1 SECTION CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing compound, reinforcement, form work and other materials that may form an integral part of the concrete construction. B. Reinforced concrete for retaining walls and the like subjected to increased environmental forces or as directed by the Engineer, shall be in accordance to Section Structural Concrete. C. The size and configuration of the various components shall be as indicated herein, in the Standard Details, and in the approved Improvement Plans, if any. D. All materials and installation shall be in accordance with the standards and specifications of the Solano Irrigation District, latest revisions RELATED SECTIONS A. Section General Requirements B. Section Miscellaneous Metalwork 1.03 SUBMITTALS A. Shop Drawings in accordance with Section B. Concrete mix design TESTING A. Slump test, air entrainment test and compressive test cylinders will be made by the Engineer or as directed by the Engineer, and such tests shall conform to the latest ASTM procedures MEASUREMENT AND PAYMENT A. The quantity of concrete will be measured to the neat lines shown on the Drawings, unless otherwise noted. Payment will be made at the unit price bid per cubic yard in the Bid Schedule for the specified reinforced Concrete work. The unit price shall include furnishing and placing all concrete materials, reinforcement, excavation, backfill and water Approved: July 18, 2012 Page 1 of 6

2 B. The cost of the reinforced concrete for pipe support pads will be included in the cost of piping. Therefore no separate payment for this item will be made in the Bid Schedule for reinforced concrete work. PART 2 MATERIALS 2.01 CEMENT A. All cement shall be Portland Cement, Type II, conforming to ASTM Designation C-150. All cement shall be free of lumps and properly aged AGGREGATES A. Fine and coarse aggregates shall conform to the requirements of ASTM C-33. The maximum nominal size of coarse aggregate shall be three quarters of an inch (¾ ) WATER A. Water shall be clean and free from oils, acids, salts and other damaging substances. Raw water is not approved AIR ENTRAINING AGENT A. The Contractor may use an air entraining agent conforming to the requirements of ASTM Designation C-260 in all concrete. The amount of air entraining agent, if used, shall be such as will affect the entrainment of four to six percent (4% - 6%) of air, by volume of the concrete at the time of discharge from the mixer REINFORCEMENT A. Reinforcing steel shall conform to ASTM A-615 Grade 40, or as indicated in the Drawings, for deformed and plain billet steel bars for concrete reinforcement MEMBRANE CURING COMPOUND A. Membrane curing compound shall be a non-waxy white pigmented sealing compound conforming to ASTM C-309. PART 3 EXECUTION 3.01 FORMWORK A. Forms shall conform to the shape, line, grade and dimensions of structures as shown on the Drawings. B. Forms shall have sufficient strength to withstand the pressure resulting from placement and vibration of the concrete and shall be maintained rigidly in position. Embedded wire ties for holding forms will not be permitted. Bolts and Page 2 of Approved: TBD

3 rods used for form ties shall be so arranged that when the forms are removed, no metal shall be within 1 of any surface. C. Wood forms shall be of sound lumber, free from loose knots or other defects, and of such quality that when treated or coated, there will be no chemical deterioration or discoloration of the formed concrete surface. All form lumber shall be surfaced lumber in narrow and uniform widths closely matched, except that plywood of adequate stiffness shall be used on all surfaces exposed to air or water. D. Lumber reused in forms shall be cleaned, repaired and plugged. All nails shall be withdrawn from lumber prior to reuse. E. The form sheathing or lining shall be so placed that the joint marks on the concrete surfaces will be in general alignment, both horizontally and vertically. Forms shall be sufficiently tight to prevent loss of mortar from the concrete. F. Three-quarter inch (¾ ) chamfer strips shall be placed in the corners and at the top-of-wall line of the forms so as to produce beveled edges on permanently exposed concrete edges. Interior angles on such surfaces and edges of formed joints will not require beveling, except where shown on the drawings. G. Forms shall be removed as soon as practical after the concrete is placed, but not until the concrete has attained the necessary strength to support all live and dead loads during the construction period. Forms shall be removed in such a manner as to prevent damage to the concrete. Immediately after the forms are removed, all defects in the concrete, including the rod holes, rock pockets, and other unconsolidated areas, shall be repaired by the drypack method, and the total exposed area with sealing compound. H. Before the concrete is placed, the forms shall be coated with a non-staining commercial form releasing agent TOLERANCES A. Variations from level, grade, alignment or plumb for any portion of a structure shall not exceed one-half inch (½ ), unless a more restrictive tolerance is shown on the Drawings PLACING REINFORCEMENT A. Before concrete reinforcing bars are placed, the surfaces of the bars and the surfaces of any metal supports for reinforcing bars shall be cleaned of heavy flaky rust, loose mill scale, dirt, grease and other foreign substances. Heavy flaky rust that can be removed by rubbing with burlap or equivalent treatment is considered objectionable. After being placed, the reinforcing bars shall be maintained in a clean condition until they are completely embedded in the concrete. B. Reinforcing bars shall be accurately placed and secured in position so that they Approved: July 18, 2012 Page 3 of 6

