3. Sanitary Plumbing Single Stack System

Size: px
Start display at page:

Download "3. Sanitary Plumbing Single Stack System"

Transcription

1 3. Sanitary Plumbing Single Stack System On completion of this section, students should be able to: Design, install and develop bills of quantities for the Single Stack Systems for domestic, commercial and industrial premises of over SIX (6) floor levels and interpret sanitary plumbing design for the systems. Assessment Criteria 3.1 Describe, design, install and develop bills of quantities for single stack sanitary plumbing systems for domestic, commercial and industrial premises to meet the requirements of the Building Code of Australia, Plumbing Code of Australia and AS/NZS Describe, design, install and develop bills of quantities for single stack modified sanitary plumbing systems for domestic, commercial and industrial premises to meet the requirements of the Building Code of Australia, Plumbing Code of Australia and AS/NZS Assessment Method may include Written assessment based on assessment criteria. Practical activities based on assessment criteria. Designs based on assessment criteria. Assignment based on assessment criteria Section 3-1

2 3.1 Describe, design, install and develop bills of quantities for single stack sanitary plumbing systems for domestic, commercial and industrial premises to meet the requirements of the Building Code of Australia, Plumbing Code of Australia and AS/NZS Refer Plumbing & Drainage Guide (BRANZ) If a multi-story building can be designed within the parameters of a single stack system, then this will usually be the simplest and most economic method of providing sanitary plumbing. A single stack system: a) is generally designed around stacks of DN 100 diameter, but there are variations to this; b) is based on the principle that there is sufficient air within the system for a number of fixtures to be connected to the stack without the need to vent individual fixture discharge pipes; c) the load effect of fixtures connected to the stack d) the maximum number of floor levels permitted to be connected to the stack are limited e) the class of the building (Residential or Commercial) f) where relief vents and cross-vents are installed and g) the number and type of fixtures permitted to be connected at any one floor level Principles of Operations Refer AS/NZS Clause The single stack systems are designed on the principles that the air within the discharge pipes from fixtures, the stack and the stack vent allows the permitted type and number of fixtures to be connected to the stack without the need for individual trap vents/air admittance valves or, in the case of ranges of fixtures, venting of the common discharge pipe. Section 3-2

3 Sizing of Stacks Residential Buildings Refer AS/NZS Clause 8.7 Stacks are sized by totalling the individual fixture unit ratings as given in Table 6.1 and considering the maximum number of floors through which the stack may pass (see Table 8.3), if the point at which the stack connects to the drain is more than 2.4 m below the lowest floor level, then that length of pipe must be counted as a floor level (refer AS/NZS Figure 8.3). Sizing Single Stack Systems for Domestic or Residential Buildings Using AS/NZS students are to complete the table below Size of stack DN Table 8.3 Single Stack System Domestic or Residential Buildings Maximum fixture unit loading Maximum number of consecutive floor levels The maximum number and type of fixtures that are permitted to be connected at any floor level for a residential building are: Refer AS/NZS Clause basins 2 baths 2 bidets 2 cloths-washing machines 2 dishwashing machines 2 kitchen sinks (double or single domestic with or without food waste disposal units) 2 laundry troughs 2 showers 2 water closet pans 2 floor waste gullies 2 bar sinks Section 3-3

4 STACK VENT (SEE CLAUSE 8.6) B Tr. (L) WC Shr S WC B Shr Bth. WC Shr B FW Tr. (L) S B WC Shr Bth. B FW Tr. (L) WC Shr WC B Shr Bth. WC Shr B FW Tr. (L) FW S WC OBLIQUE JUNCTION B Shr Bth. B FW Tr. (L) WC Shr S B Ground WC Shr Bth. FW OBLIQUE JUNCTION Fig. 3.1 Single stack residential building Section 3-4

5 Sizing Single Stack Systems for Commercial or Industrial buildings Using AS/NZS students are to complete the table below Size of stack DN 100 Table 8.4 Single Stack System Commercial or Industrial Buildings Maximum fixture unit loading Maximum number of consecutive floor levels The maximum number and types of fixtures that are permitted to be connected at any floor level for a commercial or industrial building are: Refer AS/NZS Clause basins 1 cleaner s sink 1 drinking fountain 1 sink 5 wall-hung urinals 5 water closet pans 2 showers 1 x 3 m slab type urinal 2 bar sinks Note: No additional or alternative fixtures shall be connected except tundishes receiving minor discharges. At any one floor level, the maximum discharge from all floor waste gullies shall not exceed five basins, one drinking fountain, one cleaner s sink and two showers (see Note 3 to Table 6.1). Within commercial and industrial buildings the following fixtures may be connected in a range of fixtures as listed below and shown in Fig. 8.2: i) 5 basins; ii) iii) 5 wall-hung urinals; and 5 water closet pans. The conditions for the connection method will be covered later in this learning outcome. If your design does not fall within the conditions mentioned, then you would need to consider a Fully Vented Modified System. Section 3-5

6 Fig. 3.2 Single stack commercial or industrial building Section 3-6

7 Connection of Fixture Discharge Pipes In domestic or residential buildings, fixtures shall be connected to the stack individually or through floor waste gullies. In commercial or industrial buildings, fixtures may be connected to the stack individually, through floor waste gullies or in a range of the same type of fixtures. Unequal Oblique Stack Junction Refer AS/NZS As well as the above methods of connections, two waste fixture discharge pipes, including discharge pipes from floor waste gullies may be connected at the same level within 1 m of the stack, by means of an oblique junction if: a) the angle between the two fixture discharge pipes shall be not greater than 45. b) the outlet of the junction is one size larger than the largest fixture pipe except in the case of a floor waste gully that does not receive the discharge from a fixture; and. c) the section of pipe downstream of the 45 junction is included as part of the permitted maximum length of the fixture discharge pipe. STACK 1 m max. FIXTURE DISCHARGE PIPE 45 JUNCTION ONE PIPE SIZE LARGER THAN LARGEST FIXTURE DISCHARGE PIPE FIXTURE DISCHARGE PIPE 45 max. Fig. 3.3 Unequal oblique stack junction Section 3-7

8 Length of Fixture Discharge Pipes Length and gradients of unvented fixture discharge pipes Using AS/NZS students are to complete the table below Fixture type Waste fixture WC pan DN 100 WC pan DN 80 Urinal DN 50 to 80 Max. length (m) Permitted grade % Note: If the length of fixture discharge pipes exceeds that as outlined above and within Appendix D, then a Trap Vent or Air Admittance Valve must be fitted. As stated at the start of this learning outcome, a single stack system is designed on the principle that the air within the discharge pipes, the stack and stack vent allows the type and number of fixtures to be connected without the need for extra ventilation. Extra consideration has to be given to the fixture discharge pipes apart from size, length and grade; such as the number of bends. Section 3-8

9 Bends in fixture discharge pipes Refer AS/NZS Basins and Bidets Shall have not more than two bends in the horizontal plane and two bends in the vertical plane. Other Fixtures Shall have not more than two bends in the horizontal plane and three bends in the vertical plane. Note: Bends 45 or less are not considered as a change of direction or grade. If a design needed more than the allowed bends as stated above, the discharge pipe would need venting either via a trap vent or air admittance valve. Developed length of discharge pipe must not exceed 2.5 m Basin or bidet Stack or graded pipe DN 40 min. trap 1 st horizontal bend 1 st vertical bend Total drop of discharge pipe must not exceed 1.5 m 2 nd horizontal bend for basins and bidets the max. bends allowed are: two in the horizontal plane two in the vertical plane 2 nd vertical bend Refer Plumbing and Drainage Guide (BRANZ) Fig. 3.4 Connection of basins and bidets to a branch pipe or stack Section 3-9

10 Refer Plumbing and Drainage Guide (BRANZ) Fig. 3.5 Connection of fixtures other than basins and bidets to a branch pipe or stack Trap Vents and Air Admittance Valves on over distance discharge pipes. If the fixture discharge pipe is over distance, a vent or air admittance valve is required. This must be connected in accordance with the requirements set out in AS/NZS The size of the vent is dependant on the size of the fixture trap, using AS/NZS complete the table below Using AS/NZS students are to complete the table below TABLE 7.3 MINIMUM SIZE OF TRAP VENTS Size of fixture trap Size of trap vent DN DN >50 > Section 3-10

11 Show on the diagrams below the permitted points of connection for the trap vent and the maximum and minimum distance from the trap that the vent should be located No connections permitted within this distance 75 mm P-trap or S-trap 600 mm for basins/bidets 1.5 m for other fixtures A No connections permitted within this distance 300 mm min. 1.5 m max. 75 mm no connections permitted within this distance Connect vent/aav within this length B Connect vent/aav within either Section A or B FIG. 3.6 Connection of vents/aav to graded discharge pipes Using AS/NZS students are to complete the table below TABLE 6.6 MINIMUM DETERMINED AIRFLOW CAPACITY OF AIR ADMITTANCE VALVE WHEN USED AS A TRAP, GROUP VENT OR BRANCH DRAIN VENT Fixture unit loading of discharge pipe Minimum airflow capacity of AAV, L/s Section 3-11

12 Installation of Trap Vents. Trap vents and air admittance valves are installed in one of the following four ways. Draw the approved installation methods. Refer AS/NZS TRAP VENT OR AAV 100 mm min. TRAP VENT OR AAV FIXTURE TRAP 100 mm min. GRADE 1.25% min. (a) (b) TRAP VENT GRADE 1.25% min TRAP VENT OR AAV VENT TO RISE ABOVE RIM OF FIXTURE 100 mm min. ALTERATIVE USE AAV 100 mm min. GRADE 1.25% min. (c) (d) Fig. 3.7 vent installation. Venting of Stack Refer AS/NZS The stack shall continue upwards to the vent cowl undiminished in size. Stacks that extend not more than three floor levels with a maximum loading of 30 fixture units may have the vent reduced to DN 50. Section 3-12

13 Three waste fixtures only basins, showers or kitchen sinks may be connected to this top DN 50 vertical section. Refer AS/NZS Connection of ranges of fixtures This allows groups of fixtures of the same type, to be connected through a common branch pipe without the need for extra ventilation. Basins Refer AS/NZS The maximum number of basins shall be five The fixture discharge pipe shall be: a) of size DN 40; b) not longer than 1 m; c) installed with not more than one bend; and d) graded within the range of 2.5 to 5%. The common discharge pipe shall be: a) not smaller than DN 50; b) not longer than 4.5 m; c) installed without a bend; and d) graded within the range of 2.5 to 5%. The distance between the centre-line of adjacent traps and between the near face of the stack and the centre-line of the nearest trap shall not exceed 2 m. Section 3-13

14 2m max. between basin traps 2m max. from stack to first trap max. of five basins in a range common discharge pipe 4.5m max. with no bends; min. diameter DN 50 grade 2.5 to 5.00% Refer Plumbing and Drainage Guide (BRANZ) Fig. 3.8 Connection of a range of basins Section 3-14

15 Water Closet Pans Refer AS/NZS The maximum number of WC S shall be five The fixture discharge pipe shall be: a) not longer than 1.5 for S-trap pans and 2 m for P-trap pans; b) installed with a maximum of two bends; and c) graded within the range of 1.65 to 5%. The common discharge pipe shall be: a) not smaller than DN 100; b) not longer than 10 m; c) installed with not more than two bends; and d) graded within the range of 1.65 to 5%. The distance between the centre-line of adjacent traps and between the near face of the stack and the centre-line of the nearest trap shall not exceed 6 m. max. of five WC pans Fixture discharge pipe 2m max. for P traps stack 6m max. 6m max. combined discharge pipe max. of two 45 bends gradient 1.65 to 5.0% min. DN 100 max. length 10m Refer Plumbing and Drainage Guide (BRANZ) Fig. 3.9 Connection of a range of WC s p-trap Section 3-15

16 max. of five WC pans 1.5m max. dropper fixture discharge pipe: gradient 1.65 to 5.0% Max. of two bends 10 m max. combined discharge pipe max. of two 45 bends gradient 1.65 to 5.0% min. pipe size DN 100 max. length 10m Refer Plumbing and Drainage Guide (BRANZ) Fig Connection of a range of WC s s-trap Wall-hung Urinals Refer AS/NZS The maximum number of wall-hung urinals shall be five The fixture discharge pipe shall be: a) of size DN 50; b) not longer than 1 m; c) installed with not more than one bend; and d) graded within the range of 2.5 to 5%. The common discharge pipe shall be: e) not smaller than DN 65; f) not longer than 10 m; g) installed with not more than two bends; and h) graded within the range of 2.5 to 5%. Section 3-16

17 The distance between the centre-line of adjacent traps and between the near face of the stack and the centre-line of the nearest trap shall not exceed 2.5 m. max. of five wall-hung urinals 1m max. fixture discharge pipe min. grade 2.5 to 5.0% max. length 1m max. one bend min. size DN 50 combined discharge pipe min. size DN 65 max. length 10m max. of two bends gradient 2.5 to 5.0% Refer Plumbing and Drainage Guide (BRANZ) Note: Fig Connection of a range of wall-hung urinals If waterless urinals are used they must have two fixtures connected to the discharge pipe upstream of the urinal. Offsets in Single Stack Systems Refer AS/NZS An offset may be a steep offset, made up of angles of more than 45 to the horizontal. A graded offset, made up of an angle of less than 45 to the horizontal, with a minimum grade of 2.5% for DN 80 waste stacks and 1.65% for DN 100 or larger stacks. DN 100 stacks may be offset between the base of the stack and the highest connection as long as; the height of the stack must not exceed 10 floor levels; if laundry troughs are connected above the upper offset bend, the maximum fixture unit loading for the stack is not to exceed 50. Section 3-17

18 Using AS/NZS students are to complete the table below Maximum height in consecutive floor levels above the upper offset bend TABLE 8.9 OFFSET REQUIREMENTS Minimum distance between upper offset bend and connection of fixture discharge pipe Mm Minimum distance between lower offset bend and connection of fixture discharge pipe mm Maximum fixture unit loading STACK DN 100 min. 4th 3rd Min. DISTANCE (SEE TABLE 8.9) 45 2nd 600 mm min. 1st Ground TO SEWER Fig Typical steep connection Section 3-18

19 Steep offset below the lowest connection Refer AS/NZS Where a steep offset is below the lowest connection; the height of the stack must not exceed 3 floor levels; there is a maximum number of 30 fixture units permitted through the offset; laundry troughs shall not be connected. Lowest grades pipe 100 mm min. (see Clause 8.9.4) 45 To sewer Fig Steep offset below lowest connection Note: In an area where foaming is likely to occur, the minimum distance permitted at or near the offset may need to be increased. Section 3-19

20 Graded Offset Refer AS/NZS A DN 100 stack may be offset between the base of the stack and the highest connection as long as; only one graded offset is permitted; with a maximum of 10 consecutive floor levels; with a minimum of 2 m between centre-lines of vertical sections; The upper vertical section must be installed in accordance with Clause 7.6.2; and the graded lower vertical section in accordance with Table 7.8 Using AS/NZS students are to complete the table below TABLE 7.8 MINIMUM GRADE OF OFFSET Size of graded section Min. gradient DN % < Section 3-20

21 Stack vent (see Clause 8.6) 2 m min. or Air Admittance Valve as per AS/NZS Clause 6.9 WC only with DN 40 trap vent (600 min.) 900 min min. 450 min. 600 min. 900 min. Fig Graded offset Section 3-21

22 3.2 Describe, design, install and develop bills of quantities for single stack modified sanitary plumbing systems for domestic, commercial and industrial premises to meet the requirements of the Building Code of Australia, Plumbing Code of Australia and AS/NZS The single stack modified system permits stacks to receive a higher discharge loading or to be extended to serve a greater number of floor levels by introducing a relief vent and cross-vents. The cross-vents are installed between the stack and relief vent or the installation of pressure attenuators. The introduction of a relief vent and cross-vents into the system, allows for any excess pressure variations to be alleviated. The connection of the fixture and discharge pipes is the same as that covered for the single stack system; the only difference is the addition of a relief vent and cross-vents or the use of pressure attenuators. Using AS/NZS students are to complete the table below Size of stack DN TABLE 8.5 SINGLE STACK MODIFIED SYSTEM DOMESTIC OR RESIDENTIAL BUILDINGS Maximum fixture unit loading Maximum number of consecutive floor levels Size of relief vent and crossvent DN Location of cross-vents Alternate floors Each floor Alternate floors Each floor TABLE 8.6 SINGLE STACK MODIFIED SYSTEM OTHER THAN RESIDENTIAL TYPE BUILDINGS Maximum Size of stack DN fixture unit loading Location of cross-vents 100 Maximum number of consecutive floor levels Size of relief vent and crossvent DN Each floor Each floor Each floor Section 3-22

23 Fig 3.15 Single stack modified residential building Section 3-23

24 Fig Single stack modified commercial or industrial building Section 3-24

25 Waste Stacks Waste stacks may be used to pick up waste fixtures only; Using AS/NZS students are to complete the table below Size of stack DN TABLE 8.1 SIZE OF WASTE STACK Maximum fixture unit loading TABLE 8.7 WASTE STACKS LOADING PERMITTED THROUGH GRADED OFFSET Size of graded section of offset DN Maximum fixture unit loading permitted through the offset A DN 65 waste stack may receive the discharge from kitchen sinks and laundry troughs provided; the stack does not exceed two floor levels measured between its base and the highest floor level to which fixtures are connected; only two kitchen sinks or one kitchen sink and one laundry trough are separately connected at each floor level. Section 3-25

26 Acceptable Variations AS/NZS 3500 Clause 8.8 lists acceptable variations to the requirements for single stack system such as: a) A DN 80 stack up to three floors in height for domestic or residential buildings; b) A DN 80 stack up to two floors with the top section graded; c) A DN 100 stack up to three floors with the top section graded, receiving up to 30 fixture units; d) A DN 100 stack of one floor with the top section graded, receiving 90 fixture units; Students are encouraged to read these variation and the others listed to gain an understanding of the special conditions for their installation. Section 3-26

27 CPCPSN4011A Section 3 Student Name: Due date: Answer the following questions in the space provided Quote references. 1. Name the parts of the stack shown below as numbered. 1. STACK VENT 6. RELIEF VENT 2. FIXTURE TRAP 3. STACK 7. CROSS VENT 5. FLOOR WASTE GULLY 4. SINGLE STACK SYSTEM 8. SINGLE STACK MODIFIED SYSTEM 1) 2) 3) 4) 5) 6) 7) 8) Section 3-27

28 2. What is the principle a single stack system operates on? 3. What is the difference in design between a single stack and single stack modified systems? 4. What is meant by the term, Range of Fixtures? 5. In what type of building (classification) is a range of fixtures allowed to be installed, Section 3-28

29 6. A single stack sanitary plumbing system is possibly the most common type of stack design used in low rise domestic buildings. a) Explain THREE (3) benefits of this system. i) ii) iii) b) Explain TWO (2) disadvantages of the Single Stack system. i) ii) Section 3-29

30 Instructions: Complete the design below to comply with the requirements of AS/NZS Draw directly onto this sheet. Using the correct colour code. 2. Provide all pipe sizes. 3. Show the number of fixture units per floor and include a total. 4. Include any venting requirements and indicate where you would locate any Air Admittance Valve. Section 3-30

Review the section Preparing for work, then complete the following.

