1 DATE: April 20, 2017 ARLINGTON INDEPENDENT SCHOOL DISTRICT 1203 W. Pioneer Parkway Arlington, Texas ADDENDUM II FROM: Tammy Craig Director Purchasing RE: CSP Amos & Atherton Elementary Renovations Project PLEASE NOTE THE FOLLOWING CHANGES OR CLARIFICATIONS TO THE REFERENCED BID. ATTENTION VENDORS: Please see the following attachments: 1. Sign-in sheet from the Pre-Proposal Conference on April 19, 2017 at Atherton Elementary. 2. Questions and Answers Document from Pre-Proposal Conference 3. CSP Timeline/ Milestones 4. Specifications Clarified via Perkins Will ALL OTHER TERMS, CONDITIONS AND SPECIFICATIONS REMAIN THE SAME. Please reference and acknowledge this addendum by initialing on the Proposal Form.

2

3 Arlington Independent School District CSP Amos & Atherton Elementary Schools Renovations Project Pre-Proposal Conference Wednesday, April 19, AM Atherton Elementary 2001 Overbrook Dr., Arlington, TX Questions & Answers Q: Is there a goal for the HUB? A: We do not a particular goal set. The District is looking for value in the work being done. However, 20-22% has been the trend of the 2014 bond projects. Q: Will you be sending out an addendum or do we pick it up? A: Yes, we will be sending out an addendum. All bid information and addendums are posted on our website. Q: Will this job need to be finished in the summer or outside of school hours? A: This is a 12-month job. It will be handled during school time; AISD will coordinate work schedules with contractor during the school year that will minimize the impact of disruption of school. Scheduling will take in to consideration the phasing plans in reference to rotating the spaces. Q: When is project expected to start? A: Expectation is to start July 1. Q: Are there any spaces that need to be completed before the start of school? A: Not necessarily. Would like to have security vestibule, but will work as a team with the Contractor. This is a 12-month project. Q: Do you want a full-time superintendent on both schools? A: We want somebody responsible. Superintendent at one location; assistant at another is acceptable. Must have Arlington ISD badge; badges from other Districts are not acceptable. It is a supervision issue. Must have badge to be on job site. Q: On the chiller schedules: is it an alternate or part of the base bid? A: It is part of the base bid.

4 CSP Process Milestones CSP NO Amos and Atherton Elementary School Renovation Projects The following dates are set forth for information and planning purposes; however, AISD reserves the right to make modifications as deemed necessary. Pre-Proposal Meeting 04/19/ :00AM Atherton Elementary 2101 Overbrook Dr. Arlington, TX Last Date for Questions 04/25/2017, 2:00PM Final Addendum (If necessary) 04/27/2017 Due Date CSP Purchasing, 1203 W. Pioneer Pkwy, Arlington, TX /02/2017, 2:00PM/CST Evaluation Review 05/03/ /12/2017 Recommendation to Board of Trustees 05/18/2017 Purchasing Department W. Pioneer Pkwy Arlington, Texas

5 2711 LBJ Freeway Suite 900 Farmers Branch, TX Tel: Fax: April 14, 2017 Mr. Corey Robinson Environmental and Safety Coordinator Arlington Independent School District 1201 Colorado Lane Arlington, Texas Subject: Report of Pre-Renovation Asbestos Survey Amos Elementary School Bond Program Renovations 3100 Daniel Drive Arlington, Texas EFI Project No Dear Mr. Robinson: Thank you for this opportunity to provide professional services to the Arlington Independent School District (AISD). EFI Global, Inc. (EFI) has completed a pre-renovation asbestos survey in support of the Bond Program s planned renovation activities at Amos Elementary School located at 3100 Daniel Drive in Arlington, Texas. EFI was engaged to perform this survey by acceptance of our proposal dated March 30, It is our understanding that the subject areas of the facility (as referenced above) are scheduled for renovations. Sampling was limited to those existing accessible suspect finishes and building components anticipated to be disturbed during the renovation activities as described in Perkins + Will Architect s Scope of Work and depicted on their drawings (Sheets A04-02 and A43-01), dated March 17, 2017, as provided to EFI by AISD. Sampling of roofing components, including flashings and built-up roofing, or roof mounted HVAC systems will be forwarded under separate cover. The purpose of this survey was to identify any asbestos-containing materials that may be present and are anticipated to be disturbed. The survey was performed to comply with regulations issued by the U.S. Environmental Protection Agency (NESHAP regulations, 40 CFR 61 (M)), and the Texas Asbestos Health Protection Rules (25 TAC to ). These regulations generally require that, prior to any construction, renovation, or demolition, the area where the work is to be performed shall be inspected by a properly trained and licensed individual for the presence of asbestos-containing materials that may be disturbed during the work.

6 AISD Amos Elementary April 14, 2017 Bond Program EFI Project No Pre-Renovation Asbestos Survey Page 2 The survey was performed on April 11, 2017, by Mr. David Acosta (Asbestos Inspector No ) of EFI s Dallas office. EFI collected a total of 96 samples of suspect building materials from thirty-one distinct homogeneous areas during our site visit. The suspect materials that were sampled included: Material Sampled Number of Samples Material Sampled Number of Samples Ceramic floor tile with grout and 3 12 x 12 Vinyl floor tile (white with 3 mortar blue streaks) and mastic with leveling compound Door / window frame caulk 3 Carpet mastic (yellow) 3 Cove base (blue) with mastic 3 Gypsum wallboard with joint 3 compound and vinyl wallcovering Gypsum wallboard with joint 6 2 x 4 Lay-in ceiling tile (pinholes 3 compound and texture (eggshell) with large fissures) 2 x 4 Lay-in ceiling tile (pinholes 3 HVAC duct insulation mastic (black) 3 with small and medium fissures) 2 x 4 Lay-in ceiling tile (pinholes 3 Cementitious wallboard panel 3 with small and medium fissures) Ceramic wall tile with grout and mortar 3 Textured gypsum wallboard with 3 joint compound and texture (orange peel) 4 Porcelain wall tile with grout and 3 Gypsum wallboard with joint 3 mortar compound and texture (orange peel) 2 x 4 Lay-in ceiling tile (pinholes 3 Cove base (blue) with mastic 3 with small and medium fissures) Carpet mastic (yellow) 3 12 x 12 Vinyl floor tile (white with 3 blue streaks) and mastic Gypsum wallboard with joint 3 Carpet mastic (yellow) 3 compound and texture (eggshell) Cove base (blue) with mastic 3 2 x 4 Lay-in ceiling tile (pinholes 3 and small/medium fissures) HVAC duct mastic (grey) 3 12 x 12 Vinyl floor tile (white with 3 blue streaks) and mastic with leveling compound Carpet mastic (yellow) 3 Cove base (blue) with mastic 3 Gypsum wallboard with joint 3 Exterior stucco plaster 3 compound and texture (orange peel) Gypsum wallboard with joint compound and texture (orange peel) 3 The samples of suspect materials were delivered to Cates oratories, an accredited and licensed asbestos laboratory (TDSHS oratory License No ), for analysis by polarized light microscopy (PLM) coupled with dispersion staining utilizing visual area estimation. Six of the samples analyzed were found to contain greater than 1% asbestos. A summary of the analyses, and statements of accreditation and procedures used in the analyses, are presented in Appendix I.

7 AISD Amos Elementary April 14, 2017 Bond Program EFI Project No Pre-Renovation Asbestos Survey Page 3 The following materials were determined to contain greater than one percent asbestos: gypsum wallboard system with vinyl wallcovering was found to contain 3% chrysotile asbestos; gypsum wallboard system with joint compound and texture (eggshell) was found to contain 3% chrysotile asbestos; 2 x 4 Lay-in ceiling tiles with pinholes and large fissures was found to contain 2% chrysotile asbestos; cementitious wallboard panels were found to contain 20% chrysotile asbestos; mortar associated with 4 porcelain wall tile was determined to contain 2% chrysotile asbestos; and gypsum wallboard systems with joint compound and texture (orange peel) was found to contain 3% chrysotile asbestos. The Texas Department of State Health Services requires the removal of these materials by a licensed asbestos contractor under the oversight of an asbestos consultant prior to renovation of the structure. This report is intended to comply with the EPA s NESHAP regulations and TDSHS's regulations concerning identification of ACM prior to renovation activities, and is intended to be used for purposes of acquiring a demolition permit as required under Section 13 of Article a of Vernon s Texas Civil Statutes. It is not intended to fully comply with EPA's AHERA regulations (40 CFR 763 (E)), which address asbestos identification and management requirements for schools grades K through 12. Again, EFI appreciates the opportunity to serve as your consultant in this matter. If you have any questions, or if we may be of further service to you, please do not hesitate to contact us. Sincerely, EFI GLOBAL, INC. David Acosta Tracy L. Humber Project Manager Senior Project Manager TDSHS Asbestos Inspector No TDSHS Asbestos Consultant Attachments: Appendix I - PLM Report

