1 SPECIFICATIONS FOR CAST-IN-PLACE CONCRETE SLAB DUNN COUNTY TRANSFER STATION MENOMONIE, WISCONSIN 1. SUMMARY A. Work includes: 1. Pavement removal, topsoil stripping, and site grading for concrete slab. 2. Furnishing and installing cast-in-place concrete slab. 3. Topsoiling, fertilizing, seeding, and mulching to restore disturbed areas adjacent to new concrete slab. B. The following work will be performed by others: 2. DEFINITIONS 1. Furnishing, installing, and maintaining erosion control measures at the site. A. References to "WIDOT Std. Spec." shall mean Wisconsin Dept. of Transportation, Standard Specifications for Highway and Structure Construction, latest edition, including current Supplemental Specifications. B. References to "Owner" shall mean Dunn County. C. References to "Engineer" shall mean Ayres Associates. 3. PERMITS AND CODES A. Provide all necessary permits, approvals, and licenses and pay all fees, taxes, and royalties, unless otherwise indicated. Comply with local and municipal ordinances and applicable state and national codes. 4. COORDINATION A. Additional construction is being performed by others at the transfer station site. Contractor shall coordinate its construction schedule with other contractors at the site. B. Cast-in-place concrete slab is intended to have precast concrete bunker panels installed in a specific configuration. C. Obtain Owner or Engineer approval for cast-in-place concrete slab dimensions, orientation, and location. 5. WORK HOURS A. Work shall be conducted between the hours of 7:00 a.m. and 6:00 p.m. on normal work days, unless approved for unusual circumstances. B. The hours of operation of the Dunn County Transfer Station are 5:30 a.m. to 4:00 p.m. The public is allowed at the facility on Mondays from 6:30 a.m. to 4:30 p.m., Wednesdays from 4:00 p.m. to 7:00 p.m., and Saturdays from 7:00 a.m. to noon. Page 1 of 5

2 6. SUBMITTALS A. Submit the following to Engineer for review prior to fabrication, delivery, or execution of the applicable work: 1. Three copies of slab dimension and reinforcement shop drawings. 2. Two copies of concrete job mix. 3. Three copies of chemical hardener product data. B. Submit the following to Engineer after completion of the applicable work: 1. One copy of delivery ticket for each load of concrete delivered to project. C. Submittals for proposed products shall not be used in the work unless they have been reviewed and bear the stamp and signature of Engineer. Submittals will only be reviewed for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Contractor shall be responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, coordinating his or her work with that of all other trades, and performing all work in a safe and satisfactory manner. Corrections or comments made on submittals shall not relieve Contractor from compliance with requirements of Drawings and Specifications and shall not be considered an order for extra work. 7. TESTING A. Concrete: Engineer may perform tests to verify that concrete slump, air content, temperature, and strength meet specified requirements. However, these tests are not intended to provide Contractor with information he may need to assure that materials and workmanship meet requirements of specifications, and their performance will not relieve Contractor of responsibility of performing his own tests for that purpose. 8. VERIFICATION OF CONDITIONS A. Verify grades, lines, levels, locations, and dimensions, as shown, and inspect surfaces that are to receive work before proceeding. Contractor shall be solely responsible for accuracy of measurements and laying out of its work. Notify Engineer in writing in case of unsuitable conditions, defective substrates, or discrepancies in Contract Documents. Starting of work shall imply acceptance of conditions. 9. PROTECTION A. Protect improvements on site and on adjoining properties. Provide barricades, coverings, or other types of protection as necessary to prevent damage and to safeguard against injury. Restore to original condition improvements damaged by the work or improvements which required temporary removal during construction. 10. TRAFFIC CONTROL A. Furnish and maintain construction barricades and traffic control devices when working in areas open to traffic. Barricades and traffic control devices shall comply with Wisconsin Manual on Uniform Traffic Control Devices. 11. UTILITIES A. Contractor shall notify all utilities that might have facilities in project area at least three working days in advance of starting construction. Have underground facilities located and flagged prior to beginning work. Page 2 of 5

3 12. DEMOLITION A. Remove pavements and other improvements within construction limits as shown and as required for construction. B. Saw cut existing surfacing to provide a straight, vertical joint. 13. TOPSOIL STRIPPING A. Strip topsoil from project area to whatever depths encountered; prevent intermingling with underlaying subsoil or other objectionable material. Remove heavy growths of grass from areas before stripping topsoil. B. Stockpile topsoil in storage piles in areas as designated by Engineer. Construct storage piles to freely drain surface water. Cover or sprinkle water on storage piles to prevent windblown dust. 14. GRADING A. Excavate to achieve necessary dimensions, extending a sufficient distance from construction as required for bracing, supports, concrete formwork, and other required construction. B. Subbase for concrete slab shall be select soils complying with ASTM D247 soil classification group GW (well-graded gravel), GP (poorly-graded gravel), SW (well-graded sand), or SP (poorly-graded sand). Aggregate shall pass a 1-1/2 in. sieve and not more than 35% shall be retained on a No. 10 sieve. Maximum of 5% by weight shall pass a No. 200 sieve. On-site soils are not approved for concrete slab subbase material. C. Subgrade and subbase for concrete slabs shall be compacted to 92% of Modified Proctor density, ASTM D CAST-IN-PLACE CONCRETE SLAB A. Products: 1. Cement: Portland cement, ASTM C150, Type I. 2. Aggregates: Fine and coarse aggregates, ASTM C33, consisting of clean, hard, durable sand and crushed rock, crushed gravel, or gravel. Coarse aggregate shall meet grading requirements for size number 67, 57, or 467. Maximum coarse aggregate size for each class of concrete shall be as indicated in schedule below. Ratio of coarse aggregate to fine aggregate shall not be less than 1:1 nor more than 2:1. 3. Water: Mixing water shall be potable, free of oil, acid, excessive alkalinity, organic matter, and salts. 4. Admixtures: Air-entrained admixture shall conform to ASTM C260. Other admixtures which do not adversely affect strength and durability of concrete may be used with permission of A/E, if used in strict accordance with manufacturer's instructions. Care shall be exercised to assure that the admixture does not increase or decrease air content outside of allowable limits. Do not use salt or chemical anti-freeze admixtures. 5. Integral Concrete Hardener: Dry-powder material added integrally to concrete mix to provide hardness and increased durability; Cementec "Hard-Cem", or approved equal. 6. Reinforcing Steel: ASTM A615, Grade 60, new billet steel bars. 7. Welded Wire Fabric: ASTM A185, welded steel wire fabric. 8. Moisture-Retaining Cover: Waterproof paper, polyethylene film, or polyethylene-coated burlap complying with ASTM C Curing Compound: Liquid membrane curing compound; ASTM C309, Type 2, white pigmented. Page 3 of 5

4 B. Concrete Mixture: 1. Concrete mix shall meet the following minimum requirements: Min. Comp. Min. Max. Air Strength Max. Cement, Water- 28 days, Max. Agg. Bags/ Cement % By Class p.s.i. Slump Size C.Y. Ratio Volume AA /2" 3/4"* 6-1/ %* * 1-1/2" max. aggregate size may be used if allowed by ACI 318. If used, air-entrainment shall be 4-6%. 2. Add integral concrete hardener to concrete mix at hardener manufacturer's recommended rate. 3. Prepare design mix of concrete on the basis of compressive strength by methods recommended in ACI 318. Use an independent materials laboratory for preparing and reporting proposed mix design. C. Preparation: 1. Wet forms with light oil. 2. Sprinkle subgrade with water. D. Joints: 1. Provide contraction (control) joints in slabs-on-grade to form panels of patterns as shown. 2. Form contraction joints by inserting 1/4 in. x 1/4 slab depth premolded plastic, hardboard, or fiberboard strip into fresh concrete until top surface of strip is flush with slab surface. Tool slab edges round on each side of insert. After concrete has cured, remove inserts and clean groove of loose debris. 3. Contraction joints may be formed by 1/8 in. x 1/4 slab depth saw cuts. Saw joints prior to formation of shrinkage cracks; achieve an even crisp joint. E. Mixing Concrete: 1. "Ready-mix" concrete shall be produced, delivered and handled in accordance with ASTM C94. Concrete shall be deposited at job site within one hour after introduction of water in mix. Care shall be taken in transferring concrete from truck or mixer to avoid segregation of aggregates in mixture. F. Placing Concrete: 1. Deposit concrete in a manner requiring as little rehandling as possible. Necessary hand spreading shall be done with shovels; do not use rakes. Workers shall rinse dirt from boots before walking in green concrete. 2. Placing shall be continuous between transverse joints without intermediate bulkheads. In case of temporary shutdown, concrete at unfinished end of slabs shall be covered with wet burlap. When delays are unavoidable and of such length that concrete will attain initial set, and in any event where an interruption in concrete placing operations of more than 30 minutes occurs, a joint shall be installed. 3. Provide sufficient spading, rodding, and mechanical vibrating to insure concrete flow into corners and places where concrete will not readily flow. Water-tightness and absence of honeycomb is required for acceptance. 4. Rock pockets or voids found after forms are removed shall be filled immediately with a well-mixed grout composed of one part of Portland cement and three parts of fine aggregate finished to true surface of concrete. Page 4 of 5

5 G. Finishing: 1. Thoroughly float surface after concrete has been struck off. Give surface a lightly broomed finish with grain perpendicular to direction of travel. 2. Edges shall be neatly trimmed with 1/4 in. radius edging tool. Honeycombed areas shall be pointed with mortar. H. Curing: 16. SEEDING 1. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Cure concrete using moisture-retaining cover for seven days or until 75 percent of the required 28-day compressive strength is obtained, whichever is less. 2. Methods may include plastic sheets, constant wetting of surface with water, curing paper, or commercial curing compound. Apply curing compound at not less than 200 sq ft per gal in accordance with manufacturer's recommendations. A. Turf areas disturbed by construction shall receive minimum 4 in. of salvaged topsoil, fertilizer, lime, seed, and mulch. B. Materials and construction methods shall be as follows: 1. Salvaged topsoil shall be placed in accordance with WIDOT Std. Spec., Section Fertilizer and lime shall be in accordance with WIDOT Std. Spec., Section 629, Type A. 3. Seed shall be in accordance with WIDOT Std. Spec., Section 630, Mixture No Mulch shall be in accordance with WIDOT Std. Spec., Section 627. C. At Contractor's option, seeding may be performed by hydroseeding with mulch and tackifying agent included in mixture. 17. DISPOSAL A. Dispose of excess soil materials on-site in a manner and location as approved by Owner. B. Remove from Owner's property and legally dispose of trash, debris, and waste materials. END OF SECTION Page 5 of 5

6

7

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information

SECTION RIGID PAVEMENT

SECTION RIGID PAVEMENT SECTION 02750 PART 1 GENERAL RIGID PAVEMENT 1.1 SUMMARY A. Section Includes: 1. Concrete sidewalks. 2. Concrete stair steps. 3. Concrete integral curbs gutters. 4. Concrete parking areas and roads. B.

More information

SECTION CONCRETE PAVING

SECTION CONCRETE PAVING SECTION 32 13 13 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for providing portland cement concrete work and all other incidental concrete improvements for the project

More information

SECTION CONTROLLED LOW STRENGTH MATERIAL

SECTION CONTROLLED LOW STRENGTH MATERIAL SECTION 03300 CONTROLLED LOW STRENGTH MATERIAL PART 1 GENERAL 1.1 DESCRIPTION A. This Section specifies Controlled Low Strength Material (CLSM) to be used as described in this specification, including

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 321610 - CURBING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies requirements for furnishing and installing all types of curbing including the following: granite curb, concrete and bituminous

More information

A. Submittal Procedures: See Article 13 of the General Conditions.

A. Submittal Procedures: See Article 13 of the General Conditions. SECTION 321313 - CONCRETE PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Driveways. 2. Roadways. 3. Parking lots. 4. Curbs and gutters. 5. Walks. B. Proposed Substitutions: See Article 2,

More information

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course. SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721

More information

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS Underground Electric Distribution Standards I. SCOPE This section includes the standards for concrete, reinforcing steel, formwork, concrete placement, curing, and construction joints. Concrete work for

More information

.1 Concrete mix shall be in accordance with the following:.1 The average of all tests shall exceed 25 MPa.

.1 Concrete mix shall be in accordance with the following:.1 The average of all tests shall exceed 25 MPa. Page 1 1.0 CONCRETE 1.1 CONCRETE MIX.1 Concrete mix shall be in accordance with the following: Minimum 28 Day Strength 25 MPa* Designated Aggregate Size.maximum 25 mm (1 inch) Slump. 25-75 mm (1-3 inches)

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 307 CONCRETE STRUCTURES

San Antonio Water System Standard Specifications for Construction ITEM NO. 307 CONCRETE STRUCTURES ITEM NO. 307 CONCRETE STRUCTURES 307.1 DESCRIPTION: This item shall govern the construction of box culverts, headwalls, wingwalls, bridges, box transitions, approach slabs, retaining walls, inlets, storm

More information

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE SECTION 033053- MISCELLANEOUS CAST-IN-PLACE CONCRETE PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

ITEM NO. 307 CONCRETE STRUCTURES

ITEM NO. 307 CONCRETE STRUCTURES ITEM NO. 307 CONCRETE STRUCTURES This item shall govern the construction of box culverts, headwalls, wingwalls, bridges, box transitions, approach slabs, retaining walls, inlets, storm sewer structures,

More information

SECTION EROSION CONTROL DEVICES

SECTION EROSION CONTROL DEVICES SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment

More information

SECTION CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS

SECTION CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS SECTION 32 05 23 PART 1 - GENERAL 1.1 DESCRIPTION A. This section shall cover site work concrete constructed upon the prepared subgrade and in conformance with the lines, grades, thickness, and cross sections

More information

SECTION CONCRETE PAVING PART 1 - GENERAL 1.1 REFERENCES

SECTION CONCRETE PAVING PART 1 - GENERAL 1.1 REFERENCES SECTION 321313 - CONCRETE PAVING PART 1 - GENERAL 1.1 REFERENCES A. Specifications governing civil site construction include the following list and shall be observed in the order listed below. If conflicting

More information

DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340

DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340 DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340 PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. The General provisions of the contract, including GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS AND

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes. SECTION 033053 - CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL 13686.00 CONCRETE WALKS AND CURBS 033015-1 1.1 RELATED DOCUMENTS: SECTION 033015 CONCRETE WALKS AND CURBS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General and Supplementary

More information

SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES

SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES GUIDE SPECIFICATION SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES PART 1 - SCOPE 1.01 WORK INCLUDED: 1.1.1 This guide covers the

More information

SECTION PORTLAND CEMENT CONCRETE

SECTION PORTLAND CEMENT CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 13 14 CONCRETE PAVEMENT FOR VEHICULAR AREAS PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for forming and placing reinforced concrete curbs and vehicular pavement

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3 CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required

More information

SECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary

SECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary SECTION 03300 CONCRETE PART 1 GENERAL 1.01 SCOPE OF WORK Concrete foundation walls, sanitary structures, pipe encasements, thrust blocking and slabs on grade. 1.02 REFERENCES A. ACI 301 Specification for

More information

SECTION CONCRETE PAVING FOR PEDESTRIAN AREAS. A. This Section includes exterior cement concrete pavement for the following:

SECTION CONCRETE PAVING FOR PEDESTRIAN AREAS. A. This Section includes exterior cement concrete pavement for the following: SECTION 321313 CONCRETE PAVING FOR PEDESTRIAN AREAS PART 1 GENERAL 1.1 SUMMARY A. This Section includes exterior cement concrete pavement for the following: 1. Walkways. 2. Courtyards. 3. Plazas. 4. Pedestrian

More information

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS AFTER FEBRUARY 1, 2010 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS 530.1 Description. This item shall govern for curb, gutter, combined curb and gutter, sidewalks and/or driveways,

More information

Construction Specification 62 Grouted Rock Riprap

Construction Specification 62 Grouted Rock Riprap Construction Specification 62 Grouted Rock Riprap 1. Scope The work consists of furnishing, transporting, and the installation of grouted rock riprap revetments and blankets, including filter or bedding

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS. A. Formwork complete with shoring, bracing and anchorage.

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS. A. Formwork complete with shoring, bracing and anchorage. SECTION 02528 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.01 WORK INCLUDED A. Formwork complete with shoring, bracing and anchorage. B. Concrete reinforcement complete with required supports,

More information

REINFORCED CONCRETE MASONRY SECTION

REINFORCED CONCRETE MASONRY SECTION SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving.

SECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving. SECTION PORTLAND CEMENT CONCRETE PAVEMENT 1. DESCRIPTION This specification shall govern for the construction of Portland cement concrete pavement on a prepared subgrade or base course, in accordance with

More information

5 Concrete Placement

5 Concrete Placement 5 Concrete Placement Testing Entrained Air Slump Strength Water/Cementitious Ratio Mixing Placing Concrete Compressive Test Specimens Curing De-Tensioning Multiple Strand Release Single Strand Release

More information

SECTION CONCRETE PAVING

SECTION CONCRETE PAVING PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 13 13 CONCRETE PAVING A. Extent of concrete curbs, walks, and paving as show on drawings B. Earthwork and prepared sub-base C. Concrete and related materials

More information

SECTION PRECAST CONCRETE COVER SYSTEM

SECTION PRECAST CONCRETE COVER SYSTEM SECTION 13500 PRECAST CONCRETE COVER SYSTEM PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Design Criteria: 1. Precast manufacturer shall be responsible for structural design of individual precast components,

More information

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4 City of Columbia Engineering Regulations PART 25: SPECIFICATIONS FOR ALTITUDE VALVE VAULT Table of Contents Paragraph Description Page No. 25.1 General 25-1 25.2 Materials 25-1 25.3 Concrete Masonry Work

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.1 Description The work covered by this section of the specifications consists of furnishing all labor, the construction and installation of open storm drain

More information

SECTION UNIT PAVERS

SECTION UNIT PAVERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Concrete pavers. 2. Detectable warning pavers. 3. Warning stripe pavers. 1.2 SUBMITTALS A. Product Data: For the following: 1. Pavers.

More information

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for

More information

SECTION CAST IN PLACE CONCRETE

SECTION CAST IN PLACE CONCRETE SECTION 03300 CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Section Includes. Work to be completed under this section shall include all labor, equipment, plant and materials necessary to furnish

More information

This section applies to the design and installation of cast-in-place concrete, shotcrete, precast concrete, and post-tensioned concrete.

This section applies to the design and installation of cast-in-place concrete, shotcrete, precast concrete, and post-tensioned concrete. Basis of Design This section applies to the design and installation of cast-in-place concrete, shotcrete, precast concrete, and post-tensioned concrete. Design Criteria Use most recent version of the International

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE McClellan Blakemore Architects New Warehouse Facility for SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete formwork. B. Floors and slabs on grade. C. Concrete floor

More information

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans. SECTION 1400 - CONCRETE PAVEMENT 1401 SCOPE. This section governs the furnishing of all labor, equipment, tools, and materials and the performance of all work necessary to construct concrete pavement.

More information

MATERIALS A Concrete A.1 Concrete Walk... Mix No. 3F52. A.2 Concrete Walk, Exposed Aggregate Finish... Mix No.

MATERIALS A Concrete A.1 Concrete Walk... Mix No. 3F52. A.2 Concrete Walk, Exposed Aggregate Finish... Mix No. 2521 WALKS 2521.1 DESCRIPTION This work consists of constructing concrete or bituminous walks. Concrete walks include concrete median walk and concrete truck aprons. 2521.2 MATERIALS A Concrete... 2461

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 90P-270 Sheet 1 of 5 SECTION PAVEMENT PATCHING Page 591, Section. Delete the Section and replace with

More information

SECTION CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS

SECTION CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS SECTION 03301 - CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS 808.1 DESCRIPTION: Reinforced concrete vaults shall be cast-in-place and shall include reinforcing

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations.

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations. DURA-CRETE S-SERIES PRECAST CONCRETE WALL SPECIFICATIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete Screen Wall Description: Work under this item shall consist of furnishing and erecting a wall in

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR OPEN-GRADED DRAINAGE COURSE, MODIFIED FOR JOB NUMBER 110616 (PORTLAND CEMENT-TREATED PERMEABLE BASE USING CRUSHED CONCRETE) CFS:JFS 1 of 5 APPR:ARB:TES:11-06-14

More information

Best Management Standards / Specifications. For Concrete Slab Raising. Prepared in conjunction with the Concrete Repair Association

Best Management Standards / Specifications. For Concrete Slab Raising. Prepared in conjunction with the Concrete Repair Association For Concrete Slab Raising Prepared in conjunction with the Concrete Repair Association DETAILED SPECIFICATIONS 1. Description: 2. Slab Raising: These specifications cover the furnishing, boring, drilling,

More information

9 Concrete Pavement Patching

9 Concrete Pavement Patching 9 Concrete Pavement Patching Materials Concrete Mix Design Concrete Mix Criteria Trial Batch Demonstration of CMD Acceptance Removal of Concrete Partial Depth Patches Full Depth Patched Placement of Patching

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

ITEM 421 STRUCTURAL CONCRETE

ITEM 421 STRUCTURAL CONCRETE AFTER FEBRUARY 1, 2011 ITEM 421 STRUCTURAL CONCRETE 421.1 Description. These specifications shall govern for the materials used; for the storing, measuring and handling of materials and for the proportioning

More information

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION ARDEX GUIDE SPECIFICATION ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) Cast-In-Place Concrete to Receive the ARDEX Concrete Management Systems including ARDEX Self-Leveling Underlayments SECTION 03 30 00

More information

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT): SECTION 31 32 13.16 CEMENT STABILIZATION PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the specifications for cement stabilization of sandy or silty soil and consists of pulverizing, addition

More information

SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage.

SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage. SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS. 1-3.2 Common Usage. Abbreviations Word or Words PAV.Pressure Aging Vessel PCC..Portland Cement Concrete PE.Polyethylene

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS CONCRETE SIDEWALKS AND DRIVEWAYS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary

More information

SECTION 12 INDEX CONCRETE CURBS AND GUTTERS

SECTION 12 INDEX CONCRETE CURBS AND GUTTERS SECTION 12 INDEX CONCRETE CURBS AND GUTTERS 1. SCOPE OF WORK. 12-2 2. MATERIALS. 12-2 3. CONSTRUCTION REQUIREMENTS.. 12-2 12-1 SECTION 12 CONCRETE CURBS AND GUTTERS 1. SCOPE OF WORK: This work shall consist

More information

SECTION SITE CONCRETE

SECTION SITE CONCRETE SECTION 321313 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

LITHOCRETE ARCHITECTURAL CONCRETE PAVING

LITHOCRETE ARCHITECTURAL CONCRETE PAVING LITHOCRETE ARCHITECTURAL CONCRETE PAVING PART 1 GENERAL 1.1 GENERAL CONDITIONS A. Requirements of "General Conditions of the Contract" and of Division 1, "General Requirements," apply to work in this Section

More information

Construction Specification for Concrete Curb and Concrete Curb and Gutter

Construction Specification for Concrete Curb and Concrete Curb and Gutter Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 September 2017 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03

More information

PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS

PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS SECTION 32 14 13.16 PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs used as ballast and/or paving on

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 553 FEBRUARY 1991 CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS 553.01 SCOPE 553.02 REFERENCES 553.03 DEFINITIONS TABLE OF CONTENTS 553.04 SUBMISSION

More information

Installation Guidelines

Installation Guidelines 815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Guidelines Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles (optional),

More information

SECTION 10 - TRENCHING AND BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements

More information

SECTION BRICK MASONRY ASSEMBLIES

SECTION BRICK MASONRY ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Face brick. 2. Mortar and grout. 3. Ties and anchors. 4. Miscellaneous masonry accessories. 1.2 SUBMITTALS A. Product Data: For each type

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage.

.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage. 03 10 00 CONCRETE FORMING AND ACCESSORIES Page 1 of 4 1 General 1.1 SECTION INCLUDES.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage..2 Form accessories..3 Form stripping. 1.2

More information

SECTION FLEXIBLE PAVING

SECTION FLEXIBLE PAVING SECTION 321200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Include GENERAL CONDITIONS and applicable parts of Division 1 as part of this Section. B. Examine all Drawings and other Sections of the Specifications

More information

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION A. Section Includes B. References C. Quality Assurance D. Submittals E. Delivery, Storage and Handling F. Environmental Conditions G. Summary H. Concrete

More information

By CTS Cement Manufacturing Corp.

By CTS Cement Manufacturing Corp. CSI SECTION 03 60 00 GROUTING 03 62 00 NON-SHRINK GROUTING 03 62 13 NON-METALLIC NON-SHRINK GROUTING High Flow, Non-Metallic, Multi-Purpose, Cementitious, Non-Shrink Grout EDITOR NOTE: The following guideline

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones. ITEM 432 RIPRAP 432.1. Description. This Item shall govern for the furnishing and placing of riprap of the type and details shown on the plans and in accordance with this Item. 432.2. General. Riprap furnished

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 350 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE 350.01 SCOPE 350.02 REFERENCES 350.03 DEFINITIONS TABLE OF CONTENTS

More information

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving 2004 Specifications CSJ 0196-02-120 SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving 1. Description. This Item shall govern for the furnishing and placing of colored concrete wave

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

Page 1 of 1 ADDENDUM NO. 2 PROJECT: THE SALVATION ARMY, THIFT STORE 601 N. EUCLID AVE., BAY CITY, MI WILLIAM A. KIBBE & ASSOCIATES, INC.

Page 1 of 1 ADDENDUM NO. 2 PROJECT: THE SALVATION ARMY, THIFT STORE 601 N. EUCLID AVE., BAY CITY, MI WILLIAM A. KIBBE & ASSOCIATES, INC. ADDENDUM NO. 2 PROJECT: THE SALVATION ARMY, THIFT STORE OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: THE SALVATION ARMY WILLIAM A. KIBBE & ASSOCIATES, INC. DATE: October 9, 2016 WAK PROJECT NO. 16 2197

More information

Section (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM

Section (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM PART 1: Section 32 12 43 (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM GENERAL 1.01 Description A. Work shall consist of furnishing all material, labor, services

More information

SECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM):

SECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM): SECTION 03450 ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03100 - Concrete Formwork 2. 03200 - Concrete Reinforcement 3. 03300 - Cast-in-Place Concrete 4. 03600 -

More information

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section 02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete

More information

SECTION 54 STRUCTURAL CONCRETE (FAA P-610) ITEM P-610 STRUCTURAL PORTLAND CEMENT CONCRETE DESCRIPTION MATERIALS

SECTION 54 STRUCTURAL CONCRETE (FAA P-610) ITEM P-610 STRUCTURAL PORTLAND CEMENT CONCRETE DESCRIPTION MATERIALS 54-1 GENERAL SECTION 54 STRUCTURAL CONCRETE (FAA P-610) The Contractor shall perform all work required by the plans requiring structural concrete for drainage structures, electrical foundations, and miscellaneous

More information

***************************************************************************************************************

*************************************************************************************************************** 09330 QUARRY TILE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 09 30 16 ***************************************************************************************************************

More information

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings.

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings. Section 02110 SITE CLEARING 1.00 General: A. Related Documents: The general provisions of the Contract including General and Supplementary Conditions and General Requirements, apply to the work specified

More information

SECTION MORTAR

SECTION MORTAR PART l - SCOPE SECTION 04100 - MORTAR A. This Section includes all labor, materials, equipment, and related items required for the work of mortar as shown on the Drawings and specified herein. The work

More information

SECTION INTERLOCKING PRECAST CONCRETE UNIT PAVERS

SECTION INTERLOCKING PRECAST CONCRETE UNIT PAVERS SECTION 321413.13 INTERLOCKING PRECAST CONCRETE UNIT PAVERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Interlocking concrete paver units. 2. Sand setting bed. 3. Sand joint

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

TABLE OF CONTENTS CHAPTER 7 CONCRETE

TABLE OF CONTENTS CHAPTER 7 CONCRETE TABLE OF CONTENTS CHAPTER 7 CONCRETE 7.00.00 INTRODUCTION... 7-1 7.01.00 GENERAL... 7-1 7.10.00 DESIGN STANDARDS... 7-1 7.20.00 PLACING CONCRETE... 7-1 7.20.01 Preparation... 7-1 7.20.02 Timing... 7-1

More information

CONCRETE PAVEMENTS GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 7 WATER RECLAMATION PROJECT JUNE 2013

CONCRETE PAVEMENTS GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 7 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 7 PART 1 - GENERAL 1.1 Description The work covered by this Section shall be all labour, materials, equipment, and supervision necessary to complete all concrete work shown

More information

SECTION STAMPED CONCRETE PAVING

SECTION STAMPED CONCRETE PAVING SECTION 321316.23 - STAMPED CONCRETE PAVING This Section specifies stamped concrete paving incorporating L. M. Scofield s LITHOTEX Pavecrafter imprinting patterns and LITHOCHROME Color Hardener. Suitable

More information

1. Repairing brick masonry, including replacing damaged units as indicated on drawings. 2. Repointing mortar joints.

1. Repairing brick masonry, including replacing damaged units as indicated on drawings. 2. Repointing mortar joints. SECTION 040120 BRICK MASONRY REPAIR AND REPOINTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

INDUSTRY RECOMMENDATION EXTERIOR CONCRETE FLATWORK

INDUSTRY RECOMMENDATION EXTERIOR CONCRETE FLATWORK INDUSTRY RECOMMENDATION for EXTERIOR CONCRETE FLATWORK Prepared by Ohio Concrete Inquires regarding this document may be addressed to: Ohio Concrete 2600 Corporate Exchange Dr., Ste. 165 Columbus, OH 43231

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 03 45 00_PRECAST CONCRETE STRUCTURES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including

More information