1 # 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: December 9, 2015 Item: UN Prepared by: Robert Eastman GENERAL INFORMATION: Applicant: Owner: Requested action: Purpose: Location: GBS Holdings, LLC GBS Holdings, LLC Approval of an extension of time for an existing special use permit To allow a Cultivation Facility for Medical Marijuana Southeast corner of Beesley Drive and Azure Avenue Parcel Number(s): Lot area: Comprehensive Plan: Existing land use and zoning: Surrounding land use and zoning: 9.15 ± acres Heavy Industrial Undeveloped; M-2 General Industrial District North: Sysco Food Services; M-2, General Industrial District East: Undeveloped; M-2, General Industrial District South: Undeveloped; M-2, General Industrial District West: Undeveloped; O-L Open Land BACKGROUND INFORMATION: The applicant is requesting Planning Commission consideration for an extension of time for

2 a previously approved special use permit to allow a cultivation facility for medical marijuana. The special use permit was originally approved by the City Council on October 14, The site plan has two phases and two future buildings. The applicant has received a provisional license from the State for the proposed use. The applicant has also filed a request (UN ) for an extension of time for a special use permit to allow the production of edible marijuana products or marijuana-infused products, which is scheduled for tonight s agenda. According to the site plan, the applicant is proposing to occupy 17,059 square feet of the 18,347 square foot Building A with the cultivation facility. The remaining portion (1,288 square feet) would be used for the production of edible marijuana products or marijuanainfused products. In addition, the site plan indicates additions for Building A and Building D. The addition to Building A is approximately 26,000 square feet and Building D is proposed to be 124,800 square feet. Building C is identified as a pharmacy. However, this site was not granted a provisional license for a dispensary and the applicant did not apply for an extension of time for the use permit. The previously submitted floor plan shows a single entrance for each use. The cultivation facility contains cultivation and processing facilities. Production facilities are proposed in a small portion of Building A (identified as Building B ). The facility is completely separated from the neighboring use and contains a separate entry and security. The applicant is proposing a total of 164 parking spaces at build-out of the project where 107 parking spaces are required. Access to the site is from two drives located along Azure Avenue. Access to Building D is from a single secured access area. The remaining buildings can be accessed from the central parking lot. Landscaping on the site is in compliance with industrial design standards. The site plan provides 20 feet of landscaping along Azure Avenue. Additionally, there is adequate parking lot landscaping and foundation landscaping for the proposed buildings. The proposed building A is 24 8 in height, with a flat roof and parapet, while building C is 30 8 in height. According to the building elevations, the buildings will be constructed of concrete tilt-up panels. Building A contains a belt line and windows around the accessory offices. Building C has more of an office appearance and has windows on all sides and aluminum accents on the front façade. It appears that one primary entrance for each use will be provided that will front the parking lot facing Azure Avenue. DEPARTMENT COMMENTS: Public Works Department: Fire Department: Please see the attached memorandum. Please see the attached memorandum.

3 Building Division: Police Department: Please see the attached memorandum. Please see the attached memorandum. ANALYSIS: A cultivation facility for medical marijuana is permitted within the M-2, General Industrial District with the approval of a special use permit by the Planning Commission. According to Title 17, the following requirements must be demonstrated. Distance Separation Requirements: The applicant must submit a survey from a Nevada licensed surveyor that demonstrates the proposed establishment meets the separation requirements of 1,000 from a school, 300 feet from a community facility, and developed residential. The submitted survey indicates that these requirements have been met. Separate, Stand Alone Building or Facility: According to the site plan, the applicant is proposing to locate the proposed establishment in the majority of a proposed building with two phases. The remaining portion of the building is proposed for the production of medical marijuana. The proposed use would be separated from the proposed production facility. Appropriately Zoned: The subject site has the appropriate zoning of M-2, General Industrial District. Specific Use of the Facility: The applicant is proposing a cultivation facility for medical marijuana. Other than a production facility proposed in a different suite, the letter of intent or site plan do not indicate other activities within the same suite proposed for cultivation. A Single Entrance: According to the floor plan, it appears that one entrance is proposed. The only other entrances appear to be additional ingress/egress doors for life safety. No Outside Storage: The site plan does not indicate that outside storage is proposed as part of this use. Minimum Square Footage: The floor plan indicates a facility of approximately 17,059 (phase 1) and 169,200 (build out) square feet in size. This meets the minimum size criteria of 3,500 square feet. In addition to the above requirements, there are several other requirements the applicant would need to comply with that cannot be determined with the submittal of a land use request. Those requirements include, but are not limited to maintaining discreet and professional signage, complying with life safety requirements, and ensuring there is no emission of dust, fumes, vapors, or odors. Requirements for Approval of a Special Use Permit

