WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

Size: px
Start display at page:

Download "WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00"

Transcription

1 Description Page No Summary Amount Summary 1/7 230, , , /6 96, , , Total Per Unit (MYR) 327, , , Total Unit(s) X Total Per Type (MYR) 327, , , Total Amount To Form Of Tender (MYR) 805, Summary 1/1

2 ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH Excavate, get out, part return, fill in and ram and deposit in making up levels where directed within the site and remainder load and cart away A Oversite to reduce level m , B Pile cap not exceeding 1.50m deep including working around pile heads m , C Ground beam not exceeding 1.50m deep m D Trench not exceeding 1.50m deep m E Prepare and apply 'Simechem' or other equal and approved anti-termite chemical treatment to building lot. The Tenderer shall also allow for a warranty period of 10 years including annual inspection m ,288 6, F 100mm Bed of hardcore as described spread, levelled, well rammed and consolidated, watered and blinded with fine sand, well rolled and finished to receive concrete bed (measured separately) m ,288 10, mm Concrete Grade 10 as described blinding screed, spread and levelled under G Pile cap including working around pile head m , To Collection (MYR) 30, /1

3 (CONT'd) ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH (CONT'd) 50mm Concrete Grade 10 as described blinding screed, spread and levelled under (CONT'd) A Ground beam m , B 150mm Base m C 100mm Bed m ,288 16, Reinforced concrete Grade 25 as described in D Ground beam m , , , E 150mm Base m , F 150mm Wall m , , G 100mm Bed m ,288 36, H ^^Extra over for thicknessing to an average width of 250mm and to a total depth of 200mm including all additional excavation, formwork, hardcore and handpacking hardcore to one side m J ^^Ditto to an average width of 650mm and to a total depth of 200mm ditto m , , To Collection (MYR) 77, , , /2

4 (CONT'd) ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH (CONT'd) Reinforced concrete Grade 25 as described in (CONT'd) A Reinforced concrete Grade 30 as described in pile cap m , , Mild steel bar reinforcement as described in B 10mm Diameter as column starter bar links kg ,308 2, C 10mm Diameter as stirrups in ground beam kg D 8mm Ditto kg ,165 5, High yield steel bar reinforcement as described in Pile cap E 20mm Diameter kg ,901 4, F 16mm Ditto kg ,905 13, G 12mm Ditto kg ,052 8, H 10mm Ditto kg To Collection (MYR) 56, , /3

5 (CONT'd) ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH (CONT'd) High yield steel bar reinforcement as described in (CONT'd) Column Starter Bar A 20mm Diameter kg ,049 6, B 16mm Ditto kg ,429 5, Ground beam C 16mm Diameter kg D 12mm Ditto kg ,679 7, E 10mm Ditto kg ,631 2, F 10mm Diameter in base kg G 10mm Diameter in wall kg Sawn formwork as described to H Sides of pile cap m , J Sides of ground beam m ,573 31, K Sides of wall m , L Edge of concrete not exceeding 100mm high m To Collection (MYR) 62, , /4

6 (CONT'd) ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH (CONT'd) High yield steel bar reinforcement as described in (CONT'd) Ground beam (CONT'd) Sawn formwork as described to (CONT'd) A 75mm x 75mm Triangular fillet planted on formwork to form rebate m B Forming 100mm x 100mm deep scupper drain on concrete slab including trowelling smooth and all additional formwork m C 75mm x 75mm x 6mm Thick mild steel as described angle framing with and including 12mm diameter mild steel anchor bar 100mm long welded to angle frame at 300mm centres with fishtailed and cast into concrete including painting exposed surfaces with one coat metallic primer and two coats bituminous paint m , , , D 75mm Precast concrete Grade 20 as described cover slab size 300mm x 425mm long reinforced with and including 3 Nos. 10mm diameter mild steel bars horizontally and 10mm diameter mild steel bars vertically at 200mm centres with 2 Nos. lifting notches at ends and placing in position no To Collection (MYR) 2, , , /5

7 (CONT'd) ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH (CONT'd) High yield steel bar reinforcement as described in (CONT'd) Ground beam (CONT'd) Sawn formwork as described to (CONT'd) A 75mm Ditto size 300mm x 725mm long ditto no B 75mm Ditto size 300mm x 1025mm long ditto no , To Collection (MYR) 1, , , /6

8 Description Amount Collection Page No. 1/1 30, Page No. 1/2 77, , , Page No. 1/3 56, , Page No. 1/4 62, , Page No. 1/5 2, , , Page No. 1/6 1, , , Carried To Summary (MYR) 230, , , /7

