1 Legacy Environmental Process, LLC 1445 Ashville Road, Suite 103 Leeds, Alabama In USA Fax: Pre-Plant Delivery And Installation Manual For Project Name City, State LEGACY: Project Number

2 Introduction: The wastewater treatment system is a complete; factory built prefabricated system, shipped to you, ready to be placed into the owner's excavation site. As you know, several of the subassemblies have been shipped loose for field re-assembly where shipping height limitations will not permit them to be attached. Instruction for re-assembly is provided. There are certain important details that must be checked by the owner's contractor prior to the system arriving at the job site. Please review the following instructions carefully and study the drawings of your system to obtain a working knowledge of the equipment you will receive. If you have any questions or require further information to proceed, please contact the office of Legacy (205) Please have the project name and number available for reference. Should you note an error, please contact Legacy Environmental immediately. With proper care and by following the suggested, simple instructions, money & time can be saved. These suggestions are for your guidance; by carefully reading those before you begin your work you may avoid costly mistakes. Scheduled Delivery Date: After production schedules have been reviewed, you will be advised of a shipping and delivery date. If this schedule does not meet with your project site plans, please contact Legacy Environmental immediately so we can reschedule shipment. If we are not notified before highway permits are purchased, the customer will be responsible for any additional cost for new shipping permits if rescheduling is required. The highway permits vary from state to state and are usually valid for only three (3) to five (5) working days. Excavation (If Required) For below grade system installation: A study of the shop drawings on your wastewater treatment system will permit you to determine the size and depth of the excavation needed for installation (if required). The size of the excavation should be at least two (2) feet wider and longer than the tank dimensions, allowing room for anchoring and paint touch-up prior to backfilling (if required). Pile excavating materials far enough away from the excavation site will allow the trucks and crane to operate safely from either side. Note: Shipping drain plugs with your system. These tank drains are for draining excessive water while your shipment is being moved over the road in case of heavy rain showers. Note that these shipping drains are shipped loose, and must be installed prior to any backfilling. Pre-Plant Delivery Instructions-2 Page 2 of 15

3 Warning Working in trenches-guard against cave-in. It is best to back-fill to a point above the water level in the treatment system, and on all four (4) sides to prevent freezing in cold climates. Foundation Slab Data: Due to the construction of the wastewater treatment system, a concrete foundation slab is necessary. The slab is used as a tank base, for anchoring the vessel to prevent flotation. Note: The design and construction of the slab is the responsibility of the customer's Project Engineer. For typical designs and construction methods, refer to the systems foundation pad detail drawings supplied within your submittal package. WARNING Working in Trenches-guard against cave-in To determine the exact slab design needed, assume that the total weight of the wastewater treatment system is uniformly distributed along the entire length of the foundation slab. It is extremely important that the foundation slab is level; if it is not level, the system will not function properly. The slab must be level within tolerances of ½" per each ten (10'-0") of width and within ¼" per each ten (10'-0") of length. In instances where crowns in the slab or any other non-standard workmanship exist, corrections must be made by resurfacing the slab or by placing a sand cushion on top of the slab to achieve full uniform bearing. Pre-Plant Delivery Instructions-2 Page 3 of 15

4 The Project Engineer should check the foundation slab before the wastewater treatment system arrives at the job site. Where flotation conditions exist, as in fluid soil, a foundation slab of adequate size & weight should be supplied to equal the bearing soil pressures. WELD BAR TO SIDE OF TANK WELD BAR TO SIDE OF TANK #6 REINFORCING BAR #6 REINFORCING BAR 4" 4" 2'-0" 2'-0" 3'-4" 3'-4" Suggested Anchor Methods Note: Legacy Environmental assumes no responsibility in the design and/or construction of the concrete foundation pad, including the anchoring of the wastewater treatment system to the concrete foundation pad. Drawings supplied are typical layouts only not to be used for construction purposes. Following are a few final details, which should be checked by the owner's contractor before the system arrives: 1.) Site check-the excavation and foundation pad to see that it is clear and free of mud, water or debris. The excavation site should be clear of dirt piles around the adjacent system area for truck access and safe crane clearance. 2.) Unloading facilities-arrangements should be made for obtaining a crane with sufficient capacity to lift and boom the system over and onto the base foundation pad. The wastewater treatment system will have lifting lugs properly located for balance for use with a four (4) leg cable sling with the use of a 20'-0" spreader bar to prevent undue stress on the lifting lugs. Pre-Plant Delivery Instructions-2 Page 4 of 15

5 Shipping: In almost every case, shipment of your wastewater treatment system is by special lowboy trucks. When Legacy Environmental ships your system; delivery will be made directly to the project site. Adequate road access must be available as tanks are shipped on lowboy trucks; trailer clearance is at a minimum, and the trucks can exceed 80 feet in length. When the truck(s) arrive, direct the driver to position the trailer so the outlet end of the system will be placed at the discharge end of the pad, whenever possible. Pre-Plant Delivery Instructions-2 Page 5 of 15

