1 DATE: December 15, 2009 ADDENDUM NO.: 1 BID NO.: FWC 09/10-48 BID TITLE: CHANGE: ADD: RENOVATION OF THE PRAIRIE LAKES FIELD OFFICE AT THE THREE LAKES WMA CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM DECEMBER 18, 2009 to DECEMBER 22, 2009 AT 3:00 PM PRE-BID CONFERENCE SIGN-IN SHEET VENDOR QUESTIONS AND FWC ANSWERS UPDATE: SCOPE OF WORK; PRICE SHEET AND BLUEPRINTS Please complete this form including manual signature of authorized representative and return it to this office. This completed form shall be received by this office on or before the bid opening date via mail or it can be faxed to (850) Jeri Bailey Procurement Manager VENDOR NAME: Office of the Finance & Executive Budget Director Kenneth D. Haddad Executive Barbie Levins Director (850) Purchasing Director (850) FAX (850) FAX VENDOR FEID#: ADDRESS: CITY/STATE: PHONE #: FAX #: AUTHORIZED SIGNATURE: TITLE:
2 Page 2 UPDATED INVITATION TO BID CALENDAR OF EVENTS SCHEDULE DUE DATE METHOD Vendor Bid System Bid Advertised November 25, MANDATORY Pre-Bid Conference December 9, 10:00am See Mandatory Pre-Bid Conference Clause Deadline for Questions Must be received PRIOR to: December 11, 5:00 p.m. See Deadline for Questions Clause SEALED BIDS DUE AND OPENED (make sure Bid Number is clearly marked on envelope) Must be received PRIOR to: December 22, 3:00 p.m. Submit to: Florida Fish & Wildlife Conservation Commission Attn: Purchasing 620 S. Meridian St., Room 364 Tallahassee, Florida Anticipated Posting December 28, 2009 Vendor Bid System 09/10-48 UPDATED Scope of Work The Commission is seeking bids for the expansion of its current office by extending the building with a 24x26 addition and renovating the interior of the existing office. Vendors should submit prices on both of the following options listed below. The option that best fits the needs of the Commission and is within the allocated funds for this project will be awarded. Option 1 Option 2 Option 3 Bid price for 24 x 26 addition only. Bid price for 24 x 26 addition with additional interior renovations of existing building. Bid price for 24 x 26 addition with additional interior renovations of existing building plus the construction of Handicap Parking Space according to revised blueprints. The project includes construction of the Prairie Lakes Office addition at the Prairie Lakes WMA field office located in Kenansville, Florida. The Contractor shall provide all materials, labor, equipment and inspection fees necessary for the completion of all of the defined scope of work contained herein including the plans and specifications as prepared by John Link, Architect, and in accordance with the terms and conditions of this ITB. The project consists of an addition of 624 square feet (single story frame construction) and some inside renovations consisting of wall and ceiling construction.
3 Page 3 Contractor Responsibilities All permits for this project will be the responsibility of the Contractor. The Contractor shall pay for the building permits and coordinate inspections with the County. The Contractor shall be responsible for adhering to all permit conditions. The Contractor shall be responsible for all costs to complete this project as identified within this bid package including: The Contractor shall develop and provide all construction-related documents necessary to complete the project; this includes any/all documents required for permitting and completing this project according to the specifications and drawings contained in this bid package. Blueprints will be provided by the Commission. The Contractor shall secure the required building/remodel permits, including any fees associated with these permits. Unless otherwise noted, the Commission is not exempt from any state or local permitting requirements. The Contractor shall proof roll the graded areas within the building footprints (foundation fill for a building pad will be provided by the Commission) and compact it to meet current foundation compaction building code requirements. The Contractor shall reroute and repair HVAC, plumbing and electric as necessary to accommodate the contracted floor plan. The Contractor shall install new 2-ton Central AC/Heat Pump and install ductwork according to plans. Unit shall be a minimum of 14 SEER and should have a 10 year warranty on compressor, condenser, and parts. The Contractor shall include complete installation and include the following: make ducts airtight; install new ¾ plywood deck under the air handler; install new properly sized refrigerant lines; evacuate refrigerant system; insulate refrigerant suction line; charge unit to manufacturer specs; install new drain line with flush out Tee ; make all electrical connections; and resize breakers if necessary. The Contractor shall remove three existing windows on the south side of the building. If the 2 larger removed windows meet all building codes, one can be re-installed in the existing building. The windows in the addition shall be new and meet the specifications outlined in the blueprints. The Contractor shall paint the exterior of the new addition to match existing building. All interior walls of the addition and the added walls in the existing building shall receive primer and 2 coats of paint. Color for the walls shall be approved by the Commission s Project Manager.
