1 Scope of Works Partitioning and Office Improvements of Unit 1 TGE Building, Champagne Estate Rev. Date Status By Chk App Notes 00 15/9/16 Issued for draft 1 TM 01 17/9/16 Issued for draft 2 TM 02 21/9/16 Issued for draft 3 TM CF Drawings updated 03 22/9/16 Issue for draft 3 TM CF Insurance Clause 04 23/9/16 Issue for Final TM CF CF Name Change Page 1 of 13

2 REVISION REGISTER 4 1. INTRODUCTION 5 2. PROJECT DEFINITION 5 3. CODES AND STANDARDS 5 4. SCOPE OF WORK DETAIL SCOPE OF WORK Supply of Materials, tools and equipments Installation of pre-fabricated materials Any demolishing required Onsite installation replacing existing sinks and associated plumbing Staircase adjustments Hand railing fabrication and installation Office partitioning Free standing office partitions Installation of Power to partition spaces Painting of Interior and exterior Housekeeping 8 6. DELIVERABLES 8 7. GENERAL NOTES 8 8. PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENT 8 9. VAN2017 POLICY ON STIMULANTS FIELD CHANGES AND VARIATION WORK AND MATERIALS TO BE FURNISHED BY VAN2017 / OTHERS MANDATORY PROVISION 8-9 Page 2 of 13

3 13. PAYMENT SCHEDULES 10 APPENDIX A: SUPPLY OF MATERIALS 11 APPRENDIX B: DRAWINGS: Bi, Bii, Biii 12 APPRENDIX C: SITE PICTURES 13 Page 3 of 13

4 Below table summarizes the changes: Sq No. Description Rev. No. Date 01 First Issue Sep Sep Sep Sept Sept-16 Page 4 of 13

5 Vanuatu 2017 Pacific Games venues and operations personnel are planning to a few office partitions wall insulations, plumbing works at Unit 1 office space of TGE Building. The scope describes all materials and workmanship required to complete all works. Whether specifically referred to in this document or not, in conformity with the general requirements of the drawings and or written communication. The contractor shall be in charge of revamping the selected premises as per the detailed scope below. Client/Organization: Vanuatu 2017 Pacific Games Project Name and Location: Partition and Office Improvements, Unit 1 TGE Building Champagne Estate Commences: 3 rd Oct 2016 Works Should End: 15 th Oct 2016 Contact Person: Troy MAHUK Contact address: PO Box VA6015 Port Vila, Vanuatu procurement@van2017.com cc: troy.mahuk@van2017.com Contact Number: CODES AND STANDARDS All works to be conducted by the contractor shall comply with current industry practice as well as standards and authorities detailed hereafter and elsewhere in the scope of works. Building must comply with Vanuatu National Building Code (VNBC). All work in this scope shall be provided by the Contractor to the Organization without further cost of: i. Supply of Materials, tools and equipments ii. Pre-fabrication of frame works required iii. Any demolishing required iv. Onsite installation replacing existing sinks and associated plumbing v. Staircase adjustments vi. Hand railing fabrication and installation vii. Office partitioning viii. Office Free Standing Partitions ix. Installation of Power to partition spaces x. Painting of Interior and exterior xi. Housekeeping Page 5 of 13

6 In this scope of works, the word shall indicates works to be carried out. The word should indicates a recommendation. The contractor shall do a proper site inspection as well as engage in discussion with the Project Manager and Maintenance Planners concerned prior to work in order to meet the content of this scope. Should any error or discrepancy appear in the scope, refer it the Project Manager or Lead Planner for decision. Once the selected contractor is given the notification, the Contractor shall mobilize with all materials, tools, labour and equipment in a safe manner to the work site. Work shall commence within five (5) working days after the notification to proceed. The contractor shall make prior arrangement with maintenance and operations personnel to ensure it establishes itself at the site with no trouble from any third party if any. All hot works conducted at on site must be carried out in a safe manner making sure the area is clear of any hazardous materials that my easily catch fire or cause any harm to surrounding occupants and facilities within the building premises Contractor should remove any safety hazards that may hinder the progress of work in the safest possible manner. The contractor shall remove existing hand rails and barricade the area when all jobs are done for the day or site remains inactive for the duration of the day. The contractor shall relocate sink and associated plumbing as per the drawings attached to this scope. The contractor shall provide new sink and all fittings required for new installation. The contractor shall also fabricate a cabinet on which the sink will be placed on. Page 6 of 13

7 The contractor shall make necessary adjustments to the existing staircase to bring it up to standard building code (VNBC) and should seek consultation with the project manager if the contractor proposes a new design. Work on this shall halt until told otherwise. The contractor shall design hand railing and should consult the project manager prior to fabrication and installation of hand railings on mezzanine floor along D 2 -D 5 and B 2 -D 2 (Appendix Bii). Again these must meet standard building code Vanuatu National Building Code (VNBC). The contractor shall put in place wall insulation and suitable wall framing for plasterboard. The contractor shall construct office partitions as per drawings. The windows and other components shall be installed thereafter or simultaneously. [Optional Tender- wall partition D 2 -D 5 (Appendix Bii) submit a separate quotation. Ceiling height 2700mm]. The contractor shall fashion a free standing partition as specified in Appendix Bi. The contractor shall during installation of partitions fit 3x 2G GPO s in each proposed office partition running standard 3C cables and connect to mains at the load center/main switchboard. Contractor will also isolate partitioned off lights in office partitions. Post completion of the partitioning, insulation, plumbing and electrical work, the painting works shall be completed by the contractor as well. After completion of every job each day, the contractor is responsible to safely clear all used materials and consumables to be disposed to waste area with assistance of maintenance personnel and store away equipment for housekeeping Page 7 of 13

