1 Questions and Answers about Madison Crescent and Noise Issues Question: What codes were applicable to our condos when they were built? Answer: The Virginia Uniform Statewide Building Code (VUSBC) - The Virginia Board of Housing and Community Development is appointed by the Governor and adopts the VUSBC. The VUSBC is updated approximately every three years in conjunction with the International Code Council's update to the International Building Codes. The International Building Codes and the VUSBC go through an extensive public vetting process which allows anyone to submit proposed Code Changes for consideration. Currently, Virginia is accepting proposed Code Changes for the 2012 Code Cycle. It is important to note that State law prohibits localities from amending the VUSBC or publishing their own local Building Code. SOUND TESTING QUESTIONS Question: What sound standards/code compliance requirements apply to the construction of our condo? Answer: This structure falls under the Virginia Uniform Statewide Building Codes and the International Building Codes as follows: SECTION 1207 SOUND TRANSMISSION Scope. This section shall apply to common interior walls, partitions and floor/ceiling assemblies between adjacent dwelling units or between dwelling units and adjacent public areas such as halls, corridors, stairs or service areas Air-borne sound. Walls, partitions and floor/ceiling assemblies separating dwelling units from each other or from public or service areas shall have a sound transmission class (STC) of not less than 50 (45 if field tested) for air-borne noise when tested in accordance with ASTM E 90. Penetrations or openings in construction assemblies for piping; electrical devices; recessed cabinets; bathtubs; soffits; or heating, ventilating or exhaust ducts shall be sealed, lined, insulated or otherwise treated to maintain the required ratings. This requirement shall not apply to dwelling unit entrance doors; however, such doors shall be tight fitting to the frame and sill Masonry. The sound transmission class of concrete masonry and clay masonry assemblies shall be calculated in accordance with TMS 0302 or determined through testing in accordance with ASTM E Structure-borne sound. Floor/ceiling assemblies between dwelling units or between a dwelling unit and a public or service area within the

2 structure shall have an impact insulation class (IIC) rating of not less than 50 (45 if field tested) when tested in accordance with ASTM E 492. Question: Did Prince William County perform testing for sound code compliance during the construction phase of our condos? Did any codes or regulations require the builder to perform testing to verify acceptable sound levels and code compliance? Answer: No. The Code does not require either Prince William County or the builder to conduct testing for sound code compliance. Question: Hush Acoustics LLC was hired by Miller and Smith to perform the sound testing on April 19. Since Miller and Smith has worked with Hush in the past, is this considered a conflict of interest? Answer: The VUSBC authorizes the Building Official to consider/accept reports from competent professionals (i.e., registered architects; professional engineers; licensed contractors; certified testing agencies). Eric Mays, the Building Official for Prince William County has determined that the company and the company's assigned engineer are competent to conduct and analyze the STC Field Testing. In accordance with state law and regulations, Professional Engineers are licensed professionals that are to exercise their engineering judgment without bias or prejudice. If the engineer was a direct employee of Miller & Smith, or he had an ownership interest in Miller & Smith, it would constitute a potential conflict of interest. However, in this case the company and its engineer are acting as a consultant to the Building Official, and Miller & Smith is paying for the consulting services. If you have any direct evidence of a conflict of interest or bias, please forward that information to Eric Mays at immediately. Question: What is the Statute of Limitations as it pertains to Building Code Violations? Answer: Building Code Violations must be discovered by the Building Official within two years of the issuance of the Certificate of Occupancy. Once discovered, if the violation is not abated, the Building Code Violation must be prosecuted within one year. If the Building Official discovers a Building Code Violation after the Statute of Limitations for Prosecution has expired, the Building Official is required to issue an Inspection Report documenting the Building Code Violations; however, any subsequent legal action requires a civil action by the contracting parties (i.e., homeowner, builder). Question: What date was the certificate of occupancy recorded with Prince William County for the Madison Crescent development? Answer: The Certificate of Occupancy was issued to each individual unit. In order to respond to this question, please provide the following information:

3 Name of the property owner Address of the property In addition to this, it would be helpful to have the phone number and in order to communicate with the owner. Question: Will PWC release the bonds currently being held for Miller and Smith knowing these issues exist? Answer: The Bonds have been extended for this project. At this time, no request for Bond release has been received by Prince William County. For additional information on this issue, contact Oscar F. Guzman at NEW FAQ s as of May 12, 2012 Question: What can the Homeowner do to minimize sound issues? Answer: If the homeowner wants to increase the STC and IIC Rating between the second floor and third floor, there are two basic options. The first option is to install a floor covering on the third floor that absorbs sound (i.e., carpet with carpet padding). The second option is to alter the floor/ceiling assembly between the second floor and third floor. The second option requires that a Virginia registered design professional submit a Building Permit Application and proposed plans to the County for review and approval. A Virginia licensed contractor will need to obtain the Building Permit before commencing the work, and County inspections will be required. Question: How may I view the plans that were approved by the County for the construction of the Madison Crescent Condominiums? Answer: Please submit a Freedom of Information Request to Ray Jackson at requesting to the view the documents. Mr. Jackson will contact you to schedule a time for you to view the documents. Question: Does the County s inspection procedures require Field Testing of the STC and IIC? Answer: No. Field Testing of the STC and IIC is not required to be conducted as part of normal inspection process. (NOTE: The County is not aware of any Virginia jurisdiction that mandates the Field Testing during the normal inspection process.) Question: Who was responsible for doing the sound testing that was conducted; Prince William County or Miller and Smith? Answer: Based on the County s request, Miller and Smith hired a consultant to conduct the Field Testing.

4 Question: Will the Engineer s Report be available to all residents requesting such? Answer: The Engineer s Reports are posted on the County s website at Question: Were the Madison Crescent Condos inspected by County inspectors or were they inspected under your policy 1.16 Third Party Building Inspection Certification Program? Answer: The foundation inspections were conducted under Policy 1.16 Third Party Building Inspection Certification Program. All other inspections were conducted by the County. Question: Based upon the plans Miller and Smith provided, what measures did they take, in the design process, to ensure that they would meet the IIC- 50 rating as required by the VUSBC? Did the County specifically inspect the plans for this? Given the difficulties of meeting sound requirements in Condo Units, were the design measures specifically inspected upon installation? Answer: The designer provided a detail which included 3-1/2 fiberglass batt insulation in the fire rated floor/ceiling assembly, and the plan detail indicated compliance with STC and IIC required design ratings. The County plan reviewers confirmed compliance with STC and IIC required design ratings. The County Inspectors confirmed the installation of the insulation in the floor/ceiling assembly. Question: Does the County have any specific procedures for dealing with latent defects? Answer: Complaints are submitted to the Building Code Enforcement Section in the Building Development Division. An investigation is conducted to determine if there is a Building Code Violation. If a documented Building Code Violation is within the Statute of Limitations for Prosecution of Building Code Violations, a Notice of Violation can be issued. If a documented Building Code Violation is outside of the Statute of Limitations for Prosecution of Building Code Violations, an Inspection Report is sent to the homeowner and builder to document the Building Code Violation. If the homeowner pursues civil litigation, the Inspection Report can serve as evidence of the Building Code Violation. NEW FAQ s as of June 1, 2012 Question: Will Miller & Smith conduct any additional field testing? Answer: The County did request that the builder, Miller & Smith, conduct Sound Transmission Testing throughout the Madison Crescent Two over Two dwelling units. Miller & Smith did hire a consultant to conduct Sound Transmission Testing at 7931/7933 Crescent Park Drive and 7782/7784

5 Cedar Branch Drive. However, Miller & Smith declined to conduct any additional testing, and the County does not have sufficient empirical evidence to compel Miller & Smith to conduct additional testing. Question: If I decide as the homeowner to proceed with field testing, what do I do? Answer: There are two options: 1. Destructive Testing A licensed contractor will need to obtain a Building Permit to temporarily remove portions of the ceiling in the lower dwelling unit to allow for the inspection of the sound insulation installed in the fire rated floor/ceiling assembly. Once the inspection is completed, the fire rated floor/ceiling assembly will need to be repaired immediately to mitigate the fire hazard created by breaching the fire rated assembly. The County will need to be present to witness the destructive testing and the immediate repair of the ceiling. 2. Sound Transmission Testing A qualified professional engineer may conduct testing in accordance with ASTM E and ASTM E The engineer s qualifications and report can be submitted to the County for review. Question: How can the Building Official s decision be appealed? Answer: Please refer to Virginia Uniform Statewide Building Code background information located, here.

Basement Renovation Guide For Residential Dwellings

Basement Renovation Guide For Residential Dwellings 1 Development Services Department Building Permit & Inspection Services Basement Renovation Guide For Residential Dwellings This document is a guide for home owners and does not cover all possible conditions.

More information

PG Board TAF. Thermal, Acoustic and Fire Resistant Insulation System

PG Board TAF. Thermal, Acoustic and Fire Resistant Insulation System PG Board TAF Thermal, Acoustic and Fire Resistant Insulation System PG BOARD "TAF" (Parking Garage, Mechanical, Electrical, Utility Room, etc.) Provides: Thermal insulation for above occupied space (energy

More information

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS 13VAC5-91-10. Definitions. The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise. Administrator means the Director of

More information

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION WE WILL NOT ACCEPT ANY PLANS OR PAPERWORK TO START THE REVIEW PROCESS UNTIL ALL ITEMS BELOW ARE SUBMITTED TO US AT THE SAME TIME. PLANS

More information

STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION DIVISION OF FLORIDA CONDOMINIUMS, TIMESHARES AND MOBILE HOMES

STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION DIVISION OF FLORIDA CONDOMINIUMS, TIMESHARES AND MOBILE HOMES STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION DIVISION OF FLORIDA CONDOMINIUMS, TIMESHARES AND MOBILE HOMES IN RE: PETITION FOR ARBITRATION Slade Condominium Association, Inc., Petitioner,

More information

Building Inspector. General Summary. Building Inspector I

Building Inspector. General Summary. Building Inspector I Building Inspector FLSA Status: Bargaining Unit: Covered District Council of Trade Unions (DCTU) General Summary Positions in this broad class series perform inspection of structural and mechanical systems

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

THE CONSTRUCTION SUPERVISOR

THE CONSTRUCTION SUPERVISOR City of Aurora Building Inspections 15151 E Alameda Pkwy Aurora, CO 80012 (303) 739-7420 THE CONSTRUCTION SUPERVISOR When a building permit has been issued for any construction within the City, the Supervisor

More information

Protecting Penetrations in Fire Rated Construction

Protecting Penetrations in Fire Rated Construction Protecting Penetrations in Fire Rated Construction NY State Fire Marshals and Inspectors Conference September 7 th Bruce E. Johnson UL Codes and Advisory Services UL and the UL logo are Trademarks of UL

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

BUILDING CODES & DESIGN CRITERIA

BUILDING CODES & DESIGN CRITERIA BUILDING CODES & DESIGN CRITERIA Adopted Building Codes: 2006 International Building Code (IBC) 2006 International Residential Code (IRC) 2006 International Mechanical Code (IMC) 2006 International Plumbing

More information

Chapter 1: Application and Administration

Chapter 1: Application and Administration Chapter 1: Application and Administration General Comments This chapter provides provisions regarding the purpose, scope, application, and administration of subsequent requirements of ICC 500. In addition

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Franklin County Septic & Zoning permit application: A septic and zoning permit is required for residential or commercial

More information

START WORK NOTIFICATION

START WORK NOTIFICATION START WORK NOTIFICATION This form must be submitted at least 3 buisness days before beginning work to the Rhode Island Department of Health by email at leadprogram@health.ri.gov or by fax at 401-222-2456.

More information

Boulder City NV Prepared by (Print Name) Signature Date

Boulder City NV Prepared by (Print Name) Signature Date City of Boulder City Community Development Department Building & Safety Division 401 California Avenue Boulder City, NV 89005-2600 702-293-9282 (Main Line) 702-293-9392 (Fax) 2009 International Energy

More information

CHECKLIST Inspecting a Garage

CHECKLIST Inspecting a Garage CHECKLIST Inspecting a Garage By Ben Gromicko This section deals with the details of the garage or carport inspection that may be performed. At the end of this section, you shall be able to: describe the

More information

BUILDING PERMIT APPLICATION

BUILDING PERMIT APPLICATION TOWN OF LEICESTER 132 Main Street Post Office Box 197 Leicester, New York 14481 Phone: (585) 382-3231 FAX: (585) 382-9766 BUILDING PERMIT APPLICATION All Town of Leicester property owners are required

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

PROCEDURE FOR REQUESTING A BUILDING PERMIT

PROCEDURE FOR REQUESTING A BUILDING PERMIT PROCEDURE FOR REQUESTING A BUILDING PERMIT A. CHECKLIST OF REQUIREMENTS FOR BUILDING PERMIT APPLICATION: The following checklist indicates the requirements based on the type of Building Permit being requested.

More information

BASEMENT FINISH CONSTRUCTION

BASEMENT FINISH CONSTRUCTION BASEMENT FINISH CONSTRUCTION June 2017 A City of Rochester Hills Building Department Guide to Finishing a Basement Rochester Hills Building Department 1000 Rochester Hills Dr. 248-656-4615 Guidebooks/Basement

More information

Dear Home Owner: Certificate Holder: Mr. xxxxxx Unit yyyyyy 3410 N. Lake Shore Drive Chicago, IL ADDITIONAL INSURED LANGUAGE:

Dear Home Owner: Certificate Holder: Mr. xxxxxx Unit yyyyyy 3410 N. Lake Shore Drive Chicago, IL ADDITIONAL INSURED LANGUAGE: Dear Home Owner: For your information, construction work can be done in the unit Monday through Saturday, during the hours of 8:00 am to 6:00 pm. Deliveries and equipment must be taken through the back

More information

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE: HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440

More information

SECTION BUILDING INSULATION. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION BUILDING INSULATION. Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 07210 BUILDING INSULATION Display hidden notes to specifier. (Don't know how? Click Here) A. Perimeter Fire Containment Systems. B. Building Insulation for Thermal

More information

Fenestration Components: Mechanical Summary. Water heater energy factor: Ef Fuel type: Gas Electric Other

Fenestration Components: Mechanical Summary. Water heater energy factor: Ef Fuel type: Gas Electric Other This information must be on the drawing documents not attached to plans. The following Compliance statements must be on the drawings: 2009 International Energy Conservation Code Statement of acknowledgement

More information

HACKER SOUND MAT II, to create a quieter living environment while meeting demanding project specifications in multi-family construction.

HACKER SOUND MAT II, to create a quieter living environment while meeting demanding project specifications in multi-family construction. HACKER SOUND MAT II HACKER SOUND MAT II, to create a quieter living environment while meeting demanding project specifications in multi-family construction. HACKER SOUND MAT II, a recycled rubber sound

More information

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone: 2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA 94070 Phone: 650-802-4261 PURPOSE: The residential provisions of the 2016 CalGreen

More information

BUILDING INSPECTOR I/II

BUILDING INSPECTOR I/II BUILDING INSPECTOR I/II Class specifications are intended to present a descriptive list of the range of duties performed by employees in the class. Specifications are not intended to reflect all duties

More information

The following materials and documents are required in order for you to obtain a Building Permit:

The following materials and documents are required in order for you to obtain a Building Permit: Imperial Municipal Services 263 Northland Drive Rockford, MI 49341 (616)863-9294 or 1-800-442-2794 Fax: (616)863-9298 E-mail: info@imsinspections.com Algoma Township 10531 Algoma Ave. NE Rockford, MI 49341-7108

More information

The Inspection Process. Waxhaw N.C.

The Inspection Process. Waxhaw N.C. The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"

More information

APPLICATION FOR PORCH / DECK PERMIT

APPLICATION FOR PORCH / DECK PERMIT Department of Neighborhood Services and Inspections 625 52nd Street, Room 100, Kenosha, WI 53140 Phone: 262.653.4263, Fax: 262.653.4254 APPLICATION FOR PORCH / DECK PERMIT Permit Fee: $60.00, Zoning Plan

More information

SUBSTANTIAL IMPROVEMENT

SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT General Discussion The following discussion addresses several of the issues surrounding the NFIP regulations concerning substantial improvement and substantial damage. The attached

More information

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan Requirements for Obtaining Building Permits City of Coldwater, Michigan Any owner, owner s builder, architect or agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy

More information

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department: Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,

More information

Sonoma County Code Chapter 7A

Sonoma County Code Chapter 7A Limited Density Owner- Built Rural Dwellings DeWayne Starnes, P.E., C.B.O. County of Sonoma Aka: Class K Sonoma County Code Chapter 7A www.hcd.ca.gov/codes/shl/shlarticle8.pdf d / hl/shla l df Problems

More information

Pliteq Inc. - LEED Summary

Pliteq Inc. - LEED Summary Pliteq Inc. - LEED Summary At Pliteq, we re committed to serving the health and safety of both our environment and our community. Pliteq is an engineering company dedicated to providing creative solutions

More information

Demolition Plan A1 A3. Scale: 3/32" = 1'-0" Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender.

Demolition Plan A1 A3. Scale: 3/32 = 1'-0 Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender. inc. 400-7 avenue edmonton, alberta, canada tr y t: (780) 48 47 f: (780) 48 00 e: lesnider@shaw.ca 4 door to North Common Corridor doors to door to F. H. C. Men Women ELEC/TEL UP Stairs DN F. H. C. DN

More information

Questions and Answers Questions et réponses

Questions and Answers Questions et réponses Questions and Answers Questions et réponses Ministry of Municipal Affairs and Housing MinistPre des Affaires municipales et du Logement July 28, 2003 COMING INTO FORCE OF BILL 124 : QUESTIONS AND ANSWERS

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

City of Jacksonville Development Guide Building Permits

City of Jacksonville Development Guide Building Permits City of Jacksonville TX City of Jacksonville Development Guide Building Permits A publication to help understand the Building Permit process in the City Jacksonville. Building Department 2011 J Revised

More information

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS BASEMENT FINISH REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS A construction permit is required. A homeowner may perform the construction work on his own property where he resides, without a

More information

RESIDENTIAL BUILDING PERMIT

RESIDENTIAL BUILDING PERMIT A APPLICATION FOR A RESIDENTIAL BUILDING PERMIT JACKSON CO. MS. PLAN CASE NUMBER: PERMIT NUMBER: ACCEPTED BY: APPROVED BY: Application is hereby made for a permit under the provisions of the Comprehensive

More information

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 CONTENTS A. PURPOSE B. DESIGNATED RESPONSIBILITIES C. DEFINITIONS D. PROJECT SUBMITTAL PROCEDURE E. REQUIREMENTS

More information

2014 Commercial Plan Submittal Checklist

2014 Commercial Plan Submittal Checklist City of Aurora Public Works Department AURORA PUBLIC SCHOOLS AND CHERRY CREEK PUBLIC SCHOOLS 2014 Commercial Plan Submittal Checklist Permit Center 15151 E. Alameda Parkway, Ste 2400 Aurora, CO 80012 303-739-7420

More information

Title: Building Construction for the Fire Service. Time: 3 hours. Teaching Materials: White board Building Construction for the Fire Service (PDF)

Title: Building Construction for the Fire Service. Time: 3 hours. Teaching Materials: White board Building Construction for the Fire Service (PDF) Title: Building Construction for the Fire Service Time: 3 hours Teaching Materials: White board Building Construction for the Fire Service (PDF) Motivation: With the evolution of newer building construction

More information

PRE-FABRICATED HOUSING

PRE-FABRICATED HOUSING Building Department 200 W. Oak Street 3 rd Floor Fort Collins, CO 80521 970-498-7700 www.larimer.org/building PRE-FABRICATED HOUSING PRE-FABRICATED HOUSING When you are buying a pre-fabricated home, you

More information

2017 Incentive Policies for Housing and Economic Development. Notice of Revision

2017 Incentive Policies for Housing and Economic Development. Notice of Revision 2017 Incentive Policies for Housing and Economic Development Notice of Revision MLGW Incentive Policy for Housing and Economic Development - 2017 Introduction Since 1939, Memphis Light, Gas and Water (MLGW)

More information

NEW HOMES PROGRAM 2017 PROGRAM GUIDE

NEW HOMES PROGRAM 2017 PROGRAM GUIDE NEW HOMES PROGRAM 2017 PROGRAM GUIDE Focus on Energy, Wisconsin utilities statewide program for energy efficiency and renewable energy, helps eligible residents and businesses save energy and money while

More information

RIVERS EDGE CONDOMINIUM ASSOCIATION MAINTENANCE RESPONSIBILITIES

RIVERS EDGE CONDOMINIUM ASSOCIATION MAINTENANCE RESPONSIBILITIES RIVERS EDGE CONDOMINIUM ASSOCIATION MAINTENANCE RESPONSIBILITIES This Policy Document outlines the separation of responsibilities between the Rivers Edge Condominium Association (RECA) and the Unit Owners

More information

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION Permit No. 175 Beaver Drive, P.O. Box 486 DuBois, PA 15801 Phone: 814-375-1111 Fax: 814-375-1117 Toll Free: 855-PENNSAF LOCATION OF PROPOSED

More information

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements 700 Paris Ave. PO Drawer 9 Port Royal, SC 29935 Application for Permit - P O Drawer 9, Port Royal South Carolina Permit

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

DIVISION 02 SELECTIVE DEMOLITION

DIVISION 02 SELECTIVE DEMOLITION DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.

More information

City of Centerville Building, Zoning & Code Enforcement Department

City of Centerville Building, Zoning & Code Enforcement Department City of Centerville Building, Zoning & Code Enforcement Department FAQ: Building / Zoning & Code Questions: FAQ for the City of Centerville / Building / Zoning & Code Enforcement Dept. 1. How do I contact

More information

STATEMENT OF SPECIAL INSPECTION FORM

STATEMENT OF SPECIAL INSPECTION FORM STATEMENT OF SPECIAL INSPECTION FORM Project Title: Plan Check #: Project Address: This Statement of Special Inspections is submitted in fulfillment of the requirements of the 2013 California Building

More information

CONCRETE & STAINING TECHS SIMPLY WARRANTY

CONCRETE & STAINING TECHS SIMPLY WARRANTY THIS IS A WARRANTY AND NOT INSURANCE. THIS WARRANTY DOES NOT TAKE THE PLACE OF YOUR INSURANCE OR YOUR HOMEOWNERS INSURANCE. This warranty is on the task. If the Home is sold, each successor in title to

More information

EcoTouch Insulation with PureFiber Technology

EcoTouch Insulation with PureFiber Technology PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

SPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS

SPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS BuildingName The Description of the Project P00000000 0000 DOCUMENTS Title Page Table of Contents Instruction to Bidders Form of Proposal Equal Opportunity Statement Form of Guarantee Supplemental General

More information

Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan)

Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan) Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan) Part 1: Project Specific Quality Plan Part 2: Quality Manual Part 3: Submittal Forms Part 4: Inspection Checklist Forms Contact:

More information

COMMERCIAL WINDSTORM MITIGATION INSPECTION REPORT Prepared for: Boca Vista Condominium Association, Inc th Avenue Madeira Beach, FL 33708

COMMERCIAL WINDSTORM MITIGATION INSPECTION REPORT Prepared for: Boca Vista Condominium Association, Inc th Avenue Madeira Beach, FL 33708 Insurance Appraisals Reserve Studies Wind Mitigation COMMERCIAL WINDSTORM MITIGATION INSPECTION REPORT Prepared for: Boca Vista Condominium Association, Inc. 401 150th Avenue Madeira Beach, FL 33708 As

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

APPROVED. Acceptable to the code official for compliance with the provisions of the applicable Code or referenced Standard.

APPROVED. Acceptable to the code official for compliance with the provisions of the applicable Code or referenced Standard. Chapter 1 101.1 Title. These regulations shall be known as the North Carolina Energy Conservation Code as approved by the North Carolina Building Code Council on March 11, 2008, to be effective January

More information

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST City of North Royalton Mayor Robert A. Stefanik Community Development, Building Division Dan Kulchytsky Building Commissioner 11545 Royalton Road, North Royalton, OH 44133 Phone: 440-582-3000 Fax: 440-582-3089

More information

Application Requirements for obtaining a Building Permit

Application Requirements for obtaining a Building Permit CITY OF BIRMINGHAM Community Development Building Department 151 Martin Street, Birmingham, MI 48009 Application Requirements for obtaining a Building Permit Residential Structures Building Permit Application

More information

ARTICLE XIII. COMMUNICATION TOWERS

ARTICLE XIII. COMMUNICATION TOWERS ARTICLE XIII. COMMUNICATION TOWERS Section 13.1. Purposes. The general purpose of this Section is to regulate the placement, construction, and modification of communication towers, support structures,

More information

Washoe County PLAN SUBMITTAL

Washoe County PLAN SUBMITTAL Washoe County PLAN SUBMITTAL Washoe County PLAN SUBMITTAL SPECIAL INSPECTION AND TESTING AGREEMENTS SEPTEMBER 2013 Washoe County Permits Plus Zone 1001 East Ninth Street PO Bo 11130 Reno, NV 89520-0027

More information

E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e

E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e I N D E X E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e Title Course Number *Seminar Length (days) Pg. Class Scheduling Policies 8 International Building Code

More information

INDUSTRIALIZED HOUSING AND BUILDINGS Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 70

INDUSTRIALIZED HOUSING AND BUILDINGS Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 70 INDUSTRIALIZED HOUSING AND BUILDINGS Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 70 TABLE OF CONTENTS 70.1. Authority... 1 70.10. Definitions...

More information

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE BY-LAW #69-2011 Being a by-law respecting Construction, Demolition and Change of Use Permits and Inspections for the Township of Adelaide Metcalfe

More information

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows:

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows: RESOLUTION NO.15- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LA HABRA CERTIFYING MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACTS 14-02 FOR A 32 UNIT MULTI-FAMILY RESIDENTIAL DEVELOPMENT

More information

AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION

AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION Building Permit Number: Date Received: By: I,, as owner of record of the above property, hereby request a permit for and final inspection of the installation

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

TOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES

TOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES TOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES NON-RESIDENTAL BUILDING PERMIT APPLICATION FORM PART I Location of Property Address, Zoning District, Parcel Number and Lot & Block must be provided on all

More information

Detached Garages and Building Permits. 1 and 2 Family Dwellings

Detached Garages and Building Permits. 1 and 2 Family Dwellings Detached Garages and Building Permits 1 and 2 Family Dwellings Why do I need a permit? The City of Minneapolis adopts the State of Minnesota Building Code (MNSBC) and its associated state statutes and

More information

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and PREP + INSULATION HOME ENERGY UPGRADES What every contractor needs to know. Copyright 2012 Advanced Energy. All Rights Reserved 103 HOME ENERGY UPGRADES Prep + Insulation Contents Air sealing is a challenging

More information

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool) Caroline County Department of Planning & Community Development 233 W. Broaddus Avenue 804-633-4303 phone 804-633-1766 fax www.visitcaroline.com Residential Accessory Structure Application Packet (Carport,

More information

Earthquake Brace + Bolt Program: Rules for Participation

Earthquake Brace + Bolt Program: Rules for Participation Earthquake Brace + Bolt Program: Rules for Participation About EBB Earthquake Brace + Bolt (EBB) was developed to help homeowners lessen the potential for damage to their houses during an earthquake. A

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

BUILDING INSPECTOR. The City of Campbell River is seeking a full-time Building Inspector I or II.

BUILDING INSPECTOR. The City of Campbell River is seeking a full-time Building Inspector I or II. With a moderate climate, spectacular scenery and year-round recreational offerings at our doorstep, the City of Campbell River is the ideal location to live, work, and play. BUILDING INSPECTOR The City

More information

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions As of Oct. 1, 2010, Tacoma property owners are required to have a certified inspection of their private side

More information

BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS

BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS Introduction Application Form Schedule 1 Authorization Building Permit Fees Required Drawings Contact Information FAQs Building Department 613-632-0106,

More information

Uniform Mitigation Verification Inspection Form Maintain a copy of this form with insurance policy

Uniform Mitigation Verification Inspection Form Maintain a copy of this form with insurance policy Uniform Mitigation Verification Inspection Form Maintain a copy of this form with insurance policy Inspection Date: 08/12/2011 Owner Information Owner Name: Steve Owner Contact Person: Joe Contact Address:

More information

Limited Asbestos Demolition Survey

Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect s client identified

More information

Presentation Overview: NC Energy Code RESNET Standards HERS Index HERS Verification Process

Presentation Overview: NC Energy Code RESNET Standards HERS Index HERS Verification Process Presentation Overview: NC Energy Code RESNET Standards HERS Index HERS Verification Process NC Energy Code Requirements ENERGY STAR and NC Energy Code in Alignment RESNET Standards HERS Index A scoring

More information

District of Barriere A GUIDE TO BUILDING PERMITS

District of Barriere A GUIDE TO BUILDING PERMITS District of Barriere A GUIDE TO BUILDING PERMITS THIS BROCHURE EXPLAINS: When a Building Permit is required Building Application Procedure District of Barriere Review of the Permit Application Additional

More information

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information

More information

MONROE COUNTY ZONING OFFICE

MONROE COUNTY ZONING OFFICE MONROE COUNTY ZONING OFFICE 100 South Main Street Waterloo, IL 62298 618-939-8681 Ext. 260 mczoning@htc.net PROCEDURES FOR NEW CONSTRUCTION 1. Applicant must provide a recorded copy of deed to the property

More information

Margaret Batts Tobin Laboratory

Margaret Batts Tobin Laboratory Roof Evaluation of Margaret Batts Tobin Laboratory The University of Texas At San Antonio Performed for UTSA Zero/Six Consulting, LLC 8423 Stewart Road Galveston, Texas 77554 409 740 0090 voice Table of

More information

DEVELOPMENT SERVICES PO Box 1110 Tampa, FL Date: May 12, Interested Parties. John L. Barrios, CBO, Building Official

DEVELOPMENT SERVICES PO Box 1110 Tampa, FL Date: May 12, Interested Parties. John L. Barrios, CBO, Building Official DEVELOPMENT SERVICES PO Box 1110 Tampa, FL 33601-1110 DEVELOPMENT SERVICES DEPARTMENT Date: May 12, 2017 To: From: SUBJECT: Interested Parties John L. Barrios, CBO, Building Official THRESHOLD BUILDINGS

More information

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work: 125 Syndicate Avenue, Thunder Bay, Ontario Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:.1 Removing asbestos-containing transite

More information

Sound Control Manual Sound Construction Details, Specifications, and Construction

Sound Control Manual Sound Construction Details, Specifications, and Construction Sound Control Manual Sound Construction Details, Specifications, and Construction Second in importance only to selecting the right system, are measures to ensure that the installation is performed in such

More information

- DATA REQUIREMENTS BIM

- DATA REQUIREMENTS BIM UHS BIM Protocol S E C T I O N 1 - DATA REQUIREMENTS BIM authoring software: The design team is required to use parametric BIM authoring software for creation of models that include all geometry, physical

More information

Medina County Building Department

Medina County Building Department Medina County Building Department Charles E. Huber Building Official chuber@medinaco.org Permit Center 791 W. Smith Rd. Medina, Ohio 44256 Main: (330) 722-9220 Fax: (330) 764-8204 http://building.medinaco.org

More information

Jean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp.

Jean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp. Cable Management Firestop Jean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp. FIRESTOPPING KNOWLEDGE FOR BETTER SPECIFICATION AND DESIGN OF FIRE-RATED CONSTRUCTION Presentation Topics and

More information

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PREPARED FOR: Mr. Roberto Aguirre City of San Francisco DPW, SAR, BCM 1680 Mission Street San Francisco, California PREPARED

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

ROXUL Blanket (and Batt) Insulation Section Master Guide Specification (AFB) Page 1 April 2015

ROXUL Blanket (and Batt) Insulation Section Master Guide Specification (AFB) Page 1 April 2015 Master Guide Specification (AFB) Page 1 Click on the pilcrow in the MS Word Toolbar to toggle ROXUL GUIDE NOTES on and off. Delete this text before incorporating the section into a Project Manual. 1 GENERAL

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING