Indiana University. Vice President for Capital Planning and Facilities

Size: px
Start display at page:

Download "Indiana University. Vice President for Capital Planning and Facilities"

Transcription

1 Indiana University Vice President for Capital Planning and Facilities DELIVERABLES REQUIREMENTS for CONSTRUCTION DOCUMENTS and AS-BUILT & RECORD DOCUMENTS Revised June 1,

2 Overview of Project Document Deliverables PROJECT SIZE CATEGORIES: Deliverable requirements of construction projects for Indiana University are based on estimated projected costs associated within the scope of work. There are three categories: 1. Projects with an estimated cost at or over $5,000,000 and which would be publicly bid; 2. Projects with an estimated cost under $5,000,000 while also greater than $150,000 and which would be publicly bid; 3. Projects with an estimated cost at or under $150,000 for which invitational bidding would be solicited from pre-qualified contractors; and projects for which pricing was procured through Job Order Contracting (JOC) or other methods not qualifying for categories 1 or 2 above. STANDARD TIME POINTS: While specific requirements for deliverables associated with each of the three above categories vary, the time points establishing the submission of contractual document deliverables for these categories do not. The following time points are based on long-standing practices followed by architects, engineers and contractors. Contract Documents: The process begins with review and acceptance of the construction design documents, known as Contract Documents, or commonly referred to as CD s ; these being either prepared by architectural and or engineering design consultants performing under contract to the University, or by IU s in-house design professionals. Bid Documents: The CD documents (construction drawings, plans, specifications) along with bidding documents and any addendums, are presented as the project s bid documents to construction contractors for competitive bidding. Then the selected contractor will use these documents to effect the project s defined construction. As-built and Record Documents: During the construction phase, changes to the project that modify intent described in original Bid Documents (bid-upon set of plans and specifications) may arise. 1. As-built (or Field Data Set): Changes are recorded by the contractor, resulting in an asbuilt set (paper or electronic) documents, which are maintained by the contractor through the project s construction and then submitted by the contractor to the designer. 2. Record Drawings: The designer compiles all As-builts submitted by contractor(s) into Record Drawings and/or Record BIM model(s), with the design consultant s concurring review of what changes were denoted, why they were made (such as accepted alternate or a found condition, etc.), and where they occurred. Bid Document Deliverables are prepared for the University by a design professional (either consultants performing under contract to the University, or by the University s in-house design professionals when there is no consultant under contract for the project). Bid documents consist of construction drawings, plans, specifications, along with bidding directions and any addendums, in either or both of written and graphic formats. The design professional electronically transmits in.pdf format the full set of construction drawings, specification sections and the addenda to those documents. The University s printing contractor is responsible for paper reproduction and distribution to contractors who have registered to receive the bid documents in order to publically offer a bid proposal for construction of the project. Contract or Construction Documents Deliverables are the same issue of documents cited in the paragraph above, however these deliverables are to be submitted to the University as they were natively created - in Revit.rvt and/or AutoCAD.dwg format and in Word.docx format. These file types are commonly required for public and invitational bid contracts. Within 10 days following award of bid for contract for construction, the design consultant must provide the UAO with one set of files in digital/electronic format as follows: 2

3 1. CAD Files; one file each - representing every sheet in the bid documents and with Addenda incorporated. Native CAD files shall be in.dwg format, one file for each sheet in the complete set with all xrefs fully bound. These documents must comply with University Architects Office CAD Standards. Use of AutoCAD e-transmit is recommended to bind each file. 2. Word processing files: all specifications shall be in native Word docx format (other than those provided by IU Business Office for Divisions 0 & 1). 3. Revit files: a design model for each discipline. Refer to Indiana University BIM Guidelines and standards for Architects, Engineers and Contractors. 4. COBie design submittal: When the design of scope of work designates installation of operating building equipment requiring on-going regular maintenance, a COBIE Design submittal is also required to be submitted in standard COBie xlsx workbook format with worksheet info completed for each of the following tabs at a minimum: (Tab2) Facility-ies referenced in the design; (Tab3)(Floor) description of vertical levels; (Tab4) Spaces referenced in the project; (Tab5) System- systems referenced in the project; referenced in the project; (Tab6) Register-material or equipment types(submittal register); (Tab7) Component Individually named materials and equipment. As-Built Deliverables are revisions to the construction documents based on changes that occur in the field. Contractor marks changes onto a field set of prints of the construction plans (required by their contract to be kept on site) as a log, denoting what and where the changes were made. The entire field set of plans denoting the changes are either scanned or created electronically by the contractor such that they clearly show and differentiate changed elements from originally intended. The resultant contractor s field set drawing files (.pdf format file) must then be submitted to the design professional for review and to allow for producing necessary revisions to the native design program, whether created in a Revit Model or AutoCAD.dwg files. Changes may be indicated by either graphics or notations. The revised version recording all the changes in the field to the original construction documents is called a Record Drawing, created by the design professional. The submission of the contractor s field set scans and the revised native design files must be in accord for acceptance by the University of these two as-built documents. The University requires electronic project deliverables be submitted via hard copy (CD or DVD). The deliverable should include:.dwg files for each document sheet, and all addenda & specification files. Use of AutoCAD e-transmit to bind all.dwg files is recommended to insure that no x-ref files, text files, or plot styles are lost in the submittal. Refer to the Document Deliverables Matrix below for additional deliverables and their format(s). Specific requirements for Contractor s field record of changes to contract drawings: The Contractor shall keep at the construction site a complete set of full size prints of the contract drawings, reproduced at Contractor expense. During construction, these prints shall be marked to show all deviations in actual construction from the contract drawings. The color red shall be used to indicate all additions and green to indicate all deletions. The drawings shall show the following information but not be limited thereto: a. The locations and description of any utility lines and other installations of any kind or description known to exist within the construction area. The location includes dimensions and elevations of permanent features. b. The locations and dimension of any changes within the building or structure, and the accurate location and dimension of all underground utilities and facilities. 3

