For 17 years, IRSI has been providing the CAT 5 Roof Design with Guaranteed Hurricane Protection
|
|
- Cecilia Audra Harper
- 6 years ago
- Views:
Transcription
1 For 17 years, IRSI has been providing the CAT 5 Roof Design with Guaranteed Hurricane Protection
2
3 What is the single most destructive force that causes damage to roofing systems? 85%
4 The water uplift is a result of the Vortex Vacuum off the wings.
5 The highest uplift winds - corners and perimeter.
6 Wind moves up the wall which meets straight airflow at top creating Vortex Vacuum.
7 Mechanically attached membrane with no air barrier allows moist air to enter roof.
8 Water molecules are incredibly small (one billion = one foot).
9
10 Condensation Forms Moist air condenses on the underside of the roof membrane.
11
12 Water molecules are incredibly small and exceedingly destructive.
13 Ultimate destruction of a roof metal deck can occur absent an air barrier.
14 Moisture entering a concrete roof deck - rebar expansion results in extensive damage.
15 Ultimate destruction of a roofs concrete deck can occurs without moisture management.
16 One method of single ply roof membrane attachment mechanically attached.
17 Mechanically attached method is popular because of price.
18 Fasteners are installed at the edges of the single ply membrane usually every 10 ft.
19 As the wind blows across the roof it lifts the membrane in a billowing pattern.
20 The membrane lift is occurring at the perimeter.
21 Absent an air barrier combined with high winds roof blow off is likely.
22 MECHANICALLY ATTACHED
23 The 2nd option for single-ply roof membrane attachment is fully adhered.
24 Fully adhered is 1/5th of the mechanically attached method because of high cost.
25 Adhesive is applied on the insulation facer (paper) and the underside membrane.
26 The Polyiso insulation with (paper) facer is mechanically attached.
27 Melting snow indicates air leakage from within & thermal (heat) transfer at fasteners.
28
29
30
31 The single-ply membrane lifted due to Polyiso (paper) facer failure.
32 FULLY ADHERED Example of a fully adhered roof Polyiso facer pealed back and is now upside down
33
34
35 The 3nd option for single-ply roof membrane attachment is CAT 5 Roof Design.
36 The perimeter air seal/air barrier above will not allow airflow under the membrane.
37 CAT 5 air barrier is created with air seal tape & membrane attached to the structural deck.
38 CAT 5 attachment method attaches the roof membrane to the metal structural deck.
39 CAT 5 attachment method attaches the roof membrane to the concrete structural deck.
40 Vortex valves introduce negative pressure under the membrane & into the roof system.
41 Vortex Valves 40' Vortex Valves Vortex Valves are strategically placed (2) in the corner and approximately every 40 ft.
42 Negative pressure agitates moisture molecules until solid water converts to vapor.
43 Water vapor is evacuated by air transfer through the Vortex Valves.
44 Vortex Valve being installed on a CAT 5 Roof Design System.
45 CAT 5 Roof Design vs. Big 4 Flat Roof - Wind Speed Warranties
46 Roof Warranty - Exclusions Johns Manville Hurricanes, Condensation Strong Gales (47 mph), Windstorms (34 mph), Inadequate Drainage. GAF Hurricanes, Condensation Winds in Excess of 55 mph, Failure of wood nailers, Exposure to Sustained High-Temperatures, no leaking blisters. Firestone Hurricanes, Condensation 100 mph Winds of 3 Second Peak Gusts Above Ground at Ten Meters (=55mph), Deterioration to Metal Caused by Salt or Fresh Water, Atmosphere Carlisle Hurricanes, Condensation 100 mph Winds of 3 Second Peak Gusts Above Ground at Ten Meters (=55 mph) Cat 5 Roof Design No exclusions for Hurricanes, Condensation and many other strange items.
47
48 Wind gusts exceed sustained winds by a wide margin.
49 John Manville warranty exclusions highlighted.
50 GAF warranty exclusions highlighted.
51 Firestone warranty exclusions highlighted.
52 Carlisle warranty exclusions highlighted.
53 CAT 5 Roof Design no warranty exclusions highlighted.
54 CAT 5 Roof Design Guaranteed Hurricane Protection Does Not Exclude Hurricanes From The Roof Warranty 60 mil PVC Single Ply Membrane Wind Rider Warranty 150 mph 80 mil PVC Single Ply Membrane Wind Rider Warranty 150 mph Roof Remains Waterproof 60 mil PVC Single Ply Membrane 20 Years 80 mil PVC Single Ply Membrane 30 Years Dry Existing Wet Roof Assembly Out Within One Year 60 mil PVC Single Ply Membrane Included 80 mil PVC Single Ply Membrane Included Wind-Blown Debris and Puncture Resistant Rider 80 mil PVC Single Ply Membrane Included Additional Line Item Include Provide Independent RCI certified Registered Roof Observer to oversee and document roof installation. Project specific letter of opinion form by state registered Engineer Tapered Insulation as specified by specific engineering as needed
55 CAT 5 Roof Design (center and back right) Zero Wind Related Failures - Hurricane Matthew
56 CAT 5 ROOF DESIGN NOT CAT 5 CA T 5R OO FD ES IG N
57 CAT 5 ROOF DESIGN
58 NOT CAT 5 ROOF DESIGN
59 NOT CAT 5 ROOF DESIGN
60 CAT 5 ROOF DESIGN
61 CAT 5 ROOF DESIGN
62 CAT 5 ROOF DESIGN
63 CAT 5 ROOF DESIGN
64 CAT 5 ROOF DESIGN
65 CAT 5 ROOF DESIGN
66 CAT 5 ROOF DESIGN
67 CAT 5 ROOF DESIGN
68 CAT 5 ROOF DESIGN
69 CAT 5 ROOF DESIGN
70 CAT 5 ROOF DESIGN
71 CAT 5 ROOF DESIGN
72 CAT 5 ROOF DESIGN
73 CAT 5 ROOF DESIGN
74 CAT 5 ROOF DESIGN
75 CAT 5 ROOF DESIGN
76 How Is Cat 5 Roof Design a Better Roof? Proven energy savings through air barrier technology System attaches only to the strongest component of deck assembly for maximum wind resistance and building protection Roof is airtight and vacuum sealed using wind to our advantage Guarantees hurricane protection up to 200 mph Guarantees moisture removal and condensation from the roof assembly Protects weak decks by acting as a safety net preventing winds from reaching the deck Attached field perimeter termination independent of nailers and flashing membrane Reduced fastening for fastest installation and reduced labor costs
77
78
79
80
81
82
1. Clean the existing totally adhered or mechanically attached roof membrane: TPO, EPDM, Hyplon,
Summary Specification Re-Skinning Over Two Existing Roofs The Top Roof Being a Totally Adhered Single Ply Over a Built-Up-Roof On A Poured-in-Place Concrete Deck Using the Existing Angle Change Terminations
More informationSECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 075423 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Division 00 Bidding Requirements and other Division
More information2001 COMPANY. WIND BLOWN DEBRIS RESISTANT ROOF ASSEMBLIES Hurricane 140 Mph And Tornado 250 Mph Wind Blown Debris
WIND BLOWN DEBRIS RESISTANT ROOF ASSEMBLIES Hurricane 140 Mph And Tornado 250 Mph Wind Blown Debris The Texas Tech Wind Blown Debris Test requires three impacts by the butt end of a 2 x 4 shot out of an
More information2001 COMPANY Co., ASCE 7 98 Wind Uplift Evaluation Form (Ask for Form - ASCE7dpi.doc)
2001 COMPANY 2001 Co., ASCE 7 98 Wind Uplift Evaluation Form (Ask for Form - ASCE7dpi.doc) To determine a roof s wind uplift PSF (pounds per square foot) Pressure requirement for building code compliance.
More informationSECTION 07530CP EPDM MEMBRANE ROOFING
PART 1 GENERAL 1.1 SUMMARY SECTION 07530CP EPDM MEMBRANE ROOFING A. Section includes: 1. Adhered membrane roofing and flashing 2. Mechanically fastened roof insulation 3. Walkway pads 1.2 ARCHITECTURAL
More informationExisting Roof Assembly Information. 2 nd Roof Assembly
Summary Specification Re-Skinning Maintenance and Repair Warranty Upgrade for Up to 30 Years Re-Skinning Over an Existing Smooth Surface Roof Membrane With a New 2001 Co. Wind Vented Membrane Using The
More informationThere have been many instances of aircraft hangars roof systems
Photo 1: A substantial amount of roof deck material blew off these hangars. At one hangar, many trusses also were blown away. Two nearby fighter aircraft appeared to be damaged, as well. There have been
More informationROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL
ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulation, membrane roofing, base flashings roofing membrane accessories joints, and counter flashings.
