Conceptual Engineering Report Collier County Beaches, Florida
|
|
- Harriet Cook
- 6 years ago
- Views:
Transcription
1 Conceptual Engineering Report Collier County Beaches, Florida Presented to Collier County Coastal Advisory Committee October 13, 2011 Steve Keehn, PE, CPE
2 Topics Goals Monitoring & Performance Summary 3 Major Hot Spots Findings Modeling Results Recommended Project Combination of Existing and New Practices Cost and Cost Saving Next Step
3 Goals: The purpose of the study was to develop conceptual designs that addresses the effectiveness of existing structures and beach fill design templates, and changes needed to solve hot spots and improve project performance and durability. Beach fill alternatives with a higher and wider beach berm were evaluated with structural modifications to achieve these goals.
4
5 Hot Spot Ranking Matrix Hot Spot Erosion Rates Maintain Beach Width Groin Impacts Hardbottom Limitations Management Practices Relative Importance Code Barefoot Beach R14-R16 XX NA X 3 M, N Delnor Wiggins State Park X 1 I Vanderbilt Beach R27 & R31 X X X 3 S, * Pelican Bay R35-R36 X X 2 I Clam Pass Park R42-R44 XX NA X X 4 M, N Seagate Drive R45-R46 X X X 3 S & G Park Shore R51-R54 X X X 4 S, * South of Doctors Pass R58 XX XX X X X 7 M, Str South of Lowdermilk Park R62-R64 X X X 3 S & G South Naples R71 XX 2 I Code S More sand or feeder beach likely solution G Shorten or remove groin likely solution M Management change needed Str New structure needed N Nourishment I Not a problem * Structures as fall back solution Priority Yellow, blue, green.
6
7 Major Finding The performance of the beach in avoiding hardbottom coverage has exceeded permit expectations, and the results of four years of physical monitoring indicate that the beach can be widened without a significant increased risk of hardbottom impacts. The analysis and modeling indicate that the recommended plan with a 10 year project life is feasible with the use of minimal new structures.
8 Bases of Conceptual Design Excellent Performance 25 ft. advance at MHW Versus 37 ft. retreat at -11 ft. NAVD 63 feet Total Advanage 25.0 Park Shore Hot Spot Solution
9 CHANGE INLET MANAGEMENT MODIFY DISOSAL AREA COORDINATE INLET MANAGEMENTND AND BEACH NOURISHMENT ELIMATE/REDUCE STRUCTURES (Groins) Return Disposal Area Here, but Upland South of Doctors Pass Extend Disposal Area to Here Clam Pass Park and Seagate Drive
10 In general, if sufficient sand can be placed on the beach through nourishment and inlet bypassing, then a structures are less important.
11 Much Sand and No Structures Better Beach
12 Alternatives Considered Alternative 1: FEMA Project Alternative 2: 2006 Project w/ 3 Reaches Alternative 3: Design with 10- Year Life in 5 Reaches Higher and Wider Beach Alternative 4: Structures Removal Modification
13 Summary of Modeling Results and Final Plan In general, the modeling shows a 10-year nourishment interval is feasible and most of the groins can be removed, resulting in improved performance of the beach. Modeling shows that a wider fill placement and removal of some of the existing structures is the most practical and direct solution, while many of the structures modeled had less convincing performance.
14 Calibration for Vanderbilt Beach
15 Naples with and without structures after 3 years
16 Aerial photography dated of 2008 and 2009 taken at the Double pipeline outfall and groin combination
17 Park Shore with and without structures after 3 years
18 The design without structures is the recommended plan, in conjunction with increased sand placement near hot spots identified by the modeling. This selection is a combination of Alternative 3 and M9 to M11. For economy, gaps in fill placement should be allowed in the project area to reduce the amount of fill needed and its associated cost.
19 10-Year Life Add n R-29 Gaps Vanderbilt Recommended Plan
20 10-Year Life Remove Structures Modify Bypassing to R45 Gaps Park Shore Recommended Plan
21 10-Year Life Remove Structures Modify Bypassing Disposal Build Groin Spur Gaps Naples Recommended Plan
22 Net Sediment Transport with and without Spur & Volume Gain
23 If sufficient sand can be placed on the beach through nourishment and inlet bypassing, then a structural solution is less important. In general, the modeling shows a 10-year nourishment interval is feasible and most of the groins can be removed, resulting in improved performance of the beach. Modeling shows that a wider fill placement and removal of some of the existing structures is the most practical and direct solution, while many of the structures modeled had less convincing performance. The consideration of new structures should also be delayed until sufficient monitoring of the expanded project is performed.