Review the section Preparing for work, then complete the following. CHAPTER 4: PLANNING THE LAYOUT FOR A RESIDENTIAL EXTERNAL SANITARY DRAINAGE SYSTEM 105 WORKSHEET 1 Student name: Enrolment year: Class code: Competency name/number: To be completed by teachers Satisfactory

More information

AS/NZS :1996 Plumbing and drainage - Part 2.2: Sanitary plumbing and drainage - Acceptable solutions

AS/NZS :1996 Plumbing and drainage - Part 2.2: Sanitary plumbing and drainage - Acceptable solutions Skip to main content Skip to primary navigation Home Home About this portal Latest updates Menu Print Save Email Resource detail Citations AS/NZS 3500.2.2:1996 Plumbing and drainage - Part 2.2: Sanitary

More information

Copyright 2017, ProVent Systems Inc., All Rights Reserved

Copyright 2017, ProVent Systems Inc., All Rights Reserved Copyright 2017, ProVent Systems Inc., All Rights Reserved Introduction to ProVent Systems A PVC Plastic Single Stack Waste and Vent System The ProVent System is a plumbing engineered single stack system

More information

G13. Acceptable Solutions and Verification Methods. For New Zealand Building Code Clause G13 Foul Water

G13. Acceptable Solutions and Verification Methods. For New Zealand Building Code Clause G13 Foul Water Acceptable Solutions and Verification Methods Prepared by the Ministry of Business, Innovation and Employment For New Zealand Building Code Clause G13 Foul Water G13 Status of Verification Methods and

More information

REGISTRATION EXAMINATION, november 2015 LICENSED PLUMBER. Time allowed THREE hours

REGISTRATION EXAMINATION, november 2015 LICENSED PLUMBER. Time allowed THREE hours Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 99 REGISTRATION EXAMINATION, november 05 LICENSED PLUMBER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed

More information

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter X X X Adopt Entire Chapter as amended (amended sections listed below) X X X X X X

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter X X X Adopt Entire Chapter as amended (amended sections listed below) X X X X X X CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE CHAPTER 9 - VENTS (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority and building application.)

More information

Dispute regarding the venting of a branch drain using an air admittance valve to a building at 122 Remuera Road, Auckland

Dispute regarding the venting of a branch drain using an air admittance valve to a building at 122 Remuera Road, Auckland Determination 2008/32 Dispute regarding the venting of a branch drain using an air admittance valve to a building at 122 Remuera Road, Auckland 1. The matter to be determined 1.1 This is a determination

More information

NSW Plumbing and Drainage Regulations. National Backflow Prevention Conference 28 th July 2016

NSW Plumbing and Drainage Regulations. National Backflow Prevention Conference 28 th July 2016 NSW Plumbing and Drainage Regulations National Backflow Prevention Conference 28 th July 2016 Key topics for discussion are; Plumbing and drainage regulation in NSW Consistent regulation approach Codes

More information

AS/NZS :2015. Plumbing and drainage AS/NZS :2015. Part 2: Sanitary plumbing and drainage. Australian/New Zealand Standard

AS/NZS :2015. Plumbing and drainage AS/NZS :2015. Part 2: Sanitary plumbing and drainage. Australian/New Zealand Standard AS/NZS 3500.2:2015 Incorporating Amendment No. 1 and 2 Australian/New Zealand Standard Plumbing and drainage Part 2: Sanitary plumbing and drainage Superseding AS/NZS 3500.2:2003 AS/NZS 3500.2:2015 AS/NZS

More information

The Akatherm Akavent System - Design guidelines

The Akatherm Akavent System - Design guidelines The Akatherm Akavent System - Design guidelines Plumbing Solutions Introducing a new innovation to Australian/New Zealand Plumbing Akavent Multi-Storey Sewer Drainage System The Akavent Multi-Storey Sewer

More information

CRAFTSMAN EXAMINATION, NOVEMBER 2008 PLUMBING ANSWER SCHEDULE

CRAFTSMAN EXAMINATION, NOVEMBER 2008 PLUMBING ANSWER SCHEDULE No. 9195 CRAFTSMAN EXAMINATION, NOVEMBER 2008 PLUMBING ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2008. All rights reserved. No part of this publication may be reproduced by any means

More information

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below) CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE APPENDIX C - ALTERNATE PLUMBING SYSTEMS (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority

More information

REGISTRATION EXAMINATION, JUNE 2017 CERTIFYING PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, JUNE 2017 CERTIFYING PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9195 REGISTRATION EXAMINATION, JUNE 2017 CERTIFYING PLUMBER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed

More information

Vent. Vent. Soil Stack. Basin. Waste Stack. Basin NOT FOR DRINKING. Approved Irrigation System

Vent. Vent. Soil Stack. Basin. Waste Stack. Basin NOT FOR DRINKING. Approved Irrigation System Plumbing and Services Training Package CPC08 Learning Resource Vent Vent Soil Stack ath asin Waste Stack Shower Floorwaste Testable double check valve backflow protection of the drinking water supply must

More information

Level III Chapter 1 Worksheet

Level III Chapter 1 Worksheet Chapter 1 Worksheet 1. For applicability requirements of the Plumbing Code, refer to: a. Building Code b. Administration and Enforcement Code c. Plumbing Code d. Residential Code 2. The provisions of the

More information

GWA Bathrooms & Kitchens

GWA Bathrooms & Kitchens Dr Steve Cummings Research and Development Manager GWA Bathrooms & Kitchens stevecummings@gwagroup.com.au Operational Performance Boundaries in Drainage Systems Dr Steve Cummings Operational limits sanitary

More information

A STATUS REPORT: Reduced Flows in Building Drains

A STATUS REPORT: Reduced Flows in Building Drains A STATUS REPORT: Reduced Flows in Building Drains Pete DeMarco Director of Special Programs The IAPMO Group Ph: 732.329.1237 E-mail: pete.demarco@iapmo.org Dr. Steve Cummings R&D Manager Caroma Dorf Ph:

More information

REGISTRATION EXAMINATION, JUNE 2009 DRAINLAYING ANSWER SCHEDULE

REGISTRATION EXAMINATION, JUNE 2009 DRAINLAYING ANSWER SCHEDULE No. 9197 REGISTRATION EXAMINATION, JUNE 2009 DRAINLAYING ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2009. All rights reserved. No part of this publication may be reproduced by any means

More information

Table of Contents Rules Concerning Uniform Plumbing Code

Table of Contents Rules Concerning Uniform Plumbing Code Table of Contents 07.02.06 - Rules Concerning Uniform Plumbing Code 000. Legal Authority.... 2 001. Title And Scope.... 2 002. Written Interpretations.... 2 003. Administrative Appeals.... 2 004. -- 010.

