1 RENOVATION PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent
2 AGENDA 2 Project Location General Information Existing Conditions Structural Considerations Building Organization Recent Construction Project Educational Enhancements Project Schedule Overview Questions
3 VICINITY MAP 3 Lansdowne H.S.
4 PROJECT LOCATION Regional Map Location I-95 I-695 Lansdowne H.S. I-895
5 PROJECT LOCATION Neighborhood Location Map 5 Lansdowne E.S. Lansdowne M.S. Lansdowne H.S.
6 GENERAL INFORMATION 6 Lansdowne High School - Renovation Enrollment Information Existing SRC 1,420 Current Enrollment 1,346 (as of ) Regional Programs Finance Arts & Communications Health Human Services Science Engineering and IT English Students of Other Languages School Construction History Original Building Construction 1963 Additions 1967, 1971, 1973 Major Renovations 2000 (science labs only)
7 EXISTING CONDITIONS - Lobby 7
8 EXISTING CONDITIONS Media Center 8
9 EXISTING CONDITIONS - Corridor 9
10 STRUCTURAL CONSIDERATIONS 10 PHASE I Feasibility Study Review of existing drawings & visual observation Findings/Recommendations February 2016: Evidence of building settlement Recommended crack monitoring of the music room wall Recommended repair/replacement of the music room slab Further investigation as design progresses PHASE II Additional Investigation Preliminary Update Enhanced building inspection Installed crack monitors monitoring current through October 2017 Scheduled geotechnical testing near music classroom and new elevators Findings/Recommendations July 2016: No evidence of any portion of the building moving towards the pond Needed results from geotechnical testing for final analysis PHASE III Additional Investigation Continued enhanced building and site inspection Performed geotechnical testing (borings and test pits) Findings/Recommendations August 2016: Proposed the installation of structural piles under the music wall and slab Reported all structural concerns are correctable and will be rectified in the renovation. PHASE IV Construction Documents 2017 Include repairs of settlement issues, crack locations, and bowing wall.
11 STRUCTURAL MODIFICATIONS AND NEW ELEVATORS 11 Lansdowne Road New Elevator New Elevator Music Room Slab Repair & West Wall Structural Piers (Proposed) 2016 Soil Investigation Location South Wall Structural Piers (2001)
12 SCOPE OF WORK - CURRICULUM 12 Original Project Renovate every classroom: new technology, TV monitor, marker boards, flooring, doors, ceiling and millwork Classroom designed for 1 to 1 tablet use by students Renovate library / media center including new digital learning classroom Renovate all art classrooms, food / nutrition lab Renovate administrative, guidance offices, health suite Renovate girls locker rooms Renovate technology education classrooms New TV studio 100% ADA accessibility throughout the building at every level New auditorium seating and flooring. Expanded Scope of Work Add two classrooms Auditorium upgrades including new theatrical lighting and sound system, acoustical panels, and new exterior metal panels New dance studio and sound system New recording studio New gymnasium sound system Add photovoltaic solar panel with teaching display Renovate boys locker room
13 SCOPE OF WORK - SAFETY 13 Original Project Modify main entrance to create security vestibule Install new sprinkler system Upgrade security system New security cameras throughout the building and on building exterior New door access control New Elevators Expanded Scope of Work Add emergency generator Expanded bus loop Enclose exterior stairs
14 SCOPE OF WORK - BUILDING 14 Original Project Roof replacement Install new HVAC system to include air conditioning Replace interior and exterior domestic water piping Replace interior and exterior lighting with LED lighting Repair floor settlement Repair exterior wall cracks Replace kitchen equipment Expanded Scope of Work New building entrance and lobby Corridor upgrades including new flooring and lockers New gymnasium flooring New exterior metal wall panels at auditorium New divider in activity room
15 SCOPE OF WORK - SITE 15 Original Project Site work at new elevators Site work at new chiller Temporary classroom related site work Expanded Scope of Work Expanded bus loop to better isolate bus and car traffic Add six (6) parking spots near main entry Repave parking lot and add new LED lighting Create 40 new parking spaces at stadium lot New bleachers, press box, and toilet rooms / concessions building at stadium New track running surface and field event areas New tennis court surface and nets
16 PROJECT LOCATION Aerial Map 16 Site Work Enhancement New Entrance / Addition
17 EDUCATIONAL ENHANCEMENT Existing Bus Loop and Entrance 17
18 EDUCATIONAL ENHANCEMENT New Entrance with Expanded Bus Loop 18
19 BUILDING ORGANIZATION Proposed First Floor Plan 19 Administration ADA Ramp at Gym Entrance Elevator to Locker Rooms ADA Ramp Main Entrance Guidance Health Media Center Classrooms Food Service Physical Education Auditorium ADA Lift Elevator Dual Entrance Connects Four Levels ADA Lift
20 BUILDING ORGANIZATION Proposed Second Floor 20 Classrooms Auditorium
21 EDUCATIONAL ENHANCEMENT Existing Entry/Administration 21
22 EDUCATIONAL ENHANCEMENT Proposed Entry/Administration 22 Main Entrance Main Entrance
23 EDUCATIONAL ENHANCEMENT Existing Building From Parking Lot 23
24 EDUCATIONAL ENHANCEMENT New Entrance Addition 24
25 EDUCATIONAL ENHANCEMENT Existing Building From Bus Loop 25
26 EDUCATIONAL ENHANCEMENT New Entrance Addition 26
27 EDUCATIONAL ENHANCEMENT Existing Media Center 27 Group Instruction Area Work Room Book Area Office Learning Area
28 EDUCATIONAL ENHANCEMENT Existing Media Center 28
29 EDUCATIONAL ENHANCEMENT Proposed Media Center 29 Group Instruction Area Group Instruction Area Soft Seating Collaborative Learning Area Digital Learning/ Maker Space
30 EDUCATIONAL ENHANCEMENT Proposed Media Center 30 Architectural Rendering
31 EDUCATIONAL ENHANCEMENT Proposed Media Center 31 Architectural Rendering
32 EDUCATIONAL ENHANCEMENT Typical Classroom - Existing 32
33 EDUCATIONAL ENHANCEMENT Typical Classroom - Proposed 33
34 EDUCATIONAL ENHANCEMENT Typical Classroom - Proposed 34
35 EXISTING GYMNASIUM 35
36 RENOVATED GYMNASIUM 36
37 EXISTING AUDITORIUM 37
38 PROPOSED AUDITORIUM 38
39 EXISTING STADIUM 39 Softball Field Field Event Area Existing Bleachers Existing Storage Buildings
40 PROPOSED STADIUM PARKING / CONCESSION BUILDING / BLEACHERS 40 New Parking New Bleachers Press Box New Concession Building / Toilet Rooms
41 STADIUM ENTRANCE / CONCESSION BUILDING 41
42
43 PROJECT SCHEDULE OVERVIEW 43 Phase/Activity Date Original Desk Kick-Off December 2015 Design Restart June 2017 Board Approved the Project Under State Capital September 2017 Improvement Program Submission Community Engagement December 2017 Advertisement for Bid January 2018 Board Approval April 2018 Notice to Proceed May 2018 Site Package Advertise to Bid July 2018 Site Package Board Approval October 2018 Substantial Completion August 2020
44 Thank You 44
CHADWICK ELEMENTARY SCHOOL PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent
PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent Agenda 2 Project Information Project Goals Site Conditions Building Organization Renderings
More informationBRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING
PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING
More informationBoard Meeting Presentation FEASIBILITY STUDY South Montgomery Community School Corporation. June 13, 2016
Board Meeting Presentation FEASIBILITY STUDY South Montgomery Community School Corporation June 13, 2016 Schedule/Major Milestones 2015 November December Data Collection Board Meeting- Update 2016 January
More information2019 Construction
2019 Construction Estimates @ 18 10 01 1 Oak Flat Elementary IDENTIFIED BASE BID SCOPE ITEMS Project BSSD replace door hardware to meet ADA, including re-key to master system $ 75,000 Shelter Lockdown
More informationFrost Technical Center
Frost Technical Center 1955 Greenhouses Addition Various other additions and renovations Provide site security improvements Provide improved Admin area field of view to site entrance Provide security camera
More informationHealth Life Safety Survey and Master Facilities Plan
Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master
More informationPRESENTATION JANUARY 24, 2017
4918 HOVENKAMP DRIVE DALLAS, TEXAS 75227 PRESENTATION JANUARY 24, 2017 RGM ARCHITECTS OCTOBER 25, 2016 1 2 COMMUNITY INPUT DESIGN DOCUMENT PROCUREMENT CONSTRUCTION PD SD DD CD BD CA PROJECT PROCESS 3 Construction
More information2014 MASTER PLANNING PORT ARTHUR INDEPENDENT SCHOOL DISTRICT Revised, August 5, 2014
2014 MASTER PLANNING PORT ARTHUR INDEPENDENT SCHOOL DISTRICT Revised, August 5, 2014 PROPOSED IMPROVEMENTS A. Replace Sam Houston Elementary School with a new facility to house 750 students. (Included
More informationGEORGETOWN ISD 2010 BOND PROGRAM UPDATE. Huckabee APRIL 2012
GEORGETOWN ISD 2010 BOND PROGRAM UPDATE APRIL 2012 TABLE OF CONTENTS East View High School Phase 2 Additions, Package 2 3 Georgetown High School Additions and Renovations 7 Completed Projects 12 Georgetown
More information3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000
1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000
More informationCorsicana High School
Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0
More information*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects.
