HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

Size: px
Start display at page:

Download "HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:"

Transcription

1

2 N E STA: INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS AND 418 LF 10" HWR DR 11 TYPE PE-RT PREINSULATED PIPE UNIVERSITY AVENUE DUMAS APARTMENTS ' NOTE: CONTRACTOR SHALL CONTACT THE UNIVERSITY OF MISSOURI ENERGY MANAGEMENT PRIOR TO THE START OF CONSTRUCTION. MU-EM WILL VERIFY THE LOCATION OF THE CHILLED WATER SUPPLY AND RETURN PRIOR TO CONNECTION. FUTURE WATER MAIN (NOT IN CONTRACT) HWS HWR EXIST. 12" CWR EXIST. 12" CWS UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET REFER TO EARLY ELECTRICAL PACKAGE FOR ELECTRICAL DUCTBANK IN HITT STREET FROM E-020A TO E-020 N E STA: INSTALL: 2-10"X6" TEES 2-10" VALVES 2-6" VALVES FUTURE CHILLED WATER SUPPLY AND RETURN (NOT IN CONTRACT) 3" PVC CONTROL CONDUIT FROM PULL BOX TO MANHOLE EXISTING LIGHT POLE. CONTRACTOR SHALL COORDINATE REMOVAL WITH THE CITY OF COLUMBIA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CAREFULLY REMOVE AND STOCKPILE EXISTING LIGHT POLE. REMOVE EXISTING BASE FOR CHILLED WATER CONSTRUCTION. AFTER WATER CONSTRUCTION, INSTALL NEW LIGHT POLE BASE AND REINSTALL EXISTING LIGHT FIXTURE ON NEW BASE. RECONNECT EXISTING CIRCUITS. CONTRACTOR SHALL INUDE REMOVAL AND REPLACEMENT OF POLE, COORDINATION WITH CITY OF COLUMBIA, AND ANY CITY PERMITS AND FEES IN HIS BID. 13.8' TMH-4 HITT STREET E-020A INSTALL 2-12" VALVES. INSTALL 2 BLIND FLANGES ON CWS & CWR FOR FUTURE EXTENSION. E-020 N E STA: N E STA: INSTALL: 2-6" 90 BENDS INSTALL 92 LF 6" HWS AND 90 LF 6" HWR DR 11 TYPE PE-RT PREINSULATED PIPE A A.1 CW1 CWS CWR B HW2 CWS CWR HWS HWR CWS INSTALL 120 LF 12" CWS AND 118 LF 12" CWR REMOVE AND REPLACE EXISTING PULL BOX ON TOP OF CHILLED WATER LINES HW CWR W SIDEWALK, CURB & GUTTER, AND SCHOOL OF MUSIC BUILDING ARE PROPOSED CONSTRUCTION IN A SEPARATE PROJECT CP170621, BECAUSE THESE DEVELOPMENTS SHALL BE CONSTRUCTED SIMULTANEOUSLY WITH THE UTILITIES PROJECT CP172801, THEY ARE SHOWN HERE FOR COORDINATION PURPOSES. THE UTILITIES PROJECT CP WILL END 1' FROM THE PROPOSED SCHOOL OF MUSIC BUILDING. REFER TO PROJECT CP FOR ADDITIONAL INFORMATION. CW2 W2 B.8 C W1 INSTALL 1-6" 90 BEND N E STA: INSTALL 2-12" 22.5 BENDS MUMFORD HALL N E STA: INSTALL: 2-12"X12" TEES 6-12" VALVES 2-12" 22.5 BENDS CONNECT TO EXIST 12" CWS & CWR N E STA: INSTALL: 2-6" 90 BENDS INSTALL 90 LF 6" CWS AND 88 LF 6" CWR D N E STA: INSTALL 2-12" TEES E INSTALL 2 BLIND FLANGES ON HWS & HWR FOR FUTURE EXTENSION. INSTALL 2 BLIND FLANGES ON CWS & CWR FOR FUTURE EXTENSION. N E STA: INSTALL 2-12"x6" TEES INSTALL 2-6" VALVES CONNECT TO EXISTING WATER MAIN INSTALL 12"X6" TEE INSTALL 2-12" VALVES INSTALL 1-6" VALVE INSTALL 94 LF 6" WATER SERVICE TO SCHOOL OF MUSIC BUILDING F F.1 UP 8 7 D Baltimore, Suite 300 Kansas City, Missouri, Phone: GENERAL SITE NEW SCHOOL OF MUSIC EXTEND UTILITIES Fax: Mechanical and Electrical Engineers Since 1933 UNIVERSITY OF MISSOURI - COLUMBIA u:\2017\17-114\ som extend utilities\c601-utility-hw.dwg SCALE IN FEET 20 JOB NO. CP DATE: 11/9/2017 SITE UTILITY PLAN C601