More informationACFoam-II HCFC Free "Green" Polyiso Specification
ACFoam-II HCFC Free "Green" Polyiso Specification To help owners and specifiers, the following specification strategies are offered as they relate to product performance when including HCFC FREE Green
More informationFirestone Polyiso Boards
Firestone Polyiso Boards Superior energy efficiency. Superior protection. Firestone Polyiso Boards POLISOBROUK10.indd 1 1/04/10 14:26 Firestone Polyiso Boards Firestone total roofing systems Since Firestone
More informationG October 2018
G-14-18 October 2018 The information contained in this supplement serves as a criteria for Specifiers and Authorized Applicators regarding the design and installation of Carlisle Roofing Systems and use
More informationG October 2018
G-13-18 VacuSeal TM Vent Secured Roofing Systems October 2018 The information contained in this supplement serves as a criteria for Specifiers and Authorized Applicators regarding the design and installation
More information2001Co. Compression Board Air Seal Terminations Are a Patented Roof Application Technique
2001Co. Compression Board Air Seal Terminations Are a Patented Roof Application Technique Increases the buildings structural shear resistance similar to lid on a Tupperware Box. The compression board perimeter
More informationTitle: Wind uplift pressures of 2001 Company Wind Vented/ Negative Pressure Roofing System according to CSA A Report No: B1456.
National Research Council Canada Institute for Research in Construction Ottawa, Canada K1A 0R6 Conseil national de recherches Canada Institut de recherche en construction Testing Report Title: Wind uplift
More informationMIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)
MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474 T (786) 315-2590
More informationTOTAL ROOFING SYSTEM WARRANTY
SBC Project Number: Warranty Period (Years): Warranty Number: Building, Campus and Address Roofing System Manufacturer & Address Contact Phone Email Manufacturer Authorized Roofing Applicator Designer
More informationSECTION ELASTOMERIC MEMBRANE ROOFING ADDENDUM 10 APRIL 20, 2011
SECTION 07553 ELASTOMERIC MEMBRANE ROOFING ADDENDUM 10 APRIL 20, 2011 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Elastomeric roofing membrane (EPDM), conventional application at low slope roof
More informationA Guide to Cold Storage Roof System Design Prepared by GAF Technical Services February, 2019
A Guide to Cold Storage Roof System Design Prepared by GAF Technical Services February, 2019 Table of Contents Page Introduction About GAF 2 About Cold Storage Buildings 2 Important Considerations 3 Guarantee
More informationMaking progress. For several years, the Canadian National Research Council s
Making progress A North American group shows how to design durable mechanically attached flexible membrane roof assemblies by Bas A. Baskaran, Ph.D., P. Eng. For several years, the Canadian National Research
More informationSECTION THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES
SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES A. Mechanically attached system with thermoplastic roofing membrane. B. Insulation, flat and tapered. C. Flashings. D.
