1 United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil BILL OF QUANTITIES

2 Lot #2 Construction & Rehabilitation of Wadi Gaza Bridge

3 SECTION 1: Demolition, Excavation and Backfilling Works Introduction: the contractor shall visit the site and make all investigations deemed necessary to ascertain the nature of the existing conditions of the structures to be demolished or to receive any alteration, and satisfy him as to the form and nature of works to be carried out, and the existing site conditions. It shall be understood that all salvaged materials and fittings are the UNDP property and stored as instructed by the UNDP. 1.1 Cutting & Removal of the existing demolished bridge elements (damaged foundations, concrete lining, approach slabs, end and retaining beams, piers, walls, deck, upstand beams, ground slab, protection fill, protection lining, retaining beams, hand rails, and whatsoever obstructing the works to be executed according to the design drawings ), and transporting of surplus material to approved places. The price includes all safety precautions that any deemed necessary for executing the works inclusive of supplying and erecting support scaffolding to support the bridge slab if required before demolishing the damaged slab and piers according to approved shop drawings and engineer's instructions. The contractor has to submit a workplan regarding this item for approval of the Engineer. (Demolished bridge length is about 40m and average width =6m) Lump Sum Cleaning the site area of bridge and cutting and removal of existing artificial fill and rubbish to the natural ground level (Wadi bottom level) to flow naturally, In addition to transportation of surplus material to approved places. M

4 1.3 Excavation in any kind of soil/concrete from natural levels to bottom levels of caps according to drawings, and Engineer s instruction. Note: Payment to the contractor according to engineering measurement 1.4 Backfilling from the excavated level to the bottom level of the ground slab using granular fill (Kurkar) compacted to 98% of maximum dry density in layers not exceeding 25cm thick. 1.5 Ditto, but for the inclined embankments. SECTION 1 M M M 3 100

5 SECTION 2: Concrete Works The following items include: Using new plywood 18mm thick for concrete fair face works Polythene sheet for concrete elements exposed to the soil Supply and cast plain concrete B200-10cm thick as shown in drawings Supply and fix concrete shuttering using tie-rods patent rods, after removal of tie caps it will be filled with non shrinkage cement grout. Supply reinforcement steel bars, bend, shape and fix to specified locations, Supply and cast ready-mixed concrete using mechanical vibrators, curing, and testing, required admixtures for concrete. Two coats of water-proof hot bitumen for all elements under the ground level (piers, walls and pile caps) and the backside of walls, Make openings and sleeves in the walls with the required steel detailing. Clean of existing steel reinf. 2.1 Supply and cast reinforced concrete (B350) for Pile Foundations, of depth 10m, and diameter 40cm. The price includes steel pipe casing, the casing to be removed and cutting the top 40cm to the bottom of concrete cap foundation, drilling and all other requirements to complete the works as per drawings and engineer s instructions. Linear Meter Supply and cast reinforced concrete (B350) for piles caps Type1, as per drawings and engineer s instructions. M Ditto, but for type 2 including drilling and fixing new steel bars with approved epoxy and applying bonding agent to the existing concrete, as per drawings and engineer s instructions. M 3 3

6 2.4 Supply and cast reinforced concrete (B- 350-fair face) for piers type 1, (Fair Face finished for sides not exposed to earth including supplying and fixing 2cm kalkal in girder support and 300x200x25mm galvanized steel plates as per drawings and engineer s instructions. M Ditto, but for type 2 (including backwalls). Price shall includes 2cm kalkal in the backwalls and drilling and fixing new steel bars with approved epoxy and applying bonding agent to the existing concrete, as per drawings and engineer s instructions. M Supply and cast reinforced concrete (B- 350 fair face) for Bridge solid slab, Fair Face finished, (thickness=20cm) including drop beams, inverted beams and all other required works according to drawings. Including supplying and fixing 300x200x25mm galvanized steel plates to main girders as detailed in drawings, and according to engineer's instructions. M Supply and cast reinforced concrete (B- 300) for the concrete lining ground slab 15cm thick including expansion joints and polythene sheet (0.15mm thick) under slab, price includes excavation for the ground slab. As per drawings and engineer s instructions. M Ditto, but for the concrete approach slab 15cm including expansion Joint and all requirements as per drawings and engineer s instructions. M Ditto, but for edge beams 20x100cm. As per drawings and engineer s instructions. M Ditto, but for retaining and end beams 20x50cm. As per drawings and engineer s instructions. M Ditto, but for 10cm thick slab for the protection embankment fill including expansion Joint and all requirements as per drawings and engineer s instructions. M 2 200