SECONDARY SCHOOLS Kirby Middle School Demolish 300, 400, and 500 buildings partial Change in total rebuild design New academic building - 33 classrooms *Rent portables for temporary classrooms partial
More informationFacility Improvements
AR-SI-08 CURB RAMP ADDITIONS AR-SI-10 DISCUS THROW MODIFICATIONS Curb ramps needed to provide wheelchair access and to meet ADA requirements. Modifications are needed at the discus throw pad to comply
More informationSOUTH COLONIE CENTRAL SCHOOL DISTRICT FACILITY ESTIMATED EXPENSES FORM UPDATED
SOUTH COLONIE CENTRAL SCHOOL DISTRICT FACILITY ESTIMATED EPENSES FORM UPDATED 12-14-18 This information is a summary of multiple reports which assist District Leadership in maintaining a to do list for
More informationCollins Middle School
Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0
More informationAl Behrman Elementary School
Mulberry Street Al Behrman Elementary School Relocate reception and principal s office to be adjacent to main entrance doors; provide secure entrance sequence and increase transparency to the exterior
More informationMOORESTOWN HIGH SCHOOL REFERENDUM PROJECTS
MOORESTOWN HIGH SCHOOL 06/22/15 08/28/15 Security vestibule at main entrance and transportation office; replacement of selected exterior doors; access controls at exterior doors 06/22/15 12/31/15 Upgrade
More informationCORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting
CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan Community Information Meeting October 2017 AGENDA Meeting Objectives Draft Plan Overview School Improvements for specific site Feedback/Listening
More informationLECKIE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationRAYMOND EDUCATION CAMPUS
INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationGFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1
GFW Schools Task Force Meeting 1/23/19 1 AGENDA 1. Introductions 2. Review of building tours Primary Needs 3. Review Space Programs 4. Review Concept Options District and Facility needs 5. Review Concept
More informationORIGINATED OTHERS DATA COST/FUND
TITLE: SCHEMATIC DESIGN REVIEW WILLSON SCHOOL/AUDITORIUM CATEGORY: ORIGINATED BY: OTHERS INVOLVED: DATA EXPANSION: COST/FUND SOURCE: DISCUSSION & REPORTS Kevin Barre, Director of Facilities Architecture;
More informationBALLOU SENIOR HIGH SCHOOL
INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE
More informationSTUART-HOBSON MIDDLE SCHOOL
INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationGreenwich High School Music Instructional Space & Auditorium Building Committee Report for the quarter ending June 30, 2010 July 6, 2010
Greenwich High School Music Instructional Space & Auditorium Building Committee Report for the quarter ending June 30, 2010 July 6, 2010 A. Activities a. Continued Design Development phase. b. Developed
More informationEASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923
INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationBARNARD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationBRUCE-MONROE ELEMENTARY SCHOOL AT PARK VIEW MODERNIZATION HISTORIC PRESERVATION REVIEW
HISTORIC PRESERVATION REVIEW submitted to: DC Historic Preservation Office Office of Planning ARCHITECTS ARCHITECTURAL NARRATIVE Bruce Monroe Elementary School at Park View is among the schools included
More informationStevens High School Pre Bond Presentation Claremont, NH
Stevens High School Pre Bond Presentation Claremont, NH Existing Conditions Existing Conditions Existing Conditions Existing Conditions Proposed site features New main entry that is ADA accessible New
