1 ADDENDUM NO. 1 TO THE BID DOCUMENTS FOR: NEW JEFFERSON PARISH SHERIFF S OFFICE 1 ST DISTRICT STATION 3620 HESSMERAVENUE METAIRIE, LOUISIANA JEFFERSON PARISH SHERIF S OFFICE Jefferson Parish Bid No.: 17-G-2601 N-Y Project No.: JULY 14, 2017 I. SCOPE: 1. Addendum No. 1 is issued in accordance with the provisions of the general specifications for the referenced project and is now considered to be an integral part of those original plans, specifications and contract documents. This addendum contains the following items: Pre-Bid Meeting Agenda July 6, Pre-Bid Meeting Minutes July 6, Pre-Bid Meeting Sign-In Sheet July 6, General Bidding Information. Drawings. Specifications. Page-1

2 II. GENERAL: See MEP Drawing and Specification Addenda regarding work by Owner s Vendors, as discussed in the Pre-Bid Meeting. Bids will be received in Room 413. Bids will be received to the Attention of ATTN: Karen K. Leonard III. DRAWINGS 1. Sheet A-003 Opening Schedule: Change the following door materials to all aluminum panels (NO GLASS) Kynar 20 year paint finish. Use Approved Manufacturer s Flush Heavy-Duty Doors, meeting specified requirements. A102B, A105E, A106B, A107A, A107B, A108A, A109A, A201C, A222A, A238A: All doors come under specification Section Aluminum Framed Entrances and Storefronts. 2. Sheet A-003 Opening Schedule, Sheet A-004: change the Material Description category to the following: A201B Alum & Glass Entry GL-3 TYPE R A217A Wood A231A Alum & Glass Entry GL-3 TYPE Y A231B Alum & Glass Entry GL-3 TYPE X 3. Sheets A-004 thru A-006: All frame details referenced as 6 deep are changed to 6 5/16 deep. Adjust in field as necessary. 4. Civil Drawings: All Civil Drawings are re-issued in their entirety, and are attached to this Addendum. 5. Sheet G-001: Revise Sheet Titles on the Index of Drawings as follows: A-501 Building Sections A-601 Interior Elevations A-701 Casework Sections A-702 Casework Sections 6. Sheet S-001 Structural General Notes, General Note 12, C, Enclosure Classification* * To achieve enclosed classification, all glazed openings shall be impact resistant and meet the requirements of the large missile test of ASTM E All louvers shall meet the requirements of an approved impact resisting standard or the large missile test of ASTM E Page-2

3 7. Sheet S-001 Structural General Notes, General Note 12, C, Wind Criteria: Revise Wind Criteria to Category IV. Wind Design Criteria shall be the greater requirement of either ASCE 7, or IBC Category IV, Enhanced Protection. 8. Civil Drawings, Sheet C-2.0: 1-foot depth of sand fill has already been added to across the site by the Owner. The building surcharge area still needs to be filled with additional fill material to equal the difference in the final elevation shown and the existing fill height. See Existing Topographical Survey attached to the Addendum for existing Grades. 9. Mechanical, Plumbing, and Electrical Drawings: See attachment for Clarifications to Mechanical, Plumbing and Electrical Specifications. IV SPECIFICATIONS: 1. Bidder s Checklist, Page 5. Label affixed to the Bid Envelope shall be to the attention of: ATTN: Karen K. Leonard Bids will be received in Room Supplemental Conditions, SC-4.01: Delete SC-4.01 in it s entirely. SC-4.01 is not applicable to the Work of this Project. 3. Instructions to Bidders, Davis-Bacon Act: This Project is not funded with Federal Funds. There are no prevailing wage provisions for the Work of this Contract. The Bidder is not required to comply with Davis-Bacon Wage Rates. 4. Agreement, Article V: The Contract Time shall be 420 Calendar Days. Final Acceptance shall be within 45 Calendar Days after the date of Substantial Completion. Allowance for Days of lost production due to inclement weather shall be as follows: January 11 February 10 March 8 April 7 May 5 June 6 July 6 August 5 September 4 October 3 November 5 December 8 Page-3

4 5. Agreement, Article VI, B: Liquidated Damages shall be assessed in the amount of $1, per Calendar Day until Substantial Completion, and $2, per day until Final Completion. 6. Section Aluminum-Framed Entrances and Storefronts: Part 2, 2.1, change J. to read: Blast Resistance FOR EXTERIOR SYSTEMS ONLY 7. Section Aluminum-Framed Entrances and Storefronts: Part 2, 2.4, A., change 4. To read: 4. Finish: Kynar painted surface with 20 year warranty. 8. Section Aluminum-Framed Entrances and Storefronts: Part 2, 2.7, B., reference to Three-Way Anchors : Use Approved Manufacturer s Standard Anchors for the Approved System to meet the required Wind Loads. 9. Section Glazed Aluminum Curtain Walls: Part 2, 2.2, C, change 2) to read: 2) System Depth: 6 5/16 depth for 1 15/16 glazing. 10. Section Glazing: Change 2.2 B as follows: B. (GL-1) Windborne-Debris-Impact-Resistant Laminated: Vitro (PPG) Solarban 70XL (2), Solar Control Low-E, ASTM C 1172, and complying with testing requirements in 16 CFR 1201 for Category II materials, with "Windborne-Debris-Impact Resistance" Paragraph in "Glass Products, General" Article, and with other requirements specified. Use materials that have a proven record of no tendency to bubble, discolor, or lose physical and mechanical properties after fabrication and installation. 1. Construction: Nominal 1 5/16 laminated, insulated glass with the following to comply with interlayer manufacturer's written recommendations: ¼ (6mm) Atlantica + Solarban 70XL (2) Low-E coating. ½ air space ¼ (6mm) Clear HS/FT Clear PVB interlayer ¼ (6mm) Clear HSFT C. (GL-2) 9/16 Laminated Glass: ASTM C 1172, and complying with testing requirements in 16 CFR 1201 for Category II materials, and with other requirements specified. Use materials that have a proven record of no tendency to bubble, discolor, or lose physical and mechanical properties after fabrication and installation. 1. Construction: Nominal 9/16 laminated, insulated glass with the following to comply with interlayer manufacturer's written recommendations: ¼ (6mm) Atlantica + Solarban 70XL (2) Low-E coating Clear PVB interlayer ¼ (6mm) Clear HSFT Page-4