More informationSECTION ADHERED SINGLE PLY MEMBRANE ROOFING
SECTION 07535 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered EPDM elastic sheet single ply membrane roofing. B. Related Sections: 1. Section 06100 - Carpentry: Wood deck and curbs. 2. Section
More informationRECOMMENDED DESIGN SPECIFICATION
RECOMMENDED DESIGN SPECIFICATION SILICONE COATED SPF ROOFING 1 General 1.1 Section Includes A. Silicone coated SPF roofing system, including substrate board, roof insulation boards, foam insulation materials,
More informationACFoam -III Specifications Atlas Roofing
Division 07 Thermal and Moisture Protection Section 07 22 00 Roof and Deck Insulation Section 07 22 16 - Roof Board Insulation PART 1 GENERAL 1.1 SECTION INCLUDES A. HCFC FREE Polyiso Rigid board type
More informationSECTION 1 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
Project Name: Jefferson City Jaycees Fairgrounds Main Building Roof Replacement Project Site Address: 1445 Fairgrounds Road, Jefferson City, MO 65109 Project Contact: Randy Weaver Project Contact phone
More informationThermoplastic Single Ply & Multi-Ply Roofing Systems
Thermoplastic Single Ply & Multi-Ply Roofing Systems COMMERCIAL INDUSTRIAL INSTITUTIONAL RESIDENTIAL Specializing in Roof Solutions for over 25 years FlexRoofingSystems.com Thermoplastic Single Ply Roof
More informationAdhesive Pull Test Standard Testing Procedures
Determining Adhesive Strength 1. The test sample should include the following components: a. Substrate (bare deck or existing roof). b. Vapor or air barrier if included in the new system. c. First insulation
More informationClosed-Cell Spray Foam Insulation. Performance in Residential and Commercial Buildings During Adverse Weather
Closed-Cell Spray Foam Insulation Performance in Residential and Commercial Buildings During Adverse Weather July, 2006 Although all statements and information contained herein are believed to be accurate
More informationRe-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY
Insulation for Above the Deck WALL SPECIALTY PRODUCT DESCRIPTION Rmax Re-Cover Board-3 is an energy-efficient thermal insulation board composed of a closed-cell polyisocyanurate (polyiso) foam core bonded
More informationNRCC Guarded Hot Box Testing (ASTM C ) for Energy Efficiency of a Total Roof Assembly
Introduction 2001 Company, contracted NRCC/IRC to evaluate and determine both the thermal resistance and air leakage characteristics of five roofing specimens under controlled laboratory conditions. The
More informationUpdate In Progress. Division 7 Thermal and Moisture Protection Page Section ROOFING AND WATERPROOFING
Section 07 10 00 ROOFING AND WATERPROOFING Page 07 10 00-1 1. GENERAL REQUIREMENTS A. Indicate applicable American Society for Testing and Materials (ASTM) specification in this section. 01. Fire resistance
More information1WHAT ARE THE ATTRIBUTES
1WHAT ARE THE ATTRIBUTES OF WIND ON A ROOF? Wind is a random process. When it separates from the roof edges, it creates zones of suction (negative) pressure. This suction effect has two characteristics:
More informationSECTION THERMOPLASTIC MEMBRANE ROOFING. C. Flashings. D. Roofing cant strips, stack boots, roofing expansion joints, and walkway pads.
McClellan Blakemore Architects New Warehouse Facility for SECTION 07540 THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES A. Adhered system with thermoplastic roofing membrane. B. Insulation,
More informationThe Evolution of Roofing. Helene Hardy Pierce GAF
The Evolution of Roofing Helene Hardy Pierce GAF 1 Discuss both low- and steep- pitch roof solutions for hot-humid climates and high-velocity hurricane zones, review evolution of roofing methods and materials,
More informationPLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION
DRAINAGE SOLUTIONS SINCE 1908 PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION PROVEN PERFORMANCE ARMTEC.COM
More informationSECTION ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
SECTION 075323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 07 5323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationCPD Seminar Handout: Roof Refurbishment: Choosing the Best Solution
CPD Seminar Handout: Roof Refurbishment: Choosing the Best Solution Page 2 of 15 CONTENTS Roof Refurbishment: Choosing the Best Solution CPD handout: November 2017 This document contains the key resources
More informationROOFING APPLICATION STANDARD (RAS) No. 109
ROOFING APPLICATION STANDARD (RAS) No. 109 1. 2. Scope 1.1 This Roofing Application Standard sets the requirements to determine whether a substrate and surrounding environmental conditions are appropriate
More informationASCE 7 10 Wind Code Understanding
RE: ASCE-7-10 / 60 + Building Coastal Medical Center 123 Carolina Dr Coastal, NC To Whom It May Concern: ASCE 7 10 Wind Code Understanding There is no test in the roofing industry that blows 110 mph winds
More informationBridgeton Research Center Roof Replacement and Related Work December 4, 2000 DSR # C/D
SECTION 07220 ROOF INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Special Conditions and Division 1 Specification Sections,
More informationCITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO
SECTION 01010 - SCOPE OF WORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General provisions of Contract, General Conditions and Technical Specification Sections, apply to this Section. 1.02 PROJECT DESCRIPTION
More informationROOF REPLACEMENT AND ALTERATIONS TO WOODSTOCK Barrett Architecture, PC WASTE WATER TREATMENT FACILITY - Woodstock, VT February 28, 2019 SECTION
SECTION 075400 PART 1 - GENERAL 1.1 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made a
More informationFIRESTONE RUBBERGARD EPDM
FIRESTONE RUBBERGARD EPDM One Source. Many Choices. That s Firestone. FIRESTONE BUILDING PRODUCTS Choose what works. Choose Firestone. Contractors, building owners, architects and specifiers have trusted
More informationMaximizing the Value From Commercial Roof Systems. An Industry Report
Maximizing the Value From Commercial Roof Systems An Industry Report August 0 Building owners know that their roof is a major investment spanning a long period of time. They also know that the return on
More informationFIRESTONE RUBBERGARD EPDM
FIRESTONE RUBBERGARD EPDM One Source. Many Choices. That s Firestone. 191587 RubberGard.indd 1 8/14/08 8:42:18 AM Fir e s t o n e Bu i l d i n g Pr o d u c t s Choose what works. Choose Firestone. Contractors,
More informationSECTION MANUFACTURED ROOF EXPANSION JOINTS
SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationTransit Center Waterproofing Systems. December 2015
Transit Center Waterproofing Systems December 2015 Agenda Waterproofing Systems Overview Roof Level Waterproofing Systems Physical Glass Monitoring Jar System Electronic Leak Monitoring Mesh System Fountain
More informationFIRESTONE ULTRAPLYTM TPO. One Source. Many Choices. That s Firestone.
FIRESTONE ULTRAPLYTM TPO One Source. Many Choices. That s Firestone. Firestone Building Products Choose what works. Choose Firestone. Contractors, building owners, architects and specifiers have trusted
More informationBanyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL
SECTION 07543 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationWVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 07 THERMAL AND MOISTURE PROTECTION
075000 ROOFING SYSTEMS PART 1 - GENERAL 1.1. Any deviation from the following instructions must be approved during design by WVU Facilities Management Personnel. 1.2. DEFINITIONS A. ASTM American Society
More informationFlexClad Duct and Pipe Sealing System
FlexClad Duct and Pipe Sealing System Proven Performance Outperforms Metal Jacketing Waterproof & Weather-Resistant Ideal For Indoor & Outdoor Applications Quick & Easy Self-Stick Installation Meets 25/50
More informationPOLYISO Polyisocyanurate Roofing Insulation
POLYISO Polyisocyanurate Roofing Insulation TM Above all. WHEN YOU NEED A GO-TO PRODUCT, STOP RIGHT HERE Polyiso is one of the most effective and economical insulation products in the roofing industry.
More informationPresents. Roofing Basics
Presents Roofing Basics Terminology Tile: A roof tile may be curved or flat piece of baked (at times glazed) clay or a synthetic material. It is the basic block used in covering roofs, walls, and floors.
More informationThe High R Roof: Guidelines for Energy-Efficient Roofing and Re-Roofing
PIMA Technical Bulletin #115 The High R Roof: Guidelines for Energy-Efficient Roofing and Re-Roofing About Polyiso Insulation Polyiso is a rigid foam insulation used in more than 70% of commercial roof
More informationConseil national de recherches Canada Institut de recherche en construction
National Research Council Canada Institute for Research in Construction Ottawa, Canada K1A 0R6 Conseil national de recherches Canada Institut de recherche en construction Testing Report Title: Wind uplift
More informationTechnical Changes BC Building Code 2006 Division B Part 5 Environmental Separation
1 Technical Changes BC Building Code 2006 Division B Part 5 Environmental Separation 2 1 Outline Scope and Application Durability Performance Requirements Sound Transmission Referenced Standards 3 Outline
More information4.2 Materials Membranes: inch, inch or inch thick D General
LEGACY REPORT 2403 Reissued April 1, 2005 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office 900
More informationROOF MITIGATION STRUCTURE EVALUATION FORM. For Single Family Residential Re-Roof Effective October 1, 2007 (Revised February 2, 2018)
ROOF MITIGATION STRUCTURE EVALUATION FORM For Single Family Residential Re-Roof Effective October 1, 2007 (Revised February 2, 2018) Check One Value of home does not exceed $300,000 based on insured value
More informationSECTION ELASTOMERIC MEMBRANE ROOFING
SECTION 07 5300 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Elastomeric roofing membrane, mechanically fastened conventional application. B. Insulation, flat and tapered. C. Flashings. D. Roofing cant strips,
More informationTGIK.R Roofing Systems, Uplift Resistance. Roofing Systems, Uplift Resistance
1 of 6 5/8/2012 4:19 PM TGIK.R9734 Roofing Systems, Uplift Resistance Page Bottom Roofing Systems, Uplift Resistance See General Information for Roofing Systems, Uplift Resistance KELLY CO-2001 INC 325
More informationThe Building Envelope Solution. Mike Lowery A&D Products, LLC
The Building Envelope Solution Mike Lowery A&D Products, LLC Provider # K031 Course # CCM121 The industries ONLY single-source material performance and tie-in warranty for all 6 sides of your building!
More informationRCi. roof consultants, inc. Thank you for your interest in Roof Consultants, Inc.
Thank you for your interest in Roof Consultants, Inc. We have been providing quality services for building owners and managers for over 30 years and have over 100 years of combined experience in the roofing
More informationBuilding Envelope Systems Exam Learning Objectives
Building Envelope Systems Exam Learning Objectives Roofing Nomenclature 1. Define the following roofing terms: low, flat, sloped, conventional, protected/inverted, hybrid, BUR, modified bitumen, PVC, TPO,
More informationACFoam Supreme Specifications Atlas Roofing
Division 07 Thermal and Moisture Protection Section 07 22 00 Roof and Deck Insulation Section 07 22 16 - Roof Board Insulation PART 1 GENERAL 1.1 SECTION INCLUDES A. HCFC FREE Polyiso Rigid board type
More informationUPLIFT RESISTANCE OF EXISTING ROOF DECKS: RECOMMENDATIONS FOR ENHANCED ATTACHMENT DURING REROOFING WORK
UPLIFT RESISTANCE OF EXISTING ROOF DECKS: RECOMMENDATIONS FOR ENHANCED ATTACHMENT DURING REROOFING WORK By Thomas L. Smith, AIA, RRC Abstract The uplift resistance of roof decks on many buildings in the
More informationRecommended Fastening Patterns for Rmax Insulation in Low Slope Roofing Applications
Recommended Fastening Patterns for Rmax Insulation in Low Slope Roofing Applications INTRODUCTION Rmax recommends that any insulation which is laid over a steel or wood roof deck be attached with mechanical
More informationTGIK.R Roofing Systems, Uplift Resistance. Roofing Systems, Uplift Resistance
UL TGIK.R9734 Roofing Syst. Uplift Resistance * www.2001company.com * 1.800.537.7663 * Page 1 of 6 Page 1 of 6 Page Bottom TGIK.R9734 Roofing Systems, Uplift Resistance Roofing Systems, Uplift Resistance
More informationFirestone UltraPly TM TPO Accessories. Products designed to take your UltraPly TPO roof even
Firestone UltraPly TM TPO Accessories Products designed to take your roof even Firestone UltraPly TPO Accessories We ve got you completely covered and then some. Greater energy efficiency, easy installation
More informationA. National Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual
SECTION 07 22 16 - ROOF AND DECK INSULATION Specifier Note: There are numerous types of roof insulation, some which are installed in multiple-layer roof assemblies. Specifier to verify Project requirements
More informationEverGuard Plaza Deck Roofing For Above-Grade Plaza Deck Applications
EverGuard Plaza Deck Roofing For Above-Grade Plaza Deck Applications Specifications Updated: 12/07 Quality You Can Trust Since 1886... From North America s Largest Roofing Manufacturer PLAZA DECK ROOFING
More informationFirstEnergy Program Overview
FirstEnergy Program Overview Builder incentives $400 per unit + $0.10/kWh in projected savings Eligibility Located in service area of a FirstEnergy Utility Certificate of Occupancy Dates: FirstEnergy Ohio
More informationAir Barrier Considerations for Roof/Wall Intersections. Presented by Laverne Dalgleish Air Barrier Association of America
Air Barrier Considerations for Roof/Wall Intersections Presented by Laverne Dalgleish Air Barrier Association of America Credit(s) earned on completion of this course will be reported to AIA CES for AIA
More informationADDENDUM. ADDENDUM NO. 2 October 19, 2017
ADDENDUM ADDENDUM NO. 2 October 19, 2017 As a prospective bidder, note the following revisions to the Contract Documents for the TERMINAL ROOF REPLACEMENT PROJECT at ERIE INTERNATIONAL AIRPORT, TOM RIDGE
More informationJM EPDM SYSTEMS SINGLE PLY ROOFING
SYSTEMS SINGLE PLY ROOFING EPDM FROM JM JOHNS MANVILLE BEGAN SELLING AND MARKETING EPDM IN 1982 AND HAS SINCE BECOME A PROVEN, DEPENDABLE LEADER AND PROVIDER OF EPDM (ETHYLENE-PROPYLENE-DIENE MONOMER)
More informationSECTION SINGLE-PLY ROOFING SYSTEM