7 2.12 Supply and apply special painting material (FOSROC Brush Bond or SIKA Top Seal 107) for any concrete elements above the ground level (piers, walls, beams and slab). M SECTION 2

8 SECTION 3: Miscellaneous Works 3.1 Supply, assemble and fix Elastomeric bearing joint, (Bearings TYPE 1) according to German Standards DIN 4141 Part 14, plan size 200x300mm with a total thickness of 30mm (two elastomeric layers 8mm each and three reinforcing steel shims with 3mm each) and with allowable vertical load of 750kn. As detailed in drawings, and according to Engineer s instructions. No Supply and lay compacted asphalt binder course (3/4 nominal aggregate size) 7 cm average thickness, compacted to at least 98%, including spraying the slab with RC2 binder coat at the rate of 1.0 kg/m 2 and all required tests. All in accordance with the specifications, drawings, and Engineer s instructions. M Supply and lay approved sub-base material (Kurkar) for the carriageway (under the approach slab) with CBR >30% in layers of 15cm thickness each with watering and compaction up to 98% of maximum dry density MDD. The price includes preparation of subgrade to design levels and compaction up to 95% according to modified Procter test. M Ditto but Kurkar, of 10 cm thick in one layer for sidewalks with CBR >30% and compaction to 95 %. M Supply and lay pre-cast concrete interlock tiles 6cm thick for the sidewalks on a layer of 5 cm clean sand. Price include compaction and filling joint with sand to required grades, Shape, pattern and color are as advised by the engineer. M 2 40

9 3.6 Supply and install handrail of the bridge comprising of F3 & F1.5 galvanized steel pipes with required welding. The work includes fixing and painting as per the drawings and engineer s instructions. The painting should be done by using a primer polyzinc layer and two layers of colored paint according the drawings and Engineer s instructions. Price also includes painting of curbstone according to engineer's instructions. Linear Meter Supply and install double galvanized steel pipes 4 including all fittings and welding and hanging holder. The holder consists of (80x45x6mm) galvanized steel section and fixed to the bottom of bridge slab through galvanized steel Plates and anchored to the slab through 3F20 anchors according to Engineer s instructions. The item also includes connecting the pipes with the existing manholes at the both ends of the bridge. The contractor shall coordinate with the PALTEL regarding transferring the telephone lines. MR Supply and fix signboard showing allowed vehicles to pass over the bridge as per drawings. The work shall include galvanized steel posts, concrete foundations, Timber or ply backboards and all other required works. No Supply and fix cast iron rainwater drainage grit 90x40cm including galv. Steel plate tray and galv. Steel pipe 6 and all necessary fittings and pieces as indicated in drawings and according to the engineer's instructions. No 4

10 3.10 Maintain and clean out the existing gutters and Paltel manholes at the both ends of the bridge to the operational conditions. Price includes supply and installs missing cast iron grills and covers 25 tons capacity and connecting the gullies to the wadi flow using pipes of the same existing size and type of pipes and all requirements according to the engineer s instructions. L.S 1 SECTION 3

11 Section No. 1 SUMMARY OF LOT#2 Section Description Value Demolition, Excavation, Backfilling and Stone Works. 2 Concrete Works 3 Miscellaneous Works Total VAT ZERO Grand Total Grand Total in Words. Contractor Authorized Person to sign Signature Stamp Date... Address.. Tel. Fax