8 The contractor shall forward to Maintenance Planner the time sheet of the personnel part taking in the job. All works regarding materials shall be provided by the contractor responsible. The project schedule will be provided by the concerned project engineer assigned for this project for monitoring of the progress. The Contractor shall inform or consult the concerned Company Project Engineer, Maintenance Personnel and contracts administration personnel five (5) working days in advance of the actual date on which he will take possession of the site. During installation and repair works, temporary barricading may be required to prevent unauthorized access to certain areas, this fencing / barricading shall be provided by the Contractor. Damage to other equipment or services, during the course of the entire work, shall be repaired by the Contractor at no cost to the Company (VAN2017). Each person working at site must have and wear as required the personal protective equipment (PPE) The contractor site supervisor shall ensure that the following protective equipment used where appropriate. The following list is considered the minimum requirement in protective equipment and is not intended to override any statutory safety requirements Hard hats - for all overhead works or in the vicinity of the work. Safety footwear with protective steel cap Eye protection clear glasses onsite. Ear protection - for all persons in the vicinity of noise Gloves - for handling sharp or hot objects, suitable for welding Safety harness for all work on heights VAN2017 will not be held responsible for any careless and reckless work attitudes that result in any form of bodily harm while working on the premises. The Contractor shall take note of VAN2017 s no-tolerance policy on stimulants such as drugs and alcohol. Any violations shall lead to the offender being denied entry into the work premises. Repeated violation by the same offender shall result in total ban of the concerned personnel from entry into the proposed work premises. Page 8 of 13

9 During field installation and repair, Contractor shall not undertake or perform any extra work or deviate from the Job Specification without the necessary change order duly approved by VAN2017. VAN2017 will not assume any liability for non-payment of any field change done without the required change order. a. Prior to submission of proposal, Contractor shall visit the proposed work site to determine and satisfy himself of the actual field conditions; the nature of the work; the location and peculiarities at work site; the character, quality and quantity of equipment required; the type and magnitude of labour and construction services; the character of construction tools and equipment and facilities required preliminary to and during the execution of work; the general and local conditions and all other matters which could in any way affect work under this job specification on the day of the pre-bid meeting. Any failure by Contractor to discover matters which affect work shall not relieve him from his obligations under the Job Specifications. Contract must provide proof of insurance for the following: Public/General Liability Insurance Workers Compensation Insurance Contract Insurance Failure to provide any proof of insurance will render the contractors bid proposal invalid. b. It is the Contractor's responsibility to determine the actual sizes and dimensions of Plant equipment, facilities and materials required therein. VAN2017 will not be responsible / liable for any deviations of material quantities actually required in the field. c. For conflicts on dimension between VAN2017 supplied data and field conditions, the latter shall prevail. Page 9 of 13

10 d. All inquiries for clarification and other pertinent communications shall be referred to: e. All exceptions or alternative to the Job Specifications shall be clearly listed or enumerated under the appropriate headings, i.e., EXCEPTIONS", "ALTERNATIVES", etc. As a matter of preference however, VAN2017 shall consider ALTERNATIVES only after considering the proposals that comply fully with the Job Specification. f. Contractor shall upon award, submit firm manpower listing for the job classified into site supervisors, tradesmen, assistants, safety officers, etc. The Final Payment and Retention monies shall not be released until all documents as required in the handover has been fully complied with. The contractor is eligible to apply for 25% mobilization payment up front prior to commencement of work. A further 60% shall be awarded when all jobs are completed then and contractor has done all necessary housekeeping, there will be an inspection and evaluation of work done by the Project Manager and associates [MAINGUY CONSULTING ENGINEERS AND PROJECT MANAGEMENT], once it is proven that the scope of works has been fulfilled the remaining percentage (15%) will be awarded thereafter. Page 10 of 13

11 To be furnished by Contractor Page 11 of 13

12 PROVIDED BY VAN2017 Refer to attachment Appendix Bi, Appendix Bii, Appendix Biii. Drawing Key also attached. Page 12 of 13

13 Refer to Attachment Appendix C-Site Pictures Page 13 of 13

Tender No: KKNPP/CMM/15673 Section C2 Other Conditions. Index

Tender No: KKNPP/CMM/15673 Section C2 Other Conditions. Index Tender No: KKNPP/CMM/15673 Section C2 Other Conditions Index 1. CRITERIA FOR QUOTING RATES 2. CONDITIONS FOR INSTALLATION 3. FREE ISSUE MATERIALS 4. DELIVERY PLACE 5. DELIVERY SCHEDULE 1 1.0 CRITERIA FOR

More information

The Hong Kong Polytechnic University Facilities Management Office

The Hong Kong Polytechnic University Facilities Management Office The Hong Kong Polytechnic University Facilities Management Office Safety Precautions and Requirements The Contractor shall ensure as a priority in all activities connected with the Works, the safety and

More information

Corporate Policy and Procedure

Corporate Policy and Procedure Corporate Policy and Procedure POLICY CATEGORY AUTHORITY RELATED POLICIES APPROVED BY Safety Management When Outside Contractors are Retained (Contractor Safety Management Program) (the Policy ) Health

More information

Maintenance and Refurbishment Works of Quarters Two (2) at FEA s National Control Center, Vuda. Tender Number: MR 334/2017

Maintenance and Refurbishment Works of Quarters Two (2) at FEA s National Control Center, Vuda. Tender Number: MR 334/2017 ` Maintenance and Refurbishment Works of Quarters Two (2) at FEA s National Control Center, Vuda. Tender Number: MR 334/2017 1 Fiji Electricity Authority (FEA) is a statutory body vested with the responsibility

More information

Home Modification Loan Program Guide and Bid, Scope of Work and Contract Form

Home Modification Loan Program Guide and Bid, Scope of Work and Contract Form Home Modification Loan Program Guide and Bid, Scope of Work and Contract Form PART I: Guide and General Terms and Conditions The Home Modification Loan Program (HMLP) provides funding for necessary home

More information

INSTALLATION OF NEW FURNACE CALCINER 2

INSTALLATION OF NEW FURNACE CALCINER 2 SITE INFORMATION INSTALLATION OF NEW FURNACE CALCINER 2 The tenderer should, in his own interest, do a MANDATORY SITE VISIT ON 25 TH JANAUARY 2017 to familiarize with the site conditions before tendering.