More information

CERTIFYING DRAINLAYER

CERTIFYING DRAINLAYER Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9198 REGISTRATION EXAMINATION, JUNE 2013 CERTIFYING DRAINLAYER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time

More information

CERTIFYING DRAINLAYER

CERTIFYING DRAINLAYER Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 998 REGISTRATION EXAMINATION, JUNE 08 CERTIFYING DRAINLAYER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed

More information

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS INFORMATION BULLETIN / PUBLIC - PLUMBING CODE REFERENCE NO.: LAMC 94.1502.0 Effective: 01-01-2017 DOCUMENT NO.: P/PC 2017-012 Revised: Previously Issued As: P/PC 20014-012 GRAY WATER SYSTEMS FOR RESIDENTIAL

More information

GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS

GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS City of Azusa Building & Safety Department 213 E. Foothill Blvd. Azusa, CA 91702-1395 (626) 812-5234 Fax: (626) 334-5464 GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS A. GRAYWATER SYSTEMS Under State regulations,

More information

MARLEY OPTIM DWV SANITARY SYSTEMS

MARLEY OPTIM DWV SANITARY SYSTEMS MARLEY OPTIM DWV SANITARY SYSTEMS Technical Design Manual MAKE IT MARLEY QUALITY ASSURANCE QUALITY ASSURANCE Rigorous quality testing IANZ accredited onsite laboratory CERTIFICATION CERTIFICATION Made

More information

6857 INTERNET TEST PLMB30

6857 INTERNET TEST PLMB30 Instructions: www.garyklinka.com 1. Print these pages. 2. Circle the correct answers and transfer to the answer sheet on the last page. 3. Page down to the last page for the verification forms and mailing

More information

GRAYWATER STANDARD PLAN For Simple Residential System

GRAYWATER STANDARD PLAN For Simple Residential System (Based on 203 California Plumbing Code Chapter 6) Project Address: Permit Number: Scope: This Plan applies only to simple residential systems meeting all the following criteria: Graywater discharge is

More information

CHAPTER 7 SANITARY DRAINAGE SYSTEMS

CHAPTER 7 SANITARY DRAINAGE SYSTEMS PlumbingCode06_ch07 5/29/06 8:13 AM Page 1 CHAPTER 7 SANITARY DRAINAGE SYSTEMS Drainage systems intimidate many people. When these people look at their codebooks, they see charts and math requirements

More information

BUILDING MATERIALS EVALUATION COMMISSION (BMEC) CONSOLIDATED AUTHORIZATION REPORT

BUILDING MATERIALS EVALUATION COMMISSION (BMEC) CONSOLIDATED AUTHORIZATION REPORT BUILDING MATERIALS EVALUATION COMMISSION (BMEC) CONSOLIDATED AUTHORIZATION REPORT DATE OF AUTHORIZATION February 26, 1998 BMEC REFERENCE BMEC #98-01-224 A BMEC APPLICATION # BMEC A1997-06 * Denotes a new

More information

101 S. George St 116 E Gas Ave York, PA York, PA (717) (717)

101 S. George St 116 E Gas Ave York, PA York, PA (717) (717) City of York Qdot Engineering 101 S. George St 116 E Gas Ave York, PA 17405 York, PA 17405 (717) 849-2329 (717) 744-8315 INSPECTION CHECKLIST Residential Plumbing Rough-In April 2011 2009 Codes This checklist

More information

Water Service Inspection Checklist

Water Service Inspection Checklist Water Service Piping Inspection 4 ;ection P2902 Protection of Potable Water Supply Section P2903 Water-supply System Section P2906 Materials, Joints and Connections Section P2907 Changes in Direction Section

More information

Section 12 Hydraulics.

Section 12 Hydraulics. Design Guidelines Section 12 Hydraulics. www.canterbury.ac.nz/learningresources Standards in the Design Guidelines Suite Design Standard Guidelines Index: 01 General 02 Architecture 03 Audio Visual 04

More information

The term storage water heater is a defined term used in the Acceptable Solutions and Verification Method for Clause G12 Water Supplies

The term storage water heater is a defined term used in the Acceptable Solutions and Verification Method for Clause G12 Water Supplies Determination 2016/052 Regarding the compliance of a relief drain from the safety valve to a hot water cylinder in a three-year-old house at 890 Levels Store Road, Timaru Summary This determination considers

More information

REGISTRATION EXAMINATION, JUNE 2013 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, JUNE 2013 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9192 REGISTRATION EXAMINATION, JUNE 2013 LICENSED PLUMBER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed

More information

Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12

Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12 Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12 Notice: This e-learning module is intended for general information purposes only. It only highlights certain provisions of the

More information

Septic Permit Application

Septic Permit Application BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Tel.: 519 845-5420 Toll Free: 1-866-324-6912 Fax: 519 845-3817 www.lambtononline.ca Septic Permit Application a) This application

More information

WATER & SEWER SERVICES

WATER & SEWER SERVICES WATER/SEWER ENGINEERING SECTION PHONE (703) 228-3677 WATER & SEWER SERVICES INFORMATION & APPLICATION PACKAGE REVISED MAY 2018 1 MAY 2018 Dear Customer: Thank you for taking the time to read this information

More information

CSA Group update OPIA meeting September 22, 2018:

CSA Group update OPIA meeting September 22, 2018: CSA Group update OPIA meeting September 22, 2018: Global Product, Safety & Compliance: 2018 Plumbing product recalls: No recalls issued since the June 13, 2018 OPIA meeting. 2018 Plumbing product alerts:

More information

Approved Document. Drainage and waste disposal. The Building Regulations 2010

Approved Document. Drainage and waste disposal. The Building Regulations 2010 The Building Regulations 2010 Approved Document H1 Foul water drainage H2 Wastewater treatment systems and cesspools H3 Rainwater drainage H4 Building over sewers H5 Separate systems of drainage H6 Solid