8 APPENDIX I PLM Report

9 : EFI Global Job No.: PLM Project: AISD Amos Elementary School - Bond Project, 3100 Daniel Drive, Arlington, TX Set No.: Project No: Report Date: 4/13/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/10/2017 EPA Method 600/R-93/116 Page 1 of 9 On 4/11/2017, ninety-six (96) bulk samples were submitted by Mr. David Acosta of EFI Global for asbestos analysis by PLM/DS. CL Ceramic Floor Tile w/grout & Mortar - Vestibule, Southeast Corner - Ceramic Tile - Grout - Mortar CL Ceramic Floor Tile w/grout & Mortar - Vestibule, Southeast Corner - Ceramic Tile - Grout - Mortar CL Ceramic Floor Tile w/grout & Mortar - Vestibule, Northeast Corner - Ceramic Tile - Grout - Mortar CL " X 12" White w/blue Specks/Streaks Floor Tile & Mastic - Entrance Hall at Vestibule CL " X 12" White w/blue Specks/Streaks Floor Tile & Mastic - Entrance Hall at Faculty Entrance to Office CL " X 12" White w/blue Specks/Streaks Floor Tile & Mastic - Entrance Hall at Texan Pride Sign - Floor Tile - Mastic/Leveling Cpd. - Floor Tile - Mastic/Leveling Cpd. - Floor Tile - Mastic/Leveling Cpd. CL Door/Window Frame Caulk - Vestibule, Inner Door, Northwest Corner CL Door/Window Frame Caulk - Vestibule, Outer Door, Southeast Corner CL Door/Window Frame Caulk - Vestibule, Inner Door, Southwest Corner CL Carpet Mastic (yellow) - Reception Office at Entrance Door CL Carpet Mastic (yellow) - Reception Office, East Area at Cabinet CL Carpet Mastic (yellow) - Reception Office, North Area at Cabinet CL Blue Cove Base Molding w/mastic - Entrance Hall, South Wall at Faculty Entrance to Office CL Blue Cove Base Molding w/mastic - Entrance Hall, North Wall at Fire Exit CL Blue Cove Base Molding w/mastic - Reception Office, West Wall at Entrance Door CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

10 : EFI Global Job No.: PLM Project: AISD Amos Elementary School - Bond Project, 3100 Daniel Drive, Arlington, TX Set No.: Project No: Report Date: 4/13/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/10/2017 EPA Method 600/R-93/116 Page 2 of 9 On 4/11/2017, ninety-six (96) bulk samples were submitted by Mr. David Acosta of EFI Global for asbestos analysis by PLM/DS. CL Gypsum Board Wall System w/vinyl Cover - Entrance Hall, North Wall - Wall Covering - Joint Compound - Paper - Wallboard Material CL Gypsum Board Wall System w/vinyl Cover - Entrance Hall, South Wall at Office Entrance CL Gypsum Board Wall System w/vinyl Cover - North Wall, Left Side of Outlet CL Textured Gypsum Board Wall System (eggshell) - Entrance Hall, South Wall at Southeast Corner CL Textured Gypsum Board Wall System (eggshell) - Entrance Hall, at Faculty Entrance to Office CL Textured Gypsum Board Wall System (eggshell) - Entrance Hall, South Wall at Office Window CL Textured Gypsum Board Wall System (eggshell) - Reception Office, Northeast Corner CL Textured Gypsum Board Wall System (eggshell) - Reception Office, Work Counter Part Wall CL Textured Gypsum Board Wall System (eggshell) - Reception Office, East Wall - Wall Covering - Joint Tape 3% Chrysotile - Joint Compound - Paper - Wallboard Material Not Analyzed - Positive Stop - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Layer - Joint Compound - Paper - Wallboard Material - Paint Texture - Joint Tape 3% Chrysotile - Joint Compound - Paper - Wallboard Material Not Analyzed - Positive Stop Not Analyzed - Positive Stop Not Analyzed - Positive Stop CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

11 : EFI Global Job No.: PLM Project: AISD Amos Elementary School - Bond Project, 3100 Daniel Drive, Arlington, TX Set No.: Project No: Report Date: 4/13/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/10/2017 EPA Method 600/R-93/116 Page 3 of 9 On 4/11/2017, ninety-six (96) bulk samples were submitted by Mr. David Acosta of EFI Global for asbestos analysis by PLM/DS. CL ' X 4' Acoustic Ceiling Tile (pinhole & large fissure) - Vestibule at Light 2% Chrysotile CL ' X 4' Acoustic Ceiling Tile (pinhole & large fissure) - Entrance Hall at Exit Sign CL ' X 4' Acoustic Ceiling Tile (pinhole & large fissure) - Entrance Hall at Mirror CL ' X 4' Acoustic Ceiling Tile (pinhole & small/medium fissure) - Entrance Hall at Smoke Detector CL ' X 4' Acoustic Ceiling Tile (pinhole & small/medium fissure) - Vestibule, Northeast Corner CL ' X 4' Acoustic Ceiling Tile (pinhole & small/medium fissure) - Entrance Hall at Strobe Not Analyzed - Positive Stop Not Analyzed - Positive Stop CL Duct Insulation Mastic (black) - Entrance Hall at Make Up Air Vent - Black Mastic - Wrap - Insulation CL Duct Insulation Mastic (black) - Reception Office at Ceiling Strobe - Black Mastic - Wrap - Insulation CL Duct Insulation Mastic (black) - Reception Office at Smoke Detector - Black Mastic - Wrap - Insulation CL ' X 4' Acoustic Ceiling Tile (pinhole & small/medium fissure) - Reception Office at Ceiling Strobe CL ' X 4' Acoustic Ceiling Tile (pinhole & small/medium fissure) - Reception Office at Smoke Detector CL ' X 4' Acoustic Ceiling Tile (pinhole & small/medium fissure) - Reception Office, Southwest Corner CL Cementitious Wallboard Panel - Reception Office, Storefront Window 20% Chrysotile CL Cementitious Wallboard Panel - Reception Office, Storefront Window Not Analyzed - Positive Stop CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

12 : EFI Global Job No.: PLM Project: AISD Amos Elementary School - Bond Project, 3100 Daniel Drive, Arlington, TX Set No.: Project No: Report Date: 4/13/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/10/2017 EPA Method 600/R-93/116 Page 4 of 9 On 4/11/2017, ninety-six (96) bulk samples were submitted by Mr. David Acosta of EFI Global for asbestos analysis by PLM/DS. CL Cementitious Wallboard Panel - Reception Office, Storefront Window Not Analyzed - Positive Stop CL Ceramic Wall Tile w/grout & Mortar - Corridor at CR111 - Ceramic Tile - Grout - Mortar CL Ceramic Wall Tile w/grout & Mortar - Corridor at CR111 - Ceramic Tile - Grout - Mortar CL Ceramic Wall Tile w/grout & Mortar - South Hall at Water Fountain across from 118 & 119 CL Textured Gypsum Board Wall System (orange peel) - South Hall Wall at Water Fountain across from 121 & 122 CL Textured Gypsum Board Wall System (orange peel) - South Hall Wall at Water Fountain across from 121 & 122 CL Textured Gypsum Board Wall System (orange peel) - South Hall Wall at Water Fountain across from 121 & 122 CL " Porcelain Wall Tile w/grout & Mortar - Girls Restroom at Sink, 121/122 CL " Porcelain Wall Tile w/grout & Mortar - Girls Restroom at Sink, 118/119 CL " Porcelain Wall Tile w/grout & Mortar - Boys Restroom at Sink, 121/122 - Ceramic Tile - Grout - Mortar - Paint Layer - Joint Compound - Paper - Wallboard Material - Paint Layer - Paper - Wallboard Material - Paint Layer - Joint Compound - Paper - Wallboard Material - Ceramic Tile - Grout 2% Chrysotile - Mortar Not Analyzed - Positive Stop Not Analyzed - Positive Stop CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