More information

Submission, Review and Approval of Construction Documents Submission and Review of a Completed Application for Permit

Submission, Review and Approval of Construction Documents Submission and Review of a Completed Application for Permit Building Code The Florida State University Building Code Administration Program (BCA) was established in 2001 and is responsible for ensuring that all construction activities on FSU owned facilities are

More information

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC PREPARED BY: Metropolitan Washington Airports Authority Washington Dulles International Airport Engineering

More information

Certification Number: NAT Lead Renovation, Repair and Painting Program

Certification Number: NAT Lead Renovation, Repair and Painting Program Certification Number: NAT-117534-2 Lead Renovation, Repair and Painting Program August 2018 Lead Renovation, Repair and Painting Program TABLE of CONTENTS I. Purpose II. Risk Identification III. Responsibilities

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

PERMIT AND INSPECTIONS

PERMIT AND INSPECTIONS Chapter 3 PERMIT AND INSPECTIONS 3.1 PERMITS No building or structure regulated by this Code shall be erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

Phoenix Building Construction Code Updated Amendments to the Administrative Provisions

Phoenix Building Construction Code Updated Amendments to the Administrative Provisions Phoenix Building Construction Code Updated Amendments to the Administrative Provisions CHAPTER 1 ADMINISTRATION Section 101.2 Change to read as shown: 101.2 Scope. The provisions of this Code shall apply

More information

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC PREPARED BY: Metropolitan Washington Airports Authority Washington Dulles International Airport Engineering

More information

PUBLIC CONTRACT CODE SECTION

PUBLIC CONTRACT CODE SECTION PUBLIC CONTRACT CODE SECTION 22160 22169 22160. (a) The Legislature finds and declares that the design build method of project delivery, using a best value procurement methodology, has been authorized

More information

QUALITY ASSURANCE REQUIREMENTS

QUALITY ASSURANCE REQUIREMENTS SPACE AT MUCKLENEUK CAMPUS PRETORIA QUALITY ASSURANCE REQUIREMENTS SPACE AT MUCKLENEUK CAMPUS, PRETORIA Page 1 1.1 QUALITY ASSURANCE REQUIREMENTS In undertaking the works (including all incidental services

More information

COMMUNITY COLLEGE DISTRICT OF JEFFERSON COUNTY, MISSOURI REQUEST FOR PROPOSAL: WINDOW, DOOR, AND FRAME REPLACEMENT

COMMUNITY COLLEGE DISTRICT OF JEFFERSON COUNTY, MISSOURI REQUEST FOR PROPOSAL: WINDOW, DOOR, AND FRAME REPLACEMENT COMMUNITY COLLEGE DISTRICT OF JEFFERSON COUNTY, MISSOURI REQUEST FOR PROPOSAL: WINDOW, DOOR, AND FRAME REPLACEMENT RFP # 1710002 Sheree Bell Due Date: November 30, 2017 Procurement Coordinator Not later

More information

Quality Assurance Manual

Quality Assurance Manual Quality Assurance Manual Current Electrical is committed to leading the market in satisfying customer needs by providing versatile and innovative electrical and control solutions We take pride in the ability

More information

Request for Proposal (RFP) Building Repair and Renovation Project. Instruction to Bidders (Project Management Consultants) & Eligibility Criteria

Request for Proposal (RFP) Building Repair and Renovation Project. Instruction to Bidders (Project Management Consultants) & Eligibility Criteria Section -I Request for Proposal (RFP) Building Repair and Renovation Project Instruction to Bidders (Project Management Consultants) & Eligibility Criteria 1. Project Management Consultants should submit

More information

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No PART 1 GENERAL 1.1 RELATED DOCUMENTS REQUIREMENTS COMMON TO ALL WORK CATEGORIES 1. Drawings and general provisions of the Contract, including General Special Conditions and other Division 1 Specification

More information

NOTICE FOR SELECTION OF ARCHITECT FOR ALTERATION / ADDITIONAL CONSTRUCTION WORK ON THE EXISITING BUILDING OF BHUBANESWAR CHAPTER OF ICSI

NOTICE FOR SELECTION OF ARCHITECT FOR ALTERATION / ADDITIONAL CONSTRUCTION WORK ON THE EXISITING BUILDING OF BHUBANESWAR CHAPTER OF ICSI NOTICE FOR SELECTION OF ARCHITECT FOR ALTERATION / ADDITIONAL CONSTRUCTION WORK ON THE EXISITING BUILDING OF BHUBANESWAR CHAPTER OF ICSI The Institute of Company Secretaries of India (ICSI) has its own

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS CONTENTS I. Bid Documents II. Ethical Business Practices III. Contractor Qualifications IV. Performance and Quality Standards V. Bid Evaluation VI. Contract Award VII. Work Operations

More information

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR TOWN OF LABRADOR CITY FORM OF TENDER TLC-04-18 SUPPLY & INSTALLATION OF CONCRETE FLOOR Tenderer Address Telephone # The undersigned bidder has carefully examined the Form of Tender, Instructions to Bidders,