More information

SUPPLEMENTAL 2011 PLUMBING CORRECTION SHEET FOR HIGH-RISES

SUPPLEMENTAL 2011 PLUMBING CORRECTION SHEET FOR HIGH-RISES SUPPLEMENTAL 2011 PLUMBIN CORRECTION SHEET FOR HIH-RISES 2010 CPC ENERAL REQUIREMENTS A1. Plans shall bear the registration or license number and signature of an architect, contractor, or engineer, registered

More information

REGISTRATION EXAMINATION, JUNE 2018 CERTIFYING PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, JUNE 2018 CERTIFYING PLUMBER ANSWER SCHEDULE No. 9195 REGISTRATION EXAMINATION, JUNE 2018 CERTIFYING PLUMBER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2017. All rights reserved. No part of this publication may be reproduced by any

More information

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform Statewide

More information

Charter Township of Raisin

Charter Township of Raisin Charter Township of Raisin Authority: AC. 230 of 1972 As Amended PLUMBING PERMIT APPLICATION Application date: Completion: Installation shall not 5525 Occidental Hwy. Permit # be started until an application

More information

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons (CPHD) (ISD) Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform

More information

PLUMBING SYSTEMS. Plumbing Systems

PLUMBING SYSTEMS. Plumbing Systems PLUMBING SYSTEMS DRAINAGE outhouse: American outback inhouse: Canadian city Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 Plumbing Systems Potable water supply (fit for human consumption)

More information

E10) Active air pressure suppression of drainage systems - from research to the marketplace

E10) Active air pressure suppression of drainage systems - from research to the marketplace E) Active air pressure suppression of drainage systems - from research to the marketplace S. White steve@studor.net Studor Limited, Studor House, 13 Sheridan Terrace, Hove, East Sussex, BN3 5AE, United

More information

REGISTRATION EXAMINATION, NOVEMBER 2012 LICENSED DRAINLAYER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, NOVEMBER 2012 LICENSED DRAINLAYER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9197 REGISTRATION EXAMINATION, NOVEMBER 2012 LICENSED DRAINLAYER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time

More information

for plumbing regulations.

for plumbing regulations. CHAPTER 30 SANITARY DRAINAGE SECTION P3001 GENERAL P3001.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of sanitary drainage systems. Plumbing

More information

Amendments to the 2012 International Plumbing Code

Amendments to the 2012 International Plumbing Code Amendments to the 2012 International Plumbing Code The following sections, paragraphs, and sentences of the 2012 International Plumbing Code are hereby amended as follows: Standard type is text from the

More information

Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents

Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents Chapter 1 Administration Chapter 3 General Regulations Chapter 5 Water Heaters Chapter 7 Sanitary Drainage Chapter 9 Vents Chapter 11 Storm Drainage Policy Statements Table of Contents Chapter 2 Definitions

More information

The Drainage and Plumbing Regulations 1996.

The Drainage and Plumbing Regulations 1996. The Drainage and Plumbing Regulations 1996. In accordance with the powers vested in the Ministry of Health and Welfare. and the mandate of the Maldives Water and Sanitation Authority, the Minister of Health

More information

RESIDENTIAL FIRE SERVICE METERS Addendum #1

RESIDENTIAL FIRE SERVICE METERS Addendum #1 109 WATER METERS (Addendum #1) 109.1 GENERAL All meters to be used for billing purposes shall be provided by the Water Utility. The Water Utility reserves the right to read, inspect, test or replace the

More information

1 Exam Prep Florida Building Code- Plumbing, 2014 Tabs and Highlights

1 Exam Prep Florida Building Code- Plumbing, 2014 Tabs and Highlights 1 Exam Prep Florida Building Code- Plumbing, 2014 Tabs and s These1 Exam Prep Tabs are based on the Florida Building Code - Plumbing 2014. Each 1 Exam Prep tabs sheet has five rows of tabs. Start with

More information

Septic Permit Application

Septic Permit Application Building Services Department 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519-845-5420 Toll-free: 1-866-324-6912 Fax: 519-845-3817 Septic Permit Application a) This application applies

More information

Drainage and waste disposal

Drainage and waste disposal The Building Regulations 2000 H APPROVED DOCUMENT H1 H2 H3 H4 H5 H6 Foul water drainage Wastewater treatment systems and cesspools Rainwater drainage Building over sewers Separate systems of drainage Solid

More information

SANITARY DRAINAGE CHAPTER 30

SANITARY DRAINAGE CHAPTER 30 CHAPTER 30 SANITARY DRAINAGE SECTION P3001 GENERAL P3001.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of sanitary drainage systems. Plumbing

More information

CERTIFYING DRAINLAYER

CERTIFYING DRAINLAYER No. 9198 REGISTRATION EXAMINATION, NOVEMBER 2012 CERTIFYING DRAINLAYER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2012. All rights reserved. No part of this publication may be reproduced

More information

BERMUDA STATUTORY INSTRUMENT HAMILTON SEWERAGE ORDINANCE 1951

BERMUDA STATUTORY INSTRUMENT HAMILTON SEWERAGE ORDINANCE 1951 Laws of Bermuda Title 4 Item 1(i) BERMUDA STATUTORY INSTRUMENT HAMILTON SEWERAGE ORDINANCE 1951 [made under section 9 of the Public Health Act 1949 [title 11 item 1] and section 38 of the Municipalities

More information

GRAY WATER RECYCLING SYSTEMS

GRAY WATER RECYCLING SYSTEMS GRAY WATER RECYCLING SYSTEMS Note: Section P2601.2 of the International Residential Code requires all plumbing fixtures that receive water or waste to discharge to the sanitary drainage system of the structure.