4 Page 4 The Contractor shall remove existing drop ceiling in the existing building and install new dry wall ceiling. The Contractor shall install 2 interior walls in existing conference room per specifications in the blueprints. The Contractor shall install new insulation in all exterior walls, between all interior walls, and above all ceilings. The Contractor shall ensure that new exterior door shall be solid steel with high grade deadbolt lock. The Contractor shall ensure that ceiling fans are Hampton Bay or Hunter unless approval is granted by the Commission s Project Manager to use a different brand. The Contractor shall ensure that fans are 52 size, white, reversible 3-speed motor, all wood 6-ply blades, and minimum 20 year limited motor warranty. The Contractor shall ensure that tiling shall be 12x12 and the color should be approved by the Commission s Project Manager. The Contractor shall remove bathroom wall in existing building and tile the floor new larger bathroom with 12x12 ceramic tile. The Contractor shall construct ADA handicap parking area in accordance with blueprints. Other Contractor Requirements The Contractor shall, at a minimum, be a Building Contractor as defined in Section (a), Florida Statutes. The Contractor shall be insured to do business in the State of Florida, and licensed, if required, by Osceola County. The Vendor shall provide, with the bid, a copy of their licensure issued by the Florida Construction Industries Licensing Board, as required by law. The Contractor shall be registered to do business with the State of Florida. To register, go to See Vendor Registration clause located in the General Conditions for more information. The Contractor shall ensure that the completed project must comply with all applicable building codes, rules and regulations. The completed project shall meet or exceed accepted standards for building construction. All work is to be accomplished by skilled craftsmen complimenting the trade involved; all material used is to be installed in strict accordance with the manufacturer's specifications. Improper installation or poor workmanship will not be accepted. Repairs to existing state property caused by the Contractor and not within the scope of the project work shall be the responsibility of the Contractor.
5 Page 5 The Commission shall designate areas expected to be disturbed. Trees and other vegetation outside the designated area shall be protected from damage throughout the duration of the construction period. The Contractor shall be responsible for securing any materials to prevent theft or damage. The Contractor and subcontractors shall be subject to all rules and regulations while on Commission property. The Contractor shall inform his subcontractors, laborers, workers and other persons on the construction site that any obscene remarks, cat calls, propositions, gestures or the like will not be tolerated. If any historical or cultural artifacts are uncovered during construction activities, the Contractor shall immediately halt construction within the area and contact the Commission s Project Manager. The Contractor shall provide temporary sanitary facilities for the site. Sanitary facilities shall be located at a distance sufficient to prevent contamination of any water source. At the completion of the construction work, facilities shall be removed without contaminating any local water source. In the event of temporary suspension of work or during inclement weather or whenever the Commission s Project Manager shall direct, the Contractor shall, and shall cause his subcontractors to protect carefully his and their work and materials against damage or injury from weather. If, any work or materials shall have been damaged or injured by reason of failure on the part of the Contractor or any of his subcontractors so to protect his work, such materials shall be removed and replaced at the expense of the Contractor. The Contractor is required to comply with all federal, state, and local laws, ordinances, rules, regulations, and codes that in any manner affect the work. Ignorance on the part of the Contractor will in no way relieve him from this responsibility. All inspections required to insure compliance with required codes, including any required by the State Fire Marshall s office, are the responsibility of the Contractor, and must be accepted by the Project Manager. No material containing asbestos shall be used. When any toxic substance, as defined in Chapter 442, Florida Statutes, is used, it will be the responsibility of the successful bidder to post a notice, not only to his own employees, as required by the Chapter, but also post a notice in a conspicuous place at the job site, informing building occupants of the substance being used, and a material safety data sheet for their examination. The Commission will provide three sets of plans upon award of a contract to the successful bidder. During the progress of the work, the Contractor shall
6 Page 6 require any subcontractors to record on their field sets of drawings the exact locations, as installed, of all conduit, pipe and duct lines whether concealed or exposed which were not installed exactly as shown on the contract drawings. Upon completion of the work, this revised set of plans shall be turned over to the FWC Project Manager. The Contractor shall ensure that the security of the building can be maintained during construction. The installation of the door connecting the existing building with the addition should be done in a manner so that the security of the office can be maintained. Commencement of construction by the Contractor should take place within 3 weeks of the receipt of the Purchase Order and should be completed within 60 days of the start of construction. Contractor Guarantees Minimum items to be covered for a minimum period of 12 months from the date of completion: Light fixtures: ceiling and wall mounted lights, switches and plug outlets, and circuit breakers. Roofing materials: vent flashings and sealants. Floor Covering: floor tile. Ceiling Fans Minimum items to be covered for a minimum period of 5 years from the date of completion: Roof structure or rafters, main support beam, insulation wood roof decking, and all support lumber contained within the roof. Sub-floor structure: cement pad. Exterior and interior walls and ceilings: studs, insulation, framing members, and all support lumber contained within the outside and inside walls ceiling surface materials (non-cosmetic defects). Electrical system: wiring, fittings, connections, fixture boxes, junction boxes, and main and sub panel boxes.
7 Page 7 FWC 09/10-48 UPDATED PRICE SHEET Price quoted shall be less any Federal or State sales or use taxes. The bidder recognizes that the State of Florida, by virtue of its sovereignty, is not required to pay taxes on services, goods and/or equipment purchased incident to such service. Quoted price shall include all necessary items to complete the project. ALL ITEMS SHALL BE BID, OR THE BID WILL BE REJECTED. THE BID WILL BE AWARDED TO THE RESPONSIVE, RESPONSIBLE BIDDER THAT SUBMITS THE LOWEST PRICE FOR THE OPTION CHOSEN BY THE COMMISSION. Vendors should submit quotes on both of the following options listed below. The option that best fits the needs of the Commission and is within the allocated funds for this project will be awarded. Option 1. Bid price for 24 x26 addition only. $ Option 2. Bid price for 24 x26 addition with additional interior renovations of existing building. $ Option 3. Bid price for 24 x26 addition with additional Interior renovations of existing building plus the construction of Handicap Parking Space according to revised blueprints. $ NOTE: The Vendor shall provide, with their response to this bid, a copy of the General Contractor, as defined in Section (a), Florida Statutes, licensure issued by the Florida Construction Industries Licensing Board, as required by law. Vendor/Contractor Address Signed Print Name Title Fax City/State/Zip Telephone
8
9
10
11
12 Page 8 QUESTIONS AND ANSWERS FROM PRE-BID MEETING 1. Is the architect going to supply a copy of the complete plans? The plans have been submitted to the county. 2. Sheet 1 of the plans specifies ½ cd plywood on roof, but 5/8 is specified on another sheet. What thickness of cd is required? The thickness required is ½ 3. Is an enlarged septic system/plumbing required by the county? That is not the responsibility of the contractor. FWC will be responsible for that. 4. For the T111 siding, does the siding have to be removed and then drywalled or can it be drywalled over? Dry-wall over the T111 siding. 5. What are the specs for the AC unit? The AC unit must meet the requirements in the written specs, not in the drawings. The unit listed on the drawings was an example of a unit but does not meet the specs. 6. Is FWC going to do the materials testing for the cement pad? The FWC will provide the fill dirt only; the contractor will need to have the testing done. 7. Who will provide the fill dirt? The FWC will provide the fill dirt. 8. Who will prep the site for the concrete pad? Will FWC do all the digging and get the site ready for the concrete pad? The FWC will only provide the fill dirt. Everything else will be the responsibility of the Contractor. 9. Who will take care of the water line? The FWC will take care of the water line. 10. Where is the well located? By the shop in the pump house.
13 Page Will the contractors have access to electricity? Yes, there are receptacles outside. 12. Will the contractors have access to water? Yes, a spigot will be installed. 13. Are there additional electric needs for the addition? Is there enough space on the electrical panel? The electrical panel has been updated to accommodate additional needs. 14. For the existing conference room, is there a lot of rewiring and moving of duct work that needs to be done above the drop ceiling? Any rewiring or moving of ductwork is the responsibility of the Contractor. Any Contractors bidding on this project should inspect the area and make sure the take this into account in their bid price. 15. Will the trees need to be removed? No, the trees are to be left where they are. The FWC will delimb the trees where necessary. 16. If the FWC does the addition only, will there be a transition from an 8 foot to a 10 foot ceiling? There will be no work on the existing conference room ceiling if we just do the addition only, so there will be a transition at the door from an 8 foot ceiling to a 10 foot ceiling. 17. What type of tile is to be used? Ceramic 12x12 tile to be approved by the FWC. 18. The door sizes are odd sized and would need to be custom ordered. Can 2-8 sized doors be used? As long as the door sizes meet ADA requirements, 2-8 doors can be used. 19. Will new fixtures for the lights be required? Yes.
14 Page Does the contractor have to redo current structures (i.e. doorway to the restroom) to meet ADA code? No, just the current addition must meet ADA code. 21. Recessed lighting is more expensive than other types. Does the FWC want to use recessed lighting? Yes. 22. Can we come back out to see the site? Yes, anytime. If the contractor wants to see inside the building, they will need to come between 8am and 5pm, Monday Friday and should call ahead. 23. Can surface mounted wrap fluorescent fixtures be used instead of the 1x4 flush? It could save at least $400. No. 24. Will survey and as-builts be required? A survey shouldn t be required but a site plan may be needed to meet County requirements. There is a site plan on file with the County but if it doesn t meet their requirements, then it will be the responsibility of the Contractor to complete one. 25. I hoped you would be able to answer a question I had regarding permitting, Question is are you furnishing all surveys for permitting? Flood, site plan etc. Any surveys or other work required to get the permits for this job are the responsibility of the Contractor.
I N V I T A T I O N T O B I D City and Borough of Wrangell Premanufactured Restroom
Overview The (CBW) requests sealed bids from interested and qualified firms to provide a, on a one-time basis. Supplier shall furnish all labor, materials, tools, and equipment necessary for supplying
More informationSEMINOLE TRIBE OF FLORIDA INVITATION TO BID
Solicitation #: ITB 151-2017 Title: Description: SEMINOLE TRIBE OF FLORIDA INVITATION TO BID General Home Repairs (Big Cypress Reservation) The Housing Department of the Seminole Tribe of Florida is requesting
More informationSee attached answers to questions and requests for clarification received.
Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 June
More informationAddendum #1. January 22, 2018
Addendum #1 January 22, 2018 Building B 8500 Public Works Drive Renovation for City of Manassas Water & Sewer Department 8500 Public Works Drive Manassas, VA 20110 Job Description Renovation of the existing
More informationBIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample
BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS Project Name: Address: Owner: Phone/Fax/Email: Architect / General Contractor Name: : BID DEADLINE DATE: SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME:
More informationINVITATION TO BID CITY OF HOPKINSVILLE
INVITATION TO BID CITY OF HOPKINSVILLE Office of the Procurement Specialist 715 South Virginia Street P. O. Box 707 Hopkinsville, Kentucky 42241-0707 TITLE: DESIGN BUILD BUIDLING FOR THE CITY OF HOPKINSVILLE,
More information229 Rehoboth Avenue Telephone P.O. Box 1163 Fax
Building & Licensing City of Rehoboth Beach 229 Rehoboth Avenue Telephone 302-227-6181 P.O. Box 1163 Fax 302-227-4504 Rehoboth Beach, Delaware 19971 www.cityofrehoboth.com NOTICE TO CONTRACTORS BUSINESS
More informationA D D E N D U M T O B I D PRE-ENGINEERED METAL BUILDING
Guadalupe County Auditor s Office 307 W. Court, Suite 205 Seguin, Texas 78155 830-303-4188 Ext. 1328 A D D E N D U M T O B I D PRE-ENGINEERED METAL BUILDING Bid Title: PRE-ENGINEERED METAL BUILDING Bid
More informationCity Of Mendota Construction Procedures
City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time
More informationREQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW:
Police Headquarters Project REQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW: General description The objective is to renovate an approximately 18 x 24 section of the two-bay attached garage at Town
More informationCertificate of Use Application Package
Certificate of Use Application Package Steps for Obtaining a Certificate of Use All Business must obtain a Certificate of Use prior to occupying or doing business within the space. Home Businesses do not
More informationADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5
ADDENDUM NO. 1 TO SCOPE OF WORK: Section 0220, Form 01004/5 PROJECT: Tankless Water Heaters Installation Glenn Edge and Rich Martin Apartments and Main Office Water Heater Replacement New Memorial Community
More informationApplication for Commercial Plan Review and Building Permit. Address:
City of Warrenton 200 West Booneslick Warrenton, MO 63383 : 636-456-3535 Fax: 636-456-1336 www. war r ent o n- mo.org Application for Commercial Plan Review and Building Permit PERMIT# Purpose: Commercial
More informationBasic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.
Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Franklin County Septic & Zoning permit application: A septic and zoning permit is required for residential or commercial
More informationSpring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings
Spring Lake Public Schools Spring Lake, MI March 2018 RE: High School Storage Buildings Advertisement for bids Bid Proposal Sealed bids for Spring Lake Public Schools-High School Storage Buildings will
More informationProcurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202
Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 October 26, 2017 ADDENDUM NUMBER: ONE (1) TITLE: Arc-Resistant Metal-Clad Switchgear
More informationADDENDUM A CONSTRUCTION SPECIFICATIONS
ADDENDUM A Description of Improvements: CONSTRUCTION SPECIFICATIONS The Improvements shall consist of constructing an approximate square foot single-family residence including car garage on the real property
More informationThis Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8, 2016.
ADDENDUM NUMBER ONE - June 15, 2016 CITY OF CLARKSVILLE TO: All Bidders of Record This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8,
More informationADDENDUM 1. Repair and Maintenance of Landfill Gas Chiller System. Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018
ADDENDUM 1 Date: June 13, 2018 Bid No.: Title: 18-11/AL Repair and Maintenance of Landfill Gas Chiller System Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018 This Addendum
More informationWork Order (Bid Form) Upper East Tennessee Human Development Agency
Upper East Tennessee Human Development Agency WORK ORDER INFORMATION Work Order Type: Weatherization Audit Name: 18018UE10329 CLIENT INFORMATION Address: ERWIN, TN 37692 AGENCY INFORMATION Agency: Upper
More informationRIVERSIDE CHURCH OF CHRIST. Lafayette, LA
SECTION 000010 INVITATION FOR BIDS Bids for will be received in the office of Church Development Construction Services, 708 S. Rosemont Road, Suite #101,, until 12:00 noon Local Prevailing Time on Friday,
More informationDIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM
DIVISION 22 PLUMBING PART 1 GENERAL 1.01 DESCRIPTION A. Provide a complete system of soil, waste, and vent piping to fixtures and equipment, including traps, floor drains and cleanouts, extending to a
More informationInvitation for Bid. City of Urbana, Ohio. Restroom/Storage Facility Melvin Miller Park 731 Children s Home Road, Urbana, OH 43078
205 S. Main Street Urbana, Ohio 43078 http://www.urbanaohio.com 937-652-4300 June 1, 2016 Invitation for Bid Restroom/Storage Facility Melvin Miller Park The City of Urbana received a Federal Grant to
More informationADDENDUM NO. 03 TO SPECIFICATIONS AND CONTRACT DOCUMENTS FOR JAXPORT CRUISE TERMINAL VIP ROOM RENOVATIONS JPA CONTRACT NO.