13 : EFI Global Job No.: PLM Project: AISD Amos Elementary School - Bond Project, 3100 Daniel Drive, Arlington, TX Set No.: Project No: Report Date: 4/13/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/10/2017 EPA Method 600/R-93/116 Page 5 of 9 On 4/11/2017, ninety-six (96) bulk samples were submitted by Mr. David Acosta of EFI Global for asbestos analysis by PLM/DS. CL Textured Gypsum Board Wall System (orange peel) - CR111, Northwest Corner CL Textured Gypsum Board Wall System (orange peel) - CR205, Southeast Corner CL Textured Gypsum Board Wall System (orange peel) - Hall at CR111 Door, above Grid CL ' X 4' Acoustic Ceiling Tile (pinhole & small/medium fissure) - Hall at Workroom CL ' X 4' Acoustic Ceiling Tile (pinhole & small/medium fissure) - CR111, Center CL ' X 4' Acoustic Ceiling Tile (pinhole & small/medium fissure) - CR205, Center - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material CL Blue Cove Base Molding w/mastic - Hall at CR205 Door CL Blue Cove Base Molding w/mastic - CR205, North Wall CL Blue Cove Base Molding w/mastic - CR111, South Wall CL Carpet Mastic (yellow) - CR111, Southeast Area CL Carpet Mastic (yellow) - CR205, Northeast Area CL Carpet Mastic (yellow) - CR111, Northeast Area CL " X 12" White w/blue Speck/Streaks Floor Tile & Mastic - Hall at CR111 Door - Floor Tile - Yellow Mastic CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

14 : EFI Global Job No.: PLM Project: AISD Amos Elementary School - Bond Project, 3100 Daniel Drive, Arlington, TX Set No.: Project No: Report Date: 4/13/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/10/2017 EPA Method 600/R-93/116 Page 6 of 9 On 4/11/2017, ninety-six (96) bulk samples were submitted by Mr. David Acosta of EFI Global for asbestos analysis by PLM/DS. CL " X 12" White w/blue Speck/Streaks Floor Tile & Mastic - Hall at CR205 Door CL " X 12" White w/blue Speck/Streaks Floor Tile & Mastic - Hall at Workroom Door CL Textured Gypsum Board Wall System (eggshell) - CR401, Southwest Corner CL Textured Gypsum Board Wall System (eggshell) - CR401, Northwest Corner CL Textured Gypsum Board Wall System (eggshell) - CR401, North Wall at Column - Floor Tile - Yellow Mastic - Floor Tile - Yellow Mastic - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material CL Carpet Mastic (yellow) - CR401, Center CL Carpet Mastic (yellow) - CR401, North CL Carpet Mastic (yellow) - CR401, South CL Blue Cove Base Molding w/mastic - Hall at Door to CR401 CL Blue Cove Base Molding w/mastic - CR401, West Wall CL Blue Cove Base Molding w/mastic - CR401, East Wall at Locker 18 CL ' X 4' Acoustic Ceiling Tile (pinhole & small/medium fissure) - CR401, Center CL ' X 4' Acoustic Ceiling Tile (pinhole & small/medium fissure) - CR401, Northwest Corner CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

15 : EFI Global Job No.: PLM Project: AISD Amos Elementary School - Bond Project, 3100 Daniel Drive, Arlington, TX Set No.: Project No: Report Date: 4/13/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/10/2017 EPA Method 600/R-93/116 Page 7 of 9 On 4/11/2017, ninety-six (96) bulk samples were submitted by Mr. David Acosta of EFI Global for asbestos analysis by PLM/DS. CL ' X 4' Acoustic Ceiling Tile (pinhole & small/medium fissure) - CR401, Southeast Corner CL Duct Mastic (gray) - CR401, above Grid, North CL Duct Mastic (gray) - CR401, above Grid, Center CL Duct Mastic (gray) - CR401, above Grid, Center CL " X 12" White w/blue Specks/Streaks Floor Tile w/mastic - Open Area, Northeast Corner CL " X 12" White w/blue Specks/Streaks Floor Tile w/mastic - CR502, Northeast Corner CL " X 12" White w/blue Specks/Streaks Floor Tile w/mastic - CR501, Northeast Corner - Floor Tile - Yellow Mastic - Leveling Compound - Floor Tile - Yellow Mastic - Leveling Compound - Floor Tile - Yellow Mastic - Leveling Compound CL Carpet Mastic (yellow) - CR501, Southwest Corner CL Carpet Mastic (yellow) - CR501, Southeast Corner CL Carpet Mastic (yellow) - CR502, Southwest Corner CL Blue Cove Base Molding w/mastic - Open Area, Northwest Corner CL Blue Cove Base Molding w/mastic - CR502, Southeast Corner CL Blue Cove Base Molding w/mastic - Open Area, Southeast Corner CL Textured Gypsum Board Wall System (orange peel) - CR501, Southeast Corner - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

16 : EFI Global Job No.: PLM Project: AISD Amos Elementary School - Bond Project, 3100 Daniel Drive, Arlington, TX Set No.: Project No: Report Date: 4/13/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/10/2017 EPA Method 600/R-93/116 Page 8 of 9 On 4/11/2017, ninety-six (96) bulk samples were submitted by Mr. David Acosta of EFI Global for asbestos analysis by PLM/DS. CL Textured Gypsum Board Wall System (orange peel) - CR501, Northeast Corner at Water Fountain CL Textured Gypsum Board Wall System (orange peel) - CR502, Northwest Corner at Water Fountain - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material CL Stucco/Plaster (Soffit) (Exterior) - East at CR401 Hall <1% Chrysotile CL Stucco/Plaster (Soffit) (Exterior) - Front Entrance <1% Chrysotile CL Stucco/Plaster (Soffit) (Exterior) - Front Entrance <1% Chrysotile CL Textured Gypsum Board Wall System (orange peel) - Water Fountain across from Cafeteria CL Textured Gypsum Board Wall System (orange peel) - Water Fountain across from Cafeteria CL Textured Gypsum Board Wall System (orange peel) - Water Fountain across from Cafeteria - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Texture - Paper - Wallboard Material - Paint Texture - Joint Tape 3% Chrysotile - Joint Compound - Paper - Wallboard Material CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

17 : EFI Global Job No.: PLM Project: AISD Amos Elementary School - Bond Project, 3100 Daniel Drive, Arlington, TX Set No.: Project No: Report Date: 4/13/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/10/2017 EPA Method 600/R-93/116 Page 9 of 9 On 4/11/2017, ninety-six (96) bulk samples were submitted by Mr. David Acosta of EFI Global for asbestos analysis by PLM/DS. Copies of the lab data sheets are attached; additional information may be found therein. STATEMENT OF LABORATORY ACCREDITATION The samples were analyzed in general accordance with the procedures outlined in the Method for the Determination of Asbestos in Bulk Building Materials, EPA/600/R-93/116 or the U.S. Environmental Protection Agency method, under AHERA (EPA 600/M ), for the analysis of asbestos in building materials by polarized light microscopy. The results of each bulk sample relate only to the material tested and the results shall not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. Specific questions concerning bulk sample results shall be directed to the oratory Director. Analyst: Kathy Schosek oratory Director: John R. Cates, P.G. Approved Signatory: NVLAP LAB CODE

18 2711 LBJ Freeway Suite 900 Farmers Branch, TX Tel: Fax: April 10, 2017 Mr. Corey Robinson Environmental and Safety Coordinator Arlington Independent School District 1201 Colorado Lane Arlington, Texas Subject: Report of Pre-Renovation Asbestos Survey Atherton Elementary School Bond Program Renovations 2101 Overbrook Drive Arlington, Texas EFI Project No Dear Mr. Robinson: Thank you for this opportunity to provide professional services to the Arlington Independent School District (AISD). EFI Global, Inc. (EFI) has completed a pre-renovation asbestos survey in support of the Bond Program s planned renovation activities at Atherton Elementary School located at 2101 Overbrook Drive in Arlington, Texas. EFI was engaged to perform this survey by acceptance of our proposal dated March 27, It is our understanding that the subject areas of the facility (as referenced above) are scheduled for renovations. Sampling was limited to those existing accessible suspect finishes and building components anticipated to be disturbed during the renovation activities as described in Perkins + Will Architect s Scope of Work and depicted on their drawings (Sheets A04-02 and A43-01), dated March 17, 2017, as provided to EFI by AISD. Sampling of roofing components, including flashings and built-up roofing, or roof mounted HVAC systems will be forwarded under separate cover. The purpose of this survey was to identify any asbestos-containing materials that may be present and are anticipated to be disturbed. The survey was performed to comply with regulations issued by the U.S. Environmental Protection Agency (NESHAP regulations, 40 CFR 61 (M)), and the Texas Asbestos Health Protection Rules (25 TAC to ). These regulations generally require that, prior to any construction, renovation, or demolition, the area where the work is to be performed shall be inspected by a properly trained and licensed individual for the presence of asbestos-containing materials that may be disturbed during the work.

19 AISD Atherton Elementary April 10, 2017 Bond Program EFI Project No Pre-Renovation Asbestos Survey Page 2 The survey was performed on April 4, 2017, by Mr. Michael Mendoza (Asbestos Inspector No ) of EFI s Dallas office. EFI collected a total of 105 samples of suspect building materials from 35 distinct homogeneous areas during our site visit. The suspect materials that were sampled included: Material Sampled Number of Samples Material Sampled Number of Samples Carpet mastic (2 types) 6 Cove base with mastic (3 types) 9 Caulking compound (millwork) 3 Door frame sealant (2 types) 6 Interior brick and mortar 3 Glazed block walls and mortar 3 Construction joint sealant 3 Window glazing 3 Carpet tile mastic 3 Back splash caulk 3 Sink undercoating 3 Sheet metal duct mastic (2 types) 6 4 x 4 Ceramic wall tile with grout 3 Gypsum board ceiling system (2 6 and adhesive types) 2 x 2 Ceramic floor tile with grout 6 Asphalt embedded pipe insulation 3 and mortar (2 types) wrap Pipe insulation mastic (chilled water 3 Pipe insulation mastic (chilled water 3 supply) return) Pipe insulation mastic (hot water 3 Pipe insulation mastic (hot water 3 supply) return) Gypsum board wall system with 12 2 x 4 Lay-in ceiling tile with 3 texture (4 types) pinholes and short fissures 2 x 2 Lay-in ceiling tile with pinholes 3 12 x 12 Vinyl floor tile and mastic 3 and short fissures (2 types) Back splash mastic 3 The samples of suspect materials were delivered to Cates oratories, an accredited and licensed asbestos laboratory (TDSHS oratory License No ), for analysis by polarized light microscopy (PLM) coupled with dispersion staining utilizing visual area estimation. One of the samples analyzed was found to contain greater than 1% asbestos. A summary of the analyses, and statements of accreditation and procedures used in the analyses, are presented in Appendix I. The following material was determined to contain greater than one percent asbestos: Gray window glazing at the storefront window in the reception area was found to contain 3% chrysotile asbestos. The Texas Department of State Health Services requires the removal of these materials by a licensed asbestos contractor under the oversight of an asbestos consultant prior to renovation of the structure.

20 AISD Atherton Elementary April 10, 2017 Bond Program EFI Project No Pre-Renovation Asbestos Survey Page 3 Resilient floor tile and other resinously bound materials, when analyzed by the EPA method, may actually contain higher percentages of asbestos than those detected or yield false negative results because of limitations in separating closely bound fibers and in detecting fibers of small length and diameter. When additional information is required, we recommend utilizing alternative methods of analysis, including transmission electron microscopy (TEM). However, to the best of our knowledge, there are no current Texas regulatory requirements regarding the use of TEM analysis to identify asbestos in suspect resinously bound materials. This report is intended to comply with the EPA s NESHAP regulations and TDSHS's regulations concerning identification of ACM prior to renovation activities, and is intended to be used for purposes of acquiring a demolition permit as required under Section 13 of Article a of Vernon s Texas Civil Statutes. It is not intended to fully comply with EPA's AHERA regulations (40 CFR 763 (E)), which address asbestos identification and management requirements for schools grades K through 12. Again, EFI appreciates the opportunity to serve as your consultant in this matter. If you have any questions, or if we may be of further service to you, please do not hesitate to contact us. Sincerely, EFI GLOBAL, INC. Michael Mendoza Tracy L. Humber Project Manager Senior Project Manager TDSHS Asbestos Inspector No TDSHS Asbestos Consultant Attachments: Appendix I - PLM Report

21 APPENDIX I PLM Report

22 : EFI Global Job No.: PLM Project: Atherton Elementary School Overbrook Drive, Arlington, TX Set No.: Project No: Not Provided Report Date: 4/6/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/4/2017 EPA Method 600/R-93/116 Page 1 of 10 On 4/5/2017, one-hundred five (105) bulk samples were submitted by Mr. Michael Mendoza of EFI Global for asbestos analysis by PLM/DS. CL Carpet (blue tack-down) Mastic (yellow) - K Pod, Classroom 17, Northeast Corner CL Carpet (blue tack-down) Mastic (yellow) - K Pod, Corridor along Southwest Corner CL Carpet (blue tack-down) Mastic (yellow) - K Pod, Classroom 27, Southeast Corner CL Cove Base (4", blue) & Mastic (yellow) - K Pod, Classroom 17, Northeast Corner CL Cove Base (4", blue) & Mastic (yellow) - K Pod, Corridor along Southwest Corner CL Cove Base (4", blue) & Mastic (yellow) - K Pod, Classroom 27, Southeast Corner CL Gypsum Board Wall System (eggshell) - K Pod, Classroom 17, Northeast Corner CL Gypsum Board Wall System (eggshell) - K Pod, Corridor along Southwest Corner CL Gypsum Board Wall System (eggshell) - K Pod, Classroom 27, Southeast Corner CL Carpet (blue/green) Mastic - Main Building, Classroom 15, Northeast Corner - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

23 : EFI Global Job No.: PLM Project: Atherton Elementary School Overbrook Drive, Arlington, TX Set No.: Project No: Not Provided Report Date: 4/6/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/4/2017 EPA Method 600/R-93/116 Page 2 of 10 On 4/5/2017, one-hundred five (105) bulk samples were submitted by Mr. Michael Mendoza of EFI Global for asbestos analysis by PLM/DS. CL Carpet (blue/green) Mastic - Main Building, Classroom 14, Northwest Corner CL Carpet (blue/green) Mastic - Main Building, Classroom 23, Southwest Corner CL Cove Base (4", gray) & Mastic (green) - Main Building, Classroom 15, Northeast Corner CL Cove Base (4", gray) & Mastic (green) - Main Building, Classroom 14, Northwest Corner CL Cove Base (4", gray) & Mastic (green) - Main Building, Classroom 23, Southwest Corner CL Gypsum Board Wall System (orange peel) - Main Building, Classroom 15, Northeast Corner CL Gypsum Board Wall System (orange peel) - Main Building, Classroom 14, Northwest Corner CL Gypsum Board Wall System (orange peel) - Main Building, Classroom 60, under Sink - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Layer - Joint Compound - Paper - Wallboard Material CL Door Frame Sealant (gray) - Main Building, Classroom 23, North Door CL Door Frame Sealant (gray) - Main Building, Classroom 23, West Door CL Door Frame Sealant (gray) - Main Building, Classroom 13, West Door CL Caulking Compound on Millwork - Main Building, Classroom 23, along North Wall CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

24 : EFI Global Job No.: PLM Project: Atherton Elementary School Overbrook Drive, Arlington, TX Set No.: Project No: Not Provided Report Date: 4/6/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/4/2017 EPA Method 600/R-93/116 Page 3 of 10 On 4/5/2017, one-hundred five (105) bulk samples were submitted by Mr. Michael Mendoza of EFI Global for asbestos analysis by PLM/DS. CL Caulking Compound on Millwork - Main Building, Classroom 23, along North Wall CL Caulking Compound on Millwork - Main Building, Classroom 13, along East Wall CL Gypsum Board Wall System (orange peel) - Main Building, Computer 23, Southwest Corner CL Gypsum Board Wall System (orange peel) - Main Building, Computer 23, Southeast Corner CL Gypsum Board Wall System (orange peel) - Main Building, Computer 13, Northeast Corner CL Lay-In Ceiling Tile (2' X 4', pinhole/short fissure) - Main Building, Classroom 23, by Door CL Lay-In Ceiling Tile (2' X 4', pinhole/short fissure) - Main Building, Classroom 50, by Door CL Lay-In Ceiling Tile (2' X 4', pinhole/short fissure) - Main Building, Reception Area, by Door - Paint Layer - Joint Compound - Paper - Wallboard Material - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material CL Duct Joint Sealant (gray) - K Pod, Corridor between Rooms 17 & 27 CL Duct Joint Sealant (gray) - K Pod, Corridor between Rooms 17 & 27 CL Duct Joint Sealant (gray) - K Pod, Corridor between Rooms 17 & 27 CL Lay-In Ceiling Tile (2' X 2', pinhole/short fissure) - K Pod, Classroom 17, Center CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

25 : EFI Global Job No.: PLM Project: Atherton Elementary School Overbrook Drive, Arlington, TX Set No.: Project No: Not Provided Report Date: 4/6/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/4/2017 EPA Method 600/R-93/116 Page 4 of 10 On 4/5/2017, one-hundred five (105) bulk samples were submitted by Mr. Michael Mendoza of EFI Global for asbestos analysis by PLM/DS. CL Lay-In Ceiling Tile (2' X 2', pinhole/short fissure) - K Pod, Classroom 27, Center CL Lay-In Ceiling Tile (2' X 2', pinhole/short fissure) - K Pod, Corridor between 17 & 27 CL Duct Joint Sealant (gray) - Main Building, Classroom 23 CL Duct Joint Sealant (gray) - Main Building, Classroom 50 CL Duct Joint Sealant (gray) - Main Building, Mechanical Room CL Acoustical Sink Undercoating (black) - Main Building, Classroom 50 CL Acoustical Sink Undercoating (black) - Main Building, Classroom 50 CL Acoustical Sink Undercoating (black) - Main Building, Classroom 60 CL Floor Tile (12" X 12", light blue & blue streaks) & Mastic (yellow/black) - Main Building, Classroom 50, under Sink CL Floor Tile (12" X 12", light blue & blue streaks) & Mastic (yellow/black) - Main Building, Classroom 60, under Sink CL Floor Tile (12" X 12", light blue & blue streaks) & Mastic (yellow/black) - Main Building, Classroom 60, by Door CL Interior Brick (tan) & Mortar (gray) - Main Building, at Shared Storage between A16 & A26 CL Interior Brick (tan) & Mortar (gray) - Main Building, at Shared Storage between A53 & A63 CL Interior Brick (tan) & Mortar (gray) - Main Building, at Shared Storage between A32 & A42 CL Ceramic Floor Tile (2" X 2", tan) - Main Building, Restroom 161, by Door - Floor Tile - Yellow Mastic - Black Mastic - Floor Tile - Yellow Mastic - Floor Tile - Yellow Mastic - Brick - Mortar - Brick - Mortar - Brick - Mortar - Ceramic Tile - Grout - Thinset CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

26 : EFI Global Job No.: PLM Project: Atherton Elementary School Overbrook Drive, Arlington, TX Set No.: Project No: Not Provided Report Date: 4/6/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/4/2017 EPA Method 600/R-93/116 Page 5 of 10 On 4/5/2017, one-hundred five (105) bulk samples were submitted by Mr. Michael Mendoza of EFI Global for asbestos analysis by PLM/DS. CL Ceramic Floor Tile (2" X 2", tan) - Main Building, Restroom 173, by Door CL Ceramic Floor Tile (2" X 2", tan) - Main Building, Restroom 164, by Door - Ceramic Tile - Grout - Thinset - Ceramic Tile - Grout - Thinset CL Ceramic Wall Tile (4" X 4", white) - Main Building, Restroom Ceramic Tile - Grout - Mastic CL Ceramic Wall Tile (4" X 4", white) - Main Building, Restroom Ceramic Tile - Grout - Mastic CL Ceramic Wall Tile (4" X 4", white) - Main Building, Restroom Ceramic Tile - Grout - Mastic CL Gypsum Board Ceiling System w/texture (eggshell) - Main Building, Restroom 161 CL Gypsum Board Ceiling System w/texture (eggshell) - Main Building, Restroom 172 CL Gypsum Board Ceiling System w/texture (eggshell) - Main Building, Restroom Paint Layer - Joint Compound - Paper - Wallboard Material - Paint Texture - Joint Tape - Joint Compound - Paper - Wallboard Material - Paint Layer - Joint Compound - Paper - Wallboard Material CL Ceramic Floor Tile (2" X 2", rose) - Main Building, Restroom Ceramic Tile - Grout - Thinset CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

27 : EFI Global Job No.: PLM Project: Atherton Elementary School Overbrook Drive, Arlington, TX Set No.: Project No: Not Provided Report Date: 4/6/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/4/2017 EPA Method 600/R-93/116 Page 6 of 10 On 4/5/2017, one-hundred five (105) bulk samples were submitted by Mr. Michael Mendoza of EFI Global for asbestos analysis by PLM/DS. CL Ceramic Floor Tile (2" X 2", rose) - Main Building, Restroom Ceramic Tile - Grout - Thinset CL Ceramic Floor Tile (2" X 2", rose) - Main Building, Restroom Ceramic Tile - Grout - Thinset CL Glazed Block Wall & Mortar - Main Building, Restroom Glazed Block - Mortar CL Glazed Block Wall & Mortar - Main Building, Restroom Glazed Block - Mortar CL Glazed Block Wall & Mortar - Main Building, Restroom Glazed Block - Mortar CL Asphalt Embedded Insulation Tape - Main Building, Mechanical Room, West of Room A41 CL Asphalt Embedded Insulation Tape - Main Building, Mechanical Room, by A50 CL Asphalt Embedded Insulation Tape - Main Building, Mechanical Room, by Restroom 189 CL Pipe Mastic (white) - Main Building, Mechanical Room, Chilled Water Supply CL Pipe Mastic (white) - Main Building, Mechanical Room, Chilled Water Supply CL Pipe Mastic (white) - Main Building, Mechanical Room, Chilled Water Supply - White Mastic - Wrap - Insulation - White Mastic - Wrap - Insulation - White Mastic - Wrap - Insulation CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

28 : EFI Global Job No.: PLM Project: Atherton Elementary School Overbrook Drive, Arlington, TX Set No.: Project No: Not Provided Report Date: 4/6/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/4/2017 EPA Method 600/R-93/116 Page 7 of 10 On 4/5/2017, one-hundred five (105) bulk samples were submitted by Mr. Michael Mendoza of EFI Global for asbestos analysis by PLM/DS. CL Pipe Insulation Mastic (white) - Main Building, Mechanical Room, Hot Water Supply CL Pipe Insulation Mastic (white) - Main Building, Mechanical Room, Hot Water Supply CL Pipe Insulation Mastic (white) - Main Building, Mechanical Room, Hot Water Supply CL Pipe Insulation Mastic (white) - Main Building, Mechanical Room, Chilled Water Return CL Pipe Insulation Mastic (white) - Main Building, Mechanical Room, Chilled Water Return CL Pipe Insulation Mastic (white) - Main Building, Mechanical Room, Chilled Water Return CL Pipe Insulation Mastic (white) - Main Building, Mechanical Room, Hot Water Return CL Pipe Insulation Mastic (white) - Main Building, Mechanical Room, Hot Water Return CL Pipe Insulation Mastic (white) - Main Building, Mechanical Room, Hot Water Return CL Gypsum Board Ceiling System w/texture (eggshell) - Main Building, Entry Vestibule, Northeast Corner - White Mastic - Wrap - Insulation - White Mastic - Wrap - Insulation - White Mastic - Wrap - Insulation - White Mastic - Wrap - Insulation - White Mastic - Wrap - Insulation - White Mastic - Wrap - Insulation - White Mastic - Wrap - Insulation - White Mastic - Wrap - Insulation - White Mastic - Wrap - Insulation - Paint Layer - Joint Compound - Paper - Wallboard Material CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

29 : EFI Global Job No.: PLM Project: Atherton Elementary School Overbrook Drive, Arlington, TX Set No.: Project No: Not Provided Report Date: 4/6/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/4/2017 EPA Method 600/R-93/116 Page 8 of 10 On 4/5/2017, one-hundred five (105) bulk samples were submitted by Mr. Michael Mendoza of EFI Global for asbestos analysis by PLM/DS. CL Gypsum Board Ceiling System w/texture (eggshell) - Main Building, Entry Vestibule, Northwest Corner CL Gypsum Board Ceiling System w/texture (eggshell) - Main Building, Entry Vestibule, Southwest Corner CL Construction Joint Sealant (beige) - Main Building, Entry Vestibule, Northeast Corner CL Construction Joint Sealant (beige) - Main Building, Entry Vestibule, Northwest Corner CL Construction Joint Sealant (beige) - Main Building, Entry Vestibule, Southwest Corner - Paint Layer - Joint Compound - Paper - Wallboard Material - Paint Layer - Joint Compound - Paper - Wallboard Material CL Window Glazing (gray) - Main Building, Storefront at Reception 3% Chrysotile CL Window Glazing (gray) - Main Building, Storefront at Reception Not Analyzed - Positive Stop CL Window Glazing (gray) - Main Building, Storefront at Reception Not Analyzed - Positive Stop CL Carpet Tile (2' X 2', blue-green) Mastic (green) - Main Building, Reception Area CL Carpet Tile (2' X 2', blue-green) Mastic (green) - Main Building, Secretary's Office CL Carpet Tile (2' X 2', blue-green) Mastic (green) - Main Building, File Room CL Cove Base (4", blue) & Mastic (beige) - Main Building, Secretary's Office CL Cove Base (4", blue) & Mastic (beige) - Main Building, File Room, Northwest Corner CL Cove Base (4", blue) & Mastic (beige) - Main Building, File Room, Southeast Corner CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

30 : EFI Global Job No.: PLM Project: Atherton Elementary School Overbrook Drive, Arlington, TX Set No.: Project No: Not Provided Report Date: 4/6/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/4/2017 EPA Method 600/R-93/116 Page 9 of 10 On 4/5/2017, one-hundred five (105) bulk samples were submitted by Mr. Michael Mendoza of EFI Global for asbestos analysis by PLM/DS. CL Gypsum Board Wall System w/vinyl Wall Covering - Main Building, Secretary's Office CL Gypsum Board Wall System w/vinyl Wall Covering - Main Building, File Room, Northwest Corner CL Gypsum Board Wall System w/vinyl Wall Covering - Main Building, File Room, Southeast Corner - Wall Covering - Joint Tape - Joint Compound - Paper - Wallboard Material - Wall Covering - Joint Tape - Joint Compound - Paper - Wallboard Material - Wall Covering - Joint Tape - Joint Compound - Paper - Wallboard Material CL Door Frame Sealant (gray) - Main Building, Secretary's Office CL Door Frame Sealant (gray) - Main Building, File Room CL Door Frame Sealant (gray) - Main Building, Reception Area, Exit to Café CL Backsplash Adhesive (yellow) - Main Building, Reception Area Desk CL Backsplash Adhesive (yellow) - Main Building, Reception Area Desk CL Backsplash Adhesive (yellow) - Main Building, Reception Area Desk CL Backsplash Caulk (gray) - Main Building, Reception Area Desk CL Backsplash Caulk (gray) - Main Building, Reception Area Desk CL Backsplash Caulk (gray) - Main Building, Reception Area Desk CVAE. Cates utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced

31 : EFI Global Job No.: PLM Project: Atherton Elementary School Overbrook Drive, Arlington, TX Set No.: Project No: Not Provided Report Date: 4/6/2017 Identification: Asbestos, Bulk Sample Analysis Sample Date: 4/4/2017 EPA Method 600/R-93/116 Page 10 of 10 On 4/5/2017, one-hundred five (105) bulk samples were submitted by Mr. Michael Mendoza of EFI Global for asbestos analysis by PLM/DS. Copies of the lab data sheets are attached; additional information may be found therein. STATEMENT OF LABORATORY ACCREDITATION The samples were analyzed in general accordance with the procedures outlined in the Method for the Determination of Asbestos in Bulk Building Materials, EPA/600/R-93/116 or the U.S. Environmental Protection Agency method, under AHERA (EPA 600/M ), for the analysis of asbestos in building materials by polarized light microscopy. The results of each bulk sample relate only to the material tested and the results shall not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. Specific questions concerning bulk sample results shall be directed to the oratory Director. Analyst: Chris Munch oratory Director: John R. Cates, P.G. Approved Signatory: NVLAP LAB CODE

Limited Asbestos Inspection Report

Limited Asbestos Inspection Report Limited Asbestos Inspection Report LIMITED ASBESTOS INSPECTION DALLAS/FORT WORTH INTERNATIONAL AIRPORT DEPARTMENT OF ENVIRONMENTAL AFFAIRS PROJECT NAME DFW PROJECT ID NO. DFW PERMIT NO. DFWEAD2019028 A18-233B

More information

ASBESTOS SURVEY WARNER ROBINS HOUSING AUTHORITY PROJECT SITE GA06P WARNER ROBINS, GEORGIA. December 28, 2005

ASBESTOS SURVEY WARNER ROBINS HOUSING AUTHORITY PROJECT SITE GA06P WARNER ROBINS, GEORGIA. December 28, 2005 ASBESTOS SURVEY WARNER ROBINS HOUSING AUTHORITY PROJECT SITE GA06P160003 WARNER ROBINS, GEORGIA Prepared for: Warner Robins Housing Authority Ms. Charles Alexander Prepared by: Holley Consultants, Inc.

More information

CONTRACT FOR SALE AND MOVING OF HOUSE

CONTRACT FOR SALE AND MOVING OF HOUSE CONTRACT FOR SALE AND MOVING OF HOUSE This contract of sale ( Contract ) is made by and between the City of Southlake, Texas, a home rule municipal corporation located in Tarrant County, Texas ( Seller

More information

Asbestos Survey Report

Asbestos Survey Report Asbestos Survey Report Downtown Duluth Old City Hall Block Buildings for renovation 3087 Main Street, 3097 Main Street, New Dawn Theater, 3530 W. Lawrenceville Street, Old City Hall/Church Duluth, Georgia

More information

HOMOGENEOUS AREAS LIST Asbestos

HOMOGENEOUS AREAS LIST Asbestos Elementary Campus 1985 Elementary uilding Wing (17,600 sq. ft.) uilding 12" floor tile (white/beige) and mastic 3,200 Square Feet Troughout building 2' x 2' ceiling tiles 10,000 Square Feet Gym (4,700

More information

SanAir Technologies Laboratory. Analysis Report. Rockbridge Environmental Consulting, Inc.

SanAir Technologies Laboratory. Analysis Report. Rockbridge Environmental Consulting, Inc. SanAir Technologies Laboratory Analysis Report prepared for Rockbridge Environmental Consulting, Inc. 10/26/2016 Project #: SanAir ID#: 804.897.1177 www.sanair.com Page 1 of 17 October 26, 2016 SanAir

More information

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California November 12, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Renovation Asbestos Survey Report 5862 Rupert Avenue, Marysville, California

More information

Comprehensive Asbestos & Lead Base Paint Survey

Comprehensive Asbestos & Lead Base Paint Survey Report of Comprehensive Asbestos & Lead Base Paint Survey Prepared for: Freese and Nichols, Inc. 4055 International Plaza, Suite 200 Fort Worth, TX 76109 Building Surveyed: Readiness Center - Hondo Pass

More information

Investigation Remediation Citation Drive, Suite 100 Compliance Restoration Brighton, MI 48116

Investigation Remediation Citation Drive, Suite 100 Compliance Restoration Brighton, MI 48116 Investigation Remediation 10448 Citation Drive, Suite 100 Compliance Restoration Brighton, MI 48116 Mailing Address: P.O. Box 2160 Brighton, MI 48116-2160 800 395-ASTI Fax: 810.225.3800 www.asti-env.com

More information

Comprehensive Asbestos and Lead Survey

Comprehensive Asbestos and Lead Survey Report of Comprehensive Asbestos and Lead Survey Prepared for: City of Garland 200 N. 5th Street Garland, TX 75040 Building Surveyed: Garland Civic Theater Garland, TX Report Date: Friday, September 16,

More information

DALLAS FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 1 FIRE STATION NO. 5 HVAC SYSTEM REPLACEMENT CONTRACT NO

DALLAS FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 1 FIRE STATION NO. 5 HVAC SYSTEM REPLACEMENT CONTRACT NO DALLAS FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 1 FIRE STATION NO. 5 HVAC SYSTEM REPLACEMENT CONTRACT NO. 9500664 December 3, 2018 The Request for Bids for the above is hereby revised as follows:

More information

Material Description Quantity Asbestos Content Location

Material Description Quantity Asbestos Content Location May 3, 2018 Ms. Jessica Kenney Boulder Housing Partners 4800 Broadway Street Boulder, Colorado 80304 RE: Asbestos-Containing Building Materials Survey Glen Willow 303 333 Pearl Street, Boulder, Colorado

More information

The following non-friable asbestos products were identified at the site:

The following non-friable asbestos products were identified at the site: April 27, 2018 Ms. Jessica Kenney Boulder Housing Partners 4800 Broadway Street Boulder, Colorado 80304 RE: Limited Asbestos-Containing Building Materials Survey Canyon Point Apartments First Floor 700

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

ASBESTOS INSPECTION REPORT 3801 HARNEY STREET OMAHA, NEBRASKA 68132

ASBESTOS INSPECTION REPORT 3801 HARNEY STREET OMAHA, NEBRASKA 68132 ASBESTOS INSPECTION REPORT 3801 HARNEY STREET OMAHA, NEBRASKA 68132 Prepared For: Women s Center for Advancement 222 South 29 th Street Omaha, Nebraska 68131 June 20, 2016 Prepared By: New Horizons Enterprises,

More information

Limited Asbestos Demolition Survey

Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600

More information

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM # 1 To: File 1601-909-62-4465 - IFB for: 24 Gus Garcia Demolition and Reconstruction Please note the following change:

More information

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. Barton Malow/Clark MSU Spartan Stadium 58 Shaw Lane East Lansing, Michigan

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. Barton Malow/Clark MSU Spartan Stadium 58 Shaw Lane East Lansing, Michigan POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for Barton Malow/Clark MSU Spartan Stadium 58 Shaw Lane East Lansing, Michigan 48824-1215 at Michigan State University I.M. West Building East

More information

Asbestos Inspection Cover Letter

Asbestos Inspection Cover Letter Asbestos Inspection Cover Letter Date Issued: January 27, 2016 Site Name/Location Residential Structure 4 Cauthen Street Rock Hill, South Carolina Asbestos Inspection Performed For Hank Williams Right

More information

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 at the Dairy Cattle Teaching and Research Center Building

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Hazardous Materials Inspection Services Seekonk Public Library, Seekonk, MA

Hazardous Materials Inspection Services Seekonk Public Library, Seekonk, MA January 10, 2017 Mr. Christopher Blessen Principal Tappe & Associates 6 Edgerly Place Boston, MA 02116 Reference: Hazardous Materials Inspection Services Seekonk Public Library, Seekonk, MA Dear Mr. Blessen:

More information

ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, and (a)(4)

ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, and (a)(4) ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, 763.86 and 763.85(a)(4) Assessment Completed for Clint Moore, ASLA Planning, Research and Development City of Florence 324 West Evans Street

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Physical Plant Division Engineering and Architectural Services Department

More information

NARRATIVE REPORT. Robinson Hall was originally constructed in 1976; there was a 2001 renovation throughout the building.

NARRATIVE REPORT. Robinson Hall was originally constructed in 1976; there was a 2001 renovation throughout the building. NARRATIVE REPORT 1.0 BUILDING INFORMATION Robinson Hall was originally constructed in 1976; there was a 2001 renovation throughout the building. Robinson Hall is a one-story, 10,402 ft 2 building which

More information

LIMITED ASBESTOS ASSESSMENT

LIMITED ASBESTOS ASSESSMENT LIMITED ASBESTOS ASSESSMENT FORMER DORAN MILL SITE 404 POLKVILLE ROAD SHELBY, NORTH CAROLINA 28150 ECS PROJECT NO. 49:4683 FOR CLEVELAND COUNTY ECONOMIC DEVELOPMENT JUNE 30, 2017 June 30, 2017 Mr. Matt

More information

ASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY:

ASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY: ASBESTOS SURVEY Old Detective s Building Wadesboro, NC PREPARED FOR: Alex Sewell Town Manager Town of Wadesboro 124 E. Wade Street Wadesboro, NC Date of Inspection September 28, 2016 Date of Report October

More information

ROY CONSULTING GROUP CORPORATION 9823 Balmoral Circle Charlotte, North Carolina Phone: Fax:

ROY CONSULTING GROUP CORPORATION 9823 Balmoral Circle Charlotte, North Carolina Phone: Fax: ROY CONSULTING GROUP CORPORATION 9823 Balmoral Circle Charlotte, North Carolina 28210 Phone: 704.968.4111 Fax: 704.553.9458 March 27, 2015 Mr. Barry Blevins Harnett County General Services 103 East Ivey

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

LIMITED SUPPLEMENTAL ASBESTOS AND LEAD PAINT SURVEY REPORT. Highland Park Middle School 7000 SW Wilson Avenue Beaverton, OR 97008

LIMITED SUPPLEMENTAL ASBESTOS AND LEAD PAINT SURVEY REPORT. Highland Park Middle School 7000 SW Wilson Avenue Beaverton, OR 97008 LIMITED SUPPLEMENTAL ASBESTOS AND LEAD PAINT SURVEY REPORT Highland Park Middle School 7000 SW Wilson Avenue Beaverton, OR 97008 Prepared for: Beaverton School District 16550 SW Merlo Road Beaverton, OR

More information

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 at the Demonstration Hall Building #57 East Lansing, Michigan

More information

Comprehensive Asbestos & Lead Base Paint Survey

Comprehensive Asbestos & Lead Base Paint Survey Report of Comprehensive Asbestos & Lead Base Paint Survey Prepared for: Freese and Nichols, Inc. 4055 International Plaza, Suite 200 Fort Worth, TX 76109 Building Surveyed: Readiness Center National Guard

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2286

More information

AHERA/NESHAP ASBESTOS INSPECTION REPORT 460 FEWELL STREET ROCK HILL, SC. CLIENT: City of Rock Hill P.O. Box Rock Hill, SC 29731

AHERA/NESHAP ASBESTOS INSPECTION REPORT 460 FEWELL STREET ROCK HILL, SC. CLIENT: City of Rock Hill P.O. Box Rock Hill, SC 29731 AHERA/NESHAP ASBESTOS INSPECTION REPORT 460 FEWELL STREET ROCK HILL, SC CLIENT: City of Rock Hill P.O. Box 11706 Rock Hill, SC 29731 LOCATION: 460 Fewell Street Rock Hill, SC 29730 DATE OF INSPECTION:

More information

NARRATIVE REPORT. Underlayment Paper for Linoleum. Window Glazing (4 types)

NARRATIVE REPORT. Underlayment Paper for Linoleum. Window Glazing (4 types) NARRATIVE REPORT 1.0 BUILDING INFORMATION Auxiliary Enterprises was originally constructed in 1971; an addition in 1979 installed coolers in the building, an addition in 1985 extended the building to the

More information

1.0 Executive Summary

1.0 Executive Summary & Hazardous Materials Inspection 1.0 Executive Summary [Client] contracted with Parks Environmental Consulting, Inc. (Parks) to perform an inspection and sampling for asbestos-containing materials (ACM)

More information

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION NARRATIVE REPORT 1.0 BUILDING INFORMATION Bentson Bunker Fieldhouse was originally constructed in 1931; the building has had several renovations, notably, a 1976-1980 multi-phase renovation throughout

More information

Asbestos and TCLP Survey

Asbestos and TCLP Survey Asbestos and TCLP Survey Former Tannery Building 3723 Abbotts Bridge Road Duluth, Georgia 30096 October 12, 2015 Terracon Project No. 49157726 Prepared for: City of Duluth Duluth, Georgia Prepared by:

More information

Michigan State University

Michigan State University Michigan State University ASBESTOS BUILDING INSPECTION REPORT Botany Field Lab (Plant Pathology) Building Number 452 Inspection conducted by Zach Hansmann Office of Environmental Health and Safety 150

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for Michigan State University Engineering and Architectural Services Physical Plant Building, Room 101 East Lansing, Michigan 48824-1326 at Michigan

More information

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION NARRATIVE REPORT 1.0 BUILDING INFORMATION Putnam Hall was originally constructed in 1905; there appears to have been several renovations, notably, a 1982 renovation throughout the basement and a 1983 renovation

More information

ASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON

ASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON ASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON May 23, 2007 Prepared for: Mr. Ron Smith GSA 400-15 th Street SW

More information

Please refer to the attached AEC report for survey details and analytical results.

Please refer to the attached AEC report for survey details and analytical results. August 8, 2013 Mr. Richard Higgins Norstar Development USA, L.P. 733 Broadway Albany, New York 12207 Re: Asbestos Containing Material Survey Baker Commons 106 Packard Street, Ann Arbor, Michigan ERG Project

More information

Limited Asbestos-Containing Materials Inspection Platt Road Ann Arbor, Michigan. Ann Arbor Housing Commission.

Limited Asbestos-Containing Materials Inspection Platt Road Ann Arbor, Michigan. Ann Arbor Housing Commission. Limited Asbestos-Containing Materials Inspection 3451-3457 Platt Road Ann Arbor, Michigan Ann Arbor Housing Commission November 11, 2013 Limited Asbestos-Containing Materials Inspection 3451-3457 Platt

More information

ASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL

ASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL Project #: 13916 ASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland

More information

POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT. for

POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT. for POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT for Michigan State University Engineering and Architectural Services Physical Plant Division East Lansing, Michigan 48823 at the Owen Graduate

More information

Hikone. Sincerely, Enclosures

Hikone. Sincerely, Enclosures August 8, 2013 Mr. Richard Higgins Norstar Development USA, L.P. 733 Broadway Albany, New York 12207 Re: Asbestos Containing Material Survey Hikone 2702 2760 Hikone Road, Ann Arbor, Michigan ERG Project

More information

LIMITED PRE-RENOVATION ASBESTOS BUILDING SURVEY

LIMITED PRE-RENOVATION ASBESTOS BUILDING SURVEY HNYEnvironmental Services, Inc. 430 Catherine Street Utica, New York 13501 Phone 315-733-0191 Fax 315-735-4922 hnyenvironmental@gmail.com LIMITED PRE-RENOVATION ASBESTOS BUILDING SURVEY Former Gander Mountain

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

LIMITED ASBESTOS SURVEY OF BRITT HALL ROOMS 311, 314, 314 (A-G) 1170 SISKIYOU BLVD., ASHLAND, OREGON FOR SOUTHERN OREGON UNIVERSITY

LIMITED ASBESTOS SURVEY OF BRITT HALL ROOMS 311, 314, 314 (A-G) 1170 SISKIYOU BLVD., ASHLAND, OREGON FOR SOUTHERN OREGON UNIVERSITY C 3 Coleman Creek Consulting, Inc. LIMITED ASBESTOS SURVEY OF BRITT HALL ROOMS 311, 314, 314 (A-G) 1170 SISKIYOU BLVD., ASHLA, OREGON FOR SOUTHERN OREGON UNIVERSITY INTRODUCTION Coleman Creek Consulting,

More information

Perspectives Charter School - IIT Math and Science Academy

Perspectives Charter School - IIT Math and Science Academy ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. January 7, 2010 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Nokomis Montessori School Asbestos Inspection Project #0924022 Dear Ted, Enclosed please find the inspection

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION NARRATIVE REPORT 1.0 BUILDING INFORMATION West Dining Center was originally constructed in 1972; although specific information could not be located, small renovations are evident. West Dining Center is

More information

EVALUATION ON PROJECT Prepared for: Carson. City, Nevada

EVALUATION ON PROJECT Prepared for: Carson. City, Nevada HAZARDOUS MATERIALS EVALUATION STRUCTURAL DEMOLITIO ON PROJECT 162-04-501-0033 1111 DESERT LANE LAS VEGAS, NEVADA Prepared for: Nevada Department of Transportation 1263 South Stewart Street Carson City,

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2080

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

AHERA/NESHAP ASBESTOS INSPECTION REPORT. CLIENT: City of Florence 324 West Evans Street Florence, SC (843)

AHERA/NESHAP ASBESTOS INSPECTION REPORT. CLIENT: City of Florence 324 West Evans Street Florence, SC (843) AHERA/NESHAP ASBESTOS INSPECTION REPORT CLIENT: City of Florence 324 West Evans Street Florence, SC 29501-3430 (843) 665-3173 LOCATION: 558 N. Alexander Street Florence, SC 29501 DATE OF INSPECTION: September

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Prepared for: Northside Development Group 410 Magnolia Street Spartanburg, South Carolina Prepared by: Apex Environmental

More information

AHERA/NESHAP ASBESTOS INSPECTION REPORT

AHERA/NESHAP ASBESTOS INSPECTION REPORT AHERA/NESHAP ASBESTOS INSPECTION REPORT CLIENT: Lynwood Givens City of Florence Purchasing Agent 324 West Evans Street Florence, SC 29501-3430 (843) 665-3173 LOCATION: 406 Railroad Ave Florence, SC DATE

More information

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan July 13, 2011 TTL Project No. 7615.02 Ms. Paula Boase Downriver Community Conference Brownfield Consortium 15100 Northline Road Southgate, Michigan 48195 Dear Ms. Boase: NESHAP Asbestos and Limited Hazardous

More information

Asbestos Survey Proposed Roosevelt Development Roosevelt Way NE Seattle, King County, Washington

Asbestos Survey Proposed Roosevelt Development Roosevelt Way NE Seattle, King County, Washington Asbestos Survey Proposed Roosevelt Development 6814-6820 Roosevelt Way NE Seattle, King County, Washington June 19, 2015 Terracon Project No. 81157083 Prepared for: Seattle, Washington Prepared by: Terracon

More information

ASBESTOS INSPECTION FOR LASALLE ROAD MONTROSE, CO

ASBESTOS INSPECTION FOR LASALLE ROAD MONTROSE, CO ASBESTOS INSPECTION FOR 61935 LASALLE ROAD MONTROSE, CO Prepared for: Montrose County 949 N. 2 nd Street Montrose, CO Prepared by: July 27, 2018 Montrose County 949 N. 2 nd Street Montrose, CO 81401 Attn.:

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2168

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

MICHIGAN STATE UNIVERSITY

MICHIGAN STATE UNIVERSITY ASBESTOS SURVEY REPORT MICHIGAN STATE UNIVERSITY CENTER FOR INTEGRATIVE PLANT SYSTEMS EAST LANSING, MICHIGAN Prepared By: TEK Environmental & Consulting Services, Inc. 9670 Chilson Commons Circle Suite

More information

Limited Hazardous Materials Survey Report

Limited Hazardous Materials Survey Report Limited Hazardous Materials Survey Report Applied Arts and Administrative (AA) Building Contra Costa College 2600 Mission Bell Drive San Pablo, California Project No: R1177058 March 12, 2017 Prepared for:

More information

HAZARDOUS MATERIALS EVALUATION STRUCTURAL DEMOLITION PROJECT LOCH LOMOND WAY LAS VEGAS, NEVADA. Prepared for:

HAZARDOUS MATERIALS EVALUATION STRUCTURAL DEMOLITION PROJECT LOCH LOMOND WAY LAS VEGAS, NEVADA. Prepared for: HAZARDOUS MATERIALS EVALUATION STRUCTURAL DEMOLITION PROJECT 162-04-311-025 1801 LOCH LOMO WAY LAS VEGAS, NEVADA Prepared for: Nevada Department of Transportation 1263 South Stewart Street Carson City,

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax:

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax: Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: 937-335-8807 Troy, OH 45373 Dayton, OH 45402 Fax: 937-339-4882 November 23, 2015 Mr. Dennis Zimmer City of Dayton, Division

More information

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. SSOE, Inc Wilshire Drive Suite 260 Troy, Michigan 48084

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. SSOE, Inc Wilshire Drive Suite 260 Troy, Michigan 48084 POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for SSOE, Inc. 1050 Wilshire Drive Suite 260 Troy, Michigan 48084 at Michigan State University Physics Astronomy Building (Now Psychology) East

More information

Noble Street Charter - UIC College Prep

Noble Street Charter - UIC College Prep ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-3770

More information

TARGETED ASBESTOS SAMPLING RESULTS BERND and RILEY ELEMENTARY SCHOOLS MACON, GEORGIA GEC JOB # PREPARED FOR

TARGETED ASBESTOS SAMPLING RESULTS BERND and RILEY ELEMENTARY SCHOOLS MACON, GEORGIA GEC JOB # PREPARED FOR TARGETED ASBESTOS SAMPLING RESULTS BER and RILEY ELEMENTARY SCHOOLS MACON, GEORGIA GEC JOB #40743.40 PREPARED FOR MS. CHERYL CANTY-AARON SAFETY & ENVIRONMENTAL MANAGER BIBB COUNTY BOARD OF EDUCATION 446

More information

Lake Linden Hubbell Public Schools 2017 Facility Improvements

Lake Linden Hubbell Public Schools 2017 Facility Improvements ADDENDUM NO. 2 DATE: February 23, 2017 PROJECT: OWNER: BID DATE: Lake Linden Hubbell Public Schools 2017 Facility Improvements Lake Linden Hubbell Public Schools Tuesday, February 28, 2017 at 4:00 PM The

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Ben Ystenes, Manager, Zone 5, Facilities Management, 19 Scott Hall

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Ben Ystenes, Manager, Zone 5, Facilities Management, 19 Scott Hall July 5, 2007 REPORT: Full Building Survey TO: Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Ben Ystenes, Manager, Zone 5, Facilities Management, 19 Scott Hall FROM: Dale

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2121

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall July 3, 2007 REPORT: Full Building Survey TO: Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall FROM: Bryan

More information

Three Year Asbestos Re-Inspection Report. Battle Creek Montessori Academy th Street Springfield, Michigan

Three Year Asbestos Re-Inspection Report. Battle Creek Montessori Academy th Street Springfield, Michigan Three Year Asbestos Re-Inspection Report For Battle Creek Montessori Academy 399 20 th Street Springfield, Michigan Prepared by: Northern Analytical Services, LLC. 14870 225 th Avenue Big Rapids, Michigan

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

TEXAS CONSULTING SERVICES PO Box 9910 * Midland, Texas Phone: (432) * Fax: (432)

TEXAS CONSULTING SERVICES PO Box 9910 * Midland, Texas Phone: (432) * Fax: (432) TEXAS CONSULTING SERVICES PO Box 9910 * Midland, Texas 79708 Phone: (432) 687-5455 * Fax: (432) 687-5456 Email: Txcs65@yahoo.com May 28, 2015 City of Odessa Community Development PO Box 4398 Odessa, Texas

More information

HAZARDOUS MATERIALS SURVEY IN SUPPORT OF PROJECT. Reconfigure Security Flight Sim Bldg 2048 Project Number: GJKZ

HAZARDOUS MATERIALS SURVEY IN SUPPORT OF PROJECT. Reconfigure Security Flight Sim Bldg 2048 Project Number: GJKZ HAZARDOUS MATERIALS SURVEY IN SUPPORT OF PROJECT Reconfigure Security Flight Sim Bldg 2048 Project Number: AT FAIRCHILD AIR FORCE BASE, WASHINGTON Contract.: FA4620-10-D-B001 Task Order.: 0027 February

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos & Lead Based Paint Assessment City of Spartanburg 250 Palisade Street Spartanburg, South Carolina

Asbestos & Lead Based Paint Assessment City of Spartanburg 250 Palisade Street Spartanburg, South Carolina Asbestos & Lead Based Paint Assessment City of Spartanburg 250 Palisade Street Spartanburg, South Carolina Prepared for: The City of Spartanburg 201 Caulder Avenue Spartanburg, South Carolina Prepared

More information

Asbestos Inspection Report

Asbestos Inspection Report ECH CONSULTANTS Asbestos Inspection Report 113 E. Pine Street Florence, South Carolina Prepared for: The City of Florence Prepared by: Enga Hair, AHERA Building Inspector License #BI-01591 Project Number:18-192-1

More information