More information

SPPL RFQ Ref No.: REPLACEMENT OF BALL FLOAT VALVE FOR WATER TRANSFER TANK AT SINGAPORE POOLS BUILDING

SPPL RFQ Ref No.: REPLACEMENT OF BALL FLOAT VALVE FOR WATER TRANSFER TANK AT SINGAPORE POOLS BUILDING SPPL RFQ Ref No.: 2200001220 REPLACEMENT OF BALL FLOAT VALVE FOR WATER TRANSFER TANK AT SINGAPORE POOLS BUILDING Company Name: Contact Person for this RFQ: Contact No.: Email: Lead Time: Target completion

More information

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 02 41 14 SELECTIVE BUILDING DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for systematic removal of site improvements or portions of exterior and interior of buildings

More information

Town of Saugeen Shores Department of Community Services

Town of Saugeen Shores Department of Community Services Town of Saugeen Shores Department of Community Services TENDER- Supply and Delivery of Janitorial/ Maintenance Supplies (Reference No: 2015.6760.4710) Purpose: The Town of Saugeen Shores invites companies

More information

SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)

SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS) Title: Subcontractor Control Document Effective Date: 2/3/2012 Control Number: THG_0007 Revision Number: 1 Date: 10/6/2015 Annual Review Completed: 5/13/2015 CONTENTS SUBCONTRACTOR SAFETY, HEALTH, AND

More information

DEMOLITION BY USE OF EXPLOSIVES

DEMOLITION BY USE OF EXPLOSIVES INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 91.3303.9 Effective: 7-14-95 DOCUMENT NO. P/BC 2002-020 Revised: 11-17-00 Previously Issued As: MGD #105 DEMOLITION BY USE OF EXPLOSIVES

More information

FOR THE PROVISION OF A TEAMBUILDING FACILITATOR TO CARRY OUT TEAM BUILDING PROGRAMME FOR EXECUTIVES, SENIOR MANAGEMENT AND RETAIL LEADERSHIP.

FOR THE PROVISION OF A TEAMBUILDING FACILITATOR TO CARRY OUT TEAM BUILDING PROGRAMME FOR EXECUTIVES, SENIOR MANAGEMENT AND RETAIL LEADERSHIP. REQUEST FOR QUOTATION 624-18 INVITATION TO TENDER FOR THE PROVISION OF A TEAMBUILDING FACILITATOR TO CARRY OUT TEAM BUILDING PROGRAMME FOR EXECUTIVES, SENIOR MANAGEMENT AND RETAIL LEADERSHIP. Tender Closing

More information

Building Inspections Under the Uniform Dwelling Code

Building Inspections Under the Uniform Dwelling Code 3-8-01 Authority Building Inspections Under the Uniform Dwelling Code Building and Mechanical Code (Revised 5-2013) These regulations are adopted under the statutory authority granted pursuant to Section

More information

MetroLink Operations 700 South Ewing Street Saint Louis, Missouri

MetroLink Operations 700 South Ewing Street Saint Louis, Missouri Operating Procedure SOP # Date: Page 1 of 10 Classifications: OCC Rail Dispatchers Maintenance of Way - Contractors Other Departments: Real Estate Operation Safety - Risk Management - Engineering & New

More information

INTEGRA DATA CENTER POLICIES AND PROCEDURES

INTEGRA DATA CENTER POLICIES AND PROCEDURES INTEGRA DATA CENTER POLICIES AND PROCEDURES Integra Telecom, Inc. has adopted the following Policies and Procedures related to our Data Products and Services and use of our Data Centers. The Policies and

More information

BID SPECIFICATION: ADDENDUM A

BID SPECIFICATION: ADDENDUM A BID SPECIFICATION: ADDENDUM A SUPPLY, DELIVERY AND INSTALLATION OF CLEAR VIEW TYPE FENCE AT THE DISTRICT SIX CAMPUS. A MINIMUM CIDB RATING OF 5SQ (4SQ PE) OR HIGHER IS REQUIRED CPUT17/18 TABLE OF CONTENTS

More information

SECTION ENGINEER'S OFFICE

SECTION ENGINEER'S OFFICE 01200-1 of 5 SECTION 01200 ENGINEER'S OFFICE 01200.01 GENERAL A. Description This item shall consist of furnishing and maintaining in good condition a suitable office in a location acceptable to the Engineer

More information

Bulk Bag Lifting Frame

Bulk Bag Lifting Frame User Guide Bulk Bag Lifting Frame Introduction The Conquip Bulk Bag Lifting Frame is designed for the safe and easy movement of tonne bags and other bulk bags of materials or waste around site. The frame

More information

Pod Lifting Frame. Introduction. Important Notes. Key Benefits. User Guide

Pod Lifting Frame. Introduction. Important Notes. Key Benefits. User Guide User Guide Pod Lifting Frame Introduction The Conquip Pod Lifting Frame enables the transportation of prefabricated modular pods to the required structure level. The Pod Lifting Frame fits flush against

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE DIVISION 1 GENERAL REQUIREMENTS SECTION 01 32 16 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. All drawings and technical specifications, Notice to Bidders, Instructions and Information to Bidders, Bid Proposal

More information

Rediscover Downtown Peru Commercial Use Facade Improvement Program

Rediscover Downtown Peru Commercial Use Facade Improvement Program Mission Statement: (RDP) is a group of community members and business leaders dedicated to building a vibrant downtown by supporting local businesses and encouraging revitalization and historic preservation

More information

Table of Contents. Project Agreement Schedule 14

Table of Contents. Project Agreement Schedule 14 Table of Contents PART 1 DEFINITIONS... 3 PART 2 INTEGRATED MANAGEMENT SYSTEM REQUIREMENTS... 6 2.1. Introduction... 6 2.2. Overview... 6 2.2.1 Management System Requirements... 7 2.2.2 Certification...