4 will not be displaced during the placing of the concrete, and special care shall be exercised to prevent any disturbance of the reinforcing bars in concrete that has already been placed. C. Refer to Section Miscellaneous Metalwork for requirements for steel embedments and anchor bolts CONCRETE PROPORTIONING A. The Contractor shall furnish concrete which will develop a minimum compressive strength of 3,000 psi, and shall conform to the basic requirements set forth in these Specifications. B. The net water-cement ratio of the concrete (exclusive of water within or absorbed by the aggregates) shall not exceed 0.60 by weight. C. A minimum of 5½ sacks of cement per cubic yard shall be used. D. The slump shall not exceed 3 for slabs that are horizontal or nearly horizontal, and 4 for other work. The Engineer reserves the right to alter the required slump whenever, in the Engineer s judgement, the quality of the work will improve CONCRETE MIXING A. Mixing may be performed at the site of work or by transit-mix methods. B. Transit-mixed concrete shall conform to the standard specifications for readymixed concrete per ASTM C-94. The total volume of materials mixed per batch shall not exceed the rated capacity of the mixer as determined by the standard requirement of the Associated General Contractors of America. C. If a batch mixer is used, the concrete ingredients shall be mixed for not less than one and one half (1½) minutes after all of the ingredients, except for the full amount of water, are in the mixer. The mixing shall be increased if the charging and mixing operations fail to produce a concrete in which the ingredients are consistent and uniform throughout. Water shall be added prior to, during and following the mixer-charging operation. Excessive overmixing, requiring additional water to preserve the concrete consistency, will not be permitted. Any mixer that at any time produces unsatisfactory results shall be repaired or replaced CONCRETE PLACING, JOINTING, FINISHING AND CURING A. Preparation: 1. In preparation for placing of concrete, all water, sawdust, chips and other construction debris and extraneous matter shall be removed from the interior of the forms. Page 4 of Approved: TBD

5 2. Concrete shall not be placed around any metal reinforcement or embedments until the Engineer has approved the reinforcement or embedments placed within the forms. 3. The forms, subgrade and reinforcement shall be wetted immediately before placement of the concrete. B. Temperature Limits: 1. The temperature of concrete as mixed and placed shall not be less than 55 F, nor greater than 90 F. 2. If during day or night the ambient temperature falls below, or is predicted to fall below, 40 F, concrete shall be protected from freezing during placement and curing by means of heating of materials or other approved methods, as directed by the Engineer. The concrete mix for cold-weather placement shall be maintained at a minimum temperature of 55 F during placement, and this minimum temperature shall be maintained for the first 72 hours of curing. 3. At all times the maximum temperature of concrete as placed shall be less than 90 F. When the temperature of concrete as placed may be 90 F or higher, as may be reasonably predicted from current temperatures of materials and the likelihood of rises in weather temperatures, the Contractor shall employ effective means, such as precooling aggregates and mixing water, use of ice as a part of the mixing water, shading aggregates, or placing at night, as necessary, to maintain the temperature of concrete, as placed, below 90 F. C. Placing: The concrete in each integral part of the structure shall be placed continuously. The Contractor shall not be allowed to commence concrete placement in any integral part of the structure unless the inspected and approved forms, reinforcement, embedments and other materials on hand are sufficient to allow completing the part without interruption in the placing of the concrete. The concrete shall be placed as nearly as possible to its final position by means that avoid segregation of the materials and displacement of the reinforcement. Concrete shall not be permitted to fall from a height greater than six feet (6 ) without the use of adjustable length pipes or elephant trunks. D. Compaction: Concrete during and immediately after placing, shall be thoroughly compacted. The compaction shall be done with mechanical vibrators capable of transmitting vibration to the concrete at frequencies of not less than 4,000 cycles per minute. The location, manner and duration of the application of the vibrators shall be such as to secure maximum consolidation of the concrete. The vibrators shall not be attached to or held against the forms or the reinforcing steel. E. Joints: 1. Construction Joints: Construction joints placed in concrete structures to Approved: July 18, 2012 Page 5 of 6