Post Office Box 3005 2831 Talleyrand Avenue Jacksonville, Florida 32206-0005 www.jaxport.com July 2, 2018 ADDENDUM NO. 03 TO SPECIFICATIONS AND CONTRACT DOCUMENTS FOR JAXPORT CRUISE TERMINAL VIP ROOM RENOVATIONS
More informationCITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO
SECTION 01010 - SCOPE OF WORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General provisions of Contract, General Conditions and Technical Specification Sections, apply to this Section. 1.02 PROJECT DESCRIPTION
More informationRESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS
RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS New Construction, Addition, or Alteration All plans submitted must be prepared, sealed, and signed by a Registered Nebraska Design Professional
More informationSEMINOLE TRIBE OF FLORIDA
INVITATION TO QUOTE (ITQ) ITQ # STOFBR04102018BR Roof Replacement 900 Youngblood Rd Okeechobee, FL 34974 (Brighton) ITQ DATES: Quote Due Date: 04/24/2018 @ 4:00 pm EST Solicitation Release Date: 04/10/2018
More informationBOONE COUNTY PUBLIC LIBRARY (859) 342-BOOK (2665)
ROOF Boone County Public Library is seeking competitive sealed bids to replace an existing Shingle Roof and EPDM membrane roof on the Florence Branch located at 7425 U.S. 42, Florence, KY 41042. The successful
More informationSECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL
SECTION 017418 PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationAction Recommendation: Budget Impact:
City of Fayetteville Staff Review Form Yolanda Fields 6/12/2018 COMMUNITY RESOURCES (642) Submitted By 2018-0306 Legistar File ID 7/3/2018 City Council Meeting Date - Agenda Item Only N/A for Non-Agenda
More informationVILLAGE OF MARATHON CITY MARATHON COUNTY WISCONSIN
VILLAGE OF MARATHON CITY MARATHON COUNTY WISCONSIN Instructions to Contractors The Village of Marathon City will be accepting proposals at the Marathon City Village Hall, 311 Walnut Street, PO Box 487
More information1 AND 2 FAMILY DWELLING REQUIREMENTS
PLAN REQUIREMENTS: 1 AND 2 FAMILY DWELLING REQUIREMENTS All residential plans including additions and attached garages shall be designed to the current edition of the International Residential Code. Plans
More informationProud of its Heritage, Preparing for its Future
TUSTIN Proud of its Heritage, Preparing for its Future Revised August 2013 USER GUIDE FOR THE INSTALLATION OF RESIDENTIAL ROOM ADDITIONS OR ALTERATIONS PURPOSE This guide describes the City of Tustin s
More informationFLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: 2/2/2016 RE: ITB-DOT-15/16-9030-GH RFP TITLE: FDOT Chiller Plant: Painting and Re-Roofing Subject: Bid Due Date, Scope and Bid Sheet Revisions
More informationTECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE
TECHNICAL QUESTIONS FOR ITB-DOT-17/18-7004LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE Question 1: Question 2: Question 3: Question 4: Question 5: Question 6: When area configurations
More informationSECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:
ISSUE DATE: MARCH 21, 2012 (REVISION 2-08/31/12) PROJECT: CNB BUILDINGS 2 AND 3 CATOOSA, OKLAHOMA OWNER: BID TO: (Mail & Fax) CHEROKEE NATION BUSINESSES 777 WEST CHEROKEE STREET CATOOSA, OKLAHOMA 74015
More informationNOTICE TO BIDDERS FOR THE
NOTICE TO BIDDERS FOR THE STRUCTURAL REPAIR, APPLICATION OF 200 MIL THICK POLYURETHANE FOR INTERNAL LINING OF RESERVOIR 4A, REMOVAL AND REPLACEMENT OF AN EXISTING RETAINING WALL, A 7.5 HP PUMP, PIPES,
More informationATTACHMENT A. Bid # 6793
ATTACHMENT A SCOPE OF WORK TECHNICAL SPECIFICATIONS AND CONTRACT DRAWINGS STORAGE SHED INSTALLATION AT THE SAN JOAQUIN COUNTY HOUSEHOLD HAZARDOUS WASTE FACILITY Bid # 6793 Department of Public Works Solid
More informationPERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS
Collier Township 2418 Hilltop Road, Suite 100, Presto, PA 15142 Ph. 412-279-9998 PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS This guide applies to all projects except 1 & 2 family dwellings and townhouses
More informationTOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:
TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be
More informationC o u n t y o f F a i r f a x, V i r g i n i a
001961 Page 2 C o u n t y o f F a i r f a x, V i r g i n i a A D D E N D U M DATE: August 2, 2016 ADDENDUM NO. 4 TO: REFERENCE: FOR: DUE DATE/TIME: ALL PROSPECTIVE BIDDERS Government Center Generator System
More informationApril 11, 2017 INVITATION TO TENDER ITT No. PS CONTRACTOR FOR MARPOLE PLACE RESTORATION. ADDENDUM No. 5
FINANCE, RISK AND SUPPLY CHAIN MANAGEMENT Supply Chain Management April 11, 2017 INVITATION TO TENDER ITT No. PS20170312 CONTRACTOR FOR MARPOLE PLACE RESTORATION ADDENDUM No. 5 RE: ADDITION TO APPENDIX
More informationFlorida Army National Guard Construction Facilities Management Office. Scope of Work:
Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines September 2011 Scope of Work: To provide complete design for the renovation/alterations
More informationMETROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) # M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO.
METROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) #2017-20-M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO. (1) September 28, 2017 This Addendum No. 1 consists of seven (7)
More informationLANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No
LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 103-111-5-2016 Waterproofing lower level of house, Mold Remediation and Unit Turn Scope of Work AGENCY CONTACT PERSON PRE-PROPOSAL WALK
More informationItem # 1: Attached are the revised Table of Contents and Specifications added: Section Cabinets and Vanities
ADDENDUM NO. 1 Proposed Residence 422 Hickory Street Buffalo, New York 14204 February 15, 2019 Long Associates, Architects 189 Kenmore Avenue Buffalo, New York 14223 This addendum is issued to amend the
More informationRequest for Proposal
12 E 4 th St, Duluth MN 55805 July 17, 2018 Request for Proposal BID #: Grand Marais Phase 2 2018 PROJECT NAME: Nordic Star Housing Development Phase 2 ANNOUNCEMENT DATE: July 17, 2018 DUE DATE: July 24,
More informationSUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE Information and Required Forms for Structures in Flood Zones AE & VE
County of Monroe The Florida Keys Floodplain Coordinator Upper Keys: 305-453-8729 Middle & Lower Keys: 305-289-2866 SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE Information and Required Forms for Structures
More informationNOTICE TO BIDDERS FOR THE
NOTICE TO BIDDERS FOR THE STRUCTURAL REPAIRS, APPLICATION OF 150 MIL THICK POLYURETHANE FOR INTERNAL LINING OF RESERVOIR 4A, REMOVAL AND REPLACEMENT OF A 7.5 HP PUMP, PIPES, FITTINGS, ELECTRICAL CONDUITS,
More informationAlameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
SECTION 01505 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT 1.01 SUMMARY A. Section specifies diversion of construction and demolition (non-hazardous) debris from landfill. B. Related requirements specified
More informationCOMMUNITY ACTION CHIP LEAD PROGRAM Bids due to Community Action ATTN: BERNADETTE JOHNSON 175 Main St. Battle Creek, MI 49014
COMMUNITY ACTION CHIP LEAD PROGRAM Bids due to Community Action ATTN: BERNADETTE JOHNSON 175 Main St. Battle Creek, MI 49014 Owner: Johnson Property Address: Battle Creek MI 49017 Owner Telephone: 1-269-
More informationC. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:
02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"
More informationREQUEST FOR QUALIFICATIONS ARCHITECTURAL/ENGINEERING SERVICES
I. PURPOSE REQUEST FOR QUALIFICATIONS ARCHITECTURAL/ENGINEERING SERVICES The Greensboro Housing Authority (GHA) invites qualifications for the Architectural/Engineering Services for RAD Renovations at
More informationFlorida Department of Environmental Protection Bureau of Design and Construction 3540 Thomasville Road Tallahassee, Florida 32309
Florida Department of Environmental Protection Bureau of Design and Construction 3540 Thomasville Road Tallahassee, Florida 32309 Rick Scott Governor Jennifer Carroll Lt. Governor Herschel T. Vinyard,
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 2: Roof 2 DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project
More informationTOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS
TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS The Town of East Haddam is seeking bids from qualified contractors who will
More informationResidential Building Inspections
Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved
More informationRequest for Proposal Maintenance 30X50 Storage Building Located West of Maintenance Office 902 West Trimble Berryville School District 27
Page 1 of 5 Request for Proposal 2014.11.01 Maintenance 30X50 Storage Building Located West of Maintenance Office 902 West Trimble Berryville School District 27 Notice to prospective venders: The Berryville
More informationADVERTISEMENT FOR BIDS
1. INVITATION ADVERTISEMENT FOR BIDS Sealed proposals for the following work will be received by the University of Kentucky, Capital Construction Procurement Section, Room #322 Peterson Service Building,
More informationFlorida Army National Guard Construction Facilities Management Office. Scope of Work:
Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines October 2008 Scope of Work: To provide complete design for the renovation/alterations
More informationBUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)
BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL 32907 Phone: (321) 953-8924 Fax: (321) 953-8925 CUSTOMER SERVICE INFORMATION ON COMMERCIAL PLAN REVIEW REQUIRED DOCUMENTS MUST BE SUBMITTED AT TIME
More informationWork Order (Bid Form) Blount County Community Action Agency, Inc.