6 Other means of shipment: Common carrier service can be used for shipping those systems small enough in both size & weight. In these cases, the system will be delivered to the nearest truck dock. It will then be the customer's responsibility to arrange for moving the system from the dock to the project site. Systems may also be shipped by rail. In this case, the car will be directed to the nearest rail site. It will then be the customer's responsibility to arrange for removing the system from the rail car, and providing a flat bed truck to move the system to the project site. This responsibility includes making all necessary arrangements with local authorities for special permits, when required. Unloading: When the system arrives at the project site, the contractor should have the necessary equipment available to unload and set the system on the concrete foundation pad. A crane of adequate size is usually the simplest method for unloading the tank(s). Lifting lugs are supplied on the tank(s) to ease handling. A spreader bar is required to eliminate undue stress on the lifting lugs. Legacy Environmental wastewater treatment system will be completely assembled and shipped as a unit where shipping dimensional regulations permit this procedure. A portion of the equipment is packaged separately at the factory for field installation. The equipment will be installed by the contractor at the project site. Re-assembly instructions will be supplied. Pre-Plant Delivery Instructions-2 Page 6 of 15

7 The blower/motor units, control panels, grating, handrails, UV disinfection unit (if supplied), and flowmeter is a list of typical items shipped to the project site via common carrier Note: Check inside the tank(s) for pallets of equipment, which may have been placed there for shipping. Remove these pallets and or equipment with the crane before it leaves the project site. Handrail, shipping plugs, accessory hardware, and grating are type of items shipped inside the tank(s). Unloading Miscellaneous Items: Other loose items or accessory cartons should be removed from the tank and placed in a safe place until installation on the system. The truck driver has a packing list of equipment shipped with the tank(s); this should be checked to see if all equipment is received prior to signing the shipping manifest. Please note that any shortage and/or damage must be listed on the shipping manifest, also any claims must be made within ten (10) days from delivery, and damaged goods must be reported to the trucking firm by the customer. Legacy Environmental shall not be held responsible for any damage not annotated on the shipping manifest. Contractor Responsibilities: A. Field unloading and setting of the wastewater treatment system on its concrete foundation pad as defined by the contract specifications. B. Assemble into position, at the location shown on the plans, and the component equipment that have been disconnected at the factory for shipping purposes. C. Field welding of tank(s) (if required). D. Grouting base slope of mechanical clarifier (if required) including supply of grout. E. Interconnecting of piping and wiring which may have been disconnected at the factory for shipping purposes. F. Tie in all piping, wiring, and power connections to the site utilities. G. Furnish the concrete foundation pad to set the wastewater treatment system on. H. Attach wastewater treatment system to concrete foundation pad by customer's Engineer anchor methods. I. Install drain plugs and fill the system with water to prevent flotation. J. Install the magnesium anode packages as shown on the magnesium anode layout supplied in the submittal package. K. Complete 24-hour leak test prior to backfilling. (If possible use water (not sewage) for leak test. CAUTION Once the wastewater treatment system has been set and anchored into position, the drain plugs must be installed and the tank(s) filled with water prior to leaving the project site. This system is very buoyant and will float easily. Legacy Environmental assumes no responsibility for systems that float out of position of off the concrete foundation pad due to high water tables at the project site. Pre-Plant Delivery Instructions-2 Page 7 of 15

8 Electrical Characteristics: Special precautions should be taken to make sure the correct electrical requirements are supplied at the project site. Check your data sheets and wiring diagrams, and then advise your electrical contractor as well as the Local Power Company of the necessary power requirements. A disconnect switch should be mounted within sight (if required), preferably adjacent to the system site, and wiring from the switch to the electrical control panel on the wastewater treatment system must be furnished and installed in accordance with your local electric codes. Pre-Plant Delivery Instructions-2 Page 8 of 15

9 Electrical Hook Up: The contractor must connect the wire leads provided within the wastewater treatment system to their proper terminals within the control panel. A general wiring diagram showing the locations of these items will be found within the submittal package. Note: Panel boxes shipped without knock-outs in bottom of panel for conduit connections, installing contractor will punch out panel boxes as required, and also will need to supply cord grips as required. Pre-Plant Delivery Instructions-2 Page 9 of 15

10 Note: In order to prevent damage to the blower/motor units from backflow of water, it is important to maintain the proper rotation of the blower motors. Rotation should be in the direction of the arrows located on the motors. Similarly, proper pump rotation must be maintained in order to avoid damage to the pump(s) (if required). Failure to insure proper rotation of these items will negate any manufacturers' warranties. BLOWER MOTOR UNIT MOUNTING HARDWARE FLEXIBLE HOSE CONNECTION AIR SUPPLY LINE RUBBER VIBRATION MOUNTS STEEL SUPPORT PLATE Blower Motor Unit(s): The blower motor units should be lifted onto the system with the crane before it leaves the project site. The housing sits on steel support plates, located on top of the system drilled to receive the flexible hose connection, and the four (4) rubber vibration mounts through the bottom of the blower housing with the system air supply line, which is stubbed for connection during assembly. Note: The four (4) rubber vibration mounts w/ mounting hardware, and flexible hose connector are located inside the blower housing for shipping purposes. The blower motor units are assembled and lubricated at the factory prior to shipment to the project site. Refer to O & M manuals for lubrication schedule. Pre-Plant Delivery Instructions-2 Page 10 of 15