6 facilitate construction must be approved by the Engineer. Bond is required at all construction joints. The surface of all joints shall be clean and damp when covered with fresh concrete or mortar. Cleaning shall consist of removal of all laitance, loose or defective concrete, coatings, sand, and other foreign material from the surface of the joint and exposed reinforcing steel. Mortar for bonding of joints shall be the same as that in the concrete with the coarse aggregate omitted. The mortar bond shall be approximately one half inch (½ ) thick and worked into the joint surface. 2. Contraction Joints: These joints are placed in structures or slabs to provide for movement between units, and shall have no bond across the joint. Units shall be separated by joint filler where indicated on the Drawings. F. Finishing: All horizontal surfaces on structures will have a light broom finish. G. Curing: Reinforced concrete shall be cured by membrane curing. Sealing compound shall be applied to the concrete surfaces by spraying in one coat to provide a continuous, uniform membrane over all areas. /// END OF SECTION Page 6 of Approved: TBD

San Antonio Water System Standard Specifications for Construction ITEM NO. 307 CONCRETE STRUCTURES

San Antonio Water System Standard Specifications for Construction ITEM NO. 307 CONCRETE STRUCTURES ITEM NO. 307 CONCRETE STRUCTURES 307.1 DESCRIPTION: This item shall govern the construction of box culverts, headwalls, wingwalls, bridges, box transitions, approach slabs, retaining walls, inlets, storm

More information

ITEM NO. 307 CONCRETE STRUCTURES

ITEM NO. 307 CONCRETE STRUCTURES ITEM NO. 307 CONCRETE STRUCTURES This item shall govern the construction of box culverts, headwalls, wingwalls, bridges, box transitions, approach slabs, retaining walls, inlets, storm sewer structures,

More information

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS Underground Electric Distribution Standards I. SCOPE This section includes the standards for concrete, reinforcing steel, formwork, concrete placement, curing, and construction joints. Concrete work for

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS 808.1 DESCRIPTION: Reinforced concrete vaults shall be cast-in-place and shall include reinforcing

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 321610 - CURBING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies requirements for furnishing and installing all types of curbing including the following: granite curb, concrete and bituminous

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

SPECIAL SPECIFICATION 4491 Type CAC Concrete

SPECIAL SPECIFICATION 4491 Type CAC Concrete 2004 Specifications SPECIAL SPECIFICATION 4491 Type CAC Concrete 1. Description. Remove unsound concrete and replace with Type CAC, calcium aluminate concrete for ultra high early strength concrete repairs.

More information

SECTION CONCRETE PAVING

SECTION CONCRETE PAVING SECTION 32 13 13 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for providing portland cement concrete work and all other incidental concrete improvements for the project

More information

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4 City of Columbia Engineering Regulations PART 25: SPECIFICATIONS FOR ALTITUDE VALVE VAULT Table of Contents Paragraph Description Page No. 25.1 General 25-1 25.2 Materials 25-1 25.3 Concrete Masonry Work

More information

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans. SECTION 1400 - CONCRETE PAVEMENT 1401 SCOPE. This section governs the furnishing of all labor, equipment, tools, and materials and the performance of all work necessary to construct concrete pavement.

More information

SECTION RIGID PAVEMENT

SECTION RIGID PAVEMENT SECTION 02750 PART 1 GENERAL RIGID PAVEMENT 1.1 SUMMARY A. Section Includes: 1. Concrete sidewalks. 2. Concrete stair steps. 3. Concrete integral curbs gutters. 4. Concrete parking areas and roads. B.

More information

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.1 Description The work covered by this section of the specifications consists of furnishing all labor, the construction and installation of open storm drain

More information

2001 SCOPE. This section covers all cast-in-place concrete, including reinforcing steel, forms, finishing, curing, and other appurtenant work.

2001 SCOPE. This section covers all cast-in-place concrete, including reinforcing steel, forms, finishing, curing, and other appurtenant work. SECTION 2000 - CONCRETE 2001 SCOPE. This section covers all cast-in-place concrete, including reinforcing steel, forms, finishing, curing, and other appurtenant work. 2002 GENERAL. All cast-in-place concrete

More information

SECTION CONCRETE LINED CANALS AND RESERVOIRS

SECTION CONCRETE LINED CANALS AND RESERVOIRS SECTION 02511 CONCRETE LINED CANALS AND RESERVOIRS PART 1 GENERAL 1.01 SECTION INCLUDES Canal linings shall be constructed where shown on the drawings. The lining will be unreinforced concrete containing

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL 36.1 36-2 PIPEMAKING EQUIPMENT 36.1 36-3 TRENCH EXCAVATION 36.1 36-4 SPECIAL FOUNDATION TREATMENT 36.1 36-5

More information

SECTION CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS

SECTION CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS SECTION 32 05 23 PART 1 - GENERAL 1.1 DESCRIPTION A. This section shall cover site work concrete constructed upon the prepared subgrade and in conformance with the lines, grades, thickness, and cross sections

More information

SECTION CONTROLLED LOW STRENGTH MATERIAL

SECTION CONTROLLED LOW STRENGTH MATERIAL SECTION 03300 CONTROLLED LOW STRENGTH MATERIAL PART 1 GENERAL 1.1 DESCRIPTION A. This Section specifies Controlled Low Strength Material (CLSM) to be used as described in this specification, including

More information

DIVISION 03 CONCRETE. Number CONCRETE

DIVISION 03 CONCRETE. Number CONCRETE 03 00 00 CONCRETE 03 10 00 CONCRETE FORMING AND ACCESSORIES 03 11 00 Concrete Forming 03 11 13 Structural Cast-in-Place Concrete Forming 03 11 16 Architectural Cast-in-Place Concrete Forming 03 15 00 Concrete

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE McClellan Blakemore Architects New Warehouse Facility for SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete formwork. B. Floors and slabs on grade. C. Concrete floor

More information

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL 13686.00 CONCRETE WALKS AND CURBS 033015-1 1.1 RELATED DOCUMENTS: SECTION 033015 CONCRETE WALKS AND CURBS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General and Supplementary

More information

SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES

SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES GUIDE SPECIFICATION SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES PART 1 - SCOPE 1.01 WORK INCLUDED: 1.1.1 This guide covers the

More information

Public Works Manual. Revised September Concrete & Asphalt

Public Works Manual. Revised September Concrete & Asphalt Public Works Manual Revised September 2015 Concrete & Asphalt Where it must cross domestic it must cross above and with a 1 minimum separation. Nonpotable water tape. 10.00 PORTLAND CEMENT CONCRETE 10.01

More information

REINFORCED CONCRETE MASONRY SECTION

REINFORCED CONCRETE MASONRY SECTION SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Construction Specification 62 Grouted Rock Riprap

Construction Specification 62 Grouted Rock Riprap Construction Specification 62 Grouted Rock Riprap 1. Scope The work consists of furnishing, transporting, and the installation of grouted rock riprap revetments and blankets, including filter or bedding

More information

SECTION CAST IN PLACE CONCRETE

SECTION CAST IN PLACE CONCRETE SECTION 03300 CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Section Includes. Work to be completed under this section shall include all labor, equipment, plant and materials necessary to furnish

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS 1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 03100 CONCRETE FORMWORK 1.0 GENERAL 1.1 DESCRIPTION This section defines requirements and limitations for design, construction, erection, and removal of concrete formwork for

More information

SPECIFICATION 1035 M

SPECIFICATION 1035 M MAY 1984 SPECIFICATION 1035 M SPECIFICATIONS FOR UNDERWATER CONCRETE 1035. 1. DESCRIPTION The work will consist of the mixing of concrete in accordance with the "Specifications for Reinforced Concrete",

More information

SECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving.

SECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving. SECTION PORTLAND CEMENT CONCRETE PAVEMENT 1. DESCRIPTION This specification shall govern for the construction of Portland cement concrete pavement on a prepared subgrade or base course, in accordance with

More information

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones. ITEM 432 RIPRAP 432.1. Description. This Item shall govern for the furnishing and placing of riprap of the type and details shown on the plans and in accordance with this Item. 432.2. General. Riprap furnished

More information

SECTION MORTAR

SECTION MORTAR PART l - SCOPE SECTION 04100 - MORTAR A. This Section includes all labor, materials, equipment, and related items required for the work of mortar as shown on the Drawings and specified herein. The work

More information

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for

More information

CONCRETE PAVEMENTS GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 7 WATER RECLAMATION PROJECT JUNE 2013

CONCRETE PAVEMENTS GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 7 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 7 PART 1 - GENERAL 1.1 Description The work covered by this Section shall be all labour, materials, equipment, and supervision necessary to complete all concrete work shown

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02770 - CONCRETE SIDEWALKS AND CURBS PART ONE-GENERAL 1.1 DESCRIPTION 1.1.1 General Concrete curb shall be constructed as part of the restoration work that may be necessary to replace existing

More information

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course. SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721

More information

SECTION 30 - CONCRETE STRUCTURES TABLE OF CONTENTS

SECTION 30 - CONCRETE STRUCTURES TABLE OF CONTENTS SECTION 30 - CONCRETE STRUCTURES TABLE OF CONTENTS Section Page 30-1 GENERAL... 30.1 30-2 FOOTINGS...30.1 30-3 FORMS... 30.1 30-4 REMOVAL OF FORMS... 30.1 30-5 REINFORCEMENT... 30.2 30-6 MIXING AND TRANSPORTING...

More information

.1 Concrete mix shall be in accordance with the following:.1 The average of all tests shall exceed 25 MPa.

.1 Concrete mix shall be in accordance with the following:.1 The average of all tests shall exceed 25 MPa. Page 1 1.0 CONCRETE 1.1 CONCRETE MIX.1 Concrete mix shall be in accordance with the following: Minimum 28 Day Strength 25 MPa* Designated Aggregate Size.maximum 25 mm (1 inch) Slump. 25-75 mm (1-3 inches)

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE... 44.1 44-1.01 Description... 44.1 44-1.02 Materials... 44.1 44-1.03 Proportions...

More information

SECTION 30 - CONCRETE STRUCTURES TABLE OF CONTENTS

SECTION 30 - CONCRETE STRUCTURES TABLE OF CONTENTS SECTION 30 - CONCRETE STRUCTURES TABLE OF CONTENTS Section Page 30-1 GENERAL... 30.1 30-2 FOOTINGS... 30.1 30-3 FORMS... 30.1 30-4 REMOVAL OF FORMS... 30.1 30-5 REINFORCEMENT... 30.2 30-6 MIXING AND TRANSPORTING...

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE 44-1 44-1.01 Description 44-1 44-1.02 Materials 44-1 44-1.03 Proportions 44-1 44-1.04

More information

DIVISION 03 CONCRETE CONCRETE REINFORCING Reinforcing Steel Welded Wire Fabric Reinforcing Fibrous Reinforcing

DIVISION 03 CONCRETE CONCRETE REINFORCING Reinforcing Steel Welded Wire Fabric Reinforcing Fibrous Reinforcing 03 00 00 CONCRETE 03 10 00 CONCRETE FORMING AND ACCESSORIES 03 11 00 Concrete Forming 03 11 13 Structural Cast in Place Concrete Forming 03 11 16 Architectural Cast in Place Concrete Forming 03 15 00 Concrete

More information

Division 03 Concrete Section includes various guidelines for general concrete use, curing, forming, reinforcing, finishing and concrete accessories.

