CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

Size: px
Start display at page:

Download "CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO"

Transcription

1 SECTION SCOPE OF WORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General provisions of Contract, General Conditions and Technical Specification Sections, apply to this Section PROJECT DESCRIPTION A. The project consists of total roof removal and replacement of the existing roof system as indicated in the Contract Documents dated May 2016 and titled City of Richmond Pine Camp Community Center Roof Replacement Project. B. The work consists of removing the existing built-up roof system down to the existing metal roof deck, the installation of new polyisocyanurate insulation mechanically fastened through existing decking, and the installation of a new 60 mil PVC roof membrane fully adhered as outlined in the Contract Documents. Note: All roofing system removed must be put back into a watertight condition by the end of each work day. C. Existing roof system compositions: Roof Areas A, B, E & F Perlite Roof insulation Polyisocyanurate Roof Insulation Roof Area G Wood Fiber Roof insulation - 2 Polyisocyanurate Roof Insulation Roof Areas C & D Perlite Roof insulation Polyisocyanurate Roof Insulation Roof Areas H & I - 4 Ply Built-up Roof w/ Aluminum Coating Perlite Roof Insulation Polyisocyanurate Roof Insulation - Painted Metal Deck D. New roof system compositions: Roof Areas A, B, E & F - New 1.5 Polyisocyanurate Roof insulation Roof Area G - New 0.5 High Density Polyisocyanurate Cover Board Roof Areas C & D - New 1.5 Polyisocyanurate Roof insulation - New 3 Polyisocyanurate Roof Insulation Roof Areas H & I - New Tapered Polyisocyanurate Roof insulation (starting at 1.5 ) - New 3 Polyisocyanurate Roof Insulation SCOPE OF WORK SECTION

2 E. Asbestos Containing Materials 1. AN ASBESTOS INSPECTION WAS PERFORMED AND THERE ARE NO ASBESTOS-CONTAINING MATERIALS IN THE EXISTING ROOF SYSTEM TO BE REMOVED. ASBESTOS CONTAINING MATERIALS MAY BE PRESENT IN OTHER AREAS OF THE BUILDING WHERE WORK IS BEING PERFORMED. THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ANY REMAINING ASBESTOS-CONTAINING MATERIALS ARE NOT DISTURBED OR DAMAGED, AND WILL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH CLEAN-UP AND CLEARANCE OF THE BUILDING DUE TO DISTURBANCE OR DAMAGE TO ASBESTOS-CONTAINING MATERIALS NOT INCLUDED IN THE SCOPE OF WORK. 2. REMOVE AND DISPOSE OF ASBESTOS CONTAINING MATERIALS IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAWS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING A PROJECT APPROACH BY COORDINATING WITH THE VARIOUS SUBCONTRACTORS PERFORMING OTHER COMPONENTS OF THE CONTRACT. THE SPECIFIC WORK TECHNIQUES AND PRACTICES SELECTED TO EXECUTE THE CONTRACT WILL DETERMINE THE ABATEMENT MEASURES, IF ANY, REQUIRED. THE PROJECT APPROACH SHALL BE BASED ON HISTORICAL DATA AND EXPERIENCE WITH PROJECTS OF SIMILAR SCOPE. 4. THE CONTRACTOR WILL BE REQUIRED TO PROVIDE THE OWNER WITH A DISPOSAL MANIFEST OF ALL ASBESTOS CONTAINING MATERIAL REMOVED FROM THE PROPERTY. THIS MANIFEST SHALL ACCOMPANY EACH APPLICATION FOR PAYMENT. F. Warranty Requirements: 1. Note that these warranties/guarantees shall begin on the date of acceptance of the entire project by the Owner. 2. Manufacturer's Warranty: As part of the work of this Project, pay all required fees, secure all required inspections, and do all things necessary to secure and deliver to the Owner from the roofing membrane manufacturer a Twenty Year (20 yr.) No Dollar Limit guarantee for all labor and materials required to repair any roof leaks resulting from defects in materials or workmanship in the PVC installation. 3. Installer's Guarantee: Upon completion of the work, and as a condition of its acceptance, deliver to the Owner a written guarantee signed by the Contractor and the installing subcontractor (if any) agreeing to maintain the roofing, flashings, sheet metal and caulking in a waterproof condition for a period of at least Two Years (2 yrs.) following installation, and without any additional cost to the Owner. The contractor s guarantee shall be submitted to the Owner and Consultant for approval prior to the start of the project. 4. Secure the manufacturer s approval of the project and all components of the project prior to bidding ROOF REPLACMENT WORK INCLUDED A. Remove and store existing rooftop HVAC units to allow for replacement of roof system flashings and ductwork. Remove and replace existing ductwork. New ductwork shall be insulated on the interior side of the duct and interior free area shall match free area of existing ductwork. 1. Provide all required mechanical and electrical work as required to move units and replace ductwork. 2. Relocate all wall mounted electrical components to be a minimum of 12 off of the new finished roof surface. 3. All work associated with replacement or relocation of rooftop equipment shall be performed by a licensed mechanical/electrical sub-contractor and performed by licensed tradesmen of that firm. B. Remove all existing in place roofing materials on all roof areas, including but not limited to the builtup roof membrane, roof insulations, wall flashings, associated metals, etc. SCOPE OF WORK SECTION

3 C. Repair or replace all rusted and damaged metal decking. The contractor will be required to provide interior protection at all areas where the metal deck is to be replaced. Interior protection shall be removed immediately upon completion of the deck replacement. D. Remove all abandoned equipment and supports, including loose obsolete cable lying on the roof, as indicated on the roof plans or as directed by the owner. Repair/patch all remaining opening in the roof deck with new metal deck as required to provide a structurally sound roof deck condition at all locations of equipment removal. E. Check all existing drains and drain lines to verify that lines are clear and fully functional. In the event that an existing drain can not be cleared or is damaged beyond repair, notify the Owner and upon approval replace the drain under the Unit Cost Allowance. Provide all associated piping and accessories as required to connect new drain to existing drainage lines. F. Replace the drain strainer baskets, clamping rings and drain bolts on all existing roof drain assemblies to remain with new metal components to match the existing. G. Furnish and install new pressure treated wood nailers as required and shown to match height of new insulation system. H. Furnish and install new roof insulation in accordance with Section Roof Insulation I. Furnish and install a new 60 mil fully adhered PVC single ply membrane roof system according to the specifications and the selected roof system manufacturer s requirements for a Twenty Year (20) No Dollar Limit roof system warranty/guarantee. J. Under Alternate Bid No. 1 - Furnish and install a new 80 mil fully adhered PVC single ply membrane roof system in accordance with the selected roof system manufacturer s requirements for a Twenty Year (20) No Dollar Limit and puncture resistant roof system warranty/guarantee K. Furnish and install new flashing and stripping in accordance with the approved manufacturer s requirements. L. Furnish and install new pre-manufactured ANSI/SPRI ES-1 compliant metal edges as required or shown. The new PVC membrane shall be run down over the outside face at the metal edge section. The metal color shall be chosen by the owner. M. Furnish and install new metal gutters and downspouts. The new downspouts shall be placed at existing locations and run in the same pattern as existing conditions. The metal color shall be chosen by the owner. N. Furnish and install new pre-manufactured flow through overflow scuppers to match the existing metal edge detailing. The metal color shall be chosen by the owner. O. Furnish and install new pre-finished metal counter flashings in accordance with project specifications. P. Furnish and install new manufacturer approved protective walk pads at roof access points and around all motorized equipment. Q. Furnish and install new manufacturer approved protective walk pads and concrete splash blocks under all downspout locations. R. Furnish and install and install new condensate lines directed to the nearest drainage outlet in accordance with code requirements and the manufacturer s guidelines. SCOPE OF WORK SECTION

4 S. Clean, prime, and paint all rusted piping (including gas line) and conduits prior to installation of penetration flashings CONTRACTOR S USE OF PREMISES A. Limit use of the premises for construction activities and storage in areas indicated; allow for Owner occupancy. Cooperate with Owner in devising a plan to allow safe ingress and egress during construction. 1. Keep driveways and entrances serving the premises clear and available to the Owner and the Owner's employees at all times. Do not use these areas for parking or storage of materials. B. Use of the Existing Building: Maintain the existing building in a weather tight condition throughout the construction period. Immediately repair damage caused by construction operations. Take all precautions necessary to protect the building and building occupants during the construction period. C. Contractor shall furnish and install interior tarping protection under areas of exposed decking for the duration of the work. Contractor shall remove all tarping and clean beneath areas upon completion of the work above OWNER OCCUPANCY A. The Owner will occupy the site and the existing building during the entire construction period. Cooperate with the Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the work so as not to interfere with the Owner's operations CONTRACTOR OPERATIONS AND CONDUCT A. The Contractor shall be responsible for seeing that all personnel connected with the construction work comply with the following requirements. 1. The Contractor shall be responsible for the conduct of all construction personnel while on this project. All personnel connected with the construction work shall obey all rules and regulations of the facility in regard to these matters. 2. The Owner shall maintain control of all security entrances and areas at all times. 3. The Contractor shall have a responsible representative at the job site at all times when any work is in progress. 4. The Contractor shall submit to the Owner, one week in advance, a weekly work schedule setting forth the work to be performed during the week and the daily hours during which work will be in progress. 5. Contractors and/or their representatives are limited to movement to and from and within the immediate area of their construction limits. 6. No firearms, alcohol or drugs may be brought onto the Owner's property. 7. Tools, ladders and construction equipment shall not be left unattended at the job site. All tools, ladders and equipment shall be secured when not in use. B. All mechanical and electrical work required for the completion of the roof replacement and roof repair work shall be provided by a licensed mechanical/electrical sub-contractor and performed by licensed tradesmen of that firm. The Contractor shall include all required mechanical/electrical work required in the Base Bid. 1. The Contractor shall submit a list of all sub-contractors with their credentials prior to the start of the Work. 2. The Contractor or his subs shall apply and pay for all permits and inspections required for the SCOPE OF WORK SECTION

5 completion of the Work at no additional cost to the Owner. PART 2 - PRODUCTS (Not Applicable) PART 3 - EXECUTION (Not Applicable) END OF SECTION SCOPE OF WORK SECTION

SAM HOUSTON STATE UNIVERSITY DIVISION 07 THERMAL & MOISTURE PROTECTION SECTION ROOFING SYSTEMS DESIGN AND CONSTRUCTION STANDARDS February 2016

SAM HOUSTON STATE UNIVERSITY DIVISION 07 THERMAL & MOISTURE PROTECTION SECTION ROOFING SYSTEMS DESIGN AND CONSTRUCTION STANDARDS February 2016 PART 1: GENERAL 1.01 Scope Of Standard 1.02 Reference Standards 1.03 Quality Control A. This standard provides general guidance concerning the specific preferences of the Sam Houston State University for

More information

C. All roofs shall be installed according to manufacturers guidelines. Corrections due to workmanship shall be at contractors expense.

C. All roofs shall be installed according to manufacturers guidelines. Corrections due to workmanship shall be at contractors expense. PART 1: GENERAL 1.01 Scope Of Standard 1.03 Reference Standards 1.04 Quality Control A. This standard provides general guidance concerning the specific preferences of the Sam Houston State University for

More information

DIVISION 07 THERMAL AND MOISTURE PROTECTION ROOFING

DIVISION 07 THERMAL AND MOISTURE PROTECTION ROOFING 07 00 00 PART 1 - GENERAL 1.01 DESIGN CRITERIA A. Preferred roofing types include Membrane, Metal, and Composition Shingles. 1. Membrane roofing is preferred for flat roof decks. 2. Use of asphalt-based

More information

WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 07 THERMAL AND MOISTURE PROTECTION

WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 07 THERMAL AND MOISTURE PROTECTION 075000 ROOFING SYSTEMS PART 1 - GENERAL 1.1. Any deviation from the following instructions must be approved during design by WVU Facilities Management Personnel. 1.2. DEFINITIONS A. ASTM American Society

More information

C. Jointing of Exterior Vertical Surfaces. Section D. The Secretary of the US Department of the Interior s Standards for Rehabilitation.