More information

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14 Planning and Building Department 525 San Anselmo Avenue Building Division San Anselmo, CA 94960 Phone: (415) 258-4616 Fax: (415) 454-4683 GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter

More information

RAUPIANO PLUS ACOUSTIC PLUMBING AND DRAINAGE SYSTEM. Product. Scope. Building Regulations. Appraisal No. 809 [2013]

RAUPIANO PLUS ACOUSTIC PLUMBING AND DRAINAGE SYSTEM. Product. Scope. Building Regulations. Appraisal No. 809 [2013] RAUPIANO PLUS ACOUSTIC PLUMBING AND DRAINAGE Amended 20 July 2016 BRANZ Appraisals Technical Assessments of products for building and construction. REHAU Ltd 60B Cryers Road East Tamaki Auckland Tel: 09

More information

September 11 th, 2012

September 11 th, 2012 September 11 th, 2012 Gray water reuse is a controversial subject that simultaneously generates strong support and strong opposition. The notion of using every drop of water to help alleviate the pressures

More information

Accessible Toilet and Bathing Rooms

Accessible Toilet and Bathing Rooms Accessible Toilet and Bathing Rooms Building & Fire Safety Division Yakima County Public Services This brochure is for illustration purpose only. It is NOT a complete section of the referenced codes, nor

More information

2017 BUILDING PERMIT FEES

2017 BUILDING PERMIT FEES 2017 PERMIT FEES Fees are based on the cost of construction and shall be based on a value not less than the value determined using the most current Building Valuation Data Report published by ICC. Application

More information

Section Old G4 February 2014 Amendments to G4

Section Old G4 February 2014 Amendments to G4 Dear Customer Please find enclosed Amendment 3, effective 14 February 2014, to the Acceptable Solution and Verification Method for Clause G4 Ventilation of the New Zealand Building Code. The previous amendment

More information

PRODUCT GUIDE PLUMBING. February 2017 BRETT MARTIN PLUMBING SYSTEMS PRODUCT RANGE INSTALLATION DETAILS PLUMBING SYSTEMS

PRODUCT GUIDE PLUMBING. February 2017 BRETT MARTIN PLUMBING SYSTEMS PRODUCT RANGE INSTALLATION DETAILS PLUMBING SYSTEMS February 2017 BRETT MARTIN PLUMBING SYSTEMS PRODUCT RANGE INSTALLATION DETAILS PLUMBING SYSTEMS PLUMBING P R O D U C T G U I D E Brett Martin is a multi-site international organisation producing not only

More information

City of Oregon City. Community Development. Building Division Fee Schedule. Effective January 1, 2017 BUILDING DIVISION. Description. Fee 65% $86.

City of Oregon City. Community Development. Building Division Fee Schedule. Effective January 1, 2017 BUILDING DIVISION. Description. Fee 65% $86. City of Oregon City Community Development Building Division Schedule Effective January 1, 2017 BUILDING DIVISION 1.1 Building Plan Review 1.1.01 Building Plan Review 65% 1.1.02 Electrical and Plumbing

More information

SUPPLEMENTAL MECHANICAL CORRECTION SHEET FOR SEWAGE EJECTORS AND SUMP PUMPS 2011 LAPC

SUPPLEMENTAL MECHANICAL CORRECTION SHEET FOR SEWAGE EJECTORS AND SUMP PUMPS 2011 LAPC SUPPLEMENTAL MECHANICAL CORRECTION SHEET FOR SEWAGE EJECTORS AND SUMP PUMPS 2011 LAPC This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the

More information

Form H/01: Request for an allowance to wholesale charges and/or a volumetric adjustment

Form H/01: Request for an allowance to wholesale charges and/or a volumetric adjustment Form H/01: Request for an allowance to wholesale charges and/or a volumetric adjustment Change History Version Number Date of Issue Reason for Change Change Control Reference Sections Affected Draft 20150714

More information

DEVELOPMENT SERVICES BUILDING COMMUNITY RISK REDUCTION ENGINEERING PLANNING PERMIT SERVICES TRANSPORTATION

DEVELOPMENT SERVICES BUILDING COMMUNITY RISK REDUCTION ENGINEERING PLANNING PERMIT SERVICES TRANSPORTATION DEVELOPMENT SERVICES BUILDING COMMUNITY RISK REDUCTION ENGINEERING PLANNING PERMIT SERVICES TRANSPORTATION Submit this completed form at City Hall, or use www.mybuildingpermit.com to submit your application

More information

CSA B45.5/IAPMO Z124,

CSA B45.5/IAPMO Z124, Summary of Substantive Changes between the 2017 and the 2011 edition including Update No. 1 dated May 2012 of CSA B45.5/IAPMO Z124, Plastic plumbing fixtures Presented to the IAPMO Standards Review Committee

More information

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012 2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,

More information

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following: New buildings or renovations to existing buildings for which an application for a permit was made to the Department or a municipality before April 9, 2004. New buildings or renovations to existing buildings

More information

INTERIOR ENVIRONMENT

INTERIOR ENVIRONMENT CHAPTER 12 INTERIOR ENVIRONMENT > SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern ventilation, temperature control, lighting, yards and courts, sound transmission, room dimensions,

More information

City of West Allis W Greenfield Ave Room 222 West Allis, WI Phone: (414) Fax: (414) Plumbing Inspector: Mike Romens

City of West Allis W Greenfield Ave Room 222 West Allis, WI Phone: (414) Fax: (414) Plumbing Inspector: Mike Romens City of West Allis 7525 W Greenfield Ave Room 222 West Allis, WI 53214 Phone: (414) 302 8400 Fax: (414) 302 8402 Plumbing Inspector: Mike Romens Direct: (414) 302 8419 Office hours: 8:00am 9:00am & 1:00pm

More information

Characteristics and Current Status of Drainage System with Special Fitting

Characteristics and Current Status of Drainage System with Special Fitting CIBW0 Symposium 0 Characteristics and Current Status of Drainage System with Special Fitting Kyosuke Sakaue (), Masayuki Ostuka (), Michihiro Koike (), Takayuki Toyama (). sakaue@isc.meiji.ac.jp. dmotsuka@kanto-gakuin.ac.jp.

More information

Indicative Wholesale Charges Severn Trent Water

Indicative Wholesale Charges Severn Trent Water Indicative Wholesale s 2018-19 Severn Trent Water About this document Indicative wholesale charges (non-households) - 1 April 2018 to 31 March 2019 Ofwat published IN16-02 in March 2016. This set out new

More information

GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS

GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS Building and Safety Division - Public Information County of Ventura Resource Management Agency http://www.ventura.org/ build_safe Main Office 800 S. Victoria Ave, Ventura, CA. 93009 805-654-2771 East County

More information

REQUEST FOR DEVIATION WATER AND WASTEWATER SYSTEM STANDARD SPECIFICATIONS

REQUEST FOR DEVIATION WATER AND WASTEWATER SYSTEM STANDARD SPECIFICATIONS REQUEST FOR DEVIATION WATER AND WASTEWATER SYSTEM STANDARD SPECIFICATIONS PRODUCT NAME: PRODUCT DESCRIPTION: DISTRIBUTOR'S NAME: DISTRIBUTOR'S ADDRESS: DISTRIBUTOR'S PHONE NUMBER: MANUFACTURER S NAME:

More information

SPRINGWOOD COMMUNITY & CULTURAL FACILITIES

SPRINGWOOD COMMUNITY & CULTURAL FACILITIES SPRINGWOOD COMMUNITY & CULTURAL FACILITIES REPORT ON PROPOSED HYDRAULIC AND FIRE SERVICES Issue Date Revision Author Status A September 2011 Preliminary G. Barnes Current Prepared by: Prepared for: WARREN

More information

Appendix B. Schedule 1, Water & Wastewater Consumption Rates

Appendix B. Schedule 1, Water & Wastewater Consumption Rates Appendix B Schedule 1, Water & Wastewater Consumption Rates 1 Metered Water Consumers 2 Metered Water Consumers 3 Flat Rate 4 Flat Rate 5 Flat Rate 6 Flat Rate 7 Flat Rate 8 Flat Rate Block 1 Domestic

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 08-06-1180 Application No. B- 2007-49 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 7.4.8.2.,

More information

Iron Ore (WA) Utilites Division. Property owners and plumbers handbook

Iron Ore (WA) Utilites Division. Property owners and plumbers handbook Utilities Division Plumbers Handbook Iron Ore (WA) Utilites Division Property owners and plumbers handbook Table of Contents 1 Context... 2 2 Objective... 2 3 Definitions... 2 4 Connection to Rio Tinto

More information

Chapter 2 Definitions. Chapter 2 Definitions COMBINATION WASTE AND VENT SYSTEM.

Chapter 2 Definitions. Chapter 2 Definitions COMBINATION WASTE AND VENT SYSTEM. BEDROOM. A room that can be used for sleeping and that: a. For site-built s has a minimum of 70 square feet (6.50 m 2 ) of conditioned space; b. For manufactured homes is constructed according to the standards

More information

RESIDENTIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS

RESIDENTIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS P: (847)810-3502 OR (847)810-3503/3521, F: (847)615-4383 RESIDENTIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS The following is required for a complete permit submittal. RESIDENTIAL BUILDING PERMIT, ELECTRIC

More information

Architectural Technology & Construction Management

Architectural Technology & Construction Management Architectural Technology & Construction Management Drain and sewer TCU 2016 Sewer plan Drain water (page 18-21) Waste water (page 3-6) Rain water (page 14-16) Above pages refer to Guidelines for Design

More information

2015 IPC Design, Installation and Inspection Principles IPC Design, Installation and Inspection Principles

2015 IPC Design, Installation and Inspection Principles IPC Design, Installation and Inspection Principles Description 2015 IPC Design, Installation and Inspection Principles Based on the 2015 International Plumbing Code (IPC ) The 2015 International Plumbing Code (IPC ) continues to emphasize both prescriptive

More information

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Pre-bid Meeting Minutes / Addendum No.1

Pre-bid Meeting Minutes / Addendum No.1 United Nations Development Programme Programme of Assistance to the Palestinian People برنامج الا مم المتحدة الا نماي ي/ برنامج مساعدة الشعب الفلسطیني ITB-2015-132- Addendum No. 1 - dated 3 August 2015

More information

A. This Section includes the following sanitary drainage piping specialties:

A. This Section includes the following sanitary drainage piping specialties: Page 221319-1 SECTION 221319 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949) CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA 92691 (949) 470-3054 KITCHEN REMODELS A permit is required for kitchen remodels that include removal and replacement

More information

RESIDENTIAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING REQUIREMENTS RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell

More information

STORM DRAINAGE CHAPTER 11

STORM DRAINAGE CHAPTER 11 CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

Recommended Amendments to the 2015 International Plumbing Code North Central Texas Council of Governments Region

Recommended Amendments to the 2015 International Plumbing Code North Central Texas Council of Governments Region Recommended Amendments to the 2015 International Plumbing Code North Central Texas Council of Governments Region The following sections, paragraphs, and sentences of the 2015 International Plumbing Code

More information

The Head Loss Ratio in Water Distribution: Case Study of a 96- Unit Residential Estate

The Head Loss Ratio in Water Distribution: Case Study of a 96- Unit Residential Estate Journal of Advanced & Applied Sciences (JAAS), 2 (3): 105-116, 2014 ISSN: 2289-6260 2014 Academic Research Online Publisher. Research Paper The Head Loss Ratio in Water Distribution: Case Study of a 96-

More information

Approved Document for New Zealand Building Code Laundering Clause G2

Approved Document for New Zealand Building Code Laundering Clause G2 Approved Document for New Zealand Building Code Laundering Clause G2 Prepared by the Building Industry Authority This Approved Document is prepared by the Building Industry Authority, which is a statutory

More information

EVERY ITEM WILL BE REVIEWED AND NOTED FOR COMPLIANCE (C), OR NON-APPLICABILITY (NA).

EVERY ITEM WILL BE REVIEWED AND NOTED FOR COMPLIANCE (C), OR NON-APPLICABILITY (NA). DESIGN LIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED EVERY WILL BE REVIEWED AND NOTED FOR COMPLIANCE (C), OR NON-APPLICABILITY (NA). SECTION 11 - PLUMBING A GENERAL - Check 1.

More information

Application Checklist # 2 for New and Altered Commercial Buildings including Dairy Sheds

Application Checklist # 2 for New and Altered Commercial Buildings including Dairy Sheds Ref Consent Application Checklist 2 Date February 2018 Application Checklist # 2 for New and Altered Commercial Buildings including Dairy Sheds Please complete this user guide, your building consent application

More information

Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents

Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents Chapter 1 Administration Chapter 3 General Regulations Chapter 5 Water Heaters Chapter 7 Sanitary Drainage Chapter 9 Vents Chapter 11 Storm Drainage Policy Statements Table of Contents Chapter 2 Definitions

More information

SECTION 6: HYDRAULICS CONTENTS

SECTION 6: HYDRAULICS CONTENTS SECTION 6: HYDRAULICS CONTENTS 6.1 INTRODUCTION 2 6.2 HYDRAULIC SERVICES 2 6.2.1 Standards and Regulations 2 6.2.2 Sanitary Plumbing Drainage and Fixtures 3 6.2.3 Roof and Paved Surface Drainage System

More information

Amendments to the 2006 International Plumbing Code

Amendments to the 2006 International Plumbing Code Amendments to the 2006 International Plumbing Code Table of Contents, Chapter 7, Section 714; change to read as follows: Section 714 Engineered Drainage Design................... 65 Chapter 1, Administration

More information