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Construction Salah El Deen Road Median From Al Zawaida entrance to Al Maghazi Northern entrance PAL 10-00071488 Bill of Quantity (BOQ) PREAMBLE TO BILL OF QUANTITY (BOQ)

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Rehabilitation of Tunis & Omer Bin Abdel Aziz Sidewalks PAL 10-71488 : UXOs and Rubble Removal From Gaza Strip Bill of Quantity (BOQ) PREAMBLE TO BILL OF QUANTITY (BOQ)

More information

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS BILLS OF QUANTITIES - Name of Project CONSULTANT: Name of Office DATE:APR. 2008 External Works EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS page 1 BILLS OF QUANTITIES - Name of Project CONSULTANT:

More information

Jericho Agro Industrial Park

Jericho Agro Industrial Park Bill. 1 Excavation Earth Works and Embankment Work 1 Description Unit QTY Price/ Unit Total USD The Contractor shall when pricing the rates of this bill, take into consideration including and allow for

More information

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3 ITB 2016-279 Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL-10-00098764 Bill of Quantity : Package2 - Lot 3 Package 2 Lot1- Installation, Connection

More information

Rehabilitation of Omar Bin El Khattab, Al Karama, and Saeed Dakka Roads in Jabalia by Using Crushed Material

Rehabilitation of Omar Bin El Khattab, Al Karama, and Saeed Dakka Roads in Jabalia by Using Crushed Material Rehabilitation of Omar Bin El Khattab, Al Karama, and Saeed Dakka Roads in Jabalia by Using Crushed Material Bill of Quantity of Omar Bin El Khattab Road Item No. 1.1 Description Unit Qty. Clean, excavate

More information

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2 Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2 PARTICULAR SPECIFICATIONS FOR THE CONSTRUCITON OF STORM WATER DRAINAGE NETWORK March 2018 BUREAU TECHNIQUE POUR LE DEVELOPPEMENT P.O.B

More information

BILL SUMMARY. March 15, 2018 BILL No. DESCRIPTION AMOUNT

BILL SUMMARY. March 15, 2018 BILL No. DESCRIPTION AMOUNT PROJECT: CONSTRUCTION OF NEW TIMBER WHARF, SOUTHERN BILL No. DESCRIPTION AMOUNT 1 PRELIMINARIES 2 DEMOLISHION WORKS 3 TIMBER WHARF CONSTRUCTION 4 CATWALK CONSTRUCTION BILL SUMMARY 5 CONCRETE WALKWAY CONSTRUCTION

More information

July Bill No.1: Preliminaries

July Bill No.1: Preliminaries Bill No.1: Preliminaries 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture, computers, printers, photocopier,

More information

Bill No.1: Preliminaries

Bill No.1: Preliminaries Bill No.1: Preliminaries Item No. Description of Works Qty. 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture,

More information

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES RFP/GRC/LSV/2017-003: RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES 1/7 The Contractor shall consider in his price all costs or expenses of all requirements stipulated

More information

Specialty Applications. for Keystone Walls

Specialty Applications. for Keystone Walls for Walls SHEET INDEX Title Sheet Sheet 1 Soil Nail Facing Sheet 2 Rock/Shotcrete Facing Sheet 3 Manta Ray Anchor Wall Sheet 4 H-Pile Wall Facing Sheet 5 Sheet Pile Wall Facing Sheet 6 Railing per Site

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00

More information

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS SECTION 01200 RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL 1.01 SCOPE This specification covers the work within the street right-of-way (property line) for the repair of that area which is disturbed during

More information

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1 PRELIMINARIES 1 All rates to be inclusive of all taxes including V.A.T General Matters A Water for the works item 1 B Insurance against injury to persons, property and works item 1 C Performance Bond 5%

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) PAL 10-92895 - Emergency Removal and Crushing of Rubble and Debris Management Lot # 10: Site Preparation and Crushing of Concrete Rubble Bill of Quantity (BOQ) Bill of Quantity (BOQ) ITB 2015-039 PREAMBLE

More information

STRUCTURAL STEEL FRAMING

STRUCTURAL STEEL FRAMING SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES

CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 631 NOVEMBER 2011 CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES TABLE OF CONTENTS 631.01

More information

SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS Contractors General Conditions Site Works Setting out works: Rates

SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS Contractors General Conditions Site Works Setting out works: Rates SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS 01000 Contractors General Conditions 02000 Site Works Setting out works: Rates shall include but not limited to all necessary equipments,

More information

Annex II- Lot 2. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State

Annex II- Lot 2. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State Annex II- Lot 2 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State Lot: 2 Site 2-1: Allakandie All Prices of items shall include Supplying,

More information

Requirements for Measuring and Pricing of Structural Concrete

Requirements for Measuring and Pricing of Structural Concrete Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing

More information

Annex III- Lot 3. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State

Annex III- Lot 3. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State Annex III- Lot 3 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State Lot: 3 Site 3-1: Sinja city All Prices of items shall include Supplying,

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total BILL OF QUANTITY Proposed Market Shed OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) ELEMENT NO. 1: - SUBSTRUCTURE (ALL PROVISIONAL): - Excavations and Earthworks: - A Clear site of all bush and grass and

More information

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID

More information

Table of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15

Table of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15 Table of Contents Chapter 1 : Introduction 1 1-1 Overview of Japan 1 1-1-1 Topography 1 1-1-2 Climate 1 1-1-3 Population 3 1-1-4 Economy 3 1-2 History and current status of roads in Japan 5 1-2-1 Road

More information

Annex I- Lot 1. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State

Annex I- Lot 1. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State Annex I- Lot 1 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State Lot: 1 Site 1-1: Sinnar city All Prices of items shall include Supplying,

More information

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount EXTERNAL WORKS DEMOLITION AND ALTERATIONS EXTERNALLY Pulling down to ground level; removing debris from Site a 200 mm thick masonry wall finished both sides with plaster and paint; net total area 158 square

More information

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SCHEDULE OF RATES SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT 1 Excavation for foundation in earth all types of soils like clay,

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

ITEM 442 METALS FOR STRUCTURES

ITEM 442 METALS FOR STRUCTURES AFTER NOVEMBER 1, 2008 ITEM 442 METALS FOR STRUCTURES 442.1 Description. These specifications shall govern for materials such as structural steel, wrought iron, bronze, and other metals used in structures,

More information

REPUBLIC OF KENYA THE NATIONAL TREASURY Telegraphic Address: THE NATIONAL TREASURY Finance - Nairobi POBox

REPUBLIC OF KENYA THE NATIONAL TREASURY Telegraphic Address: THE NATIONAL TREASURY Finance - Nairobi POBox REPUBLIC OF KENYA THE NATIONAL TREASURY Telegraphic Address: 22921 THE NATIONAL TREASURY Finance - Nairobi POBox 30007-00100 FAX NO. 310833 NAIROBI Telephone: +254 2252299 Website: www.treasury.go.ke When

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

50 lbs (23 kg) of + #8 (+2.36 mm) material plus 50 lbs (23 kg) of pile run material.

50 lbs (23 kg) of + #8 (+2.36 mm) material plus 50 lbs (23 kg) of pile run material. 5.5 REQUIRED SAMPLE SIZES 1. SCOPE This section covers the size of samples to be submitted to the s and Research Center for testing. The sample sizes listed are minimums and in special cases the Engineer

More information

Requirements for Measuring and Pricing of Traffic Signs and Road Markings

Requirements for Measuring and Pricing of Traffic Signs and Road Markings Requirements for Measuring and Pricing of Traffic Signs and Road Markings February 2017 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible

More information

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00 Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) Emergency Removal and Crushing of Rubble and Debris Management PAL 10-92895 Lot # 13: Rubble Removal from Different Locations of Gaza Governorates Bill of Quantity (BOQ) Bill of Quantity (BOQ) PREAMBLE