11 DISINFECTION CHAMBER GFCI RECEPTACLE UV CHANNEL UV MODULE DISCHARGE WEIR WASTEWATER TREATMENT PLANT OUTLET FIGURE A UV Disinfection Unit: (if supplied) The UV Disinfection unit is bolted into position with the hardware supplied. The discharge weir located at the outlet end of the UV system is to be facing the outlet end of the wastewater treatment system (see figure A). Note: Prior to installation of the UV channel into the wastewater treatment system, remove the UV modules from the channel and store in a safe place, as the bulbs located within the modules are very fragile. Replace UV modules into the channel and plug the modules into the GFCI receptacles supplied within the disinfection chamber. Note: If intensity monitor is supplied, refer to figure B next page for electrical, transducer & temperature sensor connections. Pre-Plant Delivery Instructions-2 Page 11 of 15

12 FIGURE B Pre-Plant Delivery Instructions-2 Page 12 of 15

13 Flowmeter Mounting: (if supplied) Flowmeter comes supplied within a pre-wired enclosure that will mount within the UV disinfection chamber (see equipment layout drawings). Bolt the flowmeter cabinet to the location as shown on the drawings, install the transducer & temperature sensor into the mounting bracket located within the effluent chamber and install wiring as shown in the illustration listed below: Note: Installing contractor must insert knockouts within the panel, as Legacy Environmental does not have conduit knockouts installed within the enclosure. MODEL OCM III FLOWMETER BLACK WHITE BLACK WHITE SHEILD TRANSDUCER BLACK WHITE POWER CONNECTIONS GREEN BLACK WHITE TEMPERATURE SENSOR MODEL ARC 5000 RECORDER GROUND TB1 GREEN BLACK WHITE 115V SUPPLY TB2/TB3 BLACK WHITE JU2 MILLI-AMP JUMPER Pre-Plant Delivery Instructions-2 Page 13 of 15

14 Field Services: At the time the wastewater treatment system is filled with water or sewage, all power connections have been completed, and all equipment is approved for service, the buyer shall, at his option, request the services of an Legacy Environmental service technician who shall instruct the owner's representative in the proper operation and maintenance of the wastewater treatment system, including instructions in conducting all required operational tests. Note: If start-up services are required, and were included within the scope of work, Legacy Environmental requires two (2) weeks notification for scheduling purposes; please contact the Customer Service (205) for scheduling. Storage Procedures General: RECOMMENDATIONS FOR INSTALLED EQUIPMENT (NOT BEING UTLIZED) 1. All equipment that will remain idle after installation must be properly maintained. Following these instructions will help you insure that the equipment will not be damaged by lack of attention during periods when it is not being used. This is not to be construed as providing or extending any Warranty by Legacy Environmental Process, LLC or any manufacturer of components supplied with the equipment. Installed Equipment Standing Idle: 1. Equipment should be operated for at least one (1) hour weekly to keep all enclosed gear surfaces wetted or otherwise with lubricant to prevent water etching or false brineling of the bearings and seizure of the seal lips on the shaft. This includes pumps and blower/motor units. 2. Space heaters, if furnished with electric motors or control panels, must be connected and operating during all idle periods. 3. If unit is being operated under power, then periodically check the level and condition of oil in each piece of equipment (if applicable). Add or replace if necessary. LONG TERM STORAGE OF EQUIPMENT NOT INSTALLED ON SYSTEM All equipment which will not be installed within one (1) month after receipt of equipment on the project site will fall under these guidelines for long term storage. 1. Specified long term storage guidelines for motors, reducers, pumps, blowers may have been covered under their respective section in the O & M manual. Pre-Plant Delivery Instructions-2 Page 14 of 15

15 2. Primer paints are not intended to be left unprotected indefinitely waiting for the finish coat to be applied. Any touch-up or re-priming will become the contractor s responsibility if equipment falls into long term storage. 3. All electrical related items, whether they are control panels, solenoid valves, torque overload devices, magnesium anodes, and chlorination tablets should be stored in a heated enclosed clean dry area to protect it against excess moisture, physical damage, and construction dust and kept away from high humidity. Leave the equipment on the skid until ready for installation. Note: Do not open chlorination tablets until ready for use, as moisture will dissolve tablets and render them useless. Pre-Plant Delivery Instructions-2 Page 15 of 15

Bulk Bag Unloader Installation, Operation and Maintenance Manual

Bulk Bag Unloader Installation, Operation and Maintenance Manual Web-Tech Australia Pty Ltd Bulk Bag Unloader Installation, Operation and Maintenance Manual Web-Tech Australia Pty Ltd Manufacturers & Suppliers of Weighing, Level & Batching Equipment 11 Electronics Street

More information

PACKAGE TERTIARY FILTER SYSTEM SPECIFICATIONS MODELS TF-2-39-C THROUGH TF-2-53-C

PACKAGE TERTIARY FILTER SYSTEM SPECIFICATIONS MODELS TF-2-39-C THROUGH TF-2-53-C PACKAGE TERTIARY FILTER SYSTEM SPECIFICATIONS MODELS TF-2-39-C THROUGH TF-2-53-C Pollution Control Systems Inc. (PCS) is pleased to provide the following equipment specifications for your consideration.

More information

Installation Manual For Conical Tanks. INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS

Installation Manual For Conical Tanks. INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS Page 1 of 10 INDEX 1. Health & Safety 3 2. Introduction 3 3. Requirements 3 4. Working Area 3 5. Equipment 3 6. 2 and 3 metre tank above ground

More information

Site Preparation... 2

Site Preparation... 2 TRUFIREWALLS INSTALLATION MANUAL This Installation Manual is intended to assist in the preparation and installation of TruFireWalls products manufactured by Oldcastle Enclosure Solutions. The TruFireWalls

More information

PACKAGED SYSTEMS INSTALLATION INSTRUCTIONS

PACKAGED SYSTEMS INSTALLATION INSTRUCTIONS PACKAGED SYSTEMS INSTALLATION INSTRUCTIONS NOTE! To the installer: Please make sure you provide this manual to the owner of the equip ment or to the responsible party who maintains the system. Part #FMF-03-333

More information

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure ArchCast Bridge 3-Sided Precast Concrete Bridge Structure Installation Manual Salem Location: 749 West Commercial Ave. Salem, IL 62881 (618) 548-1190 countymaterials.com Email: info@countymaterials.com

More information

Ground Fault Protection. Medium Voltage Artificial Neutrals

Ground Fault Protection. Medium Voltage Artificial Neutrals Ground Fault Protection Medium Voltage Artificial Neutrals Installation and Maintenance Instruction Manual 7615 Kimbel Street, Mississauga, Ontario Canada L5S 1A8 Tel: (905)673-1553 Fax: (905)673-8472

More information

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT SECTION 11322 MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT PART 1 GENERAL 1.01 SCOPE There shall be furnished ( ) Grit Separator Mechanism(s) suitable for installation in (a) concrete tank(s) -ft.

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

ARCHITECTURAL DESIGN SPECIFICATIONS CRB CRASH BEAM VEHICLE BARRIER. PART I General

ARCHITECTURAL DESIGN SPECIFICATIONS CRB CRASH BEAM VEHICLE BARRIER. PART I General ARCHITECTURAL DESIGN SPECIFICATIONS CRB-110 - CRASH BEAM VEHICLE BARRIER PART I General 1.01 SECTION INCLUDES A. This section covers the furnishing and installation of a CRB-110 Vehicle Barrier system.

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

SECTION INSTALLATION OF OWNER-FURNISHED PRODUCTS

SECTION INSTALLATION OF OWNER-FURNISHED PRODUCTS SECTION 13 00 50 INSTALLATION OF PART 1 GENERAL 1.1 GENERAL A. Furnish and install all tools, supplies, materials, equipment, appurtenances, and labor necessary for the installation, testing, and placing

More information

PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING! INSTALLATION GUIDE This guide is intended to aide in the installation of Dura-Trench systems. There are many different applications and situations for the use of this product and the installation procedures

More information

EXECUTION REQUIREMENTS

EXECUTION REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: Execution requirements. B. Related Requirements: 1. Specification Sections 2 through 49. PART 2 - PRODUCTS (Not Used). PART 3 - EXECUTION 3.1 SAFETY 01

More information

WALL CANTILEVER WORK STATION JIB CRANE

WALL CANTILEVER WORK STATION JIB CRANE SECTION 14662 WALL CANTILEVER WORK STATION JIB CRANE ***** Gorbel, Inc. manufactures a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station

More information

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES Safety Precautions in the Excavation of a Sentinel Wedge take all necessary steps to make sure the pit is secured. Follow all OSHA requirements for digging

More information

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS 23 HEATING, VENTILATING AND AIR CONDITIONING TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING - Basic HVAC Requirements 238239.19 - Wall and Ceiling Unit Heaters

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

for Phoenix II-1 Human Cremation Retort

for Phoenix II-1 Human Cremation Retort Installation Manual for Phoenix II-1 Human Cremation Retort Please Read Carefully Before Installing. Any Questions? Please Call! Failure to install properly may VOID your warranty. NOTICE: Specifications

More information

Gerber. Scientific Products. Dear Gerber Sabre Customer:

Gerber. Scientific Products. Dear Gerber Sabre Customer: Gerber Scientific Products 151 Batson Drive, Manchester, CT 06040 (860) 643-1515 Dear Gerber Sabre Customer: Thank you for purchasing the Sabre, Gerber Scientific Products advanced, high-speed, three-dimensional

More information

for BLP 200/75 Animal Cremation Retort

for BLP 200/75 Animal Cremation Retort Installation Manual for BLP 200/75 Animal Cremation Retort Please Read Carefully Before Installing. Any Questions? Please Call! Failure to install properly may VOID your warranty. NOTICE: Specifications

More information

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual FORM HEADWALL (floor mount) Installation Manual FORM HEADWALL (floor mount) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

SECTION The specification section is organized by placing information in three standard parts:

SECTION The specification section is organized by placing information in three standard parts: SECTION 14244 LIMITED USE HYDRAULIC ELEVATOR ***** Since 1982 Liftavator, Inc. has provided limited use/limited application (LU/LA) elevators, residential elevators, hydraulic vertical platform wheelchair

More information

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

NEUTRAL GROUNDING TRANSFORMERS INSTALLATION AND MAINTENANCE INSTRUCTIONS

NEUTRAL GROUNDING TRANSFORMERS INSTALLATION AND MAINTENANCE INSTRUCTIONS 1 Table of Contents SECTION 1 Unpacking... 3 1.1 Shipping... 3 1.2 Receiving... 3 SECTION 2 Installation... 3 SECTION 3 Inspection... 4 SECTION 4 Connection... 4 4.1 Neutral Lead... 5 4.2 Ground Lead...

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

PART 1- General LULA Elevator Section 14200

PART 1- General LULA Elevator Section 14200 PART 1- General LULA Elevator Section 14200 1.1 Scope To furnish all labour, materials and equipment necessary or required to fully complete the installation of the lift as indicated on the drawings and

More information

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING! DURA - TRENCH INSTALLATION GUIDE This guide is intended to aide in the installation of Dura-Trench systems. There are many different applications and situations for the use of this product and the installation

More information

VSS-2 ½ D HIGH HEAD SUMP PUMP FREE STANDING

VSS-2 ½ D HIGH HEAD SUMP PUMP FREE STANDING Flows to 200 GPM. TDH to 95 Feet at 1750 RPM Free Standing or Guide Rail Design. Available in Standard Submersible or Explosion Proof Design. Provided with 25 feet of submersible motor power cable. Cast

More information

PROPOSAL: Q July 9, 2018

PROPOSAL: Q July 9, 2018 MECHANICAL EQUIPMENT SPECIFICATIONS Motor Driven Roller Conveyor (MDR): Motorized-roller conveyor sets the standard in material handling flexibility. Its key is the use of a motorized roller that powers

More information

SECTION ALUMINUM GATES

SECTION ALUMINUM GATES P.O. Box 1058 370 South Athol Rd. Athol, Massachusetts 01331 Phone: (978) 249-7924 Fax: (978) 249-3072 SECTION ALUMINUM GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor,

More information

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 2476 JANUARY 1990 MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT 2476.01 SCOPE 2476.02 REFERENCES 2476.05 MATERIALS TABLE OF CONTENTS

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

SECTION INFLUENT EQUALIZATION TANK PUMPS

SECTION INFLUENT EQUALIZATION TANK PUMPS PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor and equipment to put into service the Influent Equalization Pumps in accordance with the Contract Drawings

More information

Spare Parts PACKING, MARKING AND SHIPPING REQUIREMENTS. Contents

Spare Parts PACKING, MARKING AND SHIPPING REQUIREMENTS. Contents Spare Parts PACKING, MARKING AND SHIPPING REQUIREMENTS Contents 1. General Requirements 2 Marking 3. Preparation Before Packing 4. Packaging and Crating of the Contract Equipment 5 Shipping Procedures

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations...

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations... www.standardchange.com 1-800-968-6955 Technical Phone Support is from 8:00AM to 7:30PM E.S.T., Monday-Friday Walk-in Service is from 8:00AM to 4:30PM E.S.T., Monday-Friday Parts Department is from 8:00AM

More information

BMVR Series. Trailer Restraints

BMVR Series. Trailer Restraints Beacon Industries, Inc. 12300 Old Tesson Rd. St. Louis, MO 63128-2247 USA Phone: (314) 487-7600 Fax: (314) 487-0100 www.beacontechnology.com E-Mail: sales@beacontechnology.com BMVR Series Trailer Restraints

More information

78-RK VARIABLE SPEED HEAVY DUTY VIBRATOR OPERATING MANUAL

78-RK VARIABLE SPEED HEAVY DUTY VIBRATOR OPERATING MANUAL 78-RK VARIABLE SPEED HEAVY DUTY VIBRATOR OPERATING MANUAL IMPORTANT INSTRUCTIONS WARNING! FOR YOUR SAFETY PLEASE READ INSTRUCTIONS BEFORE OPERATING TOOL & WEAR EYE PROTECTION FD.08/2009 THANK YOU FOR PURCHASING

More information

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING 7160 Krick Rd., Walton Hills, OH 44146 800-321-3827 - Tel 440-439-8650 - Fax 440-439-6889 SECTION 12 48 16 ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING PART 1. GENERAL 1.01 SUMMARY: This section includes

More information

Drag Chain Conveyor Installation and Operation Manual

Drag Chain Conveyor Installation and Operation Manual Drag Chain Conveyor Installation and Operation Manual Material Handling Equipment Sales, Incorporated 310 S. Section Line Rd Delaware, OH 43015 Phone: (989) 430-4005 Fax: (740) 363-9004 WARRANTY MATERIAL

More information

This guide can be used to prepare a specification for incorporating wall bracket jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating wall bracket jib cranes into a competitively bid construction project. SECTION 14654 WALL BRACKET JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

MRI Chiller Installation Guidelines

MRI Chiller Installation Guidelines MRI Chiller Installation Guidelines *These Items are the responsibility of the installing contractor to complete prior to the startup of the MRI Chiller.* **Please refer to DTS chiller manual for further

More information

Loading Arm Installation, Maintenance & Safety Manual

Loading Arm Installation, Maintenance & Safety Manual Loading Arm Installation, Maintenance & Safety Manual Version Loading Arm Hot Line: 1-800-547-9393 Dear OPW Customer: Thank you for selecting OPW Engineered Systems, Inc. ("OPW"), and giving us the opportunity