5 11. Section Linear Metal Ceilings: Change 2.2 A. Change Basis of Design from USG Paraline III to USG Paraline Plus. Unit size is 7-inches. All other references to Paraline III shall be to Paraline Plus. Lineal Meta Ceilings installed in exterior locations shall be rated for Wind Loads noted elsewhere in the Drawings and Specifications, as well as for exterior exposure. Interior Units shall generally match the exterior units in appearance. Interior units are not required to comply with Wind Load and exterior exposure requirements. 12. Section Tile: Revise 2.3Tile Products as follows: F. CWT-1 Glazed Porcelain Wall Tile I: Restrooms and Showers: Ceramiche Keope; Style: Code: Color: Gray: 12 x24 : Grout, Laticrete, 1/16 joint, Color 89 Smoke Grey. G. CWT-2 Glazed Porcelain Wall Tile II: Evidence Room and General Office: Ceramiche Keope; Style: Code: Color: Gray: 12 x12 : Grout, Laticrete, 1/16 joint, Color 89 Smoke Grey. H. CTB-1 Glazed Porcelain Tile Base at Toilet Rooms and Showers: Ceramiche Keope; Style: Code: Color: Gray: 3 x12 : Grout, Laticrete, 1/16 joint, Color 89 Smoke Grey. 13. Mechanical, Plumbing, and Electrical Specifications: See attachment for Clarifications to Mechanical, Plumbing and Electrical Specifications. V. APPROVED SUBSTITUTIONS: Subject to compliance with the requirements, the following Manufacturers, and Products are Approved as Substitutions: Section Cementitious Underlayment: HPS North America Schonox US Leveling VD Primer SHP Primer Section Aluminum-Framed Entrances and Storefronts: YKK AP Group Frame Depth Dimension shown on the Drawings are minimal nominal Frame Depths. The Contractor may provide a deeper Frame Depth from one of the Approved Aluminum-Framed Entrances and Storefronts Manufacturers to meet the required Wind Load. Page-5

6 VI. QUESTIONS ANSWERED 1. CxA Services, LLC Commissioning Specialists Question: Are Commissioning Requirements a part of Owner Provided Services. Answer: There are no Owner Provided Commissioning Services specified to be paid by the Owner. All required Commissioning Services are specified in the in the Sections of the Specifications and are paid by the General Contractor as a part of the Scope of Work of this Contract. 2. Hernandez Consulting & Construction Question: 1. Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate? Answer: Yes, this Project is Tax Exempt on materials. Tax Exempt Certificate will be provided to the Successful Bidder and his Sub-Contractors for materials and goods. Question 2. Does the owner currently have a 3rd party testing service for those items requiring testing or is the contractor free to locate and hire applicable testing firms? Answer: 3 rd Party Testing is specific to the Specification Sections. See each Specification Section for 3 rd Testing responsibility. Question 3. Who is responsible for the utility locations? Answer: The contractor is responsible to contact One Call and ensure that the utility companies mark the locations. Question 4. Is the owner or architect aware of any utility connection fee for the project? Answer: The contractor needs to contact Jefferson Parish to obtain permits and connection fees. Question 5. When will the owner release the Geotechnical report? Answer: Geotechnical Report is included as an attachment to this Addendum. Page-6

7 Question 6. Will any work be allowed during the two months after new soil is brought up to site? Answer: No work will be allowed within the surcharged area footprint for the required two months. However pile testing is permitted, as per the specifications. Question 7. The checklist requires two copies of the bid form. Will two copies of the entire bid packet be required, or just the bid form? Answer: Bidder shall provide two complete original notarized copies of all Bid Documents with his Bid. 3. Construction Masters Question: Surcharge is shown to remain for (2) months. How will pile driving operations commence while the surcharge is still in place?? Is a time extension (or a break in the contract time) figured while the surcharge is in place?? Answer: Permanent pile placement will not be permitted during the required two months for surcharge. The contract time includes the two months required for surcharge and the time required for pile testing. Contract time will not be suspended during surcharge. Question: On sheet A-001, several partition types only identify finishes on one side of the partition; these include P3 & P5. Please clarify finishes for opposite side. Answer: For P3 and P-5, provide 5/8 thick, Type-X Fire Rated Gypsum Board one side, and Cementitious Backer Units opposite Side as specified in UL U404 as indicated on the Partition Type. Question: On sheet A-001, partition type P9 does not indicate what finish is to be provided on either side, please clarify. Answer: For P-9, provide 2-Layers 1/2 thick Gypsum Board both Sides as specified in UL U412 as indicated on the Partition Type. Question: There are (2) different partition type P10 s called out. Based on the details & the surrounding construction, I assume the P10 on page A-002 to be correct, please confirm. Answer: Omit Partition Type P10 (Metal Studs) on Sheet A-001. Use Partition Type 10 (CMU) on Sheet A-002. Page-7

