1 Question & Answer: #1 The RFP calls for a survey of the building to gain a comprehensive understanding of the existing building, utilities, building systems, occupancies and all existing conditions as required to provide the required services. Is the survey meant to include the entire building or just the existing space and possible areas noted for expansion? The architect is responsible for surveying the existing building where the current CEAC program is located and to understand all the existing parameters in the existing building to adequately complete the feasibility analysis as part of this scope of work. This survey should include, but not be limited to, understanding the existing MEPF systems to allow the architect to complete the feasibility. Question & Answer: #2 It was noted during the walk-thorough that the existing observation cameras and brackets must be replaced. Is this cost included in the budget? Yes. Will Rowan re-use existing furniture? Question & Answer: #3 Rowan may re-use the existing furniture, and will need to purchase new furniture to make up for the additional program area. Question & Answer: #4 The program calls for 10 SP exam rooms. Will they contain the same equipment and furniture as currently exists in the existing rooms? The new exam rooms may include the same equipment, and will likely contain new, updated equipment. This will determined during the feasibility. Question & Answer: #5 Will MEP CAD and/or hard-copy documents representing the existing as-built conditions within the Medicine Building be available during the Feasibility phase? The University has base CAD plans reflecting the 2015 walls, doors, windows and furniture for the three floors of the building. There are no CAD files for the MEPF systems. The University has hard copies and PDFs of various prior projects and as-builts from the prior building owner. These files are unsorted. The architect will have access to the files after award of contract. Page 1 of 16
2 Question & Answer: #6 Will Site-Civil CAD and/or hard-copy documents representing the existing as-built conditions surrounding the Medicine Building be available during the Feasibility phase? The University has base CAD plans reflecting the 2015 walls, doors, windows and furniture for the three floors of the building. There are no CAD files for the MEPF systems. The University has hard copies and PDFs of various prior projects and as-builts from the prior building owner. These files are unsorted. The architect will have access to the files after award of contract. Question & Answer: #7 Under Project Description (page 5), Item D. states the Work to the exterior of the Building is not included. The Program in Appendix 3 has a column identifying new program spaces entitled Expansion: Modification/ Addition to the Facility. Is a building addition to be an option for discussion? With the understanding that the preference is to rehab the existing space within the building. A building addition can be an option for discussion, if the architect can verify that an addition is feasible for the cost and timeline for the completed project. Question & Answer: #8 Under Item V (B.), page 6 As-Built Drawings are listed as a Deliverable. As this is a Feasibility study only, can we assume that this deliverable is not applicable? If Rowan has a different definition of this term please advise. For the feasibility phase, the architect will only be required to provide any information from their survey work, in PDF format. The CAD and PDF as-built deliverables are for subsequent phase of the project. Question & Answer: #9 Does the University anticipate an increase in the number of building visits this new program may generate due to the expansion of the CEAC? If so, will this increase parking needs near the building during simulation activities or are the simulation participants already on campus and the traffic is mostly pedestrian in nature? Question & Answer: #10 Project goals indicates that there are accreditation concerns. Will those items be provided to the firm awarded the project? Yes, these will be provided after award of contract. Page 2 of 16
3 Question & Answer: #11 Is there a long-range student enrollment projection beyond the 200 number provided at the walkthrough? The University currently has 200 students per class for a total of 800 students across all 4 years of the curriculum. The school is currently considering adding a branch campus of 100 students per class. The timeline for the expansion is not known. Question & Answer: #12 What is the current and expected student/instructor ratio for the CEAC program? The instructor-to-students ratios varied significantly by the activity being conducted. The following are a few examples of the typical activities: Simulation rooms expect a 1 to 2 faculty for 8-10 students; Debriefing 1 faculty for students; Standardized patient rooms usually 1 patient to 1 student, at times there are 2-4 students involved in team-based activities. The faculty usually observe remotely, but if inside of the room there is generally one faculty in the room; Task training room 1-2 faculty per students. Question & Answer: #13 Section 3 Project Description, Item F: could you please clarify this statement? The architect is NOT required to be drafted using Revit or other BIM software. See additional notes under DELIVERABLES regarding drafting software. The architect is not required to complete this project using BIM software. Question & Answer: #14 Are there drawings/documents for HVAC, electrical and plumbing systems available for the winning team to use? The University has base CAD plans reflecting the 2015 walls, doors, windows and furniture for the three floors of the building. There are no CAD files for the MEPF systems. The University has hard copies and PDFs of various prior projects and as-builts from the prior building owner. These files are unsorted. The architect will have access to the files after award of contract. Question & Answer: #15 Can you provide a copy of the SOM ICRA policies? ICRA policies are generally related to hospital-based care and therefore would not be relevant to the work of the clinical skills center. Page 3 of 16
4 Question & Answer: #16 Does Rowan maintain a vendor relationship for design of the Low-Voltage and date systems, including Audio Visual that are required for the CEAC space? Yes. Question & Answer: #17 Are existing Architectural Drawings (CAD or PDF) documents available for the building? The University has base CAD plans reflecting the 2015 walls, doors, windows and furniture for the three floors of the building. There are no CAD files for the MEPF systems. The University has hard copies and PDFs of various prior projects and as-builts from the prior building owner. These files are unsorted. The architect will have access to the files after award of contract. Question & Answer: #18 Are existing MEP / Fire Alarm / Sprinkler & Security (CAD or PDF) documents available for the building? The University has base CAD plans reflecting the 2015 walls, doors, windows and furniture for the three floors of the building. There are no CAD files for the MEPF systems. The University has hard copies and PDFs of various prior projects and as-builts from the prior building owner. These files are unsorted. The architect will have access to the files after award of contract. Question & Answer: #19 Are cut Sheets available for the current CEAC suite security system, i.e., security system host, card readers, locks, etc.? The University has hard copies and PDFs of various prior projects and as-builts from the prior building owner. These files are unsorted. The architect will have access to the files after award of contract. Question & Answer: #20 Are cut Sheets available for the current CEAC suite technologies, i.e., workstations, monitors, cameras? The University has hard copies and PDFs of various prior projects and as-builts from the prior building owner. These files are unsorted. The architect will have access to the files after award of contract. Page 4 of 16
5 Question & Answer: #21 Are there concerns with the style or capacity of computers or servers utilized within the CEAC suite? However, the architect will work with the University IRT department to verify the necessary scope of work. The architect will verify an approximate scale of additional data that may be needed for the project and University IRT will assist in scoping and estimating the work. Question & Answer: #22 Are there current concerns with security, as it relates to accessing the CEAC suite? Question & Answer: #23 Are there concerns with current exam room sizes? The current rooms are found to be on the small side. Room sizes are to be confirmed with the CEAC department as part of this scope of work. Question & Answer: #24 Are there concerns with current lighting levels? Question & Answer: #25 Are there concerns with current HVAC comfort level and/or controls? Question & Answer: #26 Are there concerns with the current network associated with the CEAC suite? Page 5 of 16
6 Question & Answer: #27 Is a dedicate CEAC suite I.T. Room required or desired? We have IDF rooms on each level of the existing building. There may be a need for a dedicated equipment closet to support the CEAC expansion, but that will need to be vetted by the architect during the feasibility phase. Question & Answer: #28 Is a dedicate CEAC suite closed network to distribute information for simulation training required? This will need to be confirmed by the architect during the feasibility phase. Question & Answer: #29 Does the CEAC suite want a connection to the building network? If so, segregated networks or, is the use of a firewall with rules to separate sufficient? This will need to be verified with the CEAC and University IRT during the feasibility phase. Question & Answer: #30 Does the CEAC suite require a wireless controller as an intermediate device to communicate with the proposed simulators? This is not known at this time. This scope will need to be verified with the CEAC and the University IRT during the feasibility phase. Question & Answer: #31 Is outside internet access required or desired? Yes, this access is provided through the existing University IRT infrastructure. Question & Answer: #32 Regarding new and/or additional I.T. equipment, is the selection of the equipment type, manufacturer, model, etc. to be addressed within the Assessment? During the feasibility phase, the task does not include a detailed systems selection of IT equipment. During the feasibility phase, the task does include a general description and estimate for what the IT work will entail for the next phases of the project. Page 6 of 16
7 Question & Answer: #33 Are there concerns with PTZ camera locations, as they relate field of vision? Question & Answer: #34 Are there concerns with the quantity of PTZ cameras within a training exam room? Question & Answer: #35 Does CEAC have a specific camera manufacture and/or model that is to be specified? Not at this time. Question & Answer: #36 Does CEAC have a schedule for when site surveys can be conducted? The CEAC can be flexible is scheduling the site survey. Scheduled times can be identified readily based upon the needs of the vendor. Most weeks have 1 or more open days in which to provide access to the center. If a specific time span is required to complete the site survey, the CEAC can work with the vendor to schedule the time. The center has the greatest flexibility in the evenings (after 5:00 pm) and on weekends when there is limited programming. Question & Answer: #37 Will the Director of the CEAC, or designate, be available during the site surveys to discuss the Department s requirements and/or wish list items to be included in the Feasibility Report? People from the CEAC program will be available for meetings with the Architect (RFP Paragraph IV.A.1). These meetings may not occur on the exact days of the architect s survey. Page 7 of 16
8 Question & Answer: #38 Please confirm that Rowan is requesting fee proposals for the Feasibility Design Phase (FD) only. Assuming that this is correct, please confirm that Deliverables nos. 2, 6, and 7 (RFP Section V.B. on page 6 of 25) are not required as part of the FD scope. Also, please confirm the anticipated scope per Deliverable 5 (Presentations and Renderings) as may be appropriate to the FD phase effort. Specifications, calculations and cut sheets and as-built deliverables may be a part of the deliverables for the Feasibility Design Phase. Presentation and renderings will be provided as appropriate to the Feasibility Design Phase. Question & Answer: #39 Can the Feasibility Design Phase (FD) of this effort be contracted through an active, current On-Call Services agreement? This project is not being contracted through the current on-call services agreement. Question & Answer: #40 Does Appendix 3 describe the full extent of available programmatic material, or will the selected firm be provided additional programmatic detail? Appendix 3, starting on page 21 of the RFP, has the current extent of the programming material. The selected firm is responsible for meeting with the CEAC department to review the programming material provided, confirming any additional details that arise during the meeting. Question & Answer: #41 Are MEP as built documents available for the spaces to be occupied within the Rowan Medicine Building? If so, are these available in a CADD format? The University has base CAD plans reflecting the 2015 walls, doors, windows and furniture for the three floors of the building. There are no CAD files for the MEPF systems. The University has hard copies and PDFs of various prior projects and as-builts from the prior building owner. These files are unsorted. The architect will have access to the files after award of contract. Page 8 of 16
9 Question & Answer: #42 Will the selected design team have clear access to the building and the existing CEAC, or will access need to be coordinated due to restricted hours? The existing CEAC space and adjacent spaces within the existing building are occupied, and the survey work will need to occur to work with the existing building occupants and schedule. For common areas in the building, the survey work will need to be coordinated with Rowan SOM facilities staff. Question & Answer: #43 Please confirm. Does the referenced $3M Total Project Budget include the purchase and installation of all medical and instructional equipment? Similarly, does this budget include all required audio-visual and IT equipment? The three million dollar budget includes every cost associated with the project, including medical equipment, instructional equipment, AV and IT materials and labor. Question & Answer: #44 Will the selected firm be responsible for specifying the medical equipment? If so, will the University identify and provide equipment selections or will this be the responsibility of the selected design firm? For the feasibility phase, the architect will not be specifying medical equipment. Question & Answer: #45 Will the selected firm be responsible for specifying the technology/ IT equipment? If so, will the University identify and provide equipment selections or will this be the responsibility of the selected design firm? For the feasibility phase, the architect will not be specifying IT equipment. The University s IRT staff is responsible for specifying IT equipment. Question & Answer: #46 Is there an existing server room within the Rowan Medicine Building? Yes. Question & Answer: #47 Is the existing infrastructure in place to handle additional IT/AV/High Fidelity equipment? This will need to be determined by the architect and the University during the feasibility phase of this project. Page 9 of 16
10 Question & Answer: #48 Will existing cameras and microphones be relocated or is new equipment to be purchased? This will be determined during the feasibility phase of this project. The architect will need to advise the University how this project can be completed for the budget and during the time frame outlined in the RFP. Question & Answer: #49 Who will be responsible for specifying security systems and equipment? In this scope of work, feasibility design phase, the security systems and equipment do not need to be specified. The general scope intent will be documented. Question & Answer: #50 Does the anticipated Feasibility Design Phase scope include an overall code review for the subsequent, Schematic Design/building part of the scope, or is the scope of code review scaled to the immediate needs of the FD phase only? The architect will be responsible for a code review analysis up to the level of the feasibility development. Question & Answer: #51 Is the intent of the renovation to re-use as much existing interior architecture as possible or does Rowan anticipate that the project will require gutting and renovating the existing spaces? It is the intent of the University to complete the work within the project schedule and budget, while meeting the needs of the CEAC expansion. The extent of the renovation work will be determined through the feasibility analysis by the architect, keeping within the project schedule and budget. Question & Answer: #52 Where does one find the University s Design Guidelines? Please confirm the latest edition of these guidelines. Answer here Click the link to Space and Furniture Standards : Question & Answer: #53 How many references are required for each team member? (RFP Item XVIII. C. 8. a., page 15 of 25) Three references for each team member (company or firm), not for each individual person. Page 10 of 16
11 Question & Answer: #54 Please confirm whether the University, or a consultant on the selected design team, will be responsible for selection and scheduling of medical equipment serving the Center. Basic selection of major equipment will be necessary to obtain a reasonably accurate feasibility design cost estimate. For this scope of work, feasibility design phase, the CEAC team will advise the type of medical equipment will be necessary. During this phase, the detailed selection and scheduling of equipment is not a part of this scope of work. Question & Answer: #55 Audio-visual and other similar technology based systems will likely be responsible for a significant part of this project s budget. How does the University imagine this information be conveyed for Feasibility Design? Narrative only? Narrative plus drawings? Preliminary specification required? The University is relying on the architect and their consultants to use the graphic and written tools of their expertise to convey the design options, statement of probable cost, schedule, diagrammatic sketches, and summary report as outlined in Part V.C of the RFP. Question & Answer: #56 Please confirm scope of furniture design and selection required for the Feasibility Design deliverable. The architect is only responsible for confirming a that a space is able to accommodate the people, equipment, fixtures, and furnishings could work in the concept plan. Question & Answer: #57 Please provide a total building GSF per floor for the Medicine Building. Answer here 1 st Floor = 44,000 s.f., 2 nd Floor = 38,000 s.f., 3 rd Floor = 38,000 s.f. Question & Answer: #58 Please confirm that existing MEP/FP system design documents are available and will be provided to us in electronic format at the start of the project. The University has base CAD plans reflecting the 2015 walls, doors, windows and furniture for the three floors of the building. There are no CAD files for the MEPF systems. The University has hard copies and PDFs of various prior projects and as-builts from the prior building owner. These files are unsorted. The architect will have access to the files after award of contract. Page 11 of 16
12 Question & Answer: #59 Please confirm the specific scope of the technology component (i.e. IT/Data/Security/AV, etc.). The architect is responsible for documenting the general scope of work for the IT, security, AV, lab equipment, etc. of this project. The architect will work with the CEAC program to determine the needs for the project. The architect will work with the University IRT and Facilities teams to understand the existing systems and capacities for the project. The architect will work with the University to scope the options for the project and to estimate the options for the project. Question & Answer: #60 Is there any additional information available regarding the existing HVAC systems currently supporting the proposed project area? For example, are there any deficiencies with respect to said existing systems that we should know about while developing our scope and proposal? Nothing beyond normal maintenance issues Question & Answer: #61 While we understand that as part of the simulation spaces we will include medical gas outlets we assume that live medical gas systems will not be required. Please confirm that we should exclude the efforts associated with selecting and coordination the installation of new medical gas systems as part of the Feasibility Study. There are no existing gas systems existing in the building. If gases exist in existing spaces throughout the building, they have individual piped systems for medical gases. For this feasibility design phase, the architect will determine with the CEAC what medical gases will be required as part of the project. Question & Answer: #62 Confirm the type of estimate of required: order of magnitude or trade breakdown? The architect will provide a high level breakdown of the costs. This will include general breakdown of hard costs (temporary facilities, contractor OH&P, high level breakdown by CSI Division, etc.) and soft costs (professional fees, permitting fees, FF&E, etc.) Page 12 of 16
13 Question & Answer: #63 At the walkthrough you confirmed that Architectural drawings will be provided for the building in cad format, will MEP drawings also be provided? The University has base CAD plans reflecting the 2015 walls, doors, windows and furniture for the three floors of the building. There are no CAD files for the MEPF systems. The University has hard copies and PDFs of various prior projects and as-builts from the prior building owner. These files are unsorted. The architect will have access to the files after award of contract. Question & Answer: #64 Confirm that MEP/FP/FA feasibility design services should be included, are you expecting any other engineering disciplines to be involved? The University does not have a list of specific engineers or consultants to be listed in the architects proposals. The University does expect the architects to document how they will provide for the services in the RFP Part V.C such as programming, surveying, estimating, scheduling and phasing. Question & Answer: #65 Do you have a list of preferred or approved engineers and estimating consultants we should use? Question & Answer: #66 Confirm that medical equipment planning will be by others. The scope of work for this project does not include detailed medical equipment planning. This feasibility design services includes high level programming, high level estimating, and high level design options as to how this project may be executed in the next phase of the work. It will be determined by the University how the detailed medical equipment selection and design will be executed. Question & Answer: #67 Confirm that IT/Low voltage/ camera and projection equipment planning will be by others. The scope of work for this project does not include detailed IT, AV, Security design. This feasibility design services includes high level programming, high level estimating, and high level design options as to how this project may be executed in the next phase of the work. It will be determined by the University how the detailed selection and design will be executed. Page 13 of 16
14 Question & Answer: #68 The RFP references LEED silver level energy savings, but no certification. Should quantitative energy analysis or modeling of each design option be part of feasibility study phase? This will not be required during the Feasibility Design Phase. This may be required in the subsequent phases of the work. Question & Answer: #69 Are there currently base building gases (Oxygen, Vacuum, Compressed Air, etc.) distributed throughout the building? There is no building wide medical gas system. Some of the suites in the building have stand-alone gas tanks and localized piping. Question & Answer: #70 If there are existing base building gases, what gases are they? There is no building wide medical gas system. Some of the suites in the building have stand-alone gas tanks and localized piping. Question & Answer: #71 Is the building currently equipped with a central building automation system (BAS)? Johnson Controls Metasys, HVAC controls only. Question & Answer: #72 Does the University anticipate any significant additional emergency or UPS power requirements beyond what is currently existing within the building? The building has an existing emergency power, used for back-up of limited refrigerator (vaccination storage) power and life safety systems. All future work will follow this same logic for utilization of emergency backup power. Page 14 of 16
15 Question & Answer: #73 We assume that the MEP distribution for the new space programming will be similar concept/distribution to the current building operation. Are the MEP goals of this project to support the new programming (and not an upgrade in and of itself)? This scope of work will not include building wide upgrades. This scope of work will only include that MEP work to support the new program. Question & Answer: #74 Is the building all stand-alone MEP systems, or is it part of a larger campus distribution? Stand-alone. Question & Answer: #75 Does the scope of this project include any upgrades to campus infrastructure or a shift of utility use for energy efficiency purposes? Question & Answer: #76 Are any existing building spaces critical to maintain 24/7 operation throughout construction, requiring design to maintain continuous service with zero interruption even if it s existing system is impacted as part of work in adjacent areas? Only the data closets. But the buildings are not open 24/7. Some spaces are open until midnight for student study. Question & Answer: #77 Can documented accreditation concerns be shared now as opposed to after award? These concerns will be provided after award. Page 15 of 16
16 Question & Answer: #78 Does the University have a medical equipment planner/vendor that the design team can coordinate with for simulation and other medical equipment selections? Yes, the University works with different vendors for different pieces of medical equipment and systems. When the equipment and systems are determined, and the University then knows which vendors to coordinate with, the University will share that information. If you submitted questions to bids@rowan.edu by the due date indicated in the bid document, but they were not received and answered here, please contact: Robert Yufer Office of Contracting & Procurement Yufer@rowan.edu Page 16 of 16
1.0 ABOUT THE NU GUIDELINES
Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner
More informationAddendum #02 New County Office Building Responses to RFP Questions
Sam Lin Manager Project Development Unit 1402 Maple Street Redwood City, CA 94063 650-369-4766 September 22, 2017 slin@smcgov.org Addendum #02 New County Office Building Responses to RFP Questions To All
More information- DATA REQUIREMENTS BIM
UHS BIM Protocol S E C T I O N 1 - DATA REQUIREMENTS BIM authoring software: The design team is required to use parametric BIM authoring software for creation of models that include all geometry, physical
More informationProposals are to be presented in two submissions: a Technical Submission and a Financial Submission, each of which consists of the following packages:
Page 1 of 17 APPENDIX B: PROPOSAL REQUIREMENTS Proposals are to be presented in two submissions: a Technical Submission and a Financial Submission, each of which consists of the following packages: TECHNICAL
More informationProposals are to be presented in two submissions: a Technical Submission and a Financial Submission, each of which consists of the following packages:
Page 1 of 16 APPENDIX B: PROPOSAL REQUIREMENTS Proposals are to be presented in two submissions: a Technical Submission and a Financial Submission, each of which consists of the following packages: TECHNICAL
More informationOffice of Planning, Design and Construction. Capital Program Update May 10, 2017
Office of Planning, Design and Construction Capital Program Update May 10, 2017 Projects Under Construction Translational Research Center Translational Research Center Phase I Site work Status: Completed
More information9/10/2016 LEARNING OBJECTIVES WHY RENOVATE? Outatime to Renovate? FACILITY RENOVATIONS 101
FACILITY RENOVATIONS 101 Outatime to Renovate? LEARNING OBJECTIVES 1. Participants will understand the overall process and key aspects to be considered before undertaking a facility renovation project.
More informationJanice Reedus, Director of Business & Auxiliary Services Campus Center Building A, Room Houbolt Road Joliet, IL 60431
DATE: January 9, 2015 Addendum No. 1 Page 1 of 7 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Respondents SUBJECT: Addendum No. 1 PROJECT NAME: Commissioning Agent Services
More informationSTATE UNIVERSITY CONSTRUCTION FUND
STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant
More information4 TH and Folsom February 8, 2019 RFP for Professional Services Exhibits EXHIBIT B: SCOPE OF SERVICES
EXHIBIT B: SCOPE OF SERVICES The Architect s Consultant basic services shall result in a complete design for the project, coordinated with the architectural design and consultant team, complying with all
More informationGLOBAL INTERACTIVE SOLUTIONS Site Survey Options
GLOBAL INTERACTIVE SOLUTIONS Site Survey Options Option 1 Option 2 Remote Site Survey On-Site Survey Your Future Facility Remote Telephone/ Video Site Survey Creation of General Budget Estimate Option
More informationUNIVERSITY OF MASSACHUSETTS BUILDING AUTHORITY
UNIVERSITY OF MASSACHUSETTS BUILDING AUTHORITY ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS ARCHITECTURAL AND ENGINEERING SERVICES FOR COBURN HALL ADDITION AND RENOVATION THE UNIVERSITY OF MASSACHUSETTS LOWELL
More informationRFQ for Architectural Services - Attachment 5 North Campus Student Housing Phase IV(b) Haggett Hall Replacement and Oak Hall Project No.
SPECIAL CONDITIONS Article I, Section A delete this paragraph in its entirety and replace it with the following language: Owner s representative to act on its behalf with respect to this Agreement shall
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationSTATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist
STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist The following checklist shows the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the
More informationAttachment 8 Statement of Work (SOW)
Attachment 8 Statement of Work (SOW) The following requirements are necessary for successful implementation of the contract for the proposer to provide design A/E services to assist the County in the Development
More informationEastern Michigan University
Eastern Michigan University Prepared by: EMU Physical Plant Facilities Planning and Construction Page Intro-1 Purpose of Eastern Michigan University Physical Plant; Facilities Planning and Construction
More informationErie County Medical Center Corporation. Addendum Number 1 to RFP # 21728
Erie County Medical Center Corporation RFP # 21728 Addendum Number 1 Erie County Medical Center Corporation Addendum Number 1 to RFP # 21728 ARCHITECTURAL / ENGINEERING SERVICES FOR: MEP SYSTEMS / ELEVATOR
More informationQuestions received on Creedmoor PC Major Renovation for Outpatient Residence, Building 70 and DASNY s responses:
Questions received on Creedmoor PC Major Renovation for Outpatient Residence, Building 70 and DASNY s responses: 1. Will Building 70 be an Article 28 DOH compliant facility? 2. Are the clients/patients
More informationMinnesota State Colleges and Universities. South Central College. Request for Proposals for Commissioning Agent. STEM and Healthcare Renovation
Minnesota State Colleges and Universities South Central College Request for Proposals for Commissioning Agent STEM and Healthcare Renovation Date: 12/18/2017 ADDENDUM #1 1. The Sign-In sheet for the voluntary
More informationCHAPTER 3: DESIGN. TN Higher Education Designers Manual October 2018 Page 1 of 12
3.01 GENERAL A. Design the project to meet the authorized scope, budget, and schedule. B. Upon initiation of the project, arrange to review with the Owner the service and administrative requirements as
More informationBUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION
I. PURPOSE BUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION To ensure the proper process to request and obtain approval for all renovation or new construction projects within Bucknell
More informationGuidelines for Capital Project Design & Implementation Northeastern University
Guidelines for Capital Project Northeastern University Second Edition Issued: Northeastern University Guidelines for Capital Project Prepared by: Campus Planning and Development with Second Edition Issued:
More informationQuestions & Answers to RFP for Efficiency & Transformation Review
Questions & Answers to RFP for Efficiency & Transformation Review Questions are listed in the order received. Responses for the Sourcing & Procurement RFP and the Delivery of Services are Combined in this
More informationSchool Assessment Report
School Assessment Report School: KIPP Vision Report: Dec 15, 14 Condition Assessment: Suitability Assessment: Generated: 12/15/14 12:33:33 PM Final School Assessment Report - Charter Schools, KIPP Vision
More informationGeneral Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action
Project Number: Prepared By: Action General Objectives of Phase Drawings and other documents indicating the scale and relationships of Project components in conformance with program Building areas and
More informationScience Technology Engineering and Mathematics (STEM) Initiative
DEPARTMENT of FACILITIES DESIGN December 17, 2013 and CONSTRUCTION REQUEST for PROPOSAL Science Technology Engineering and Mathematics (STEM) Initiative PRE-CONSTRUCTION SERVICES Facilities Design and
More informationI. INTRODUCTION. Purpose: Design Guidelines Components: Introduction To Design Process and Standards
I. INTRODUCTION The Los Angeles Community College District is currently undertaking the largest public sector sustainable building effort in the United States, funded by its Proposition A/AA and J Bond
More information2017 Piqua City Schools RFP Door Access System
2017 Piqua City Schools RFP Door Access System for secondary instructional buildings, PHS, PJHS Alternate bids for Washington Primary, Springcreek Primary, Central Intermediate and Board of Education Section
More informationSANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016
FACILITIES COMMITTEE MEETING OCTOBER 18, 2016 1 ACTIVE PROJECTS Santa Ana College Central Plant, Infrastructure and Mechanical Upgrades 2 COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements
More informationFACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017
FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding
More informationSchool Assessment Report
School Assessment Report School: Sutton Middle School (Powers Ferry) Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:32:59 AM FOR OFFICIAL USE ONLY Final School
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: March 27-29, 2018 ****************************************************************************** SUBJECT USD North Commons Renovation
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION)
ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION) Subject to conditions prescribed by the University of California, San Francisco (the University or UCSF ), bids for a Construction Manager at Risk Agreement
More informationREQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT
REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT FOR THE THORNTON HOSPITAL EAST ENTRY AND ATRIUM, & THORNTON HOSPITAL RADIOLOGY/MRI MEDICAL CENTER, LA JOLLA FD&C Project No 5022 Proposals due Tuesday, March
More informationPLANNING AND EVALUATION PRELIMINARY DESIGN
PLANNING AND EVALUATION Project Initiation Discuss and refine client requirements Project brief, Schedule, Budget Confirm client's space needs and program Establish scope of work Obtain client-supplied
More informationBrown University Updated March 11, 2013 Facilities Design & Construction Standards
SECTION 01 17 90 UTILITY & CRITICAL SYSTEM CONNECTIONS AND INTERRUPTIONS PART 1 - GENERAL 1.1 SUMMARY: A. Brown University operates and maintains extensive campus and building utilities and distribution
More informationREQUEST FOR INTEREST OF ARCHITECTURAL SERVICES FOR THE CITY HALL RELOCATION PROJECT TO 400 E MAIN STREET
REQUEST FOR INTEREST OF ARCHITECTURAL SERVICES FOR THE CITY HALL RELOCATION PROJECT TO 400 E MAIN STREET Posted 1-16-2015 City answers are in blue >>> Dale Smith 1/12/2015 10:45 AM
More informationCareer Center Advance Planning/Design Services Code Item 321
The University of North Carolina at Charlotte Temporary Office Space Facilities Management - Capital Projects Hickory Building (Building #536 on Campus Map) 9316 Mary Alexander Road Charlotte, NC 28223
More informationADDENDUM NO. 2 REQUEST FOR PROPOSAL NO. R DESIGN SERVICES FOR RENOVATIONS TO KREILING HALL
December 1, 2015 ADDENDUM NO. 2 Attention to Proposers: This constitutes Addendum No. 2 to the referenced Request for Proposals (RFP), and consists of this six (6) page cover letter, and a two (2) page
More informationHealth Life Safety Survey and Master Facilities Plan
Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master
More informationS CHEDULE G - D OCUMENTS S UBMITTAL R EQUIREMENTS
S CHEDULE G - D OCUMENTS S UBMITTAL R EQUIREMENTS This Attachment lists the items to be provided by the Architect in accordance with Owner/Architect Agreement. This list is not all-inclusive, nor is it
More informationDIRECTIVE 1B-7 Issue date: October Energy, Sustainability, LEED and Executive Orders
DIRECTIVE 1B-7 Issue date: October 2017 Energy, Sustainability, LEED and Executive Orders As of December 28, 2012, Executive Order No. 88 (E.O. 88) replaced E.O.111 ( Green and Clean State Buildings and
More informationDESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST
DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Design Development Review Package. Provide a written explanation for any omissions. The following items,
More informationThe Lothian Residence Hall Building System Infrastructure Analysis project will develop a phased strategy that will include the following elements:
UNIVERSITY OF CALIFORNIA, RIVERSIDE REQUEST FOR PROPOSAL PRE-DESIGN AND PRE-ENGINEERING PROGRAMMING LOTHIAN RESIDENCE HALL BUILDING SYSTEM INFRASTRUCTURE AND SEISMIC ANALYSIS Introduction The University
More informationBuilding Information Modeling (BIM) Execution Plan
10/19/2017 for [Stanford Project Name] [Stanford Project Number] Developed by [Primary A/E] TABLE OF CONTENTS USE OF THE BIM EXECUTION PLAN... 3 1. PROJECT INFORMATION... 3 2. PROJECT SCHEDULE AND MILESTONES...
More informationSchool Assessment Report
School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report
More informationRFQ /ME - ADDENDUM 3
RFQ 150855/ME - ADDENDUM 3 RFQ Closing: November 3, 2015 at 2:00 PM (Local Time) Page 1 of 5_ RFQ Number: 150855/ME Date: October 26, 2015 RETURN SUBMITTALS AS SHOWN BELOW Copies of submittal required:
More informationFlorida Army National Guard Construction Facilities Management Office. Scope of Work:
Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines September 2011 Scope of Work: To provide complete design for the renovation/alterations
More informationAddendum #1. January 22, 2018
Addendum #1 January 22, 2018 Building B 8500 Public Works Drive Renovation for City of Manassas Water & Sewer Department 8500 Public Works Drive Manassas, VA 20110 Job Description Renovation of the existing
More informationOffice of Planning, Design and Construction. Capital Program Update April 10, 2017
Office of Planning, Design and Construction Capital Program Update April 10, 2017 Projects Under Construction Translational Research Center Translational Research Center Phase I Site work Completed - June
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 I DATE: May 9-11, 2017 ****************************************************************************** SUBJECT: SDSU Harding Hall Renovation
More informationProfessional Qualifications Supplement (PQS) Instructions. GENERAL INSTRUCTIONS UF-368, Reitz Union Expansion and Renovation
BUSINESS AFFAIRS www.facilities.ufl.edu FACILITIES PLANNING AND CONSTRUCTION DIVISION Professional Qualifications Supplement (PQS) Instructions GENERAL INSTRUCTIONS UF-368, Reitz Union Expansion and Renovation
More informationARIZONA STATE UNIVERSITY - EXHIBIT A SCOPE OF SERVICES FOR DESIGN PROFESSIONAL TO STANDARD FROM AGREEMENT BETWEEN OWNER AND DESIGN PROFESSIONAL
ARIZONA STATE UNIVERSITY - EXHIBIT A SCOPE OF SERVICES FOR DESIGN PROFESSIONAL TO STANDARD FROM AGREEMENT BETWEEN OWNER AND DESIGN PROFESSIONAL (CM@Risk Edition) June 1, 2015 Edition Exhibit A Scope of
More information28.00 Project Briefing & Procurement
28.00 Project Briefing & Procurement 28.01 Generally A new building marks a significant investment in the future of the University. For many years hence it will reflect the changing role of the University
More informationHEALTHCARE OF THE FUTURE INTEGRATED CARE + FACILITY DESIGN
HEALTHCARE OF THE FUTURE INTEGRATED CARE + FACILITY DESIGN PROJECT INTRODUCTION PROGRAM + DESIGN RESPONSE Built-to-Suit prototype Medical Clinic was designed in response to tenant s extensive development
More informationDESIGN DEVELOPMENT PHASE
UNIVERSITY OF MICHIGAN DESIGN DELIVERABLES FEBRUARY 2012 As part of the deliverables for formal UM review at each of the major phases of design listed below, the Design Professional shall submit this "Design
More informationNotice: Request for Proposals. RFP Question & Answers #1-35
Notice: Request for Proposals for Construction Manager At Risk RFP Question & Answers #1-35 Publication of Proposal December 31, 2012 Submission of Proposal Deadline January 28, 2013 workforceconnections
More informationSeptember 23, 2016 ADDENDUM #2
September 23, 2016 ADDENDUM #2 To: From: Subject: Prospective Bidders St. Johns County Purchasing Department Bid No. 16-55 St. Johns County Building Services Renovation & Remodeling. This Addendum #2 is
More informationApplication for Certificate of Occupancy Procedure for Existing Commercial & Residential 4 (+) Family Buildings
Application for Certificate of Occupancy Procedure for Existing Commercial & Residential 4 (+) Family Buildings (City of Solon Building Department) (Form date: December 23, 2010) General Procedure (refer
More informationSchool Assessment Report
School Assessment Report School: Humphries Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:35:17 AM FOR OFFICIAL USE ONLY Final School Assessment
More informationEXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services... A-2. B. Architectural Programming... A-5
EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER A. Basic Services... A-2 B. Architectural Programming... A-5 1. Project Initiation... A-5 C. Design Services... A-6 1. Schematic Design Phase...
More informationAPPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects
PROVINCE OF NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE RENEWAL DTIR Document DC350 APPENDICES DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed
More informationTHE PROCESS. Phase 1 Pre-Design Objective: Determine the owner s criteria for the project. Fee Breakdown: 5-10% of total fee.
Considerations on Hiring an Architect How the Design Process Works Page 1 of 9 This guide explains the progression of a typical project from an idea through construction of an actual building. Projects
More informationManage Deliverables - Construction Step 6 February 2015
Manage Deliverables - Construction Step 6 February 2015 1 Construction Phase Step 1: Needs Development Step 2: Scope Development Step 3: Selection of Design Team Step 4: Design Phase Step 5: Selection
More informationBusiness School Program Plan Revision 2
UNIVERSITY OF COLORADO DENVER Business School Program Plan 2 August 18, 2009 Business School Program Plan 2 Business School Program Plan 2 University of Colorado Denver I. Executive Summary The Business
More informationTech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey
Tech Assignment 1 University Medical Center of Princeton Plainsboro Road, Township of Plainsboro, New Jersey David Bodnar CM Chris Maget 10/5/2009 Table of Contents Executive Summary...3 Project Schedule
More informationThe Waldinger Corporation Office & Production Building
The Waldinger Corporation Office & Production Building Scout Trail Des Moines, IA 50321 SVPA Project No 18036 U.D.R.B. PROJECT NARRATIVE September 19, 2018 The Waldinger Corporation Office & Production
More informationADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018
ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP #2018-09-01 NOTICE TO PROSPECTIVE BIDDERS February 1, 2018 Prospective bidders are hereby informed of the following corrections, additions,
More informationCONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST
CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,
More informationResidence Hall Phase XVI Code Item 308 Code Item 312 Advanced Planning
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0558 PROJECT: UNC Charlotte Residence Hall Phase
More informationINSTRUCTIONS FOR DIVISION 00 DOCUMENTS
INSTRUCTIONS FOR DIVISION 00 DOCUMENTS Division 00 is the first section of the specifications for construction. For each advertised bid project, the College/University must direct the Architect/Engineer
More informationARIZONA STATE UNIVERSITY - EXHIBIT A SCOPE OF SERVICES FOR DESIGN PROFESSIONAL TO STANDARD FROM AGREEMENT BETWEEN OWNER AND DESIGN PROFESSIONAL
ARIZONA STATE UNIVERSITY - EXHIBIT A SCOPE OF SERVICES FOR DESIGN PROFESSIONAL TO STANDARD FROM AGREEMENT BETWEEN OWNER AND DESIGN PROFESSIONAL (CM@Risk Edition) August 1, 2013 Edition Exhibit A Scope
More informationORANGE COUNTY WATER DISTRICT Ward Street Fountain Valley, California ADDENDUM NO. 2 TO REQUEST FOR PROPOSALS FOR
ORANGE COUNTY WATER DISTRICT 18700 Ward Street Fountain Valley, California 92708-6930 ADDENDUM NO. 2 TO REQUEST FOR PROPOSALS FOR OCWD Physical Access Control System Replacement and Video Monitoring Upgrades
More informationMajor Project Request Biennium
Agency Institution Major Project Request 217-19 Biennium G16 University of Wisconsin Platteville Project Title Sesquicentennial Hall Project Request The UW System requests enumeration of $55,189, ($54,62,
More informationRFP /ME - ADDENDUM 2
RFP 201013/ME - ADDENDUM 2 RFP Closing: February 5, 2015 at 2:00 PM (Local Time) Page 1 of 33 RFP Number: 201013/ME Date: January 28, 2015 RETURN PROPOSALS AS SHOWN BELOW Copies of proposal required: Eight
More informationProject Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope
Project Scope & Budget Breakdown Mandatory Scope Recommended Additional Scope Wish List Scope Site Plan EXISTING Site Plan PROPOSED First Floor Plan PROPOSED Basement Floor Plan PROPOSED Mandatory Scope
More informationPROPOSAL FOR ARCHITECTURAL SERVICES. June 22, 2015
PROPOSAL FOR ARCHITECTURAL SERVICES June 22, 2015 FIRM BACKGROUND Dimension IV Madison Design Group is built on a vision of architecture and professional services that puts the client and users, the building
More informationSchool Assessment Report
School Assessment Report School: Cascade Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:55 AM FOR OFFICIAL USE ONLY Final School Assessment
More informationNAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase
General Objectives of Phase Drawings and other documents to fix and describe the size and character of the project as to architectural, structural, mechanical and electrical systems, materials and such
More information0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft
0B 2 m 1:110 7:40 pm. 01 5 m 1:230 7:38 pm. 02 5 m 1:230 7:38 pm. 03 5 m 1:230 7:45 pm. Facility Profile ( FP-1 ) City: State: Country: Address: Stories: Attic: Basement: Glassboro New Jersey United States
More informationPROJECT DESCRIPTION. The project is the Spartan Complex Seismic Upgrade, San Jose, California.
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE SPARTAN COMPLEX SEISMIC UPGRADE PROJECT SAN JOSE STATE UNIVERSITY ONE WASHINGTON SQUARE, SAN JOSE, CA 95192-0010 The Trustees of
More informationPROVIDENCE COLLEGE - RUANE FRIAR DEVELOPMENT CENTER
PROVIDENCE COLLEGE - RUANE FRIAR DEVELOPMENT CENTER NOTICE TO CONSTRUCTION MANAGERS: Dimeo Construction Company (DCC), Providence College s Owner Project Manager (OPM) is soliciting Guaranteed Maximum
More informationADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR. The University of Texas Health Science Center at San Antonio
ADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR The University of Texas Health Science Center at San Antonio Renovate Floor 1 and Floor 2 of the PARC Bldg. RFP No.: 745-16-9935
More informationDick s Sporting Goods Demolition Package
REQUEST FOR PROPOSAL FOR COMPETITIVE SEALED PROPOSALS TO PROVIDE: Dick s Sporting Goods Demolition Package at Salt Lake City, UT 2425 E. Camelback Rd. Suite 750 Phoenix AZ 85016 Notice of Extended Payment
More informationRATIONALE AND REASONING
RATIONALE AND REASONING Background The main tenant residing in BMH is the Anthropology Department. Most of the building systems constructed in the building are over forty years old and are at the end of
More informationUniversity of Colorado Denver Facilities Projects Scope of Work Questionnaire
Project #: University of Colorado Denver Facilities Projects Scope of Work Questionnaire Please review questionnaire, provide comments, and save the form. Project Manager Assigned: Overview Project Location:
More informationREQUEST FOR PROPOSALS (RFP)
REQUEST FOR PROPOSALS (RFP) American Institute of Architects, Nebraska Chapter New Office Space for AIA Nebraska and Lincoln Haymarket Development Corporation Offices Introduction The American Institute
More informationProcedure Yes; No; greater than
Procedure 1. Project manager (PM) notifies facilities information coordinator of forecasted substantial completion date one month prior to reaching substantial completion. 2. PM completes the project information
More informationRequests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018
Requests for Information - 05.0.1 5pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 201 RFI 01 Is the RFP due at 4pm or 5pm on May 16th? Response: RFI 02 Do you have an anticipated
More informationThe City of Madison requests statements of qualifications for architectural and engineering design services for the PINNEY LIBRARY project.
Department of Public Works Engineering Division Robert F. Phillips, P.E., City Engineer City-County Building, Room 115 210 Martin Luther King, Jr. Boulevard Madison, Wisconsin 53703 Phone: (608) 266-4751
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationFIVE WAYS YOUR MOVE TO A BIM WORKFLOW PAYS OFF
ARCHITECTURE & BUILDING ENGINEERING AEC COLLECTION EBOOK FIVE WAYS YOUR MOVE TO A BIM WORKFLOW PAYS OFF Get started > 01 02 03 04 05 DELIVER HIGHER- QUALITY WORK OPERATE MORE EFFICIENTLY EXPAND YOUR BILLABLE
More information1. Division 1 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
CFA A HVAC PROJECT SECTION 01100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationREQUEST FOR PROPOSAL. Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend.
REQUEST FOR PROPOSAL Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend For St. Charles Health System Issued: May 9, 2016 Proposal Due: June 9,
More informationDESIGNER'S GUIDE. Section IV Close Out Procedures (Revised May 22, 2013) Yale University Facilities Planning & Construction
DESIGNER'S GUIDE Section IV Close Out Procedures (Revised May 22, 2013) Yale University Facilities Planning & Construction TO ACCESS SECTION CLICK ON TITLE IN INDEX IV. Table of Contents IV. CLOSE OUT
More informationWhat happened to Division 17? and what is CLA? A Strategic Plan for Communications, Life Safety and Building Automation Systems
What happened to Division 17? and what is CLA? A Strategic Plan for Communications, Life Safety and Building Automation Systems Discussion Points History of MasterFormat and CLA CLA Consultant What BICSI
More informationPROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services
PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services SUBMISSION DEADLINE: October 23, 2009 11:00am FAIR AND OPEN PUBLIC SOLICITATION PROCESS FOR PROFESSIONAL SERVICES
More information