9 ELEMENT 2 - VIBRATED REINFORCED CONCRETE GRADE 25 AS DESCRIBED IN A Column m , , B Projected coping m , C Column on beam m , D Circular column m , , , E Stiffener (Provisional) m , F Suspended ground beam m , , G Ditto; circular on plan of 1875mm radius m , H Suspended curved ground beam m , , J Suspended floor beam m , , , K Arch beam; to a varies radius m , , , L Sloping roof beam m , , , M Lower roof beam m , , , N Upstand lower roof beam m , , , P Upper roof beam m , , To Collection (MYR) 73, , , /1

10 (CONT'd) ELEMENT 2 - (CONT'd) VIBRATED REINFORCED CONCRETE GRADE 25 AS DESCRIBED IN (CONT'd) A Lower ring beam m , , , B Upper ring beam m , , , C Plinth m , , D 200mm Thick wall m , , MILD STEEL BAR REINFORCEMENT TO CONCRETE AS DESCRIBED IN Column E 6mm Diameter bar as links kg F 8mm Diameter ditto kg G 10mm Diameter ditto kg Projected coping H 6mm Diameter bar as links kg Column on beam J 6mm Diameter bar as links kg To Collection (MYR) 6, , , /2

11 (CONT'd) ELEMENT 2 - (CONT'd) VIBRATED REINFORCED CONCRETE GRADE 25 AS DESCRIBED IN (CONT'd) Circular column A 6mm Diameter bar as links kg B 8mm Diameter ditto kg Stiffener (Provisional) C 6mm Diameter bar as links kg Suspended ground beam D 6mm Diameter bar as stirrups kg E 8mm Diameter ditto kg F 10mm Diameter ditto kg ,399 2, Suspended ground beam, circular on plan of 1875mm radius G 10mm Diameter bar as stirrups kg Suspended curved ground beam H 10mm Diameter bar as stirrups kg To Collection (MYR) 4, /3

12 (CONT'd) ELEMENT 2 - (CONT'd) VIBRATED REINFORCED CONCRETE GRADE 25 AS DESCRIBED IN (CONT'd) Suspended floor beam A 6mm Diameter bar as stirrups kg B 8mm Diameter ditto kg C 10mm Diameter ditto kg ,192 6, Arch beam; to a varies radius D 6mm Diameter bar as stirrups kg E 10mm Diameter ditto kg Sloping roof beam F 10mm Diameter bar as stirrups kg Lower roof beam G 6mm Diameter bar as stirrups kg H 10mm Diameter ditto kg ,872 3, Upstand lower roof beam J 8mm Diameter bar as stirrups kg To Collection (MYR) 10, /4

13 (CONT'd) ELEMENT 2 - (CONT'd) VIBRATED REINFORCED CONCRETE GRADE 25 AS DESCRIBED IN (CONT'd) Upstand lower roof beam (CONT'd) A 10mm Diameter ditto kg Upper roof beam B 8mm Diameter bar as stirrups kg C 10mm Diameter ditto kg Lower ring beam D 10mm Diameter bar as stirrups kg Upper ring beam E 10mm Diameter bar as stirrups kg Plinth F 10mm Diameter bar as stirrups kg To Collection (MYR) 2, /5

14 Description Amount Collection Page No. 2/1 73, , , Page No. 2/2 6, , , Page No. 2/3 4, Page No. 2/4 10, Page No. 2/5 2, Carried To Summary (MYR) 96, , , /6

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total BILL OF QUANTITY Proposed Market Shed OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) ELEMENT NO. 1: - SUBSTRUCTURE (ALL PROVISIONAL): - Excavations and Earthworks: - A Clear site of all bush and grass and

More information

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount EXTERNAL WORKS DEMOLITION AND ALTERATIONS EXTERNALLY Pulling down to ground level; removing debris from Site a 200 mm thick masonry wall finished both sides with plaster and paint; net total area 158 square

More information

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK PROPOSED ECD BLOCK ELEMENT NO. 1 SUBSTRUCTURES (ALL PROVISIONAL) A B C D Site clearance Clear the site off grass, shrubs and all vegetation; cart away as directed Excavate vegetable soil average 200mm

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

WORK BELOW LOWEST FLOOR FINISH BQ/1/4 230, FRAME BQ/2/8 441, UPPER FLOOR BQ/3/2 507, ROOF BQ/4/8 202,915.35

WORK BELOW LOWEST FLOOR FINISH BQ/1/4 230, FRAME BQ/2/8 441, UPPER FLOOR BQ/3/2 507, ROOF BQ/4/8 202,915.35 Summary Description Page No Amount Summary WORK BELOW LOWEST FLOOR FINISH BQ/1/4 230,694.60 FRAME BQ/2/8 441,488.20 UPPER FLOOR BQ/3/2 507,277.98 ROOF BQ/4/8 202,915.35 STAIRS, RAMPS AND STAIRCASE FINISHES