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SPECIAL CONDITIONS Definitions: a) OWNER: Union County Vocational-Technical Schools UCVTS b) CITY or TOWN: Scotch Plains, New Jersey c) ARCHITECT: Netta Architects 1084 Route 22 West Mountainside, New

More information

Pre-Construction Meeting Minutes

Pre-Construction Meeting Minutes Project Name Project # Project Address Tel: Fax: Gilbane Building Company Pre-Construction Meeting Date Start End Next Meeting Next Time Prepared By Company Purpose Location Next Location General Notes

More information

COUNTY OF SAN JOAQUIN

COUNTY OF SAN JOAQUIN June 4, 2012 COUNTY OF SAN JOAQUIN General Services Department 44 North San Joaquin Street, Suite 590 Stockton, California 95202-2778 (209) 468-3357, Fax (209) 468-2186 GABRIEL E. KARAM Director Capital

More information

Request for Proposal # 1703 Water Damage Repair of Murray Mansion

Request for Proposal # 1703 Water Damage Repair of Murray Mansion Request for Proposal # 1703 Water Damage Repair of Murray Mansion The City of Lindsay/Lindsay Public Works Authority, Oklahoma, is accepting sealed proposals for Water Damage Repair of a historic public

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

Environmental, Health and Safety Policy for Contractors

Environmental, Health and Safety Policy for Contractors Environmental, Health and Safety Policy for Contractors The attached policy is a tool to help contractors understand and comply with RBC's Environmental, Health and Safety rules. The information that follows

More information

TYPICAL APARTMENT FLOOR PLAN

TYPICAL APARTMENT FLOOR PLAN PHOTO #7 PHOTO #8 EAST 8TH STREET (60' WIDE STREET) P L P L PHOTO #4 P L P L A B C D E F G H I #21 ASTOR PLACE 11 STORY BUILDING HEIGHT = 130' (11 STORIES) STAIR #3 BROADWAY (100' WIDE STREET) L STAIR

More information

Chapter 2 Parties to the Contract

Chapter 2 Parties to the Contract Chapter 2 Parties to the Contract 2.1 Introduction Construction work may include building of a new structure, additions, alterations, expansion, replacement, dismantling, erection, commissioning, rehabilitation,

More information

The Art Barn is available to be seen by potential vendors by appointment only by contacting EMSA s CFO whose information is listed below.

The Art Barn is available to be seen by potential vendors by appointment only by contacting EMSA s CFO whose information is listed below. October 10, 2018 OBJECT: REQUEST FOR PROPOSAL VENDORS, The ( EMSA ) located at 1600 Dundee Avenue in Elgin, IL 60120 is soliciting vendors with an expertise in construction services-demolition to perform

More information

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993 P a g e 1 SUBJECT ISSUED BY APPROVED BY CONTRACT CONTRACT BETWEEN EMPLOYER AND MANDATORY SAFETY MANAGER: SUN CITY RESORT DIRECTOR OF OPERATIONS PAGE 1 OF 15 EFFECTIVE: REVISION NO: 1 HEALTH AND SAFETY

More information

Transnet Freight Rail RFP No: SIG 9078 A Division of Transnet Limited. Part C3.1. Works Information

Transnet Freight Rail RFP No: SIG 9078 A Division of Transnet Limited. Part C3.1. Works Information 1.0 BACKGROUND Part C3.1 Works Information 1.1 Transnet Freight Rail has approximately 4 000 (four thousand) hydraulic and welding tools of various makes and types throughout the Republic of South Africa,

More information

PRICING DOCUMENT FOR REQUEST FOR APPLICATIONS FOR APPOINTMENT TO A MULTI-PARTY FRAMEWORK AGREEMENT FOR ENERGY EFFICIENCY RETROFITTING WORKS FOR

PRICING DOCUMENT FOR REQUEST FOR APPLICATIONS FOR APPOINTMENT TO A MULTI-PARTY FRAMEWORK AGREEMENT FOR ENERGY EFFICIENCY RETROFITTING WORKS FOR PRICING DOCUMENT FOR REQUEST FOR APPLICATIONS FOR APPOINTMENT TO A MULTI-PARTY FRAMEWORK AGREEMENT FOR ENERGY EFFICIENCY RETROFITTING WORKS FOR LOCAL AUTHORITIES LOT CAVITY WALL INSULATION AND ANCILLARY

More information

Embassy of India Tel Aviv TENDER NOTICE. Subject: Cleaning contract for the Office premises of Embassy of India, Tel Aviv

Embassy of India Tel Aviv TENDER NOTICE. Subject: Cleaning contract for the Office premises of Embassy of India, Tel Aviv Embassy of India Tel Aviv TENDER NOTICE Subject: Cleaning contract for the Office premises of Embassy of India, Tel Aviv Sealed quotations are invited for award of contract for cleaning of the office premises

More information

NOTICE INVITING TENDER (NIT)

NOTICE INVITING TENDER (NIT) NOTICE INVITING TENDER (NIT) Government of India, Ministry of Defence, Director General, Project Seabird, Integrated HQs of MoD (Navy), West Block-5, R K Puram, New Delhi -110066, Telephone No: 011 26105539,

More information

UNITED STATES EMBASSY ABIDJAN, COTE D IVOIRE

UNITED STATES EMBASSY ABIDJAN, COTE D IVOIRE UNITED STATES EMBASSY ABIDJAN, COTE D IVOIRE STATEMENT OF WORK TO INSTALL ADDITIONAL NETWORK AND ELECTRICAL OUTLET IN THE USAID WORKPLACE ROOM 267 AT NEC DATE: June 19, 2017 POST: Abidjan, Cote D Ivoire

More information

DIVISION 02 SELECTIVE DEMOLITION

DIVISION 02 SELECTIVE DEMOLITION DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.

