1 SECTION D Wall Systems. Contents. SUBJECT Introduction Design Considerations Installation Components PAGE D2 D2 D4 D5 System Specifications Stud One Side Stud Both Sides Stud and Furring Channel Resilient Mount/Furring Channel CSR Hebel Powerpanel FRL Upgrade Column Encasement System Installation Details D6 D8 D10 D12 D13 D15 D16 D17 D1. The Red Book
2 Introduction. Gyprock plasterboard and CSR Fibre Cement Wallboard can be used with masonry walls for effective fire and acoustic solutions. These linings can eliminate the need for render, increase the fire rating of the masonry, or provide an acoustic performance to meet sound transmission and sound impact ratings. Systems incorporating masonry and an insulated cavity are generally used where there is a requirement for excellent acoustic performance and discontinuous construction. The provision of a cavity also allows the inclusion of services such as water pipes. Gyprock plasterboard may be directly applied to the masonry substrate, screw fixed to metal furring channels that are fixed to the masonry, or may be fixed to separate stud framing. CSR Fibre Cement Wallboard may be fixed to furring channels or studs. Systems in this section are suitable for a wide range of masonry products. These are typically clay and concrete blocks, autoclaved aerated concrete blocks and panels, and may include cast concrete elements. Minimum performance conditions apply to the substrates to achieve the system performance values, and these are stated in the system specifications. Specific fixing details apply to each type of substrate. These wall systems are generally used in internal applications in commercial, industrial, institutional, domestic and high-rise domestic construction, or in the renovation of older buildings. A number of systems for external masonry veneer walls can be found in Section B and Section C. Design Considerations. STRUCTURAL PERFORMANCE. All wall elements must be designed for the applied loads. Vertical loads may be supported by the masonry element of the wall or by the stud framing. Lateral loads should be considered separately for framed and masonry parts of a wall. To achieve the specified sound performance, ties from masonry to the stud framing must not be used. Framed Wall Elements. Guidance is given in Tables D2, D3, & D4 for the selection of Rondo studs and other specific sections in non-loadbearing internal walls only, for 0.25kPa and 0.35kPa. For other brand of studs, studs that are required to be loadbearing, and studs subject to high lateral pressures, contact the manufacturer for design information. Maximum spans for Rondo furring channels are given in Table D1. Tall multi-residential buildings often have operable doors and windows, resulting in internal walls being subject to wind pressure. In these cases, walls must be designed for the appropriate loads. Stud frames that are part of a masonry wall system may be load bearing. A qualified structural engineer must complete the structural design of loadbearing wall systems. Walls with shelving attached are considered loadbearing. Further information on the design of stud walls is given in Section B. Walls lined with GYPROCK plasterboard designed as loadbearing, and non-loadbearing walls selected from Tables D2-D4, meet the requirements of Specification C1.8 Clause 3.4 Walls generally. TABLE D1. MAXIMUM SPACING OF WALL SUPPORT CLIPS FOR FURRING CHANNELS. Walls Generally (UDL = 0.35kPa) Rondo Maximum Furring Channel Spacing of Clips Part (mm) 308 (16mm) (28mm) 1200 NOTE: Support clips include Gyprock Resilient Mounts and Rondo direct fixing clips. D2. The Red Book
3 TABLE D2. MAXIMUM WALL HEIGHT WITH RONDO LIPPED STEEL STUDS. NON LOADBEARING INTERNAL WALLS NON FIRE RATED OR FIRE RATED. Walls Generally (Load UDL = 0.25kPa). Wall Frame and Lining Configuration 600mm cts Stud Depth mm Stud Gauge BMT Min. Lining Thickness One Row Nogging 6mm Two Rows Nogging 6mm Three Rows Nogging 6mm Maximum Wall Height (m) TABLE D3. MAXIMUM WALL HEIGHT WITH RONDO LIPPED STEEL STUDS. NON LOADBEARING WALLS NON FIRE RATED OR FIRE RATED. Walls of Shafts and Fire Isolated Exits Generally (Load UDL = 0.35kPa). Wall Frame and Lining Configuration Stud Depth mm Stud Gauge BMT Min. Lining Thickness Maximum Wall Height (m) One Row Nogging 6mm mm cts Two Rows Nogging 6mm The values in Tables D2 and D3 have been prepared by Rondo Building Services Pty Ltd. TABLE D4. MAXIMUM WALL HEIGHT FOR STAGGERED STEEL STUDS LINED TWO SIDES OR WALLS LINED ONE SIDE ONLY NON LOADBEARING WALLS. Walls Generally (Load UDL = 0.25kPa). Supplier Rhino Steel Lysaght Steel Stud Type UniSpan 53 TS TS TS Wall Frame Stud Depth/BMT mm 53/ 61/ / /0.70 and Lining Supplier Steel Stud Type Wall Frame and Lining Min. Cavity Width Configuration Min. Lining Thickness 13mm GYPROCK FYRCHEK 600mm cts 2 layers x 13mm GYPROCK FYRCHEK 9mm CSR Fibre Cement Wallboard Stud Depth/BMT mm Min. Cavity Width Configuration Min. Lining Thickness 13mm GYPROCK FYRCHEK 600mm cts 2 layers x 13mm GYPROCK FYRCHEK 9mm CSR Fibre Cement Wallboard TH / TH / Maximum Wall Height (m) Stramit TH64120 TH / /0.75 Maximum Wall Height (m) TH / TS / TH / D3. The Red Book
4 Wall Elements. All brick and block wall elements are to be designed in accordance with AS3700 Structures. walls must be designed to AS3600, Structures, and CSR Hebel Powerpanel must be designed in accordance with CSR Hebel literature. FIRE RESISTANCE. For systems without a stated Fire Resistance Level (FRL), the system FRL is equal to the FRL of the masonry wall element. The FRL of masonry walls is dependant on the height and width of the wall; contact the manufacturer for more information. To achieve the required fire performance of a wall, it is essential that installation is in accordance with the masonry manufacturer s details and relevant installation standards. This should include fire sealing at the wall head and perimeters, and filling of mortar joints. All gaps and penetrations should be effectively fire sealed. Vermiculite plaster has no capacity to accommodate building movement and may not be suitable for use as a general purpose fire rated caulking. Its use is specified in some wall/ceiling junctions. Refer to the Gyprock Ceiling Systems Installation Guide, GYP570. In systems with Gyprock Fyrchek plasterboard, framing, jointing and fire sealing must be in accordance with Section B of this manual. FYRCHEK plasterboard must be fully screw fixed, and the use of Gyprock Acrylic Stud Adhesive is not permitted. PERFORMANCE. The acoustic performance of some systems is dependant on a minimum Rw of the masonry wall element. This is to be the tested performance of the masonry without render or sheet linings, and must be verified by the masonry unit manufacturer. Installation of the masonry element of the wall must be in accordance with the manufacturer s details for the tested product. Systems that meet the requirements for discontinuous construction are noted in the system specifications. These have studs that are separated from the masonry by at least 12mm. The plasterboard lining on the studs (the wall leaf) therefore has a separation of at least 12mm plus the depth of the stud, which exceeds the minimum of 20mm. Systems that use only resilient mounts or fixing clips with furring channels to create a cavity, do not meet the requirements of discontinuous construction. The acoustic performance of wall systems may be affected by: Sound flanking. The effectiveness of workmanship and caulking. The presence and treatment of penetrations. The inclusion of structural elements and bridging items. Reducing the stated or implied cavity sizes. The acoustic performance of wall systems will not be affected by: The addition of Gyprock plasterboard or CSR Fibre Cement linings. The use of deeper studs or larger cavities. The use of timber studs of at least equal depth in lieu of steel studs. Refer to Section A for detailed information. Perimeter Sealing. To attain the stated Rw in systems that do not rely on plasterboard for the fire rating, use CSR Gyprock Wet Area Acrylic Sealant, CSR Gyprock Fire Mastic or other tested acoustic rated material of equivalent or better performance. Installation. MASONRY. All brick and block walls are to be installed in accordance with AS3700 Structures. CSR Hebel Powerpanel must be installed in accordance with CSR Hebel literature. FRAMING. For detailed information on wall junctions, intersections, frame attachments and penetrations, refer to Section Z of this manual. Refer to manual GYP544, Steel Frame Wall Systems Installation Guide for detailed information on installation of stud framing. WALLBOARD & PLASTERBOARD FIXING. Walls may be built to achieve a particular Level of Finish as defined in AS/NZS The Level of Finish specified can have requirements for frame alignment, jointing, back blocking methods and sheet orientation. CSR Fibre Cement Wallboard and Gyprock plasterboard may be installed vertically or horizontally, although for some Levels of Finish horizontal sheeting must be used. D4. The Red Book
5 Except for fire grade plasterboard, fixing to framing may be fastener only or combination fastener/adhesive. Plasterboard fixed direct to masonry may be adhesive daub fixed as shown in installation diagram FIG D4, full bed adhesive fixed, or mechanically fixed. JOINTING & FINISHING. Refer to the Gyprock Residential Installation Guide, GYP547 and CSR Fibre Cement Wet Area Lining Systems, FC101 for detailed jointing and finishing information. It should be noted that: Multi-layered systems only require jointing and finishing of the outer layer. It is a requirement of the that a water resistant taping compound, such as CSR Gyprock & Fibre Cement Wet Area Base Coat, be used at vertical wall junctions (corners), and horizontal and vertical joints within wet areas such as showers. CONTROL JOINTS. Control joints must be installed to allow for structural movement. Allowance for movement must be made through the masonry and any direct fixed lining, and through framed wall elements. Refer to Section Z of this manual for details. Control joints must be installed at all construction joints in the building, and at the following locations: For masonry with any direct fixed lining or lining fixed to furring channels: Refer to masonry manufacturer. At 12m maximum centres. At change of substrate material. For stud framed wall elements: Non-tiled internal walls with fibre cement outer layer: at 7.2m maximum centres. Tiled internal walls with fibre cement outer layer: at 4.2m maximum centres. Walls with plasterboard outer layer: at 12m maximum centres. Components. LINING & FIXING MATERIALS. Refer to Section A of this manual for detailed information on CSR Gyprock and Fibre Cement lining products, masonry adhesive, and for fastener specifications for fixing GYPROCK plasterboard to steel studs and furring channel. CSR Gyprock Adhesive is a fast and convenient method of fixing GYPROCK plasterboard systems to masonry substrates. CSR Gyprock Acrylic Stud Adhesive is used for fixing non fire grade linings to framing. FRAMING. CSR Gyprock and CSR Fibre Cement recommend steel components manufactured by Rondo Building Services Pty Ltd. Additional information on the steel components can be obtained from the Rondo Building Services Pty Ltd, telephone For information on Lysaght, Stramit or UniSpan top hat sections, please refer to the appropriate component manufacturer, and the Gyprock Steel Frame Wall Systems Installation Guide, GYP544. Fixing clips include CSR Resilient Mount, Rondo direct fixing clips 237, Beta-Fix and STSC clips. Furring channels part 308 or 129 are to be fitted into wall track part 142 or 140 respectively at top and bottom. MASONRY. For systems in this section, masonry may include clay or concrete blocks, autoclaved aerated concrete blocks and panels, and reinforced concrete. Brick and block substrates shall comply with AS3700. D5. The Red Book
6 Wall Systems - Stud One Side. SPECIFICATION Steel stud framing, as per table, at 600mm centres. Cavity infill as per table. 12mm minimum cavity between masonry and framing. Single wall with Rw as stated. plasterboard CD direct fixed to masonry. PKA-A027 Wall Requirements Rw > 41 Rw > 44 CSR 760 CSR 761 CSR 762 CSR 764 CSR 765 CSR 766 STUD WIDTH mm CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr (a) 75 Glasswool Partition batts 56/48 58/50 (b) 95 Comfortseal R2.0 batts 59/51 (c) ASB4/TSB4 Polyester batts 56/48 58/50 (d) ASB5/TSB5 Polyester batts 59/51 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 58/50 59/52 (b) 95 Comfortseal R2.0 batts 60/53 (c) ASB4/TSB4 Polyester batts 58/50 59/51 (d) ASB5/TSB5 Polyester batts 60/53 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 62/54 62/55 (b) 95 Comfortseal R2.0 batts 63/56 (c) ASB4/TSB4 Polyester batts 61/54 62/55 (d) ASB5/TSB5 Polyester batts 63/56 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 59/51 60/52 (b) 95 Comfortseal R2.0 batts 61/53 (c) ASB4/TSB4 Polyester batts 59/51 60/52 (d) ASB5/TSB5 Polyester batts 61/53 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 60/52 60/55 (b) 95 Comfortseal R2.0 batts 63/56 (c) ASB4/TSB4 Polyester batts 60/52 62/54 (d) ASB5/TSB5 Polyester batts 63/56 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 63/56 65/58 (b) 95 Comfortseal R2.0 batts 66/59 (c) ASB4/TSB4 Polyester batts 63/56 65/58 (d) ASB5/TSB5 Polyester batts 66/59 ADDITIONAL THICKNESS mm D6. The Red Book
7 Wall Systems - Stud One Side. SPECIFICATION Steel stud framing, as per table, at 600mm centres. Cavity infill as per table. 12mm minimum cavity between masonry and framing. Single wall with Rw as stated. 1 x 13mm Gyprock plasterboard CD direct fixed to masonry. PKA-A027 Wall Requirements Rw > 46 Rw > 51 CSR 767 CSR 768 CSR 769 CSR 770 CSR 771 CSR 772 STUD DEPTH mm CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr (a) 75 Glasswool Partition batts 61/53 63/55 (b) 95 Comfortseal R2.0 batts 64/56 (c) ASB4/TSB4 Polyester batts 61/53 63/55 (d) ASB5/TSB5 Polyester batts 64/56 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 63/55 64/57 (b) 95 Comfortseal R2.0 batts 65/58 (c) ASB4/TSB4 Polyester batts 63/55 64/56 (d) ASB5/TSB5 Polyester batts 65/58 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 66/59 67/60 (b) 95 Comfortseal R2.0 batts 68/61 (c) ASB4/TSB4 Polyester batts 66/59 67/60 (d) ASB5/TSB5 Polyester batts 68/61 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 64/56 65/57 (b) 95 Comfortseal R2.0 batts 66/58 (c) ASB4/TSB4 Polyester batts 64/56 65/57 (d) ASB5/TSB5 Polyester batts 66/58 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 65/57 67/60 (b) 95 Comfortseal R2.0 batts 68/61 (c) ASB4/TSB4 Polyester batts 65/57 67/59 (d) ASB5/TSB5 Polyester batts 68/61 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 68/61 70/63 (b) 95 Comfortseal R2.0 batts 71/64 (c) ASB4/TSB4 Polyester batts 71/64 72/65 (d) ASB5/TSB5 Polyester batts 73/66 ADDITIONAL THICKNESS mm D7. The Red Book
8 Wall Systems - Stud Both Sides. SPECIFICATION Steel stud framing, as per table, at 600mm centres. 12mm minimum cavity between masonry and framing. Single wall with Rw as stated. 12mm minimum cavity between masonry and framing. Steel stud framing, as per table, at 600mm centres. PKA-A027 Wall Requirements Rw > 41 Rw > 44 CSR 780 CSR 781 CSR 782 CSR 783 CSR 784 CSR 785 STUD DEPTH mm CAVITY INFILL (Both Sides) Rw / Rw+Ctr (a) 75 Glasswool Partition batts 60/52 62/54 (b) 95 Comfortseal R2.0 batts 63/55 (c) ASB4/TSB4 Polyester batts 59/51 61/53 (d) ASB5/TSB5 Polyester batts 63/55 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 62/54 63/56 (b) 95 Comfortseal R2.0 batts 64/57 (c) ASB4/TSB4 Polyester batts 61/53 62/54 (d) ASB5/TSB5 Polyester batts 64/57 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 65/58 66/59 (b) 95 Comfortseal R2.0 batts 67/60 (c) ASB4/TSB4 Polyester batts 64/57 65/58 (d) ASB5/TSB5 Polyester batts 67/60 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 63/55 64/56 (b) 95 Comfortseal R2.0 batts 65/57 (c) ASB4/TSB4 Polyester batts 62/54 63/55 (d) ASB5/TSB5 Polyester batts 65/57 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 64/56 66/59 (b) 95 Comfortseal R2.0 batts 67/60 (c) ASB4/TSB4 Polyester batts 63/55 65/57 (d) ASB5/TSB5 Polyester batts 67/60 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 67/60 69/62 (b) 95 Comfortseal R2.0 batts 70/63 (c) ASB4/TSB4 Polyester batts 66/59 68/61 (d) ASB5/TSB5 Polyester batts 70/63 ADDITIONAL THICKNESS mm D8. The Red Book
9 Wall Systems - Stud Both Sides. SPECIFICATION Steel stud framing, as per table, at 600mm centres. 12mm minimum cavity between masonry and framing. Single wall with Rw as stated. 12mm minimum cavity between masonry and framing. Steel stud framing, as per table, at 600mm centres. PKA-A027 Wall Requirements Rw > 46 Rw > 51 CSR 786 CSR 787 CSR 788 CSR 789 CSR 790 CSR 791 STUD DEPTH mm CAVITY INFILL (Both Sides) Rw / Rw+Ctr (a) 75 Glasswool Partition batts 65/57 67/59 (b) 95 Comfortseal R2.0 batts 68/60 (c) ASB4/TSB4 Polyester batts 64/56 66/58 (d) ASB5/TSB5 Polyester batts 68/60 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 67/59 68/61 (b) 95 Comfortseal R2.0 batts 69/62 (c) ASB4/TSB4 Polyester batts 66/58 67/59 (d) ASB5/TSB5 Polyester batts 69/62 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 70/63 71/64 (b) 95 Comfortseal R2.0 batts 72/65 (c) ASB4/TSB4 Polyester batts 69/62 70/63 (d) ASB5/TSB5 Polyester batts 72/65 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 68/60 69/61 (b) 95 Comfortseal R2.0 batts 70/62 (c) ASB4/TSB4 Polyester batts 67/59 68/60 (d) ASB5/TSB5 Polyester batts 70/62 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 69/61 71/64 (b) 95 Comfortseal R2.0 batts 72/65 (c) ASB4/TSB4 Polyester batts 68/60 70/62 (d) ASB5/TSB5 Polyester batts 72/65 ADDITIONAL THICKNESS mm (a) 75 Glasswool Partition batts 72/65 74/67 (b) 95 Comfortseal R2.0 batts 75/68 (c) ASB4/TSB4 Polyester batts 71/64 73/66 (d) ASB5/TSB5 Polyester batts 75/68 ADDITIONAL THICKNESS mm D9. The Red Book
10 Wall Systems - Stud and Furring Channel. SPECIFICATION Steel stud framing, as per table, at 600mm centres. 12mm minimum cavity between masonry and framing. Single wall with Rw as stated. 28mm furring channel, fixed to masonry. Furring cavity infill, as per table. Plasterboard as per table, fixed to furring. PKA-A027 Wall Requirements Rw > 41 Rw > 44 CSR 540 CSR 541 CSR 542 CSR 543 STUD DEPTH mm STUD CAVITY INFILL FURRING CAVITY INFILL Rw / Rw+Ctr (a) 50 Glasswool Partition batts 50 Glasswool Partition batts 58/46 59/47 (b) 75 Glasswool Partition batts 50 Glasswool Partition batts 59/47 60/48 (c) ASB3/TSB3 Polyester batts TBL10/25 58/46 59/46 (d) ASB4/TSB4 Polyester batts TBL10/25 59/47 60/48 ADDITIONAL THICKNESS mm (a) 50 Glasswool Partition batts 50 Glasswool Partition batts 59/47 59/48 (b) 75 Glasswool Partition batts 50 Glasswool Partition batts 60/48 61/50 (c) ASB3/TSB3 Polyester batts TBL10/25 60/48 60/49 (d) ASB4/TSB4 Polyester batts TBL10/25 61/49 61/50 ADDITIONAL THICKNESS mm (a) 50 Glasswool Partition batts 50 Glasswool Partition batts 61/49 61/49 (b) 75 Glasswool Partition batts 50 Glasswool Partition batts 62/50 62/50 (c) ASB3/TSB3 Polyester batts TBL10/25 61/49 61/48 (d) ASB4/TSB4 Polyester batts TBL10/25 62/50 62/50 ADDITIONAL THICKNESS mm (a) 50 Glasswool Partition batts 50 Glasswool Partition batts 61/49 62/51 (b) 75 Glasswool Partition batts 50 Glasswool Partition batts 62/50 64/53 (c) ASB3/TSB3 Polyester batts TBL10/25 62/50 63/52 (d) ASB4/TSB4 Polyester batts TBL10/25 63/51 64/53 ADDITIONAL THICKNESS mm D10. The Red Book
11 Wall Systems - Stud and Furring Channel. SPECIFICATION Steel stud framing, as per table, at 600mm centres. 12mm minimum cavity between masonry and framing. Single wall with Rw as stated. 28mm furring channel, fixed to masonry. Furring cavity infill, as per table. Plasterboard as per table, fixed to furring. PKA-A027 Wall Requirements Rw > 46 Rw > 51 CSR 544 CSR 545 CSR 546 CSR 547 STUD DEPTH mm STUD CAVITY INFILL FURRING CAVITY INFILL Rw / Rw+Ctr (a) 50 Glasswool Partition batts 50 Glasswool Partition batts 63/51 64/52 (b) 75 Glasswool Partition batts 50 Glasswool Partition batts 64/52 65/53 (c) ASB3/TSB3 Polyester batts TBL10/25 63/51 64/51 (d) ASB4/TSB4 Polyester batts TBL10/25 64/52 65/53 ADDITIONAL THICKNESS mm (a) 50 Glasswool Partition batts 50 Glasswool Partition batts 64/52 65/54 (b) 75 Glasswool Partition batts 50 Glasswool Partition batts 65/53 67/56 (c) ASB3/TSB3 Polyester batts TBL10/25 65/53 66/56 (d) ASB4/TSB4 Polyester batts TBL10/25 66/54 67/56 ADDITIONAL THICKNESS mm (a) 50 Glasswool Partition batts 50 Glasswool Partition batts 68/56 69/57 (b) 75 Glasswool Partition batts 50 Glasswool Partition batts 69/57 70/58 (c) ASB3/TSB3 Polyester batts TBL10/25 68/56 69/56 (d) ASB4/TSB4 Polyester batts TBL10/25 69/57 70/58 ADDITIONAL THICKNESS mm (a) 50 Glasswool Partition batts 50 Glasswool Partition batts 69/57 69/58 (b) 75 Glasswool Partition batts 50 Glasswool Partition batts 70/58 71/60 (c) ASB3/TSB3 Polyester batts TBL10/25 70/58 70/59 (d) ASB4/TSB4 Polyester batts TBL10/25 71/59 71/60 ADDITIONAL THICKNESS mm D11. The Red Book
12 Wall Systems - Resilient Mount/Furring Channel. SPECIFICATION Plasterboard as per table, direct fixed to furring. 28mm furring channel at 600mm centres, fixed to masonry with CSR Gyprock Resilient Mounts. Single wall with Rw as stated. Plasterboard as per table, fixed to masonry. plasterboard CD direct fixed to masonry. PKA-A027 DOES NOT MEET Wall Requirements CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr Rw > 41 CSR 530 CSR 531 FURRING SIDE. FURRING SIDE. (a)50 Glasswool Partition batts 55/42 (b) ASB2/TSB2 Polyester Blanket 54/41 ADDITIONAL THICKNESS mm 53 (a)50 Glasswool Partition batts 58/47 (b) ASB2/TSB2 Polyester Blanket 57/46 ADDITIONAL THICKNESS mm 66 Rw > 44 CSR 532 CSR 533 FURRING SIDE. FURRING SIDE. (a)50 Glasswool Partition batts 58/45 (b) ASB2/TSB2 Polyester Blanket 57/44 ADDITIONAL THICKNESS mm 53 (a)50 Glasswool Partition batts 61/50 (b) ASB2/TSB2 Polyester Blanket 60/49 ADDITIONAL THICKNESS mm 66 Rw > 46 CSR 534 CSR 535 FURRING SIDE. FURRING SIDE. (a)50 Glasswool Partition batts 60/47 (b) ASB2/TSB2 Polyester Blanket 59/46 ADDITIONAL THICKNESS mm 53 (a)50 Glasswool Partition batts 63/52 (b) ASB2/TSB2 Polyester Blanket 62/51 ADDITIONAL THICKNESS mm 66 Rw > 51 CSR 536 CSR 537 FURRING SIDE. FURRING SIDE. (a)50 Glasswool Partition batts 65/52 (b) ASB2/TSB2 Polyester Blanket 64/51 ADDITIONAL THICKNESS mm 53 (a)50 Glasswool Partition batts 68/57 (b) ASB2/TSB2 Polyester Blanket 67/56 ADDITIONAL THICKNESS mm 66 D12. The Red Book
13 Wall Systems - CSR Hebel Powerpanel. SPECIFICATION Plasterboard as per table, fixed to panels. 75mm CSR Hebel Powerpanel. 30mm minimum gap. 75mm Hebel Powerpanel. Plasterboard as per table, fixed to panels. TEST OR ATF-1023 FRL Report/Opinion CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr Up to /240/240 FCO 2073 HEBEL 75PP 1 x 10mm GYPROCK (a) 50 Glasswool Partition batts 64/59 WALL THICKNESS mm 200 SPECIFICATION Plasterboard as per table, fixed to furring. Rondo 129 furring channel at 600mm centres. 50mm Glasswool Partition batts 75mm CSR Hebel Powerpanel Cavity infill, as per table, in 30mm minimum gap. 75mm CSR Hebel Powerpanel 50mm Glasswool Partition batts Rondo 129 furring channel at 600mm centres. Plasterboard as per table, fixed to furring. TEST OR /1109A R4/VF FRL Report/Opinion CAVITY INFILL (Both Sides) Rw / Rw+Ctr Up to /240/240 FCO 2073 HEBEL 75PP-DC 1 x 10mm GYPROCK AQUACHEK Plasterboard. (a) 50 Glasswool Partition batts 64/50 WALL THICKNESS mm 264 D13. The Red Book
14 Wall Systems - CSR Hebel Powerpanel. SPECIFICATION 64mm steel studs at 600mm centres. Gap, as per system table. 75mm CSR Hebel Powerpanel. Plasterboard as per table, fixed to panel. TEST OR ➀ ATF-1023 ➁ /1109A R4/VF FRL Report/Opinion GAP TO STUDS mm CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr Up to /180/180 FCO 2073 HEBEL 75SS 1 x 10mm GYPROCK AQUACHEK Plasterboard. FYRCHEK (a) 75 Glasswool Partition batts 61/51 ➀ (a) 75 Glasswool Partition batts 61/53 ➁ WALL THICKNESS mm SPECIFICATION Plasterboard as per table, fixed to furring. Rondo 129 furring channel at 600mm centres. 50mm Glasswool Partition batts. 75mm CSR Hebel Powerpanel Gap, as per system table. 64mm steel studs at 600mm centres. TEST OR /1109A/ R4/VF FRL Report/Opinion GAP TO STUDS mm CAVITY INFILL (Refer to Section A) Rw / Rw+Ctr Up to /180/180 FCO 2073 HEBEL 75SS-DC 1 x 10mm GYPROCK Plasterboard CD. AQUACHEK (a) 50 Glasswool Partition batts 59/47 (a)105 Comfortseal R2.0 batts 62/51 WALL THICKNESS mm D14. The Red Book
15 Wall Systems - FRL Upgrade. SPECIFICATION Plasterboard lining as per table, fixed to furring channels. Rondo furring channels or studs at 600mm maximum centres. wall with FRL X/Y/Z. Rondo furring channel or studs at 600mm maximum centres. Plasterboard lining as per table, fixed to furring channels. N/A FRL Report/Opinion ADDITIONAL FRL CSR x 16mm GYPROCK FYRCHEK X+30 / Y+60 / Z+60 Wall X/Y/Z CSR 731 FYRCHEK X+60 / Y+120 / Z+120 FCO 382 CSR x 16mm GYPROCK FYRCHEK X+90 / Y+180 / Z+180 SPECIFICATION N/A Plasterboard lining as per table, fixed to furring channels. Rondo furring channels or studs at 600mm maximum centres. wall with FRL X/Y/Z. FRL Report/Opinion Lining of fire side ADDITIONAL FRL Lining on non fire side CSR 722 ONE SIDE 1 x 16mm GYPROCK FYRCHEK X+30 / Y+30 / Z+30 X+0 / Y+20 / Z+30 Wall X/Y/Z CSR 723 ONE SIDE FYRCHEK X+60 / Y+60 / Z+60 X+0 / Y+40 / Z+60 FCO 382 CSR 724 ONE SIDE 2 x 16mm GYPROCK FYRCHEK X+90 / Y+90 / Z+90 X+0 / Y+60 / Z+90 D15. The Red Book
16 Column Encasement Systems. SPECIFICATION Reinforced concrete column with FRL X/-/- Plasterboard lining as per table fixed direct to column. OR Plasterboard lining as per table fixed to Rondo furring channel. Rondo furring channel at 600mm maximum centres. FRL FCO 1356 X+30/ / CSR 795 X+60/ / CSR 796 X+120/ / CSR 797 X+120/ / CSR 798 PLASTERBOARD LINING FYRCHEK FYRCHEK 2 x 16mm GYPROCK FYRCHEK 1 x 25mm GYPROCK SHAFT LINER PANEL. FIG. D1. CONCRETE COLUMN ENCASEMENT FIRE RATED STEEL FURRING MOUNTED. Track cut and fixed to furring channels at top and bottom of column GYPROCK FYRCHEK fixed to furring channel at 200mm centres FIG. D2. CROSS SECTIONAL VIEW. 50mm Steel reinforced concrete column 600mm Fix External Angle Bead and set all external angles GYPROCK FYRCHEK plasterboard fixed at 200mm maximum centres to all framing Furring Channel 308 or Centre Fix Batten 333 at 600mm centres Anchor Clip 237 fixed with metal fasteners at 100mm from each end and 1200mm centres along column FIG. D3 CONCRETE COLUMN ENCASEMENT FIRE RATED DIRECT FIXED. Anchor Clips 237 at 1200mm maximum vertical centres and 308 Furring Channel at 600mm maximum horizontal centres or Centre Fix Batten 333 directly fixed at 600mm maximum horizontal centres Steel reinforced concrete column Fix External Angle Bead and set all external angles Direct fasten each layer of GYPROCK FYRCHEK plasterboard with Tapcon 10g screws (or equivalent) at 400 x 400mm horizontal and vertical centres Screw fix each layer at 200mm maximum centres to steel framing Offset Butt Joints in consecutive layers by 300mm minimum 75mm 400mm Fasten at butt joints with laminating screws at 200mm max centres 200mm Apply External Angle Bead to all corners and set Note: Butt joints in single layer systems to be backed by furring channel or nogging D16. The Red Book
17 FIG. D4 INSTALLATION DETAIL. MASONRY WALL (EXCEPT AAC) VERTICAL SHEETING ADHESIVE FIXING. Adhesive daubs 100mm max from top edge of sheet Adhesive daubs 50mm from sheet edge Adhesive daubs at 460mm centres Adhesive daubs 50mm from sheet edge NON FIRE RATED Location Field Butt Joints Angles & Openings FIRE RATED Fixing & Spacing Adhesive at 460mm centres beginning 100mm from top and bottom sheet edges and 50mm from recessed sheet edges Adhesive at 460mm centres 50mm from sheet edges Adhesive daubs at 460mm centres GYPROCK Plasterboard Adhesive daubs 100mm max from bottom edge of sheet Daubs of GYPROCK Adhesive. 6mm min. gap FIG. D5 INSTALLATION DETAIL. MASONRY WALL WITH FURRING CHANNEL HORIZONTAL SHEETING SCREW FIXING. Rondo Track or Angle fixed to ceiling frame NON FIRE RATED FIRE RATED One or two layers of GYPROCK FYRCHEK Plasterboard to each side of wall 300mm min. 300mm 1st Layer Edges & Field 2nd Layer Field Recessed Edges Butt Joints Angles & Openings Fixing & Spacing Screws at 600mm centres Fixing & Spacing Screws at 300mm centres Screw at each furring Screws at 200mm centres Screws at 300mm centres CSR Gyprock Resilient Mounts or Furring Anchor Clips at 1200mm from tracks and 1200mm centres between Rondo Furring Channel at 600mm maximum horizontal centres 600mm 600mm min 600mm min 300mm NOTE: Single layer systems using fire rated or non fire rated Gyprock plasterboard are fixed to the same specifications as detailed for the 2nd layer. Caulk all perimeter gaps with CSR Gyprock Fire Mastic to achieve stated fire rated and acoustic performance 200mm Rondo Track or Angle fixed to floor Fasteners at 10 to 16mm from sheet edges D17. The Red Book
18 FIG. D6 INSTALLATION DETAIL. HEBEL AAC WALL VERTICAL SHEETING SCREW FIXING mm GYPROCK Plasterboard NON FIRE RATED Location Field, Butt Joints & Edges Fixings FIRE RATED Fixing & Spacing Screws at 600mm horizontal centres x 300mm vertical centres 50mm x 10g bugle head screws CSR Hebel AAC Panel 300mm 600 mm 6mm min. gap FIG. D7 INSTALLATION DETAIL. HEBEL AAC WALL HORIZONTAL SHEETING SCREW FIXING. CSR Hebel AAC Panel NON FIRE RATED Location Field, Butt Joints & Edges FIRE RATED Fixing & Spacing Screws at 600mm horizontal centres x 300mm vertical centres Fixings 50mm x 10g bugle head screws CSR Hebel AAC Panel 300mm GYPROCK Plasterboard 6mm min. gap 10-16mm min. from each edge 600mm D18. The Red Book
SECTION B Steel Frame Wall Systems. Contents. Steel Stud Selection Tables. Introduction. Design Considerations. Installation.
SECTION B Steel Frame Wall Systems. Contents. SUBJECT Steel Stud Selection Tables Introduction Design Considerations Installation Components PAGE B2 B4 B4 B6 B7 System Specifications Single Stud Staggered
More informationSECTION E Ceiling Systems. Contents. Introduction. Design Considerations. Installation. Components. System Specifications. Floor/Ceiling Systems
SECTION E Ceiling Systems. Contents. SUBJECT Introduction Design Considerations Installation Components PAGE E2 E2 E4 E4 System Specifications Floor/Ceiling Systems Roof/Ceiling Systems E6 E12 Floor or
More informationComponents. Contents. Introduction. Applications. Linings. Introduction 2. Applications 2
GYP513 April 2006 2 Contents Introduction 2 Applications 2 Components 2 3 Design Considerations 4 Regulatory Issues 5 System Features 6 Typical Installation Sequence 7 Party Wall System Selection 8 11
More informationContents. Timber framing to be installed in accordance with AS:1684 Metal framing to be installed in accordance with BCA Volume: 2
Contents BCA Codes 3 General 4 Fire Performances Thermal and Acoustic Insulation Wall Installation 4 Timber Frame Separation Walls 5 Steel Frame Separation Walls 6 External Fire Rated Walls 7 Floor Installation
More informationFIRE RATING MATERIAL FIXING NOTES
FIRE RATING MATERIAL FIXING NOTES FIRE RATING MATERIAL FIXING NOTES... 1 External Wall Systems... 2 Non load bearing steel stud walls... 3 LOAD-BEARING STEEL STUD WALLS... 3 NON LOAD-BEARING TIMBER STUD
More informationGYPROCK STRATAWALL INTER-TENANCY WALL SYSTEMS INSTALLATION GUIDE
GYPROCK STRATAWALL INTER-TENANCY WALL SYSTEMS INSTALLATION GUIDE CONTENTS Introduction 2 Applications 2 System Features 2 Components 3 5 Design Considerations 6 8 System Selection 9 13 Installation Details
More informationLow Rise Multi-Residential Intertenancy Walls. Design and Installation Guide
Low Rise Multi-Residential Intertenancy Walls Design and Installation Guide Contents Introduction 3 This Design Guide has been prepared as a source of information to provide general guidance to consultants
More informationGYPROCK PARTY WALL INTERTENANCY WALL SYSTEMS FOR CLASS 1 BUILDINGS
GYPROCK PARTY WALL INTERTENANCY WALL SYSTEMS FOR CLASS 1 BUILDINGS CONTENTS Introduction 2 Applications 3 Advantages 3 Components 3 6 Design Considerations 7 8 System Features 10 Typical installation Sequence
More informationParty Wall Design & Installation
Party Wall Design & Installation PROFESSIONAL SOLUTIONS Contents Introduction 2 Applications 2 Advantages 3 Gyprock Plasterboard Selection 4 Components 6 Design Considerations 9 System Selection 12 Typical
More informationExternal Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185
Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185 GENERAL REQUIREMENTS 185 FRAMING 185 PLASTERBOARD LAYOUT 189 PLASTERBOARD FIXING 190 EXTERIOR
More informationWet Areas Using Plasterboard
INSTALLATION 168 DEFINITIONS 168 WET AREA REQUIREMENTS 168 WATERPROOFING REQUIREMENTS BY AREA 169 GENERAL REQUIREMENTS 171 FRAMING 171 PLASTERBOARD LAYOUT 171 PLASTERBOARD FIXING 171 CONSTRUCTION DETAILS
More informationCommercial Cinema Wall Systems
Commercial Systems Design and installation guide PROFESSIONAL SOLUTIONS CONTENTS Introduction 2 Applications 2 Advantages 2 Components 3 Handling & Storage 3 Acoustic Performance 4 Design Considerations
More informationIntertenancy Barrier Systems for Terrace Homes
Intertenancy Barrier Systems for Terrace Homes Specification & Installation Manual CBI5113 NATIONAL SUPPORT VISIT: POST: Winstone Wallboards Limited 37 Felix Street, Penrose, Auckland 1061, New Zealand
More informationSYSTEMS+ STEEL STUD WALLS INNOVATIVE SYSTEMS SOLUTIONS USGBORAL.COM
USGBORAL.COM S+ C 2 C 14 C 19 C 26 C 42 C 57 C 73 INTRODUCTION QUICK SELECTION TABLES LINED ONE SIDE LINED BOTH SIDES QUIET STUD STAGGERED STUD TWIN STUD C STEEL STUD WALLS INNOVATIVE S SOLUTIONS C STEEL
More informationLow Rise Multi-Residential Party Walls. Design & Installation Guide
Low Rise Multi-Residential Party Walls Design & Installation Guide HBLA041 LRPW July 2006 Contents 1.0 Introduction 3 2.0 Benefits 4 3.0 Typical Applications 5 4.0 Regulatory Issues 6 5.0 Selecting a Hebel
More informationFire Resistant: Achieves FRL levels of 90/90/90 for load bearing walls.
( ) is a new and innovative system designed to provide high performance separating walls between units and apartments in low-rise residential and commercial projects. provides exceptional fire and acoustic
More informationGypWall TM ROBUST 4.4. GypWall ROBUST. Durable impact resistant partition system. Key facts. Sector Guide
GypWall TM ROBUST GypWall ROBUST is a high impact resistant partition system for use where a more durable structure is required. The system provides a lightweight, cost-effective, non-loadbearing partition
More informationInstruction and Safety Manual Resilient Sound Isolation Clips (SIC Clips)
SOUND ISOLATION CLIPS Installation Manual Instruction and Safety Manual Resilient Sound Isolation Clips (SIC Clips) SOUND ISOLATION CLIP SPECIFICATIONS Width...1.00 inch Height...1.06 inch Length...3.86
More informationPart E robustdetails. robustdetails. September 2015 Update Pack. Dear Colleague,
Part E September 2015 Update Pack Dear Colleague, Thank you for subscribing to receive updates to the Part E Robust Details Handbook. The most significant amendment is to the Besblock wall, E-WM-26, which
More informationInstallation Guide and Safety Manual Resilient Sound Isolation Clips (SIC Clips)
Installation Guide and Safety Manual Resilient Sound Isolation Clips (SIC Clips) SOUND ISOLATION CLIP SPECIFICATIONS Width...1.00 inch Height...1.06 inch Length...3.86 inch Weight....025 lbs Max Spacing...48
More informationPROMATECT hour walls
PROMATECT 100 2 hour walls 08 9445 8300 info@progressivematerials.com.au progressivematerials.com.au Partitions General Information Introduction Partitions and external walls are used to separate buildings,
More informationfireseal Party Wall Design Guide CLASS 1 BUILDINGS PARTY WALL DESIGN GUIDE PAGE 1
fireseal Party Wall Design Guide CLASS 1 BUILDINGS PARTY WALL DESIGN GUIDE PAGE 1 1.0 INTRODUCTION CONTENTS The stability of a building in a fire depends upon the performance of all the component parts
More informationGIB Quiet Clip GIB CBI March Features and Benefits
CBI - 5113 March 2002 GIB Quiet Clip Features and Benefits No special flooring systems required Easy fit Installation Significantly improves low frequency sound transmission Significantly improves low
More informationGypLyner UNIVERSAL Metal framed wall lining system
Metal framed wall lining system Pizza Express, York 30 Metal framed wall lining system wall lining system is a cost-effective, virtually independent metal frame drylining. It is a general purpose system
More informationrondo accessories CONTENTS:
rondo accessories SUMMARY Rondo has a range of accessories to complement our steel wall and ceiling systems, which includes Top Hats, Reveal Beads and Angles, as well as a rod bending tool for suspended
More informationGypLyner IWL Independent wall lining system
Independent wall lining system Photograph courtesy of Philip Brier 0 Independent wall lining system independent wall lining is a lightweight, nonloadbearing drylining which is erected independently of
More informationGypLyner (walls) Metal framed wall lining system. GypLyner.
GypLyner GypLyner (walls) Metal framed wall lining system GypLyner is a cost-effective, virtually independent metal frame drylining system for lining walls. General purpose and suitable for all internal
More informationCHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES
CONTENTS 10.1 PLASTERWORK 10.2 2 ND AND 3 RD FIX FINISHES FUNCTIONAL REQUIREMENT 10.1 Plasterwork Workmanship Design Technical Manual TS-011-09-010412 i. All workmanship must be within defined tolerances
More informationSYSTEMS+ SPECIALTY SYSTEMS INNOVATIVE SYSTEMS SOLUTIONS USGBORAL.COM
USGBORAL.COM S+ I 2 INTRODUCTION I 8 LIFT & SERVICES SHAFTS I 8 Shaftwall I 9 Ventshaft I 10 COLUMN PROTECTION I 13 BEAM PROTECTION I 14 FIRE TUNNEL I SPECIALTY S INNOVATIVE S SOLUTIONS I SPECIALTY S INTRODUCTION
More informationRondo steel stud. Framing Systems Installation Manual. revised: october 2008
Rondo steel stud Framing Systems Installation Manual revised: october 2008 design considerations general information The Rondo Steel Stud and Track sections detailed in this installation manual will provide
More informationrobustdetails E-FC-7 Separating Floor Concrete Separating Floors Concrete E-FC-7
DO Butt floor blocks tightly together Cover floor blocks with min 50mm concrete topping Ensure that concrete does not enter the cavity and bridge the two leaves of supporting wall blockwork - it is acceptable
More informationImpact Damage Resistant Wall Systems. GYP511 January 2011
Impact Damage Resistant Wall Systems GYP511 January 2011 Contents General Installation Introduction 2 Advantages 2 2 Material Specifications 2 Design Considerations 3 Framing 5 Plasterboard Installation
More informationGypWall AUDIO The ultimate cinema wall system
The ultimate cinema wall system 9 Vox Cinemas, Muscat City Centre - Sultanate of Oman 7 0 R w db 0 0 mins is a non-loadbearing, twin frame high performance wall system that provides exceptionally high
More informationParty Wall Roof Junction Design Guide
fireseal Party Wall Roof Junction Design Guide CLASS 1 BUILDINGS Party Wall Design Guide 1 Expert insulation advice Project and value engineering support Industry-leading building science research A wealth
More informationUSGBORAL.COM SYSTEMS+ INTRODUCTION OUTRWALL BRICK VENEER WALLS EXTERNAL WALLS INNOVATIVE SYSTEMS SOLUTIONS
USGBORAL.COM S+ E 2 E 5 E 9 E 10 INTRODUCTION OUTRWALL WALLS FIRECLAD E EXTERNAL WALLS INNOVATIVE S SOLUTIONS E EXTERNAL WALLS INTRODUCTION The following USG Boral external wall systems are outlined in
More informationGypLyner UNIVERSAL Metal framed wall lining system
Metal framed wall lining system! This section includes updated information, added since it was first published in July 009. Please see the WHITE BOOK update document for details. Last updated 0/0/00 Cadbury
More informationECO Wall & Floor Panels
Certification Body: ABN: 80 111 217 568 JAS-ANZ Accreditation No. Z4450210AK PO Box 7144, Sippy Downs Qld 4556 +61 (07) 5445 2199 www.certmark.org Certificate Holder: Chad Group Australia Pty Ltd ABN:
More informationGypWall QUIET Acoustic separating wall system
Acoustic separating wall system 90 Al Mafraq Hospital, Abu Dhabi 0 R w db 90 0 mins is a lightweight, non-loadbearing, twin framed acoustic separating wall, primarily used as a sound resisting wall in
More informationKnauf Wall Liner. Head Track. Brackets. Wall Lining Stud. Fixings. Knauf Plasterboard. Floor Track. 98 Wall Liner
The Knauf Wall Liner System is extremely versatile and can be specified for application on masonry backgrounds with moderate irregularities between 20mm and 125mm. It can accommodate any of the range of
More informationInstallation Guide and Safety Manual Resilmount A237R (Resilient Sound Isolation Clips)
Installation Guide and Safety Manual Resilmount A237R (Resilient Sound Isolation Clips) 3" RESILMOUNT A237R SPECIFICATIONS 1d " f" Width...1.375 inch Height...3.25 inch Depth...1.125 inch Weight....025
More informationGYP500 October RRP $24.95
GYP500 October 2004. RRP $24.95 Table of Contents. SECTION A B C D E F G Z SUBJECT Introductory Information. Steel Stud Wall Systems. Timber Stud Wall Systems. Masonry Wall Systems. Ceiling Systems. Services
More informationTiling Tiling
416 Tiles can be applied to drylined walls or the surface of lightweight partition systems to dado level or above. can be carried out in any type of building either in dry areas or in areas subject to
More informationWall Linings. As well as complete dry lining solutions we also provide fast-drying parge coat to ensure airtightness,
Wall Linings Our versatile range of wall lining systems makes it easy to produce a high-quality, high-performance finished wall regardless of the background. Whether your priority is acoustic control,
More informationSECTION GYPSUM BOARD SYSTEM
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 09 29 00 GYPSUM BOARD SYSTEM A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification sections,
More informationCHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10
CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES 283 Chapter 10 FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 10.1 PLASTERWORK Workmanship i. All workmanship must be within the tolerances
More informationConcrete Soffit Direct Fix
Installation Guide Concrete Soffit Direct Fix Recommended Pattern insulation boards may be installed in any pattern. The recommended pattern is a square-set pattern, for simplest and quickest configuration
More informationGypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products.
GypLyner GypLyner Metal framed wall lining system All our systems are covered by SpecSure when using genuine Gyproc and Isover products Linings GypLyner GypLyner is a cost-effective, virtually independent
More informationINTERTENANCY SYSTEMS 2018
KOROK INTERTENANCY SYSTEMS 2018 FOR TERRACED HOUSING AND APARTMENTS CBI 5113 FEB 2018 KOROK KOROK INTERTENANCY SYSTEMS 2018 FOR TERRACED HOUSING AND APARTMENTS SECURE, QUIET, FLEXIBLE. KOROK Intertenancy
More informationDriLyner 5.2. DriLyner. Drywall masonry lining systems. Key facts. Sector Guide
systems provide simple and effective techniques for fixing Gyproc plasterboards or Gyproc thermal laminates to brick, block, and concrete walls. They can be used in all building types in both new-build
More informationFire Safety and Performance of Wood in Multi-Residential and Commercial Buildings. Boris Iskra Forest & Wood Products Australia
Fire Safety and Performance of Wood in Multi-Residential and Commercial Buildings Boris Iskra Forest & Wood Products Australia This Presentation 1. Fire Hazard Properties Building Code of Australia Volume
More informationSECTION GYPSUM BOARD SYSTEM
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 09 29 00 GYPSUM BOARD SYSTEM A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification sections,
More informationInterHome SEPARATING WALL SYSTEM FOR MULTI-RESIDENTIAL CONSTRUCTION
InterHome SEPARATING WALL SYSTEM FOR MULTI-RESIDENTIAL CONSTRUCTION B Contents DISCLAIMER Products manufactured and systems designed by Knauf are produced in accordance with the Building Code of Australia
More informationSECTION GYPSUM BOARD ASSEMBLIES
SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.
More informationTiling Tiling Finishes C08
C08 Finishes In rooms subject to high or intermittent moisture conditions, the range of boards available for tiling offers flexibility of design and peace of mind when installed in both wall linings, lightweight
More informationFire Resistance and Sound Insulation of Concrete Masonry for New South Wales
Fire Resistance and Sound Insulation of Concrete Masonry for New South Wales Contents Preface Preface 2 Introduction 2 NCC-BCA requirements 3 Fire 3 1.1 Design of walls for fire resistance 3 1.2 General
More information05 INTERIOR 0522p RONDO in partitions - framed and lined
0522P RONDO IN PARTITIONS - FRAMED AND LINED Branded worksection This branded worksection Template has been developed by NATSPEC in conjunction with Rondo Building Services Pty Ltd and may be used whilst
More information1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights
1 Exam Prep Application and Finishing of Gypsum Board GA-216-2013 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2013 Application and Finishing of Gypsum Panel Products. Each
More information1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights
1 Exam Prep Application and Finishing of Gypsum Board GA-216-2016 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2016 Application and Finishing of Gypsum Panel Products. Each
More informationSECTION GYPSUM BOARD PART 1 - GENERAL
SECTION 09250 - GYPSUM BOARD PART 1 - GENERAL 1.01 DESCRIPTION: A. Work under this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary Conditions
More informationPROMATECT 100 Solid Partitions
PROMATECT 100 Solid Partitions 08 9445 8300 info@progressivematerials.com.au progressivematerials.com.au Partitions General Information Introduction Partitions and external walls are used to separate buildings,
More informationProject No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6
DECEMBER, 2016 Page 1 of 6 1 GENERAL 1.01 RELATED SECTIONS.1 Section 01 33 00 - Submittal Procedures..2 Section 07 21 16 - Batt and Blanket Insulation..3 Section 07 92 10 - Sealants..4 Section 09 91 00
More informationC08. S04. P02 P08 Tiling
! This section includes updated information, added since it was first published in December 2015. Last updated 29/03/2018 C08. S04. P02 P08 Including C08. S01. P02 Finishes introduction C08 Finishes Introduction
More informationrondo steel stud drywall framing system
steel stud & track rondo steel stud drywall framing system SUMMARY The Rondo Steel Stud Drywall Framing System provides a durable, practical and lightweight structure for internal plasterboard walls and
More informationSECTION GYPSUM BOARD ASSEMBLIES
PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 09260 - A. Metal stud wall framing. Denoted on drawings as "metal studs". B. Metal channel ceiling framing. C. Acoustic insulation and sealant. D. Cementitious
More informationInstallation Guide and Safety Manual QuietClip (Resilient Sound Isolation Clips)
Installation Guide and Safety Manual QuietClip (Resilient Sound Isolation Clips) 1d" 2 2" 1 4" f" QUIETCLIP SPECIFICATIONS Width...1.25 inch Height...4.25 inch Depth...1 inch Weight....025 lbs Max Spacing...48
More information05 INTERIOR 0522p RONDO in partitions - framed and lined
0522P RONDO IN PARTITIONS - FRAMED AND LINED Branded worksection This branded worksection Template has been developed by NATSPEC in conjunction with Rondo Building Services Pty Ltd and may be used whilst
More informationApproved Document E Technical Design Report
Approved Document E Technical Design Report Report No 15692 Date 15 th April 2013 Sound Solution Consultants Ltd. Ref 15692 Page 1 Client: Site Address Brighton Our Report Ref:15692 Table of Contents 1.
More informationJune Non - Residential New Build Partition walls
June 2010 Non - Residential New Build 4.6.3 Partition walls Non-residential new build 4.0 Non-residential New Build Partition Walls Contents Introduction find online page Solution optimiser and pathfinder
More informationPROMAtect H 4 hour walls. progressivematerials.com.au
PROMAtect H 4 hour walls 08 9445 8300 info@progressivematerials.com.au progressivematerials.com.au Partitions General Information Introduction Partitions and external walls are used to separate buildings,
More informationPart E robustdetails. robustdetails. January 2018 Update Pack
Part E Pack Dear Colleague, The first Update Pack of the year, and the first welcome from me as Chief Executive. Although new to the role, I have been with the company for nine years with responsibility
More informationREGULATORY INFORMATION REPORT. An assessment of the fire resistance of CSR Hebel external wall panels if tested in accordance with AS
REGULATORY INFORMATION REPORT An assessment of the fire resistance of CSR Hebel external wall panels if tested in accordance with AS1530.4-2005. EWFA Report No: RIR 24648-07 Report Sponsor: CSR Panel Systems
More informationAdjustable Suspension Hanger Technical Datasheet
Adjustable Suspension Hanger sheet The Adjustable Suspension Hangers Clip are a component of the Keylock Ceiling System. The upper vertical side of the hanger allows the Suspension Rod that goes through
More informationicore HR outperforms other building boards in many important ways including the following:
icore HR is a new and innovative system designed to provide high performance separating walls between units and apartments in high-rise commercial projects. icore HR system provides exceptional fire and
More informationFIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250
FIRE PROTECTION GTEC Shaftwall range uses a specially designed system to protect voids and shafts in buildings. It resists pressure changes and enables installation from one side of the shaft only. GTEC
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 092650 - GYPSUM BOARD SHAFT WALL ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationDrywall & Veneer Plaster Products
ii Contents 1 Drywall & Veneer Plaster Products Describes complete line of construction products, including Sheetrock brand gypsum panels and Imperial brand gypsum base for drywall and veneer plaster construction,
More informationFire resistance and acoustic properties
Fire resistance and acoustic properties Fire resistance and acoustic properties Fire resistance levels are specified in the Building Code of Australia (BCA). This system provides an accurate method of
More informationSingle frame acoustic separating wall system
GypWall QUIET SF GypWall QUIET SF Single frame acoustic separating wall system GypWall QUIET SF metal stud partition is a lightweight, non-loadbearing, single frame wall system. Subject to Local Authority
More informationGypWall RAPID db Plus
Metal stud housing partition system! This section includes updated information, added since it was first published in July 009. Please see the WHITE BOOK update document for details. Last updated 0/0/00
More informationSECTION GYPSUM BOARD ASSEMBLIES
PART 1 - GENERAL 1.1 SUMMARY SECTION 09 21 16 A. Provide gypsum board assemblies as shown and specified. Work includes: 1. Walls, partitions, and soffits, including metal framing systems. 2. Acoustical
More informationGypWall AUDIO The ultimate sound insulating wall system
The ultimate sound insulating wall system Cineworld, Ilford 8 The ultimate sound insulating wall system is a non-loadbearing, twin frame high performance wall system that provides exceptionally high levels
More informationFire Rated Glazing System Guide
Fire Rated Glazing System Guide FIRE RATED GLAZING SYSTEM GUIDE Introduction Pyropanel Developments are specialists in fire rated glazing solutions, and our systems are designed for easy installation into
More informationSECTION GYPSUM BOARD
SECTION 092900 GYPSUM BOARD PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Interior gypsum wallboard. 2. Tile backing panels. B. Related Sections: 1. Section 012300 Alternates. 1.2 SUBMITTALS A.
More informationSECTION GYPSUM BOARD
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.01 SUMMARY A. Section Includes 1. Gypsum board screw attached to wood framing and furring members, joint treatment, and accessories. 2. Installation of
More informationrobustdetails E-FC-6 Separating Floor Concrete Separating Floors Concrete E-FC-6 SYSTEM INSTALLATION
SYSTEM INSTALLATION The use of this screed resilient layer system must incorporate the following: 1) 8mm Regupol E48 (resilient layer to be laid over entire floor area with 50mm overlaps) 2) All joints
More informationHigh Rise Facades. Design and Installation Guide
High Rise Facades Design and Installation Guide Contents Introduction 3 This Design Guide has been prepared as a source of information to provide general guidance to consultants and in no way replaces
More informationInstallation & Specification Manual Board Fixing
Installation & Specification Manual Board Fixing 4 th Ed. September 2014 Fac. 2/89 Somerset Road Campbellfield Melbourne, 3061 P. 03 9359 2336 F. 03 9359 9306 info@ezylite.com.au www.ezylite.com.au Ezy-Lite
More informationTechnical Manual. Harpro High-Rise External Wall System HBG-003, September 2015 Homebuild Global Pty Ltd
Technical Manual Harpro High-Rise External Wall System HBG-003, September 2015 Homebuild Global Pty Ltd Our Story Our Story Homebuild Global Pty Ltd is a young and dynamic Australian company based in Sydney
More informationPROMAtect h concrete upgrade Concrete and brick walls
PROMAtect h concrete upgrade Concrete and brick walls 08 9445 8300 info@progressivematerials.com.au progressivematerials.com.au Concrete Upgrading Systems Index 112 Type of System Increase of Concrete/brick
More informationThe extra strong, extra durable, sound resistant system that you can direct fix to
C0 Partitions The extra strong, extra durable, sound resistant system that you can direct fix to All our systems are covered by SpecSure when using genuine Gyproc and Isover products gyproc.ie Utilising
More informationSECTION NON-STRUCTURAL METAL FRAMING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable
More informationFire Door Installation
FA LCON PANEL PRODUCTS LTD 14.1 It is vital that performance doorset are installed by competent tradesmen and It is strongly recommended that the installer is a member of a recognised quality assurance
More informationHouses and Low Rise Multi-Residential External Walls PowerPanel XL. Design and Installation Guide NEW
Houses and Low Rise Multi-Residential External Walls PowerPanel XL Design and Installation Guide NEW Contents Introduction 3 This Design Guide has been prepared as a source of information to provide general
More informationSOUND INSULATION TESTING IN DWELLINGS
SOUND INSULATION TESTING IN DWELLINGS Chris Dilworth, AWN Consulting This Presentation Discusses the standards by which we judge sound insulation performance. Presents the results of sound insulation tests
More informationPronto Panel Multi-storey Internal Wall & Low-rise Intertenancy Wall System
Certificate number: CM30050 Rev3 Global-Mark Pty Ltd, Suite 4.07, 32 Delhi Road, North Ryde NSW 2113, Australia Tel: +61 (0)2 9886 0222 - www.global- Mark.com.au Certificate Holder: Brickworks Building
More informationEXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board. 1.2 RELATED WORK A. Installation of steel framing members for walls, partitions,
More informationSEPARATING WALLS CLASS 1A
TECHNICAL DATA SHEET ISSUED BY TIMBER QUEENSLAND SEPARATING WALLS CLASS 1A (DUPLEXES, TOWNHOUSES, BUILDINGS ROW HOUSES, TERRACE HOUSES) 33 RECOMMENDED PRACTICE // AUGUST 2014 Fire and sound are important
More informationPRODUCT GUIDE
WWW.HEBEL.COM.AU PRODUCT GUIDE CONTENTS Facts about Hebel 3 Where is Hebel used 4 Benefits of Hebel 5 PowerBlock+ (External & Internal Walls, Bathroom Hobs & DIY) 6 PowerPanel XL (External & Zero Boundary
More informationREPORT HOLDER: GYPSUM ASSOCIATION 962 WAYNE AVENUE, SUITE 620 SILVER SPRING, MARYLAND EVALUATION SUBJECT:
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 338 Reissued 02/208 This report is subject to renewal 02/209. DIVISION: 09 00 00
More informationSECTION GYPSUM BOARD
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 29 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable