1 PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road

2 STAFFING MATRIX Construction Engineering and Inspection-Wiles Road

3 JAMES JEFFERS, P.E. Senior Project Engineer Years of Experience: 25 Directly managed the construction of the $43M Design Build Dixie Highway Flyover Bridge and $120M I-95 Managed Lanes project for FDOT district 4. FDOT Broward Construction Manager, wherein he delivered an annual work program averaging more than $250M. Under his leadership, the Broward Operations office continually exceeded District 4 goals and always led the district in achieving positive results. Project Engineer on similar urban arterials including Sunrise Boulevard, Hollywood Boulevard and SR 7.

4 HEMBERTH SALAZAR, P.E. Project Administrator Years of Experience: 12+ $12.6 Million Design-Build Miami-Dade Expressway Authority (MDX) ORT conversion project in SR new toll gantry structures and modification to three currently existing in the SR-836 corridor and construction of an exit ramp from SR-836 west bound to access the FDOT District VI Office. Project Administrator / CSS / Senior Roadway Inspector. This $1.1 million project consisted of new drainage exfiltration trenches installation, milling and resurfacing, sidewalk reconstruction and pavement striping from US-1 to Grand Ave. and from SW 27th Ave. to SW 32nd Ave. City of Miami Milling and resurfacing of SR 5/US-1 from North of SE 17th St to Broward Blvd. D4 FDOT hybrid project which involves milling and resurfacing of SR 5/US-1 from North of SE 17th St to Broward Blvd. The project included miscellaneous safety, median landscape, signalization, drainage, signing improvements. It also included the reconstruction of a new approach slabs, wing walls, barrier walls, traffic separators, sidewalks and removal and application of new structural steel coating on the Tarpon River Bridge. FDOT D6 SR 973 (Galloway Rd.) from SW 41st St thru SW 96th St (Length of Project: 3.5 Miles) FDOT D4 SR 838 (Sunrise SR 7 Sidewalk Project next to the SFWMD Canal C-12 in Broward County FDOT D4 SR SR 817 (University Dr.) Intersection in Broward County

5 RYAN SANTIAGO Contract Support Specialist / Senior Inspector Years of Experience: 15+ Contract Support Specialist on: SR-A1A from east of Mercedes River small bridge to Sunrise, 4.5 Mil. A1A/South Ocean Drive from Miami-Dade County Line to Seacrest Parkway, 4.8 Mil. A1A from NE 18 th ST to Oakland Park Blvd., 9.5 Mil. Biscayne Groupings, 32 Mil. Sr. Inspector on: NW 57th Ave. / Red Road Reconstruction Grouping, 40 Mil. Dixie Flyover Bridge Construction, 43 Mil. SR 5 (US-1/Federal Hwy), from Sheridan Street to SE 18 th Street, 12.5 Mil.

6 OTHER STAFF AND SERVICES Inspector / RCS/Secretary / Surveyor Logan Fasanella, RJ Behar & Company, Inc. 5 Years of Experience as an inspector in District 4 in Broward County Mona Catalona, Solid Consulting Engineers, Inc. 11 Years of Experience as a Resident Compliance Specialist and as a Secretary with FDOT District 4 in Broward County. Landon Alfie Cross, P.S.M., Carnahan Proctor Cross, Inc. 45 Years of Experience as Senior Project Surveyor

7 Project Over View The project involves roadway widening 4-6 lanes Lighting conduit placement ADA Compliance Bike lane construction Asphalt overbuild raising profile Tree Root pruning Signal upgrades Extensive drainage. Full replacment of curb and gutter. Gravity walls and unique L walls of varying heights. This is a mixed-use corridor, with both residential and commercial considerations. The fire station currently under construction at Rock Island Rd and Wiles Rd will not be directly impacted by operations.