24 DESIGN VOLUMES REACH Vanderbilt R22 to R31 N. Park Shore R45 to R48 Park Shore R49 to R55 DESIGN VOLUME (C.Y.) ALT. 1 ALT. 2 ALT. 3 40,000 41,733 58,056 21,000 40,881 49,729 30,000 97, ,337 Naples Beach 84, , ,008 R58A to R79 SUBTOTAL 175, , ,130 Barefoot Beach 100,000 R14 to R16 Clam Pass R42 to R44 30,000 TOTAL 175, , ,130
25 Recommended project: Combination of existing practices and new alternatives using Design Alternative 3 without structures and modification to inlet management practices Continuation of Existing Practices. Beach fill Vanderbilt Beach R22.5 to R31.5 Park Shore R45.5 to R54 Naples Beach R58 to R79 Inlet Bypassing at Wiggins, Clam and Doctors Passes
26 New Elements Widen & raise the beach to support a 10-year life. Nourish Barefoot Beach (R14 R16) and ebb shoal. Nourish Clam Pass Park as feeder beach for Park Shore. Return to pre-2005 disposal area for Doctors Pass dredging Remove structures from beach sequentially from those with the largest impact, lowest cost and easiest to address outfall solution. Start with the structures located closest to Clam and Doctors Passes. Add a spur to the south Doctors Pass jetty Delay other structures
27 Higher & Wider Profile Typical Naples Beach Profile 2006 vs 2010 Template Comparison Profile 2006 Template Expanded Template Elevation (ft, NAVD Distance (ft)
28 Gaps No Fill Needed R-22 to R-24 R-50 R-66 to R-69 R-31 R-54 R-73 to R-75 R-49 R-55 R-77 to R-79
29 Groin Removal Remove Groins In Sequence North to South starting with: Three groins South of Clam Pass Vicinity of R44.5 & R45.5 First 2 groins South of Doctors Pass R58 & R59+300
30 Cost and Cost Savings
31 Price Estimate Item Alt. 1 FEMA Design Alt. 2 Existing Design Alt. 2A Existing Design Alt yr Nourishmen t Interval Fill Volume 175, , , ,130 Fill Cost for 2006 Project Limits $9,218,501 $18,497,995 $18,497,995 $24,345,324 Barefoot and Clam Pass Parks $0 $0 $3,751,300 $3,751,300 Structure Modification & Removal $0 $0 $400,000 $1,600,000 Design, Permit & Monitoring $906,950 $906,950 $1,265,301 $1,490,987 Sub-total $10,125,451 $19,404,945 $23,914,595 $31,187,611 Potential Savings -$1,233,490 -$1,818,586 -$2,016,322 -$2,850,000 Reduction to 8-Year Proj. Life $0 $0 $0 -$2,764,001 5% Contingency $444,598 $879,318 $1,094,914 $1,278,680 Total $9,336,559 $18,465,677 $22,993,187 $26,852,290
32 Optimizing Project Cost. Schedule and Synchronize Coastal Components & Management Bidding and Contract Methods Administrative Technical Refine Design New Programmatic Biological Opinion
33 Schedule and Synchronize Coastal Management in County Inlet Dredging Beach Nourishment Beneficial Use of Sand Joint use of restricted disposal areas. Combine similar projects Marco, Caxambus and Doctors Pass
34 Savings Bidding and Contract methods Joint Project with bidding guarantees. Use unit price to manage sand volumes and cost Early availability of draft Plans and Specifications Partnered Maximize dredger time and flexibility Include best weather months in construction period. Highest dredge availability Best weather during sea turtle season Year Round Dredging Including Calmer Months
35 Complementary Tasks Outfalls Pipes Permit Issue Hot spots stays until outfall solved. Make changes to Inlet Management
36 New Programmatic Biological Opinion Allows Year Round Construction
37 ¼ Mile Long Submerged Pipeline Being Emplaced Needs a Flat Water Day
38 2006 Construction Overview 92 days (60 Days Pumping) 8.2 miles of beach 664,000 CY construction volume Borrow area 33 to 38 miles away Equipment Great Lakes Dredge & Dock Company - 2 Hopper Dredges - 2 offshore booster pumps - 3+ miles of subline - Pipeline collars over reef areas
39 Environmental Monitoring Seek Reduction In Monitoring 14 miles of reef characterization Over 500 acres of hardbottom survey using Side Scan Sonar Diver edge verification Digital video documentation and reef data collection over 36 permanent monitoring transects, each 150 meters in length. Hard coral census and stress level assessments Complex and thorough marine resource investigation that it is ongoing annually for the next 3 years, then every other year until 2011.
40 Next Step Set Schedule Meet with FDEP Start Design & Permit Modification Develop Cost Saving and Bidding Plan Negotiate Reduced Monitoring Implement Plan
41 Task to Implement Project Permit Design, Plans and Specification for Project Pre-Application Meeting FDEP Map 3 New Pipeline Corridor and with Dredge Operational Areas Special Design Survey for Profiles, Structures, ECL & 3D Design Elements 3-D Design Update (around hardbottom) with larger fill section and new reaches Design Clam Pass Park and Barefoot Beach Address Hot Spots and Hardbottom Avoidance with intermediate profile line Run model with refinements and to revalidate design and Spreading magnitude Design structure modifications and removals Prepare BOEM Environmental Assessment Prepare & submit permit modification to 2005 Permit with new Permit Sketches RAI Cycle with Meetings Update biological and physical monitoring plans Develop Hardbottom Impact Assessment Develop Plans and Specifications Bidding and Award Pre-, During- and Post-Construction Task Pre-Construction Survey & Biological Monitoring Hardbottom mapping using side scan Construction Services Pipeline Corridors Monitoring Shore Bird Sea Turtle Monitoring Post-Construction Survey, Report and Certification Post-Construction Biological Monitoring and Report
42 The End
Public Information Meeting 7 MARCH 2017
Public Information Meeting 7 MARCH 2017 Outline of the Presentation Overview of the project Key dates and milestones Anticipated construction Timetable & Activities Required sea turtle monitoring during
More informationBEACH AND INLET PROJECTS UPDATE
BEACH AND INLET PROJECTS UPDATE Topics Post-Matthew FEMA Emergency Dune Restoration Project Revised Permit Based on Updated Survey Adjust Design Due to Post-Storm Recovery/Erosion USACE Delta Project Expected
More informationMEETING AGENDA ALTERNATIVE SAND SOURCE INVESTIGATION DADE COUNTY, FLORIDA BEACH EROSION CONTROL & HURRICANE PROTECTION PROJECT
ALTERNATIVE SAND SOURCE INVESTIGATION DADE COUNTY, FLORIDA BEACH EROSION CONTROL & HURRICANE PROTECTION PROJECT MEETING AGENDA Draft Environmental Assessment Poster Session: 6:30 6:45 Presentation 6:45
More informationShore Protection. Atkins Team Overview. Coastal Engineering Consultant Services for Segment III. Atkins originated in Miami in 1960
Coastal Engineering Consultant Services for Segment III Shore Protection BROWARD COUNTY SOLICITATION T2112588P1 1 Atkins originated in Miami in 1960 Atkins Team Overview Leader Integrating Coastal Science
More informationMARTIN COUNTY, FLORIDA INTER-OFFICE MEMORANDUM To the Honorable Board of County DATE: August 14, 2015
TO: MARTIN COUNTY, FLORIDA INTER-OFFICE MEMORANDUM To the Honorable Board of County DATE: August 14, 2015 Commissioners VIA: Taryn Kryzda, County Administrator FROM: SUBJECT: Don Donaldson, P.E. Engineering
More informationTown of Duck North Carolina
Town of Duck North Carolina Town of Duck Shore Protection Project Photograph obtained by. (July 7, 2017). Beach Maintenance Plan August 2017 Updated September 2018 Prepared By:. 4038 Masonboro Loop Road
More informationTown of Duck North Carolina
Town of Duck North Carolina Town of Duck Shore Protection Project Photograph obtained by. (July 7. 2017). Beach Maintenance Plan August 2017 Prepared By:. 4038 Masonboro Loop Road Wilmington, NC 28409
More informationREQUEST FOR ADDITIONAL INFORMATION (RAI #1) JCP
1 of 126 8500.83 January 15,, 2012 Lainie Edwards, Ph.D. Environmental Manager Florida Department of Environmental Protection Bureau of Beaches and Coastal Systems Mail Station 300 3900 Commonwealth Blvd.
More informationJames Gray M.S. Tem Fontaine M.S., P.E.
2012 FSBPA Annual Conference September 28, 2012 Indian River County - Sector 3 Beach and Dune Restoration Project Summary and Perspectives Using an Upland Sand Source James Gray M.S. Tem Fontaine M.S.,
More informationATTACHMENT 2 PROJECT NEED AND JUSTIFICATION
ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION INTRODUCTION The Project includes providing erosion control and shoreline stabilization measures including beach nourishment, maintenance dredging and bypassing,
More informationA World of Solutions
Project Goals Engineering, Economics, & Environmental Principles Minimization of execution risks Construction industry s highest standards Cost savings vs. conventional methods Consistency with Master
More informationLEE COUNTY, FLORIDA GASPARILLA ISLAND SEGMENT SHORE PROTECTION PROJECT 2013 BEACH RENOURISHMENT POST CONSTRUCTION MONITORING REPORT.