Division 03 Concrete Section includes various guidelines for general concrete use, curing, forming, reinforcing, finishing and concrete accessories. Section includes various guidelines for general concrete use, curing, forming, reinforcing, finishing and concrete accessories. This design guideline is written to the designer of record (DOR). This guideline

More information

SECTION PRECAST CONCRETE COVER SYSTEM

SECTION PRECAST CONCRETE COVER SYSTEM SECTION 13500 PRECAST CONCRETE COVER SYSTEM PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Design Criteria: 1. Precast manufacturer shall be responsible for structural design of individual precast components,

More information

SECTION 54 STRUCTURAL CONCRETE (FAA P-610) ITEM P-610 STRUCTURAL PORTLAND CEMENT CONCRETE DESCRIPTION MATERIALS

SECTION 54 STRUCTURAL CONCRETE (FAA P-610) ITEM P-610 STRUCTURAL PORTLAND CEMENT CONCRETE DESCRIPTION MATERIALS 54-1 GENERAL SECTION 54 STRUCTURAL CONCRETE (FAA P-610) The Contractor shall perform all work required by the plans requiring structural concrete for drainage structures, electrical foundations, and miscellaneous

More information

DIVISION 03 CONCRETE. Section Title Number CONCRETE

DIVISION 03 CONCRETE. Section Title Number CONCRETE 03 00 00 CONCRETE ***ALL CONCRETE HARDSCAPE & RELATED SITE CONCRETE MUST ALSO ADHERE TO THE 2015 LANDSCAPE MASTER PLAN AS WELL AS THE DIVISION 3 TECHNICAL STANDARDS. THE LANDSCAPE MASTER PLAN CAN BE FOUND

More information

CHAPTER 9 - PORTLAND CEMENT CONCRETE

CHAPTER 9 - PORTLAND CEMENT CONCRETE CHAPTER 9 - PORTLAND CEMENT CONCRETE 9.1 GENERAL The work shall consist of furnishing, forming, placing, finishing, and curing Portland Cement concrete, as required. 9.2 MATERIALS 9.2.1 Portland Cement:

More information

SECTION CONCRETE FORMWORK

SECTION CONCRETE FORMWORK SECTION 03100 CONCRETE FORMWORK PART 1 GENERAL 1.1 REFERENCES A. The following is a list of standards which may be referenced in this section: 1. American Concrete Institute (ACI): a. 117, Standard Specifications

More information

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,

More information

9 Concrete Pavement Patching

9 Concrete Pavement Patching 9 Concrete Pavement Patching Materials Concrete Mix Design Concrete Mix Criteria Trial Batch Demonstration of CMD Acceptance Removal of Concrete Partial Depth Patches Full Depth Patched Placement of Patching

More information

SECTION CONCRETE FORMWORK AND ACCESSORIES

SECTION CONCRETE FORMWORK AND ACCESSORIES SECTION 03100 CONCRETE FORMWORK AND ACCESSORIES Part 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for construction and removal of forms for the containment of concrete to

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 13 14 CONCRETE PAVEMENT FOR VEHICULAR AREAS PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for forming and placing reinforced concrete curbs and vehicular pavement

More information

CELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES

CELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES PART 1: SCOPE CELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES 1.1 An Approved Celcore Applicator shall furnish all labor, materials and supervision

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE... 44.1 44-1.01 Description... 44.1 44-1.02 Materials... 44.1 44-1.03 Proportions...

More information

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION ARDEX GUIDE SPECIFICATION ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) Cast-In-Place Concrete to Receive the ARDEX Concrete Management Systems including ARDEX Self-Leveling Underlayments SECTION 03 30 00

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS SECTION 30 CONCRETE STRUCTURES 30-1 GENERAL Concrete structures shall conform to Section 51, Concrete Structures,

More information

1. Cast-in place structural concrete including footers, foundations, and other non-slab applications. 2. Formwork 3. Reinforcement

1. Cast-in place structural concrete including footers, foundations, and other non-slab applications. 2. Formwork 3. Reinforcement SECTION 03 31 00 - CAST-IN-PLACE STRUCTURAL CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Cast-in place structural concrete including footers, foundations, and other non-slab applications.