More information

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis. PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: Section 02775 1. Reinforced concrete sidewalks. 2. Wheelchair Ramps. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION PURPOSE, INTENT AND INTERPRETATION OF SPECIFICATIONS The purpose of these Specifications is to establish, where applicable, minimum acceptable standards

More information

Minimum Sample and Test Requirements (MSTR)

Minimum Sample and Test Requirements (MSTR) South Dakota Department of Transportation Minimum Sample and Test Requirements (MSTR) Table of Contents Page 1. Asphalt Construction:... 1 1.1 Asphalt Concrete, Hot Mix... 3 A. Aggregate, Composite...

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES

More information

Method of Measurement for Road Works Series MM Pavements

Method of Measurement for Road Works Series MM Pavements Method of Measurement for Road Works Series MM 700 - CC-RMP-00700 March 015 CC Construction & Commissioning Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure

More information

CATCHMENT STRUCTURE 13M X 15M

CATCHMENT STRUCTURE 13M X 15M BILL OF QUANTITIES AND SPECIFICATIONS CONSTRUCTION OF 100M3 DJABIA ITEM No. DESCRIPTION UNIT QUANTITY RATE AMOUNT KSHS CATCHMENT STRUCTURE 13M X 15M 1.1 Clear catchment site of all bushes, scrubs, undergrowth,

More information

PROPOSED COMPLETION OF ROAD INFRASTRUCTURE AND MAINTENANCE WORKS AT EXPORT PROCESSING ZONES AUTHORITY - ATHI RIVER. ITEM NO.

PROPOSED COMPLETION OF ROAD INFRASTRUCTURE AND MAINTENANCE WORKS AT EXPORT PROCESSING ZONES AUTHORITY - ATHI RIVER. ITEM NO. BILL 1 : GENERAL & PRELIMINARIES A B C Allow for preliminaries of mobilization and set up, storage facilities etc,minor preparatory works and compliance with conditions of contract. 1.00 Allow a Prime

More information

1.02 RELATED WORK: Refer to the following sections for related work:

1.02 RELATED WORK: Refer to the following sections for related work: SECTION 4200 - CONCRETE STRUCTURES PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of header curb, retaining walls, energy dissipation structures for drainage channels, reinforced concrete

More information

INSTALLATION MANUAL FOR MODULAR EXPANSION JOINT (LG SYSTEM)

INSTALLATION MANUAL FOR MODULAR EXPANSION JOINT (LG SYSTEM) INSTALLATION MANUAL FOR MODULAR EXPANSION JOINT (LG SYSTEM) TABLE OF CONTENTS 1. INTRODUCTION TO THE MODULAR EXPANSION JOINT 1.1 Purpose 1.2 How They Work 1.3 Movement Capacity 1.3.1 Longitudinal Direction

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Programme of Assistance to the Palestinian People UXOs and Rubble Removal from Gaza Strip Removal of Residential and public Debris from North Governorate (Package 7)

More information

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg, Georgetown. 1.2 Engineer The Engineer

More information

Scanned by CamScanner

Scanned by CamScanner JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY May 7, 2002 This page left blank intentionally. May 7, 2002 Preliminary Cost Estimate Summary ESTIMATE TYPE A ABC Consulting Hwy 99:06 ABC Project No. 1234-01-56789

More information

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE Bridge Manual - Part I - June 2007 5-1 CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE 5.1 GENERAL This chapter is intended to instruct the Designer in the preparation and submission of Special Provisions and

More information

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.