8 Question: There are boxed notes on page A-101 (a boxed #1, for example, running along the P8 wall at the entry lobby 103) that do not correspond to a note; please clarify. Answer: Boxes on the exterior side of the wall are Scored Concrete in the Plaza. See Sheet A-801. Lines on the interior side of the walls are the Slab Edge for Future Tenant Work... Provide the Texture and Pattern specified in Section Stamped Concrete Paving, for areas inside of the Boxes. Question: There are several references to flat screen TV s throughout the building (specifically in the fitness center 232); please clarify if these are to be provided by the Owner. Answer: Wall-Mounted Flat Screen TV s are specified in Section Miscellaneous Equipment. Question: Mechanical room 225 is indicated to have a 2x2 ACT ceiling on the finish schedule (A-001); however, on the reflected ceiling plan (A-202) it has a gyp board ceiling indicated; please clarify. Answer: Provide Suspended Gypsum Board as indicated on the Reflected Ceiling Plan, and Partition Type. Revise the finish Schedule to read Suspended Painted Gypsum Board. Question: Restroom 234, 235, & 237 are all indicated to have rubber weight room floor tiles (note number 11); I assume this is supposed to be #12 (ceramic tile). Answer: Provide Ceramic Tile Floor Finish 12 in Rooms 234, 235, and 237 in lieu of Rubber Floor 11. Question: Covered area 111 does not have any flooring indicated (A-801), is this area to be sealed concrete?? Answer: Exposed Area is 110. Provide Dry-Shake Color Hardener as specified in Section Stamped Concrete Paving. Attachments: Pre-Bid Conference Agenda Pre-Bid Conference Meeting Minutes Pre-Bid Conference Sign-In Sheet Civil Drawings (N-Y Associates). Geotechnical Report Topographical Survey Letter Vivien and Associates (MEP Drawings & Specifications) MEP Drawings (Vivien & Associates) Page-8

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen:

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen: March 6, 2018 Subject: Addendum No. 2 Toyota Park Transit Center Phase II Ladies and Gentlemen: This Addendum No. 2 is being issued to provide responses to questions submitted by potential bidders and

More information

DALLAS-FORT WORTH INTERNATIONAL AIRPORT

DALLAS-FORT WORTH INTERNATIONAL AIRPORT DALLAS-FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 2 TO THE REQUEST FOR BIDS Contract No. 9500445 Restroom Rehabilitation at Terminal B (Phase 3 & 4) December 20, 2010 THE REQUEST FOR BIDS (RFB) FOR

More information

ADDENDUM NUMBER TWO. for SWIM TEAM LOCKER ROOM RENOVATIONS REBID UNIVERSITY OF SOUTH CAROLINA COLUMBIA, SOUTH CAROLINA. DATE OF ISSUE: June 19, 2014

ADDENDUM NUMBER TWO. for SWIM TEAM LOCKER ROOM RENOVATIONS REBID UNIVERSITY OF SOUTH CAROLINA COLUMBIA, SOUTH CAROLINA. DATE OF ISSUE: June 19, 2014 ADDENDUM NUMBER TWO for SWIM TEAM LOCKER ROOM RENOVATIONS REBID UNIVERSITY OF SOUTH CAROLINA COLUMBIA, SOUTH CAROLINA DATE OF ISSUE: June 19, 2014 TO: ALL BIDDERS OF RECORD This Addendum is issued pursuant

More information

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

ADDENDUM NO. 2 Consisting of 3 pages and Attachments 10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta

More information

ADDENDUM NUMBER 3. Date: December 6, Towneplace Suites by Marriott Springfield, MO. General Contractors Baron Design & Associates, L.L.C.

ADDENDUM NUMBER 3. Date: December 6, Towneplace Suites by Marriott Springfield, MO. General Contractors Baron Design & Associates, L.L.C. ADDENDUM NUMBER 3 Date: December 6, 2012 Project: Towneplace Suites by Marriott Springfield, MO To: From: General Contractors Baron Design & Associates, L.L.C. Documents for the referenced project are

More information

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows: ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan

More information

ITEM NO. 1: Section Quality Requirements. ITEM NO. 2: Section Unit Masonry. ITEM NO. 3: Section Thermal Insulation

ITEM NO. 1: Section Quality Requirements. ITEM NO. 2: Section Unit Masonry. ITEM NO. 3: Section Thermal Insulation 701½ West First Street Defiance, OH 43512 Phone 419-782-6211 architects@beilharzinc.com December 8, 2017 WAUSEON EXEMPTED VILLAGE SCHOOLS New Administration Office Building Wauseon, Ohio B7-4551 ADDENDUM

More information

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS SECTION 08 4113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Aluminum entrance doors and frames. 2. Glass infill panels. 3. Door hardware. B. Related Sections:

More information

Repair Maintenance Hangar Phase II August 2010

Repair Maintenance Hangar Phase II August 2010 SECTION 08800 GLASS AND GLAZING PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Monolithic glass. 2. Insulating glass. 3. Mirror glass. 4. Glazing accessories. B. Types of work in this section include

More information

RFI REPLY. Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005

RFI REPLY. Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005 Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005 To: All Bidding General Contractors Fax Email U.S. Mail Attn. Messenger We are sending the following: Quick

More information

Addendum No: One (1) Date: April 16, 2013 Project No.: College of the Muscogee Nation Student Center

Addendum No: One (1) Date: April 16, 2013 Project No.: College of the Muscogee Nation Student Center ADDENDUM Addendum No: One (1) Date: April 16, 2013 Project No.: 12017.00 Project: Location: College of the Muscogee Nation Student Center Okmulgee, Oklahoma This Addendum is issued for information of the

More information

Arlington Public Schools Purchasing Office

Arlington Public Schools Purchasing Office Arlington Public Schools Purchasing Office NOTICE OF ADDENDUM NO. 1 Issued on April 10, 2018 TITLE: ITB NO.: RENOVATIONS TO THE ARLINGTON CAREER CENTER 60FY18 ITB CLOSING DATE PRIOR TO 2:00 P. M., (LOCAL

More information

MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 440 / 533 WEST MAIN STREET TUPELO, MS / FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON

MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 440 / 533 WEST MAIN STREET TUPELO, MS / FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON ADDENDUM NUMBER FROM: MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 0 / 533 WEST MAIN STREET TUPELO, MS 3880 / 3880 FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON PHONE: -8-00 PROJECT: ACADEMIC STUDENT

More information

NOTTAWASEPPI HURON BAND of the POTAWATOMI

NOTTAWASEPPI HURON BAND of the POTAWATOMI NOTTAWASEPPI HURON BAND of the POTAWATOMI Widoktadwen New Government Center Bid Pkg #2 Pre Bid Meeting October 4, 2012 The SKILLMAN Corporation Project Administration Construction Management Nottawaseppi

More information

MSA MOORE & SPENCE ARCHITECTS, P.A.

MSA MOORE & SPENCE ARCHITECTS, P.A. MSA MOORE & SPENCE ARCHITECTS, P.A. ADDENDUM NUMBER SEVEN (7): November 20, 2008 to the Construction Documents dated October 17, 2008 for: HACFM, New Administration Office Building, Fort Myers, Florida

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

This addendum is being issued to answer questions submitted by the question deadline and to distribute a revised bid price form.

This addendum is being issued to answer questions submitted by the question deadline and to distribute a revised bid price form. INVITATION TO BID (ITB) FOR POOL CONSTRUCTION AT THE FORD WOODS PARK CONTROL No. 122972 ADDENDUM No. 5 City of Dearborn ISSUE DATE: 12/4/17 DUE DATE: 12/13/17 AT 3:00 p.m. Local Time This addendum is being

More information

4615 E. State Street Suite 206 Rockford Illinois /

4615 E. State Street Suite 206 Rockford Illinois / ADDENDUM NO. 2 Date: April 29th 2015 4615 E. State Street Suite 206 Rockford Illinois 61108 815 / 397-3330 Project: Whiteside County Health Department New Facility and Interior Renovation Project Number:

More information

a. "Packaged Rooftop Electric Cooling / Heating Unit Schedule", remark #5 (M001), has the condensate drain requirement for RTU-1.

a. Packaged Rooftop Electric Cooling / Heating Unit Schedule, remark #5 (M001), has the condensate drain requirement for RTU-1. June 10, 2014 Addendum No. 2 WICOMICO YOUTH & CIVIC CENTER RENOVATIONS & ADDITIONS 500 Glen Avenue Salisbury, MD, 21804 2012.095.01 The following items supplement, change, delete or add to the 100% Construction

More information

ADDENDUM NO. 3. IFB J Emergency Communication Center Renovation and Addition Project

ADDENDUM NO. 3. IFB J Emergency Communication Center Renovation and Addition Project ADDENDUM NO. 3 DATE: May 26, 2017 INVITATION FOR BID: DATED: May 4, 2017 RECEIPT DATE: May 31, 2017 OPENING DATE: June 1, 2017 SUBJECT: Ladies/Gentlemen: Please take note of the following: Receipt/Opening

More information

Accellent Cardiology Expansion Brooklyn Park, Minnesota EXTERIOR ENCLOSURE - PART Exterior Wall Construction

Accellent Cardiology Expansion Brooklyn Park, Minnesota EXTERIOR ENCLOSURE - PART Exterior Wall Construction EXTERIOR ENCLOSURE - PART 4 4.1 Exterior Wall Construction A. The exterior wall systems consist of the assemblies outline below. Drawings will indicated the acronym associated with each of the wall system

More information

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

Addendum #4 July 13, 2015

Addendum #4 July 13, 2015 Five Counties Children s Centre Addition 872 The Dutton Firehouse Road Complex Addendum #4 Peterborough, 721 Monaghan ON Road, K9H Peterborough, 7G1 ON K9J 5J8 Page 1 Addendum #4 July 13, 2015 The following

More information

SECTION GYPSUM BOARD

SECTION GYPSUM BOARD SECTION 092900 GYPSUM BOARD PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Interior gypsum wallboard. 2. Tile backing panels. B. Related Sections: 1. Section 012300 Alternates. 1.2 SUBMITTALS A.

More information

SECTION WALL AND DOOR PROTECTION

SECTION WALL AND DOOR PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 10 26 00 WALL AND DOOR PROTECTION SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable to

More information

Sample Specification

Sample Specification Sample Specification Enclosed is a template for you to use in preparing a final, quarry tile specification incorporating products manufactured by Metropolitan Ceramics, by Ironrock Capital, Inc. Quarry

More information

Five Forks Branch Library MPS Project No May 25, 2016

Five Forks Branch Library MPS Project No May 25, 2016 Five Forks Branch Library MPS Project No. 015026.00 May 25, 2016 ADDENDUM NO. 3 The following clarifications, amendments, additions, deletions, revisions, and/or modifications are hereby made a part of

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,

More information

Sample Specifications

Sample Specifications Sample Specifications Below is a template for you to use in preparing a final, quarry tile specification incorporating products manufactured by Metropolitan Ceramics, by Ironrock Capital, Inc. Quarry tile

More information

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding

More information

SECTION TILING

SECTION TILING PART 1 GENERAL 1.01 SECTION INCLUDES A. Ceramic Tile for floor applications. B. Ceramic Tile for wall applications. C. Ceramic accessories. D. Ceramic trim. E. Non-ceramic trim. 1.02 RELATED REQUIREMENTS

More information

SECTION U.S. ALUMINUM SERIES BAL-350 HURRICANE RESISTANT BALCONY/TERRACE DOOR

SECTION U.S. ALUMINUM SERIES BAL-350 HURRICANE RESISTANT BALCONY/TERRACE DOOR Page 1 of 6 SECTION 08 39 80 U.S. ALUMINUM SERIES BAL-350 HURRICANE RESISTANT BALCONY/TERRACE DOOR U.S. Aluminum has designed one of the most demanding air and water protection products, the BAL- 350 Small

More information

NOTICE TO BIDDERS OF RECORD

NOTICE TO BIDDERS OF RECORD NOTICE TO BIDDERS OF RECORD ADDENDUM NO. 02 ROOF REPLACEMENT: MOUNT NITTANY MIDDLE SCHOOL 656 BRANDYWINE DRIVE STATE COLLEGE, PA 16801 HLA # - March 28, 2016 This Addendum forms a part of the Contract

More information

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018 ` Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 January 11, 2019 Addendum #4 To Request

More information

Mold resistant, paperless gypsum board shall be used in bath, kitchen, and janitor locations.

Mold resistant, paperless gypsum board shall be used in bath, kitchen, and janitor locations. 09 00 00 - FINISHES 09 00 00 General Information CCU is continuing its investigation into preferred floor surface materials. In general, selection of floor materials should consider the environmental impact

More information

Sample Specifications

Sample Specifications Sample Specifications Below is a template for you to use in preparing a final, quarry tile specification incorporating products manufactured by Metropolitan Ceramics, by Ironrock Capital, Inc. Quarry tile

More information

NOTE: For construction other than new commercial or additions (renovations), only those areas below describing the scope of work will be applicable.

NOTE: For construction other than new commercial or additions (renovations), only those areas below describing the scope of work will be applicable. Applicant s Name: New Commercial - Commercial Additions Renovations Permit Plan Submittal Check List Applicant s Phone Number (s): Project Address: Project Type: _New Commercial or Commercial Addition

More information

City of Miami ADDENDUM NO. 5. January 12, 2017 INVITATION TO BID NO.: CURTIS PARK NEW SWIMMING POOL FACILITY

City of Miami ADDENDUM NO. 5. January 12, 2017 INVITATION TO BID NO.: CURTIS PARK NEW SWIMMING POOL FACILITY City of Miami ADDENDUM NO. 5 January 12, 2017 INVITATION TO BID NO.: 15-16-040 CURTIS PARK NEW SWIMMING POOL FACILITY OFFICE OF CAPITAL IMPROVEMENTS ( OCI ) PROJECT NO.: TO: ALL PROSPECTIVE BIDDERS: The

More information

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS [OR WOOD] PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School A D D E N D U M # 1 DATE: TO: FROM: PROJECT: All Bidders Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School CBI JOB NO.: 11063 The following items shall modify

More information

2004 MASTER FORMAT SECTION Façade Panels

2004 MASTER FORMAT SECTION Façade Panels 2004 MASTER FORMAT SECTION 07 44 00 Façade Panels Hunter Douglas Façades Aluminum Façade Systems PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

A. Remove Table of Contents and insert new attached Table of Contents.

A. Remove Table of Contents and insert new attached Table of Contents. ADDENDUM NO. 01 PROJECT Colby Glass E.S. Window Upgrades and ADA Work PROJECT NO. 16043 DATE February 07, 2018 TO: All Prime Contract Bidders and all others to whom Drawings and Specifications have been