C. Jointing of Exterior Vertical Surfaces. Section D. The Secretary of the US Department of the Interior s Standards for Rehabilitation. PART 1: GENERAL 1.01 Scope Of Standard A. This standard provides general guidance concerning the specific preferences of the University of Texas at Austin for roofing systems. B. UT recognizes that project

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 07 40 00 Roofing 1. General Several factors repeatedly show up during the inspection of roofs that have failed prematurely. They include inappropriate use of materials, poor drainage systems, poor details

More information

SECTION 07530CP EPDM MEMBRANE ROOFING

SECTION 07530CP EPDM MEMBRANE ROOFING PART 1 GENERAL 1.1 SUMMARY SECTION 07530CP EPDM MEMBRANE ROOFING A. Section includes: 1. Adhered membrane roofing and flashing 2. Mechanically fastened roof insulation 3. Walkway pads 1.2 ARCHITECTURAL

More information

Project Number BID NO. CAG 18 2 ROOF REPLACEMENT FOR HARFORD COUNTY PUBLIC SCHOOLS NORTH HARFORD ELEMENTARY. Addendum # 2

Project Number BID NO. CAG 18 2 ROOF REPLACEMENT FOR HARFORD COUNTY PUBLIC SCHOOLS NORTH HARFORD ELEMENTARY. Addendum # 2 Project Number.0 BID NO. CAG ROOF REPLACEMENT FOR HARFO COUNTY PUBLIC SCHOOLS NORTH HARFO ELEMENTARY Addendum # This addendum is to be attached to the North Harford Elementary School Roof Replacement bid

More information

3. Roof Expansion Joints between New Building and Existing Building.

3. Roof Expansion Joints between New Building and Existing Building. SECTION 077200 - ROOF ACCESSORIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Amendments to General Conditions and Division 01 Specification

More information

University of New Hampshire Scholars' Repository

University of New Hampshire Scholars' Repository University of New Hampshire University of New Hampshire Scholars' Repository Division 07 Thermal and Moisture Protection Chapter 5 Technical Construction and Renovation Standards 1-25-2013 075423 - TPO

More information

Tuscaloosa Police Station

Tuscaloosa Police Station Tuscaloosa Police Station 3801 Trevor S Phillips Ave Tuscaloosa, AL 35401 Core Cut: Spray Foam Roof- ½ thick +- Single Ply Membrane Tapered EPS Insulation 2-6 Metal Deck PART 1 GENERAL 1.1 SCOPE OF WORK

More information

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 075423 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Division 00 Bidding Requirements and other Division

More information

REPORT OF ROOF CONDITION STUDY. YOUR FACILITY Your Facilities Location. Date YOUR FACILITY S IDENTIFICATION. Prepared for Your Company

REPORT OF ROOF CONDITION STUDY. YOUR FACILITY Your Facilities Location. Date YOUR FACILITY S IDENTIFICATION. Prepared for Your Company REPORT OF ROOF CONDITION STUDY YOUR FACILITY Your Facilities Location YOUR FACILITY S IDENTIFICATION Date Prepared for Your Company 1114 Grindstone, Union, Kentucky 41091 (859) 657-6677 [Report Date] [Client]

More information

ADDENDUM # 2. - Page 1 of 2

ADDENDUM # 2. - Page 1 of 2 2013-03-20 REQUEST FOR TENDER AFRICA RESTAURANT ROOF REPLACEMENT RFT # 11 (2013-03) ADDENDUM # 2 - Page 1 of 2 This addendum shall be incorporated into, and form part of RFT # 11 (2013-03) and take precedence

More information

DATE R2.2 ROOF DETAILS - BUILT UP ROOF DETAILS CURBS. An Company PHONE:

DATE R2.2 ROOF DETAILS - BUILT UP ROOF DETAILS CURBS. An Company PHONE: A B C D E F G H I J K L M N O P Q R S T U V 5 6 7 8 9 0 5 6 7 8 9 0 5 6 7 8 9 9 GENERAL ROOFING NOTES - VILLAGE POLICE STATION ROOF REPLACEMENT PROJECT - 06 PLANS AND DETAILS - MARCH 0TH, 06. CONTRACTOR

More information

Fairfield Board of Education Proposed Capital Non-Recurring Projects

Fairfield Board of Education Proposed Capital Non-Recurring Projects Fairfield Board of Education Proposed Capital Non-Recurring Projects 2014-2015 Fairfield Public Schools Capital Non-Recurring Project Overview 2014-2015 Location Project Estimated Cost Page Mill Hill

More information

ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL

ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulation, membrane roofing, base flashings roofing membrane accessories joints, and counter flashings.

More information

BOONE COUNTY PUBLIC LIBRARY (859) 342-BOOK (2665)

BOONE COUNTY PUBLIC LIBRARY (859) 342-BOOK (2665) ROOF Boone County Public Library is seeking competitive sealed bids to replace an existing Shingle Roof and EPDM membrane roof on the Florence Branch located at 7425 U.S. 42, Florence, KY 41042. The successful

More information

SECTION 1 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

SECTION 1 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING Project Name: Jefferson City Jaycees Fairgrounds Main Building Roof Replacement Project Site Address: 1445 Fairgrounds Road, Jefferson City, MO 65109 Project Contact: Randy Weaver Project Contact phone

More information

The Alabama Building Commission has adopted the 2006 International Energy Conservation Code as the State Energy Conservation Code

The Alabama Building Commission has adopted the 2006 International Energy Conservation Code as the State Energy Conservation Code SECTION 07 20 00 THERMAL PROTECTION SCOPE OF WORK This Section includes building wall, floor and ceiling insulation, and roofing. QUALITY ASSURANCE For all new construction projects and renovation projects

More information

DIVISION MEMBRANE ROOFING & ROOFING ACCESSORIES

DIVISION MEMBRANE ROOFING & ROOFING ACCESSORIES DIVISION 07 50 00 MEMBRANE ROOFING & ROOFING ACCESSORIES A. Final selection and approval of the roofing system for new construction and reroofing is reserved by the UAO. These guidelines, in consultation

More information

Design for Daytona State College Building th Street. New Smyrna Beach, FL 32168

Design for Daytona State College Building th Street. New Smyrna Beach, FL 32168 Design for Building- 268 VICINITY MAP. The scope of work for this project, repair existing metal roofing, aluminum framed window system and replace louver systems. 2 4 TITLE SHEET ROOF PLANS S 2. All work

More information

REROOFING THE CAREER TECHNICAL SCHOOL FOR THE CLEBURNE COUNTY BOARD OF EDUCATION HEFLIN, ALABAMA

REROOFING THE CAREER TECHNICAL SCHOOL FOR THE CLEBURNE COUNTY BOARD OF EDUCATION HEFLIN, ALABAMA McKee and Associates Architecture and Interior Design Addendum No. FOUR Date: 07.17.17 Project: REROOFING THE CAREER TECHNICAL SCHOOL FOR THE CLEBURNE COUNTY BOARD OF EDUCATION HEFLIN, ALABAMA A4.1 GENERAL

More information

ADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5

ADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5 ADDENDUM NO. 1 TO SCOPE OF WORK: Section 0220, Form 01004/5 PROJECT: Tankless Water Heaters Installation Glenn Edge and Rich Martin Apartments and Main Office Water Heater Replacement New Memorial Community

More information

SOLAR COATING SYSTEMS ACRYLIC RENOVATION ROOF 4.5. Specification for Built-Up Roofing SUMMARY

SOLAR COATING SYSTEMS ACRYLIC RENOVATION ROOF 4.5. Specification for Built-Up Roofing SUMMARY SOLAR COATING SYSTEMS ACRYLIC ROOF RENOVATION 4.5 Specification for Built-Up Roofing 07590 PART 1. GENERAL 1.01 SUMMARY NAME ADDRESS A. Furnish and install a seamless, waterproof spray applied elastomeric

More information

Acrylic/Urethane. Metal Roof Restoration Sample Design Guideline

Acrylic/Urethane. Metal Roof Restoration Sample Design Guideline 1 DG0009-I 04/2017 Metal Roof Restoration Sample Design Guideline Acrylic/Urethane ITW POLYMERS SEALANTS NORTH AMERICA, INC. 111 S. Nursery Road. Irving, TX 75060 Tel: 972-438-9111 Fax: 972-554-3939 www.itwsealants.com

More information

RECEIVE A RADICAL COMPREHENSIVE COMMERCIAL ROOF INSPECTION & DETAILED REPORT

RECEIVE A RADICAL COMPREHENSIVE COMMERCIAL ROOF INSPECTION & DETAILED REPORT RECEIVE A RADICAL COMPREHENSIVE COMMERCIAL ROOF INSPECTION & DETAILED REPORT Keeping moisture out of buildings since 1987 If you want something to perform, you have to maintain it. After all, you wouldn

More information

SECTION CO-POLYMER ELASTOMERIC COOL-ROOF COATING

SECTION CO-POLYMER ELASTOMERIC COOL-ROOF COATING SECTION 076000 - CO-POLYMER ELASTOMERIC COOL- PART 1 - GENERAL 1.1 SUMMARY OF WORK A. Contractor is to supply the necessary labor, materials, and equipment to coat existing roof system (approximately 390

More information

ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS

ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS Re-Ply Roofing Systems Application Specification # AC - 2010-A & MB PART I GENERAL 1.01 DESCRIPTION A. This guideline specification includes

More information

ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS

ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS Re-Ply Roofing Systems Application Specification # AC-2014-A & MB-15 (15 Year Material & Labor Warranty) PART I - GENERAL 1.01 DESCRIPTION

More information

UNIVERSITY OF MISSOURI Division 07 Thermal and Moisture Protection Roofing:

UNIVERSITY OF MISSOURI Division 07 Thermal and Moisture Protection Roofing: Roofing: 1. Materials used for moisture protection will comply with specifications contained in the appropriate American Society for Testing and Material standards (ASTM). 2. General roof specification

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 077200 - ROOF ACCESSORIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION A. Examination, preparation, and general installation procedures.

SECTION A. Examination, preparation, and general installation procedures. SECTION 01 7000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Examination, preparation, and general installation procedures. B. Cutting and patching. C. Cleaning and protection. D. Substantial Completion E. Final

More information

RECOMMENDED DESIGN SPECIFICATION

RECOMMENDED DESIGN SPECIFICATION RECOMMENDED DESIGN SPECIFICATION SILICONE COATED SPF ROOFING 1 General 1.1 Section Includes A. Silicone coated SPF roofing system, including substrate board, roof insulation boards, foam insulation materials,

More information

CMP WellRoof Brochure

CMP WellRoof Brochure CMP WellRoof Brochure (COMGN183) Updated: 3/16 I M YOUR GAF CMP Certified Maintenance Professional CONTRACTOR Your Very Best Choice For Your Commercial Roofing Maintenance Program FACT * Studies have shown

More information

6. ENGINEERING SYSTEMS REQUIREMENTS B30 ROOFING B30 GENERAL SYSTEM DESCRIPTION

6. ENGINEERING SYSTEMS REQUIREMENTS B30 ROOFING B30 GENERAL SYSTEM DESCRIPTION 6. ENGINEERING SYSTEMS REQUIREMENTS B30 ROOFING SYSTEMS REQUIREMENTS ROOFING TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT Level 2 Group Elements. This

More information

SOLAR COATING SYSTEMS SYSTEM EMULSION /ACRYLIC. Specification for Built-Up Roofing MULSION/A 1.01 SUMMARY

SOLAR COATING SYSTEMS SYSTEM EMULSION /ACRYLIC. Specification for Built-Up Roofing MULSION/A 1.01 SUMMARY SOLAR COATING SYSTEMS 2-PLY EMULSION MULSION/A /ACRYLIC SYSTEM Specification for Built-Up Roofing 07590 PART 1. GENERAL 1.01 SUMMARY Name Address City, State, zip A. Furnish and install a seamless, reinforced

More information

GUIDELINES FOR ROOF MOUNTED PHOTOVOLTAIC INSTALLATIONS

GUIDELINES FOR ROOF MOUNTED PHOTOVOLTAIC INSTALLATIONS GUIDELINES FOR ROOF MOUNTED PHOTOVOLTAIC INSTALLATIONS 1. General Information included in this document is to be used as a guideline when a Photovoltaic (PV) system is to be installed over a new or existing

More information

LOG COLLEGE MIDDLE SCHOOL

LOG COLLEGE MIDDLE SCHOOL PART 1-GENERAL 1.1 SUMMARY A. This section includes the following: 1. Curb-mounted plastic glazed skylights. B. Refer to roofing system sections for roofing accessories to be built into the roofing system

More information

Town of Atkinson, New Hampshire INVITATION TO BID. Town Garage Roof Replacement Issued: June 30, 2015

Town of Atkinson, New Hampshire INVITATION TO BID. Town Garage Roof Replacement Issued: June 30, 2015 Town of Atkinson, New Hampshire INVITATION TO BID Town Garage Roof Replacement Issued: June 30, 2015 The Town of Atkinson invites qualified contractors to bid on the replacement of the roof of the Town

More information

ReflectiClean Acrylic/Urethane

ReflectiClean Acrylic/Urethane 1 DG0009-J 08/2015 Metal Roof Restoration Sample Design Guidelines ReflectiClean Acrylic/Urethane ITW POLYMERS SEALANTS NORTH AMERICA, INC. 111 S. Nursery Road. Irving, TX 75060 Tel: 972-438-9111 Fax:

More information

Architectural Inspection Low Slope Roofing

Architectural Inspection Low Slope Roofing 0521 Low Slope Roofing All components of the roof system including insulation The roofing on the original building is an Inverted Roof Membrane Assembly (IRMA). It consists of a rubber membrane over ¾

More information

A. Provide all labor, equipment, and materials fabricate and install the following. 2. Counterflashings over bituminous base flashing.

A. Provide all labor, equipment, and materials fabricate and install the following. 2. Counterflashings over bituminous base flashing. SECTION 076200 - FLASHING AND SHEET METAL PART 1 GENERAL 1.1 SECTION INCLUDES: A. Provide all labor, equipment, and materials fabricate and install the following. 1. Edge strip and flashing. 2. Counterflashings

More information

Light-Metal Roof Edge, Raised

Light-Metal Roof Edge, Raised NAIL WOOD CANT TO BLOCKING 2 ROWS STAGGERED EACH ROW 24 O.C. 1/2 MIN. 10 0 MAX. FASTEN 18 O.C. WITH NEOPRENE GASKETED FASTENERS 3-1/2 MIN. 4 6 JOINT COVER PLATE SET IN TWO BEADS OF SEALANT 4 MIN. SPECIFIED

More information

B. Sections and all references contained therein form a part of this Section of the Specifications.

B. Sections and all references contained therein form a part of this Section of the Specifications. KARGES-FAULCONBRIDGE, INC. KFI: 14-044.00 SEWARD MONTESSORI SCHOOL ADDITION & REMODELING SECTION 260010 - PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including

More information

MAINTENANCE INSPECTION GUIDE

MAINTENANCE INSPECTION GUIDE MAINTENANCE INSPECTION GUIDE A QUICK AND EASY REFERENCE FOR BUILDING OWNERS O OBSERVE The leading cause of premature roofing system failure is the lack of a maintenance program. Periodic inspections and

More information

1. Clean the existing totally adhered or mechanically attached roof membrane: TPO, EPDM, Hyplon,

1. Clean the existing totally adhered or mechanically attached roof membrane: TPO, EPDM, Hyplon, Summary Specification Re-Skinning Over Two Existing Roofs The Top Roof Being a Totally Adhered Single Ply Over a Built-Up-Roof On A Poured-in-Place Concrete Deck Using the Existing Angle Change Terminations

More information

RCi. roof consultants, inc. Thank you for your interest in Roof Consultants, Inc.

RCi. roof consultants, inc. Thank you for your interest in Roof Consultants, Inc. Thank you for your interest in Roof Consultants, Inc. We have been providing quality services for building owners and managers for over 30 years and have over 100 years of combined experience in the roofing

More information

6. ENGINEERING SYSTEMS REQUIREMENTS B30 ROOFING B30 GENERAL SYSTEM DESCRIPTION

6. ENGINEERING SYSTEMS REQUIREMENTS B30 ROOFING B30 GENERAL SYSTEM DESCRIPTION 6. ENGINEERING SYSTEMS REQUIREMENTS B30 ROOFING SYSTEMS REQUIREMENTS ROOFING TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT Level 2 Group Elements. This

More information

6. ENGINEERING SYSTEMS REQUIREMENTS B30 ROOFING B30 GENERAL SYSTEM DESCRIPTION

6. ENGINEERING SYSTEMS REQUIREMENTS B30 ROOFING B30 GENERAL SYSTEM DESCRIPTION 6. ENGINEERING SYSTEMS REQUIREMENTS B30 ROOFING SYSTEMS REQUIREMENTS ROOFING TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT Level 2 Group Elements. This

More information

SECTION THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES A. Mechanically attached system with thermoplastic roofing membrane. B. Insulation, flat and tapered. C. Flashings. D.

More information

DIVISION 7 THERMAL AND MOISTURE PROTECTION

DIVISION 7 THERMAL AND MOISTURE PROTECTION DIVISION 7 THERMAL AND MOISTURE PROTECTION UCSC Campus Standards Handbook Waterproofing Standards 07100 1 SECTION 07100: WATERPROOFING STANDARDS A. Guarantee 1. Provide a guarantee on Contractor's letterhead

More information

Scope of Repair Davenport Grade School Roof Repair

Scope of Repair Davenport Grade School Roof Repair Scope of Repair Grade School Roof Repair Prepared for: Graehm Wallace Perkins Coie LLP 1201 Third Avenue, Suite 4900 Seattle, WA 98101-3099 Date of Issuance: March 19, 2018 SECTION 011000 SUMMARY OF WORK

More information

SECTION ELASTOMERIC MEMBRANE ROOFING ADDENDUM 10 APRIL 20, 2011

SECTION ELASTOMERIC MEMBRANE ROOFING ADDENDUM 10 APRIL 20, 2011 SECTION 07553 ELASTOMERIC MEMBRANE ROOFING ADDENDUM 10 APRIL 20, 2011 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Elastomeric roofing membrane (EPDM), conventional application at low slope roof

More information

SECTION ROOF SPECIALTIES

SECTION ROOF SPECIALTIES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 71 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

New Smyrna Beach, FL Daytona State College th Street. Design for. Building-1 SPECIFICATIONS ROOF PLANS SPECIFICATIONS TITLE SHEET

New Smyrna Beach, FL Daytona State College th Street. Design for. Building-1 SPECIFICATIONS ROOF PLANS SPECIFICATIONS TITLE SHEET 2 4 6 7 TITLE SHEET ROOF PLANS S ELEVATIONS ELEVATIONS TITLE SHEET 268. The scope of work for this project, repair existing metal roofing, aluminum framed window system and replace louver systems. 2. All

More information

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

DIVISION 7 - THERMAL AND MOISTURE PROTECTION 07100 WATERPROOFING 07150 DAMPPROOFING 07175 Water Repellent Coatings 07190 VAPOR AND AIR RETARDERS 07192 Vapor Retarders 07200 INSULATION 07240 Exterior Insulation and Finish Systems 07250 FIREPROOFING

More information

Hobby Parking Office HOU/ Proj./ No. 738 Houston, Texas 100% Bid and Construction Documents- Addendum #2, January 26, 2017

Hobby Parking Office HOU/ Proj./ No. 738 Houston, Texas 100% Bid and Construction Documents- Addendum #2, January 26, 2017 SECTION 077200 - ROOF ACCESSORIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

GAF Scheduled Maintenance Checklist

GAF Scheduled Maintenance Checklist GAF Scheduled Maintenance Checklist (COMGN119) Updated: 10/15 gaf.com Help Prevent Roofing Problems Before They Happen Comprehensive Manual With The Information You Need To Help Maintain Your New Roof.

More information

1. Selective Demolition Section Adhered PVC Roofing System Section Sealants and Caulking Section 07920

1. Selective Demolition Section Adhered PVC Roofing System Section Sealants and Caulking Section 07920 SECTION 07620 - FLASHING AND SHEET METAL PART 1 - GENERAL 1.01 DESCRIPTION A. Work included: Provide all flashing and sheet metal not specifically described in other Sections of these Specifications but

More information

Warranty and Inspection Requirements & Procedures

Warranty and Inspection Requirements & Procedures Warranty and Inspection Requirements & Procedures Tropical Roofing Products offers Limited Product Warranties (Material Only) and Limited Full System Warranties (Labor & Material). All Warranties require

More information

2016 Capital Improvement Project REHABILITATION OF METAL ROOFING SECTION REHABILITATION OF METAL ROOFING PART 1 - GENERAL

2016 Capital Improvement Project REHABILITATION OF METAL ROOFING SECTION REHABILITATION OF METAL ROOFING PART 1 - GENERAL 13414.01 REHABILITATION OF METAL ROOFING 070151-1 SECTION 070151 REHABILITATION OF METAL ROOFING 1.1 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of the Contract, including General

More information

ADDENDA #5- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services

ADDENDA #5- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services ADDENDA #5- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services Addenda Dated: 01/16/2018 PURPOSE: The purpose of this Addenda #5 is to provide a

More information

2018 FRENGER FOOD COURT ROOFING PROJECT

2018 FRENGER FOOD COURT ROOFING PROJECT For: Facilities and Services, NMSU Main Campus, New Mexico State University, Las Cruces, NM : 01/XX/2018 - ISSUED FOR RFP #: CONSULTANTS: ARCHITECT: WILLIAMS AVE. FRENGER FOOD CRT. McFIE CIRCLE PROJECT

More information

1.1 SECTION INCLUDES Verify Scope, including identification of plies and type of coating.

1.1 SECTION INCLUDES Verify Scope, including identification of plies and type of coating. SECTION 07 51 00 - BUILT-UP ASPHALT ROOFING PART 1: GENERAL Requestor Note: Requestor to verify project requirements related to roof deck, drainage, fire resistance, wind uplift, insulation, surfacing,

More information

DIVISION 07 - THERMAL & MOISTURE PROTECTION

DIVISION 07 - THERMAL & MOISTURE PROTECTION DIVISION 07 - THERMAL & MOISTURE PROTECTION DESIGN CRITERIA General Design Requirements: 1. When designing roof access ladders and stairways to roof shall not be alternating tread type. 2. Provide 18 gauge

More information

ROOF REPORT 3130 TCHULAHOMA

ROOF REPORT 3130 TCHULAHOMA ROOF REPORT 3130 TCHULAHOMA MEMPHIS, TENNESSEE BUILDING OWNER: Memphis Shelby County Airport Authority BUILDING MANAGER: MSCAA SURVEY DATE: 6/12/17 BUILDING CONSTRUCTION COMPLETED: 1985 ROOF AREA (SF):

More information

Roof Inspection Report

Roof Inspection Report Roof Inspection Report Arts Center Lawrence, KS Roof Inspection Report Prepared for: Prepared by: City of Lawrence Roofing Solutions, Inc. Mr. Jason Stowe 6728 W. 153 rd Street PO Box 708 Overland Park,

More information

ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Revised September 14 The General Trade Knowledge portion of the examination is administered daily in Computer Based Testing (CBT)

More information

Kings Welding Works. Mr. Adam LaDuke Kings Welding Works 10111Capital Road Oak Park, Michigan 48237