More information

TERMS OF REFERENCE FOR SERVICE CONTRACTING

TERMS OF REFERENCE FOR SERVICE CONTRACTING TERMS OF REFERENCE FOR SERVICE CONTRACTING Assignment Location Construction of Steel Portal Frame Shades Zaatari, Azraq Refugee Camps and Ruwayshid 1. JUSTIFICATION/BACKGROUND To safeguard children from

More information

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details

More information

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY D DEMOLITION & SITE CLEARANCE D1 GENERAL CLEARANCE 6-D152 Open bush and thicket in and around ha 0.02 the ponds. Locally disposed. D2 REMOVAL OF TREES AND STUMPS 6-D212 Trees of girth: 150 mm - 500 mm

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Concrete Steps B. Handrails C. Safety Rail 1.02 DESCRIPTION OF WORK A. Construction of concrete steps. B. Furnishing

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03

More information

SECTION 303 CULVERTS

SECTION 303 CULVERTS 303.01 Scope - This section covers the construction of pipe culverts. 303.01.01 Definitions for the purposes of this section, the following general terms are defined as follows: a) Backfilling means the

More information

A Provide for Contractor's Office, Store etc. Sum

A Provide for Contractor's Office, Store etc. Sum BILL NO.1 - PRELIMINARIES AND GENERAL CONDITIONS A Provide for Contractor's Office, Store etc. Sum B C Provide for Insurance in accordance with the Conditions of the Contract. Allow for the provision of

More information

Section REINFORCING STEEL

Section REINFORCING STEEL Section 03210 PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and subsequent placing of reinforcing steel, deformed and smooth, chairs, ties, splicing devices, and other reinforcing accessory

More information

Elevated Slab Sequence

Elevated Slab Sequence Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 DECEMBER 1990 CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.05 MATERIALS TABLE OF CONTENTS

More information

TABLE OF CONTENTS

TABLE OF CONTENTS DIVISION 33: SEWER AND SEPTIC SYSTEMS 33 3633 UTILITY SEPTIC TANK DRAINAGE FIELD TABLE OF CONTENTS 33 0000-1 SECTION 33 3633-- UTILITY SEPTIC TANK DRAINAGE FIELD PART 1 - GENERAL 1.1 SUMMARY A. Includes

More information

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2 ~ 05-1 ~ 05 00 00 Metals 05 00 00 METALS... 2 05 08 00 Commissioning of Metals... 2 05 12 00 Structural Steel Framing... 2 05 12 30 Steel Studs... 2 05 45 00 METAL SUPPORT ASSEMBLIES... 2 05 50 00 METAL

More information

Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill No Description Unit Qty

Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill No Description Unit Qty Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Us$ Cent Us$ Cent Notes s for excavation works shall include: Removal of site obstacles, rocks, trees and small concrete of store

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 350 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE 350.01 SCOPE 350.02 REFERENCES 350.03 DEFINITIONS TABLE OF CONTENTS

More information

KANPUR SMART CITY LIMITED

KANPUR SMART CITY LIMITED Nagar Nigam Mukhyalay, 3 rd Floor, Moti Jheel, Kanpur - 208002 Tel.: +91 512 2541258, 2546194 Email:ksclkanpur@gmail.com KANPUR SMART CTY LMTED No.: KSCL/PMC/Open Gym/01/2 Date: 17/02/2018 Reply to queries

More information

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Effective September 9, 2014 The General Trade Knowledge portion of the examination is administered daily in Computer

More information

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON - April 24, 2017 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 25, 2017 in accordance

More information

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations.

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations. DURA-CRETE S-SERIES PRECAST CONCRETE WALL SPECIFICATIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete Screen Wall Description: Work under this item shall consist of furnishing and erecting a wall in

More information

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Drainage, Road Drainage and Collection Pit A - EXCAVATION: 57 Drainage, Road Drainage and Collection Pit SCHEDULE OF QUANTITY Sl.N o. 1 Particulars Qty Unit Rate Amount A - EXCAVATION: Earth work in EXCAVATION IN FOUNDATION TRENCHES IN ALL KIND OF SOIL including

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

Attachment A Repair Knee Brace on High Arch Salt Building Fayette County, Mill Run Stockpile #24 Project # Building #PA

Attachment A Repair Knee Brace on High Arch Salt Building Fayette County, Mill Run Stockpile #24 Project # Building #PA I. Base Bidding Requirements This is a Base Bid project; the following describes the Base Bid requirements. Contractors are to provide bids for Base Bid #1. A. BASE BID #1: II. Work Included The following

More information

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL. Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN,

More information

WORKS DESCRIPTION Unit. Quantity Unit price Total USD

WORKS DESCRIPTION Unit. Quantity Unit price Total USD BILL OF QUANTITIES MAIN DESIGN OF LANDSLIDE REMEDY ON THE STATE ROAD OF II A CLASS NO 70, SECTION: SEDLARE - DEBELO BRDO, from km 4+960 to km 4+978, ID-373 No 3 4 5 WORKS DESCRIPTION Unit Quantity Unit

More information

Keuka Studios May 2008 SECTION {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes.

Keuka Studios May 2008 SECTION {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes. SECTION 05 73 16 {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes. PART 1 GENERAL 1.1 SUMMARY A. Section includes cable railing system, with architectural metal

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT DIVISION IV CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 4100 MEASUREMENT AND PAYMENT 4100 SCOPE... 2 4101 Clearing and Grubbing...

More information

DRAFT. Draft Bill of Quantities. Drainage

DRAFT. Draft Bill of Quantities. Drainage Draft Bill of Quantities September 2015 STORM DRAINAGE INFORMATION Measurement notes Drawings used : WYG (80) 140 Rev T1, D-(80) 001 Rev T1, D-(80) 002 Rev T1, D-(80) 003 Rev T1 and D-(80) 004 Rev T1 All

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 553 FEBRUARY 1991 CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS 553.01 SCOPE 553.02 REFERENCES 553.03 DEFINITIONS TABLE OF CONTENTS 553.04 SUBMISSION

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman

More information

Special Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following:

Special Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following: CHAIN LINK FENCE - Item No. GATES - Item No. Special Provision No. 541S01 October 1998 AMENDMENT TO OPSS 541, DECEMBER 1990 OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced

More information

Clarification of ITB Amendment No. 1 Pre-Bid meeting Minutes. Excavation and leveling of the Jericho Agro Industrial Park

Clarification of ITB Amendment No. 1 Pre-Bid meeting Minutes. Excavation and leveling of the Jericho Agro Industrial Park Clarification of ITB Amendment No. 1 Pre-Bid meeting Minutes Excavation and leveling of the Jericho Agro Industrial Park Date & Time Location Contractors 04 October 2010 @ 11:30hrs Jericho Municipality

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION ITEM NO. 812 WATER MAIN INSTALLATION 812.1 DESCRIPTION: This item shall consist of water main installation in accordance with these specifications and as directed by the Engineer. 812.2 MATERIALS: The

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS SECTION 1 - MISCELLANEOUS STANDARDS 1.00.01 -.05 Table of Contents 1.11.01 Decimal Parts of a Foot and Inch 1.21.01 Factors

More information

CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS

CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS December 2012 CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard

More information

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address: SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION Permit Application #: Project Address: Purpose: To meet the requirements of CBC Section 1704.3 this form may be used as a statement

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3 CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS

More information

Whatcom County Bid ADDENDUM NO. 2 West Badger Road / Bertrand Creek Bridge #50 Replacement CRP Federal Aid BRS-2037(107)

Whatcom County Bid ADDENDUM NO. 2 West Badger Road / Bertrand Creek Bridge #50 Replacement CRP Federal Aid BRS-2037(107) WHATCOM COUNTY ADMINISTRATIVE SERVICES DEPARTMENT FINANCE/ACCOUNTING Whatcom County Courthouse 311 Grand Avenue, Suite #503 Bellingham WA 98225-4082 Brad Bennett, Finance Manager March 19, 2019 Whatcom

More information

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section. SECTION 10 5300 ALUMINUM WALKWAY COVERS Part 1 General 1.01 Related Documents A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.02 References A. International

More information

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section 02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete

More information