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

Carried to collection

Carried to collection ELEMENT NO. 1 SUBSTRUCTURES (ALL PROVISIONAL) A B C D Site clearance Clear the site off grass, shrubs and all vegetation; cart away as directed 40 sm Excavate vegetable soil average 200mm deep and cart

More information

PROPOSED CONSTRUCTION OF TWIN ECD CLASSROOM AND THREE DOOR PIT LATRINE BILLS OF QUANTITIES PROPOSED TWIN ECD CLASSROOM FINANCIAL YEAR

PROPOSED CONSTRUCTION OF TWIN ECD CLASSROOM AND THREE DOOR PIT LATRINE BILLS OF QUANTITIES PROPOSED TWIN ECD CLASSROOM FINANCIAL YEAR PROPOSED CONSTRUCTION OF TWIN ECD CLASSROOM AND THREE DOOR PIT LATRINE EMC/EDU/1 ELEMENT 01: SUBSTRUCTURES (All Provisional) A Oversite Excavations Excavate oversite to remove vegetable soil 150mm thick

More information

BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA

BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA CONSTRUCTION OF MODEL DISPENSARY BLOCK Item DESCRIPTION QTY UNIT RATE TOTAL(KS ELEMENT : SUBSTRUCTURE (ALL PROVISIONAL):

More information

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL. Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN,

More information

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD TENDER FOR Construction of Stone Masonry Compound Wall for NIAB Campus at Survey No.37, Serlingampally, Hyderabad VOLUME V January 2013 HSCC

More information

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID

More information

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16

More information

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI GROUND FLOOR COMPLETION OF WORKS TO GROUND FLOOR SITE WORKS DEMOLITIONS AND ALTERATIONS Ground floor Removing a polythene damp proof membranes, complete with mesh fabric reference A 252, hacking edges

More information

PRICED BILL OF QUANTITIES

PRICED BILL OF QUANTITIES Engineering Projects (dia) Limited (A Govt of dia Enterprise) Words 1 EARTH WORK 1.1 Earth work in excavation by mechanical means (Hydraulic Excavator) / Manual means over areas (exceeding 30 cm in depth,

More information

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI. SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04

More information

KANPUR SMART CITY LIMITED

KANPUR SMART CITY LIMITED Nagar Nigam Mukhyalay, 3 rd Floor, Moti Jheel, Kanpur - 208002 Tel.: +91 512 2541258, 2546194 Email:ksclkanpur@gmail.com KANPUR SMART CTY LMTED No.: KSCL/PMC/Open Gym/01/2 Date: 17/02/2018 Reply to queries

More information

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY D DEMOLITION & SITE CLEARANCE D1 GENERAL CLEARANCE 6-D152 Open bush and thicket in and around ha 0.02 the ponds. Locally disposed. D2 REMOVAL OF TREES AND STUMPS 6-D212 Trees of girth: 150 mm - 500 mm

More information

ITEM DESCRIPTION QTY UNIT RATE K.SHS PROPOSED KMTC CLASSROOMS AT NYAHURURU L HOSPITAL - - ELEMENT NO. 1 SUBSTRUCTURES. Oversite excavation -

ITEM DESCRIPTION QTY UNIT RATE K.SHS PROPOSED KMTC CLASSROOMS AT NYAHURURU L HOSPITAL - - ELEMENT NO. 1 SUBSTRUCTURES. Oversite excavation - PROPOSED KMTC CLASSROOMS AT NYAHURURU L HOSPITAL ELEMENT NO. 1 SUBSTRUCTURES Oversite excavation A Excavate oversite to remove top soil average 150mm deep and cart away 400 sm Excavation B C D E Excavate

More information

PROPOSED ERECTION AND COMPLETION OF CEREAL STORE.

PROPOSED ERECTION AND COMPLETION OF CEREAL STORE. PROPOSED ERECTION AND COMPLETION OF. AB/1 STORE ELEMENT NO. 1 A B SUBSTRUCTURES (ALL PROVISIONAL) Excavations Clear site of small bushes and grub roots of small trees and cart away Excavate average 150mm

More information

300 SM 285 SM 256 CM 70 CM 63 CM 210 SM 241 SM 3 CM

300 SM 285 SM 256 CM 70 CM 63 CM 210 SM 241 SM 3 CM ADMINISTRATION BLOCK ELEMENT NO. 1 SUBSTRUCTURE WORKS (All Provisional) NOTE: This elements include all works upto and including the ground floor slab EXCAVATED EARTH WORK A B C D Clear over site to remove

More information

ITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal

ITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal EARTHWORKS Excavation for foundations 5E343.2 In class III material m³ 1,260 Max. Depth: 0.50 1 m For disposal 5E334.2 In class III material m³ 720 Max. Depth: 1 2 m For disposal Filling Ancillaries 5E723.0

More information

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA AT PLOT NO. IIA/35, ACTION AREA IIA, NEW TOWN, KOLKATA, WEST BENGAL 700 157 Pages (1 5)

More information

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of BILL OF QUANTITIES Name of Work: Beautification of Adalatganj Talab, Patna, Bihar S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of specified

More information

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1 PRELIMINARIES 1 All rates to be inclusive of all taxes including V.A.T General Matters A Water for the works item 1 B Insurance against injury to persons, property and works item 1 C Performance Bond 5%

More information

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2 Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2 PARTICULAR SPECIFICATIONS FOR THE CONSTRUCITON OF STORM WATER DRAINAGE NETWORK March 2018 BUREAU TECHNIQUE POUR LE DEVELOPPEMENT P.O.B

More information

CATCHMENT STRUCTURE 13M X 15M

CATCHMENT STRUCTURE 13M X 15M BILL OF QUANTITIES AND SPECIFICATIONS CONSTRUCTION OF 100M3 DJABIA ITEM No. DESCRIPTION UNIT QUANTITY RATE AMOUNT KSHS CATCHMENT STRUCTURE 13M X 15M 1.1 Clear catchment site of all bushes, scrubs, undergrowth,

More information

Requirements for Measuring and Pricing of Structural Concrete

Requirements for Measuring and Pricing of Structural Concrete Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing

More information

ITEM DESCRIPTION QTY UNIT RATE K.SHS PROPOSED SURGICAL THEATER - ELEMENT NO. 1 SUBSTRUCTURES. Oversite excavation -

ITEM DESCRIPTION QTY UNIT RATE K.SHS PROPOSED SURGICAL THEATER - ELEMENT NO. 1 SUBSTRUCTURES. Oversite excavation - PROPOSED SURGICAL THEATER ELEMENT NO. 1 SUBSTRUCTURES Oversite excavation A Excavate oversite to remove top soil average 150mm deep and cart away 446 sm Excavation B C D E Excavate to reduce levels commencing

More information

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Drainage, Road Drainage and Collection Pit A - EXCAVATION: 57 Drainage, Road Drainage and Collection Pit SCHEDULE OF QUANTITY Sl.N o. 1 Particulars Qty Unit Rate Amount A - EXCAVATION: Earth work in EXCAVATION IN FOUNDATION TRENCHES IN ALL KIND OF SOIL including

More information

Construction of Shopping Complex at MNIT campus.

Construction of Shopping Complex at MNIT campus. Name of work:- Construction of Shopping Complex at MNIT campus. G-Schedule S.No Qty Items Unit Rate Amount 1 253 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation

More information

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15. Tender ref no: SBIIMS/BHU/AO/08-9/ Date: 0.0.09 Sl. No. ITEM SPECIFICATION UNIT QTY RATES AMOUNT PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING Earth work in excavation of recharge

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

Scanned by CamScanner

Scanned by CamScanner JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY

More information

SELF-ASSESSMENT EXERCISE FOR CHAPTER 24: PREPARATION OF BILLS OF QUANTITIES

SELF-ASSESSMENT EXERCISE FOR CHAPTER 24: PREPARATION OF BILLS OF QUANTITIES SELF-ASSESSMENT EXERCISE FOR CHAPTER 24: PREPARATION OF BILLS OF QUANTITIES Abstract the quantities and prepare a BQ for the basement measurement in Chapter 5. Please prepare a query sheet of problems

More information

APPLICABILITY TABLE. Council BSC CHRC GRC IRC LSC MRC RRC Applicable Yes Yes Yes Yes Yes Yes Yes

APPLICABILITY TABLE. Council BSC CHRC GRC IRC LSC MRC RRC Applicable Yes Yes Yes Yes Yes Yes Yes Precast roof slabs refer Standard Drawing CMDG-D-03 Special cast iron cover and frame, refer Service Authority. Special cast iron cover and frame, refer Service Authority. Cast iron cover and frame Ø 200

More information

CHAPTER 16 - GANTRIES

CHAPTER 16 - GANTRIES CHAPTER 16 - GANTRIES DS Temple 16.1 SCOPE This section covers the inspection of Sign Gantries as specified in the applicable chapter of the Specifications. It also covers the special attention which must

More information

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS BILLS OF QUANTITIES - Name of Project CONSULTANT: Name of Office DATE:APR. 2008 External Works EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS page 1 BILLS OF QUANTITIES - Name of Project CONSULTANT:

More information

PROPOSED EXTERNAL WORKS AT NKABUNE TECHNICAL TRAINING INSTITUTE BILL 1 DRIVEWAYS AND PARKINGS

PROPOSED EXTERNAL WORKS AT NKABUNE TECHNICAL TRAINING INSTITUTE BILL 1 DRIVEWAYS AND PARKINGS PROPOS XTRNAL WORKS AT NKABUN THNIAL TRAINING INSTITUT BILL 1 RIVWAYS AN PARKINGS ITM NO SRIPTION QTY UNIT RAT AMOUNT SIT LARAN AN XAVATION 418 SM A ut grass and shrubincluding grubbing roots along proposed

More information

Temecula Medical Center Temecula, CA

Temecula Medical Center Temecula, CA Temecula Medical Center Temecula, CA Technical Assignment #2 Sean F. Beville The Pennsylvania State University Architectural Engineering Structural Option Senior Thesis Project Student Advisor: Thomas

More information

1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.

1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION. ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT 1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION. Clearing of site, site office/work shed, Toilet, etc. A provisional cost to be allocated in South African

More information

FOR. RCC Structural Works for Construction of Infectious Block Building at Kendrapara, Odisha state VOLUME III PRICE BID/BILL OF QUANTITIES

FOR. RCC Structural Works for Construction of Infectious Block Building at Kendrapara, Odisha state VOLUME III PRICE BID/BILL OF QUANTITIES AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: WRO/CON/757/0188 FOR RCC Structural Works for Construction of Infectious Block Building at Kendrapara, Odisha state VOLUME III PRICE BID/BILL OF QUANTITIES

More information

PRE-CAST HOUSE CONSTRUCTION

PRE-CAST HOUSE CONSTRUCTION PRE-CAST HOUSE CONSTRUCTION BDA is a Planning and Development Authority Jurisdictional Area is 1370 sq.km. Developed 64 Layouts Distributed 1,40,000 of sites Developed Infrastructure Works like Ring Roads

More information

QPM Ltd. Tender Document _1020

QPM Ltd. Tender Document _1020 Bill No. 1 : PRELIMINARIES 1.01 CONTRACT: Allow for complying with obligations and liabilities in, or implied by the contract documents and for all necessary temporary and ancillary works. Mobilisation

More information

Return, fill in and ram well selected excavated materials to make up levels around wall foundations.

Return, fill in and ram well selected excavated materials to make up levels around wall foundations. ELEMENT NO. 1 EARTH WORKS & SUBSTRUCTURE [ALL PROVISIONAL] The works in this section includes all work up to and including ground floor slab :- Excavation / Earth works A. B. Clear the site of all bushes,

More information

CHAPTER 8. Concrete Work

CHAPTER 8. Concrete Work Concrete Work Clay Bricklaying Made Easy CONCRETE WORK Foundations for walls and piers All loadbearing walls and piers are required to stand on a concrete foundation, which must be able to receive and

More information

Building Construction

Building Construction Building Construction Shallow Foundations Module-III Introduction The foundation can be classified broadly into two types: Shallow foundations Deep foundations Shallow foundations Shallow Foundations When

More information

CIVIL WORKS Mahesh G. Nair

CIVIL WORKS Mahesh G. Nair MEASUREMENT BOOK SUNIL Date Work Order Contractor : : EARTH WORKS CIVIL WORKS Mahesh G. Nair GROUND FLOOR 1 EARTH WORKS EXCAVATION : Earth work excavation for foundation trenches in all classes of soil

More information

Method of Measurement for Road Works Series MM Structural Concrete

Method of Measurement for Road Works Series MM Structural Concrete Method of Measurement for Road Works Series MM 1700 - CC-RMP-01700 December 2013 CC Construction & Commissioning Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure

More information

PROGRESSIVE REPORT FOR CABANA MEMORIAL BUILDING CLIENT: SISTERS OF IMMACULATE HEART OF MARY RAPARATRIX GOOGONYA CONTRACTOR:BUCONS (U) LIMITED

PROGRESSIVE REPORT FOR CABANA MEMORIAL BUILDING CLIENT: SISTERS OF IMMACULATE HEART OF MARY RAPARATRIX GOOGONYA CONTRACTOR:BUCONS (U) LIMITED PROGRESSIVE REPORT FOR CABANA MEMORIAL BUILDING CLIENT: SISTERS OF IMMACULATE HEART OF MARY RAPARATRIX GOOGONYA CONTRACTOR:BUCONS (U) LIMITED MARCH 2016 Table of Contents Chapter one:... 2 Overview of

More information

This precast prestressed concrete pedestrian

This precast prestressed concrete pedestrian The Rockach Boulevard Pedestrian Bridge by ELIEZER SHAMIR Partner, E. Shamir - H. Posner Consulting Engineers Tel-Aviv, Israel This precast prestressed concrete pedestrian bridge crosses the Rockach Boulevard,

More information

TITLE: ABLUTION BLOCK WITH BIODIGESTER. ITEM No. D E S C R I P T I O N UNIT QTY

TITLE: ABLUTION BLOCK WITH BIODIGESTER. ITEM No. D E S C R I P T I O N UNIT QTY SUBSTRUCTURES 01 SITE CLEARANCE A Clear site of all shrubs, thicket & undergrowth including m² 170 grubbing up of roots and dispose off as directed by the Engineer. (provisional) B Removal of trees and

More information

Statement of Special Inspection Requirements

Statement of Special Inspection Requirements Statement of Special Inspection Requirements California Building Code Chapter 17 Construction plans shall include a statement of special inspection in accordance with CBC chapter 17. The statement of special

More information

Seven Wonders of the Ancient World

Seven Wonders of the Ancient World Seven Wonders of the Ancient World Pyramid of Meidum shed 250,000 tons of limestone outer casings Typical Pyramid Pyramid at Meidum Mexico Alameda buildings Palace of Fine Arts National Theater

More information

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK Schedule-I: Civil Works EARTH WORK Section-A : DSR Items 1 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in

More information

Slab on Grade. Introduction CHAPTER 10

Slab on Grade. Introduction CHAPTER 10 CHAPTER 10 Slab on Grade Introduction A concrete slab on grade is a level surface of concrete that lies directly on the ground. Slabs on grade are used for roads, sidewalks, patios, airport runways and

More information

R-Group Finland Oy. REA Lifting Inserts Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved

R-Group Finland Oy. REA Lifting Inserts Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved R-Group Finland Oy REA Lifting Inserts Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved 10.2.2017 2 Table of Contents 1 DESCRIPTION OF THE SYSTEM...

More information

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg, Georgetown. 1.2 Engineer The Engineer

More information

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following: PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral

More information

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall

More information

2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE:

2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE: SECTION 07651 FLEXIBLE COPPER SHEET FLASHINGS Advanced Building Products, Inc. manufacturer many types of flexible copper sheet flashings. Due to their ductility, high tensile strength, and resistance

More information

ABSTRACT SHEET Name of Work : Main Building Proposed Construction of RSETI Building On Plot No. 7/1 & 9 At-Babupeth, Chandrapur

ABSTRACT SHEET Name of Work : Main Building Proposed Construction of RSETI Building On Plot No. 7/1 & 9 At-Babupeth, Chandrapur ABSTRACT SHEET Name of Work : Main Building Proposed Construction of RSETI Building On Plot No. 7/1 & 9 At-Babupeth, Chandrapur Sr.No. Particulars Unit Qty. Rate Amount 1 Excavation for foundation in earth,

More information

Concrete Slab-on-Ground

Concrete Slab-on-Ground Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI ` INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI-110068 NOTICE INVITING QUOTATION IG/CMD/NIQ-civil/2014 Dated: - 26/06/2014 Name of work:- Construction

More information

Item Description Qty Unit Rate Total x 1500 mm with one fixed light and two hanging lights 18 No 9, ,000

Item Description Qty Unit Rate Total x 1500 mm with one fixed light and two hanging lights 18 No 9, ,000 ELEMENT NO.1 WINDOWS Standard steel casement windows complete with hinges, stays, fasteners, pinning lugs to concrete or block work surround and bedding frame in cement and sand mortar A 1550 x 1500 mm

More information

D Bulk Excavate in black cotton soils depth exceeding 1.5 M but not exceeding 3.0m 2,488 CM 450 1,119,600.00

D Bulk Excavate in black cotton soils depth exceeding 1.5 M but not exceeding 3.0m 2,488 CM 450 1,119,600.00 SUBSTRUCTURES (All provisional) Site Preparation A Clear site of all bushes, shrubs and grub up roots and remove from site 1,800 SM 120 216,000.00 B C Excavations & Earthworks Excavate oversite soil average

More information

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following: PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral

More information

2016 DESIGN AND DRAWING OF REINFORCED CONCRETE STRUCTURES

2016 DESIGN AND DRAWING OF REINFORCED CONCRETE STRUCTURES R13 SET - 1 DESIGN AND DRAWING OF REINFCED CONCRETE STRUCTURES 1 Design a simply supported rectangular beam to carry 30kN/m superimposed load over a span of 6m on 460mm wide supports. Use M20 grade concrete

More information

Sabah Shawkat Cabinet of Structural Engineering 2017

Sabah Shawkat Cabinet of Structural Engineering 2017 3.1-1 Continuous beams Every building, whether it is large or small, must have a structural system capable of carrying all kinds of loads - vertical, horizontal, temperature, etc. In principle, the entire

More information

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali FINANCIAL BID DOCUMENT Miscellaneous Civil Work in Low Lying Area at

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS. A. Formwork complete with shoring, bracing and anchorage.

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS. A. Formwork complete with shoring, bracing and anchorage. SECTION 02528 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.01 WORK INCLUDED A. Formwork complete with shoring, bracing and anchorage. B. Concrete reinforcement complete with required supports,

More information

SECTION PRECAST CONCRETE COVER SYSTEM

SECTION PRECAST CONCRETE COVER SYSTEM SECTION 13500 PRECAST CONCRETE COVER SYSTEM PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Design Criteria: 1. Precast manufacturer shall be responsible for structural design of individual precast components,

More information

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System For over 65 years the Miller brand has been synonymous with personal fall protection products and services. As the global leader in safety at height solutions, Honeywell Safety Products introduces a new

More information

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

Confined masonry. An illustrated guide for masons. This manual explains this technique. Confined masonry. RC frames. Columns first, walls after

Confined masonry. An illustrated guide for masons. This manual explains this technique. Confined masonry. RC frames. Columns first, walls after S D C Confined masonry An illustrated guide for masons This manual explains this technique RC frames Columns first, walls after Confined masonry Walls first, columns after 1. Site selection and form of

More information

UNIT III Earthwork Estimation & Reinforcement Estimation

UNIT III Earthwork Estimation & Reinforcement Estimation SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : ECV(13A01605) Year & Sem: IV-B.Tech & I-Sem Course & Branch: B.Tech

More information

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE S.NO Description Unit Total Qty EARTH WORK EXCAVATION : Earthwork in excavation at all depths for foundation, pile cap,drain, ramp,pits, etc.,

More information

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

Tender Schedule for the Work Construction of Staff qtrs. at Tainda S/S (1no.) 1.Amount put to Tender:- Rs 7,48,024/- 2.E.M.D. Required: - R 8,000/- 3. Class of contractor :- "D" & "C" 4. Cost of Tender Paper:- R 4,200/- Sl- No Tender Schedule for the Work "Construction of Staff

More information

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed Construction Measurement III SBQ3314 Precast Pre stressed Concrete Works Dr. Sarajul Fikri Mohamed Table of Contents 1. Pre stressed concrete in bridgeworks: technological aspects 2. SMM2 measurement rules

More information

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.)

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) Based on. I to IV w.e.f. 10 May 2012 Length of the Road =250 m, ROW 18 m Abstract Estimate S.No. Description of Item SOR Item Cost 1

More information

EUROACCESSORIES COLUMN FORMERS

EUROACCESSORIES COLUMN FORMERS EURO ACCESSORIES COLUMN FORMERS www.euroacc.co.uk Introduction: Euro Accessories are the sole distributors of the BAG Column Formers in the UK and Ireland. BAG have 15 years experience in the production

More information

Prestressed Concrete Tanks. Design & Construction

Prestressed Concrete Tanks. Design & Construction Prestressed Concrete Tanks Design & Construction The PRELOAD Advantage PRELOAD has maintained a focused vision on designing and constructing the highest-quality and most-durable liquid storage tanks for

More information

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES Safety Precautions in the Excavation of a Sentinel Wedge take all necessary steps to make sure the pit is secured. Follow all OSHA requirements for digging

More information

Tolerances for Concrete Construction. Tolerances for Concrete Construction. Tolerance 6/16/2015

Tolerances for Concrete Construction. Tolerances for Concrete Construction. Tolerance 6/16/2015 Tolerances for Concrete Construction Thomas J Downs P.E., FACI President Forensic Experts Minneapolis, MN What is it? Tolerances for Concrete Construction When did we start this anyway? Who said we needed

More information

PROJECT: PROPOSED MIGRANTS RESOURCE CENTER - MOGADISHU - IMPLEMENTED BY: CLIENT.

PROJECT: PROPOSED MIGRANTS RESOURCE CENTER - MOGADISHU - IMPLEMENTED BY: CLIENT. PROJECT: PROPOSED MIGRANTS RESOURCE CENTER IMPLEMENTED BY: CLIENT. MIGRANTS RESOURCE CENTER RESOURCE CENTER IOM : FEBRUARY 2018 DRAWING INDEX SHEET N O 01. 01/24 02. 02/24 03. 03/24 04. 04/24 05. 05/24

More information

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M. Bill of Quantities Nature of work : Construction of Health Center with 8 rooms (Clinics, Pharmacy, Labs, Fence & Latrines) Location: Shakreen- El Fasher Town- North Darfur State No. Description Qty Unit

More information

CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS

CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS 30 CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS 3.1 INTRODUCTION There are numerous similarities between ferrocement and reinforced concrete. Both use similar matrix and reinforcement materials. They

More information

Civil Engineering Construction Chapter 5

Civil Engineering Construction Chapter 5 Civil Engineering Construction Chapter 5 Introduction to Floor Dr Mohamad Syazli Fathi Department of Civil Engineering UTM RAZAK School of Engineering & Advanced Technology UTM International Campus August

More information

Calculation of requirement of Labour. for construction of IAY/CMRHM

Calculation of requirement of Labour. for construction of IAY/CMRHM Calculation of requirement of Labour for construction of IAY/CMRHM Total cost as per 2012 SOR = Rs 7,01,746.00 Deduct 7.5% Contractor s profit = Rs (-) 52,631.00 = Rs 6,49,115.00 Taking 1/3 as the Labour

More information

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT Roof Parapet (Detail 911) 21 0 380 380 40 Tie Beams (Detail 8) Tie Beams (Detail 8) FGL Raft foundation (Detail 6) 4 H=0 min Column (Detail 7) + 0.00 PLAIN CONCRETE,6 ELEVATION VIEW 1/0 FGL Floor Tank

More information

LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap

LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS Diagram 1: Standard Membrane Continuation 150 mm Overlap Ensure Membrane to Membrane Contact Diagram 2: Membrane Continuation

More information

1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes.

1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes. 1 Structural Steelwork 1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes. A steel section is designated by the serial size in millimeters

More information

TRANSPORT and LIFTING spherical head anchors

TRANSPORT and LIFTING spherical head anchors Technical specification head anchors The best way of calculating the lifting anchors is step by step. The following steps are in the correct sequence: Determine the weight of the element. (concrete : +/-

More information

ARCHITECTURAL DRAWINGS

ARCHITECTURAL DRAWINGS PROJECT DETAILS Implementation Partner: Project title: Grant No.: KIS062 Content : ARCHITECTURAL DRAWINGS SHEET NO. REHABILITATION OF GRANT NO.: - KIS062 COVER SHEET INDEX SHEET CONTENTS 01 02 03 04 05

More information

WCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS

WCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS SCO #: 8-8-0 TABLE OF CONTE COV DESCRIPTION COVER SHEET ALUMNI TOWER ELEVATIONS & PLAN VIEWS REPAIR DETAILS - M TO REPAIR DETAILS - TO M0 & C TO REPAIR DETAILS - A & F TO F VICINITY MAP ALUMNI TOWER ALUMNI

More information

Statement of Special Inspections 2013 CBC

Statement of Special Inspections 2013 CBC BUILDIG & SAFET DIVISIO 2729 Prospect Park Drive Rancho Cordova, CA 95670 Phone: (916) 851-8760 Fax: (916) 851-8762 Statement of Special Inspections 2013 CBC PERMIT #: PROJECT ADDRESS: This Statement of

More information

Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay

Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay External view of Manulife Tower from various location Block plan showing the building layout of the new

More information

Bison Precast Flooring Specification

Bison Precast Flooring Specification Page: 1 of 4 1.0 SCOPE OF THE SPECIFICATION 1.01 Floor types: This specification covers the design, manufacture and associated site work for the following floor types; Hollow core floors Composite hollow

More information

Selection, installation and USage of HatcHeS

Selection, installation and USage of HatcHeS Selection, installation and USage of HatcHeS Tech NoTe Hatches for utility structures are manufactured from cast iron, aluminum and steel. The casting requirements, in regard to concrete cover and required

More information