Kings Welding Works. Mr. Adam LaDuke Kings Welding Works 10111Capital Road Oak Park, Michigan 48237 Mr. Adam LaDuke Kings Welding Works 10111Capital Road Oak Park, Michigan 48237 Jacqueline Walters LaDuke Roofing and 13000 Northend Ave Oak Park Michigan 48237 (248) 414-6600 (248) 414-6604 Kings Welding

More information

Job Order Contract. Price Proposal Summary - CSI $109, Proposal Total

Job Order Contract.   Price Proposal Summary - CSI $109, Proposal Total 1 Job Order Contract Price Proposal Summary - CSI www.eziqc.com Date: Contract Number: Contractor: Proposal Value: Proposal Name: Detailed Scope: June 12, 2015 Region 5 028084.00 Roofing Project at Yucca

More information

THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Roof areas 1 & 3

THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Roof areas 1 & 3 PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 5423 THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Roof areas 1 & 3 A. Tear off existing roof system down to gypsum roof deck and install new Thermoplastic membrane

More information

Roof Replacement. Notes: T-1 (Title Page) 709 Bull Street Columbia, South Carolina. University of South Carolina. Callcott Social Science

Roof Replacement. Notes: T-1 (Title Page) 709 Bull Street Columbia, South Carolina. University of South Carolina. Callcott Social Science Notes: Drawing Index T-1 Title R-1 Roof Plan - Existing Conditions R-2 Roof Plan - New D-1 Roof Details D-2 Roof Details S1.0 Safety Anchor Plan Building 709 Bull Street Columbia, 1 10/13 T-1 (Title Page)

More information

333-90TH STREET DALY CITY. CA ADDENDUM #1 CONTRACT BID DOCUMENTS FOR DOELGER SENIOR CENTER BOILER REPLACEMENT (101 LAKE MERCED BOULEVARD)

333-90TH STREET DALY CITY. CA ADDENDUM #1 CONTRACT BID DOCUMENTS FOR DOELGER SENIOR CENTER BOILER REPLACEMENT (101 LAKE MERCED BOULEVARD) CITY OF DALYCITY 333-90TH STREET DALY CITY. CA 9401 5-1895 PHONE: (650)99 1-8000 ADDENDUM #1 CONTRACT BID DOCUMENTS FOR DOELGER SENIOR CENTER BOILER REPLACEMENT (101 LAKE MERCED BOULEVARD) IN AND FOR THE

More information

DIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM

DIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM DIVISION 22 PLUMBING PART 1 GENERAL 1.01 DESCRIPTION A. Provide a complete system of soil, waste, and vent piping to fixtures and equipment, including traps, floor drains and cleanouts, extending to a

More information

ADDENDUM 1 TO INVITATION TO BID NUMBER 5131-RB ROOF REPAIR AND RECOAT OF FDH AND BSL BUILDING

ADDENDUM 1 TO INVITATION TO BID NUMBER 5131-RB ROOF REPAIR AND RECOAT OF FDH AND BSL BUILDING ADDENDUM 1 TO INVITATION TO BID NUMBER 5131-RB ROOF REPAIR AND RECOAT OF FDH AND BSL BUILDING University of Nevada, Las Vegas Purchasing Department 4505 Maryland Parkway Las Vegas, Nevada 89154-1033 (702)

More information

THERMOPLASTIC-POLYOLEFIN ROOFING (TPO)

THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 5423 THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) A. Thermoplastic membrane roofing system, including all components specified. B. Disposal of demolition debris

More information

A. National Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual

A. National Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual SECTION 07 22 16 - ROOF AND DECK INSULATION Specifier Note: There are numerous types of roof insulation, some which are installed in multiple-layer roof assemblies. Specifier to verify Project requirements

More information

DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING

DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING (TO RESTORE EPDM MEMBRANES) PART 1 GENERAL 1.01 DESCRIPTION A. The scope of this design guideline is to describe the installation of the ALDOCOAT Silicone reflective

More information

SECTION MODIFIED BITUMINOUS SHEET WATERPROOFING

SECTION MODIFIED BITUMINOUS SHEET WATERPROOFING SECTION 07 13 52 MODIFIED BITUMINOUS SHEET WATERPROOFING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

ROOF SPECIFICATION MODIFIED 2-PLY SYSTEM RE-ROOF. (2- ply + Modified with Insulation Cold Process) Project Number: PORTLAND STATE UNIVERSITY

ROOF SPECIFICATION MODIFIED 2-PLY SYSTEM RE-ROOF. (2- ply + Modified with Insulation Cold Process) Project Number: PORTLAND STATE UNIVERSITY ROOF SPECIFICATION MODIFIED 2-PLY SYSTEM RE-ROOF (2- ply + Modified with Insulation Cold Process) Project Number: 11091 PORTLAND STATE UNIVERSITY Portland, Oregon September 19, 2011 A-TECH/NORTHWEST, INC.

More information

DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING

DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING (TO RESTORE SMOOTH MODIFIED BITUMEN/BUR ROOF SYSTEMS) PART 1 GENERAL 1.01 DESCRIPTION A. The scope of this design guideline is to describe the installation

More information

DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING

DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING (TO RESTORE SMOOTH MODIFIED BITUMEN/BUR) PART 1 GENERAL 1.01 DESCRIPTION A. The scope of this design guideline is to describe the installation of the ALDOCOAT

More information

Wesleyan University 1.1 RELATED INFORMATION, DOCUMENTS AND REQUIREMENTS

Wesleyan University 1.1 RELATED INFORMATION, DOCUMENTS AND REQUIREMENTS Wesleyan University SCOPE OF WORK 346 WASHINGTON STREET ASPHALT ROOF REPLACEMENT PROJECT 23AB VINE STREET ASPHALT ROOF REPLACEMENT PROJECT 72 HOME NORTH SIDE ROOF REPLACEMENT 64 FOUNTAIN AVE ROOF REPAIR

More information

A. Submit product data sheets and literature verifying physical properties of materials.

A. Submit product data sheets and literature verifying physical properties of materials. I. GENERAL ACRYSHIELD ROOF MANAGEMENT SYSTEM Installation Guide Specification For Preserving EPDM Roofs 07500 Saving Money, Safeguarding the Environment One Roof at a Time. 1.01 SUMMARY A. Provide labor,

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

Distances are not shown to scale. Existing porch. Community. Building. Distances are not shown to scale

Distances are not shown to scale. Existing porch. Community. Building. Distances are not shown to scale patio and deck 00 Building Two story Four-plex Entrance 0 0 00 Building Single Story Duplex 0 patio Contact Information: Owner: Housing Authority of Yamhill County, NE Dunn Place, McMinnville, OR 9. Contact:

More information

SECTION ELASTOMERIC MEMBRANE ROOFING

SECTION ELASTOMERIC MEMBRANE ROOFING SECTION 07 5300 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Elastomeric roofing membrane, mechanically fastened conventional application. B. Insulation, flat and tapered. C. Flashings. D. Roofing cant strips,

More information

NFL Building Sloped Roof Replacement

NFL Building Sloped Roof Replacement NFL Building Sloped Roof Replacement Summary of Scope of Work The NFL Building has sloped asphalt shingle roofs and flat roofs, this project includes the replacement of the sloped main roofs and small

More information

SECTION TOPSHIELD GUIDE SPECIFICATION SMOOTH AND GRANULE SURFACE ROOF RESTORATION TS-AC yr

SECTION TOPSHIELD GUIDE SPECIFICATION SMOOTH AND GRANULE SURFACE ROOF RESTORATION TS-AC yr SECTION 07 56 00 TOPSHIELD GUIDE SPECIFICATION SMOOTH AND GRANULE SURFACE ROOF RESTORATION TS-AC-70-483-70 15yr PART I GENERAL 1.01 RELATED DOCUMENTS A. Requirements of Division 1 General Requirements

More information

Architectural Inspection Pitched Roofing

Architectural Inspection Pitched Roofing Architectural Inspection Pitched Roofing 0511 Pitched Roofing All components of the roof system including insulation Description of the building system Three types of pitched roofing are found at the Gastineau

More information

ASHLEY AVE. PARKING GARAGE CHILLER TOWER ROOF REPAIRS

ASHLEY AVE. PARKING GARAGE CHILLER TOWER ROOF REPAIRS NORTH CHILLER TOWER ROOF R-00 COVER SHEET R-0 ROOF PLAN DRAWING INDEX VICINITY MAP SITE MAP ASHLEY AVE. PARKING GARAGE CHILLER TOWER ROOF REPAIRS 58 ASHLEY AVE. CHARLESTON, SC 90 STATE PROJECT NO. H5-D5

More information

UBC Technical Guidelines Section Edition Membrane Roofing Page 1 of 7..1 Section Building Envelope General Requirements

UBC Technical Guidelines Section Edition Membrane Roofing Page 1 of 7..1 Section Building Envelope General Requirements Page 1 of 7 1.0 GENERAL 1.1 Related UBC Guidelines.1 Section 07 00 10 Building Envelope General Requirements 1.2 Coordination Requirements.1 Coordinate design with Building Envelope Consultant. 1.3 Description.1

More information

Care & Preventative Maintenance Guide Liquid Applied Coatings and Roofing Systems 8/2016

Care & Preventative Maintenance Guide Liquid Applied Coatings and Roofing Systems 8/2016 Care & Preventative Maintenance Guide Liquid Applied Coatings and Roofing Systems 8/2016 Copyright 2016 GAF 1 Campus Drive Parsippany, NJ 07054 www.gaf.com Overview Due to its constant exposure to heat,

More information

ADDENDUM No. 2 Park Hill School District 2019 Roofing Projects January 30, 2019

ADDENDUM No. 2 Park Hill School District 2019 Roofing Projects January 30, 2019 ADDENDUM No. 2 Park Hill School District 2019 Roofing Projects January 30, 2019 You are instructed to read and note the following described changes, corrections, clarifications, omissions, deletions, additions,

More information

Roof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208

Roof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208 Notes: Drawing Index T-1 Title R-1 Roof Plan - Existing Conditions R-2 Roof Plan - New D-1 Roof Details D-2 Roof Details D-3 Roof Details M-1 Mechanical - Roof Plan M-2 Mechanical - Details Roof Key Plan

More information

Transit Center Waterproofing Systems. December 2015

Transit Center Waterproofing Systems. December 2015 Transit Center Waterproofing Systems December 2015 Agenda Waterproofing Systems Overview Roof Level Waterproofing Systems Physical Glass Monitoring Jar System Electronic Leak Monitoring Mesh System Fountain

More information

SECTION ASPHALT SHINGLE ROOFING SYSTEMS. Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text".

SECTION ASPHALT SHINGLE ROOFING SYSTEMS. Display hidden notes to specifier by using Tools/Options/View/Hidden Text. SECTION 07311 ASPHALT SHINGLE ROOFING SYSTEMS Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text". PART 1 GENERAL 1.1 SECTION INCLUDES A. Granule surfaced asphalt shingle

More information

American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I

American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I A. DESCRIPTION OF WORK INCLUDED PIPING UPDATE INCLUDED ITEMS: Shop fabricate custom perimeter cover plates. Shop fabricate inlet

More information

ROOF INSPECTION AND ANALYSIS PROCEDURE QUINLAN ASSOCIATES, LLC. 166 SHORE DRIVE BURR RIDGE, ILLINOIS

ROOF INSPECTION AND ANALYSIS PROCEDURE QUINLAN ASSOCIATES, LLC. 166 SHORE DRIVE BURR RIDGE, ILLINOIS ROOF INSPECTION AND ANALYSIS PROCEDURE QUINLAN ASSOCIATES, LLC. INSPECTION AND ANALYSIS PROCEDURE CONDUCTED ON: QUINLAN ASSOCIATES, LLC. INSPECTION CONDUCTED FOR: MS. CHERYL QUINLAN QUINLAN ASSOCIATES,

More information