8 Potential Issues Utility Relocations Utility relocation is a challenge in any project. The volume and variety of adjustments and relocations to be performed by maintaining agencies proves unique and will require a significant level of coordination between all parties. Of note are: 6 Gas Main (STA , , and ). 16 and 12 Water Mains requiring relocation throughout the project limits. We will rely upon our previous relationships with David Rivera and Max Chamorro (TECO) and Coral Springs Public Works Department to encourage them to relocate their lines and have the least impact upon construction. Buried fiberoptic French Drain located where it was not anticipated on east project. We will rely upon our previous relationship: David Rivera and Max Chamorro (TECO) Coral Springs Public Works Department

9 Potential Issues Lane Closures / Noise Ordinance A single lane closure will be allowed between 9:30PM and 7:30 AM. Noise ordinance (6:00 PM to 7:00 AM on weekdays, 6:00 PM to 9:00 AM weekends and holidays). Contractor to obtain a special permit allowing operations outside of the time constraints placed in the Coral Springs. Construction around Whispering Woods Development. This HOA is preparing to commence a resurfacing of the property. Property Manager, Mary Banmiller The roadway widening will impact the driveways Publix Plaza, 74 Ave, and multiple shopping centers. Must maintain access during roadway widening and driveway reconstruction at each affected entrance. The Whispering Woods Business Center - Completely dependent on accessibility from Wiles Rd.

10 Potential Issues Environmental The silt fence, inlet protection and outfall protection Special attention given to the 11-acre Whispering Woods Park containing wetland mitigation 13.9-acre Red Lichen Sanctuary Special care will be taken to ensure no runoffs will enter The Sanctuary during mast arm installation. Vacuum street sweeper at least twice a week or as directed by the Engineer. Cleanliness will be a topic of discussion during the regular progress meetings. Dust Control will be vital.

11 Public Coordination F&J will institute a proactive Public Involvement effort to ensure all motorist, businesses, and project stakeholders are kept informed of upcoming lane closures and changes in traffic patterns, if needed. Invite ALL stakeholders to our pre-construction conference. We will meet with the residents effected: Whispering Woods community Hidden Hammock/Butler Farms Careful coordination between the Contractor, the HCED and the property owners will be needed to ensure an issue free operation.\ Coordination with new fire station being built. Coordination with irrigation and landscaping with businesses and residents

12 Complete Streets Initiative Our team has extensive experience with not only the Complete Streets initiatives, but also with the road diet designs. Currently implementing Complete Streets initiatives: CEI services for Wiles Rd. from Rock Island Rd to SR7 CEI services for Pine Island Rd. from Nova Dr. to SR-84. We understand the importance of this initiative to make streets safe for all users.

13 OTHER CONSIDERATIONS F&J Team is currently on the Wiles Rd. phase 1 from Rock Island Rd. to SR-7 project with RJ Behar (R P1). Open communication and coordination between overlapping projects. Local QA/QC oversight Francis Chin Sr. P.E. (45 Yrs Experience), and Osvaldo, Ossie Larrazabal, P.E. (14 Yrs Experience) Initial and bi-annual reviews of the Team to evaluate resources, equipment, certifications, documentation, and processes and recommend improvements. Skilled, proven reviews at no cost to Broward County. CBE with Broward County County Business Enterprise F&J is a DBE/SBE with FDOT

14 THANK YOU FOR YOUR CONSIDERATION

Construction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL

Construction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL Construction Engineering and Inspection Services to Silver Shores Boulevard Broward County, FL R L I N O. R 2 11 4 0 8 0 P 1 I. Experience and Qualifications with Roadway Construction a. Eisman & Russo

More information

1/2017. F&J Engineering Group, Inc North Lake Dasha Drive Plantation, FL 33324

1/2017. F&J Engineering Group, Inc North Lake Dasha Drive Plantation, FL 33324 Request for Proposal (RFP) No. J2111758P1 1. Ability of Professional Personnel: A. Describe the qualifications and relevant experience of the proposed Senior Project Engineer and all key personnel that

More information

BROWARD COUNTY. Solicitation Bid #V P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure

BROWARD COUNTY. Solicitation Bid #V P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure BROWARD COUNTY Solicitation Bid #V2114585P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure YOUR CEI SOLUTION YOUR PARTNERS Cory Nichols, P.E Quality Assurance Quality Control

More information

MEET THE AE TEAM YOUR CEI SOLUTION YOUR PARTNERS

MEET THE AE TEAM YOUR CEI SOLUTION YOUR PARTNERS BROWARD COUNTY Broward County Project Number 5413 Qualifications for Construction Engineering and Inspection Services CEI Services for Wiles Road from Riverside Drive to Rock Island Road YOUR CEI SOLUTION

More information

Overview. Construction Engineering and Inspection Services for Wiles Road from Riverside Drive to Rock Island Road

Overview. Construction Engineering and Inspection Services for Wiles Road from Riverside Drive to Rock Island Road Construction Engineering and Inspection Services for Wiles Road from Riverside Drive to Rock Island Road Presentation for March 3, 2017 Overview Staffing Project Understanding Approach Past Performance

More information

Introduction Who We Are

Introduction Who We Are Introduction Who We Are We offer a diverse scope of professional services that often enables us to serve as a reliable one-source partner, efficiently tackling time-sensitive projects with customized solutions.

More information

CEI Services Transit Bus Stop Infrastructure

CEI Services Transit Bus Stop Infrastructure Presentation for: Broward County Board of County Commissioners sioners V2114585P1 CEI Services Transit Bus Stop Infrastructure Presented by: SOLID Consulting Engineers, Inc. (CBE/SBE) COMPANY AND TEAM

More information

NOVEMBER 13, 2017 S O L I C I T A T I O N N O. V P

NOVEMBER 13, 2017 S O L I C I T A T I O N N O. V P NOVEMBER 13, 2017 PRE QUALIFICATIONS R.J. Behar & Company, Inc. (RJB) has overseen in excess of $1 billion in construction projects throughout the state of Florida. Our team is fully qualified in the following

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127

More information

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction

More information

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501 SR 874/Don Shula Expressway Ramp Connector Project Development & Environment (PD&E) Study PUBLIC HEARING December 8, 2011 MDX Contract #: RFP-09-04 MDX Work Program #: 87410.011 ETDM #: 11501 1 This Public

More information

The Gateway Expressway FTBA Conference. February 2-3, 2017

The Gateway Expressway FTBA Conference. February 2-3, 2017 The Gateway Expressway FTBA Conference February 2-3, 2017 256996-1 SR 686 (Roosevelt Blvd.) at CR 611 (49th St. N) PD&E 256866-1 Segment 2A 256997-1 SR 686 (Roosevelt Blvd.) from 49th St. Bridge to north

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Baltic Avenue, Maine to Mississippi Avenues Project ID Numbers: S1702 / 173620 This project will mill and repave the roadway, upgrade ADA ramps, and improve drainage, thermoplastic stripping, manholes,

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8" 8" 8" 8" 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT.

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8 8 8 8 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT. } SURVEY SR 429 { CONST. SR 429 (WEKIVA PKWY) R/W (15 MIN.) 0'-10.4' R/W (15 MIN.) STANDARD CLEARING & GRUBBING 24'-36' 24'-48' 94' BORDER (2-30.) (2-30.) 94' BORDER 10' 4' 10' NATURAL GROUND, MAX. CUT

More information

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida November 7, 2014 SUBMITTED BY: Dewberry Bowyer-Singleton 520 South

More information

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction I-395 Reconstruction MDX SR 83611 Improvements I-95 Concrete Pavement Reconstruction FTBA Conference February 10, 2016 Presentation Outline Project Overview I-395 Reconstruction MDX SR 83611 I-95 Pavement

More information

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2011) Cover Photo: Joint Utility Trench installation along Fifth Street just north of Bridge Street. Page 1

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Foreword This manual contains

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Comment Form Date: To: From:

More information

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report Function : Transportation Activity : Road & Street Facilities Category : Arterial Roads Pinellas County Capital Improvement Program, FY2011 - FY2016 Project No: 1618 Title: 118th Avenue Expressway Cost

More information

MDX PROCUREMENT/CONTRACT NO.: RFP MDX WORK PROGRAM NO.:

MDX PROCUREMENT/CONTRACT NO.: RFP MDX WORK PROGRAM NO.: MDX PROCUREMENT/CONTRACT NO.: RFP-14-03 MDX WORK PROGRAM NO.: 83628.030 MDX PROJECT/SERVICE TITLE: DESIGN-BUILD SERVICES FOR SR 836 OPERATIONAL, CAPACITY AND EXHIBIT A DESIGN-BUILD SCOPE OF SERVICES REVISED

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 05/10/2018 PC.A1.2 Arterial with Cement

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 04/01/2019 PC.A1.2 Arterial with Cement

More information

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: --

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: -- ROADWAY CONSTRUCTION NOTES 1. ALL RIGHT-OF-WAY OTHER THAN ROADWAY AREAS SHALL BE SODDED. ALL SLOPE STEEPER THAN 6:1 SHALL REQUIRE SODDING. THE CITY RESERVES THE RIGHT TO REQUIRE SODDING IN SPECIAL AREAS

More information

ADA Training Design Case Studies MnDOT

ADA Training Design Case Studies MnDOT ADA Training Design Case Studies 2018 MnDOT 2 ADA Design Case Studies Overview TH 61 (Mounds Blvd) Mill & Overlay Lesson: Steep Slopes and Construction Limits Snelling Avenue Mill & Overlay Lesson: Strategies

More information

CITY OF SAFETY HARBOR ENGINEERING

CITY OF SAFETY HARBOR ENGINEERING CITY OF SAFETY HARBOR ENGINEERING The Engineering Department provides the city with technical services including design of construction and maintenance projects, review of development plans, field surveys,

More information

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) 10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents

More information

2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM

2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM 2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM A. District: 1 2 3 4 5 6 7 TPK C.O. B. Nomination Category: (Select only one category) Outstanding Major Project

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) ADA South, Contract 1 w/o ROW DBNUM: 15420 / UPC: 154200 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction

More information

Enclave at Black Point Marina Community Development District. 1 st Supplemental Engineer s Report Infrastructure Improvements

Enclave at Black Point Marina Community Development District. 1 st Supplemental Engineer s Report Infrastructure Improvements Enclave at Black Point Marina Community Development District 1 st Supplemental Engineer s Report Infrastructure Improvements Prepared for Enclave at Black Point Marina Community Development District Board

More information

LO R (CENTER RIDGE ROAD)

LO R (CENTER RIDGE ROAD) Ditch END PROJECT BEGIN PROJECT 83 STA 1291+16 STA 1168+50 20 STONEY RIDGE RD. LATITUDE: 41 23 40" N 0 PORTION TO BE IMPROVED INTERSTATE HIGHWAY FEDERAL ROUTES STATE ROUTES COUNTY & TOWNSHIP S OTHER S

More information

ANNUAL INSPECTION REPORT 2017 TABLE OF CONTENTS

ANNUAL INSPECTION REPORT 2017 TABLE OF CONTENTS ANNUAL INSPECTION REPORT 2017 TABLE OF CONTENTS 1.0 OVERVIEW 1 1.1 MDX System Background 1 1.2 Inspection Program Objective 2 1.3 Inspection Program Scope 2 1.4 Performance Measures 3 1.5 Maintenance and

More information

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director Ohio Contractor Association Annual Work Forecast Program John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director John R. Kasich, Ohio Governor Jerry Wray, ODOT Director ODOT S

More information

PAVEMENT DESIGN MEMORANDUM

PAVEMENT DESIGN MEMORANDUM PAVEMENT DESIGN MEMORANDUM FOR SR 70 (15TH STREET EAST) ROUNDABOUT MANATEE COUNTY FINAL SUBMITTAL FPID 435090-1-52-01 PREPARED FOR: FLORIDA DEPT. OF TRANSPORTATION DISTRICT 1 FEBRUARY 16, 2018 PREPARED

More information

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES CITY OF SANTA MONICA Department of Public Works Civil Engineering Division 1685 Main, Room 116 Santa Monica, CA 90401 Tel: (310) 458-2240 or (310) 458-8737 EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

SR 50 PD&E Study

SR 50 PD&E Study SR50 Project Development & Environment Study Public Hearing November 1, 2011 SR 50 PD&E Study 427056-1-22-01 1 Purpose of the Public Hearing Afford persons the opportunity to express their views about

More information

6/2017. Calvin, Giordano & Associates, Inc Eller Drive, Suite 600 Fort Lauderdale, FL 33316

6/2017. Calvin, Giordano & Associates, Inc Eller Drive, Suite 600 Fort Lauderdale, FL 33316 1. Ability of Professional Personnel: A. Describe the qualifications and relevant experience of the proposed Senior Project Engineer and all key personnel that are to be assigned to this project as well

More information

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL.

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL. N ARRAN RD. N US 319 CRAWFORDVILLE HWY SR 61 SHADEVILLE RD. WAKULLA HARVEY MILL ROAD US 319 PREBLE-RISH INC CIVIL SURVEYING SITE PLANNING 36 JASPER THPMAS ROAD CRAWFORDVILLE, FL. 32327 GENERAL NOTES: 1.

More information

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT TO: Planning and Zoning Board FROM: Carlos M. Rivero, City Planner DATE: August 10, 2015 RE: Storage Facility P&Z ITEM # 15-010 OWNER

More information

Construction Cost Estimation Preparation Manual (Metric Units)

Construction Cost Estimation Preparation Manual (Metric Units) 07/25/2001 Construction Cost Estimation Preparation Manual (Metric Units) July 2001 Prepared by Cost Estimating Unit Program Support Services 07/25/2001 Table of Contents Section Page 1.0 Introduction

More information

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE EDGE OF PAVEMENT EXIST SIDEWALK PROPOSED SIDEWALK PROPOSED SIDEWALK EXIST PIPE DBI SD 12 FT 12 FT LANDSCAPING LANDSCAPING EXIST DITCH TO BE REMOVED EXISTING PLAN (RIGHT SIDE SHOWN, LEFT SIDE SIMILAR) PROPOSED

More information

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements Keys Edge Community Development District Engineer s Report Infrastructure Improvements Prepared for Keys Edge Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

1/2017. Atkins North America, Inc W. Boy Scout Boulevard Tampa, FL 33607

1/2017. Atkins North America, Inc W. Boy Scout Boulevard Tampa, FL 33607 Request for Proposal (RFP) No. J2111758P1 1. Ability of Professional Personnel: A. Describe the qualifications and relevant experience of the proposed Senior Project Engineer and all key personnel that

More information

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015 WELCOME Public Meeting for I-35 / I-44 Interchange October 6, 2015 TEAM INTRODUCTIONS PURPOSE OF THIS MEETING is to present the alternative alignments for the I-35/I-44 and I-35/NE 63rd Street Interchanges

More information

NW 47TH AVENUE PROJECT DEVELOPMENT & ENVIRONMENTAL

NW 47TH AVENUE PROJECT DEVELOPMENT & ENVIRONMENTAL VALUE ENGINEERING STUDY OF NW 47TH AVENUE PROJECT DEVELOPMENT & ENVIRONMENTAL FM Number: 430637-1-22-01 STUDY NUMBER: 1400601 MIAMI, FLORIDA October 21-25, 2013 FINAL REPORT In Association With: THE FLORIDA

More information

MAINTENANCE OF TRAFFIC NOTES

MAINTENANCE OF TRAFFIC NOTES MAINTENANCE OF TRAFFIC NOTES GENERAL: 1. THE REGULATORY SPEED USED FOR MOT CALCULATIONS FOR EACH FACILITY ARE NOTED BELOW. MODIFICATIONS TO THE REGULATORY SPEED MAY REQUIRE RESUBMITTAL OF THE MOT PLAN.

More information

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and

More information

B-PERMIT PLAN CHECK MANUAL

B-PERMIT PLAN CHECK MANUAL B-PERMIT PLAN CHECK MANUAL 11. PLAN SHEETS AND NOTES Preformatted B-Permit plans sheets can be downloaded from the internet on the Bureau of Engineering s website. The Plan sheets can be found under the

More information

MAINTENANCE OF TRAFFIC NOTES

MAINTENANCE OF TRAFFIC NOTES MAINTENANCE OF TRAFFIC NOTES GENERAL: 1. THE REGULATORY SPEED USED FOR MOT CALCULATIONS FOR EACH FACILITY ARE NOTED BELOW. MODIFICATIONS TO THE REGULATORY SPEED MAY REQUIRE RESUBMITTAL OF THE MOT PLAN.

More information

TRANSPORTATION. Governmental Projects

TRANSPORTATION. Governmental Projects TRANSPORTATION Governmental Projects Function: Activity: Category: Transportation Road & Street Facilities Arterial Roads Project No: 1618 Title: 118th Avenue Expressway Cost Center: 841418 Department:

More information

2311 Egg Harbor Road Susan Shin-Angulo Lindenwold, NJ Freeholder Liaison Phone Fax

2311 Egg Harbor Road Susan Shin-Angulo Lindenwold, NJ Freeholder Liaison Phone Fax Jackson Rd (CR 534) Reconstruction Project Between NJSH RT #73 (MP 12.67) To Atco Ave. (MP 14.92) Townships of Berlin & Waterford County of Camden, New Jersey Bi-Weekly Progress Report Monday 4/23/18 thru

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 December 28, 2018 The Platte County Board of Supervisors will

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

PERMITTING AND CONSTRUCTION MANUAL

PERMITTING AND CONSTRUCTION MANUAL PUBLIC RIGHT-OF-WAY CONTENTS PERMITTING AND CONSTRUCTION MANUAL 1. INTRODUCTION 2. PUBLIC SERVICE PROVIDER REGISTRATION 3. CONSTRUCTION PERMITTING PROCEDURE 3.1 Permitting Process 3.2 Permit Application

More information

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN FINAL REPORT INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN Prepared for: City of Modesto Prepared by: Willdan Financial Services Approved by Modesto City Council on July 9, 2013 Resolution

More information

CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD

CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD Schedule 5 Page 1 GENERAL DETAILS G1 General Legend for Contract Drawings Deleted (Per City A-size Drawing Block) G2 Legend for Materials

More information

WAKULLA SITE PLANNING

WAKULLA SITE PLANNING WAKULLA CIVIL SURVEYING SITE PLANNING TRAFFIC CONTROL PLAN WAKULLA ARRAN ROAD WIDENING & RESURFACING UTILITY CONTACT LIST NO. DATE: APPR. REVISION: DATE: CIVIL SURVEYING SITE PLANNING GENERAL NOTES WAKULLA

More information

IMPROVING I 81 IN MARYLAND

IMPROVING I 81 IN MARYLAND IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I

More information

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. Welcome Public Meeting August 2, 2017 5:00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. www.glenwoodsouthbridge.net Welcome to the South Bridge Environmental Assessment Public Meeting Why Are We Here Tonight?

More information

South Carolina Department of Transportation. Engineering Directive

South Carolina Department of Transportation. Engineering Directive South Carolina Department of Transportation Engineering Directive Directive Number: ED-17 Effective: May 5, 2015 Subject: Encroachment Permits References: S.C. Code of Laws, Sections 57-3-110, 57-5-1080,

More information

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE STANDARD PLANS OF THE CITY OF LA QUINTA, THE LATEST EDITION OF THE STANDARD SPECIFICATIONS

More information

Project Scope of Work Contract Time Percentage of contract time added, excluding weather and holidays = 13.0% (<20%)

Project Scope of Work Contract Time Percentage of contract time added, excluding weather and holidays = 13.0% (<20%) Summary Report All Electronic Tolling (AET) Phase 6B Veterans Expressway (SR 589) from Gunn Hwy to Dale Mabry Hwy CEI Senior Project Engineer: Jeffrey James, P.E. Metric Engineering, Inc. 615 Crescent

More information

Tangerine Road Dove Mountain Boulevard to La Cañada Drive

Tangerine Road Dove Mountain Boulevard to La Cañada Drive Tangerine Road Dove Mountain Boulevard to La Cañada Drive PUBLIC MEETING The Highlands at Dove Mountain November 19, 2015 PRESENTATION OUTLINE 1. Tangerine Road Corridor in Review Project Need Project

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

TAMPA BAY NEXT MAJOR PROJECTS UPDATE

TAMPA BAY NEXT MAJOR PROJECTS UPDATE TAMPA BAY NEXT MAJOR PROJECTS UPDATE Marshall Hampton, FDOT District Seven Tampa Bay Next Program Manager January 18, 2019 1 2 Program Overview Funding Priorities Fiscal Year 2018 2019 2020 2021 2022 2023

More information

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016 Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb

More information

Zoo Interchange Reconstruction

Zoo Interchange Reconstruction May 14, 2013 Roberto Gutierrez, PE WisDOT Chris Hager, PE - WisDOT Zoo Interchange Reconstruction Overview of Presentation overview WisDOT Southeast Region I-94 North-South I794/I-94 restriping Hoan bridge

More information

COUNTY OF SUTTER ENCROACHMENT PERMIT

COUNTY OF SUTTER ENCROACHMENT PERMIT COUNTY OF SUTTER ENCROACHMENT PERMIT PERMIT No. Development Services Dept. Engineering Division 1130 Civic Center Blvd Yuba City, CA 95993 (530) 822-7400 Hours: 8 AM - 5 PM Upon completion, submit application

More information

FTBA 2018 Construction Conference Major Projects Update

FTBA 2018 Construction Conference Major Projects Update FTBA 2018 Construction Conference Major Projects Update Bill Jones, P.E. FDOT District 7 Director of Transportation Development 1 2 3 FUNDED PROJECTS Howard Frankland Bridge Industry Forum September 2018

More information

ARCHITECT - ENGINEER QUALIFICATIONS ESCAMBIA COUNTY, FL

ARCHITECT - ENGINEER QUALIFICATIONS ESCAMBIA COUNTY, FL ARCHITECT - ENGINEER QUALIFICATIONS PART 1 - CONTRACT-SPECIFIC QUALIFICATIONS 1. TITLE AND LOCATION (City and State) Professional Services as Governed by Florida Statute 287.055 A. CONTRACT INFORMATION

More information

CITY OF ROCKLIN STANDARD DRAWINGS

CITY OF ROCKLIN STANDARD DRAWINGS CITY OF ROCKLIN STANDARD DRAWINGS November 2016 Table of Contents Page # Section 1 Section 2 Section 3 General Notes and Review Boxes 01-01 Signature Blocks... 1 01-02 General Notes (Sheet 1 of 8)... 2

More information

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 SUBJECT: APPROVAL OF A CONTRACT WITH BOND BLACKTOP, INC., IN THE AMOUNT OF $556,812 FOR PHASE 1 AND

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List October 2018 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown

More information

Modified FY ,100, ,329,791

Modified FY ,100, ,329,791 Retail/North Andrews Gardens Neighborhood Improvement Program Expenses Through FY 4 Modified FY 5 Budget FY 26-21 North Andrews Gardens Neighborhood Improvement Project 21,524,34 22,75,757 --- 6,1, 6 ---

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),

More information

CHAPTER 8 TRANSPORTATION ELEMENT

CHAPTER 8 TRANSPORTATION ELEMENT CHAPTER 8 TRANSPORTATION ELEMENT Section 8.01 Purpose: The purpose of this Chapter (element) is to establish the desired and projected transportation system within Niceville and to plan for future motorized

More information

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES The District of West Vancouver requires a Traffic Management Plan (TMP) to be submitted for acceptance by the Land Development

More information

Shadow Lake Woods HOA

Shadow Lake Woods HOA A Regional Transportation Solution Shadow Lake Woods HOA November 22, 2016 WEKIVA PARKWAY Project Description $1.6 Billion Completion of Central Florida s Beltway 25-mile Toll Road Non-Toll Road Improvements:

More information

SPRR TUPELO ST. R UNION CITY BLVD. ZON PADRE PASEO DEEP CREEK ROAD ARDENWOOD COYOTE HILLS REGIONAL PARK PROJECT LIMITS PATTERSON RANCH ROAD BLVD. COMM

SPRR TUPELO ST. R UNION CITY BLVD. ZON PADRE PASEO DEEP CREEK ROAD ARDENWOOD COYOTE HILLS REGIONAL PARK PROJECT LIMITS PATTERSON RANCH ROAD BLVD. COMM SPRR TUPELO ST. R UNION CITY BLVD. ZON PADRE PASEO DEEP CREEK ROAD ARDENWOOD COYOTE HILLS REGIONAL PARK PROJECT LIMITS PATTERSON RANCH ROAD BLVD. COMMERCE DR. PASEO PADRE PARKWAY KAISER DRIVE DUMBARTON

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES JANUARY 2018

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES JANUARY 2018 MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM Each applicant needs to thoroughly review the conditions of development issued by the Planning Division in the format of a Resolution approving your project

More information

Design-Build and Design-Bid-Build

Design-Build and Design-Bid-Build Design-Build and Design-Bid-Build Comparison of Overall Cost and Time Question: How does the total cost and time to deliver a $55,000,000 and 814 day design-build project compare to using design-bid-build

More information

8 PROJECT IMPLEMENTATION

8 PROJECT IMPLEMENTATION 8 PROJECT IMPLEMENTATION 8.1 Opinions of Costs The construction cost estimate for Grant Road Improvement Plan, based on quantities from the 30 percent construction plans is $102,120,380 in 2008 dollars.

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center Traffic Management Guide to Concrete Overlay Solutions December 5, 2014 ACPA Annual Meeting Dale S. Harrington P.E. Representing CP Tech Center Traffic Management- Concrete Overlays Traffic Management

More information

CITY OF NEW ORLEANS. Repaving the Gateway to the French Quarter: Implementing the Downtown Infrastructure Improvement Project

CITY OF NEW ORLEANS. Repaving the Gateway to the French Quarter: Implementing the Downtown Infrastructure Improvement Project CITY OF NEW ORLEANS Repaving the Gateway to the French Quarter: Implementing the Downtown Infrastructure Improvement Project Agenda Background Project Scope 2 Superdome Central Business District French

More information

ROADWAY DESIGN AND CONSTRUCTION STANDARDS

ROADWAY DESIGN AND CONSTRUCTION STANDARDS ROADWAY DESIGN AND CONSTRUCTION STANDARDS Adopted: 1990 Amended: 1994 2003 2011 2013 ROADWAY DESIGN AND CONSTRUCTION STANDARDS ORIGINALLY ADOPTED IN 1990 Resolution No. R-990-046 OFFICIALLY AMENDED IN

More information

Florida Department of Transportation

Florida Department of Transportation Florida Department of Transportation Major Projects Report District 6 December 2018 Table of Contents Table of Contents Project Development and Environment (PD&E) Study Phase S.R 9A/I-95 from U.S. 1 to

More information

Final Air Quality Report

Final Air Quality Report Florida Department of TRANSPORTATION Final Air Quality Report PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida Financial Project ID: 430136-1-22-01 ETDM Project Number: 13026

More information

Information for File # RJH

Information for File # RJH Information for File #2011-01629-RJH Applicant: Matthew Ternes Corps Contact: Ryan Huber, U. S. Army Corps of Engineers, 211 North Broadway, Suite 221, Green Bay, Wisconsin 54303; ryan.j.huber@usace.army.mil;

More information

Supersizing of Wake County s Solid Waste Convenience Centers

Supersizing of Wake County s Solid Waste Convenience Centers Supersizing of Wake County s Solid Waste Convenience Centers Roy Baldwin Wake County Solid Waste Management Jeffrey Murray, PE, BCEE HDR NC SWANA Spring 2016 Technical Conference Greensboro, North Carolina

More information

MEMORANDUM - CITY OF PASADENA DEPARTMENT OF PUBLIC WORKS

MEMORANDUM - CITY OF PASADENA DEPARTMENT OF PUBLIC WORKS . ATTACFTMENT D I MEMORANDUM CITY OF PASADENA DEPARTMENT OF PUBLIC WORKS DATE: TO: FROM: RE: Denver Miller, Zoning Administrator Planning and Development Department City Engineer Department of Public Works

More information

Broadway Grade Separation Study. Palo Alto Rail Committee Meeting November 29, 2017

Broadway Grade Separation Study. Palo Alto Rail Committee Meeting November 29, 2017 Palo Alto Rail Committee Meeting November 29, 2017 Slide 1 Project Area Millbrae Station City Limits Existing Railroad Crossing at Broadway Caltrain Operational Constraint Major Constraints Millbrae Station

More information