PART 1 - GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals required to provide single-ply adhered roofing system. 1.02 COORDINATION A. The Contractor
More informationWood Decks Testing Reveals Best Wood Roof Deck Systems to Resist Wind-Uplift by Fulton Desler, senior engineer, APA The Engineered Wood Association
This article was originally published in Western Roofing January/February 2007 Wood Decks Testing Reveals Best Wood Roof Deck Systems to Resist Wind-Uplift by Fulton Desler, senior engineer, APA The Engineered
More informationImpact Resistance What the Hail Is Happening?
Impact Resistance What the Hail Is Happening? Thomas J. Taylor GAF 1 Campus Drive Parsippany, NJ 07054 1 April 11 th 2016 Wylie, TX Hail Storm Hail can be very destructive! How can we manage the risk?
More informationWelcome to this continuing education seminar. This is the first of three parts of the Building Enclosure Fundamentals series.
Welcome to this continuing education seminar. This is the first of three parts of the Building Enclosure Fundamentals series. 1 3 6 7 8 The primary reasons to build airtight buildings are to avoid drafts
More informationThe revolution in low-slope roofing. DIFFERENCES BETWEEN The V2T Technology & 2001 Company (Kelly) Vents
The revolution in low-slope roofing DIFFERENCES BETWEEN The V2T Technology & 2001 Company (Kelly) Vents There are very few low slope vent systems available in the market place today. So, we are frequently
More informationArchitectural Inspection Pitched Roofing
Architectural Inspection Pitched Roofing 0511 Pitched Roofing All components of the roof system including insulation Description of the building system Three types of pitched roofing are found at the Gastineau
More informationINVINSA & INVINSA FR ROOF COVER BOARDS. Manual for Design Professionals and Contractors
INVINSA & INVINSA FR ROOF COVER BOARDS Manual for Design Professionals and Contractors INVINSA & INVINSA FR Highest Density Polyisocyanurate Cover Boards In a roofing system, insulation provides thermal
More informationBOONE COUNTY PUBLIC LIBRARY (859) 342-BOOK (2665)
ROOF Boone County Public Library is seeking competitive sealed bids to replace an existing Shingle Roof and EPDM membrane roof on the Florence Branch located at 7425 U.S. 42, Florence, KY 41042. The successful
More informationB.U.R., Modified & Shingle. Roofing Systems. Section 3 - Low Slope Roofing Installation Instructions
B.U.R., Modified & Shingle Roofing Systems Section 3 - Low Slope Roofing Installation Instructions 3.1 Storage & Handling The following is a list of Malarkey basic requirements for handling and storing
More informationADDENDUM NO. 1. JULY 11, 2016 AT 11:00 AM (Noon, Local Prevailing Time) At the office of the Schuylkill County Housing Authority
ADDENDUM NO. 1 Date of Issue: JUNE 24, 2016 Project: CONTRACT NO. 16-3 ROOF REPLACEMENT Project Owner: Bid Due Date: SCHUYLKILL COUNTY HOUSING AUTHORITY 245 Parkway, Schuylkill Haven, PA 17972 JULY 11,
More informationDC ITB A D D E N D U M # 1
DC ITB-15-087 A D D E N D U M # 1 DEPARTMENT OF CORRECTIONS 501 South Calhoun Street Tallahassee, Florida 32399-2500 BID NO.: BID TITLE: DC ITB-15-087 Lake Correctional Institution Re-roofing of Vocational
More informationUniversity of New Hampshire Scholars' Repository
University of New Hampshire University of New Hampshire Scholars' Repository Division 07 Thermal and Moisture Protection Chapter 5 Technical Construction and Renovation Standards 1-25-2013 075423 - TPO
More informationROOFING APPLICATION STANDARD (RAS) No. 109
ROOFING APPLICATION STANDARD (RAS) No. 109 Scope 1.1 This Roofing Application Standard sets the requirements to determine whether a substrate and surrounding environmental conditions are appropriate for
More informationWhat is the V2T Roof System?