More informationUpdate on FCPS Construction/Renovation Projects. June 2016
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: SOUTH BRONX HS TRANSPORTABLE - X, 701 ST. ANNS AVENUE, New York, 10455 Inspection Id Inspection Type Time In Last Edited SA : Architectural
More informationSchool Without Walls
INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationLASALLE - BACKUS EDUCATION CAMPUS
INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationBOYERTOWN AREA SENIOR HIGH SCHOOL
BOYERTOWN AREA SCHOOL DISTRICT ADDITIONS & RENOVATIONS To BOYERTOWN AREA SENIOR HIGH SCHOOL MONTHLY PROGRESS REPORT No. 11 January 2016 Construction Manager D Huy Engineering, Inc. Architect KCBA Architects
More informationLOVEJOY Independent School District
Long-Range Facilities Planning Projected Bond Sale Project Series 2014 Series 2018 Series 2023 Total (2013 Cost) (with 6% Yearly Inflation) 1. Hart Elementary $ 6,716,424 $ 6,168,802 $ 1,200,121 $ - $
More informationCapital Projects Update
Issaquah School District Issaquah High School Reconstruction December 2009 West side of the site: North classroom building is being sheet-rocked, taped, and primed. Data and electrical wiring is being
More informationJanuary 2017 Project Update
January 2017 Project Update Overall Referendum Project Status: ON SCHEDULE/ON BUDGET All elements of the project completed to date have been completed on or ahead of schedule and final costs were under
More informationNOYES EDUCATION CAMPUS
INITIAL YEAR BUILT 1930 BUILDING AREA 49,700 SF CURRENT PROGRAM CAPACITY 321 ENROLLMENT 2008 337 WARD 5 PROPOSED PROGRAM CAPACITY 450 Site Plan NOYES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-8
More informationHinsdale Township High School District 86 Referendum Project Listing April 2, Approved
Hinsdale Township High School District 86 Referendum Project Listing April 2, 2019 - Approved 1-12-2019 Project Category and Description Central South Total Security Replace Intercom System Install a completely
More informationChenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017
Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections
More informationDrexel Hill Middle School
150004 Drexel Hill Middle School Site Plan for Drexel Hill Middle School Floor Plan for Drexel Hill Middle School 2 150004; Drexel Hill Middle School. This school is located at 3001 State Road, Drexel
More informationEdmonton Public School District No. 7
EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationSchool Board Proposed Capital Improvements Program. Fiscal Years
School Board Proposed Capital Improvements Program Fiscal Years 2017-2026 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-8 Capital Projects Description Pages 9-14 SCHOOL BOARD PROPOSED CAPITAL
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: SAINT FRANCIS COLLEGE - BROOKLYN, 180 REMSEN STREET, New York, 11201 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-02-05
More informationProject Status Report Property and Finance Committee Meeting August 6, 2013
Westmont Hilltop School District Project Status Report Property and Finance Committee Meeting August 6, 2013 S. Dwight Knouse II, AIA, LEED AP Russell D. Greaser, Project Manager Matthew T. Filan, PE,
More informationWissahickon School District Natatorium & Central Plant Project. Project Update March 27, 2017
Wissahickon School District Natatorium & Central Plant Project Project Update March 27, 2017 Project Features 1. New central plant and receiving area to serve current High School and future Master Plan.
More informationFACILITY ASSESSMENT PRESENTATION 11 October SCHRADERGROUP architecture
FACILITY ASSESSMENT PRESENTATION 11 October 2017 SCHRADERGROUP architecture AGENDA 1. 1 Facility Assessment Review 2. 2 Prioritizing the Scope of Work with Associated Costs 3 Timeline of Work 3. 4 Procurement
More informationNYC Department of Education
Asset: P.S. 25 TRANSPORTABLE - S.I., 4210 ARTHUR KILL ROAD, New York, 10309 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-01-11 6:25 AM 2018-01-17 6:03 PM AA : Architectural
More informationReferendum Implementation
SPACE Net Gain (new) Classrooms Claremont = +47 Hillcrest & Elizabeth = +20 Utilization Gain SGS = +25 at 6-8 MS level SAFETY Annex Connection To Franklin Park Repair Parking Lots, Sidewalks & Outdoor
More informationSHEPHERD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationNEIDIG ELEMENTARY SCHOOL ADDITION & RENOVATION PHASING. Neidig Community Meeting July 2018
NEIDIG ELEMENTARY SCHOOL ADDITION & RENOVATION PHASING Neidig Community Meeting July 2018 PROPOSED NEIDIG ELEMENTARY SCHOOL Expanded parking Separate bus loop Gymnasium Addition 2 story classroom wing
More informationPottsgrove School District
Pottsgrove School District Pottsgrove High School Additions/Renovations Project Summary February 7, 2014 Eight East Broad Street Hatfield, PA 19440-2401 215.368.5806 Executive Summary In the summer of
More informationDesign Advisory Committee Meeting #5. December 19, 2017
Design Advisory Committee Meeting #5 December 19, 2017 1 Meeting Agenda 1. Agenda / Attendance Sheet 5 minutes 2. BEST Grant Recap 3. Review Funding Options additional information 4. Master Plan Summary
More informationExhibit B TOWSON WEST ELEMENTARY SCHOOL BALTIMORE COUNTY PUBLIC SCHOOLS. September 9, Design Collective Project Number
Exhibit B SCHEMATIC DESIGN BRIEFING for Dr. JOE A. HAIRSTON TOWSON WEST ELEMENTARY SCHOOL BALTIMORE COUNTY PUBLIC SCHOOLS September 9, 2008 Design Collective Project Number 149-08 Towson West Elementary
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: LAFAYETTE ACADEMIES - BRONX, 1231 LAFAYETTE AVENUE, New York, 10474 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-01-02
More informationRevised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi
Original Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 75% Three Story Academic Addition with CTE Gymnasium Addition: Multi-court gym 3 courts
More informationNALLE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationBoynton High School & Blackford Site
Boynton High School & Blackford Site Balance (E- D) 980075 Blackford Campus Repairs (Asphalt, Plaster, Complete 100% 07/16/18 10/05/18 $725,367.67 $735,233.50 $352,463.56 -$9,865.83 $382,769.94 4 980066
More informationNYC Department of Education
Architectural Inspection Asset: NEW DORP AF (NEW)-STATEN ISLAND, 465 NEW DORP LANE, New York, 10306 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-11 11:11 AM 2018-04-18
More informationBOYERTOWN AREA SENIOR HIGH SCHOOL
BOYERTOWN AREA SCHOOL DISTRICT ADDITIONS & RENOVATIONS To BOYERTOWN AREA SENIOR HIGH SCHOOL MONTHLY PROGRESS REPORT No. 10 November / December 2015 Construction Manager D Huy Engineering, Inc. Architect
More informationELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015
ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015 TABLE OF CONTENTS PROGRAM SUMMARY DESIGN EXPLORATION EXISTING SITE PLAN - ANALYSIS DEMOLITION SITE PLAN PROPOSED SITE PLAN PROPOSED FLOOR PLANS DEMOLITION
More informationMADISON HIGH SCHOOL // Executive Summary
MADISON HIGH SCHOOL // Executive Summary community + wrap-around services arts courtyard arts commons courtyard commons entry Construction Cost $95,000,000 Student Design Capacity 1,700 Project Cost $145,909,717*
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls
More informationMAURY ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking
More information10 Year Plan. Facilities Planning Guide. December 15, 2014
10 Year Plan Facilities Planning Guide December 15, 2014 October 21, 2014 Facilities Study Session o Existing funding sources established relating to facilities Routine Restricted Maintenance Account (RRMA)
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: I.S. 364 AX (POOL&GYM)-BROOKLYN, 1540 VAN SICLEN AVE, New York, 11239 Inspection Id Inspection Type Time In Last Edited SA : Architectural
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: HS FOR MATH, SCI & ENGINEERING-M, 240 CONVENT AVENUE, New York, 10031 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-12-20
More informationUpper Adams School District Facility Study Presentation Part 2 November 17, 2016
Upper Adams School District Facility Study Presentation Part 2 November 17, 2016 Providing a Client Oriented Approach to Architecture Crabtree, Rohrbaugh & Associates, Architects Agenda Part 1 Current
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S./I.S. 266 - QUEENS, 74-10 COMMONWEALTH BLVD, New York, 11426 Inspection Id Inspection Type Time In Last Edited SA : Architectural
More informationLEWIS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationSuperintendent Proposed Capital Improvements Program. Fiscal Years
Superintendent Proposed Capital Improvements Program Fiscal Years 2019-2024 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-7 Capital Projects Description Pages 8-12 SUPERINTENDENT PROPOSED CAPITAL
More informationDAVIS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-
More informationArchitect and Engineer: Friar Associates inc.
Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: SOUTH BRONX AF - BRONX, 701 ST. ANNS AVENUE, New York, 10455 Inspection Id Inspection Type Time In Last Edited SA : Architectural -
More informationSchool Assessment Report
School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: MIDWOOD HS ADDITION - BROOKLYN, 2886 BEDFORD AVENUE, New York, 11210 Inspection Id Inspection Type Time In Last Edited SA : Architectural
More informationFacility Improvements
CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation
More informationPLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationNYC Department of Education
Asset: PRE-K CENTER @ 105 WILLIS AVENUE - BRONX, 105 WILLIS AVENUE, New York, 10454 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-01-25 1:11 PM 2018-01-25 3:50 PM AA
More informationWATKINS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationFEASIBILITY STUDY SEPTEMBER 1 8,
FEASIBILITY STUDY SEPTEMBER 1 8, 2 0 1 2 OVERVIEW PAUL SWARTZ, AIA, PP PRINCIPAL-IN-CHARGE JIM PETRO, AIA PROJECT ARCHITECT STUART J. HEISEY, PE MECHANICAL ENGINEER LEED AP BD+C The last feasibility study
More informationNYC Department of Education
Architectural Inspection Asset: Building Assessment Survey 2017-2018 PRE-K CENTER @ 168-42 JAMAICA AVENUE - QUEENS, 168-42 JAMAICA AVENUE, New York, 11432 Inspection Id Inspection Type Time In Last Edited
More informationNYC Department of Education
Architectural Inspection Asset: Building Assessment Survey 2017-2018 NYC SCHOOL CONSTR. AUTHORITY - QUEENS, 30-30 THOMSON AVE, New York, 11101 Inspection Id Inspection Type Time In Last Edited SA : Architectural
More informationCOOLIDGE SENIOR HIGH SCHOOL
INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationNew Ringgold Middle School. Project Slideshow August 26, 2017
New Ringgold Middle School Project Slideshow August 26, 2017 Aerial Photo from West Provided by Hudson Group Taken 8.16.2017 Aerial Photo from North Provided by Hudson Group Taken 8.16.2017 Aerial Photo
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: P.S. 65 - BROOKLYN, 158 RICHMOND STREET, New York, 11208 Inspection Id Inspection Type Time In Last Edited Architectural - Senior 2018-05-15 11:22 AM 2018-06-12
More informationOperational Services Facility Innovation & Readiness Stakeholder Team
Operational Services Facility Innovation & Readiness Stakeholder Team A great place for kids to learn. A great place for employees to work. A place our community can be proud of. 21 st Century School District!
More informationSAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )
SAMUEL CLEMENS ADDITIONS & RENOVATIONS (02-26-2018) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 39% COMPLETE As
More informationSEATON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationMinuteman Regional Vocational Technical School
Minuteman Regional Vocational Technical School List of Recommendations L1 AAB compliance: Improvements to front entrance (concrete ramps, railings, etc.) Required by AAB cost trigger L2 AAB compliance:
More information6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After
Contents 1 Program Outline Gymnasium Restrooms Storage rooms IDF 2 Finish Outline Walls Flooring Ceiling Roof 3 MEP Outline Plumbing Mechanical Electrical 4 Communication and Security Guideline Communication
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: FRANCIS LEWIS AF - QUEENS, 58-20 UTOPIA PKWY, New York, 11365 Inspection Id Inspection Type Time In Last Edited SA : Architectural -
More informationMCER Study for Little Powder K-8
MCER Study for Little Powder K-8 CCSD #1 Little Powder K-8 Weston, WY Wyoming School Facilities Department Cheyenne, WY TSP, Inc. Sheridan, WY May 16, 2016 Table of Contents Introduction 3 Goals and Objectives
More informationPOWELL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3
More informationSAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )
SAMUEL CLEMENS ADDITIONS & RENOVATIONS (02-05-2018) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 33% COMPLETE As
More informationFacilities Feasibility Study Frederick Douglass HS Condition Assessment
Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies
More informationHorseheads 2030: Project Planning Update: 5/30/17
Horseheads 2030: Project Planning Update: 5/30/17 Agenda Survey Results Scope & Estimate Highlights: Horseheads High School Scope & Estimate Highlights: Middle School/Intermediate School Priority Scope