4 c. Correct grade or alignment of roads, structures, and utilities if any changes were made from contract plans. d. Correct elevations if changes were made in site grading from the contract plans. e. Changes in details of design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor including, but not limited to, fabrication erection, installation, and placing details, pipe sizes, insulation material, dimensions of equipment foundations, etc. f. The topography and grades of all drainage installed or affected as part of the project construction. g. All changes or modifications from the original design and from the final inspection. h. Where contract drawings or specifications allow options, only the option actually used in the construction shall be shown on the as-built drawings. The option not used shall be indicated as deleted. These deviations shall be shown in the same general detail utilized in the contract drawings. Markings of the prints shall be pursued continuously during construction to keep them up to date. This information shall be maintained in a current condition at all times until the completion of the work. The resulting field-marked data shall be referred to and marked as As-Built Field Data and shall be used for no other purpose. They shall be made available for inspection by IU s representative whenever requested during construction and shall be jointly inspected for accuracy and completeness by IU s representative and a responsible representative of the Contractor prior to submission of each monthly pay estimate. Failure to keep the As-Built Field Data (including Equipment-in-Place lists in the COBIE spreadsheet) current shall be sufficient justification to withhold a retained percentage from the monthly pay estimate. Close-out / As-Built Documents Deliverable Requirements Indiana University requires that the As-Built Documents Deliverable be submitted via hard copy (CD or DVD and Paper). The electronic portion of this deliverable should include:.dwg files for each document sheet,.pdf files for each document sheet, As-built Field Data Set (a.pdf of each sheet), and O & M Manuals. When a sheet has no changes, it still must be included along with a notation of no changes on it. Use AutoCAD e-transmit to bind all.dwg files; this is the best way to insure that no x-ref files, text files, or plot styles are lost in the submittal. Follow the As- Built Document Matrix below to determine the responsible party for each deliverable, and in what format. O&M (Operations & Maintenance) Manuals The contractor shall submit to Indiana University one pdf of the O&M manuals along with the Construction Operations Building Information Exchange (COBIE) file; which shall include: (1) the make, model and serial number of each piece of installed equipment, (2) the location of any equipment installed in the building. As-Built and Record Document Deliverable Matrix The following matrix outlines the various As-Built and Record Documents deliverables that are required on two different project categories with the associated responsible parties that will be in place for contracts entered into as of February 1, All deliverables indentified in this article are to be provided as indicated. Document Deliverables Matrix The following matrix outlines the Document deliverables required on three different project categories; indicating the associated responsible parties. All deliverables identified in this article are to be provided as indicated. 4

5 Responsible Parties A/E = Architect/Engineer C = Contractor Category 1: for Bid Projects with an estimated project cost at or over $5 million: Construction Documents Deliverables Resp. Party Quantity Format Due Date IU BIM Proficiency Matrix A/E 1 set.xlsx Prior to selection as required IU BIM Execution Plan A/E, C 1 set.docx 30 days after contract awarded Design BIM Model(s) A/E 1 set.rvt 10 days after construction contract is awarded Construction Document CAD Drawings A/E 1 set.dwg &.pdf 10 days after construction contract is awarded Addenda A/E 1 set.docx &.pdf 10 days after construction contract is awarded Specifications A/E 1 set.docx &.pdf 10 days after construction contract is awarded COBie Data (COBie setup) A/E 1 set.xlsx 10 days after construction contract is awarded As-built and Record Documents Deliverables Resp. Party Quantity Format Due Date Record Document CAD Drawings and all project Affidavit(s) A/E (see note) (see note) * 1 set each.pdf &.dwg on CD or DVD as well as 2 sets hard copy (paper). Prior to Final Payment As-Built Field Mark-ups - Files and/or Scans C 1 set.pdf & hard At Substantial Completion & Prior to Final Payment Operations & Maintenance Manuals (O&M) C 1 set.pdf & hard At Substantial Completion & Prior to Final Payment COBie Construction Data C 1 set.xlsx Prior to Final Payment As-Built BIM Model(s) A/E 1 set.rvt Prior to Final Payment Category 2: for Bid Projects with an estimated project cost under $5 million: Construction Documents Deliverables Resp. Party Quantity Format Due Date Construction Document CAD Drawings A/E 1 set.dwg &.pdf 10 days after construction contract is awarded Addenda A/E 1 set.docx &.pdf 10 days after construction contract is awarded Specifications A/E 1 set.docx &.pdf 10 days after construction contract is awarded COBie Data (COBie setup) A/E 1 set.xlsx 10 days after construction contract is awarded As-built and Record Documents Deliverables Resp. Party Quantity Format Due Date Record Document CAD Drawings and all project Affidavit(s) A/E (see note) (see note) * 1 set each.pdf &.dwg on CD or DVD as well as 2 sets hard copy (paper). Prior to Final Payment As-Built Field Mark-ups - Files and/or Scans C 1 set.pdf & hard At Substantial Completion & Prior to Final Payment Operations & Maintenance Manuals (O&M) C 1 set.pdf & hard At Substantial Completion & Prior to Final Payment COBie Construction Data C 1 set.xlsx Prior to Final Payment 5