What is the V2T Roof System? The V2T Roof System uses the power of the wind to hold the roof securely in place. The technology behind this patented system uses a recognized principle of physics to create
More informationUnderstanding Wind Uplift Ratings
Page 1 of 5 Home Understanding Wind Uplift Ratings By Stan Choiniere September 1, 2006 What is an FM Approvals wind test, and what do the various wind uplift ratings mean? This question is frequently asked,
More informationHP+ Building Enclosure Systems. Affordable Solutions for Title 24 and Beyond
HP+ Building Enclosure Systems Affordable Solutions for Title 24 and Beyond BASF High Performance Envelope Solutions Reduce moisture risk Improve Title 24 compliance margin Save materials and labor on
More informationThe Role of Control Layers in Building Enclosure Design
The Role of Control Layers in Building Enclosure Design COLIN SHANE M.ENG., P.ENG. ASSOCIATE, SENIOR PROJECT MANAGER OCTOBER 13, 2016 Disclaimer: This presentation was developed by a third party and is
More informationWATERPROOFING SYSTEMS BLACK PEARL BASE FLASHING OPTION AT PARAPET RT250-05B 04/2016 WATERPROOFING SYSTEMS TYPICAL CURB DETAIL WITH CONCRETE TRAFFIC SURFACE RT250-06 4/2016 RAM-TOUGH 250DM WATERPROOFING
More informationConstruction Standards PAGE
Construction Standards PAGE 072100-1 SECTION 072100 PART 1 - GENERAL 1.1 M.S.U. ISSUES A. It the intent of MSU that insulation of its projects will comply with LEED NC 3 Credit Requirements EA Prerequisite
More informationAir Barrier Requirements for Low-Slope Roof Assemblies Myths vs. Facts
Air Barrier Requirements for Low-Slope Roof Assemblies Myths vs. Facts Peter Kalinger Canadian Roofing Contractors Association Dr. B. Baskaran National Research Council of Canada 1 Air Leakage Controlling
More informationEffective Envelope Design Mitigating Risk with High Performance Panels and Acrylic Flashing Systems
Effective Envelope Design Mitigating Risk with High Performance Panels and Acrylic Flashing Systems Presented by: Cale Kids & Sean Smith Huber Engineered Woods Disclaimer: This presentation was developed
More informationCRCA Education Series. Self-Adhering Membrane Roofing Systems for Low Slope Roofs
CRCA Education Series Self-Adhering Membrane Roofing Systems for Low Slope Roofs CRCA is a Registered Provider with the American Institute of Architects Continuing Education Systems. Credit earned upon
More informationFixed Skylight / Fixed Multiple Skylight Milgard Aluminum Window
Skylight Fixed Skylight / Fixed Multiple Skylight Milgard Aluminum Window The Series Skylight has been specifically designed to provide maximum thermal efficiency by incorporating a special polyurethane
More informationSECTION STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING
SECTION 07 52 16 - PART 1 - GENERAL 1.1 Related Documents A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationRoofing Underlayment Systems
Roofing Underlayment Systems New Construction, Additions and Repairs Commercial, Residential or Institutional Applications Self-Adhering and Self-Sealing Overall Weather and Waterproofing Secondary Water
More informationMechanically Attached and Fully Adhered Roofing Systems
Mechanically Attached and Fully Adhered Roofing Systems January 2012 TABLE OF CONTENTS Part I General 1.01 Description... 3 1.02 General Design Considerations... 4 1.03 Quality Assurance... 5 1.04 Submittals...
More information