More information

YOUR SPLASH PAD RESOURCE

YOUR SPLASH PAD RESOURCE 1 Index Permits & Inspections Material List Warnings Splash Pad Types Pre-Site Grading Plumbing Schematic Pressure Testing Concrete Preparation and Pour Housing/Nozzle Installation Above Ground Water Feature

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

SECTION SLUDGE HOLDING TANK DECANTER PUMP

SECTION SLUDGE HOLDING TANK DECANTER PUMP PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor and equipment to put into service the Sludge Holding Tank Decanter Pumping System in accordance with the

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for

More information

SECTION FIRE HYDRANTS

SECTION FIRE HYDRANTS SECTION 02080 FIRE HYDRANTS PART 1 - GENERAL 1.01 DESCRIPTION A. Work Specified The work specified shall include all labor, material, equipment, tools, services and incidentals necessary to furnish and

More information

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description Ceiling Systems Between us, ideas become reality METALWorkS General Installation Instructions RH200 Custom Hook-on Panels 1.0 GENERAL 1.1. Product Description RH200 system is a downward accessible, metal

More information

Fabrication and Installation Table of Contents

Fabrication and Installation Table of Contents Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for

More information

Model T Professional Series 1/2HP 2 YEAR WARRANTY SUBMERSIBLE SUMP PUMP

Model T Professional Series 1/2HP 2 YEAR WARRANTY SUBMERSIBLE SUMP PUMP Model T00718 REPAIR PARTS REF. PART DESCRIPTION 1 310883 Upper casing 2 310885 Motor housing 3 310889 Stator 4 310887 Shaft / rotor 5 310895 Mechanical seal 6 310892 Impeller 7 310893 Strainer 8 310890

More information

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING 7160 Krick Rd., Walton Hills, OH 44146 800-321-3827 - Tel 440-439-8650 - Fax 440-439-6889 SECTION 12 48 16 ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING PART 1. GENERAL 1.01 SUMMARY: This section includes

More information

Technical Data Sheet NEC/GRAN/95:01

Technical Data Sheet NEC/GRAN/95:01 Technical Data Sheet NEC/GRAN/95:01 Installation Guidance Notes Granular Surround Note : These guidance notes refer only to the installation of Granular surround underground tanks. These guidance notes

More information

16. Design of Pipeline Structures.

16. Design of Pipeline Structures. 16. Design of Pipeline Structures. a. General. 1) The following guidelines are for the design of structures for water and sewer pipelines including structural concrete and miscellaneous metals design.

More information

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm) Wastewater Flow Distributor Technical Data Submittal Special Precautions Specifications Installation 24½" (62.2 cm) 12½" (31.8 cm) 24½" (62.2 cm) (30.5 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet

More information

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION A. This section specifies the furnishing, installation, and connection of precast manholes and pullboxes with ducts

More information

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for

More information

A. This Section includes the following sump pumps and accessories, inside the building, for building storm drainage systems:

A. This Section includes the following sump pumps and accessories, inside the building, for building storm drainage systems: SECTION 221429 - SUMP PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

FS-TRIO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.

FS-TRIO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62. Wastewater Flow Distributor Technical Data Submittal Special Precautions Specifications Installation 24½" (62.2 cm) 12½" (31.8 cm) 24½" (62.2 cm) (30.5 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet

More information

Trex Commercial Products page Metal Railing

Trex Commercial Products page Metal Railing SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Post Rail (Glass). D. Tensiline Railings (Cable). E. Track Rail (Glass).

More information

1DIVISION 15- MECHANICAL Section Fire Pumps. A. Single Stage, Double Suction, 9100 Series Horizontal Splitcase Fire Pump (Base Mounted)

1DIVISION 15- MECHANICAL Section Fire Pumps. A. Single Stage, Double Suction, 9100 Series Horizontal Splitcase Fire Pump (Base Mounted) 1DIVISION 15- MECHANICAL Section 15320 Fire Pumps 1.00 PART 1 -GENERAL 1.01 DESCRIPTION OF WORK: A. Provide pumps for fire suppression. 1.02 SECTION INCLUDES: A. Single Stage, Double Suction, 9100 Series

More information

Technical Specification for Decentralized Wastewater Treatment System (DEWATS)

Technical Specification for Decentralized Wastewater Treatment System (DEWATS) Technical Specification for Decentralized Wastewater Treatment System (DEWATS) Environmental science faculty, Kabul University, Kabul, Afghanistan Project ID: 138 20 th April, 2016 1 Table of Contents

More information

SV24. Submittal Special Precautions Specifications Installation. 12½" (31.8 cm) 12½" (31.8 cm) 12" (30.5 cm) 12" (30.5 cm) 12" (30.