More information

SECTION BRICK MASONRY ASSEMBLIES

SECTION BRICK MASONRY ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Face brick. 2. Mortar and grout. 3. Ties and anchors. 4. Miscellaneous masonry accessories. 1.2 SUBMITTALS A. Product Data: For each type

More information

.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage.

.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage. 03 10 00 CONCRETE FORMING AND ACCESSORIES Page 1 of 4 1 General 1.1 SECTION INCLUDES.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage..2 Form accessories..3 Form stripping. 1.2

More information

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes. SECTION 033053 - CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS AFTER FEBRUARY 1, 2010 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS 530.1 Description. This item shall govern for curb, gutter, combined curb and gutter, sidewalks and/or driveways,

More information

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1993 Specifications CSJ 0162-01-080, etc. SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1. Description. This Item shall govern for the repair of impact damaged prestressed

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

SECTION SHOTCRETE Cast-In-Place Concrete Precast Prestressed Concrete Joists and Beams.

SECTION SHOTCRETE Cast-In-Place Concrete Precast Prestressed Concrete Joists and Beams. SECTION 03361 SHOTCRETE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 03413 - Precast Prestressed Concrete Joists and Beams. 1.02 REFERENCES A. American Society

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for the supply, casting, finishing, curing, and testing of cast-in-place concrete, as

More information

SECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary

SECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary SECTION 03300 CONCRETE PART 1 GENERAL 1.01 SCOPE OF WORK Concrete foundation walls, sanitary structures, pipe encasements, thrust blocking and slabs on grade. 1.02 REFERENCES A. ACI 301 Specification for

More information

1.02 RELATED WORK: Refer to the following sections for related work:

1.02 RELATED WORK: Refer to the following sections for related work: SECTION 4200 - CONCRETE STRUCTURES PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of header curb, retaining walls, energy dissipation structures for drainage channels, reinforced concrete

More information

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis. PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: Section 02775 1. Reinforced concrete sidewalks. 2. Wheelchair Ramps. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

SECTION CONCRETE REPAIR AND PATCHING

SECTION CONCRETE REPAIR AND PATCHING SECTION 03937 CONCRETE REPAIR AND PATCHING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, General Specifications, and Division

More information

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations.

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations. DURA-CRETE S-SERIES PRECAST CONCRETE WALL SPECIFICATIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete Screen Wall Description: Work under this item shall consist of furnishing and erecting a wall in

More information

SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage.

SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage. SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS. 1-3.2 Common Usage. Abbreviations Word or Words PAV.Pressure Aging Vessel PCC..Portland Cement Concrete PE.Polyethylene

More information

SECTION PORTLAND CEMENT CONCRETE

SECTION PORTLAND CEMENT CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this

More information

A. Submittal Procedures: See Article 13 of the General Conditions.

A. Submittal Procedures: See Article 13 of the General Conditions. SECTION 321313 - CONCRETE PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Driveways. 2. Roadways. 3. Parking lots. 4. Curbs and gutters. 5. Walks. B. Proposed Substitutions: See Article 2,

More information

***************************************************************************************************************

*************************************************************************************************************** 03450 ARCHITECTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 45 13 ***************************************************************************************************************

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for the supply, casting, finishing, curing, and testing of cast-in-place concrete, as

More information

Columbia Public Schools Shepard Elementary School Classroom Building Addition PWA I 1 CONCRETE REINFORCEMENT ~4 ASSURANCE

Columbia Public Schools Shepard Elementary School Classroom Building Addition PWA I 1 CONCRETE REINFORCEMENT ~4 ASSURANCE B. Supports and accessories for steel reinforcement. 1.02 SECTIONS A. Section 03300- Cast-in-Place Concrete. 1.03 SUBMITTALS A. See Section 01300- Administrative Requirements, for submittal procedures.

More information

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows: Section 02775 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Reinforced concrete sidewalks. B. Wheelchair ramps. C. Reinforced slope paving. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 350 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE 350.01 SCOPE 350.02 REFERENCES 350.03 DEFINITIONS TABLE OF CONTENTS

More information

SECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM):

SECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM): SECTION 03450 ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03100 - Concrete Formwork 2. 03200 - Concrete Reinforcement 3. 03300 - Cast-in-Place Concrete 4. 03600 -

More information

SECTION INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING

SECTION INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING SECTION 04210 INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING PART I GENERAL 1.1 SUMMARY A. Provide installation of new or replacement of masonry units and/or repointing of masonry units

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

A. Reinforcing steel for cast-in-place concrete. A. See Section ~ Unit Prices, for additional unit price requirements.

A. Reinforcing steel for cast-in-place concrete. A. See Section ~ Unit Prices, for additional unit price requirements. SECTION 03 2000 CONCRETE REINFORCEMENT PART1 GENERAL 1.01 SECTION INCLUDES A. Reinforcing steel for cast-in-place concrete. B. Supports and accessories for steel reinforcement. 1.02 UNIT PRICE- MEASUREMENT

More information

1 Exam Prep Guide to Shotcrete Questions

1 Exam Prep Guide to Shotcrete Questions 1 Exam Prep Guide to Shotcrete Questions 1. According to Guide to Shotcrete, another name used for dry mix shotcrete is: A. batching B. gunite C. shotcrete D. slugging 2. Shotcrete in which all of the

More information

LITHOCRETE ARCHITECTURAL CONCRETE PAVING

LITHOCRETE ARCHITECTURAL CONCRETE PAVING LITHOCRETE ARCHITECTURAL CONCRETE PAVING PART 1 GENERAL 1.1 GENERAL CONDITIONS A. Requirements of "General Conditions of the Contract" and of Division 1, "General Requirements," apply to work in this Section

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 90P-270 Sheet 1 of 5 SECTION PAVEMENT PATCHING Page 591, Section. Delete the Section and replace with

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood.

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 03100-1 PART 1 GENERAL 1.1 Related Work.1 All Division 1 Specification Sections.2 Section 02233 Granular Base.3 Section 02311 Site Grading.4 Section 03200

More information

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following: PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral

More information

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure

More information

SECTION STRUCTURAL CONCRETE

SECTION STRUCTURAL CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. Provision and installation of formwork, reinforcing steel, and cast-in-place concrete detailed and described on the drawings and hereinafter specified. B. Provision

More information

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE SECTION 033053- MISCELLANEOUS CAST-IN-PLACE CONCRETE PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION CONCRETE PAVING

SECTION CONCRETE PAVING PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 13 13 CONCRETE PAVING A. Extent of concrete curbs, walks, and paving as show on drawings B. Earthwork and prepared sub-base C. Concrete and related materials

More information

Conditions of the Contract and Division 1 General Requirements are a part of this section.

Conditions of the Contract and Division 1 General Requirements are a part of this section. NOTES TO SPECIFIER General notes about the specifications and the reasons for them are listed here in general statements. Use this as a guide when choosing the correct selection of statements that apply

More information

SECTION 11 - REINFORCED AND PLAIN CONCRETE WORKS CONTENTS

SECTION 11 - REINFORCED AND PLAIN CONCRETE WORKS CONTENTS CONTENTS SPECIFICATIONS SECTION NO. Scope 11.20 Codes and Standards 11.21 Form Release Agent 11.22 Supports, Chairs and Spacers 11.23 Reinforcement 11.24 Forms 11.25 Premoulded Joint Filler 11.26 Cement

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 03 45 00_PRECAST CONCRETE STRUCTURES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including

More information

SECTION UNIT PAVERS

SECTION UNIT PAVERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Concrete pavers. 2. Detectable warning pavers. 3. Warning stripe pavers. 1.2 SUBMITTALS A. Product Data: For the following: 1. Pavers.

More information

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving 2004 Specifications CSJ 0196-02-120 SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving 1. Description. This Item shall govern for the furnishing and placing of colored concrete wave

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-03 52 16 (April 2008) -------------------------- Preparing Activity: USACE Superseding UFGS-03 51 00 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS References