EMBANKMENT DAM SEEPAGE MODIFICATIONS CHOICES AND CONSIDERATIONS. John W. France, PE, D.WRE 1 ABSTRACT INTRODUCTION

Size: px
Start display at page:

Download "EMBANKMENT DAM SEEPAGE MODIFICATIONS CHOICES AND CONSIDERATIONS. John W. France, PE, D.WRE 1 ABSTRACT INTRODUCTION"

Transcription

1 This paper is reproduced from the Proceedings of the 2014 United States Society on Dams (USSD) Annual Conference, with the permission of USSD. EMBANKMENT DAM SEEPAGE MODIFICATIONS CHOICES AND CONSIDERATIONS John W. France, PE, D.WRE 1 ABSTRACT Seepage modifications are among the most common dam safety risk reduction measures. Options for seepage modifications can be grouped into two categories: 1) seepage collection and control measures and 2) seepage cut off or reduction measures. Within each category there are a number of different alternatives and configurations available to dam engineers. This paper provides an overview of the wide range of seepage modification options and argues for careful consideration of the full range of options before selecting the best option for a particular dam. INTRODUCTION Seepage and internal erosion is one of the leading causes of embankment dam failure and incidents, and, consequently, seepage modifications are a common dam safety risk reduction measure. This paper discusses the options available for dam safety modifications and the factors to be considered in choosing an appropriate modification for a particular dam. This is an overview paper, which does not address design and construction details for the various available solutions. Rather, this paper describes the overall concepts of solutions and the general construction methods for some of the solutions. The reader is encouraged to consult other references for appropriate design and construction details. The objectives of an embankment dam seepage modification can include: preventing piping and internal erosion limiting pore pressures, uplift, and seepage forces preventing slope instability and surface sloughing preventing wet spots and surface erosion limiting loss of stored water. The first four objectives may be related to dam safety concerns, while the last objective, limiting loss of stored water, is an operational concern rather than a dam safety concern. Seepage modifications can be grouped into two different categories: 1) seepage cut off or reduction alternatives and 2) seepage collection and control alternatives. It has been the author s experience that engineers often think first of seepage cut off alternatives, 1 URS Corporation, 8181 East Costilla Place, Denver, CO, john.france@urs.com,

2 and in some cases do not consider collection and control alternatives at all. It is suggested that in almost all cases seepage collection and control alternatives should be considered in evaluation of alternatives. Even in cases when seepage cut off is selected as the primary modification alternative, it may be appropriate to consider including a seepage collection and control system to provide redundancy and reliability to the solution. In modern design of zoned earthfill dams, both low permeability cores and filters to protect the cores are included. Philosophically, inclusive of both cut off and collection / control elements in a modification would be a similar approach to providing redundancy. Seepage collection and control systems offer two distinct advantages over cut off / reduction alternatives. First, the modification can be constructed at the locations where seepage has been observed, virtually assuring that the modifications are constructed in the correct location. In contrast, the locations of seepage cut offs are often based on interpretation of subsurface information, with the inherent risk that this information is inaccurate or incomplete and the cut off elements are not located correctly. Second, construction of the elements of a seepage control system can be observed directly, increasing the reliability of verification of satisfactory construction. Cut off elements are often constructed using subsurface techniques (e.g. drilling or slurry-filled excavations), which cannot be directly observed, making verification of satisfactory construction more challenging and potentially less reliable. Of course there are some potential disadvantages with seepage collection and control alternatives. Some alternatives, for example those requiring excavation into the embankment, may require lowering the reservoir to provide for safety during construction. Other alternatives may require excavation into the foundation at the downstream toe of the dam, which may require dewatering systems for construction. SEEPAGE COLLECTION AND CONTROL ALTERNATIVES Tools available for seepage collection and control include: filters to prevent internal erosion drains to collect and convey seepage flows relief wells to reduce uplift pressures. These tools can be combined in different configurations to address the characteristics of a particular dam. A few of the more common configurations are illustrated schematically and discussed below. In Figures 1 through 8, the speckled yellow layers and zones indicate filter materials, and the gray layers and zones indicate drain materials. The illustrations presented below are schematic and do present design details. For all of these solutions filter and drain materials would need to be specified to meet modern filter design criteria, and appropriate design details would need to be incorporated to provide for appropriate function and constructability.

3 Filter / Drain Blanket Figure 1 illustrates a filter / drainage blanket at the toe of a homogeneous dam. This concept is applicable to situations when seepage exits the face of the embankment and / or the toe area, and there is concern that the seepage could lead to piping or internal erosion of the soils at the exit point. It is a relatively low cost option to provide a filtered exit for the seepage. In this illustration, the layer placed adjacent to the embankment and foundation soil provides the filter function, and the outer gray-colored layer would be a filter-compatible drain layer (typically a gravel material) designed to safely convey the seepage. In most cases, a drain pipe would be installed within the drain layer to collect and measure the seepage. Although the illustration in Figure 1 shows a blanket at the toe of the embankment, this configuration could also be applied to abutments or abutment groins. Figure 1 Schematic Illustration of Filter / Drain Blanket Filter / Drain Blanket and Berm Figure 2 illustrates the filter / drainage blanket from Figure 1 with the addition of a covering berm. The berm can provide two functions. First, it can protect the gravel drain layer from contamination (e.g. with windblown dust) or damage (e,g. by vandalism). Second, it can provide weight to resist uplift forces that might develop within the filter / drain layers. If the gradation of the berm material is too fine to be filter-compatible with the drain layer, a filter or separator layer is appropriate between the berm material and the drain, to prevent contamination of the drain from infiltration through the berm. Since significant flow across this boundary is not expected, the separator does not need to be particularly clean (low in fines content). In some cases, the author has used an aggregate base course as a separator, instead of more expensive filter sand. A geotextile could also be considered at this interface.

4 Shallow Toe Drain Figure 2 Schematic Illustration of Filter / Drain Blanket and Berm Figure 3 illustrates a shallow toe drain, an option which is applicable if there is no seepage exiting the face of the dam and either limited seepage exiting the foundation or seepage generally confined to shallow foundation strata. As shown, this option typically includes a pipe within the drain zone to allow collection and measurement of seepage. If the drain is covered with finer material, a filter or separator would be needed between the drain and the cover material, as discussed above for the filter / drain and berm configuration. Construction of this alternative may require lowering of the reservoir and dewatering in advance of the excavation. Deep Toe Drain Figure 3 Schematic Illustration of Shallow Toe Drain Figure 4 illustrates a deep toe drain, an option which is applicable if there is no seepage exiting the face of the dam and either a large amount of seepage exiting the foundation or significant seepage in deeper foundation strata. The configuration is essentially the same as that for the shallow toe drain, except that it is larger and extends deeper into the foundation. Construction of this alternative would almost certainly require lowering of the reservoir and dewatering in advance of the excavation.

5 Toe Drain and Berm Figure 4 Schematic Illustration of Deep Toe Figure 5 illustrates a berm added to a toe drain alternative. The illustration is shown for the deep toe drain option, but it could also be used for the shallow toe drain option. The berm can provide the same two functions as described for the blanket filter / drain alternative: protection and uplift resistance. The illustration in Figure 5 shows a chimney drain extending up the slope between the embankment and the berm, which would provide filter protection for seepage exiting the downstream face of the dam below the top of the filter. Figure 5 Schematic Illustration of Deep Toe Drain and Berm Trench Toe Drain and Berm Figure 6 shows a trench toe drain and berm configuration. The trench toe drain would provide filter protection and seepage collection for the foundation layers. In most cases, groundwater levels in the foundation would be at or near the ground surface. In these cases, the trench would likely be constructed using slurry trench excavation methods. The trench excavation would be supported by degradable slurry (e.g. guar-based slurry). The trench would then be backfilled with a soil that is filter-compatible with the foundation soil, after which the backfilled trench would be treated to revert or degrade the slurry, restoring the permeability of the filter backfill. The advantage of this method is that the trench drain can be constructed without dewatering and with limited or no lowering of the reservoir. A disadvantage is that filter / drain function can be affected by construction methods. Although trench filter drains have been successfully installed using this method, there have been cases where the slurry has not been successfully reverted or degraded,

6 dramatically reducing the permeability of the trench. There also have been cases where segregation of the fill or low density of the fill has been reported. Careful selection of construction materials and proper construction methods are required for successful implementation of this method. Figure 6 Schematic Illustration of Trench Toe Drain and Berm Chimney Filter Overlay Figure 7 shows a chimney filter overlay configuration. In this configuration, any topsoil or vegetation is stripped from the downstream face of the embankment. The chimney filter is then placed on the embankment and covered with a protective layer of embankment material. This alternative provides filter protection and collection of seepage through the embankment. Depending on the depth of the toe trench, it may be possible to construct this alternative without significantly lowering the reservoir. In the illustration, the top of the chimney is shown near the embankment crest. Historically, chimney filters were designed to extend above the phreatic surface estimated from seepage analyses. More recently designers have begun to extend the tops of chimney filters to the normal storage pool or even to the maximum flood pool. The reason for the higher chimney elevations is to provide protection against seepage and internal erosion through potential defects (e.g. cracks or pervious zones) located relatively high in the embankment. Figure 7 Schematic Illustration of Chimney Filter Overlay

7 Internal Chimney Filter Figure 8 shows an internal chimney filter configuration. This approach is applicable if it is desired to lower the phreatic surface deep within the embankment shell or if there is filter incompatibility between the embankment core and the shell. To construct the configuration shown in Figure 7 the reservoir would be lowered to provide for safety during construction. The downstream section of the embankment would then be excavated. The filter would be placed, and then the downstream shell would be reconstructed and the reservoir raised. Relief Wells Figure 8 Schematic Illustration of Internal Chimney Filter Figure 6 illustrates a relief well installation. Relief wells are appropriate for relieving high piezometric pressures in a relatively pervious layer that is confined beneath a lower permeability layer. The pressure reduction provided by the relief wells helps prevent uplift and / or blowout of the confining layer. Relief wells require regular maintenance to maintain their effectiveness, because the relief wells foul and clog over time. In some cases, a filter drain trench, as illustrated above in Figure 6, may be a suitable alternative to relief wells, without the long term maintenance requirements. Low Permeability Confining Layer High Permeability Layer With High Pressures Figure 9 Schematic Illustration of Relief Wells

8 SEEPAGE CUT OFF ALTERNATIVES There are three general categories of seepage cut off or reduction alternatives: grouting, low permeability blankets, and barrier walls. The term cut off has been used in this paper in quotes, because it is rare, if ever, that seepage can truly be cut off completely. A more correct term is seepage reduction. Geologic and other subsurface conditions are such that it is unusual that seepage pathways can be completely blocked to effectively eliminate seepage. The three categories of seepage reduction alternatives are discussed below, followed by a discussion of different methods for constructing barrier walls. Grouting Figure 10 is a schematic illustration of grouting. Holes are drilled into the strata to be grouted. Grout is then injected into the target strata in a controlled manner. In the author s opinion, there are limited soils that are amenable to grouting as a seepage treatment. Permeation grouting, even with chemical grouts, requires soils that are sufficiently permeable for grout to penetrate. Caution is required for grouting in soils or soft rock to limit pressures and prevent hydrofracturing, which can damage soil or soft rock strata. In rock, grout can generally penetrate only into air and water filled spaces. As a result, when grout is injected into rock joints that are partially filled with soil, the grout will fill only the open parts of the joints, leaving the soil infilling in place. In some cases, this will reduce seepage in the short term, but over time the remaining soil is eroded out of the joints, resulting in an increase in seepage. In such cases, grouting can be only a temporary solution. Figure 10 Schematic Illustration of Grouting

9 Low Permeability Blankets Figure 11 illustrates a low permeability blanket option. In this illustration the blanket is placed on the reservoir floor and the upstream face of the embankment. The blanket lengthens the flow path for seepage through the foundations, reducing flow, downstream gradients, and foundation pressures. The illustration is applicable to a homogeneous embankment or a zoned dam with an upstream core, so that the blanket can be connected to the principal seepage barrier within the embankment. For a central core dam, the low permeability blanket would need to be connected to the central core to be effective. While this may be practical for a new dam, it would not likely be practical for a dam safety modification. An alternative for modification of a central core dam would be to extend the low permeability blanket up the upstream face to serve as a low permeability facing. Obviously, construction of a low permeability blanket for a seepage modification would require draining the reservoir for construction. Low permeability blankets can be constructed of compacted low permeability soil (clays, silts, clayey sands, etc.) or of geomembranes of various types. Barrier Walls Figure 11 Schematic Illustration of a Low Permeability Blanket Three potential barrier wall configurations are shown schematically in Figures 12 through 14. Figure 12 illustrates a barrier wall constructed through the centerline of the dam from the crest, while Figures 13 and 14 illustrate barrier walls constructed on the upstream slope or at the upstream toe, respectively. Upstream slope or upstream toe locations would require partial or total lowering of the reservoir for construction as a modification. The upstream slope or upstream toe locations are most suitable to homogeneous embankments or upstream core embankments in which the barrier wall can easily be connected to the seepage barrier in the embankment. However, these wall locations could be used for central core dams, by constructing a low permeability blanket on the upstream slope above the top of the barrier wall. The blanket would essentially serve as an upstream low permeability facing.

10 In all of the installations the barrier wall reduces seepage quantities, gradients, and piezometric pressures downstream of the wall. Figure 12 Schematic Illustration of a Centerline Barrier Wall Figure 13 Schematic Illustration of an Upstream Slope Barrier Wall Figure 14 Schematic Illustration of an Upstream Toe Barrier Wall Barrier Wall Construction Methods There are a variety of methods available for construction of barrier walls, with advantages and disadvantages of each. The methods can generally be divided into four

11 broad categories: continuous walls, mixed-in-place walls, element walls, and jet grout walls. Each of these categories is discussed below. Continuous Barrier Walls are most often constructed using backhoes to excavate continuous, slurry supported trenches, as illustrated in Figure 15. After excavation the trench is backfilled with one of three types of backfill: soil bentonite (SB), cement bentonite (CB), and soil cement bentonite (SCB). For SB and SCB, the backfill is mixed on the ground surface, and then placed in the trench, displacing the slurry. SB backfill is developed by mixing the excavated soil with a specified amount of bentonite to produce a low permeability backfill. SCB backfill is produced by mixing the excavated soil with specified amounts of bentonite and cement to produce a low permeability backfill with cementitious properties. The cementitious properties of the SCB can provide some increased erosion resistance, however, it should be recognized that the with the addition of cement the SCB backfill sets, and care must be taken in construction to assure that the backfill does not set prematurely causing problems in placing subsequent backfill and compromising the integrity of the wall. For the CB alternative, the cement bentonite is used as the slurry and the backfill is created in the trench as the CB slurry sets. The CB is mixed in plants at the surface and placed in the trench during excavation. Advantages of continuous barrier wall construction include relatively simple construction and the lack of joints, increasing the likely of wall continuity. A barrier wall constructed with this methodology will almost certainly be continuous, unless there are trench wall collapses or backfill inconsistency. Long stick backhoes, such as that shown in Figure 15, can excavate continuous barrier walls to depths of as much as 80 to 90 feet. Figure 15 Construction of a Continuous Method Cement Bentonite Barrier Wall

12 Mixed-In-Place Walls can be constructed with several different types of equipment, all of which mix soil in place with cement to create cemented soil barrier walls. Three different types of equipment are illustrated in Figures 16 and 17. Figure 16 shows a deep soil mixing (DSM) device comprised of multiple augers which mix soil in place while injecting cement into the mixture. The augers are used repeated in a line to create a barrier wall. Figure 16 Deep Soil Mixing (DSM) Wall Construction Figure 17 shows two different pieces of equipment used for mix-in-place walls. The device shown on the left is a cutter soil mix (CSM) device, which is comprised of cutter wheels at the bottom of the device. The cutter is advanced into the ground and cement is injected as the cutter wheels mix the in place soil to create the barrier wall. As with the DSM device, the CSM device is used repeatedly in a line to construct a barrier wall. The device shown on the right is a trench cutting remixing deep (TRD) device, which is like a giant trenching machine which mixes soil in place with the cement. The TRD is advanced along the barrier wall alignment to construct the wall.

13 Figure 17 A Cutter Soil Mixing (CSM) Device (Left) and a Trench Cutting Remixing Deep (TRD) Wall Device (right) Construction with both the DSM and CSM devices involves joint connections between each subsequent advance of the device. Care must also be taken to maintain alignment of the resulting barrier wall panels to be confident that gaps are not created between adjacent panels. The TRD is a continuous construction method without joints, which may increase the likelihood of continuity; however shrinkage during curing may create small cracks in the wall after curing. The mixed-in-place methods are generally limited to somewhat more than 100 feet depth. Element Barrier Walls can also be constructed with a number of types of equipment that are used to construct either rectangular panels or circular secant piles. Figure 18 shows a clam shell excavator (left) and a hydromill (right), both of which can be used to excavate rectangular (in plan) panels. Figure 19 shows a Wirth downhole drill, which was used at Wolf Creek Dam to construct circular (in plan) secant piles. Augers and drills with and without casing can be used to construct secant piles.

14 Figure 18 A Clam Shell Excavator (left) and a Hydromill (right) Figure 19 A Wirth Downhole Drill for Secant Pile construction Element barrier walls can be constructed in a variety of configurations, some of which are illustrated in Figures 20 through 23. In almost all cases, element walls are constructed in sequences of primary and secondary elements. Figure 20 shows two primary and one secondary rectangular barrier wall panel elements. The primary panels would be excavated and backfilled with concrete first. Then the secondary panel would be excavated between and connected to both of the two primary panels. The panels are

15 normally excavated with slurry support and backfilled with concrete placed from the bottom using tremie methods to displace the slurry. P = Primary Element S = Secondary Element Figure 20 Plan Illustration of a Panel Barrier Wall Installation Figure 20 illustrates a barrier wall constructed of secant pile elements. As for the panel wall, the secant pile wall is constructed with a series of primary and secondary elements, with the primary elements placed before the secondary elements. The secant piles can be constructed with slurry filled holes or with cased holes. Cement backfill is placed from the bottom, using tremie methods. P = Primary Element S = Secondary Element Figure 21 Plan Illustration of a Secant Pile Barrier Wall Installation Figure 21 illustrates a combined barrier wall constructed of secant pile primary elements and panel secondary elements. Potential advantages of this configuration include fewer joints than an all secant pile wall and more reliable joints than and all panel wall. P = Primary Element S = Secondary Element Figure 22 Plan Illustration of a Combined Barrier Wall Installation Challenges for element wall construction include assuring element alignment and assuring joint quality. Advantages of element walls are the substantial depths that can be reached with these walls, and the ability to advance the walls into hard rock with the right equipment. Element walls have been constructed to depths of as much as 400 feet and depths exceeding 150 feet are not uncommon. The recently completed barrier wall at the U.S. Army Corps of Engineers Wolf Creek Dam, KY (Santillan and Salas, 2012) set a new standard for element alignment. Using directionally drilled pilot holes, secant piles at Wolf Creek dam were consistently drilled to depths up to 275 feet and more than 100 feet into very hard limestone to within about three inches of target locations.

16 Jet Grout Barrier Walls The jet grouting process is illustrated in Figure 23. A hole is advanced with drill rods. When the drill hole reaches the target elevation, a nozzle or monitor is used to cut the soil and inject cement grout. The process is continued as the monitor is retracted to create a jet grout mass. The monitor can be a single, double, or triple fluid device. The single fluid monitor uses grout to both cut the soil and create the mass. The double fluid monitor uses a combination of grout and air to cut the soil and create the mass. The triple fluid monitor uses air and water to cut the soil and grout to create the mass. A jet grout barrier wall is constructed by installing jet grout columns adjacent to and in contact with each other. With a skilled operator jet grout can be used to create barrier walls around existing subsurface features. An advantage of jet grouting is that it can be used to construct jet grout masses at depth without extending them all the way to the surface. After the jet mass is extended to the desired top elevation, the drill hole above that elevation can simply be filled with grout, rather than jetted. 1. Drilling 2. Jetting from bottom-up 3. Column completed Figure 23 Jet Grouting Process

17 CONSIDERATIONS From the preceding discussions, it is clear that there is a wide range of alternatives available for seepage modifications. When developing seepage modifications, the engineer should consider this wide range of alternatives in light of the specific project and site conditions. Factors that will enter into the determination of the best alternative for a particular project include cost, constructability, technical effectiveness, and operational impacts. The significance of the loss of water due to leakage and seepage can be a consideration in comparing collection / control alternatives with cut off / reduction alternatives. If water is pumped or diverted into the reservoir and the leakage impacts the quantity of water available from the project, solutions that reduce leakage may be weighted more heavily. On the other hand, if the leakage does not significantly impact water availability, reducing leakage is not of great importance. For example, for the Washakie Dam project discussed below, the project is located on the main stem of a river and the reservoir fills completely and the spillway operates almost every year. Sufficient water is available to meet irrigation demands almost every year, despite the substantial foundation leakage. Consequently, reducing leakage was not a significant consideration in selecting a modification alternative. Site conditions may significantly impact technical effectiveness. For example, consider the effectiveness of a partially penetrating barrier wall, such as that shown in Figure 24. As shown, the wall penetrates only part of the way through a pervious foundation layer and seepage will occur beneath the wall. Cedegren evaluated the effectiveness of such walls, as shown in Figure 25 (Cedergren, 1989). As illustrated in that figure, the a cut off needs to penetrate almost fully through a pervious layer to significantly reduce the amount of seepage. The wall must extend about 80 percent of the way through the layer to reduce the seepage by 50 percent, and a wall that extends 90 percent of the way through the layer only reduces seepage by just over 60 percent. Figure 24 A Partially Penetrating Barrier Wall

18 The influence of site conditions can also be illustrated through consideration of two example dams: Washakie Dam in Wyoming and Wolf Creek Dam in Kentucky. Washakie Dam is an embankment dam founded on glacial soils on the Wind River Reservation in Wyoming. The dam had a long history of significant seepage with some evidence of internal erosion. When seepage modifications were evaluated, both barrier walls and seepage collection and control alternatives were considered. In this case, barrier walls were eliminated from consideration because of several site conditions. First, the glacial foundations were very complex and the exact pathways for seepage were not well known. The glacial foundations included pervious layers and lenses intermixed with low permeability deposits. Confidence in the ability to construct a barrier wall in the right location was low. Second, there was no low permeability layer within practical depths, so the cutoff would be partial, at best. Lastly, the glacial deposits included large boulders, which would have made construction of a barrier wall very difficult, if not impractical. A downstream, deep toe trench and chimney filter seepage collection and control system was selected and successfully constructed at Washakie Dam (France, 2002 and France, 2005). Figure 25 Flow Net Analysis of Partially Penetrating Cutoff (from Cedergren, 1989)

19 Wolf Creek Dam is a homogeneous embankment dam constructed on karstic limestone foundations in south central Kentucky. The dam has a long history of seepage and internal erosion problems related to the karstic foundations (Zoccola, Haskins, and Jackson, 2009). In this case, the seepage that causes the problems is occurring through a network of joints and karst features in the foundation rock. These features are open to partially open in many locations. Consequently, there is no practical way to construct a reliable downstream filter and collection system, and such systems were eliminated from further consideration. A deep element barrier wall was selected and successfully constructed (Santillan and Salas, 2012). From the above discussion, it is clear that the engineer should enter into a seepage modification project with an open mind, not with a predilection toward either cut off solutions or seepage collection / control solutions. The full range of alternatives should be considered and evaluated in light of the specific site and project constraints. CLOSURE There is a wide range of potential solutions to seepage and internal erosion problems, which can be grouped into two broad categories: 1) seepage collection and control alternatives and 2) cut off or seepage reduction alternatives. There is no one size fits all preferred solution to all seepage issues. Each dam is unique and the seepage solution should be tailored to the specific project and site conditions for that dam. The engineer should not begin the evaluation with a basis toward either category of solution. Rather, the full range of solutions should be considered in light of cost, constructability, technical effectiveness, and operational impacts. It has been the author s experience that seepage issues can often be addressed with collection / control solutions more reliably and at less cost than with cut off / seepage reduction solutions. REFERENCES Cedergren, Harry R., 1989, Seepage, Drainage, and Flow Nets, Third Edition, John Wiley and Sons, Inc., New York, NY. France, John W., 2002, Seepage Control in Glacial Foundations - A Lesson in Humility Dam Safety 2002, National Conference of the Association of State Dam Safety Officials, Tampa, Florida, September France, John W., 2005, Washakie Dam Safety Modifications, Wyoming - A Case Study In Seepage Collection And Control In Glacial Foundations, H2GEO, Denver, CO, A Geotechnical Practice Publication, pgs , American Society of Civil Engineers, Reston, VA Santillan, Alberto Fabio and Pierre Salas, 2012, Wolf Creek Dam Foundation Remediation An Innovative Successful Solution, (2012), Dam Safety 2012, National

20 Conference of the Association of State Dam Safety Officials, Denver, CO, September Zoccola, Michael F., Tommy A. Haskins, and Daphne M. Jackson, 2009, Seepage, Piping, And Remediation in a Karst Foundation At Wolf Creek Dam, Managing Our Water Retention Systems: Proceedings of the 29th Annual Meeting and Conference of the U.S. Society on Dams, Nashville, Tennessee, April 2009.

Scope of Discussion. Foundation Related Issues. Foundation Preparation and Treatment During Dam Construction 10/14/2014

Scope of Discussion. Foundation Related Issues. Foundation Preparation and Treatment During Dam Construction 10/14/2014 Foundation Preparation and Treatment During Dam Construction John W. France, PE, D.WRE URS Corporation Denver, Colorado October 14, 2014 1 Scope of Discussion Broad discussion of treatment of foundations

More information

CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park

CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park CBC Case Study-1212 1 of 5 CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park More Than Geotechnical Engineering DAYTON 125 Westpark Road Centerville, OH 45459 Phone: 937-428-6150 HAZARD

More information

Chapter 3: Summaries of Case Histories

Chapter 3: Summaries of Case Histories Chapter 3: Summaries of Case Histories This chapter presents summaries of 30 case studies on the performance of seepage barriers in dams that were reviewed for this study. Information was collected on

More information

Slurry Trench / Diaphragm Walls

Slurry Trench / Diaphragm Walls UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Slurry Trench / Diaphragm Walls CM 420 TEMPORARY

More information

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment rotary drill hydro-mill backhoe Clamshell + Kelly bar VERTICAL BARRIERS SLURRY

More information

CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS

CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS 8-1. General. All earth and rock-fill dams are subject to seepage through the embankment, foundation, and abutments. Seepage control is necessary to prevent excessive

More information

Levee Cutoff Wall Construction Considerations Natomas Levee Improvement Program July 28, 2009

Levee Cutoff Wall Construction Considerations Natomas Levee Improvement Program July 28, 2009 Levee Cutoff Wall Construction Considerations Natomas Levee Improvement Program Background The Natomas Levee Improvement Program (NLIP), sponsored by the Sacramento Area Flood Control Agency (SAFCA) with

More information

The Problem. Embankment Dams on Karstic Limestone, Soluble and Erodible Foundations: Challenges and Solutions GEOSYSTEMS, L.P.

The Problem. Embankment Dams on Karstic Limestone, Soluble and Erodible Foundations: Challenges and Solutions GEOSYSTEMS, L.P. Embankment Dams on Karstic Limestone, Soluble and Erodible Foundations: Challenges and Solutions Donald A. Bruce, Geosystems, L.P. Keith Ferguson, Kleinfelder, Inc. GEOSYSTEMS, L.P. The Problem Centerhill

More information

Compaction and Jet Grouting

Compaction and Jet Grouting Compaction and Jet Grouting Alan Ringen, PE Senior Vice President Breakthroughs in Tunneling Short Course August 16, 2017 Grouting Principles Geotechnical Grouting: The injection of pumpable fluid materials

More information

Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam

Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam David M. Robison, P.G. Geotechnical and Dam Safety Section, Louisville District, U.S. Army Corps of Engineers

More information

Agenda. Alternative Measures (for Cutoffs) for Dams on Karst. Failure Modes Three Techniques. 1. Introduction and Background

Agenda. Alternative Measures (for Cutoffs) for Dams on Karst. Failure Modes Three Techniques. 1. Introduction and Background Alternative Measures (for Cutoffs) for Dams on Karst Louisville, KY Dr. Donald A. Bruce, Geosystems, L.P. 724-942-0570 Agenda 1. Introduction and Background Failure Modes Three Techniques i. Category I

More information

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii Preface to the Third Edition xiii About the Authors xv Acknowledgements xvii Contents PART ONE: THEORY...1 1. Groundwater in Construction...3 1.1 Groundwater in the Hydrologic Cycle 3 1.2 Origins of Dewatering

More information

A COLLABORATIVE SUCCESS CONSTRUCTION OF THE MORMON ISLAND AUXILIARY DAM KEY-BLOCK FOR SEISMIC REHABILITATION. Abstract

A COLLABORATIVE SUCCESS CONSTRUCTION OF THE MORMON ISLAND AUXILIARY DAM KEY-BLOCK FOR SEISMIC REHABILITATION. Abstract A COLLABORATIVE SUCCESS CONSTRUCTION OF THE MORMON ISLAND AUXILIARY DAM KEY-BLOCK FOR SEISMIC REHABILITATION M. Jonathan Harris, P.E. 1 Eric S. Lindquist, P. E. 2 Rob Jameson 3 Trace Porter 4 Abstract

More information

Paul Brunner, Larry Dacus, Doug Handen. Repairs to Concrete-Lined V-Ditch Alternatives Evaluation

Paul Brunner, Larry Dacus, Doug Handen. Repairs to Concrete-Lined V-Ditch Alternatives Evaluation Memo To: Paul Brunner, Larry Dacus, Doug Handen From: Alberto Pujol /Dan Wanket Date: 09/10/2010 Re: Feather River Levee Site 7 Extension Repairs to Concrete-Lined V-Ditch Alternatives Evaluation This

More information

USACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED

USACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED USACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED 1 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56

More information

A COLLABORATIVE SUCCESS CONSTRUCTION OF THE MORMON ISLAND AUXILIARY DAM KEY-BLOCK FOR SEISMIC REHABILITATION. Abstract

A COLLABORATIVE SUCCESS CONSTRUCTION OF THE MORMON ISLAND AUXILIARY DAM KEY-BLOCK FOR SEISMIC REHABILITATION. Abstract A COLLABORATIVE SUCCESS CONSTRUCTION OF THE MORMON ISLAND AUXILIARY DAM KEY-BLOCK FOR SEISMIC REHABILITATION M. Jonathan Harris, P.E. 1 Eric S. Lindquist, P. E. 2 Rob Jameson 3 Trace Porter 4 Abstract

More information

Problems in Improvement Evaluation, QA and QC

Problems in Improvement Evaluation, QA and QC Problems in Improvement Evaluation, QA and QC Specifying test types, locations, and frequency Representativeness of samples Variability in treatment and uncertainty about acceptable amount of variability

More information

July 2011 BUREAU OF INDIAN STANDARDS. Draft Indian Standard

July 2011 BUREAU OF INDIAN STANDARDS. Draft Indian Standard FOR COMMENTS ONLY DOC: WRD 8 (551)C July 2011 BUREAU OF INDIAN STANDARDS Draft Indian Standard GUIDELINES FOR DESIGN OF UNDER-SEEPAGE CONTROL MEASURES FOR EARTH AND ROCKFILL DAMS (FIRST REVISION OF IS

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

TSAILE DAM MODIFICATION PROJECT Unearthing a Safer Dam

TSAILE DAM MODIFICATION PROJECT Unearthing a Safer Dam TSAILE DAM MODIFICATION PROJECT Unearthing a Safer Dam Bureau of Indian Affairs Navajo Regional Safety of Dams Program Stephen G. Brown, PE Kleinfelder Acknowledgements C. Scott Goss BIA Chief Safety of

More information

Golder Associates Innovative Applications (GAIA) Inc.

Golder Associates Innovative Applications (GAIA) Inc. Golder Associates Innovative Applications (GAIA) Inc. Environmental and Geotechnical Applications of Cutter Soil Mixing RemTech October, 2007 Presented by: Brian Wilson www.gaiacontractors.com What is

More information

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES MINNESOTA WETLAND RESTORATION GUIDE BLOCKING AND FILLING SURFACE DRAINAGE DITCHES TECHNICAL GUIDANCE DOCUMENT Document No.: WRG 4A-1 Publication Date: 10/14/2015 Table of Contents Introduction Application

More information

Conduits through Embankment Dams

Conduits through Embankment Dams Conduits through Embankment Dams Best Practices for Design, Construction, Problem Identification and Evaluation, Inspection, Maintenance, Renovation, and Repair L-266/September 2005 Introduction Conduits

More information

SEEPAGE FAILURE, EVALUATION AND REMEDIATION OF PENN FOREST DAM

SEEPAGE FAILURE, EVALUATION AND REMEDIATION OF PENN FOREST DAM SEEPAGE FAILURE, EVALUATION AND REMEDIATION OF PENN FOREST DAM by W. B. Bingham, P.E.l R. E. Holderbaum, P,E.* W. S. Sherman, P,E,3 ABSTRACT Penn Forest Dam is a large earthfill embankment dam that impounds

More information

Seepage Cutoffs for Dams: Reassertion of the Composite Wall Concept

Seepage Cutoffs for Dams: Reassertion of the Composite Wall Concept Seepage Cutoffs for Dams: Reassertion of the Composite Wall Concept Dr. Donald A. Bruce GEOSYSTEMS, L.P. Contents of Today s Presentation 1. Review of Concrete Cut-Off Wall Construction 2. Review of Contemporary

More information

Transient Seepage Analyses of Soil-Cement Uplift Pressures During Reservoir Drawdown

Transient Seepage Analyses of Soil-Cement Uplift Pressures During Reservoir Drawdown Transient Seepage Analyses of Soil-Cement Uplift Pressures During Reservoir Drawdown Robert J. Huzjak 1, P.E., M. ASCE, Adam B. Prochaska 2, Ph.D., A.M. ASCE, and James A. Olsen 3, A.M. ASCE 1 President,

More information

Fly Ash Reservoir II Dam Initial Safety Factor Assessment. Cardinal Power Plant Brilliant, Ohio S&ME Project No A

Fly Ash Reservoir II Dam Initial Safety Factor Assessment. Cardinal Power Plant Brilliant, Ohio S&ME Project No A Fly Ash Reservoir II Dam Initial Safety Factor Assessment Cardinal Power Plant Brilliant, Ohio S&ME Project No. 7217-15-006A Prepared for: American Electric Power 1 Riverside Plaza, 22 nd Floor Columbus,

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5B Access Tracks, Hardstanding Areas, Electrical Compounds, Borrow Pit And Cable Laying Construction Method Statement Copyright ESB International

More information

Important Role of Filters in Hydraulic Soil Structures Hamid Fallah Apr. 19, 2013

Important Role of Filters in Hydraulic Soil Structures Hamid Fallah Apr. 19, 2013 11 th PURDUE GEOTECHNICAL SOCIETY WORKSHOP Important Role of Filters in Hydraulic Soil Structures Hamid Fallah Apr. 19, 2013 Outline Introduction Brief history of evolution of filter design criteria Design

More information

Ground Improvement Techniques

Ground Improvement Techniques GRD Journals Global Research and Development Journal for Engineering Recent Advances in Civil Engineering for Global Sustainability March 2016 e-issn: 2455-5703 Ground Improvement Techniques 1 Nimisha

More information

US ARMY CORPS OF ENGINEERS ALASKA DISTRICT BUILDING STRONG. 21 September Coleman Chalup, P.E. Lead Engineer USACE Alaska District

US ARMY CORPS OF ENGINEERS ALASKA DISTRICT BUILDING STRONG. 21 September Coleman Chalup, P.E. Lead Engineer USACE Alaska District US ARMY CORPS OF ENGINEERS ALASKA DISTRICT Chena River Lakes Flood Control Project/Moose Creek Dam, North Pole, Alaska - USACE Design, Cost, And Constructability Considerations For CSM Barrier Walls In

More information

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA)

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) #47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) by Michael J. Carey Michael J. Fisher Steven R. Day Presented at: International Containment Technology

More information

Bioreactor Landfill Design

Bioreactor Landfill Design Bioreactor Landfill Design Timothy Townsend, PhD, PE Department of Environmental Engineering Sciences University of Florida ttown@ufl.edu Bioreactor Landfill Design Modern landfill design entails many

More information

SUSTAINABLE FOUNDATION ENGINEERING MIXED-IN- PLACE TECHNIQUES FOR DURABLE CUT-OFF WALLS

SUSTAINABLE FOUNDATION ENGINEERING MIXED-IN- PLACE TECHNIQUES FOR DURABLE CUT-OFF WALLS SUSTAINABLE FOUNDATION ENGINEERING MIXED-IN- PLACE TECHNIQUES FOR DURABLE CUT-OFF WALLS Peter, BAUER Spezialtiefbau GmbH, Schrobenhausen, Germany, +49 8252 974266, +49 8252 971496, peter.banzhaf@bauer.de

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EG Engineer Regulation 1110-2-1942 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design INSPECTION, MONITORING AND MAINTENANCE OF RELIEF WELLS 25 September

More information

Ponds: planning, design, and construction

Ponds: planning, design, and construction Ponds: planning, design, and construction Ponds for many purposes: Fish Production Recreation Water Supply Esthetics Wildlife Habitat Natural ponds: Formed in natural depressions in the landscape Not man-made

More information

Figure (12.1) Foundation Grouting

Figure (12.1) Foundation Grouting Chapter 12 - Foundation Grouting 12. Foundation Grouting 12.1. Introduction: The construction of structures on weak ground often requires the soil to be improved in order to ensure the safety and the stability

More information

Preliminary Concepts for Soil-Bentonite Cutoff Wall Topock Compressor Station, Needles, California

Preliminary Concepts for Soil-Bentonite Cutoff Wall Topock Compressor Station, Needles, California TECHNICAL MEMORANDUM Preliminary Concepts for Soil-Bentonite Cutoff Wall Topock Compressor Station, Needles, California DATE: April 14, 2004 Pacific Gas and Electric Company (PG&E) is undertaking an expedited

More information

DOUBLE ROW GROUT CURTAIN DESIGN AND CONSTRUCTION FOR CEDAR CREEK DAM IN MALAKOFF, TEXAS. Daniel P. Bole 1 Marc T. Miller, P.E. 2 Billy L.

DOUBLE ROW GROUT CURTAIN DESIGN AND CONSTRUCTION FOR CEDAR CREEK DAM IN MALAKOFF, TEXAS. Daniel P. Bole 1 Marc T. Miller, P.E. 2 Billy L. DOUBLE ROW GROUT CURTAIN DESIGN AND CONSTRUCTION FOR CEDAR CREEK DAM IN MALAKOFF, TEXAS Daniel P. Bole 1 Marc T. Miller, P.E. 2 Billy L. Fisher 3 ABSTRACT This case history presents the design and construction

More information

Typical flow net for the flow beneath the dam with heel cutoff wall [Lambe & R.V. Whitman (1979)]

Typical flow net for the flow beneath the dam with heel cutoff wall [Lambe & R.V. Whitman (1979)] Typical flow net for the flow beneath the dam with heel cutoff wall [Lambe & R.V. Whitman (1979)] Typical flow net for the flow beneath the dam with toe cutoff wall [Lambe & R.V. Whitman (1979)] Exit gradient

More information

Grouting Bilfinger Spezialtiefbau GmbH

Grouting Bilfinger Spezialtiefbau GmbH Grouting Bilfinger Spezialtiefbau GmbH Goldsteinstrasse 114 D-60528 Frankfurt Phone: +49 69 6688-345 Fax: +49 69 6688-277 Email: info.spezialtiefbau@bilfinger.com www.foundation-engineering.bilfinger.com

More information

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com

More information

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization www.malcolmdrilling.com Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning

More information

APPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011

APPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011 APPENDIX A EARTHEN EMBANKMENT VERSION 1.0 March 1, 2011 SECTION A-1: DESCRIPTION OF PRACTICE An earthen embankment is a raised impounding structure made from compacted soil. The embankment is the feature

More information

CUTTER SOIL MIXED WALL SHORING AND SEEPAGE CUT OFF OFFICE BUILDING NEAR WATERFRONT

CUTTER SOIL MIXED WALL SHORING AND SEEPAGE CUT OFF OFFICE BUILDING NEAR WATERFRONT CUTTER SOIL MIXED WALL SHORING AND SEEPAGE CUT OFF OFFICE BUILDING NEAR WATERFRONT By John Kvinsland Malcolm Drilling Company, Kent, Washington Bob Plum ASCE, P.E., Principal Kleinfelder Consultants, Seattle

More information

Laboratory modeling of erosion potential of seepage barrier material

Laboratory modeling of erosion potential of seepage barrier material Utah State University DigitalCommons@USU All Graduate Theses and Dissertations Graduate Studies 5-2013 Laboratory modeling of erosion potential of seepage barrier material Nathan E. Braithwaite Follow

More information

Category 1 Waste Rock Stockpile Groundwater Containment System

Category 1 Waste Rock Stockpile Groundwater Containment System Memorandum To: Jennifer Saran, Poly Met Mining Inc. Project: 23690862.00-042-008 1.0 Introduction The Co-Lead Agencies have requested a summary of the four containment systems that are planned for the

More information

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) Activity: Infiltration Systems PLANNING CONSIDERATIONS: Design Life: Short IS Acreage

More information

Annual Meeting of the Association of State Dam Safety Officials INNOVATIVE SLURRY TRENCH METHODS FOR THE REHABILITATION OF SMALL DAMS.

Annual Meeting of the Association of State Dam Safety Officials INNOVATIVE SLURRY TRENCH METHODS FOR THE REHABILITATION OF SMALL DAMS. Annual Meeting of the Association of State Dam Safety Officials Sept 9 to 13, 2001 Snowbird, UT INNOVATIVE SLURRY TRENCH METHODS FOR THE REHABILITATION OF SMALL DAMS Steven R. Day 1, Christopher R. Ryan

More information

Proceedings of the 10 th Australia New Zealand Conference on Geo-Mechanics, Common Ground Brisbane Australia, October 2007

Proceedings of the 10 th Australia New Zealand Conference on Geo-Mechanics, Common Ground Brisbane Australia, October 2007 Page 1 of 6 Proceedings of the 10 th Australia New Zealand Conference on Geo-Mechanics, Common Ground Brisbane Australia, October 2007 Vertical groundwater barriers for contaminated site reclamation Christopher

More information

Lewisville Dam. Draft Dam Safety Modification Environmental Assessment Public Review

Lewisville Dam. Draft Dam Safety Modification Environmental Assessment Public Review Lewisville Dam Draft Dam Safety Modification Environmental Assessment Public Review Stacy Gray (Project Manager) U.S. Army Corps of Engineers, Fort Worth District 27 September 2016 US Army Corps of Engineers

More information

Construction Technology B (CON4313)

Construction Technology B (CON4313) 3 - Basement 1 Quick Revision 1.1 Problems arising from basement construction a. Excavation method. b. Surface and ground water control c. Lateral stability of basement excavation. d. Stability of adjoining

More information

Lightweight fill in dam remediation - a case study

Lightweight fill in dam remediation - a case study Lightweight fill in dam remediation - a case study K. M. H. BARR, W. A. Fairhurst & Partners, Glasgow, UK SYNOPSIS. The east dam at Millbuies Loch was reconstructed following observations of crest settlement.

More information

CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS

CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS IAC 5/12/93, 4/8/98 Environmental Protection[567] Ch 39, p.1 IAC 5/12/93, 4/8/98 CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS 567 39.1(455B) Purpose. The purpose of this chapter is to

More information

COMPACTION GROUTING OF FIVE CHANNELS DAM AU SABLE RIVER, MICHIGAN. 1.0 Introduction

COMPACTION GROUTING OF FIVE CHANNELS DAM AU SABLE RIVER, MICHIGAN. 1.0 Introduction COMPACTION GROUTING OF FIVE CHANNELS DAM AU SABLE RIVER, MICHIGAN Author: Jeffrey M. Bair - Paul C. Rizzo Associates, Inc. Co-Authors: Howard Gault Paul C. Rizzo Associates, Inc. Stuart Johnson Consumers

More information

SEEPAGE ANALYSIS UNDERNEATH DIYALA WEIR FOUNDATION

SEEPAGE ANALYSIS UNDERNEATH DIYALA WEIR FOUNDATION Thirteenth International Water Technology Conference, IWTC 13 009, Hurghada, Egypt SEEPAGE ANALYSIS UNDERNEATH DIYALA WEIR FOUNDATION Saleh I. Khassaf 1, Aqeel Sh. Al-Adili, and Rafid S. Rasheed 3 1 Asst.

More information

Remedial grouting works to two dams in Hong Kong

Remedial grouting works to two dams in Hong Kong Remedial grouting works to two dams in Hong Kong D. GALLACHER, AECOM, Edinburgh, UK SYNOPSIS. Tai Tam Upper and West Col Dams in Hong Kong had experienced substantial leakage over an extended period. Recommendations

More information

CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted September 5, Part 1 Introduction...2

CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted September 5, Part 1 Introduction...2 CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted September 5, 1989 Table of Contents Page Part 1 Introduction...2 32-1 Purpose...2 32-2 Applicability...2 32-3 Definitions...2 32-4

More information

ASSOCIATION OF STATE DAM SAFETY OFFICIALS VOLUME 14 ISSUE ISSN

ASSOCIATION OF STATE DAM SAFETY OFFICIALS VOLUME 14 ISSUE ISSN ASSOCIATION OF STATE DAM SAFETY OFFICIALS VOLUME 14 ISSUE 2 2016 ISSN 1944-9836 IN THIS ISSUE: Depression at Nesbitt Dam Developing a Dam Emergency Intervention Toolbox Lake Delhi Dam Reconstruction Technology

More information

Grouting for Freezing

Grouting for Freezing Grouting for Freezing Joseph A. Sopko, Ph.D., P.E. M.ASCE 1, Adam T. Curry, P.E. M.ASCE, 2 and Gregory T. Ziegler, P.E., M.ASCE 3 1 Moretrench American Corporation, 100 Stickle Ave., Rockaway, NJ 07866;

More information

Water Well Decommissioning Guidelines

Water Well Decommissioning Guidelines Water Well Decommissioning Guidelines Approval Date: June 1, 2007 Effective Date: September 10, 2007 Approved By: Gerard MacLellan Version Control: This is a new guideline I. Introduction The Water Well

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

EVALUATION OF DIFFERENT SEEPAGE CONTROL MEASURES FOR A PROPOSED GOLEN GOL WEIR IN PAKISTAN

EVALUATION OF DIFFERENT SEEPAGE CONTROL MEASURES FOR A PROPOSED GOLEN GOL WEIR IN PAKISTAN Sci., Tech. and Dev., 32 (4): 299-307, 2013 EVALUATION OF DIFFERENT SEEPAGE CONTROL MEASURES FOR A PROPOSED GOLEN GOL WEIR IN PAKISTAN BAZID KHAN 1 *, MUHAMMAD AMIN 2 AND NOOR BADSHAH 3 1 Department of

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

> GRouTING systems. The experience and expertise to deliver the right grouting solution for the job. Grouting is the most diverse

> GRouTING systems. The experience and expertise to deliver the right grouting solution for the job. Grouting is the most diverse > GRouTING systems The experience and expertise to deliver the right grouting solution for the job Grouting is the most diverse of all specialty geotechnical disciplines. It encompasses a range of individual

More information

UNDERPINNING A CRANE FOUNDATION

UNDERPINNING A CRANE FOUNDATION UNDERPINNING A CRANE FOUNDATION Donald R. McMahon, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New York, USA Andrew J. Nichols, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New

More information

STRUCTURAL STABILITY ASSESSMENT. Bremo Power Station CCR Surface Impoundment: North Ash Pond STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT. Bremo Power Station CCR Surface Impoundment: North Ash Pond STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT Bremo Power Station CCR Surface Impoundment: North Ash Pond ~,Dominion Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff,

More information

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES SUBSURFACE DRAINAGE DESIGN D4 DESIGN GUIDELINE CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES D4 ISSUE: NO:2 Mar 2012 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL...