SV24. Submittal Special Precautions Specifications Installation. 12½ (31.8 cm) 12½ (31.8 cm) 12 (30.5 cm) 12 (30.5 cm) 12 (30. Wastewater Sampling Port Technical Data Submittal Special Precautions Specifications Installation 16½" (31.8 (41.9 cm) 8" (20.3 cm) -L -O SUBMITTAL STANDARD: 4" plain end inlet/outlet Highway traffic load

More information

DIVISION 33 UTILITIES SECTION PACKAGED SEWAGE GRINDER PUMPING UNITS

DIVISION 33 UTILITIES SECTION PACKAGED SEWAGE GRINDER PUMPING UNITS DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: The work specified in this Section consists of providing an Environmental One grinder pump(s) unit with tank, internal piping and

More information

Edge-of-Dock Leveler 'BA' - 'BX' Series. Owner s Manual and Installation Instructions

Edge-of-Dock Leveler 'BA' - 'BX' Series. Owner s Manual and Installation Instructions Edge-of-Dock Leveler 'BA' - 'BX' Series Owner s Manual and Installation Instructions A Message to Aaron-Bradley Edge-of-Dock Owners and Operators Edge-of-Docks are specialized equipment with unique operating

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 8 SECTION 083921 PEDESTRIAN FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for your

More information

SECTION HANDRAILS AND RAILINGS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION HANDRAILS AND RAILINGS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES Display hidden notes to specifier. (Don't know how? Click Here) A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Post

More information

MRI Chiller Installation Guidelines

MRI Chiller Installation Guidelines MRI Chiller Installation Guidelines *These Items are the responsibility of the installing contractor to complete prior to the startup of the MRI Chiller.* **Please refer to DTS chiller manual for further

More information

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48- 60- 72- 96 long Installation Instructions Supreme Air DYNAMIC BARRIER Bench Fume Hood H50 S T Y L E Fume Hoods 48"- 60"- 72"- 96" long Publication No. IIH50-SA 06/01 Part Number: IMAN-H50 Kewaunee Scientific Corporation

More information

SECTION ELECTRIC FOUR FOLD DOORS MODEL 46 FLAT SHEETED

SECTION ELECTRIC FOUR FOLD DOORS MODEL 46 FLAT SHEETED SECTION 08350 ELECTRIC FOUR FOLD DOORS MODEL 46 FLAT SHEETED PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

ARCHITECTURAL DESIGN SPECIFICATIONS SG-4 - CRASH RATED SWING GATE

ARCHITECTURAL DESIGN SPECIFICATIONS SG-4 - CRASH RATED SWING GATE ARCHITECTURAL DESIGN SPECIFICATIONS SG-4 - CRASH RATED SWING GATE PART I General 1.1 SECTION INCLUDES A. This section covers the furnishing and installation of a SG-4 Crash Rated Swing Gate Vehicle Barrier

More information

T-Series SPLIT SYSTEM UNITS TSA R-410A - 60 HZ

T-Series SPLIT SYSTEM UNITS TSA R-410A - 60 HZ REFRIGERANT CONDENSERS Guide Specifications T-Series SPLIT SYSTEM UNITS TSA R-410A - 60 HZ September 5, 2012 Note: This Specification is for Allied Commercial T-Series 6- to 20-ton, outdoor air conditioner

More information

MECHANICAL LEVELERS. P.O. Box 338 Spring Hill, Tennessee /486/ /251/3382 Fax 931/486/0316

MECHANICAL LEVELERS. P.O. Box 338 Spring Hill, Tennessee /486/ /251/3382 Fax 931/486/0316 EDE & BLE Owner s Manual MECHANICAL LEVELERS P.O. Box 338 Spring Hill, Tennessee 37174 931/486/2296 800/251/3382 Fax 931/486/0316 www.pioneerleveler.com SM SECTION 1 RECEIVING: INSTALLATION INSTRUCTIONS

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

HAZOP Checklist for Sewage Treatment Plant

HAZOP Checklist for Sewage Treatment Plant HAZOP Checklist for Sewage Treatment Plant CHECKLIST 1.0 Overall Layout of Treatment Plant 1.1 General Layout Property are fenced and gated and the fence height. State where these problems/impacts occur

More information

INSTALLATION MANUAL PROVIDER PLUS

INSTALLATION MANUAL PROVIDER PLUS INSTALLATION MANUAL PROVIDER PLUS OVERVIEW The Provider Plus is a UL-listed, surface-mounted, horizontal modular headwall assembly. This system uses one or more horizontal component tiers to locate services

More information

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces. PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Handrails and guardrails. 1.2 PERFORMANCE REQUIREMENTS A. General: In engineering railings to withstand structural loads indicated, determine

More information

SECTION MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 10560 MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Installation Instructions For Overly Acoustical / Bullet Resistant Window

Installation Instructions For Overly Acoustical / Bullet Resistant Window 574 West Otterman Street Greensburg, PA 15601 Toll Free: (800) 979-7300 Local: (724) 834-7300 Fax: (724) 830-2871 Email: overly@overly.com DOOR COMPANY Installation Instructions For Overly Acoustical /

More information

LK Manifold Cabinet UNI, LK Prefab Cabinet UNI

LK Manifold Cabinet UNI, LK Prefab Cabinet UNI LK Manifold Cabinet UNI, LK Prefab Cabinet UNI Design The cabinets are designed to be installed into a wall or ceiling or externally on a wall. The minimum joist depth is 95 mm for UNI, 120 mm for UNI

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section AUTOMATIC CONTROL VALVE INSULATED ENCLOSURE (HOT BOX)

