introduction: Gilbane developed this CostAdvisor Model of the proposed new Manhattan College Student Commons

More information

5/15/2013. Approved Course Title 2010 Existing Building Code Chapters Florida Building Code, Existing Building. Chapters

5/15/2013. Approved Course Title 2010 Existing Building Code Chapters Florida Building Code, Existing Building. Chapters 2010 Florida Building Code, Existing Building A Code for Existing Buildings Approved Course Title 2010 Existing Building Code Chapters 10-14 Chapters 10-14 Module Objectives Chapter 1 Administration Chapter

More information

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2014 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M Other Structures Under $5M Buildings

More information

NEW MIDDLE SCHOOL PROJECT

NEW MIDDLE SCHOOL PROJECT Monthly Report May 2017 2 INTRODUCTION P.J. Dick Incorporated is pleased to present to the Chartiers Valley Board of School Directors the following Construction Report for the Chartiers Valley Middle School

More information

Jobsite Layout Considerations

Jobsite Layout Considerations 1 Jobsite Layout Considerations The controlling contractor must consider many factors when laying out a site to support construction operations Site and building size and Equipment requirements configuration

More information

# 11 ) UN MEDICAL MARIJUANA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING

# 11 ) UN MEDICAL MARIJUANA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING # 11 ) UN-31-16 MEDICAL MARIJUANA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: June 8, 2016 Item: UN-31-16 Prepared by: Marc Jordan GENERAL INFORMATION:

More information

Katie Sennett. Dec. 18, Baltimore, Maryland. Proposal. Page 2. Page 1

Katie Sennett. Dec. 18, Baltimore, Maryland. Proposal. Page 2. Page 1 Table of Contents o Executive Summary......... Page 2 o Building Introduction..........Page 4 o Analysis 1.................. Page 8 o Analysis 2................. Page 10 o Analysis 3.................Page

More information

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2018 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $5M Buildings Over $100M Buildings $5M - $15M Other Structures Under $1M Buildings

More information

Robinson Landing: Townhouse Pre-Construction Presentation January 9, 2018

Robinson Landing: Townhouse Pre-Construction Presentation January 9, 2018 Robinson Landing: Townhouse Pre-Construction Presentation January 9, 2018 Topics of Presentation 1. Team Introductions 2. Project Overview Location, Aerial View & Site Plan 3. Overall Schedule 4. Sequence

More information

Woodbridge Redevelopment Update. CLC Meeting #6 Wednesday, December 13, 2017

Woodbridge Redevelopment Update. CLC Meeting #6 Wednesday, December 13, 2017 Woodbridge Redevelopment Update CLC Meeting #6 Wednesday, December 13, 2017 1. Introductions Agenda 2. Project Updates 3. Construction Updates Progress to Date What s Happening Now 3 Month Schedule 4.

More information

The courthouse exterior. Courtesy of NLA/HLM Architects. United States. Courthouse Sacramento, Robert D. McCartney, S.E.

The courthouse exterior. Courtesy of NLA/HLM Architects. United States. Courthouse Sacramento, Robert D. McCartney, S.E. The courthouse exterior. Courtesy of NLA/HLM Architects. United States Courthouse Sacramento, Robert D. McCartney, S.E. CA Modern Steel Construction / November 2001 Public entrances to courtrooms occur

More information

Schuylkill Avenue Phase I Community Briefing Summary and Notes December 2, 2013

Schuylkill Avenue Phase I Community Briefing Summary and Notes December 2, 2013 Schuylkill Avenue Phase I Community Briefing Summary and Notes December 2, 2013 Representatives from The Children s Hospital of Philadelphia (CHOP), joined by design firm, Cooper Robertson & Partners,

More information

706 Mission Street The Mexican Museum Dock Levelers, Roll-Up Doors, Gates and Fencing, and Metal Panels Pre-Bid Meeting

706 Mission Street The Mexican Museum Dock Levelers, Roll-Up Doors, Gates and Fencing, and Metal Panels Pre-Bid Meeting Dock Levelers, Roll-Up Doors, Gates and Fencing, and Metal Panels Bid Pre-Bid Meeting Thursday, October 6, 2016 Equal Opportunity Program Overview Raymond Lee Kristin Gonsar Drew Kitchen Michelle Nolen

More information

Public Works Department

Public Works Department Effective Date: March 23, 2005 CITY ENGINEERING FEE SCHEDULE PRODUCTS Public Works Design and Specifications Book Zoning Map Water Distribution System Map Wastewater Collection System Map AutoCAD Drawings

More information

VERSION 2.0. FOR COMMERCIAL PROJECTS New Construction and Additions

VERSION 2.0. FOR COMMERCIAL PROJECTS New Construction and Additions VERSION 2.0 EFFECTIVE DATE APRIL 30 2012 GUIDE BUILDING PERMIT SUBMISSIONS FOR COMMERCIAL PROJECTS New Construction and Additions The Guide is intended to assist applicants in understanding the Submission

More information

ROOSEVELT ISLAND OPERATING CORPORATION OF THE STATE OF NEW YORK DESIGN OF TWO NEW ELEVATORS FOR MANHATTAN TRAM STATION

ROOSEVELT ISLAND OPERATING CORPORATION OF THE STATE OF NEW YORK DESIGN OF TWO NEW ELEVATORS FOR MANHATTAN TRAM STATION ROOSEVELT ISLAND OPERATING CORPORATION OF THE STATE OF NEW YORK DESIGN OF TWO NEW S FOR MANHATTAN TRAM STATION 254 EAST 60th STREET, NEW YORK, NY 10022 PROJECT PROPOSAL Modernization of the Manhattan Aerial

More information

FOR LEASE 801 N. FEDERAL HWY FORT LAUDERDALE, FL RETAIL/OFFICE FLAGLER VILLAGE FREESTANDING BUILDING

FOR LEASE 801 N. FEDERAL HWY FORT LAUDERDALE, FL RETAIL/OFFICE FLAGLER VILLAGE FREESTANDING BUILDING FLAGLER VILLAGE FREESTANDING BUILDING Rental Rate: $40/SF Building Size: 3,879 SF Lot Size: 8,590 SF Lease Type: NNN Zoning: RAC-UV Highlights: 45,785 Traffic Count (2012) 25 Parking Spaces +/- 130 Frontage

More information

City Commission Workshop

City Commission Workshop Causeway Boulevard Corridor Study City of Dunedin, Florida City Commission Workshop January 10, 2012 Causeway Boulevard Corridor Study City of Dunedin, Florida Workshop Agenda Where we re at in the process.

More information

CONSTRUCTION PROPOSAL Vision General Contracting LLC

CONSTRUCTION PROPOSAL Vision General Contracting LLC CONSTRUCTION PROPOSAL Vision General Contracting LLC August 25, 2015 My Site Name 1234 Address Street My City, GA 000000 Horizontal Infrastructure completion! Vision General Contracting LLC 1681 Fernleaf

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

Oregon University System OHSU Collaborative Life Sciences Building. Portland, OR

Oregon University System OHSU Collaborative Life Sciences Building. Portland, OR Oregon University System OHSU Collaborative Life Sciences Building Portland, OR Technical Information Size of Project: 28,000 cubic yards; 650,000 square foot Strength Requirements: 4,000 psi Water/Cement

More information