LEE COUNTY, FLORIDA GASPARILLA ISLAND SEGMENT SHORE PROTECTION PROJECT 2013 BEACH RENOURISHMENT POST CONSTRUCTION MONITORING REPORT August 2014 U.S. ARMY CORPS OF ENGINEERS JACKSONVILLE DISTRICT Table
More informationVILLAGE OF BALD HEAD ISLAND SHORELINE PROTECTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT
VILLAGE OF BALD HEAD ISLAND SHORELINE PROTECTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT Prepared By: U.S. Army Corps of Engineers Wilmington District and Land Management Group, Inc. (Third Party
More informationAPPENDIX C DESIGN & ENGINEERING
APPENDIX C DESIGN & ENGINEERING Study Authority. This study is authorized under Section 204 of the Water Resources Development Act of 1992, as amended. Study Description. This appendix presents the results
More informationCanaveral Harbor, Florida Federal Navigation Project -- Final Mitigation for Beach Impacts
Canaveral Harbor, Florida Federal Navigation Project -- Final Mitigation for Beach Impacts olsen associates, inc. Kevin R. Bodge, Ph.D., P.E. Olsen Associates, Inc. Jacksonville, Florida Brevard County
More informationCity of Naples Beach Restoration & Water Quality Improvement Project
City of Naples Beach Restoration & Water Quality Improvement Project Presented By: Erickson Consulting Engineers, Inc. Karyn Erickson, ME, PE, D CE, Project Director Christin Perkinson, PhD, PE, D CE,
More informationThe release of the Final Environmental Impact Statement (FEIS) for the Bogue
This document is scheduled to be published in the Federal Register on 03/05/2018 and available online at https://federalregister.gov/d/2018-04408, and on FDsys.gov BILLING CODE: 3720-58 DEPARTMENT OF DEFENSE
More informationAPPENDIX I DRAFT COMPENSATORY MITIGATION PLAN
APPENDIX I DRAFT COMPENSATORY MITIGATION PLAN This page intentionally left blank. SOUTHERN PALM BEACH ISLAND COMPREHENSIVE SHORELINE STABILIZATION PROJECT DRAFT COMPENSATORY MITIGATION PLAN TABLE OF CONTENTS
More informationFlorida Inland Navigation District: Permitting and Construction of the M 5 Island Offloading & Crossroads Maintenance Dredging and the NA 1 Upland
Florida Inland Navigation District: Permitting and Construction of the M 5 Island Offloading & Crossroads Maintenance Dredging and the NA 1 Upland DMMA Facility Authored by Lori Brownell, P.E. and John
More informationUSACE (IP-SLN)
Broward County Shore, Segment III, Protection Project, FDEP Permit #0163435-001-JC FDEP Permit #0163435-009-JC FDEP Permit #0226688-001-JC USACE Permit 1999-5545 (IP-SLN) Sand Quality Control and Quality
More informationMARCH 4, protection office oro tecttr ebeach com
MARCH 4, 2016 protection office oro tecttr ebeach com BOGUE BANKS MASTER BEACH NOURISHMENT PLAN CARTERET COUNTY, NC SUMMARY REPORT Prepared For: Prepared By: March 4, 2016 Summary Report Page ii TABLE
More informationFinal General Reevaluation Report and Final Environmental Impact Statement. Hurricane Protection and Beach Erosion Control
Final General Reevaluation Report and Final Environmental Impact Statement on Hurricane Protection and Beach Erosion Control WEST ONSLOW BEACH AND NEW RIVER INLET (TOPSAIL BEACH), NORTH CAROLINA Appendix
More informationREUSE OF DREDGED SEDIMENTS
REUSE OF DREDGED SEDIMENTS Lake Erie Waterkeeper Conference W.W. Knight Nature Preserve, Perrysburg, Ohio Friday, March 18, 2016 John H. Hull, P.E., BCEE Hull & Associates, Inc. SEDIMENT ENTERING LAKE
More informationAPPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT RENOURISHMENT
APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT 2014-2015 RENOURISHMENT U.S. ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT JUNE 2014 This page intentionally blank. SECTION
More informationMississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan
Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan BOEM Gulf of Mexico Sand Management Working Group October, 205 Justin McDonald, P.E. US Army Corps of Engineers
More informationBiological Monitoring: An Underwater Perspective
A World of Solutions 2015 National Annual Conference September 23-25, 2015; Hawks Cay, Duck Key, FL Biological Monitoring: An Underwater Perspective Lauren Floyd and Stacy Buck, CB&I Overview Florida s
More informationThe State of New Jersey s Shore Protection Program
Oakwood Beach Storm Damage Reduction Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs Branch Dwight Pakan, Project Manager, Philadelphia District
More informationSand Relocation Project
Sand Relocation Project (Contract E ) Dade County BEC & HP Project Tom R. Martin, P.E. Senior Coastal Engineer USACE, Jacksonville District February 15, 2013 US Army Corps of Engineers JACKSONVILLE DISTRICT
More informationAsharoken Coastal Storm Damage Risk Reduction Feasibility Study
Asharoken Coastal Storm Damage Risk Reduction Feasibility Study Megan Jadrosich Project Manager U.S. Army Corps of Engineers Project Progress New York District Public Update April 23, 2009 Outline Summary
More informationNORTH CAROLINA TERMINAL GROIN STUDY. Feasibility and Advisability of the Use of a Terminal Groin as an Erosion Control Device
NORTH CAROLINA TERMINAL GROIN STUDY Feasibility and Advisability of the Use of a Terminal Groin as an Erosion Control Device Science Panel Meeting December 1, 2009 Meeting Agenda Introductions Status of
More informationCEC Coastal Permitting Workshop
January 10, 2017 CEC Coastal Permitting Workshop Braxton Davis and Doug Huggett NC Division of Coastal Management Division of Coastal Management Overview Regulatory Program 4 District Offices; Local Permitting
More information02 APRIL PUBLIC NOTICE U.S. Army Corps of Engineers, Savannah District
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 Planning Branch TO WHOM IT MAY CONCERN: 02 APRIL 2019 PUBLIC NOTICE U.S. Army
More informationNags Head Beach Nourishment Project
Proposed Plan Up to 4.6 million CY Construction in Spring- Summer 2011 Via Hopper Dredge & Other Feasible Equipment All Previous NC Beach Nourishment Projects Oct 2006 Wilmington District Washington Regulatory
More informationPhoto on 22 October 2016 Post Matthew. Nags Head Shoreline Management Committee Public Meeting April 15, 2017
Photo on 22 October 2016 Post Matthew Nags Head Shoreline Management Committee Public Meeting April 15, 2017 Presentation Outline Nags Head Beach Nourishment Planning History Review of the 2011 Beach Nourishment
More informationTable 2. Revised Table 2.2-4: FEIS MSCIP Channel Alternatives Comparison Table Alternatives No Action (200x36) DEIS Alternatives (DMMP Multi-Use Alternative 2A) FEIS Revised Alternatives (DMMP Multi-Use
More informationCONSOLIDATED JOINT COASTAL PERMIT AND INTENT TO GRANT SOVEREIGN SUBMERGED LANDS AUTHORIZATION
CONSOLIDATED JOINT COASTAL PERMIT AND INTENT TO GRANT SOVEREIGN SUBMERGED LANDS AUTHORIZATION PERMITTEE/AUTHORIZED ENTITY: Broward County 218 S.W. 1 st Avenue Ft.Lauderdale, FL 33301 Permit/Authorization
More informationHarbour Constructions
Harbour Constructions River and Coastal morphology: They provide morphological services based on one-, two- and threedimensional computer models. These models are used to answer the questions of clients
More informationNATIONAL OCEAN SERVICE
NATIONAL OCEAN SERVICE Jeff Payne, Ph.D., Office for Coastal Management Steve Thur, Ph.D., Acting Director National Centers for Coastal Ocean Science February 23, 2017 NATIONAL OCEAN SERVICE oceanservice.noaa.gov
More informationConstruction Challenges in Restoring Louisiana s Barrier Islands
Construction Challenges in Restoring Louisiana s Barrier Islands Master Plan Overview Following Hurricanes Katrina and Rita in 2005, the Louisiana Legislature created the CPRA and tasked it with coordinating
More informationBENEFICIAL REUSE OF DREDGE MATERIAL SOUTH BAY SALT POND RESTORATION PROJECT PHASE 2
BENEFICIAL REUSE OF DREDGE MATERIAL SOUTH BAY SALT POND RESTORATION PROJECT PHASE 2 CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE EDEN LANDING ECOLOGICAL RESERVE PHASE 2 HAS TWO PARTS: PROJECT UPDATE USFWS
More informationSEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA. [FDEP Permit No.
SEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA [FDEP Permit No.] Palm Beach Co Department of Environment Resources Management Jupiter/Carlin
More informationVirginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study
1 Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study Policy Recommendations and City-wide Flood Protection Strategies January 15, 2019 2 Agenda Project Overview Hazards and
More informationPUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE
DEPARTMENT OF THE ARMY MOBILE DISTRICT, CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 REPLY TO ATTENTION OF: JOINT PUBLIC NOTICE U. S. ARMY CORPS OF ENGINEERS, MOBILE DISTRICT AND FLORIDA
More informationCOASTAL STRATEGIES FOR DRAINAGE RESILIENCE
COASTAL STRATEGIES FOR DRAINAGE RESILIENCE FDOT S APPROACH AND VISION TODAY S TOPICS Current Concerns and Trends Risk Tolerance and Design Criteria Long-Term Coastal Planning Area of Recurring Flooding
More informationSEDIMENT QUALITY ASSURANCE/QUALITY CONTROL PLAN DUVAL COUNTY BEACH NOURISHMENT PROJECT. FDEP Permit No JC
SEDIMENT QUALITY ASSURANCE/QUALITY CONTROL PLAN DUVAL COUNTY BEACH NOURISHMENT PROJECT FDEP Permit No. 0228528-005-JC PERMITTEE: City of Jacksonville, Florida 20 July 2015 A. INTRODUCTION The project will
More informationFSBPA Chip Baumberger, Project Scientist Dustin Myers, UAV Coordinator Brent Gore, GIS Coordinator
FSBPA 2018 Practical applications of drones (UAVs) for aerial mapping of beach and nearshore habitats & comparison to full-scale manned aircraft using GIS-based hardbottom classification Chip Baumberger,
More informationComprehensive Barrier Island Restoration Plan
Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan 202 National Conference on Beach Preservation Technology February 0, 202 Justin McDonald, P.E. Lead Project
More informationSEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA. [FDEP File No.
SEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA [FDEP File No. 0307741-002-JC] USACE DADE COUNTY BEC & HP CONTRACT G May 2012 A. INTRODUCTION
More informationKiawah Island 2016 Beach Monitoring
Kiawah Island 2016 Beach Monitoring Steven Traynum Coastal Science & Engineering straynum@coastalscience.com 3/8/17 1 Coastal Science & Engineering CSE founded in 1984 Most SC nourishment and groin experience
More informationPA-03. Honorable Mike Kelly. Pennsylvania 114th Congress. 3rd Congressional District. Miles
PA-03 Honorable Mike Kelly Pennsylvania 114th Congress 3rd Congressional District 2 3 & 1&& / 0 1, O&M, Erie Harbor 2, CG-CAP 204, Presque Isle Regional Sediment Management 3, CG, Presque Isle Shoreline
More informationEcotourism Business Owner
Local Resident You have been selected to represent your community on this issue. Your community is a beach community. Members of your community enjoy living where they do because they enjoy seeing wildlife
More informationDREDGING FOR BENEFICIAL USE
DREDGING FOR BENEFICIAL USE Linda S. Lillycrop Program Manager, Regional Sediment Management Program US Army Engineer Research and Development Center PIANC Inland Rivers, Ports and Terminals Annual Conference
More informationLessons Learned, Innovations, and Successes from U.S. Great Lakes Areas of Concern Sediment Cleanups
Lessons Learned, Innovations, and Successes from U.S. Great Lakes Areas of Concern Sediment Cleanups Presented at RPIC Federal Contaminated Sites National Workshop April 15, 2014 Gina Bayer, CH2M HILL
More informationJuly 22, Dear Mr. Garis:
Gregory W. Garis Environmental Specialist III Department of Environmental Protection Beaches, Inlets, and Ports 2600 Blair Stone Road, Mail Station 3544 Tallahassee, Florida 32399-3000 (850) 245-8280 Response
More informationFernando Camargo, Hull & Associates, Inc. On behalf of Joe Cappel Toledo-Lucas County Port Authority. Thursday, December 7, 2017
Fernando Camargo, Hull & Associates, Inc. On behalf of Joe Cappel Toledo-Lucas County Port Authority Thursday, December 7, 2017 1 Toledo Harbor Dredging Federal Channel spans RM 7 to LM 18 (25 miles, 400-500
More informationNEW RIVER INLET CHANNEL REALIGNMENT PROJECT UPDATE NOVEMBER 1, 2012
NEW RIVER INLET CHANNEL REALIGNMENT PROJECT UPDATE NOVEMBER 1, 2012 Construction Schedule Preconstruction Conference Nov. 13 @ Town Hall Dredge Arrives Nov. 15 th Sand Placement Begins Nov. 17 th Dredging
More informationAT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.
Cairns Shipping Development Project Revised Draft Environmental Impact Statement Fact Sheet July 2017 AT A GLANCE > An additional 70 cruise ships into Port of Cairns each year by 2031 > Project design
More informationThe Clean Water Act and 404/401 Process in Hawaii
The Clean Water Act and 404/401 Process in Hawaii Presented by: Robert Walker, PE Coastal Engineer Anchor QEA, LLC Clean Water Act (1972) Restore and maintain the chemical, physical, and biological integrity
More informationAMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements.
AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE Sec. 13-1-34 is created to read as follows: Sec. 13-1-34 Lake Superior Shoreland Lot Development Requirements. Introduction. Much of Bayfield County s Lake
More informationInterstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination
4-65 Interstate 73 FEIS: I-95 to the Myrtle Beach Region 4-66 Comment noted. The use of existing roadways was considered during alternative development (refer to Chapter 2, Section 2.1, page 2-1 and the
More informationConstruction of Offshore Stormwater Discharges Using HDD Technologies. Karyn Erickson, D.CE., PE, President Erickson Consulting Engineers, Inc.
Construction of Offshore Stormwater Discharges Using HDD Technologies Karyn Erickson, D.CE., PE, President Erickson Consulting Engineers, Inc. 1 Presentation Overview Introduction Project Need and Purpose
More informationROTAWN ENERGY AND LOGISTICS DREDGING PROFILE
ROTAWN ENERGY AND LOGISTICS DREDGING PROFILE DREDGING PROFILE ABOUT US Rotawn Energy and Logistics Services Ltd was established in 2007 as an indigenous Nigerian company offering tailor made solutions
More informationCollaboration: Sea-level Marin Adaptation Response Team (C-SMART)
Collaboration: Sea-level Marin Adaptation Response Team (C-SMART) Photo Credit : Lighthawk Aerial 3501 Civic Center Drive, Rm. 308 San Rafael, CA 94903 415 4736269 T www.marinslr.org Marin County Board
More informationSEDIMENT CHOREOGRAPHY
Global Reach. Local Benefit. SEDIMENT CHOREOGRAPHY 4/15/2016 Maritime and the Regional Economy The Port of Cleveland spurs job creation and helps our region compete globally by connecting local businesses
More informationPUBLIC NOTICE. Attn: Mr. Greg Rudolph, Carteret County Shore Protection office Post Office Box 4297 Emerald Isle, North Carolina 28594
US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: March 1, 2018 Comment Deadline: April 2, 2018 Corps Action ID Number: SAW-2009-00293 All interested parties are hereby advised that
More informationSANDY HOOK CHANNEL, NEW YORK HARBOR FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING
Public Notice In replying refer to: Public Notice No. Sandy Hook Channel, NY Harbor FY17 Published: 14 February 2017 Expires: 14 March 2017 New York District 26 Federal Plaza New York, N.Y. 10278 ATTN:
More informationExecutive Summary. Monterey Peninsula Water Management District. Sand City Desalination Project Feasibility Study. Executive Summary.
Monterey Peninsula Water Management District Sand City Desalination Project Feasibility Study Executive Summary March 25, 2004 EXHIBIT 4- Executive Summary Introduction and Background Camp Dresser & McKee
More informationSource Control Early Action Focused Feasibility Study
Source Control Early Action Focused Feasibility Study Engineering Presentation Scott E. Thompson, PE Malcolm Pirnie, Inc. Remedial Options Workgroup Meeting June 27, 2007 Outline Target Area Selection
More informationFinal General Reevaluation Report and Final Environmental Impact Statement. Hurricane Protection and Beach Erosion Control
Final General Reevaluation Report and Final Environmental Impact Statement on Hurricane Protection and Beach Erosion Control WEST ONSLOW BEACH AND NEW RIVER INLET (TOPSAIL BEACH), NORTH CAROLINA Appendix
More informationPUBLIC NOTICE. Figure 8 Beach Homeowners Association, Inc. C/o: Mr. David Kellam (Administrator) 15 Bridge Road Wilmington, North Carolina 28411
US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 29, 2016 Comment Deadline: August 1, 2016 Corps Action ID Number: SAW-2006-41158 All interested parties are herby advised that
More informationFINAL ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT RENOURISHMENT
FINAL ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT 2014-2015 RENOURISHMENT U.S. ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT JUNE 2014 FINAL
More informationVessel Impacts to Shallow Water Habitat: Groundings and Prop Scarring in the Florida Keys National Marine Sanctuary
Vessel Impacts to Shallow Water Habitat: Groundings and Prop Scarring in the Florida Keys National Marine Sanctuary Presented to the FKNMS Sanctuary Advisory Council April 19, 2016 Steve Werndli, FKNMS
More informationCoastal Green Infrastructure Techniques for the Protection of SR 1 Vulnerability Assessment and Demonstration
Coastal Green Infrastructure Techniques for the Protection of SR 1 Vulnerability Assessment and Demonstration Field Seminar No. 1 The Delaware Floodplain: Impacts of Severe Storms on Infrastructure in
More informationInitial Construction and Maintenance Costs
VI. Initial Construction and Maintenance Costs This section documents the state of knowledge regarding the initial and maintenance costs associated with terminal groin structures. As part of the cost study,
More informationNotice of Availability (NOA) of the Draft Environmental Impact Statement. (DEIS) and the Announcement of a Public Hearing for the Installation of a
This document is scheduled to be published in the Federal Register on 08/28/2015 and available online at http://federalregister.gov/a/2015-21282, and on FDsys.gov BILLING CODE: 3720-58 DEPARTMENT OF DEFENSE
More informationBOEM s Offshore Energy Leasing Programs
Bureau of Ocean Energy Management BOEM s Offshore Energy Leasing Programs North Carolina Beach Inlet & Waterway Association Annual Conference November 13, 2017 BOEM s Mission The Mission of the Bureau
More informationMatrix of Potential Coastal Adaptation Strategies
Matrix of Potential Coastal Adaptation Strategies The matrix provided on pages 60-76, developed by Lesley Ewing (California Coastal Commission) and Dr. Reinhard Flick, outlines some of the most common
More informationEncinitas-Solana Beach Coastal Storm Damage Reduction Project. San Diego County, California. Appendix D. 404(b)(1) Evaluation
1 2 3 4 5 6 7 8 9 10 Encinitas-Solana Beach Coastal Storm Damage Reduction Project San Diego County, California Appendix D 404(b)(1) Evaluation 11 12 13 14 15 16 17 U.S. Army Corps of Engineers Los Angeles
More informationU.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement
U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement Name of Project: Maintenance Dredging AIWW Vicinity Jupiter
More informationUtilizing Dredge Material in Wetland and Estuarine Restoration. Bartholomew Wilson P.G. Delaware Center for the Inland Bays
Utilizing Dredge Material in Wetland and Estuarine Restoration Bartholomew Wilson P.G. Delaware Center for the Inland Bays Inland Bays Fringe Wetland Restoration Workgroup DNREC s Shoreline and Waterway,
More informationRestore America s Estuaries October 24, 2012
Coordinating Dredged Material Management in the Pacific Coast s Largest Estuary with Construction of the Pacific Coast s Largest Tidal Wetland Restoration Project. Restore America s Estuaries October 24,
More informationBig Sarasota Pass and New Pass Inlet Management Plan 2008 Peer Review Report
Table of Contents Consolidated Report on Peer Reviews... Pages 2-17 Executive Summary. Page 2 Introduction... Page 5 Physical and Environmental Data Page 5 Numerical Modeling. Page 7 Coastal Engineering.
More informationTeam Member Affiliation WEDA Member Role
Summary: Dominion Cove Point LNG, LP (DCP) owns and operates the Cove Point Liquefied Natural Gas (LNG) Terminal (terminal), an LNG import terminal in Lusby, Maryland (Figure 1). The terminal includes
More information40 YEARS OF MARINE OPERATIONS & ENGINEERING IN HAWAII. Makai Research Pier, Waimanalo, Hawaii. 863 N. Nimitz Hwy, Honolulu Harbor
40 YEARS OF MARINE OPERATIONS & ENGINEERING IN HAWAII Makai Research Pier, Waimanalo, Hawaii 863 N. Nimitz Hwy, Honolulu Harbor Santa Cruz, California www.seaengineering.com ABOUT US Sea Engineering, Inc.
More informationRiverine Sand Mining Scofield Island Restoration Project (BA-40)
Riverine Sand Mining Scofield Island Restoration Project (BA-40) Kenneth Bahlinger CPRA Project Manager Michael Poff CEC Project Engineer October 24, 2012 committed to our coast committed to our coast
More informationCoastal Hazards Vulnerability and Fiscal Impact Study Report:
Agenda Item B.1 Coastal Hazards Vulnerability and Fiscal Impact Study Report: Vulnerability Assessment and Adaptation Strategies Review October 12, 2015 Planning Commission Meeting Presentation by: Anne
More informationConstruction of Offshore Stormwater Discharges using HDD Technologies
TM2-T2-04 Construction of Offshore Stormwater Discharges using HDD Technologies Karyn Erickson, PE, Erickson Consulting Engineers, Sarasota FL Bobbi Claybrooke, EI, Erickson Consulting Engineers, Sarasota
More informationSUSTAINABLE SOLUTIONS FOR DREDGED MATERIAL MANAGEMENT IN OHIO
SUSTAINABLE SOLUTIONS FOR DREDGED MATERIAL MANAGEMENT IN OHIO Western Dredge Association Midwest Chapter Omaha, Nebraska Friday, March 10, 2017 David Emerman, Ohio EPA/Ohio Lake Erie Commission James White,
More informationShingle Creek Watershed Management Commission Wetland 639W Outlet Modifications Summary Feasibility Report
Shingle Creek Watershed Management Commission Wetland 639W Outlet Modifications Summary Feasibility Report The proposed project is the modification of the outlet of Wetland 27-0639W to reduce phosphorus
More informationJ O I N T P U B L I C N O T I C E
J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, SC 2943-517 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Ocean and Coastal
More informationShrewsbury River Basin, Sea Bright, New Jersey Coastal Storm Risk Management Feasibility Study
Shrewsbury River Basin, Sea Bright, New Jersey Coastal Storm Risk Management Feasibility Study Draft Integrated Feasibility Report & Environmental Assessment Appendix E: Pertinent Correspondence & Environmental
More informationMay 4, Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602
2011 Environmental Excellence Award Application May 4, 2011 Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602 Contact: Mr. Channing Hayden, Jr. Director
More informationPEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION
US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK
More informationCoastal Science and Engineering Collaborative (CSEC) Overview
Coastal Science and Engineering Collaborative (CSEC) Overview 1 237 237 237 217 217 217 200 80 252 NNBF 200 119 174 200 Workshop 27.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112
More informationSECTION 6.0 AVOIDANCE, MINIMIZATION AND MITIGATIVE MEASURES
SECTION 6.0 AVOIDANCE, MINIMIZATION AND MITIGATIVE MEASURES CEQ regulations (40 CFR 1508.20) define mitigation to include: (1) avoiding the impact altogether by not taking a certain action or parts of
More informationProtect, Accommodate, or Retreat? Integrating Adaptation Strategies and Ecosystem Services into the Cape Cod Coastal Planner
Protect, Accommodate, or Retreat? Integrating Adaptation Strategies and Ecosystem Services into the Cape Cod Coastal Planner Jennifer Clinton Cape Cod Commission April Wobst Association to Preserve Cape
More informationGREAT EGG HARBOR INLET TO TOWNSENDS INLET STORM DAMAGE REDUCTION PROJECT CAPE MAY COUNTY, NJ DRAFT ENVIRONMENTAL ASSESSMENT (EA)
GREAT EGG HARBOR INLET TO TOWNSENDS INLET STORM DAMAGE REDUCTION PROJECT CAPE MAY COUNTY, NJ DRAFT ENVIRONMENTAL ASSESSMENT (EA) SEPTEMBER 2013 PREPARED BY: U.S. ARMY CORPS OF ENGINEERS, PHILADELPHIA DISTRICT
More informationPRELIMINARY SHORELINE PROTECTION STUDY Parking Lot D to the JFK Library
PREPARED FOR: UNIVERSITY OF MASSACHUSETTS BOSTON PRELIMINARY SHORELINE PROTECTION STUDY Parking Lot D to the JFK Library UNIVERSITY OF MASSACHUSETTS Boston, Massachusetts PREPARED BY: PARE CORPORATION
More informationClimate change and the coast: CZM efforts to improve community resilience. Bruce K. Carlisle Director Massachusetts Office of Coastal Zone Management
Climate change and the coast: CZM efforts to improve community resilience Bruce K. Carlisle Director Massachusetts Office of Coastal Zone Management Background / context Massachusetts coastal communities
More informationPublic Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Public Notice U.S. Army Corps Permit Application No: SWG-2007-01025 Of Engineers Date Issued: 29 March 2018 Galveston District Comments Due: 30 April 2018 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT
More information