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section AUTOMATIC CONTROL VALVE INSULATED ENCLOSURE (HOT BOX) Section 15959 PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and the installation of Automatic Control Valve Insulated Enclosures (Hot Boxes) for control valves installed on water lines

More information

SECTION WASTEWATER TREATMENT SYSTEM (CONTROL PANEL AND INSTRUMENTATION)

SECTION WASTEWATER TREATMENT SYSTEM (CONTROL PANEL AND INSTRUMENTATION) SECTION 46 00 00 WASTEWATER TREATMENT SYSTEM (CONTROL PANEL AND INSTRUMENTATION) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment

More information

SECTION PLUMBING DRAINAGE AND CONTAINMENT. Copyright Specialloy Industries Inc. dba Slot Drain Systems - All rights reserved

SECTION PLUMBING DRAINAGE AND CONTAINMENT. Copyright Specialloy Industries Inc. dba Slot Drain Systems - All rights reserved SECTION 22 14 00 - PLUMBING DRAINAGE AND CONTAINMENT Copyright 1998-2017 Specialloy Industries Inc. dba Slot Drain Systems - All rights reserved PART 1 GENERAL 1.1 SECTION INCLUDES A. SLOT shaped, non-grated,

More information

Railroad Track Scale

Railroad Track Scale Installation & Service Manual Railroad Track Scale Model: 8710 2003 by Thurman Scale Company All rights reserved 50727 Issue #1 8/03 Amendment Record Railroad Track Scale Model: 8710 50727 Manufactured

More information

Gerber Scientific Products

Gerber Scientific Products Page 1 of 9 Sabre Series Router Pre-Installation Checklist Gerber FastFact # 5003 Supplied by: Gerber Service Last Modified: June 28, 2012 Summary: This document provides the Pre-Installation for your

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS 2190 Dagenais Blvd.West Laval (Quebec) Canada H7L 5X9 Tel. : 514.337.4415 Fax : 514.337.4029 info@burcam.com see us at www.burcam.com VERSION Z MODELS 300500 SUMP PUMPS Your pump

More information

SECTION ALUMINUM HANDRAIL SYSTEMS

SECTION ALUMINUM HANDRAIL SYSTEMS SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

SECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:

SECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following: SECTION 03470 TILT-UP PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Work includes, but is not limited to, the following: 1. Precast wall panels. 2. Forms and casting beds. 3. Concrete. 4. Reinforcing

More information

HYDRAULIC TRUCK RESTRAINT OWNER S MANUAL

HYDRAULIC TRUCK RESTRAINT OWNER S MANUAL HYDRAULIC TRUCK RESTRAINT OWNER S MANUAL TR 2000 - TRUCK RESTRAINT Serial Number: Model: Customer: Date Shipped: Options: OWNER S MANUAL Table Of Contents Safety Information Warning... 3 Installation...

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. GORBEL PRODUCT SPECIFICATIONS 2010 Gorbel, Inc., P.O., Box 593, Fisher, New York 14453-0593 PHONE: 800-821-0086, FAX: 585-924-6273; WEBSITE: www.gorbel.com November SECTION 41 22 31PRIVATE FREE STANDING

More information

BRILLIANT WONDERS LED WATERFALL INSTALLATION INSTRUCTIONS CMP SERIES. Brilliant Wonders LED WATERFALLS

BRILLIANT WONDERS LED WATERFALL INSTALLATION INSTRUCTIONS CMP SERIES. Brilliant Wonders LED WATERFALLS R BRILLIANT WONDERS LED WATERFALL INSTALLATION INSTRUCTIONS CMP 25677 SERIES Brilliant Wonders LED WATERFALLS TABLE OF CONTENTS 1 Product Overview....2 1.1. Packing List...2 2 Safety.3 3 Installation Guide.....4

More information

MODEL INSTALLATION INSTRUCTIONS

MODEL INSTALLATION INSTRUCTIONS WWW.BURCAM.COM 2190 Boul. Dagenais West TEL: 514.337.4415 LAVAL (QUEBEC) FAX: 514.337.4029 CANADA H7L 5X9 info@burcam.com Your pump has been carefully packaged at the factory to prevent damage during shipping.

More information

FYPON, LLC. February 2014

FYPON, LLC. February 2014 Section 06 66 30 EXTERIOR PVC RAILINGS AND GUARDS PART 1 - GENERAL 1.1 RELATED SECTIONS: A. All contract documents apply to work of this section; this includes but is not limited to: Agreement; Drawings;

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 8 SECTION 083919 WATERTIGHT DOORS **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for your specific project

More information

INSTALLATION GUIDE. 4-Post Lift. Model United States. United Arab Emirates. Egypt.

INSTALLATION GUIDE. 4-Post Lift. Model United States. United Arab Emirates. Egypt. 4-Post Lift INSTALLATION GUIDE United States 17779 Main Street Suite C Irvine, CA 92614 USA Tel: +1(949) 333-3800 Fax: +1(949) 333-3804 United Arab Emirates Model 46614 P.O. Box 121971 Saif Zone A2-032

More information

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

Model # 800SM-PS3. 8/3/2016 Page 1 of 8 Model # 800SM-PS3 8/3/2016 Page 1 of 8 /3/2016 Page 2 of 8 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information