3 800 HW1 "Hot Water Line PROFILE" HW2 HW " Sanitary CW1 24" Storm "Chilled Water and Water Main Line PROFILE" W1 8" Water 2" Gas 8" Sanitary 2'x2' UT HVE CW2 W " COVER 400 L.F. 10" HWS 400 L.F. 10" HWR DR 11 TYPE PE-RT PREINSULATED PIPE Existing Grade NOTE: CONTRACTOR SHALL CONTACT THE UNIVERSITY OF MISSOURI ENERGY MANAGEMENT PRIOR TO THE START OF CONSTRUCTION. MU-EM WILL VERIFY THE LOCATION OF THE CHILLED WATER SUPPLY AND RETURN PRIOR TO CONSTRUCTION. 2'x2' UT 6" Water HVE DUCT BANK 2" Gas 24" Storm 6" MIN 6" CHILLED WATER 6" Water 8" Sanitary 8" Water Finished Grade 98 L.F. 6" HWS 98 L.F. 6" HWR DR 11 TYPE PE-RT PREINSULATED PIPE 18" Storm CONTRACTOR TO STOP HOT WATER LINE 1'OUTSIDE OF PROPOSED SCHOOL OF MUSIC BUILDING AT STATION Baltimore, Suite 300 Kansas City, Missouri, Phone: Fax: Mechanical and Electrical Engineers Since " Water Existing Grade L.F. 6" CWS 89.9 L.F. 6" CWR PVC C900 PIPE 6" Water LF WATER SERVICE 6" PVC C900 PIPE 6" HOT WATER " Sanitary 8" Water Finished Grade by Others 18" Storm LF WATER SERVICE 6" PVC C900 PIPE 20 L.F. 6" WATER DIP ASS L.F. 6" CWS 66.5 L.F. 6" CWR PVC C900 PIPE 36" COVER 20 L.F. 6" CWS 20 L.F. 6" CWR 730 DIP ASS GENERAL SITE NEW SCHOOL OF MUSIC EXTEND UTILITIES UNIVERSITY OF MISSOURI - COLUMBIA u:\2017\17-114\ som extend utilities\c602-utility-hw.dwg CONTRACTOR TO STOP CHILLED WATER AND WATER MAIN LINE 1'OUTSIDE OF PROPOSED SCHOOL OF MUSIC BUILDING AT STATION JOB NO. CP DATE: 11/9/2017 SITE UTILITY PROFILES C602

4 3" PVC CONDUIT SEE PLANS FOR VALVE LOCATIONS FINISHED GRADE FINISHED GRADE 3" PVC CONDUIT 14" 14" BRANCH SIZE DETERMINED BY LOCATION BRING BRANCH LINES TO SAME LEVEL IN TRENCH AS SHOWN ON PLANS 10" 10" 36" MIN. FINISHED GRADE VALVE (TYP) 3/4" STAINLESS STEEL ROD AND AMP EBAA SERIES 1600 DRILL 1/4" HOLE IN PVC PIPE KNOT WIRE TRACER WIRE (TYP) 12" x 12" x 4" CONC. SLAB IN GRASSY AREAS ONLY CHILLED WATER BRANCH CONNECTION 45 MJ BEND FITTING TEE/REDUCING TEE MJ X MJ X MJ 12" X 12" X 6" CONCRETE PAD (TYP) PVC 36" MIN. 3/4" STAINLESS STEEL ROD AND AMP EBAA SERIES " VALVE BOX ^ TO PIPE TRACER WIRE (TYP) 12" x 12" x 4" CONC. SLAB IN GRASSY AREAS ONLY CHILLED WATER BUTTERFLY VALVE CHILLED WATER JUNCTION BOX DETAIL SEE DIMENSION PLAN AND ASSOCIATED DETAILS FOR FINAL SURFACE TREATMENT UNDERGROUND MARKING TAPE (2) 24" ABOVE PIPE UNDERGROUND MARKING TAPE (2) 24" ABOVE PIPE* KNOT WIRE DRILL 1/4" HOLE IN PVC PIPE DUCTILE IRON CAP VALVE (TYP) 12" X 12" X 6" CONCRETE PAD (TYP) FUTURE CABLE BY OWNER SATISFACTORY SOIL BACKFILL IN MAX 6" LIFTS COMPACTED TO 85% DENSITY 3" PVC CONDUIT 36" RAD. BEND 1" BRAIDED PULL ROPE (TYP.) PLAN VIEW 24" MIN. JUNCTION BOX 14" MIN. SECTION NOTES: 1. LOCATE JUNCTION BOXES AS FOLLOWS: A. AT EVERY TEE IN THE CONDUIT. B. AFTER 360 DEGREES OF BEND IN THE CONDUIT. 6" IN GRASS AREAS, 24" IN PLANT BEDS UNDERGROUND MARKING TAPE (2) 24" ABOVE PIPE* 4" JUNCTION BOX SEE MU STANDARD SPEC. SECTION CHW LINES 14" PLAN VIEW (AT TEE) 3/4" CRUSHED STONE 12" DEEP SATISFACTORY SOIL BACKFILL IN MAX 6" LIFTS COMPACTED TO 85% DENSITY 6" IN GRASS AREAS, 24" IN PLANT BEDS 1600 Baltimore, Suite 300 Kansas City, Missouri, Phone: Fax: Mechanical and Electrical Engineers Since 1933 u:\2017\17-114\ som extend utilities\c603-utility-hw-details.dwg 24" MIN. 5 36" MIN. DR 11 TYPE PE-RT PREINSULATED PIPE 4 18" MIN. VALVE BOX ^ TO PIPE TRACER WIRE (TYP) FUSED FLANGE INTEGRAL WITH DR 11 TYPE PE-RT PIPE. RE:SPECS BOLT FLANGE TO DIP VALVE STAINLESS STEEL BACKUP PLATE SECTION EPDM SEAT HOT WATER BUTTERFLY VALVE VENT BOX SEE SPEC. SECTION " BALL VALVE 1" VENT LINE TYPE K COPPER - ROUTE TO VENT BOX CHW LINES CHILLED WATER VENT BOX DETAIL 12" x 12" x 4" CONC. SLAB IN GRASSY AREAS ONLY KNOT WIRE DRILL 1/4" HOLE IN PVC PIPE DUCTILE IRON CAP VALVE (TYP) 12" X 12" X 6" CONCRETE PAD (TYP) 3/4" CRUSHED STONE 12" DEEP 1" TAPPING SADDLE NOTES: 1. LOCATE VENT BOXES AS FOLLOWS: A. AS REQUIRED TO VENT NEW SECTION OF LOOP PIPING DURING INITIAL FILL AND TEST. BACKFILL ALL HOT WATER VALVES WITH 2" GILSULATE RE: SPECS 1 3 PIPE DIA. UNDISTURBED SOIL PIPE DIA. SEE DIMENSION PLAN AND ASSOCIATED DETAILS FOR FINAL SURFACE TREATMENT UNDERGROUND MARKING TAPE (2) 24" ABOVE PIPE 12" 12" UNDISTURBED SOIL 7 36" MIN. 36" MIN. 4" 4" SATISFACTORY SOIL BACKFILL OR MoDOT TYPE 5 STONE IN MAX. 6" LIFTS. COMPACT TO 85% DENSITY. TRACER WIRE TAPED TO PIPE EVERY 5' WITH DUCT TAPE PVC WATER LINE MAX 3/4" CRUSHED STONE LAY WATER LINE ON 4" BED OF CRUSHED STONE WATER MAIN TRENCH NOT IN PAVEMENT SATISFACTORY SOIL BACKFILL OR MoDOT TYPE 5 STONE IN MAX. 6" LIFTS. COMPACT TO 95% DENSITY. TRACER WIRE TAPED TO PIPE EVERY 5' WITH DUCT TAPE PVC WATER LINE MAX 3/4" CRUSHED STONE LAY WATER LINE ON 4" BED OF CRUSHED STONE WATER MAIN TRENCH UNDER PAVEMENT 36" MIN. 1/3 PIPE DIA. UNDISTURBED SOIL SEE DIMENSION PLAN AND ASSOCIATED DETAILS FOR FINAL SURFACE TREATMENT 1 3 PIPE DIA. 3" PVC CONTROL CONDUIT (BOTTOM OF CONDUIT EVEN WITH BOTTOM OF PIPE.) 36" MIN. 4" UNDISTURBED SOIL 3" PVC CONTROL CONDUIT (BOTTOM OF CONDUIT EVEN WITH BOTTOM OF PIPE.) 9 8 4" 12" MIN. UNDERGROUND MARKING TAPE (2) 24" ABOVE PIPE 12" 12" 12" MIN. MAX 3/4" CRUSHED STONE LAY WATER LINE ON 4" BED OF CRUSHED STONE CHILLED WATER TRENCH NOT IN PAVEMENT MAX 3/4" CRUSHED STONE SATISFACTORY SOIL BACKFILL OR MoDOT TYPE 5 STONE IN MAX. 6" LIFTS. COMPACT TO 95% DENSITY. TRACER WIRE TAPED TO PIPE EVERY 5' WITH DUCT TAPE PVC WATER LINES LAY WATER LINE ON 4" BED OF CRUSHED STONE CHILLED WATER TRENCH UNDER PAVEMENT TRACER WIRE TAPED TO PIPE EVERY 5' WITH DUCT TAPE PVC WATER LINES 36" MIN. 1/3 PIPE DIA. UNDISTURBED SOIL SEE DIMENSION PLAN AND ASSOCIATED DETAILS FOR FINAL SURFACE TREATMENT 1 3 PIPE DIA " MIN. 4" UNDISTURBED SOIL 11 4" 12" MIN. UNDERGROUND MARKING TAPE (2) 24" ABOVE PIPE 12" 12" 12" MIN. MAX 3/4" CRUSHED STONE LAY WATER LINE ON 4" BED OF CRUSHED STONE HOT WATER TRENCH NOT IN PAVEMENT MAX 3/4" CRUSHED STONE HOT WATER TRENCH UNDER PAVEMENT SATISFACTORY SOIL BACKFILL OR MoDOT TYPE 5 STONE IN MAX. 6" LIFTS. COMPACT TO 95% DENSITY. TRACER WIRE TAPED TO PIPE EVERY 5' WITH DUCT TAPE HDPE PE-RT WATER LINES LAY WATER LINE ON 4" BED OF CRUSHED STONE TRACER WIRE TAPED TO PIPE EVERY 5' WITH DUCT TAPE HDPE PE-RT WATER LINES GENERAL SITE NEW SCHOOL OF MUSIC EXTEND UTILITIES JOB NO. CP DATE: 11/9/2017 SITE UTILITY DETAILS - 1 C603 UNIVERSITY OF MISSOURI - COLUMBIA

5 ^ WATER MAIN GATE VALVE WATER LINE FLUSHING 1 2 GENERAL SITE NEW SCHOOL OF MUSIC EXTEND UTILITIES 1600 Baltimore, Suite 300 Kansas City, Missouri, UNIVERSITY OF MISSOURI - COLUMBIA Phone: Fax: Mechanical and Electrical Engineers Since 1933 u:\2017\17-114\ som extend utilities\c603-utility-hw-details.dwg JOB NO. CP DATE: 11/9/2017 SITE UTILITY DETAILS - 2 C604

6 REMOVE AND REPLACE CURB SAWCUT ALL EDGES. REMOVE AND REPLACE SIDEWALK. SAWCUT AT NEAREST JOINT MIDDLEBUSH HALL HWS HW1 HWR FREDRICK APARTMENTS UNIVERSITY AVENUE DUMAS APARTMENTS FUTURE WATER MAIN (NOT IN CONTRACT) HWS HWR EXIST. 12" CWR EXIST. 12" CWS REMOVE AND REPLACE ASPHALT. SAWCUT ALL EDGES FUTURE CHILLED WATER SUPPLY AND RETURN (NOT IN CONTRACT) UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET TMH-4 E-020A HITT STREET REMOVE AND REPLACE CURB SAWCUT ALL EDGES. PROTECT EXIST. CURB TO REMAIN E CWS A CWR A.1 CW B HW REMOVE AND REPLACE SIDEWALK. SAWCUT AT NEAREST JOINT HW CW2 B.8 CONTRACTOR SHALL PROTECT EXISTING PULL BOX THROUGHOUT CONSTRUCTION C SCHOOL OF MUSIC UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR CURB AND SIDEWALK CONSTRUCTION FROM THE NORTH CURB OF UNIVERSITY AVE NORTH. D REMOVE AND REPLACE SIDEWALK. SAWCUT AT NEAREST JOINT MUMFORD HALL E REMOVE AND REPLACE CURB SAWCUT ALL EDGES. CONTRACTOR SHALL PROTECT EXISTING LIGHT POLE THROUGHOUT CONSTRUCTION. BRACE EXISTING POLE AS NECESSARY FOR CONSTRUCTION F F.1 LEGEND SAW CUT EXISTING PAVEMENT REMOVE AND REPLACE EXISTING ASPHALT PAVEMENT REMOVE AND REPLACE EXISTING SIDEWALK REMOVE AND REPLACE EXISTING CURB AND GUTTER 0 SCALE IN FEET Baltimore, Suite 300 Kansas City, Missouri, Phone: Fax: Mechanical and Electrical Engineers Since 1933 FINE ARTS PAVEMENT REPLACEMENT PLAN u:\2017\17-114\ som extend utilities\c605-pavement layout.dwg a " R 2" TYPE BP-2 ASPHALTIC CONCRETE SURFACE COURSE 8" MoDOT PLANT MIX BITUMINOUS COURSE 6" MoDOT TYPE 1 AGGREGATE BASE COURSE 6" MIN. SCARIFIED AND COMPACTED SUBGRADE, OR COMPACTED SUITABLE MATERIAL PER SPECIFICATIONS FULL DEPTH ASPHALT PAVEMENT REPLACEMENT 1 1 2" R 1 1 2" R 1 2 " R STRAIGHT BACK CURB & GUTTER (TYPE CG-1) TYPICAL CURB REPLACEMENT GENERAL NOTES: " EXPANSION JOINTS WITH 2' DOWELS SHALL BE PLACED AT RADIUS POINTS AND AT 150' INTERVALS. THESE DOWELS SHALL BE GREASED AND WRAPPED ON ONE END WITH EXPANSION TUBES DEEP CONTRACTION JOINTS SHALL BE INSTALLED AT APPROXIMATELY 10' INTERVALS. THESE JOINTS SHALL PASS ACROSS THE ENTIRE CURB SECTION. 3. FIX DOWELS WITH BAR SUPPORTS. 4. CONCRETE SHALL CONFORM TO SPECIFICATIONS. 5. USE 5 8" Ø x 2' SMOOTH DOWELS AT LOCATIONS SHOWN ON EACH TYPICAL SECTION. 6. DEPTH OF CURB SHALL BE A MINIMUM OF 8 THRU THE ACCESSIBLE RAMPS. 7. CURBS SHALL BE POURED MONOLITHIC WITH FULL DEPTH CONCRETE PAVEMENT, AS INDICATED IN THE PLANS. OMIT CUTTER LINE JOINT, UNLESS SPECIFICALLY SHOWN ON THE PLANS. 8. SEE DIMENSION & GRADING PLANS FOR LOCATION OF WET & DRY CURBS. 9. OMIT CONSTRUCTION JOINT AND POUR CURBS MONOLITHIC WITH NEW PAVEMENT, AS INDICATED IN THE PLANS. ANY VARIATIONS MUST BE APPROVED BY THE ENGINEER, PRIOR TO INSTALLATION. JOINT SEALER 1 2 " RUBBER EXPANSION JOINT 3 4" MoDOT TYPE 1 AGGREGATE BASE SIDEWALK NOTES: SLOPE 1% MIN., 1.5% MAX 4,000 PSI REINFORCED CONCRETE WITH #4 REBAR AT 18' O.C.E.W ON BAR SUPPORTS PROOF ROLL SUBGRADE SEE SPECIFICATIONS 1. CONCRETE SHALL CONFORM TO SPECIFICATIONS " RUBBER EXPANSION JOINTS SHALL BE PLACED WHERE WALK ABUTS JUNCTION OF EXISTING WALK, CONCRETE CURBS, DRIVEWAYS, AND SIMILAR STRUCTURES, AND AS SHOWN IN THE PLAN DRAWINGS. 3. CONTROL JOINTS SHALL BE PLACED AS SHOWN ON THE DRAWINGS OR AT DISTANCE NOT EXCEEDING THE LENGTH TO WIDTH RATIO OF SAWCUT ALL CONTROL JOINTS. 5. KEY ALL CONSTRUCTION JOINTS. 6. ALL JOINTS SHALL BE SEALED WITH VULCAN 45 OR DOW CORNING 888 SILICON JOINT SEALANT 1 4 " R EXPANSION JOINT NOTE: ALL JOINTS SHALL BE SEALED STANDARD SIDEWALK AND JOINT DETAILS 6" JOINT SEALER BELOW V-GROOVE V-GROOVE CONTROL JOINT 3 8 " V-GROOVE ALL CONTROL JOINTS SHALL FIRST BE 1 8" STRAIGHT SAWCUTS BY 1 1 2" DEEP. AFTER THE CONCRETE HAS HARDENED, CONTRACTOR SHALL BEVEL CUT THE CONTROL JOINTS WITH WITH A 3 8" V-GROOVE BLADE. GENERAL SITE NEW SCHOOL OF MUSIC EXTEND UTILITIES JOB NO. CP DATE: 11/9/2017 C605 UNIVERSITY OF MISSOURI - COLUMBIA SITE PAVEMENT REPLACEMENT PLAN

7

8

9

10

11

12

13

14

15

16

17

18

19

ONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,

ONE PIPE LENGTH MAX (REFER TO 1/4/FT SLOPE (MIN) 5'-0 (MIN) OR 4 LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4x6 REFER TO TYPICAL EXCAVATION, VENT CAP (MUSHROOM TYPE) SOLID CAP EXIST GRADE MIN BUILDING REFER TO NOTE #4 MIN CONCRETE SIDEWALK CURB OR EDGE OF SIDEWALK STREET CLEANOUT (REFER TO NOTE #3) VENT PIPE 4" PVC 6" PVC CLEANOUT CONCRETE

More information

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of chilled water piping installed for the University of Missouri. DESIGN GUIDELINES: 1. Materials 1.1. Pipe

More information

MAXIMUM TRENCH WIDTH AS REQUIRED SEE MEASUREMENT AND PAYMENT SECTION OF SPECIFICATIONS

MAXIMUM TRENCH WIDTH AS REQUIRED SEE MEASUREMENT AND PAYMENT SECTION OF SPECIFICATIONS REFER TO PAVEMENT PATCHING DETAIL FOR REQUIREMENTS ABOVE FINISHED SUBGRADE EL. MAXIMUM ALLOWABLE WIDTH OF PAVEMENT PATCH, SEE MEASUREMENT AND PAYMENT SECTION OF SPECIFICATIONS MAXIMUM TRENCH WIDTH AS REQUIRED

More information

D-1 THE CITY OF HARRISBURG 1 1/2" MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2" MIN. ID-2 BINDER COARSE

D-1 THE CITY OF HARRISBURG 1 1/2 MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2 MIN. ID-2 BINDER COARSE EXISTING STREET SURFACE 1 1/2" MIN. ID-2 BINDER COARSE 1 1/2" MIN. ID-2 WEARING COARSE AC-20 SEALER (ALL AROUND) 8" CLASS A P.C. CONCRETE SAW CUT TOP OF CONCRETE SHALL MEET SURFACE OF EXISTING CONCRETE.

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 Project: Coteau Street & Utility Improvements Bid Date: 1:00 P.M., Local Time, March 20, 2017 Bid Location: Office of the City Administrator/Clerk, City of Lake Benton 106 S. Center Street

More information

DRINKING WATER LINE INSTALLATION STANDARDS

DRINKING WATER LINE INSTALLATION STANDARDS 30" MIN. 72" MAX. ORIGINAL GROUND SURFACE BACKFILL WITH A-1-a OR NATIVE MATERIAL PER APWA STANDARDS. MATERIAL MUST MEET APWA STANDARD FOR GRANULAR BORROW. COMPACT BACKFILL ABOVE PIPE ZONE TO 96% DENSITY

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

PERMANENT PAVEMENT REPAIR NO SCALE

PERMANENT PAVEMENT REPAIR NO SCALE SAWCUT EXISTING PAVEMENT 2" BITUMINOUS CONCRETE SURFACE COURSE, CLASS 2 (MIN) CLEAN EDGE PRIOR TO PAVING AND PAINT WITH LIQUID BITUMEN. INSTALL SEALANT OVER JOINT UPON COMPLETION 2" BITUMINOUS CONCRETE

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required

More information

2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION CONTRACT NO ADDENDUM NUMBER TWO. Scope of this Addendum

2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION CONTRACT NO ADDENDUM NUMBER TWO. Scope of this Addendum D E N V E R I N T E R N A T I O N A L A I R P O R T CONTRACT NO. 201208796 ADDENDUM NUMBER TWO Scope of this Addendum Addendum Number Two includes modifications to the following Contract Documents issued

More information

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 28, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE TORONTO TRANSPORTATION March 2012 TS 803 DUCTS TABLE OF CONTENTS 1. DRAWINGS TTD 803.001 TTD 803.010 DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE 2. CONSTRUCTION

More information

APPENDIX A MEASUREMENT AND PAYMENT

APPENDIX A MEASUREMENT AND PAYMENT P-150 DEMOLITION 4.01 Removal of pavement shall be measured per square yard based on the area shown on the plans. Any pavement removed outside the designed limits of removal because the pavement was damaged

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INSTALL MANHOLE LIDS FLUSH WITH EXISTING GROUND SURFACE.

More information

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES PART 1 DESIGN DIRECTIVES 1.1 GENERAL SECTION 02801 MISCELLANEOUS SITE DETAILS A. This section consists of AutoCAD drawings depicting typical landscape details governing the installation of miscellaneous

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway. Last Revision by CO Special Provisions: 09/14/18 Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2018-143 ((2360) PLANT MIXED ASPHALT PAVEMENT (MSCR)) when using this writeup.

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL SECTION 321200 - PAVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The Contractor for this work shall be held to have read all of the Bidding Requirements, the Proposal Forms, the General Conditions of

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION ITEM NO. 812 WATER MAIN INSTALLATION 812.1 DESCRIPTION: This item shall consist of water main installation in accordance with these specifications and as directed by the Engineer. 812.2 MATERIALS: The

More information

ITEM NO. 824 SERVICE SUPPLY LINES (WATER)

ITEM NO. 824 SERVICE SUPPLY LINES (WATER) ITEM NO. 824 SERVICE SUPPLY LINES (WATER) 824.1 DESCRIPTION: This item shall consist of water service supply lines installation and adjustment installed in accordance with these specifications and as directed

More information

Department of Building and Zoning Approaches and Sidewalks for ONE AND TWO FAMILY CONSTRUCTION

Department of Building and Zoning Approaches and Sidewalks for ONE AND TWO FAMILY CONSTRUCTION Department of Building and Zoning Approaches and Sidewalks for ONE AND TWO FAMILY CONSTRUCTION GENERAL ITEMS SUBGRADE Prior to pouring concrete all subgrades must be wetted and compacted. All formwork

More information

STANDARD CONSTRUCTION DETAILS SANITARY SEWER REVISED MARCH 2018 DEPARTMENT OF ENGINEERING

STANDARD CONSTRUCTION DETAILS SANITARY SEWER REVISED MARCH 2018 DEPARTMENT OF ENGINEERING STANDARD CONSTRUCTION DETAILS REVISED MARCH 2018 GENERAL NOTES EMBEDMENT DETAILS EMBEDMENT DETAILS TWO-WAY CLEANOUT - EXISTING LATERAL TWO-WAY CLEANOUT - NEW CONSTRUCTION TYPICAL SEWER HOUSE SERVICE CONNECTION

More information

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 23, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS

More information

SANITARY SEWER GENERAL NOTES. Sanitary Sewer Construction Notes

SANITARY SEWER GENERAL NOTES. Sanitary Sewer Construction Notes Sanitary Sewer Construction Notes 1. All public sanitary sewer systems shall be constructed in accordance with the latest edition of the Washington State Department of Transportation Standard Specifications

More information

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER)

San Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER) San Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER) 824.1 DESCRIPTION: This item shall consist of water service supply lines adjustment and installation

More information

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone Entllus DUMPSTER PAD AND REPLACE WITH NEW BETWEEN THESE TWO POINTS SAWCUT ALONG DEMO LINE REMOVE PARKING SPOTS CURB, GUTTER, ASPHALT AND LANDSCAPING, WITHIN HATCHED AREA FOR NEW ADDITION CURB & GUTTER

More information

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860)

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860) City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT 06457 TEL: (860) 638-3500 FAX: (860) 343-8091 GENERAL REQUIREMENTS WATER MAIN AND SERVICE INSTALLATION JANUARY 2017 WATER MAINS:

More information

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE

More information

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2015 REVISIONS

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2015 REVISIONS , NEVADA YEAR 2015 REVISIONS SECTION TITLE AND REVISIONS SUMMARY EFFECTIVE DATE 217.S2 "Residential Curb and Gutter, R-Type" - New drawing to accommodate ADA requirements. 223 "Residential Driveway" -

More information

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT]

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT] PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT] A. - General. B. - Streets. C. - Stormwater drainage system. D. - Water

More information

SECTION PUBLIC WATER SERVICE CONNECTIONS

SECTION PUBLIC WATER SERVICE CONNECTIONS SECTION 33 14 14 PUBLIC WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for water service connections to small commercial, light industrial, and residential

More information

YAKIMA COUNTY, WASHINGTON. Special Provisions For Water Main Construction

YAKIMA COUNTY, WASHINGTON. Special Provisions For Water Main Construction YAKIMA COUNTY, WASHINGTON Special Provisions For Water Main Construction The 2014 Standard Specifications for Road, Bridge, and Municipal Construction as prepared by the Washington State Department of

More information

ISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS

ISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS ISSUED: 1/16/15 1.0 COMBINATION 6'' CURB & GUTTER ISSUED: 1/16/15 1.0 SIDEWALK DETAIL ISSUED: 7/7/15 1.0 VALLEY GUTTER ISSUED: 2/11/16 1.0 BRICK PAVER SIDEWALK DETAIL 1''=1' WIDTH VARIES SEE SHEET 2 MIN.

More information

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST Village of Vernon Hills Community Development Department - Building Division 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http://www.vernonhills.org INSPECTION TIMING

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. All private construction and/or maintenance activities which take place within the City right-of-way are subject to oversight

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

ROUTE 3 OLD WINTHROP ROAD PROJECT LOCATION I-95 PROJECT LOCATION WESTERN AVENUE NORTH BELFAST AVE.

ROUTE 3 OLD WINTHROP ROAD PROJECT LOCATION I-95 PROJECT LOCATION WESTERN AVENUE NORTH BELFAST AVE. PROJECT LOCATION PROJECT LOCATION NORTH BELFAST AVE. ROUTE 3 WESTERN AVENUE I-95 OLD WINTHROP ROAD INSTALL NEW 3" x 1" CC DOUBLE STRAP SERVICE SADDLE, 1" CC x 1 1/4" COMPRESSION CORPORATION AND 1 1/4"

More information

SPECIAL SPECIFICATION 6664 Level (3) Communications System

SPECIAL SPECIFICATION 6664 Level (3) Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6664 Level (3) Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Level (3) Communications,

More information

SPECIAL SPECIFICATION 6658 Time Warner Communications System

SPECIAL SPECIFICATION 6658 Time Warner Communications System 2004 Specifications CSJ 1200-05-014 1. Description. SPECIAL SPECIFICATION 6658 Time Warner Communications System A. This Item will govern the installation of all facilities belonging to Time Warner Cable

More information

A. Testing Laboratory Services: Section B. Excavation, Site Fill and Rough Grading: Section Sub-Base Course Material (If requested).

A. Testing Laboratory Services: Section B. Excavation, Site Fill and Rough Grading: Section Sub-Base Course Material (If requested). SECTION 02500 - PART 1 - GENERAL 1.01 RELATED WORK SPECIFIED ELSEWHERE A. Testing Laboratory Services: Section 01411. B. Excavation, Site Fill and Rough Grading: Section 02200. C. Concrete: Section 03310.

More information

SANITARY MANHOLE S-1 ENGINEERING DEPARTMENT PLATE NUMBER NEENAH R-1733 CASTING ASSEMBLY OR AS NOTED ON PLAN OR APPROVED EQUAL.

SANITARY MANHOLE S-1 ENGINEERING DEPARTMENT PLATE NUMBER NEENAH R-1733 CASTING ASSEMBLY OR AS NOTED ON PLAN OR APPROVED EQUAL. "INFI-SHIELD" SEAL OR EQUAL. NEENAH R-1733 CASTING ASSEMBLY OR AS NOTED ON PLAN OR APPROVED EQUAL. 27" HDPE ADJUSTING RINGS (2 MIN., 1' MAX. OF RINGS). ECCENTRIC CONE 4.0' HIGH 48" 5" P2 PROFILE GASKET

More information

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual [Type text] Heber Light & Power Developers & Excavators Electrical Service Requirements Manual May 2017 E.1.1 - GENERAL REQUIREMENTS PURPOSE This section was prepared to aid developers, contractors, engineers

More information

FOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS

FOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS FOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS Rev: 3/26/18 Pipe and fittings used in sanitary sewer construction shall

More information

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

CITY OF GRANBURY STANDARD SPECIFICATIONS For Public Works Projects

CITY OF GRANBURY STANDARD SPECIFICATIONS For Public Works Projects Updated 11/20/2015 CITY OF GRANBURY STANDARD SPECIFICATIONS For Public Works Projects 10/29/2018 JWooldridge TABLE OF CONTENTS STANDARD CONSTRUCTION SPECIFICATIONS FOR PUBLIC WORKS PROJECTS A. WATER DISTRIBUTION

More information

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS CS-2-01. GENERAL: Trench excavation shall conform with the City Standard Specifications. In general a trench is defined as an excavation in which

More information

TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT

TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT COMPACTED BACK FILL COMPACTED BACK FILL UNDISTURBED TRENCH WALL INITIAL BACKFILL SPRING LINE OF PIPE HAUNCHING EMBEDMENT MATERIAL SPRING LINE OF PIPE HAUNCHING EMBEDMENT MATERIAL MIN. BEDDING BEDDING MINIMUM

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

The Metropolitan Sewer District of Greater Cincinnati

The Metropolitan Sewer District of Greater Cincinnati The Metropolitan Sewer District of Greater Cincinnati Dry Run Area Sewers, Phase 1 and Phase 2 Contract A, Project ID 10270000_10270005 Date Issued: 03/25/2010 ADDENDUM NO. 2 This addendum will only be

More information

PERMEABLE PATH PAVING

PERMEABLE PATH PAVING SAWCUT CONTROL JOINT: 1 WIDE x 1" DEEP SIGN B: R5-1 24" (1 REQ'D) SIGN C: R5-11 24"x 1 (1 REQ'D) PADOT STANDARD SIGNAGE INSTALL PER PADOT SPECIFICATIONS. HIGH INTENSITY PRISMATIC SIGN ON 0.080" THICK ALUMINUM

More information

ANY SPECIFICATION DRAWINGS OR DATED PRIOR TO SEPTEMBER 2015 WILL NOT BE HONORED.

ANY SPECIFICATION DRAWINGS OR DATED PRIOR TO SEPTEMBER 2015 WILL NOT BE HONORED. November 30, 2015 Dear STEMC Member and Contractors, Over the years, STEMC has made many changes to its member requirements for new services and specifications associated with those requirements. As a

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

This type of masonry shall consist of brick laid in full beds of cement mortar.

This type of masonry shall consist of brick laid in full beds of cement mortar. SECTION 11.0 DRAINAGE STRUCTURES 11.01 Scope of Work This item shall consist of installation and construction of storm drainage pipes, culverts, basins, headwalls, manholes, junction boxes, head ditches,

More information

CONDITIONS EXISTING EXISTING CONDITIONS SURVEY PROVIDED BY EGAN, FIELD & NOWAK ON FEBRUARY 20, PRELIMINARY - NOT FOR CONSTRUCTION

CONDITIONS EXISTING EXISTING CONDITIONS SURVEY PROVIDED BY EGAN, FIELD & NOWAK ON FEBRUARY 20, PRELIMINARY - NOT FOR CONSTRUCTION K:\TWC_LDEV\\ABRA\Maple Grove, \ Design\CAD\PlanSheets\C- CONDITIONS.dwg April 4, 018 - :44pm 40 0 8 CONDITIONS SURVEY PROVIDED EGAN, FIELD & NOWAK ON FEBRUARY 0, 018. LIMITS OF CONSTRUCTION OVERHEAD POWER

More information

400 watt, high pressure sodium. Type C watt, high pressure sodium Collector Street Light Units

400 watt, high pressure sodium. Type C watt, high pressure sodium Collector Street Light Units CITY OF MEDFORD PUBLIC WORKS DEPARTMENT ENGINEERING & DEVELOPMENT DIVISION TRAFFIC ENGINEERING SECTION April 15, 2010 Street Lighting Standards and Specifications Luminaire Types Type R-100 100 watt, high

More information

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (URD) Index General Discussion... 1-2 Description... 3-7 Drawings (Available

More information

City of Naples Utilities Department Wastewater Collections Division

City of Naples Utilities Department Wastewater Collections Division City of Naples Utilities Department Wastewater Collections Division Request for Proposal Reclaimed Water Fire Hydrant & Water Service Installations February 2015 Reclaimed Water Fire Hydrant & Services

More information

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment

More information

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance To: Project Name: Bidding Company Site Work Project Contact: Address: Various Phone: Fax: Bid Number: Project Location: Various, Anywhere, PA Bid Date: 7/16/2014 Clarifications: This takeoff does not include

More information

M&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS MAYOR PRO-TEMPORE, DISTRICT II DISTRICT VIII COUNCIL MEMBER

M&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS MAYOR PRO-TEMPORE, DISTRICT II DISTRICT VIII COUNCIL MEMBER LAREDO INTERNATIONAL AIRPORT M&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS 78041 CITY OF LAREDO, TEXAS HONORABLE RAUL G. SALINAS, MAYOR ESTEBAN RANGEL MAYOR PRO-TEMPORE, DISTRICT

More information

SECTION CONCRETE PAVING

SECTION CONCRETE PAVING PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 13 13 CONCRETE PAVING A. Extent of concrete curbs, walks, and paving as show on drawings B. Earthwork and prepared sub-base C. Concrete and related materials

More information

TYPE "A" CATCH BASIN

TYPE A CATCH BASIN 27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

SECTION 3200 CONCRETE CURB AND GUTTER

SECTION 3200 CONCRETE CURB AND GUTTER PART 1 GENERAL 1.01 Section Summary SECTION 3200 CONCRETE CURB AND GUTTER CONCRETE CURB AND GUTTER A. Construction of concrete curb and gutter. 1.02 Related Sections A. Section 2900 Aggregate Base Course.

More information

SECTION 1500 REMOVALS

SECTION 1500 REMOVALS SECTION 1500 REMOVALS REMOVALS PART 1 GENERAL 1.01 Section Summary A. Removal of structures, obstructions, surfacing, and miscellaneous items. 1.02 Related Sections A. Section 1800 Excavation and Embankment

More information

CHAPTER 3 - PRESSURE IRRIGATION

CHAPTER 3 - PRESSURE IRRIGATION CHAPTER 3 - PRESSURE IRRIGATION 3.1 GENERAL This division covers furnishing and installing pressure pipe as shown on the Drawings or established in the field, and all flushing, testing, repairing, as required

More information

SECTION 12 INDEX CONCRETE CURBS AND GUTTERS

SECTION 12 INDEX CONCRETE CURBS AND GUTTERS SECTION 12 INDEX CONCRETE CURBS AND GUTTERS 1. SCOPE OF WORK. 12-2 2. MATERIALS. 12-2 3. CONSTRUCTION REQUIREMENTS.. 12-2 12-1 SECTION 12 CONCRETE CURBS AND GUTTERS 1. SCOPE OF WORK: This work shall consist

More information

Index to Technical Specifications

Index to Technical Specifications Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation

More information

Appendix 4. Bills of Quantities

Appendix 4. Bills of Quantities Appendix 4. Bills of Quantities 201 A4.1 Deep trench latrines Partitions of local materials 1m apart Timber foot rests and floor plates Lightweight timber frame Excavated soil (used for back-fill) Plastic

More information

CITY OF FARGO SPECIFICATION SANITARY SEWER

CITY OF FARGO SPECIFICATION SANITARY SEWER SECTION 1200 SECTION 1200 CITY OF FARGO SPECIFICATION SANITARY SEWER PART 1 DESCRIPTION OF WORK (revised March, 2007) The work to be done under these Specifications and the accompanying drawings consist

More information

Town of Huntertown Lima Road * PO Box 95 * Huntertown, IN Phone (260) * * Fax (260)

Town of Huntertown Lima Road * PO Box 95 * Huntertown, IN Phone (260) *   * Fax (260) HUNTERTOWN APPLICATION FOR NEW WATER AND SEWER SERVICES All requests for new water and sewer service shall be made to the Huntertown Utility Service Board for their approval before any connections can

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract

More information

CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS

CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS December 2012 CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions Specifications...

More information

Copper-Type K soft Drawn 40, 50 HDPE 100 and larger

Copper-Type K soft Drawn 40, 50 HDPE 100 and larger 1.0 GENERAL 1.1 Scope 1.1.1 The work covered by this section involves the installation of water and sewer service connections and all other associated work. 1.2 Authorization 1.2.1 Do not install service

More information

CHAPTER 6. Sanitary Sewer

CHAPTER 6. Sanitary Sewer CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION A. This section specifies the furnishing, installation, and connection of precast manholes and pullboxes with ducts

More information

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER COMMUNICATIONS LIGHTING Street Lighting Plan 710 Riser... 287 730 Collar for street light pole... 289 731 Pull box... 291 732 Trench for street light

More information

CHAPTER 3 - PRESSURE IRRIGATION

CHAPTER 3 - PRESSURE IRRIGATION CHAPTER 3 - PRESSURE IRRIGATION 3.1 GENERAL This division covers furnishing and installing pressure pipe as shown on the Drawings or established in the field, and all flushing, testing, repairing, as required

More information

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS 16.01 GENERAL Specifications in this section shall apply to the construction of storm sewer systems including excavation, trenching, backfilling,

More information

Section 403. DRAINAGE STRUCTURES

Section 403. DRAINAGE STRUCTURES 403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used

More information

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1 Section 7 Roadway GENERAL REQUIREMENTS...7-1 I. TYPICAL SECTION...7-1 7.1 LANE WIDTHS...7-1 7.2 SHOULDER WIDTHS...7-1 7.3 CROSS SLOPE...7-2 7.4 CURB AND UNDERDRAINS...7-2 7.5 SIDEWALKS AND DRIVEWAYS...7-2

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES

San Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES ITEM NO. 813 WATER SERVICE FOR FIRELINES 813.1 DESCRIPTION: This item shall consist of water service for fire line installations in accordance with these specifications and as directed by the Engineer.

More information

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis. PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: Section 02775 1. Reinforced concrete sidewalks. 2. Wheelchair Ramps. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor

More information

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6 SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO. 18-4501 SOLICITATION NO. CO-00198 ADDENDUM 6 (September 10, 2018) To Respondent of Record: This addendum, applicable to work referenced

More information