4 In accordance with the Zoning Ordinance, the Planning Commission may, by motion, grant a special use permit if the Planning Commission finds, from the evidence presented, that all of the following facts exist: 1. The proposed use is consistent with the Comprehensive Master Plan and all applicable provisions of this Code and applicable State and Federal regulations; 2. The proposed use is consistent with the purpose and intent of the zoning district in which it is located and any applicable use-specific standards and criteria in Chapter of this Code; 3. The proposed use is compatible with adjacent uses in terms of scale, site design, and operating characteristics (such as, but not limited to, hours of operation, traffic generation, lighting, noise, odor, dust, and other external impacts); 4. Any significant adverse impacts anticipated to result from the use will be mitigated or offset to the maximum extent practicable; and 5. Facilities and services (including sewage and waste disposal, water, gas, electricity, police and fire protection, and roads and transportation, as applicable) will be available to serve the subject property while maintaining adequate levels of service for existing development. Staff has no objections to the proposed use. The proposed use is consistent with the zoning designation, and also appears to be consistent with the criteria set for a medical marijuana establishment. The proposed site plan is in compliance with the design standards. In regards to compatibility with the surrounding properties, the applicant will need to ensure on an on-going basis that noise, odor, dust, or other external impacts do not negatively impact the surrounding properties. Furthermore, prior to issuance of any tenant improvements or the issuance of a business license, the applicant will need to ensure that appropriate facilities and services are in place. RECOMMENDATION: The Community Development and Compliance Department recommends that UN be approved subject to the following conditions: Planning and Zoning: 1. That, unless expressly authorized through a variance, waiver or another approved method, this development shall comply with all applicable codes and ordinances. Public Works:

5 2. All known geologic hazards shall be shown on the site plan and the civil improvement plans. Subsequent identification of additional hazards may substantially alter the original site plan. 3. Approval of a drainage study is required prior to submittal of the civil improvement plans. 4. Dedication and construction of the following streets and/or half streets is required per the Master Plan of Streets and Highways and/or City of North Las Vegas Municipal Code section : a. Azure Avenue b. Beesley Drive 5. The public street geometrics, width of over-pave and thickness of the pavement sections will be determined by the Department of Public Works. 6. Approval of a traffic study is required prior to submittal of the civil improvement plans; a queuing analysis may be required. Please contact Traffic Engineering at to request a scope. 7. No dimensions are provided for the easternmost exit-only driveway. One way driveways must be a minimum of 12 wide measured from face-of-curb to face-ofcurb. The western driveway is located to close to Beesley Drive. The minimum back of curb radius at the Beesley Drive/Azure Way intersection is 25 feet. The size and number of driveways and their locations are subject to review and approval by the City of North Las Vegas Traffic Engineer and must meet the standards set forth in North Las Vegas Municipal Code section Conformance will require modifications to the site. 8. A turn analysis using Auto Turn or similar software program shall be provided showing that trucks can maneuver into the proposed secured access drive aisle. 9. Commercial driveways are to be constructed in accordance with Clark County Area Uniform Standard Drawing numbers 222.1, including throat depths, and 225, with minimum widths of 32 feet as measured from lip of gutter to lip of gutter. 10. The property owner is required to grant a roadway easement for commercial driveway(s). 11. Prior to the installation of any subgrade street improvements, all required underground utilities (i.e. telephone, power, water, etc.) located within public rightsof-way, shall be extended a minimum of ten (10) feet beyond the project boundary. 12. All off-site improvements must be completed prior to final inspection of the first building.

6 Police Department: 13. All applications must follow State of Nevada requirements for facility security. 14. Police Department approval is contingent upon submittal of a security plan to the Police Department, which will be verified with a site visit. ATTACHMENTS: Public Works Memorandum Fire Protection Memorandum Building Division Memorandum Police Department Memorandum Letter of Intent Site Plan Floor Plan Building Elevations Survey Clark County Assessor s Map Location and Zoning Map

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING # 5 ) UN-74-16 THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: November 9, 2016 Item: UN-74-16 Prepared by: Marc

More information

#21 ) FDP Covenant Group FINAL DEVELOPMENT PLAN

#21 ) FDP Covenant Group FINAL DEVELOPMENT PLAN STAFF REPORT #21 ) FDP-04-16 Covenant Group FINAL DEVELOPMENT PLAN To: Planning Commission Meeting date: October 12, 2016 Item: FDP-04-16 Prepared by: Robert Eastman GENERAL INFORMATION: Applicant: Owner:

More information

# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING

# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING # 7 ) UN-53-16 MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: September 14, 2016 Item: UN-53-16 Prepared by: Marc Jordan GENERAL INFORMATION: Applicant:

More information

# 14 ) ZN AMERICAN DIALYSIS CENTER OF NORTH LAS VEGAS M-2, GENERAL INDUSTRIAL DISTRICT TO M-1, BUSINESS PARK INDUSTRIAL DISTRICT PUBLIC HEARING

# 14 ) ZN AMERICAN DIALYSIS CENTER OF NORTH LAS VEGAS M-2, GENERAL INDUSTRIAL DISTRICT TO M-1, BUSINESS PARK INDUSTRIAL DISTRICT PUBLIC HEARING # 14 ) ZN-10-16 AMERICAN DIALYSIS CENTER OF NORTH LAS VEGAS M-2, GENERAL INDUSTRIAL DISTRICT TO M-1, BUSINESS PARK INDUSTRIAL DISTRICT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date:

More information

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT

More information

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION CITY OF GENEVA, NEW YORK The purpose of the site plan and architectural review process is to secure compliance with the City s Zoning Ordinance and to promote

More information

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan A. In accordance with Local Government Code Section 232.007, an Infrastructure Development Plan (IDP) is required for all manufactured home rental communities, as defined in Section A 1.0 E of these regulations,

More information

# Mercyhealth Hospital Project Review for Planning and Zoning Commission

# Mercyhealth Hospital Project Review for Planning and Zoning Commission #2017-38 Mercyhealth Hospital Project Review for Planning and Zoning Commission Meeting Dates: December 6, 2017 and January 3, 2018 Requests: 1. Preliminary Planned Unit Development and 2. Special Use

More information

MINUTES CITY OF NORTH LAS VEGAS PLANNING COMMISSION

MINUTES CITY OF NORTH LAS VEGAS PLANNING COMMISSION MINUTES CITY OF NORTH LAS VEGAS PLANNING COMMISSION October 10, 2007 All Staff Reports and attachments are available on the City s Website - http:// www.cityofnorthlasvegas.com BRIEFING: 5:30 P.M., Conference

More information

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007: LOT GRADING DEFINITION Lot grading is the reshaping or sloping of the land in such a way that surface drainage from rain runoff is directed away from the buildings and is controlled in a manner that eliminates

More information

Zoning Permits 11-1 ZONING PERMITS

Zoning Permits 11-1 ZONING PERMITS Zoning Permits 11-1 ZONING PERMITS (a) Building or structures shall be started, repaired, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator and a building

More information

Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial

Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial Planning Commission Staff Report Planning Commission Hearing November 14, 2016 Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial Request: A request to develop a 15,996 square foot

More information

Architectural Review Board Report

Architectural Review Board Report Architectural Review Board Report Architectural Review Board Meeting: December 15, 2014 Agenda Item: 7.5 To: From: Subject: Architectural Review Board Steve Traeger, Principal Urban Designer Grace Page,

More information

Request Conditional Use Permit (Automobile Repair Garage) Staff Planner Jimmy McNamara

Request Conditional Use Permit (Automobile Repair Garage) Staff Planner Jimmy McNamara Applicant Property Owner Sarrow One, LLC Public Hearing December 14, 2016 City Council Election District Princess Anne Agenda Item 13 Request Conditional Use Permit (Automobile Repair Garage) Staff Planner

More information

BAUM INDUSTRIAL PARK DEVELOPMENT, PERFORMANCE AND MAINTENANCE STANDARDS DOCUMENT. October, 1991

BAUM INDUSTRIAL PARK DEVELOPMENT, PERFORMANCE AND MAINTENANCE STANDARDS DOCUMENT. October, 1991 BAUM INDUSTRIAL PARK DEVELOPMENT, PERFORMANCE AND MAINTENANCE STANDARDS DOCUMENT October, 1991 PART I INTRODUCTION 1. The Baum Industrial Park includes about 150 acres of land generally located east of

More information

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions: SECTION 46-53.1 B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT A. PURPOSE The B-2 Community Commercial Business District is oriented toward retail, service businesses and multi-family residential development.

More information

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith Applicant Property Owner Holland Century Associates, LLP Public Hearing January 13, 2016 Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith Location 3949 Holland Road

More information

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT TO: Planning and Zoning Board FROM: Carlos M. Rivero, City Planner DATE: August 10, 2015 RE: Storage Facility P&Z ITEM # 15-010 OWNER

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 SUBDIVISION NAME DEVELOPMENT NAME LOCATION Northside LTD/Joint Venture Subdivision, Resubdivision of and Addition to Lot 3A Northside

More information

Commercial Tax Abatement

Commercial Tax Abatement A confirmation letter is issued by the City upon receipt of this application. This application is not effective and not considered filed until the confirmation letter has been issued. Filing does not assure

More information

SOLAR ENERGY CONVERSION FACILITIES. Carroll County Code of Public Local Laws & Ordinances As of December 1, 2015

SOLAR ENERGY CONVERSION FACILITIES. Carroll County Code of Public Local Laws & Ordinances As of December 1, 2015 158.153 SOLAR ENERGY CONVERSION FACILITIES Carroll County Code of Public Local Laws & Ordinances As of December 1, 2015 158.153 SOLAR ENERGY CONVERSION FACILITIES. (A) Purpose. The intent of this section

More information

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater.

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater. Background The City of rth Las Vegas strives to provide the development community with adequate information to ensure the successful completion of any project in the City. To aid in the submittal of a

More information

Commercial Remodel Permit

Commercial Remodel Permit Commercial Remodel Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each

More information

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY

More information

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations Section 16.20.060 - Corridor Residential Traditional Districts ( CRT ) Typical Buildings in the CRT District Sections: 16.20.060.1 Composition of Traditional Residential Corridors 16.20.060.2 Purpose and

More information

AGENDA PLANNING COMMISSION MEETING Thursday, May 5, 2016 City Council Chambers 220 E Morris Avenue, 2 nd Floor Planning Commission Work Meeting at 6:30 p.m. 1. Discussion of Agenda Items Regular Planning

More information

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1300 CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1301 SECTION 13.01 STATEMENT OF PURPOSE To provide for manufactured home park development, of long-term duration of stay, in

More information

Fence and Wall Requirements

Fence and Wall Requirements Fence and Wall Requirements Definitions Decorative wall - A wall constructed of stone or other material erected for the sole purpose of providing a decorative and/or landscaped feature, and not to include

More information

ADMINISTRATIVE HEARING STAFF REPORT

ADMINISTRATIVE HEARING STAFF REPORT ADMINISTRATIVE HEARING STAFF REPORT Salt Lake City Water Treatment Facility 1365 West 2300 North CONDITIONAL USE Case #PLNPCM2013-00762 December 12, 2013 Planning and Zoning Division Department of Community

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

WESTERN ENGINEERING CONSULTANTS, Inc LLC

WESTERN ENGINEERING CONSULTANTS, Inc LLC WESTERN ENGINEERING CONSULTANTS, Inc LLC 127 S. Denver Avenue, Ft. Lupton CO 80621 2501 Mill St. Brush, CO 80723 Ph. 303-913-7341, Fax 720-294-1330 Email: firstname.lastname@westerneci.com August 24, 2017

More information

r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r

r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r N e w A l b a n y, O h i o r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r D e s i g n G u i d e l i n e s & R e q u i r e m e n t s s e c t i o n 5 I. Overview This section applies to all

More information

RESIDENTIAL BUILDING PERMIT PROCEDURES

RESIDENTIAL BUILDING PERMIT PROCEDURES RESIDENTIAL BUILDING PERMIT PROCEDURES Community Development Dept. 9220 Bonita Beach Road, Ste. 111 Bonita Springs, FL 34135 (239) 444-6150 permitting@cityofbonitaspringscd.org THREE (3) SETS OF PLANS

More information

ARTICLE III: LAND USE DISTRICTS EXCLUSIVE FOREST AND CONSERVATION DISTRICT (EFC)

ARTICLE III: LAND USE DISTRICTS EXCLUSIVE FOREST AND CONSERVATION DISTRICT (EFC) ARTICLE III: LAND USE DISTRICTS III-129 342 EXCLUSIVE FOREST AND CONSERVATION DISTRICT (EFC) 342-1 Intent and Purpose The Exclusive Forest and Conservation District is intended to provide for forest uses

More information

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS) 1420 Miner Street Des Plaines, IL 60016 P: 847.391.5380 desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS) Five sets of stamped plans and specifications (six sets if food establishment),

More information

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations Section 16.20.020 - Neighborhood Suburban Single-Family Districts ( NS ) Sections: Typical Block in a Neighborhood Suburban District 16.20.020.1 History and Composition of Suburban Neighborhoods 16.20.020.2

More information

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations 16.20.060 - Corridor Residential Traditional District ( CRT ) Figure REFERENCE Typical Buildings in the CRT District Sections: 16.20.060.1 Composition of Traditional Residential Corridors 16.20.060.2 Purpose

More information

Attachment 1 Findings and Conditions

Attachment 1 Findings and Conditions 2451 Ridge Road Use Permit #04-10000066 Attachment 1 Findings and Conditions APRIL 10, 2008 CEQA FINDINGS 1. The project is categorically exempt from the provisions of the California Environmental Quality

More information

5 February 12, 2014 Public Hearing APPLICANT AND PROPERTY OWNER: ERIK HOMES, L.L.C.

5 February 12, 2014 Public Hearing APPLICANT AND PROPERTY OWNER: ERIK HOMES, L.L.C. 5 February 12, 2014 Public Hearing APPLICANT AND PROPERTY OWNER: ERIK HOMES, L.L.C. STAFF PLANNER: Kristine Gay REQUEST: Special Exception for Alternative Compliance to the Oceanfront Resort District Form-Based

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

Departure from Parking & Loading Standards

Departure from Parking & Loading Standards The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

ONLY ONLY BUILDING AND PARKING ENVELOPE RAMP STAIRS NEW SURFACE PARKING PROPOSED HOTEL PROPOSED TWO STORY PARKING STRUCTURE NEW SURFACE PARKING

ONLY ONLY BUILDING AND PARKING ENVELOPE RAMP STAIRS NEW SURFACE PARKING PROPOSED HOTEL PROPOSED TWO STORY PARKING STRUCTURE NEW SURFACE PARKING LOCATION MAP SITE DEVELOPMENT DATA: --ACREAGE: ± 5. ACRES -- ZONING: MUDD-O -- USES: UP TO TWO () HOTELS WITH UP TO 70 ROOMS (APPROXIMATELY 00 ROOMS IN THE EXISTING HOTEL ON THE SITE, AND UP TO 70 ROOMS

More information

City of Valdosta Land Development Regulations

City of Valdosta Land Development Regulations Section 210-3 Urban Commercial Corridor Overlay District (A) Purpose. The purposes of the Urban Commercial Corridor Overlay District are to: (1) Promote the general health, safety, and welfare of the community.

More information

Application Number: SP Project Name: Novo Nordisk Bright Sky Major Site Plan (acting as a Master Plan)

Application Number: SP Project Name: Novo Nordisk Bright Sky Major Site Plan (acting as a Master Plan) STAFF REPORT Town of Clayton Staff Report Planning Department 111 E. Second Street, Clayton, NC 27520 P.O. Box 879, Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720 Planning Board February 22, 2016

More information

City of Jacksonville Development Guide Building Permits

City of Jacksonville Development Guide Building Permits City of Jacksonville TX City of Jacksonville Development Guide Building Permits A publication to help understand the Building Permit process in the City Jacksonville. Building Department 2011 J Revised

More information

Last Updated March 15, 2016

Last Updated March 15, 2016 CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT 30508 S. West Outer Road, Harrisonville, MO 64701 P- (816) 380-8134 F- (816) 380-8130 Last Updated March 15, 2016 Information

More information

Addition to Section 4 - Special Use Regulations

Addition to Section 4 - Special Use Regulations Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information

Building Permit Submittal Requirements

Building Permit Submittal Requirements CITY OF MONTE SERENO 18041 Saratoga-Los Gatos Road Monte Sereno, CA 95030 Phone (408) 354-7635 Fax (408) 395-7653 www.cityofmontesereno.org Building Permit Submittal Requirements NOTE: Submit three (3)

More information

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements General Information Site Card. Before starting construction, post the site card (issued by the City) in a front window visible from the street. Miss Dig. Before you dig, call Miss Dig at 800.482.7171 This

More information

ORDINANCE NO. BE IT ORDAINED by the City Council of the City of Waukee:

ORDINANCE NO. BE IT ORDAINED by the City Council of the City of Waukee: ORDINANCE NO. AN ORDINANCE TO AMEND CHAPTER 300, ZONING ORDINANCE, CITY OF WAUKEE, IOWA, BY AMENDING SECTION 301.8 TO ADD PROVISIONS REGULATING SOLAR ENERGY SYSTEMS BE IT ORDAINED by the City Council of

More information

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord. ARTICLE 987. PD 987. SEC. 51P-987.101. LEGISLATIVE HISTORY. PD 987 was established by Ordinance No. 30512, passed by the Dallas City Council on June 14, 2017. SEC. 51P-987.102. PROPERTY LOCATION AND SIZE.

More information

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW Chapter 8 Building and Building Regulations, Article XIII Grading and Drainage and Article XV Soil Erosion and Sedimentation

More information

SUBDIVISION SECTION STREET DESIGN MANUAL

SUBDIVISION SECTION STREET DESIGN MANUAL CITY OF ANAHEIM SUBDIVISION SECTION STREET DESIGN MANUAL A. INTRODUCTION : POLICY STATEMENT B. STREET CLASSIFICATION C. STREET STANDARDS REQUIREMENTS Requirements Approval of Street Improvement Plans Widening

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

ZONING RESOLUTION OF KNOX COUNTY APPENDIX C SOLAR ENERGY SYSTEM ORDINANCE

ZONING RESOLUTION OF KNOX COUNTY APPENDIX C SOLAR ENERGY SYSTEM ORDINANCE ZONING RESOLUTION OF KNOX COUNTY APPENDIX C SOLAR ENERGY SYSTEM ORDINANCE Purpose The purpose of this ordinance is to promote and encourage economic development, while maintaining order in the construction,

More information

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # )

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # ) H.O. 03/24/14 SP-14-01 Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS #201400001) Request: Approval of a Special Permit for major earthmoving in the A (General Agriculture)

More information

Christy Usher, AICP Associate Planner Phone Fax:

Christy Usher, AICP Associate Planner Phone Fax: Item No: 2 Meeting Date: March 12, 2013 To: Planning Commission Date: March 7, 2013 Authorized By: Ron Munekawa Chief of Planning By: Christy Usher, AICP Associate Planner Phone 650 522-7215 Fax: 522-7201

More information

RESIDENTIAL ARCHITECTURAL DESIGN (RAD) REVIEW STANDARDS AND PROCESS

RESIDENTIAL ARCHITECTURAL DESIGN (RAD) REVIEW STANDARDS AND PROCESS RESIDENTIAL ARCHITECTURAL DESIGN (RAD) REVIEW STANDARDS AND PROCESS The Residential Architectural Design (RAD) Review process was adopted by the El Cerrito City Council in 1994. It was intended to strike

More information

DESIGN AND CONSTRUCTION STANDARDS CODE

DESIGN AND CONSTRUCTION STANDARDS CODE DESIGN AND CONSTRUCTION STANDARDS CODE FOR City of Bridgeport Harrison County West Virginia August 1995 Revised December 21, 2015 515 W. Main Street, P.O. Box 1310 Bridgeport, WV 26330 Phone: 304-842-8204

More information

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270) CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY 42141 Phone: (270) 651-3921 Fax: (270) 651-9553 Permit # Filing Date: Total Fee: Property Property Owner: Subdivision: Lot #

More information

MIAMI 21 ARTICLE 5. SPECIFIC TO ZONES PUBLIC HEARING-FIRST READING TABLE OF CONTENTS

MIAMI 21 ARTICLE 5. SPECIFIC TO ZONES PUBLIC HEARING-FIRST READING TABLE OF CONTENTS TABLE OF CONTENTS 5.1 Generally 5.2 Natural Transect Zone (T1) and Rural Transect Zones (T2) (Reserved) 5.3 Sub-Urban Transect Zones (T3) 5.4 General Urban Transect Zones (T4) 5.5 Urban Center Transect

More information

ARTICLE 5 RESIDENTIAL MANUFACTURED HOME DISTRICT. Description and Purpose CHARTER TOWNSHIP OF BRIGHTON ZONING ORDINANCE

ARTICLE 5 RESIDENTIAL MANUFACTURED HOME DISTRICT. Description and Purpose CHARTER TOWNSHIP OF BRIGHTON ZONING ORDINANCE ARTICLE RESIDENTIAL MANUFACTURED HOME DISTRICT This Article was reviewed and approved by the Michigan Department of Consumer and Industry Services, Corporation and Securities Bureau, Manufactured Home

More information

Ordinance No Lot Surface Drainage

Ordinance No Lot Surface Drainage Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section

More information

RECOMMENDATION: Staff recommends approval and provides the following motion for the commission s consideration:

RECOMMENDATION: Staff recommends approval and provides the following motion for the commission s consideration: PZ Case No. 17-09 Planning & Zoning Commission COMMUNITY DEVELOPMENT DEPARTMENT March 13, 2017 Subject: Consider making a recommendation on PZ Case No. 17-09; the site plans for Amega Garage Doors at 4901

More information

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS To Wit: To see if the Town will vote to amend the Town of Westborough Zoning Bylaws, Article 2, District Regulations, Section 2300, Use Regulations Schedule; and to amend Article 4, Special Regulations

More information

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES City of Bullhead City Development Services/Public Works Permit Submittal Requirements FENCES Contact Information: Building Division (928) 763-0124 Planning & Zoning Division (928) 763-0123 Engineering

More information

Franklin County Communique to the Planning Board

Franklin County Communique to the Planning Board Franklin County Communique to the Planning Board PETITIONER(S): Name of Petitioner: Carolina Solar Energy II, LLC Address: 400 W. Main St. Suite 503 City/State/Zip: Durham, NC 27701 LOCATION: REQUEST FOR

More information

BULLARD STREET HEYWOOD AVENUE 40' PUBLIC R/W 40' PUBLIC R/W MARKED CROSSWALK FUTURE B.O.C. LANDSCAPE SCREENING (USDG U-03 RESIDENTIAL WIDE)

BULLARD STREET HEYWOOD AVENUE 40' PUBLIC R/W 40' PUBLIC R/W MARKED CROSSWALK FUTURE B.O.C. LANDSCAPE SCREENING (USDG U-03 RESIDENTIAL WIDE) DEVELOPMENT STANDARDS A. General Provisions 1. These Development Standards form a part of the Rezoning Plan associated with the Rezoning Petition filed by CapRock, LLC ( Petitioner ) to accommodate the

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

Residential Design Standards Draft 9 August 2013

Residential Design Standards Draft 9 August 2013 RESIDENTIAL DESIGN STANDARDS ORDINANCE DRAFT 9 AUGUST 2013 17.25 Residential Design Standards 17.25.010 Purpose The purpose of this chapter is to establish minimum design standards for new residential

More information

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento 915 I Street, Sacramento, CA 95814-2671 4 To: Members of the Planning and Design Commission: PUBLIC HEARING May 11, 2017 Subject: Capital City

More information

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer Town of Pittstown 97 Tomhannock Road, Valley Falls, NY 12185 (518) 753-4222 Office of the Building Inspector / Code Enforcement Officer I. Required before issuance of Building Permit 1. Completed Application

More information

City of La Palma Agenda Item No. 2

City of La Palma Agenda Item No. 2 City of La Palma Agenda Item No. 2 MEETING DATE: March 9, 2015 TO: FROM: SUBMITTED BY: AGENDA TITLE: DEVELOPMENT COMMITTEE DOUGLAS D. DUMHART COMMUNITY DEVELOPMENT DIRECTOR SCOTT HUTTER, ASSOCIATE PLANNER

More information

Community Development Department Council Chambers, 7:30 PM, February 18, 2016

Community Development Department Council Chambers, 7:30 PM, February 18, 2016 STAFF REPORT 2016-3P: Special Use Permit Community Development Department Council Chambers, 7:30 PM, February 18, 2016 To: From: Re: Paul Luke, Plan Commission Chairperson Steve Marciani, AICP, Planning

More information

ZONING ADMINISTRATOR AGENDA

ZONING ADMINISTRATOR AGENDA COMMUNITY DEVELOPMENT SERVICES PLANNING SERVICES ZONING ADMINISTRATOR AGENDA May 14, 2014 City Council Chambers 3:00 PM 1. 911 Arguello Street (Crown Castle on behalf of Sprint) Use Permit and Architectural

More information

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations 16.20.020 Neighborhood Suburban Single-Family District ( NS ) Figure REFRENCE Typical Houses in Neighborhood Suburban 1 Figure REFRENCE Typical Block in a Neighborhood Suburban District Sections: 16.20.020.1

More information

The requirements set forth in this Section shall govern the construction and/or installation of all Renewable Energy Systems:

The requirements set forth in this Section shall govern the construction and/or installation of all Renewable Energy Systems: CHAPTER 408: RENEWABLE ENERGY SYSTEMS Renewable Energy Systems are accessory uses which include Solar Energy Systems and Wind Energy Systems that provide supplemental energy to residential, nonresidential,

More information

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS April 2009 General Solid Waste and Recycling Service Responsibilities: The City of Denton is the exclusive provider

More information

SECTION 3 STAKING REQUIREMENTS

SECTION 3 STAKING REQUIREMENTS 3.01 TOPIC INDEX SECTION 3 STAKING REQUIREMENTS 3.01 INDEX 3.02 PURPOSE 3.03 GENERAL 3.04 STAKING PROCEDURE 3.05 TMWA / DEVELOPER COORDINATION 3.06 WATER STAKING DETAILS 3.07 DEVELOPER RESPONSIBILITIES

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

Light Industrial (I)

Light Industrial (I) C H A P T E R 32 Light Industrial (I) Sections 17.32.01 Purpose 17.32.02 Permitted Uses 17.32.03 Accessory Uses 17.32.04 Conditional Uses 17.32.05 Site Plan Review 17.32.06 Development Standards 17.32.07

More information

Click to edit Master text styles

Click to edit Master text styles LB, GB & OB Zoning District Architectural and Building Design Standards GB & LB OB Overview of items to consider: Design Standards General Requirements 1. Buildings should Second be parallel to street

More information

MONROE COUNTY ZONING OFFICE

MONROE COUNTY ZONING OFFICE MONROE COUNTY ZONING OFFICE 100 South Main Street Waterloo, IL 62298 618-939-8681 Ext. 260 mczoning@htc.net PROCEDURES FOR NEW CONSTRUCTION 1. Applicant must provide a recorded copy of deed to the property

More information

Neighborhood Traditional Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Neighborhood Traditional Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations Section 16.20.010 - Neighborhood Traditional Single-Family Districts ( NT ) Typical Houses in a Neighborhood Traditional District Typical Block in a Neighborhood Traditional District Common Features of

More information

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows:

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows: RESOLUTION NO.15- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LA HABRA CERTIFYING MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACTS 14-02 FOR A 32 UNIT MULTI-FAMILY RESIDENTIAL DEVELOPMENT

More information

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT March 29, 2011 Staff Contact: Ward Stewart or Peyman Behvand (707)

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT March 29, 2011 Staff Contact: Ward Stewart or Peyman Behvand (707) CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT March 29, 2011 Staff Contact: Ward Stewart or Peyman Behvand (707) 449-5140 TITLE: REQUEST: A1 TIRES AND WHEELS CONDITIONAL USE PERMIT

More information

ENVIRONMENTAL INFORMATION FORM

ENVIRONMENTAL INFORMATION FORM ENVIRONMENTAL INFORMATION FORM City of Fontana Planning Division The purpose of this form is to inform the city of the basic components of the proposed project so that the City may review the project pursuant

More information

COMMUNITY DEVELOPMENT

COMMUNITY DEVELOPMENT COMMUNITY DEVELOPMENT PERMITTING PROCEDURE FOR NEW SINGLE FAMILY & DUPLEX RESIDENCES, ADDITIONS, ALTERATIONS, SHEDS, UTILITY BUILDINGS, GAZEBOS, POLE- BARNS & DETACHED GARAGES (eff. 3/15/2012) Plans that

More information

CITY OF WACONIA PLANNING COMMISSION AGENDA

CITY OF WACONIA PLANNING COMMISSION AGENDA CITY OF WACONIA PLANNING COMMISSION AGENDA Regular Meeting of Thursday, October 5, 2017 Planning Commission City Hall 6:30 PM Waconia, Minnesota MEMBERS: Robert Grohmann, Steve Hebeisen, Dan Lesher John

More information

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS

More information

Submittal Requirements for Administrative Design Review of Signage

Submittal Requirements for Administrative Design Review of Signage CITY OF MERCER ISLAND, DEVELOPMENT SERVICES GROUP 9611 S.E. 36 ST., MERCER ISLAND, WA 98040 (206) 275-7605 FAX: (206) 275-7726 WWW.MERCERGOV.ORG Submittal Requirements for Administrative Design Review

More information

Title 15 BUILDINGS AND CONSTRUCTION

Title 15 BUILDINGS AND CONSTRUCTION Title 15 BUILDINGS AND CONSTRUCTION Chapters: 15.04 International Codes Adopted 15.08 Building Permits 15.12 Movement of Buildings Chapter 15.04 INTERNATIONAL CODE COMMISSION CODES Sections: 15.04.010

More information

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations. COACHELLA VALLEY WATER DISTRICT DOMESTIC WATER CHECKLIST Tract/Parcel No: Project Common Name: Developer: Engineer: Engineer Signature: Date: Phone: Phone: Print: This is only a general checklist; please

More information

a. Structures subject to section Architectural & Site Design Standards must comply with the following additional fencing standards:

a. Structures subject to section Architectural & Site Design Standards must comply with the following additional fencing standards: 5.03.02 Fences and Walls A. All districts. 1. Whenever a property owner elects to construct a chain link fence, pursuant to the provisions herein, adjacent to an arterial or collector road in the urban

More information

TRAFFIC STUDY GUIDELINES

TRAFFIC STUDY GUIDELINES TRAFFIC STUDY GUIDELINES December 2013 The scope of the traffic impact analysis (TIA) should follow these guidelines and the requirements of VMC 11.80.130 and VMC 11.70, transportation concurrency (attached

More information

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA DESIGN REVIEW REPORT DOCKET NO: SUMMAR NO.: : : Paul D. Johnston AT LARGE: A: Chris Roberts B: Elton M. Lagasse ADVERTISING DATES: PAB PUBLIC HEARING:

More information

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person

More information

UNHEATED UTILITY STRUCTURES BUILDING PERMIT PACKET: APPLICATION AND GUIDE

UNHEATED UTILITY STRUCTURES BUILDING PERMIT PACKET: APPLICATION AND GUIDE Gunnison County, CO Community Development Department 221 N. Wisconsin St. Ste. D, Gunnison, CO 81230 Phone: (970) 641 0360 FAX: (970) 641 8585 Website: www.gunnisoncounty.org/planning.html Email: planning@gunnisoncounty.org

More information

FENCE PERMIT APPLICATION

FENCE PERMIT APPLICATION Department of Building, Zoning & Housing 26789 Highland Road Richmond Heights, Ohio 44143-1429 216-383-6312 Fax: 216-383-6319 richmondheightsohio.org FENCE PERMIT APPLICATION LOCATION OF JOB LOT # SUBDIVISION

More information