Blount County Community Action Agency, Inc. WORK ORDER INFORMATION Work Order Type: Weatherization Audit Name: 10001BL10082 CLIENT INFORMATION Address: MARYVILLE, TN 37804 AGENCY INFORMATION Agency: Blount
More informationTRIAD ENGINEERING CONSULTANTS, INC.
TRIAD ENGINEERING CONSULTANTS, INC. 2638 Willard Dairy Rd Providing High Point, NC Suite 100 Plumbing, Mechanical and 27265 (336) 454-0225 Electrical Engineering Services Since 1984 admin@triadengmep.com
More informationADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018
ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP #2018-09-01 NOTICE TO PROSPECTIVE BIDDERS February 1, 2018 Prospective bidders are hereby informed of the following corrections, additions,
More informationCITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS
CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS Update April 29, 2013 12 Permit application forms and contact information can be found on our website under Inspection Department
More informationHome Remodeling Code Violations
Home Remodeling Code Violations & INTRODUCTION At some point, every homeowner considers renovating or remodeling. Home design ideas may be simple repairs or improvements, or they could involve taking a
More information~lamance <tount!' 9'~UUJ ;i)epwdment 124 We6t ElmStltm (j,taluun,.ncjjdli &vwfina 27253!Jefepfwae(336) :Jax(336)
~lamance
More informationREQUEST FOR PROPOSALS Garfield Charter Township Hall Sidewalk Snowmelt Heating System Repairs Garfield Township, Grand Traverse County
REQUEST FOR PROPOSALS Garfield Charter Township Hall Sidewalk Snowmelt Heating System Repairs Garfield Township, Grand Traverse County Proposals Due: 10:00 A.M., Thursday, March 28, 2019 Address Proposals
More informationContractor/Owner initials are verification that items #1 and #2 and items (a) thru (g) above are included in the submitted plan/drawing.
FINISH BASEMENT/ADDITION/REMODEL PLAN CORRECTIONS LIST (Based on the current Editions of the International Codes and National Electrical Code) PLAN CHECKED BY: LOT/SUBDIVISION/ADDRESS: CONTRACTOR OR OWNER/BUILDER:
More informationANNEX A.1 TECHNICAL SPECIFICATIONS. Open Call for Tender. No F/SE/10/05. Provision of Building Inspection, Maintenance, Alteration and Repair services
ANNEX A.1 TECHNICAL SPECIFICATIONS Open Call for Tender No F/SE/10/05 Provision of Building Inspection, Maintenance, Alteration and Repair services Building Inspection, Maintenance, Alteration and Repair
More informationINSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.
INSPECTION REQUIREMENTS Page 1 of 5 JOB SITE ADDRESS posted during entire construction process. JOB PLACARD POSTED IN PLAIN SIGHT: GREEN Placard - Building, ORANGE Placard Electrical, BLUE Placard - HVAC,
More informationCity of Forney - Parks & Recreation Department
Request for Proposal (RFP) City of Forney Parks & Recreation Department Forney Community Park Park Maintenance Building Addition April 2, 2015 1.0 SUMMARY 1.1 Request for Proposals: Firms with proven experience
More informationBUILDING PERMIT APPLICATION
Town of Dansville 1487 Day Road Arkport, NY 14807 607-295-7223 http://townofdansvilleny.com/ Page 1 of 5 Date Recd: Fee Pd: How Pd: Recd by: Permit #: BUILDING PERMIT APPLICATION Please review all pages.
More informationREQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES
REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will
More informationDick s Sporting Goods Demolition Package
REQUEST FOR PROPOSAL FOR COMPETITIVE SEALED PROPOSALS TO PROVIDE: Dick s Sporting Goods Demolition Package at Salt Lake City, UT 2425 E. Camelback Rd. Suite 750 Phoenix AZ 85016 Notice of Extended Payment
More informationCity of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)
Residential New Home Building Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be used as a guideline. Where circumstances
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationSECTION ADDENDUM NUMBER ONE
Softball Field Repairs and Upgrades 03 February 2012 University of South Carolina Upstate State Project Number: H34-I350 DP3 Architects Project Number: 11124 GENERAL INFORMATION SECTION 00 09 10 ADDENDUM
More informationWhat this Family Room Specification Package can be used for:
Family Room Conversion Specification Package. 1) These plans are for conceptual and bidding purposes only. 2) These plans cannot be used to apply for a building permit. 3) All design information must be
More information1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.
City of Goshen Instructions for Residential Permit Application Why do you need a building permit? Your home is a large investment, and if your construction project does not comply with the codes adopted
More informationCONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS
CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL
More informationADDENDUM # 1 To: File RFP for: New Affordable Home Construction Services
Procurement Department ADDENDUM # 1 To: File 1605-909-23-4532 RFP for: New Affordable Home Construction Services Please note the following change: Change #1 RFP closing date and time is changed to July
More informationHOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the
More informationGramercy Place Condo Association, Inc.
E-Mail to fiona@ymginc.com Print Document Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) ````````````````````````` (Cell) E-Mail
More informationCity of Jacksonville Finance Department
City of Jacksonville Finance Department # 1 Municipal Drive Office Phone: (501) 982-4502 P.O. Box 126 Fax Number: (501) 985-9768 Jacksonville, AR. 72076 E-Mail: rbest@cityofjacksonville.net Cheryl Erkel
More informationBID PROPOSAL FORM C.I.P. NO PROJECT: VETERANS PARK SHOOTING RANGE LEAD ABATEMENT/DEMO
Bid Proposal Form C.I.P. NO. 2016-012 PROJECT: BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND ATTACHMENTS AS REQUIRED SUBMITTED BY: (Bidder s Name) In accordance with the City of Commerce s Notice
More informationKIPLING SCHOOL RENOVATION AND EXPANSION PHASE 2 KIPLING, SASKATCHEWAN
2012-07-26 00 91 14 31/2011 ADDENDUM NO. 2 Kipling School Renov. & Expansion Phase 2, Kipling, SK. Page 1 of 2 ADDENDUM NUMBER: ISSUED BY: PROJECT: TWO SEPW Architecture Inc. 109 3725 Pasqua St., Regina,
More informationCITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application
CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY
More informationONE AND TWO FAMILY DWELLING PERMIT APPLICATION REQUIREMENTS
ONE AND TWO FAMILY DWELLING PERMIT APPLICATION REQUIREMENTS Submit a permit application with all applicable items completed, including inserts, when you construct a new building, construct an addition,
More informationADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT
ADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT Effective September 6, 2018, Addendum No. 3 (THREE), {Pages 1-7 and the applicable attachment(s)}, is associated
More informationTOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION
TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION Town of Hague Building Inspector: Dale Wagner Home #: 306-225-2265 Cell #: 306-241-4741 Fill all part of the permit application including the date and signature.
More informationGreen Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING
Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING WWW.STOPWASTE.ORG New Addition Consider the following green remodeling options in a new addition.
More informationProperty Inspection Report
DAVID A. MEACHAM Professional Inspection & Construction Services Property Inspection Report Prepared for David Smith Property Address 1154 Gulf View Drive Tampa Bay, Florida Inspection Date Friday, October
More informationTOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR
TOWN OF LABRADOR CITY FORM OF TENDER TLC-04-18 SUPPLY & INSTALLATION OF CONCRETE FLOOR Tenderer Address Telephone # The undersigned bidder has carefully examined the Form of Tender, Instructions to Bidders,
More informationMaintenance and Refurbishment Works of Quarters Two (2) at FEA s National Control Center, Vuda. Tender Number: MR 334/2017
` Maintenance and Refurbishment Works of Quarters Two (2) at FEA s National Control Center, Vuda. Tender Number: MR 334/2017 1 Fiji Electricity Authority (FEA) is a statutory body vested with the responsibility
More informationCITY OF ANDERSON BUILDING AND CODES 601 South Main Street
CITY OF ANDERSON BUILDING AND CODES 601 South Main Street Plan Review Notes (STREET ADDRESS) ANDERSON, SC Plan Review Number: Building Plans prepared by: Plans Signed by: Project Name: Plans Received:
More informationMeasure 1 Seal Ducts Components Inspected
WORK ORDER INFORMATION Work Order Type: Weatherization Audit Name: 1000049 CLIENT INFORMATION Client ID: 1002275 AGENCY INFORMATION Agency: Upper East Tennessee Human Development Agency Address: 301 Louis
More informationCOMMERCIAL SUBMITTAL PACKET
COMMERCIAL SUBMITTAL PACKET ADMINISTRATION & STANDARDS The Ashtabula County Building Department is responsible for the administration and enforcement of the applicable State of Ohio Building Codes for