More information

City of New Haven. 101 FRONT STREET PO BOX 236 NEW HAVEN, MO Phone * * Fax

City of New Haven. 101 FRONT STREET PO BOX 236 NEW HAVEN, MO Phone *  * Fax City of New Haven 101 FRONT STREET PO BOX 236 NEW HAVEN, MO 63068 Phone 573-237-2349 * www.newhavenmo.org * Fax 573-237-4696 February 19, 2013 Request for Bids New Haven City Park Bock Field fencing The

More information

MINUTES OF PRE-BID CONFERENCE. INVITATION TO BID INTERIOR FITTING-OUT WORKS FOR NEW UNDP CAMBODIA COUNTRY OFFICE Process No:

MINUTES OF PRE-BID CONFERENCE. INVITATION TO BID INTERIOR FITTING-OUT WORKS FOR NEW UNDP CAMBODIA COUNTRY OFFICE Process No: I. Background MINUTES OF PRE-BID CONFERENCE INVITATION TO BID INTERIOR FITTING-OUT WORKS FOR NEW UNDP CAMBODIA COUNTRY OFFICE Process No: 35-46214 The United Nations Development Programme (UNDP) would

More information

SUPPLEMENTAL BID BULLETIN NO. 1. This Supplemental Bid Bulletin No. 1 is issued to amend the project title,

SUPPLEMENTAL BID BULLETIN NO. 1. This Supplemental Bid Bulletin No. 1 is issued to amend the project title, Batangas State University Bidding Documents (Based on Revised IRR of RA 9184, Fourth Edition, December 2010) January 7, 2016 SUPPLEMENTAL BID BULLETIN NO. 1 This Supplemental Bid Bulletin No. 1 is issued

More information

IV. REGULATIONS GOVERNING BOOTH DECORATION WITHIN THE TAIPEI WORLD TRADE CENTER EXHIBITION HALL

IV. REGULATIONS GOVERNING BOOTH DECORATION WITHIN THE TAIPEI WORLD TRADE CENTER EXHIBITION HALL IV. REGULATIONS GOVERNING BOOTH DECORATION WITHIN THE TAIPEI WORLD TRADE CENTER EXHIBITION HALL 1. Construction guidelines for exhibition booths: (1) It is essential that exhibition booths must be properly

More information

HEALTH & SAFETY SPECIFICATIONS FOR MINOR CONTRUCTION WORK ACTITIVITES AT SANBI PREMISES.

HEALTH & SAFETY SPECIFICATIONS FOR MINOR CONTRUCTION WORK ACTITIVITES AT SANBI PREMISES. HEALTH & SAFETY SPECIFICATIONS FOR MINOR CONTRUCTION WORK ACTITIVITES AT SANBI PREMISES. 1. PURPOSE The objective of the Health and Safety Specifications is to provide a guideline for the principal contractor

More information

SCOPE OF WORK FOR RATE CONTRACT FOR ERECTION / REMOVAL OF BAMBOO STAGING/SCAFFOLDING ON U/W HULL AND ONBOARD IN SHIPS AND SUBMARINES

SCOPE OF WORK FOR RATE CONTRACT FOR ERECTION / REMOVAL OF BAMBOO STAGING/SCAFFOLDING ON U/W HULL AND ONBOARD IN SHIPS AND SUBMARINES SCOPE OF WORK FOR RATE CONTRACT FOR ERECTION / REMOVAL OF BAMBOO STAGING/SCAFFOLDING ON U/W HULL AND ONBOARD IN SHIPS AND SUBMARINES (A) Detailed description of the job to be executed with quantum of job

More information

Tender Document and Specifications for Council Property Assorted Painting and Decorating between Parks and Recreation and Contractor.

Tender Document and Specifications for Council Property Assorted Painting and Decorating between Parks and Recreation and Contractor. Tender Document and Specifications for Council Property Assorted Painting and between Parks and Recreation and Contractor. CONTRACT 2014-02 November 2014 CONTENTS Instruction to Tenderers... 3 Foreword

More information

1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT)

1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT) 1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT) The use of an existing elevator during construction shall be strictly prohibited. Any deviation

More information

2018 REQUEST FOR PROPOSAL FOR JANITORIAL SERVICES. Alberta Construction Safety Association (ACSA)

2018 REQUEST FOR PROPOSAL FOR JANITORIAL SERVICES. Alberta Construction Safety Association (ACSA) 2018 REQUEST FOR PROPOSAL FOR JANITORIAL SERVICES Alberta Construction Safety Association (ACSA) CLOSING DATE: February 9 th, 2018 SECTION 1 PURPOSE AND CONTENT 1.1 We are Alberta s partner in construction

More information

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395 TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION 518-355-7575 Ext 395 Needed to Obtain a Residential Accessory Structure Building Permit: 1. Building

More information

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following: SECTION 01700 - CONTRACT CLOSEOUT PART 1 - GENERAL 1.01 RELATED DOCUMENTS 1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Architectural Commission Report

Architectural Commission Report City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 TEL. (310) 285-1141 FAX. (310) 858-5966 Architectural Commission Report Meeting Date: Wednesday, August 15, 2018 Subject:

More information

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate

More information

The Colby Community College (the College ) is requesting proposals (RFP) for Design/Build services for a new Athletics Facility in Colby, Kansas.

The Colby Community College (the College ) is requesting proposals (RFP) for Design/Build services for a new Athletics Facility in Colby, Kansas. 1. PROJECT DESCRIPTION REQUEST FOR DESIGN/BUILD PROPOSALS FOR A NEW ATHLETICS FACILITY FOR COLBY COMMUNITY COLLEGE COLBY, KANSAS 67701 Issue Date: 10/1/2018 The Colby Community College (the College ) is

More information

Tender Document and Specifications for Council Property Assorted Painting and Decorating between the Council and Contractor.

Tender Document and Specifications for Council Property Assorted Painting and Decorating between the Council and Contractor. Tender Document and Specifications for Council Property Assorted ing and Decorating between the Council and Contractor. CONTRACT 2017-16 1 December 2017 1 CONTENTS Instruction to Tenderers... 3 Foreword

More information

TITLE: CONTRACTOR SAFETY. Safety Procedures and Policies. Issuing Authority: Multi-Color Corporation, Page Number: 1 of 5. Date Effective: 4/1/2011

TITLE: CONTRACTOR SAFETY. Safety Procedures and Policies. Issuing Authority: Multi-Color Corporation, Page Number: 1 of 5. Date Effective: 4/1/2011 Page Number: 1 of 5 1.0 SCOPE Safety in the plant is concerned with more than just the Multi-Color associate. All outside contractors must also follow specific guidelines and rules for safe conduct while

More information

IBC Container. Introduction. Important Notes. Key Benefits. User Guide

IBC Container. Introduction. Important Notes. Key Benefits. User Guide User Guide IBC Container Introduction The Conquip IBC Liquid Container is an Intermediate Bulk Container for transporting and storing bulk liquids and other substances. It is a pallet tank that is reusable

More information

SECTION 50 CONTROL OF WORK

SECTION 50 CONTROL OF WORK SECTION 50 CONTROL OF WORK 50-01 AUTHORITY OF THE ENGINEER. The Engineer shall decide any and all questions which may arise as to the quality and acceptability of materials furnished, work performed, and

More information

DEMOLITION TRADE SPECIFICATION

DEMOLITION TRADE SPECIFICATION DEMOLITION TRADE SPECIFICATION GENERAL a) BDW Trading Limited Barratt Homes and David Wilson Homes are all trading names of BDW Trading Limited the Company. b) Site Condition The Contractor is to examine

More information

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE TECHNICAL QUESTIONS FOR ITB-DOT-17/18-7004LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE Question 1: Question 2: Question 3: Question 4: Question 5: Question 6: When area configurations

More information

GUIDELINE. A Guide to. Testing and Commissioning Guidelines PED/SDQS/MN-TNC(V)1/R/0807(116)

GUIDELINE. A Guide to. Testing and Commissioning Guidelines PED/SDQS/MN-TNC(V)1/R/0807(116) GUIDELINE A Guide to Testing and Commissioning Guidelines PED/SDQS/MN-TNC(V)1/R/0807(116) LIST OF SECTION 1.0 INTRODUCTION 1 2.0 DEFINITIONS AND INTERPRETATION 1 3.0 PRE-COMMISSIONING 2 3.1 General 2 3.2

More information

ATTACHMENT A. Bid # 6793

ATTACHMENT A. Bid # 6793 ATTACHMENT A SCOPE OF WORK TECHNICAL SPECIFICATIONS AND CONTRACT DRAWINGS STORAGE SHED INSTALLATION AT THE SAN JOAQUIN COUNTY HOUSEHOLD HAZARDOUS WASTE FACILITY Bid # 6793 Department of Public Works Solid

More information

User Guide. IBC Liquid Container

User Guide. IBC Liquid Container User Guide IBC Liquid Container Product Information Specification Item IBC Liquid Container Product Code FB300-01000 Product Information Overview The Conquip IBC Liquid Container is an Intermediate Bulk

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. E-Mail to fiona@ymginc.com Print Document Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) ````````````````````````` (Cell) E-Mail

More information

COAA EPCM CONTRACT PHILOSOPHY. COAA EPCM Contract Committee

COAA EPCM CONTRACT PHILOSOPHY. COAA EPCM Contract Committee COAA EPCM CONTRACT PHILOSOPHY COAA EPCM Contract Committee 1. Introduction The COAA EPCM Contract Committee, consisting of owner, contractor and affiliate members, has developed a standard form EPCM Contract

More information

COSHH Store. Introduction. Important Notes. Key Benefits. User Guide

COSHH Store. Introduction. Important Notes. Key Benefits. User Guide User Guide COSHH Store Introduction The Conquip Walk-In COSHH Store is designed for secure storage of chemicals and other hazardous or flammable substances that can cause harm to the environment. Its weather-proof

More information

Price Electronics,LLC Quality Assurance Manual

Price Electronics,LLC Quality Assurance Manual Price Electronics,LLC QUALITY POLICY INTRODUCTION The purpose of this manual is to document the company s quality system, to instruct and guide employees whose actions affect product quality and to inform

More information

GENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES

GENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 120 NOVEMBER 2014 GENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES TABLE OF CONTENTS 120.01 SCOPE 120.02 REFERENCES 120.03 DEFINITIONS 120.04 DESIGN

More information

TO COLLECTION. Section No. 1 Bill No. 1 PARTICULAR PRELIMINARIES Prepared by; CWO; Kiambu County. pp/1

TO COLLECTION. Section No. 1 Bill No. 1 PARTICULAR PRELIMINARIES Prepared by; CWO; Kiambu County. pp/1 SECTION NO. 1 PRELIMINARIES BILL NO. 1 PARTICULAR PRELIMINARIES A PRICING ITEMS OF PRELIMINARIES Prices SHALL BE INSERTED against items of preliminaries in the tenderers priced Bills of Quantities. Please

More information

Jhabua Power Ltd. NOTICE INVITING BIDS

Jhabua Power Ltd. NOTICE INVITING BIDS Jhabua Power Ltd. 2nd Floor, Centrum plaza, Golf Course Road, Sector- 53, Gurgaon-122002 Ph.: +91-124-4392000 Fax: +91-124-4376496 NOTICE INVITING BIDS BY JHABUA POWER LIMITED (JPL) 2nd Floor, Centrum

More information

FABRICATION OF A NEW INDUCED DRAUGHT FAN DUCTING KILN 2

FABRICATION OF A NEW INDUCED DRAUGHT FAN DUCTING KILN 2 FABRICATION OF A NEW INDUCED DRAUGHT FAN DUCTING KILN 2 SITE INFORMATION The tenderer should, in his own interest, visit the site and familiarize with the site conditions before tendering. For any clarification,

More information

FCX Department of Occupational Health and Safety. Contents. Open-Hole Policy

FCX Department of Occupational Health and Safety. Contents. Open-Hole Policy FCX Department of Occupational Health and Safety Open-Hole Policy Approval Date: 12/09/13 Original Date: 03/30/09 SOP # FCX-01 Revision # 6 Supersedes X High Medium Task Risk Low NA Contents 1.0 Policy...2

More information

REQUEST FOR PROPOSAL (RFP) for the Construction of Base Building Requirements for the new Alaska Gallery exhibit.

REQUEST FOR PROPOSAL (RFP) for the Construction of Base Building Requirements for the new Alaska Gallery exhibit. REQUEST FOR PROPOSAL (RFP) for the Construction of Base Building Requirements for the new Alaska Gallery exhibit. 1. INVITATION The Anchorage Museum is soliciting bids from qualified general contractors

More information

Special Provision No. 199S53 January 2018

Special Provision No. 199S53 January 2018 PERFORMANCE REQUIREMENT - QUALITY PROCESSES Special Provision No. 199S53 January 2018 1.0 SCOPE This Special Provision describes the performance requirements for quality processes, assessment of conformance

More information

SECTION GENERAL REQUIREMENTS

SECTION GENERAL REQUIREMENTS SECTION 01005 GENERAL REQUIREMENTS PART 1 GENERAL 1.01 WORK COVERED BY CONTRACT DOCUMENTS A. Work of this Contract comprises the chiller and cooling tower replacement at Five Oaks Middle School which includes

More information

NOTICE TO BIDDERS. Bids will be publicly opened and read aloud at approximately 2:15pm in the Saugatuck-Douglas District Library.

NOTICE TO BIDDERS. Bids will be publicly opened and read aloud at approximately 2:15pm in the Saugatuck-Douglas District Library. SECTION 00 02 00 - NOTICE TO BIDDERS NOTICE TO BIDDERS Notice is hereby given that sealed bids will be received: By: Saugatuck-Douglas District Library 137 Center Street Douglas, MI 49406 For: Saugatuck-Douglas

More information

STOCKHOLDING DOCUMENT MANAGEMENT SERVICES LIMITED FORMERLY KNOWN AS SHCIL PROJECTS LIMITED

STOCKHOLDING DOCUMENT MANAGEMENT SERVICES LIMITED FORMERLY KNOWN AS SHCIL PROJECTS LIMITED STOCKHOLDING DOCUMENT MANAGEMENT SERVICES LIMITED FORMERLY KNOWN AS SHCIL PROJECTS LIMITED REQUEST FOR PROPOSAL (RFP) 130616 FOR SUPPLY INSTALLATION AND COMMISSIONING OF STEEL MEZZANINE FLOORING AT MAHAPE

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-01 45 00.10 20 (February 2010) Changed 1-08/17 ----------------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 45 02.10 (November 2008) UNIFIED FACILITIES

More information

SECTION ADDENDA

SECTION ADDENDA SECTION 00 91 03 ADDENDA ADDENDUM NO. 2 June 14, 2017 RE: Cana Island Light Station Phase 2 Baileys Harbor, WI RA 1372.A FROM: TO: River Architects, Inc. 740 7 th Street North La Crosse, Wisconsin 54601

More information

Pro-Demnity Insurance Company

Pro-Demnity Insurance Company Pro-Demnity Insurance Company September 16, 2009 IMPORTANT NOTICE: Non-Drained Exterior Wall Exclusion & Window Wall Endorsements Two important changes to the Pro-Demnity Insurance Policies provided under

More information

for selection of Architect for above mentioned work. The scope of the work of the Architect shall be as under:

for selection of Architect for above mentioned work. The scope of the work of the Architect shall be as under: NOTICE FOR SELECTION OF ARCHITECT FOR FURNISHING OF NEW PREMISES OF BHOPAL CHAPTER OF ICSI AT SECOND FLOOR HALL (ON RIGHT HAND SIDE), CHETAK COMPLEX, M.P NAGAR, ZONE- II, BHOPAL The Institute of Company

More information

Terms for Support and Maintenance

Terms for Support and Maintenance Terms for Support and Maintenance 1. Definitions Agreement The Order Form, these Support Terms, any other terms or schedules attached hereto and any additional order(s) made in writing by the Customer

More information

Tender Document and Specification

Tender Document and Specification Tender Document and Specification for Council Property Assorted Painting and Decorating between Parks and Recreation and Contractor CONTRACT 2014-02 March 2014 CONTENTS Instruction to Tenderers... 3 Foreword

More information