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09260 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SUMMARY A. Provide gypsum board assemblies. 1.2 SUBMITTALS A. Product Data: Submit manufacturer's product data and installation instructions for

More information

327 King Street Exterior Repairs & Interior Renovations Project No. H15-N200-PG

327 King Street Exterior Repairs & Interior Renovations Project No. H15-N200-PG StudioA Architecture ADDENDUM NO. 2 Date: 11 October 2013 Re: 327 King Street Exterior Repairs & Interior Renovations Project No. H15-N200-PG From: Whitney Powers To: Bidders/Planholders This Addendum

More information

DESIGN AND CONSTRUCTION STANDARDS November 2010

DESIGN AND CONSTRUCTION STANDARDS November 2010 09 00 03 GENERAL PROVISIONS A. For renovation projects, consider the building s character and existing finishes. All material patches should blend as closely as possible. Some buildings on campus have

More information

DESIGN AND CONSTRUCTION STANDARDS April 2011

DESIGN AND CONSTRUCTION STANDARDS April 2011 09 00 03 GENERAL PROVISIONS A. For renovation projects, consider the building s character and existing finishes. All material patches should blend as closely as possible. Some buildings on campus have

More information

Question 2: Regarding Section VII, part 10, which jurisdiction issues permits for work performed at Ronald Reagan Washington National Airport?

Question 2: Regarding Section VII, part 10, which jurisdiction issues permits for work performed at Ronald Reagan Washington National Airport? RONALD REAGAN WASHINGTON NATIONAL AIRPORT METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SOLICITATION RFP 1-11-C138 TERMINAL B/C PRE-SECURITY RESTROOM RENOVATIONS RESPONSES TO CONTRACTOR QUESTIONS Question

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 3 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

Coastal Carolina University Design Guidelines FINISHES

Coastal Carolina University Design Guidelines FINISHES 09 00 00 - FINISHES 09 00 00 General Information CCU is continuing its investigation into preferred floor surface materials. In general, selection of floor materials should consider the environmental impact

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

A NEW SCHOOL ATHENS BIBLE SCHOOL FOR THE PRESIDENT AND BOARD OF DIRECTORS ATHENS, ALABAMA

A NEW SCHOOL ATHENS BIBLE SCHOOL FOR THE PRESIDENT AND BOARD OF DIRECTORS ATHENS, ALABAMA McKee and Associates Architecture and Interior Design Addendum No. TWO Date: 09.27.17 Project: A NEW SCHOOL ATHENS BIBLE SCHOOL FOR THE PRESIDENT AND BOARD OF DIRECTORS ATHENS, ALABAMA A2.1 GENERAL PROJECT

More information

3. Has a hazardous materials survey been completed for the project to identify any potential contaminates? Answer: Yes.

3. Has a hazardous materials survey been completed for the project to identify any potential contaminates? Answer: Yes. 1. Page A401 details 3, 4, 5 show storefront sections, but no storefront specification exists. Can this be provided? Answer: This frame these sections apply to is to be changed to hollow metal. Delete

More information

2. In moist areas, portland cement plaster should be used if a more permanent material is not within budget limits.

2. In moist areas, portland cement plaster should be used if a more permanent material is not within budget limits. UDIVISION 9 FINISHES 09 00 00 FINISHES 09 20 00 PLASTER AND GYPSUM BOARD PLASTER 1. Major partitions are to extend to underside of structure as required by code. Allow for structural deflection. Provide

More information

See attached answers to questions and requests for clarification received.

See attached answers to questions and requests for clarification received. Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 June

More information

SECTION TRESPA ATHLON SOLID COMPOSITE PHENOLIC TOILET PARTITIONS. A. Solid composite phenolic toilet compartments and urinal screens.

SECTION TRESPA ATHLON SOLID COMPOSITE PHENOLIC TOILET PARTITIONS. A. Solid composite phenolic toilet compartments and urinal screens. SECTION 102113 TRESPA ATHLON SOLID COMPOSITE PHENOLIC TOILET PARTITIONS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Solid composite phenolic toilet compartments and urinal screens. 1.02 RELATED SECTIONS

More information

Chevy Chase Club June 30, 2008 Bowie Gridley Architects

Chevy Chase Club June 30, 2008 Bowie Gridley Architects SECTION 092900 - GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent. SECTION 092900 - GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

FINA Stoneworks NATURAL STONE HONEYCOMB REINFORCED PANEL SYSTEM

FINA Stoneworks NATURAL STONE HONEYCOMB REINFORCED PANEL SYSTEM GUIDE SPECIFICATION FINA Stoneworks NATURAL STONE HONEYCOMB REINFORCED PANEL SYSTEM Section 07 42 00 WALL PANELS This suggested guide specification has been developed using the current edition of the Construction

More information

STRUCTURAL DESIGN CRITERIA

STRUCTURAL DESIGN CRITERIA CHAPTER 3 STRUCTURAL DESIGN CRITERIA SECTION 301 GENERAL 301.1 Scope. Loads and load combinations shall be determined in accordance with ASCE 7 unless otherwise noted. Structural elements of the storm

More information

A1.01 SITE PLAN 394 W OLENTANGY ST POWELL, OH BUILDING TO BE RENOVATED SITE PLAN. P F www. archa ll.

A1.01 SITE PLAN 394 W OLENTANGY ST POWELL, OH BUILDING TO BE RENOVATED SITE PLAN. P F www. archa ll. N O R T H F I F T H S T R E E T C O L U M B U S O H I O P.. 00 F.. 000 www. archa ll. com W OLENTANGY ST POWELL, OH 0 DRAWING SET 0 0 0 preliminary check bid permit construction REVISIONS BUILDING TO BE

More information

DOCUMENT BID DOCUMENT

DOCUMENT BID DOCUMENT DOCUMENT 00 40 00 BID DOCUMENT 1 Submit bids in compliance with Document 00 21 00Instructions to Bidders. Fill in blanks which pertain to the project or indicate N/A. The Owner reserves the right to reject

More information

AMBICO Limited Section and BLAST RESISTANT STEEL WINDOW FRAME ASSEMBLIES Page 1

AMBICO Limited Section and BLAST RESISTANT STEEL WINDOW FRAME ASSEMBLIES Page 1 Page 1 This section includes AMBICO Blast Resistant Steel Window Frame assemblies and relies on applicable industry standards. This section includes proprietary and descriptive type specification requirements.

More information

ALL-ALUMINUM DOOR & WINDOW FRAMING

ALL-ALUMINUM DOOR & WINDOW FRAMING ALL-ALUMINUM DOOR & WINDOW FRAMING WITH INTEGRATED ALUMINUM DOOR STOP SECTION 08 41 13 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS SPECIFICATION PART 1 GENERAL 1.1 SECTION INCLUDES: A. Prefinished aluminum

More information

4.1.3 Project Manual

4.1.3 Project Manual 4.1.3 Project Manual (*Section requires Filed Sub-Bid) PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP Division 00 Procurement and Contracting Requirements Section 00 01 03 Project Directory Section 01

More information

Invitation for Bid. City of Urbana, Ohio. Restroom/Storage Facility Melvin Miller Park 731 Children s Home Road, Urbana, OH 43078

Invitation for Bid. City of Urbana, Ohio. Restroom/Storage Facility Melvin Miller Park 731 Children s Home Road, Urbana, OH 43078 205 S. Main Street Urbana, Ohio 43078 http://www.urbanaohio.com 937-652-4300 June 1, 2016 Invitation for Bid Restroom/Storage Facility Melvin Miller Park The City of Urbana received a Federal Grant to

More information

GENERAL PROVISIONS

GENERAL PROVISIONS 09 00 03 GENERAL PROVISIONS A. For renovation projects, consider the building s character and existing finishes. All material patches should blend as closely as possible. Some buildings on campus have

More information

Addendum No. 1 November 03, 2016

Addendum No. 1 November 03, 2016 Addendum No. 1 November 03, 2016 Project: Location: Bid Date: Liberal Arts Building Entry & Basement Remodel University of Montana University of Montana Campus Liberal Arts Building 136, 32 Campus Drive,

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal.

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal. Addendum #1 Window Replacements at [4] Buildings Desoto Bass Court, OH5-2A, AMP 7 IFB #13-02 May 6, 2013 Greater Dayton Premier Management 400 Wayne Ave. Dayton, Ohio 45410 This Addendum modifies and shall

More information

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

CATAMARAN TOWER - 1 Seef Area Plot 19, 20 STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

ADDENDUM NO. 1 February 6, Bidders are hereby informed that the construction plans and/or specifications are modified as follows:

ADDENDUM NO. 1 February 6, Bidders are hereby informed that the construction plans and/or specifications are modified as follows: ADDENDUM NO. 1 February 6, 2013 TO: PLANS and SPECIFICATIONS for BUILDING IMPROVEMENTS MARCELINE NUTRITION CENTER 229 WEST HAUSER STREET MARCELINE, MISSOURI The Architects Alliance, Inc. 631 West Main

More information

GENERAL PROVISIONS

GENERAL PROVISIONS 09 00 03 GENERAL PROVISIONS A. For renovation projects, consider the building s character and existing finishes. All material patches should blend as closely as possible. Some buildings on campus have

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Storefront systems and aluminum framed glass doors. 2. Hardware, fasteners, accessories, filler pieces, etc., required

More information

VELUX America Inc. SPECIFICATION FOR MODEL QPF SELF-FLASHED FIXED SKYLIGHT SECTION UNIT SKYLIGHTS

VELUX America Inc. SPECIFICATION FOR MODEL QPF SELF-FLASHED FIXED SKYLIGHT SECTION UNIT SKYLIGHTS SECTION 08620 UNIT SKYLIGHTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Performance and product component information for VELUX QPF selfflashed fixed skylight. B. Unit skylight mounted directly to roof decking.

More information

CONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008

CONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008 SECTION 092900 - GYPSUM BOARD 1.1 SUMMARY A. This Section includes the following: 1. Interior gypsum board. 2. Tile backing panels. B. Related Sections include the following: 1. Division 06 Section "Rough

More information

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No. SECTION 092900 GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION ALUMINUM GLASS FLOOR SKYLIGHT SYSTEMS

SECTION ALUMINUM GLASS FLOOR SKYLIGHT SYSTEMS PART 1: GENERAL 1.01 SUMMARY SECTION 04818 ALUMINUM GLASS FLOOR SKYLIGHT SYSTEMS A. Structural glass floor system, consisting of structural extruded aluminum System or Stainless Steel system and laminated

More information

ALL PROSPECTIVE CONTRACTORS, PLAN ROOMS AND SUPPLIERS

ALL PROSPECTIVE CONTRACTORS, PLAN ROOMS AND SUPPLIERS Architect: Studio 2H Design, LLC 1721 4 th Avenue North, Suite 101 Birmingham, Alabama 35203 (205) 264-9988 July 26, 2018 ADDENDUM NO. 5 UA Project No.: 712-17-1081 EDA Investment No.: 04-79-07154 B.C.

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

STANDARD PLAN RELEASE SUMMARY(SPR) Facilities Management Department

STANDARD PLAN RELEASE SUMMARY(SPR) Facilities Management Department STANDARD PLAN RELEASE SUMMARY(SPR) Facilities Management Department Building Design: Nauvoo 00 Release Date: February 2001 Release Number: 1 Summarized below is a list of modifications made to the Standard

More information

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY

More information

Addendum 2 Bid No & 12-5

Addendum 2 Bid No & 12-5 Addendum 2 Bid No. 12-4 & 12-5 July 26, 2012 Westgate/Belvedere Homes Community Redevelopment Agency Single Family Housing Rehabilitation Attachments for your use: Revised Checklist Revised Bid Sheets

More information

Modifications or clarifications to original plans and specifications: 1. ATTENDEES OF THE PRE-BID CONFERENCE ARE ON THE ATTACHED LIST

Modifications or clarifications to original plans and specifications: 1. ATTENDEES OF THE PRE-BID CONFERENCE ARE ON THE ATTACHED LIST 209 North Pierce voice 501.219.1614 Little Rock Arkansas, 72205 fax 501.219.1613 www.andrewhicksarchitect.com Andrew Hicks: Project Manager Phone: (501) 219-1614 FAX: (501)219-1613 andrew@andrewhicksarchitect.com

More information

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 13686.00 HOLLOW METAL DOORS AND FRAMES 081113-1 SECTION 081113 - HOLLOW METAL DOORS AND FRAMES 1.1 RELATED DOCUMENTS: PART 1 - GENERAL A. Drawings and general provisions of Contract, including General

More information

STRUCTURAL DESIGN CRITERIA

STRUCTURAL DESIGN CRITERIA CHAPTER 3 STRUCTURAL DESIGN CRITERIA SECTION 301 GENERAL 301.1 Scope. Loads and load combinations shall be determined in accordance with ASCE 7 unless otherwise noted. Structural elements of the storm

More information

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 138 MCKEE STREET MANCHESTER, CT BID NO. 16/17-5 ADDENDUM NO. 1 1. The bid opening has been

More information

Waikoloa Homesites. Kohala Coast, HI. Outline Specifications. Prepared By: 16 December 15

Waikoloa Homesites. Kohala Coast, HI. Outline Specifications. Prepared By: 16 December 15 Waikoloa Homesites Kohala Coast, HI Prepared By: Fritz Harris-Glade, NCARB, AIA FHG Architects AIA, LLC HG Construction Management, Inc. P. O. Box 4476 Kailua Kona, HI 96745 16 December 15 TMK : (3) 0-0-000:000

More information

Project Manual Index of Specifications Shenandoah Schools Concession Building

Project Manual Index of Specifications Shenandoah Schools Concession Building INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions

More information

ICC/NSSA STANDARD FOR THE DESIGN AND CONSTRUCTION OF STORM SHELTERS ICC

ICC/NSSA STANDARD FOR THE DESIGN AND CONSTRUCTION OF STORM SHELTERS ICC Standards Action - May 2, 2014 - Page 43 of 50 Pages International Code Council ICC/NSSA STANDARD FOR THE DESIGN AND CONSTRUCTION OF STORM SHELTERS ICC 500-2013 edition Public Comment Draft #3 The ICC

More information

SECTION HOLLOW METALWORK. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION HOLLOW METALWORK. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 081113 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Chapter 2 QUALITY ASSURANCE

Chapter 2 QUALITY ASSURANCE Chapter 2 QUALITY ASSURANCE 2.1 GENERAL 2.1.1 Scope. This chapter provides minimum requirements for quality assurance for seismic-forceresisting systems and designated seismic systems. These requirements

More information

Section SoundPly LR M25 Acoustic Ceiling Panels

Section SoundPly LR M25 Acoustic Ceiling Panels Section 095126 Acoustic Ceiling Panels PART 1 GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY A. Drawings and general conditions of the Contract, including General and Supplementary Conditions and Division 1

More information

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE TABLE OF CONTENTS SECTION TITLE DATE Division 00 Procurement and Contracting Requirements 000101... Project Title Page 000116... CAD Standards 001116... Invitation to Bid 002113... Instructions to Bidders

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:

SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address: SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division Permit Application #: Project Address: Purpose: To meet the requirements of City of Walnut Creek Municipal Code Section

More information

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system.

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. SECTION 08625 METAL FRAMED SKYLIGHT PART 1 GENERAL 1.01 SECTION INCLUDES: A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. B. Fabrication