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

Plastic concrete cutoff walls have been used for

Plastic concrete cutoff walls have been used for The world s largest cutoff wall at Karkheh dam A.A. Mirghasemi, Mahab Ghodss Co. and University of Tehran, Iran M. Pakzad, Mahab Ghodss Co., Iran B. Shadravan, University of Ottawa, Canada The Karkheh

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116 (i) Site Name and Ownership Information: HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY Site Name: Site Location: Site Address: Owner: Owner Address:

More information

Civil Engineering Construction I (CBE5031)

Civil Engineering Construction I (CBE5031) Civil Engineering Construction I (CBE5031) Basement 1 1 Quick Revision 1.1 Problems arising from basement construction a) Excavation method. b) Surface and ground water control c) Lateral stability of

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information

Brochure E. The Soilcrete Jet Grouting Process

Brochure E. The Soilcrete Jet Grouting Process Brochure 67-03 E The Soilcrete Jet Grouting Process Contents History...3 Soilcrete Jet Grouting Process... 4 Process Variations... 6 Construction Forms... 7 Construction Sequences... 8 Stabilisation...

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

An Introduction to Seepage, Slope and Settlement of Levees

An Introduction to Seepage, Slope and Settlement of Levees An Introduction to Seepage, Slope and Settlement of Levees Course No: G02-011 Credit: 2 PDH J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI Continuing Education and Development, Inc. 9 Greyridge Farm

More information

USE OF TRENCH DRAINS TO IMPROVE CHRONIC EMBANKMENT STABILITY PROBLEMS. and SHANNON & WILSON, INC. ABSTRACT

USE OF TRENCH DRAINS TO IMPROVE CHRONIC EMBANKMENT STABILITY PROBLEMS. and SHANNON & WILSON, INC. ABSTRACT USE OF TRENCH DRAINS TO IMPROVE CHRONIC EMBANKMENT STABILITY PROBLEMS by Steven R. McMullen, P.E. Principal Engineer and Dexter N. McCulloch, C.E.G. Senior Vice President SHANNON & WILSON, INC. ABSTRACT

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5 Turbine Foundation Construction Method Statement Copyright ESB International Limited, all rights reserved. Farm Contents 1 Introduction

More information

Ground Improvement. Martin G. Taube, P.E., P.G. February 4, 2003

Ground Improvement. Martin G. Taube, P.E., P.G. February 4, 2003 ODOT Geotechnical Information Exchange Seminar Ground Improvement Martin G. Taube, P.E., P.G. February 4, 2003 Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 ph. (412) 221-4500 fax (412)

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams

Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams by James K. Mitchell, Sc.D., P.E., Dist. M.ASCE University of Alberta, Edmonton, Alberta October 6, 2010 1 SCOPE OF THE LECTURE

More information

Santa Clara Valley Water District Page 1 of 4

Santa Clara Valley Water District Page 1 of 4 Santa Clara Valley Water District File No.: 17-0256 Agenda Date: 4/28/2017 Item No.: 6. BOARD AGENDA MEMORANDUM SUBJECT: Discussion on the Anderson Dam Seismic Retrofit Project. RECOMMENDATION: A. Receive

More information

Standard Guidelines for the Design, Installation, Maintenance, and Operation of Urban Subsurface Drainage, ASCE/EWRI 12-, 13-, 14-05

Standard Guidelines for the Design, Installation, Maintenance, and Operation of Urban Subsurface Drainage, ASCE/EWRI 12-, 13-, 14-05 Standard Guidelines for the Design, Installation, Maintenance, and Operation of Urban Subsurface Drainage, Table of Contents Standard Guidelines for the Design of Urban Subsurface Drainage Foreword...ix

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SECANT PILE. Introduction:

SECANT PILE. Introduction: SECANT PILE Introduction: Over the last few decades construction of retaining walls in urban areas has grown significantly, as a result of territorial and economical development of the cities. In most

More information

CCR Rule Annual Inspection Report 2

CCR Rule Annual Inspection Report 2 Inspection Description An ARCADIS team performed the Trimble County Gypsum Storage Pond (GSP) 2015 annual inspection by a qualified professional engineer. The overall goal of the inspection was to ensure

More information

Suggested Stormwater Management Practices For Individual House Lots

Suggested Stormwater Management Practices For Individual House Lots Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These

More information

Use of Jet Grouting in Challenging Infrastructure Renewal Situations in Hawaii

Use of Jet Grouting in Challenging Infrastructure Renewal Situations in Hawaii Use of Jet Grouting in Challenging Infrastructure Renewal Situations in Hawaii Reyn Hashiro 1, P.E., M. ASCE, Devin Nakayama 2, P.E. M. ASCE, and James Kwong 3, Ph.D., P.E., M. ASCE 1 Associate, Yogi Kwong

More information

Geotechnical Engineering

Geotechnical Engineering Geotechnical Engineering Part of a diversified family of solutions www.jmt.com An Employee Owned Company Geotechnical Engineering JMT s very experienced staff in design and construction testing services

More information

AMERICAN ELECTRIC POWER (SWEPCO)

AMERICAN ELECTRIC POWER (SWEPCO) 2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION

More information

Central Region GeoHazard Assessment H597:02, km Slide May 2011 Site Inspection and Instrumentation Monitoring Report

Central Region GeoHazard Assessment H597:02, km Slide May 2011 Site Inspection and Instrumentation Monitoring Report Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 July 14, 2011 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region GeoHazard Assessment H597:02,

More information

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 The Institution of Engineers of Ireland Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 MODULE 4 RETAINING STRUCTURES DEEP EXCAVATIONS

More information

Appendix 14-I Description of Stream Crossing for Electrical Interconnect

Appendix 14-I Description of Stream Crossing for Electrical Interconnect Appendix 14-I Description of Stream Crossing for Electrical Interconnect 14.0 Ecology Appendix 14-I CPV Valley Energy Project Description of Stream Crossing for Electrical Interconnect The CPV Valley Energy

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

Application of Geotextiles in Pavement Drainage Systems

Application of Geotextiles in Pavement Drainage Systems International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 4 (2014), pp. 385-390 Research India Publications http://www.ripublication.com/ijcer.htm Application of Geotextiles

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information