6 Category 3: non-public bid Projects at or under $150,000 of invitational bidding from contractors, or procured through job order contracting (JOC), or other methods not qualifying for categories 1 or 2: Construction Documents Deliverables Resp. Party Quantity Format Due Date Construction Document CAD Drawings A/E 1 set.dwg &.pdf 10 days after construction contract is awarded Addenda A/E 1 set.docx &.pdf 10 days after construction contract is awarded Specifications A/E 1 set.docx &.pdf 10 days after construction contract is awarded As-built and Record Documents Deliverables Resp. Party Quantity Format Due Date Record Document CAD Drawings and all project Affidavit(s) A/E (see note) (see note) * 1 set each.pdf &.dwg on CD or DVD as well as 2 sets hard copy (paper). Prior to Final Payment As-Built Field Mark-ups - Files and/or Scans C 1 set.pdf & hard At Substantial Completion & Prior to Final Payment Operations & Maintenance Manuals (O&M) C 1 set.pdf At Substantial Completion & Prior to Final Payment Responsible Parties A/E = Architect/Engineer C = Contractor Responsible Party shall not be relieved of responsibility when files delivered do not meet established requirements or are defective. Indiana University shall verify all files and the Owner s Representative shall be notified of acceptance. Submittal Standards BIM (Building Information Modeling) - refer to requirements in The Indiana University Building Information Modeling (BIM) Guidelines For Architects, Engineers, and Contractors at: CAD (Computer Aided Design) - refer to the Indiana University and National CAD Standards as outlined at: COBIE (Construction Operations Building Information Exchange) - for spreadsheets, instructions, and guidance go to: COBie 2.26* is the version to be used. (*8-9-15: made correction in bold) GIS/SITE for Site, Civil, Landscape and Utilities guidance go to: File Format Standards BIM - Autodesk Revit.rvt - Revit version should closely be coordinated with entire team and Owner and indicated in IU BIM Execution Plan CAD - Autodesk AutoCAD.dwg - format should be AutoCAD version 2014.dwg (AutoCAD release 2014) and each file named for each individual drawing sheet PDF - Adobe pdf format should be configured to allow for text searches and printing. Pdfs should also be rotated to drawing/sheet orientation. Files should be named to match the individual sheet/drawing number. RVT (see BIM above). 6

7 Definitions Affidavit Signed letter affirmation to the University. A Code Affidavit would be the Architect/Engineer s assurance of project s design meeting current required restrictive codes and laws (such as ADA), and will also list any/all unique deviations allowed by the State to be taken, such as any variance(s). Environmental Affidavit would be the Architect/Engineer s assurance of project s design meeting current required environmental codes and laws, and will also list any and all unique deviations that may have been allowed by the legal jurisdiction. Check with Team Leader for required affidavits on project. As-Built Documents - As-built documents are the collection of paper drawings or electronic drawings that typically reside in the contractor s onsite trailer that contain mark-ups, annotations, and comments about changes that have been made to the contract documents during the construction phase. As-Built Model - Design Intent Models that have been updated throughout the construction process. These changes and updates have been communicated from the Contractor to the Design Team through the comments, annotations, and markups from the As-Built Documents. These typically, but not always, are discipline-specific models. Building Information Model (BIM) - A digital representation of physical and functional characteristics of a facility; a shared knowledge resource for information about a facility forming a reliable basis of decisions during life-cycle, which is defined as existing conception to demolition. BIM Execution Plan (BEP) - A plan that is created from Indiana Universities BIM Execution Plan Template that is to be submitted thirty (30) days after contract award. The BEP helps to define roles and responsibilities within a project team. BIM Proficiency Matrix (BPM) - A matrix that was designed to measure the expertise of a firm as it relates to using a BIM process on projects. It will be used by Indiana University as one of the many selection criteria during the selection process. C.O.B.i.e. Construction Operations Building Information Exchange COBIE spreadsheet replaces submission of multiple copies of paper documents delivered at the conclusion of construction. The data required by COBIE is the same information as is currently required by project handover/o&m data. The contractor is to insert installed equipment data in the spreadsheet that will link into designer provided space, and installation information. Operations and Maintenance Manuals (O&M s) Includes all manufacturers warrantee information, product data and maintenance requirements and recommendations as would be required to properly and safely maintain installed building elements and equipment and maintain the warrantee status of same. Also shall include all temperature control drawings, fire protection system documents, security system documents, and Interior Finishes binders (in format as required by UAO Interiors Dept.) Record Drawing - The production of Record Drawings is the capturing of the As-Built Documents annotations, comments, and mark-ups in a drawing format only. This requirement is separate of any updating of any models. Related Documents (for others see VPCPF website: Building Design Standards - CADD Standards G.I.S. Drawing Procedure - Engineering Deliverables - Interiors Standards (web page under construction as of date of this edition of this document) Site and Landscape Standards - Space Planning Guidelines - [End of Document] 7

BIM Design & Construction Requirements Indiana University

BIM Design & Construction Requirements Indiana University BIM Design & Construction Requirements Indiana University AGC BIM Forum - Philadelphia October 9, 2009 www.shp.com Opening Comments Two years ago Indiana University began the process of embracing the use

More information

EXHIBIT A SCOPE OF SERVICES FOR DISTRICTWIDE CONSULTING ENGINEERNG SERVICES STRUCTURES DESIGN

EXHIBIT A SCOPE OF SERVICES FOR DISTRICTWIDE CONSULTING ENGINEERNG SERVICES STRUCTURES DESIGN EXHIBIT A SCOPE OF SERVICES FOR DISTRICTWIDE CONSULTING ENGINEERNG SERVICES STRUCTURES DESIGN Financial Project ID: 417069-1-32-04 Work Program Item No.: N/A Federal Aid Project ID: County/Section No.:

More information

1.0 ABOUT THE NU GUIDELINES

1.0 ABOUT THE NU GUIDELINES Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner

More information

[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT B , STANDARD FORM OF ARCHITECT S SERVICES: DESIGN AND CONTRACT ADMINISTRATION

[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT B , STANDARD FORM OF ARCHITECT S SERVICES: DESIGN AND CONTRACT ADMINISTRATION [JURISDICTION] S AMENDMENTS TO AIA DOCUMENT B141-1997, STANDARD FORM OF ARCHITECT S SERVICES: DESIGN AND CONTRACT ADMINISTRATION ARTICLE 2.1. PROJECT ADMINISTRATION SERVICES. Paragraph 2.1.2. Paragraph

More information

State of Tennessee Office of the State Architect {TN OSA) Building Information Modeling {BIM) Requirements. Version 1.0

State of Tennessee Office of the State Architect {TN OSA) Building Information Modeling {BIM) Requirements. Version 1.0 State of Tennessee Office of the State Architect {TN OSA) Building Information Modeling {BIM) Requirements Version 1.0 April 22, 2013 Table of Contents 1. Introduction...... 1 1.1. Mission of the TN OSA

More information

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services Appendix D University of Maine System Supplementary Requirements to AIA Document B201-2007 Standard Form of Architect s Services This document provides the Architect s scope of services only and must be

More information

BIM Design & Construction Requirements. Follow-up Seminar. September 10,

BIM Design & Construction Requirements. Follow-up Seminar. September 10, BIM Design & Construction Requirements Follow-up Seminar September 10, 2009 www.indiana.edu/~uao/iubim.html Opening Comments Two years ago Indiana University began the process of embracing the use of Building

More information

NC State University OESAD GUIDELINES Contract Year

NC State University OESAD GUIDELINES Contract Year July 1, 2014 NC State University OESAD GUIDELINES Contract Year 2014-2016 I. Informal Projects A. Preface Based on the North Carolina Administrative Code (NCAC), Title 01, Subchapter 30D Section.0300 Selection

More information

RECITALS TERMS AND CONDITIONS. The scope of work is contained in Exhibit A, attached hereto and incorporated herein.

RECITALS TERMS AND CONDITIONS. The scope of work is contained in Exhibit A, attached hereto and incorporated herein. FIFTH AMENDMENT TO MASTER CONTRACT FOR PROFESSIONAL SERVICES FOR WASTEWATER TREATMENT PLANT ENGINEERING FINAL DESIGN SERVICES FOR THE DURHAM ADVANCED WASTEWATER TREATMENT FACILITY PRIMARY TREATMENT AND

More information

600 - Phase C Intermediate Review Checklist for the Architect- Engineer

600 - Phase C Intermediate Review Checklist for the Architect- Engineer 600 Phase C Intermediate Review Checklist for the Architect Engineer This checklist is to be used by the ArchitectEngineer during Phase C of the Project and shall be included in the Intermediate Review

More information

Exhibit A Scope of Services and Deliverables

Exhibit A Scope of Services and Deliverables Exhibit A Scope of Services and Deliverables Attachment to MnDOT Contract No. for Project Name Project # 16-TZ dated Scope of Services includes: Programming / Schematic Design Phase Design Development

More information

ACEC CAD AND BIM FOR SENIOR FIRM LEADERS

ACEC CAD AND BIM FOR SENIOR FIRM LEADERS ACEC CAD AND BIM FOR SENIOR FIRM LEADERS Michael DeLacey President Microdesk, Inc. mdelacey@microdesk.com Steve Zocco Business Development Microdesk, Inc. Szocco@Microdesk.com Agenda Changing Expectations

More information

Overview of the BIM Execution Plan... 1

Overview of the BIM Execution Plan... 1 BIM Execution Plan A guide to using industry standards, best practices and data exchange procedures in order to successfully coordinate and collaborate with other cross disciplines using BIM. Contents

More information

The Home Depot U.S.A., Inc. Instructions to Bidders

The Home Depot U.S.A., Inc. Instructions to Bidders The Home Depot U.S.A., Inc. Instructions to Bidders Home Depot Page 1 of 5 Article 1 Definitions 1.1 Bidding Documents include the Bidding Requirements and the proposed Contract Documents. The Bidding

More information

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS GENERAL The commercial bidding process is a well-defined path of positioning oneself to be the successful bidder amongst a group purporting to offer the same quality materials and labor. There are certain

More information

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Olscamp Central Chiller Plant CCP-3 Response

More information

MARCH 16, 2015 RESPONDENTS MUST ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE PROPOSAL EXECUTION PAGE

MARCH 16, 2015 RESPONDENTS MUST ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE PROPOSAL EXECUTION PAGE MARCH 16, 2015 ADDENDUM NO. 2 FOR REQUEST FOR QUALIFICATIONS ( RFQ ) FOR PROFESSIONAL ARCHITECTURE AND ENGINEERING DESIGN SERVICES SPECIFICATION NO. 127930 For which proposals are scheduled to open in

More information

CLEAN WATER SERVICES AND CAROLLO ENGINEERS, INC. RECITALS. 1. District and Consultant previously entered into the Master Contract.

CLEAN WATER SERVICES AND CAROLLO ENGINEERS, INC. RECITALS. 1. District and Consultant previously entered into the Master Contract. THIRTY-FOURTH AMENDMENT TO MASTER CONTRACT FOR WASTEWATER TREATMENT PLANT ENGINEERING SERVICES ROCK CREEK AWWTF DIGESTER 1 AND 2 MODIFICATIONS PROJECT NO. 6787 CLEAN WATER SERVICES AND CAROLLO ENGINEERS,

More information

Alberta Infrastructure. Digital Project Delivery Asset Information Management Contractor Requirements

Alberta Infrastructure. Digital Project Delivery Asset Information Management Contractor Requirements Alberta Infrastructure Digital Project Delivery Asset Information Management Contractor Requirements Table of Contents Asset Information Management Objectives 2 AIM Manager 3 AIM Execution Plan (AEP) 3

More information

Alberta Infrastructure. Digital Project Delivery Asset Information Management Design-Builder Requirements

Alberta Infrastructure. Digital Project Delivery Asset Information Management Design-Builder Requirements Alberta Infrastructure Digital Project Delivery Asset Information Management Design-Builder Requirements Table of Contents Asset Information Management Objectives 2 1. AIM Manager 3 2. AIM Execution Plan

More information

Owner has determined that this project is a Major Capital Renovation project as that term is defined herein.

Owner has determined that this project is a Major Capital Renovation project as that term is defined herein. BUILDING INFORMATION MODELING REQUIREMENTS Owner has determined that this project is a Major Capital Renovation project as that term is defined herein. PART 1 GENERAL 1.1. RELATED DOCUMENTS 1.1.1. Attention

More information

Student Government Office Renovations Design/Construction Administration Services Code Item 305

Student Government Office Renovations Design/Construction Administration Services Code Item 305 The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, NC 28223 Telephone: 704-687-0615 PROJECT: UNC Charlotte Student Government Office

More information

ATTACHMENT D SCOPE OF SERVICES

ATTACHMENT D SCOPE OF SERVICES ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.

More information

Specific requirements for individual units of work are included in the appropriate sections in Divisions 2 through 16.

Specific requirements for individual units of work are included in the appropriate sections in Divisions 2 through 16. SECTION 01 77 00 - PROJECT CLOSE-OUT PART 1 - GENERAL DESCRIPTION OF REQUIREMENTS: Definitions: Project close-out is the term used to describe certain collective project requirements, indicating completion

More information

Alberta Infrastructure. Digital Project Delivery Building Information Modelling Design-Builder Requirements

Alberta Infrastructure. Digital Project Delivery Building Information Modelling Design-Builder Requirements Alberta Infrastructure Digital Project Delivery Building Information Modelling Design-Builder Requirements Table of Contents Building Information Modelling Objective 2 1. BIM Manager 3 2. BIM Execution

More information

Alberta Infrastructure. Digital Project Delivery Building Information Modelling Consultant Requirements

Alberta Infrastructure. Digital Project Delivery Building Information Modelling Consultant Requirements Alberta Infrastructure Digital Project Delivery Building Information Modelling Consultant Requirements Table of Contents Building Information Modelling Objective 2 1. BIM Manager 3 2. BIM Execution Plan

More information

Subject: Statement of Qualifications for Public Safety Building Design

Subject: Statement of Qualifications for Public Safety Building Design March 5, 2010 Subject: Statement of Qualifications for Public Safety Building Design The City of Porterville seeks Statements of Qualification (SOQ) from qualified architectural and engineering firms for

More information

BIM Execution Plan Template. CPG-DGN-PLN-085 Revision 0 08/08/2016

BIM Execution Plan Template. CPG-DGN-PLN-085 Revision 0 08/08/2016 BIM Execution Plan Template CPG-DGN-PLN-085 Revision 0 08/08/2016 Contents Section Page References... 1 Acronyms and Abbreviations... 1 Capital Projects Group BIM Execution Plan Template Guide... 2 Tables

More information

Residence Hall Phase XVI Code Item 308 Code Item 312 Advanced Planning

Residence Hall Phase XVI Code Item 308 Code Item 312 Advanced Planning The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0558 PROJECT: UNC Charlotte Residence Hall Phase

More information

PLANNING AND EVALUATION PRELIMINARY DESIGN

PLANNING AND EVALUATION PRELIMINARY DESIGN PLANNING AND EVALUATION Project Initiation Discuss and refine client requirements Project brief, Schedule, Budget Confirm client's space needs and program Establish scope of work Obtain client-supplied

More information

CONSTRUCTION DOCUMENTS Part 1

CONSTRUCTION DOCUMENTS Part 1 Audio Presentation Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 017823 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

Building Information Modeling (BIM) Execution Plan

Building Information Modeling (BIM) Execution Plan 10/19/2017 for [Stanford Project Name] [Stanford Project Number] Developed by [Primary A/E] TABLE OF CONTENTS USE OF THE BIM EXECUTION PLAN... 3 1. PROJECT INFORMATION... 3 2. PROJECT SCHEDULE AND MILESTONES...

More information

Document B105. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project

Document B105. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project TM Document B105 2007 Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.)

More information

INSTRUCTIONS FOR USING THE MICHIGAN SCHOOL BUSINESS OFFICIALS ( MSBO ) PROTOTYPE FORM OWNER/ARCHITECT AGREEMENT WITH CONSTRUCTION MANAGER COORDINATION

INSTRUCTIONS FOR USING THE MICHIGAN SCHOOL BUSINESS OFFICIALS ( MSBO ) PROTOTYPE FORM OWNER/ARCHITECT AGREEMENT WITH CONSTRUCTION MANAGER COORDINATION INSTRUCTIONS FOR USING THE MICHIGAN SCHOOL USINESS OFFICIALS ( MSO ) PROTOTYPE FORM OWNER/ARCHITECT AGREEMENT WITH CONSTRUCTION MANAGER COORDINATION Please be advised that the purpose of this Instruction

More information

Attachment 1 Architectural Services

Attachment 1 Architectural Services A. Phase 1, Programming and Schematic Design: 1. Ascertain the requirements for each project through a meeting with the COUNTY, and a review of an existing schematic layout of each project, if such layout

More information

ADDENDUM TO USC BIM GUIDELINES VS.

ADDENDUM TO USC BIM GUIDELINES VS. Addendum for Negotiated Contracts BIM Guidelines NEGOTIATED CONTRACTS ADDENDUM TO USC BIM GUIDELINES VS. 1.6 ADDENDUM #1 Building Information Modeling (BIM) Guidelines V 1.6 (April 18,2012) FOR DELIVERY

More information

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL 1.1 GENERAL When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and maintain an effective Quality Control Program that details the methods and

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

East Village Utilities Design & Construction Administration Services Code Item 307B

East Village Utilities Design & Construction Administration Services Code Item 307B The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0615 PROJECT: UNC Charlotte East Village Utilities

More information

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition Document B132 2009 Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

SECTION CONTRACTOR QUALITY CONTROL

SECTION CONTRACTOR QUALITY CONTROL SECTION 01451 CONTRACTOR QUALITY CONTROL PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

BIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION. for the COUNTY OF ORANGEBURG. Project Number: FY

BIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION. for the COUNTY OF ORANGEBURG. Project Number: FY BIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION for the COUNTY OF ORANGEBURG Project Number: FY13-1206 October 18, 2012 1180 Columbia Avenue Suite 201 29063 (803) 781-1451

More information

REQUEST FOR QUALIFICATIONS ARCHITECTURAL

REQUEST FOR QUALIFICATIONS ARCHITECTURAL REQUEST FOR QUALIFICATIONS ARCHITECTURAL and ENGINEERING CONSULTING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS SQ # 10565 MIDDLESEX COUNTY COLLEGE 2600 WOODBRIDGE AVENUE EDISON, NEW JERSEY 08818

More information

BIM V.1 Tables A1

BIM V.1 Tables A1 APPENDIX FORMS: Note: All forms to be completed by project Architect/Engineer in conjunction with Illinois State University. APPENDIX B1: PROJECT INFORMATION 1. Owner: Illinois State University 2. Name:

More information

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order [Introductory Note to User: The following text as published describes

More information

Document B252TM 2007

Document B252TM 2007 Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation

More information

University of Washington. Request for Qualifications. Commissioning Authority Services for

University of Washington. Request for Qualifications. Commissioning Authority Services for University of Washington Request for Qualifications Commissioning Authority Services for University of Washington Fluke Hall Renovation Project Project Number: 203880 Submittal Date: July 18, 2013 at 3:00

More information

I. CHANGES TO THE SPECIFICATIONS REISSUED WITH THIS ADDENDUM

I. CHANGES TO THE SPECIFICATIONS REISSUED WITH THIS ADDENDUM I. CHANGES TO THE SPECIFICATIONS REISSUED WITH THIS ADDENDUM A. Delete the following pages and substitute the new pages which are attached and made a part of this Addendum. Changes to existing contract

More information

Attachment 8 Statement of Work (SOW)

Attachment 8 Statement of Work (SOW) Attachment 8 Statement of Work (SOW) The following requirements are necessary for successful implementation of the contract for the proposer to provide design A/E services to assist the County in the Development

More information

TRANSFER AND IMPLEMENTATION OF DATA RECORDS TO GIS READY FILES

TRANSFER AND IMPLEMENTATION OF DATA RECORDS TO GIS READY FILES FORMAL INVITATION FOR BIDS TRANSFER AND IMPLEMENTATION OF DATA RECORDS TO GIS READY FILES Solicitation No.: M-15-003-MR Addendum 2 February 9, 2015 This addendum changes the IFB, provides a sample drawing,

More information

Copyright 2010 AIA Georgia Institute of Technology Facilities Closeout Procedures. 2/15

Copyright 2010 AIA Georgia Institute of Technology Facilities Closeout Procedures. 2/15 SECTION 017700 - CLOSEOUT PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following: 1.

More information

SECTION 1.0 PROJECT REVIEW AND ACCEPTANCE PROCESS

SECTION 1.0 PROJECT REVIEW AND ACCEPTANCE PROCESS 1.1 INTRODUCTION SECTION 1.0 PROJECT REVIEW AND ACCEPTANCE PROCESS 1.1.1 This technical manual has been prepared as a guide for the design and construction of water, wastewater, and reclaimed water system

More information

OSNI PONCA OFFICE REMODEL

OSNI PONCA OFFICE REMODEL OSNI PONCA OFFICE REMODEL PROJECT MANUAL OCTOBER 2016 SCHEMMER PROJECT NO. 06571.002 OSNI PONCA OFFICE REMODEL TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000115 LIST OF DRAWING

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-01 45 00.10 20 (February 2010) Changed 1-08/17 ----------------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 45 02.10 (November 2008) UNIFIED FACILITIES

More information

Florida Cleanroom Systems

Florida Cleanroom Systems Florida Cleanroom Systems Design Build Projects / Project Quality Control Plan (PQCP) Quality Control / Quality Assurance Manual May 2010 1 TABLE OF CONTENTS Section 1: Introduction 3 1.1 Defining Plan

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018 CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) 646-5716 May 15, 2018 Request for Proposals No. G180026673 for Design Professional Services Richmond Public Schools George Mason

More information

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services... A-2. B. Architectural Programming... A-5

EXHIBIT A RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services... A-2. B. Architectural Programming... A-5 EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER A. Basic Services... A-2 B. Architectural Programming... A-5 1. Project Initiation... A-5 C. Design Services... A-6 1. Schematic Design Phase...

More information

Submission, Review and Approval of Construction Documents Submission and Review of a Completed Application for Permit

Submission, Review and Approval of Construction Documents Submission and Review of a Completed Application for Permit Building Code The Florida State University Building Code Administration Program (BCA) was established in 2001 and is responsible for ensuring that all construction activities on FSU owned facilities are

More information

Section 08 CONSTUCTION DOCUMENTS TABLE OF CONTENTS

Section 08 CONSTUCTION DOCUMENTS TABLE OF CONTENTS Section 08 CONSTUCTION DOCUMENTS TABLE OF CONTENTS 08.01 GENERAL... 22 A. REFERENCE ABBREVIATIONS... 2 B. AGREEMENT BASIS... 2 C. DESIGN PROFESSIONAL RESPONSIBILITIES... 2 D. OWNER RESPONSIBILITIES...

More information

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018 CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) 646-5716 May 15, 2018 Request for Proposals No. G180026671 for Design Professional Services Richmond Public Schools E.S.H Greene

More information

ADMINISTRATIVE DIRECTIVE #CS-04

ADMINISTRATIVE DIRECTIVE #CS-04 HILLSBOROUGH COUNTY Office of the County Administrator ADMINISTRATIVE DIRECTIVE #CS-04 SUBJECT: EFFECTIVE DATE: UTILITY COORDINATION PROCEDURES FOR HILLSBOROUGH COUNTY CONSTRUCTION PROJECTS WITHIN COUNTY

More information

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018 CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) 646-5716 May 15, 2018 Request for Proposals No. G180026674 for Design Professional Services Richmond Public Schools Elkhardt-Thompson

More information

Section I - Introduction

Section I - Introduction Section I - Introduction A. Purpose The purpose of this document is to present information to Professional Services Firms that will allow them to design projects, prepare construction documents and provide

More information

Delivering Building Information to Owners Birgitta Foster Vice President, Facilities Integration VDCO Tech, Inc.

Delivering Building Information to Owners Birgitta Foster Vice President, Facilities Integration VDCO Tech, Inc. Delivering Building Information to Owners Birgitta Foster Vice President, Facilities Integration VDCO Tech, Inc. bfoster@vdcotech.com Michael Tardif, Assoc. AIA, LEED AP Senior Partner BLCI Building Life

More information

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS February 5, 2019

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS February 5, 2019 EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 25-19 February 5, 2019 TO: RE: Invited Firms Request for Submittals to El Paso Water - Public Service Board (EPWater) Statement of Work Professional

More information

ALL-IN-ONE CLOUD BASED CITIZEN SERVICE PLATFORM FOR PERMITTING, LICENSING, INSPECTIONS, AND ENFORCEMENT

ALL-IN-ONE CLOUD BASED CITIZEN SERVICE PLATFORM FOR PERMITTING, LICENSING, INSPECTIONS, AND ENFORCEMENT City of McMinnville, Community Development Department ALL-IN-ONE CLOUD BASED CITIZEN SERVICE PLATFORM FOR PERMITTING, LICENSING, INSPECTIONS, AND ENFORCEMENT Bid Document Nolan Ming 10/11/2017 ALL-IN-ONE

More information

EXHIBIT A TO CONTINUING SERVICES AGREEMENT

EXHIBIT A TO CONTINUING SERVICES AGREEMENT ARCHITECTURE SERVICES EXHIBIT A TO CONTINUING SERVICES AGREEMENT ARTICLE 1 - OWNER S OBLIGATIONS 1.1 In addition to the provisions of SECTION 4 of the Agreement, Owner shall provide an initial budget for

More information

PROJECT DESIGN GUIDE D02 COMMUNICATION PLAN

PROJECT DESIGN GUIDE D02 COMMUNICATION PLAN PDG PROJECT DESIGN GUIDES D02 PROJECT DESIGN GUIDE D02 COMMUNICATION PLAN Project Name: Name Project No.: Number Date: Date Document No.: PDG-PDG-PRO-D02.0 Date Created: 2 nd May 2012 Date Revised: R01

More information

Owner's Representative Scope Matrix - D/B Rev 10/28/2013

Owner's Representative Scope Matrix - D/B Rev 10/28/2013 Ecluded Owner's Representative Scope Matri - D/B Rev 10/28/2013 The following matri is a worksheet to identify required and optional scope for Owner's Representative services. Please identify the scope

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines October 2008 Scope of Work: To provide complete design for the renovation/alterations

More information

Request for Qualifications (Criteria Architect/Engineer, Architect/Engineer) State of Ohio Standard Forms and Documents

Request for Qualifications (Criteria Architect/Engineer, Architect/Engineer) State of Ohio Standard Forms and Documents Request for Qualifications (Criteria Architect/Engineer, Architect/Engineer) State of Ohio Standard Forms and Documents Administration of Project: School District Board + OFCC Project Name West Clermont

More information

GENERAL REQUIREMENTS FOR ENGINEERING AND DESIGN

GENERAL REQUIREMENTS FOR ENGINEERING AND DESIGN Project Procedures GENERAL REQUIREMENTS FOR ENGINEERING AND DESIGN 07/28/2011 PAGE 1 OF 7 1.0 PURPOSE 1.1 PURPOSE OF ENGINEERING PROJECT PROCEDURES This P-4 series of Engineering Project Procedures provides

More information

SECTION QUALITY CONTROL

SECTION QUALITY CONTROL SECTION 01 45 00 QUALITY CONTROL PART 1 - GENERAL 1.1 DESCRIPTION This section specifies requirements for Contractor Quality Control (CQC) for Design-Bid-Build (DBB) or Design-Build (DB) construction projects.

More information

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017 Exterior Alterations and New Office/ Warehouse for All Weather Shelters Northwest Business Park, Building 5, Bay 3 13459-149 Street Edmonton, AB Issued for Tender: Site Visit: Available upon request. Closing

More information

APPENDIX J TABLE OF CONTENTS. Bidding Requirements, Contract Forms and Conditions of the Contract

APPENDIX J TABLE OF CONTENTS. Bidding Requirements, Contract Forms and Conditions of the Contract TABLE OF CONTENTS PART 1. Introduction PART 2. Organization of Project Manual PART 3. Bidding Requirements, Contract Forms and Conditions of the Contract PART 4. Specifications - Divisions 1-33 3/1/06

More information

Appendix A - Technical Specifications Engineering Services For the RiverTown Water Treatment Plant Project

Appendix A - Technical Specifications Engineering Services For the RiverTown Water Treatment Plant Project 1. GENEAL JEA is implementing the ivertown Water Treatment (WTP) Project to design and construct a new water treatment plant and production wells in the ivertown area of St. Johns County to provide potable

More information

School Design Guide. Los Angeles Unified School District

School Design Guide. Los Angeles Unified School District School Design Guide Los Angeles Unified School District July 2015 Los Angeles Unified School District Design Standards Department Los Angeles Unified School District Page ii Design Standards Department

More information

Autodesk and the UK BIM Level 2 Mandate

Autodesk and the UK BIM Level 2 Mandate Autodesk and the UK BIM Level 2 Mandate BIM Level 2 Mandate The UK Cabinet Office is in the midst of a multi-year effort to reform the way in which the UK government procures construction helping to ensure

More information

Design Review Process FACILITY OPERATIONS

Design Review Process FACILITY OPERATIONS Design Review Process FACILITY OPERATIONS DESIGN REVIEW LEAN TEAM AUGUST 2016 CONTENTS Introduction...3 Participants...3 Design Reviewers Facility Operations...4 Providing Feedback...5 Design Review Sessions...6

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-01 45 00.00 10 (November 2016) ----------------------------------- Preparing Activity: USACE Superseding UFGS-01 45 00.00 10 (February 2010) UNIFIED FACILITIES GUIDE

More information

1ARCHITECTURE TABLE OF CONTENTS

1ARCHITECTURE TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 0102 COVER 00 0107 SEALS PAGE 00 0111 TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 1000 01 2000 01 2100 01 2300 01

More information

Division 03 - Concrete Section New Westminister Multi-Use Civic Facility & Office Building Project No Page 1

Division 03 - Concrete Section New Westminister Multi-Use Civic Facility & Office Building Project No Page 1 Project No. 210022 Page 1 PART 1 GENERAL 1.7 Documents.1 The General Conditions of the Canadian Standard Construction Document CCDC-2, together with all amendments and supplements and Division 1 General

More information

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 23 08 00 Commissioning of HVAC Systems 1. GENERAL A. GENERAL PROVISIONS 1. Drawings and general provisions of the Contract, including General Conditions and Division - 1 Specifications Sections, apply

More information

RELATED DOCUMENTS & REQUIREMENTS

RELATED DOCUMENTS & REQUIREMENTS 2 Existing Conditions NOTE: This is a new section, with content imported from other sections of the previous version of the KU Design Standards. Key revisions or additions to the earlier standards are

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines September 2011 Scope of Work: To provide complete design for the renovation/alterations

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA This section is used for projects under $1,000,000 use other section if more than $1M SECTION 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 SCOPE A. Preliminary Contract Schedule, Contract

More information

APPENDIX A TECHNICAL SPECIFICATIONS Engineering Services for the Twin Creeks RW Storage Tank and Booster Pump Station

APPENDIX A TECHNICAL SPECIFICATIONS Engineering Services for the Twin Creeks RW Storage Tank and Booster Pump Station APPENDIX A TECHNICAL SPECIFICATIONS 069-18 Engineering Services for the Twin Creeks RW Storage Tank and Booster Pump Station DESCRIPTION OF SCOPE OF SERVICES GENERAL The Twin Creeks project include the

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SPECIAL CONDITIONS Definitions: a) OWNER: Union County Vocational-Technical Schools UCVTS b) CITY or TOWN: Scotch Plains, New Jersey c) ARCHITECT: Netta Architects 1084 Route 22 West Mountainside, New

More information

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING) 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

1.1 IT Requirement of Employer - MMRCL Digital Project management platform to be used for PMRCL

1.1 IT Requirement of Employer - MMRCL Digital Project management platform to be used for PMRCL 1.1 IT Requirement of Employer - MMRCL Digital Project management platform to be used for PMRCL 1.1.1 Employer s Enterprise wide IT system i.e. Digital Project Management Platform will be the working environment

More information

Quality Management Manual Revision 19

Quality Management Manual Revision 19 Quality Management Manual Revision 19 959 Concord Street Framingham, MA 01701 508-875-2121 www.epm-inc.com with offices in Knoxville, TN and Raleigh, NC Rev. 19 PROPRIETARY INFORMATION NOTICE Page ii

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS DESIGN / ENGINEERING TEAM RIVERFRONT TOWN CENTER Town of Shallotte 106 Cheers Street, PO Box 2287 Shallotte, North Carolina 28459 Deadline for Submittal: February 9, 2018 at

More information

SUBSTANTIAL AND FINAL COMPLETION - MAJOR PROJECTS

SUBSTANTIAL AND FINAL COMPLETION - MAJOR PROJECTS Facilities Planning Policy & Procedure #13 TITLE OBJECTIVE AND PURPOSE RESPONSIBILITY SUBSTANTIAL AND FINAL COMPLETION - MAJOR PROJECTS To allow proper review by appropriate University departments and

More information

Invitation to Negotiate

Invitation to Negotiate Invitation to Negotiate Programming, Design, and Consulting Services Lisa Daws 4/3/2012 CLERKS OF COURT OPERATIONS CORPORATION Table of Contents Agency Background... 3 Statement of Purpose... 3 Scope of

More information

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue Bidding Conditions March 22, 2018 (Project# 0192) at the Fresno Chaffee Zoo Project : Warthog Exhibit Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS Addendum - A document issued

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year Two Thousand and BETWEEN the Architect s client identified as the Owner: Capitol

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect s client identified

More information