1 Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region Columbia Street Kamloops, BC, V2C-2T3 Telephone: (250) Fax: (250) Swift River Pit No Location: The pit is located approximately 29.5km east of the Highway 97/26 junction in Quesnel, then 800m metres south of Highway 26 off of Ranch Road. Legal Description: The pit is legally described as that part of District Lot 443 together with that tract of land in the vicinity of District Lot 433, Cariboo. Geographic coordinates are UTM 10, Easting, Northing. Ownership is Crown Land file , tenure document Gradation: The average and range of laboratory samples as well as oversize rock field estimates for material from the 2014 testing program at Swift River Pit are as follows: Laboratory Samples Classification: Average (%) Range (%) Gravel ( mm) Sand ( mm) Fines (<0.075mm) Oversize Field Estimates Classification: Average (%) Range (%) Boulders (>375mm) 0 0 Cobbles ( mm) Cobbles (75-150mm) Maximum rock size observed was 350mm.

2 Aggregate Gradation Chart: 2

3 Summary of Test Pit Logs:

4 2014 4

5 5

6 Aggregate Quality: A summary of aggregate quality tests performed on pit run samples from the tested area are as follows: Granular Volume: TP or Year Micro-Deval (%) (C/F) Sand Equivalent (%) Bulk Relative Density (C/F) Absorption (%) (C/F) / / / / Estimated Volume: 85,000 m 3 The Estimated Volume has been determined by multiplying the surface area of the mining area (1.8ha) by an average depth of 4.7 metres. Pit Development and Recommendations: The mining area and aggregate stockpile site have been previously developed by the Ministry of Transportation and Infrastructure (MoTI). Any additional development will be the responsibility of the contractor and shall be completed as per the pit development plan or as directed by the Ministry Representative. Any stripping of overburden, if needed, can be placed within existing overburden stockpiles located east of TP and near TP on the upper bench as indicated on the pit development plan. The crusher is recommended to be located at the base of the slope near Test Pit as identified on the pit development plan, with mining proceeding in a northeasterly direction as indicated. SM3 was encountered at the base of slope on a small elevated bench located immediately north of the crusher location. In order to avoid contamination with underlying SM3 it is suggested that mining commence at the base of the elevated bench. The use of a bulldozer to push mining material to the crusher location is also suggested to avoid the SM3 and an excessively high relief pit face. Processed aggregate may be stockpiled to the south of the crusher location as indicated on the pit development plan. Any stripping of overburden, if needed, can be placed on the east side of the pit as indicated on the pit development. At the completion of mining, active pit faces shall be sloped to a minimum of 1 ½:1 with pit run granular material. All reject materials resulting from aggregate production are to be placed in separate stockpiles free from deleterious material and in an easily accessible location. No 6

7 stockpiling against the pit face is permitted without the permission from the Aggregate Resource Manager. Site Photographs: TP 14-02, TP 14-04,

8 TP 14-13, TP 14-15,

9 Panorama of upper bench from TP 14-04, November Crusher and stockpile area/mining area, mid photo November

10 TP17-01, November TP 17-02, November Samantha Kinniburgh Senior Aggregate Resource Specialist 10

Redeau Lake Pit No. 1947

Redeau Lake Pit No. 1947 Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops, BC, V2C-2T3 Telephone: (250) 371-3965 Fax: (250) 828-4083

More information

Ootischenia Pit No. 0925

Ootischenia Pit No. 0925 Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops, BC, V2C 2T3 Telephone: (250) 819-1103 Fax: (250) 828-4083

More information

Technical Summary. January 2014

Technical Summary. January 2014 Pit Name: Roaring Lake Pit Provincial Pit Numbers: 1330 & 4065 Technical Summary January 2014 Location: Roaring Lake Pit is located on Highway 16, approximately 44 km west of Prince George, BC. Access

More information

Terrace Airport Pit Aggregate Resource Assessment Technical Summary Provincial Pit Number 5235

Terrace Airport Pit Aggregate Resource Assessment Technical Summary Provincial Pit Number 5235 Terrace Airport Pit Aggregate Resource Assessment Technical Summary Provincial Pit Number 5235 Ministry of Transportation and Infrastructure 213, 1011-4 th Avenue, Prince George, BC, V2L 3H9 McElhanney

More information

Technical Circular: T-5-90 December 5, 1990

Technical Circular: T-5-90 December 5, 1990 Technical Circular: T590 December 5, 1990 TO : ASSISTANT CHIEF HIGHWAY ENGINEER ALL HQ DIRECTORS: Prof. Services, Planning and Major Projects ALL REGIONAL MANAGERS: Prof. Services, Planning and Operations

More information

Ontario ENGINEERING STANDARD SPECIFICATION 1.0 PURPOSE 2.0 MATERIALS

Ontario ENGINEERING STANDARD SPECIFICATION 1.0 PURPOSE 2.0 MATERIALS 1/8 1.0 PURPOSE This specification describes the minimum gradation and physical property requirements and describes acceptable material qualities, handling, storage and delivery of earthfill materials.

More information

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1004 NOVEMBER 2004 MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS TABLE OF CONTENTS 1004.01 SCOPE 1004.02 REFERENCES 1004.03 DEFINITIONS 1004.04

More information

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 1004 NOVEMBER 2012 MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS TABLE OF CONTENTS 1004.01 SCOPE 1004.02 REFERENCES 1004.03 DEFINITIONS

More information

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1004 NOVEMBER 2012 MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS TABLE OF CONTENTS 1004.01 SCOPE 1004.02 REFERENCES 1004.03 DEFINITIONS

More information

INDEX FOR SPECIFICATIONS FOR AGGREGATE FOR BITUMINOUS PAVEMENT SCOPE... 2

INDEX FOR SPECIFICATIONS FOR AGGREGATE FOR BITUMINOUS PAVEMENT SCOPE... 2 February 2017 No. 920(I) INDEX FOR SPECIFICATIONS FOR AGGREGATE FOR BITUMINOUS PAVEMENT 920. 1 SCOPE... 2 920. 3 MATERIALS 3.1 Source of Supply... 2 3.2 Aggregate Requirements... 2 3.3 Mix Design... 3

More information

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003 ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES Special Provision No. 199S38 March 2003 The following MTO specification is not based on or referenced to an OPS Specification.

More information

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1001 MARCH 1993 MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL 1001.01 SCOPE 1001.02 REFERENCES 1001.03 DEFINITIONS TABLE OF CONTENTS 1001.04 SUBMISSION

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

MATERIAL SPECIFICATION FOR AGGREGATES - CONCRETE

MATERIAL SPECIFICATION FOR AGGREGATES - CONCRETE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1002 APRIL 2004 MATERIAL SPECIFICATION FOR AGGREGATES - CONCRETE TABLE OF CONTENTS 1002.01 SCOPE 1002.02 REFERENCES 1002.03 DEFINITIONS 1002.04 SUBMISSION

More information

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 1001 NOVEMBER 2018 MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL TABLE OF CONTENTS 1001.01 SCOPE 1001.02 REFERENCES 1001.03 DEFINITIONS 1001.04 DESIGN

More information

Jeremy s Construction Ltd.

Jeremy s Construction Ltd. Jeremy s Construction Ltd. Environmental Assessment Registration Document Proposed Doyles Quarry Extension Submitted by: Jeremy s Construction Limited P.O. Box 137 Doyles, NL A0N 1J0 March 2017 Table of

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

MATERIAL SPECIFICATION FOR AGGREGATES - CONCRETE

MATERIAL SPECIFICATION FOR AGGREGATES - CONCRETE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1002 APRIL 2011 MATERIAL SPECIFICATION FOR AGGREGATES - CONCRETE TABLE OF CONTENTS 1002.01 SCOPE 1002.02 REFERENCES 1002.03 DEFINITIONS 1002.04 DESIGN

More information

55.3 AGGREGATE PRODUCTION AND STOCKPILING

55.3 AGGREGATE PRODUCTION AND STOCKPILING 55.3 AGGREGATE PRODUCTION AND STOCKPILING 55.3.1 GENERAL The Work covers the general requirements for production, gradation, stockpiling, and pit operations for specified aggregate materials. 55.3.2 AGGREGATE

More information

MATERIAL SPECIFICATION FOR AGGREGATES - SURFACE TREATMENT

MATERIAL SPECIFICATION FOR AGGREGATES - SURFACE TREATMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 1006 NOVEMBER 2013 MATERIAL SPECIFICATION FOR AGGREGATES - SURFACE TREATMENT TABLE OF CONTENTS 1006.01 SCOPE 1006.02 REFERENCES 1006.03 DEFINITIONS

More information

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP INFRASTRUCTURE SERVICES Page 1 of 7 1.0 GRANULAR BASE AND SUB-BASE 1.1 DESCRIPTION.1 This section specifies requirements for supplying, producing, hauling placing and compacting processed gravel or quarried

More information

Information Bulletin:

Information Bulletin: Equipment Advisory Adv. No. 2015012 R1 Supersedes: Adv. No. 2015012 R0 Issue Date: April 21, 2015 File: 1649.10 Information Bulletin: Backfill Revision Note Revised text since R0 edition is shown with

More information

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1004 NOVEMBER 2012 MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS TABLE OF CONTENTS 1004.01 SCOPE 1004.02 REFERENCES 1004.03 DEFINITIONS

More information

BALLAST PRODUCTION CURRY QUARRY

BALLAST PRODUCTION CURRY QUARRY BALLAST PRODUCTION CURRY QUARRY 2019-2020 INVITATION TO SITE VISIT OCOTBER 2018 SEPTEMBER 27, 2018 ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVENUE ANCHORAGE, ALASKA 99501 PROJECT DESCRIPTION & SCOPE

More information

County of Park PARK COUNTY WYOMING PRIVATE SOURCE GRAVEL POWELL AREA PRODUCE TO STOCKPILE REQUEST FOR QUOTE

County of Park PARK COUNTY WYOMING PRIVATE SOURCE GRAVEL POWELL AREA PRODUCE TO STOCKPILE REQUEST FOR QUOTE PUBLIC WORKS DEPARTMENT Brian J. Edwards, PE Park County Engineer Road & Bridge and Engineering 527-8520 or 754-8520 PARK COUNTY, WYOMING ORGANIZED 1911 ORIGINAL PARK COUNTY COURTHOUSE CODY, WYOMING COMPLETED

More information

Section 5 Specification 5.22 Supply and Install Smooth Wall Steel Pipes TABLE OF CONTENTS

Section 5 Specification 5.22 Supply and Install Smooth Wall Steel Pipes TABLE OF CONTENTS TABLE OF CONTENTS 5.22 SUPPLY AND INSTALL SMOOTH WALL STEEL PIPES... 1 5.22.1 GENERAL... 1 5.22.2 MATERIALS... 1 5.22.2.1 Culvert Material... 1 5.22.2.2 Material for Bedding, Backfill and Sealing... 1

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

Special Provision No. 110S11 June 2012

Special Provision No. 110S11 June 2012 AMENDMENT TO OPSS 1002, APRIL 2004 Special Provision No. 110S11 June 2012 OPSS 1002, April 2004, Material Specification for Aggregates Concrete is deleted in its entirety and replaced with the following:

More information

PACIFIC SILICA AND ROCK QUARRY LTD. Aggregates and Quarry Materials Application Requirements List

PACIFIC SILICA AND ROCK QUARRY LTD. Aggregates and Quarry Materials Application Requirements List PACIFIC SILICA AND ROCK QUARRY LTD. Aggregates and Quarry Materials Application Requirements List The following information is sourced from Pacific Silica and Rock Quarry Ltd. Ministry approved Mine Plan

More information

MATERIAL SPECIFICATION FOR AGGREGATES - CONCRETE

MATERIAL SPECIFICATION FOR AGGREGATES - CONCRETE ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 1002 APRIL 2018 MATERIAL SPECIFICATION FOR AGGREGATES - CONCRETE TABLE OF CONTENTS 1002.01 SCOPE 1002.02 REFERENCES 1002.03 DEFINITIONS 1002.04 DESIGN

More information

Special Provision No. 110S11 August 2007

Special Provision No. 110S11 August 2007 AMENDMENT TO OPSS 1002, APRIL 2004 Special Provision No. 110S11 August 2007 OPSS 1002, April 2004, Material Specification for Aggregates Concrete is deleted in its entirety and replaced with the following:

More information

1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface.

1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface. 3505 - SPECIFICATION FOR GRANULAR BASE COURSE 3505 - l DESCRIPTION 1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface. 1.02 The following definitions

More information

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1001 NOVEMBER 2005 MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL TABLE OF CONTENTS 1001.01 SCOPE 1001.02 REFERENCES 1001.03 DEFINITIONS 1001.04 SUBMISSION

More information

SECTION 303 CULVERTS

SECTION 303 CULVERTS 303.01 Scope - This section covers the construction of pipe culverts. 303.01.01 Definitions for the purposes of this section, the following general terms are defined as follows: a) Backfilling means the

More information

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES SAND AND GRAVEL PERMIT APPROVING WORK SYSTEM AND RECLAMATION PROGRAM (Issued pursuant to Section 10 of the Mines Act R.S.B.C. 1996, C.293) Permit:

More information

Geotechnical Investigation Report

Geotechnical Investigation Report Geotechnical Investigation Report Proposed,000-Gallon Water Storage Tank Fagasa Pass Tank Upper Pago Pago, American Samoa Prepared for: ASPA Water Engineering Division Tafuna, American Samoa PO Box PPB

More information

State of Nevada Department of Transportation Materials Division

State of Nevada Department of Transportation Materials Division State of Nevada Department of Transportation Materials Division STANDARD METHODS OF SAMPLING STONE, GRAVEL, SAND AND PAVING MIXTURES FOR USE AS HIGHWAY MATERIALS SCOPE This test method is used to obtain

More information

January 2008 No. 500 INDEX FOR SPECIFICATIONS FOR GRADING SCOPE...1

January 2008 No. 500 INDEX FOR SPECIFICATIONS FOR GRADING SCOPE...1 January 2008 No. 500 INDEX FOR SPECIFICATIONS FOR GRADING 500. 1 SCOPE...1 1.1 Dimensions...1 1.2 Pre-Construction Meeting...1 1.3 Inspection of Equipment...1 1.5 Work Around Structures...1 1.6 Protection

More information

AGGREGATE QUALITY MONITORING PROGRAM

AGGREGATE QUALITY MONITORING PROGRAM Test Procedure for AGGREGATE QUALITY MONITORING PROGRAM TxDOT Designation: Tex-499-A Effective Date: December 007 1. SCOPE 1.1 The Aggregate Quality Monitoring Program (AQMP) provides the requirements

More information

MATERIAL SPECIFICATION FOR AGGREGATES - CONCRETE

MATERIAL SPECIFICATION FOR AGGREGATES - CONCRETE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1002 APRIL 2013 MATERIAL SPECIFICATION FOR AGGREGATES - CONCRETE TABLE OF CONTENTS 1002.01 SCOPE 1002.02 REFERENCES 1002.03 DEFINITIONS 1002.04

More information

Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia

Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia Upland Excavating Ltd. Engineering Consultant: GHD Limited Presentation Agenda Project Background Site

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

MATERIAL SPECIFICATION FOR AGGREGATES - HOT MIX ASPHALT

MATERIAL SPECIFICATION FOR AGGREGATES - HOT MIX ASPHALT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1003 NOVEMBER 2006 MATERIAL SPECIFICATION FOR AGGREGATES - HOT MIX ASPHALT TABLE OF CONTENTS 1003.01 SCOPE 1003.02 REFERENCES 1003.03 DEFINITIONS 1003.04

More information

LAPEER COUNTY ROAD COMMISSION ANNUAL BID SLURRY SEAL SURFACE SPECIFICATIONS

LAPEER COUNTY ROAD COMMISSION ANNUAL BID SLURRY SEAL SURFACE SPECIFICATIONS 2009-17 LAPEER COUNTY ROAD COMMISSION ANNUAL BID SLURRY SEAL SURFACE SPECIFICATIONS DESCRIPTION The Slurry Seal Surface shall consist of a mixture of emulsified asphalt, mineral aggregate and water, properly

More information

Percent Passing by Weight. 105% Payment #200

Percent Passing by Weight. 105% Payment #200 2018 GUIDE SPEC FOR CRUSHING GRAVEL ROAD SURFACING AGGREGATE (10-17-2018) Please delete the first two pages of this document (the user note) prior to putting the spec into a contract Specification User

More information

Standard Test Procedures Manual

Standard Test Procedures Manual STP 400 Standard Test Procedures Manual 1. SCOPE 1.1. Description of Test 2. PROCEDURES This method describes the minimum requirements for a contractor s Quality Control Plan that will help to assure that

More information

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1001 NOVEMBER 2013 MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL TABLE OF CONTENTS 1001.01 SCOPE 1001.02 REFERENCES 1001.03 DEFINITIONS 1001.04 DESIGN

More information

Managing Mine Slimes and Other Lessons Learned Jack Waite Mine Removal Action

Managing Mine Slimes and Other Lessons Learned Jack Waite Mine Removal Action Managing Mine Slimes and Other Lessons Learned Jack Waite Mine Removal Action Todd Bragdon, CDM Smith Brandon Ball, Parametrix Bill Adams, EPA Region 10 Rod Zion, USACE Seattle Jeff Johnson, US BLM Rich

More information

MATERIAL SPECIFICATION FOR AGGREGATES - HOT MIX ASPHALT

MATERIAL SPECIFICATION FOR AGGREGATES - HOT MIX ASPHALT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 1003 APRIL 2013 MATERIAL SPECIFICATION FOR AGGREGATES - HOT MIX ASPHALT TABLE OF CONTENTS 1003.01 SCOPE 1003.02 REFERENCES 1003.03 DEFINITIONS

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

MATERIAL SPECIFICATION FOR AGGREGATES - BASE, SUBBASE, SELECT SUBGRADE, AND BACKFILL MATERIAL

MATERIAL SPECIFICATION FOR AGGREGATES - BASE, SUBBASE, SELECT SUBGRADE, AND BACKFILL MATERIAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 1010 NOVEMBER 2013 MATERIAL SPECIFICATION FOR AGGREGATES - BASE, SUBBASE, SELECT SUBGRADE, AND BACKFILL MATERIAL TABLE OF CONTENTS 1010.01 SCOPE

More information

100% Payment. 105% Payment #

100% Payment. 105% Payment # CRUSHED AND STOCKPILED GRAVEL ROAD SURFACING AGGREGATE (3-17-2017) Please delete the first two pages of this document (the user note) prior to putting the spec into a contract Specification User Note:

More information

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY REPORT ON STAGE 3C CONSTRUCTION (REF.NO. VA-101-1/5-1) Rev. No. Revision Date Approved 0 Issued in Final September 23, 2005 AMEC010485_0001

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 314 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING TABLE OF CONTENTS

More information

PROPOSED BULK SAMPLING PROJECT

PROPOSED BULK SAMPLING PROJECT Houston Lake Mining Inc. PROPOSED BULK SAMPLING PROJECT PAK Rare Metals Project (Permission to take bulk sample to test rock quality) Houston Lake Mining Inc.(HLM) is requesting permission to remove up

More information

Quarry Planning and Metrics

Quarry Planning and Metrics Quarry Planning and Metrics Topics to Be Covered Benefits of Planning Key Factors Affecting Quarry Planning Annual Plan Review Characteristics of Good Plans What is Quarry Planning? Quarry planning is

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

TABLE OF CONTENTS ASPHALT MIX DESIGN AND JOB MIX FORMULA...8

TABLE OF CONTENTS ASPHALT MIX DESIGN AND JOB MIX FORMULA...8 4112 END PRODUCT SPECIFICATION FOR ASPHALT CONCRETE TABLE OF CONTENTS 4112.1 GENERAL...3 4112.1.1 Description... 3 4112.1.2 Definitions... 3 4112.2 MATERIALS...7 4112.2.1 General... 7 4112.2.2 Asphalt...

More information

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6 03005_Jan31_2018.pdf Page 1 of 6 INDEX Page 03005-1 DESCRIPTION 2 03005-2 MATERIALS 2 03005-3 APPROVAL FOR BASE COURSE 3 03005-4 CONSTRUCTION 3 03005-5 MEASUREMENT 6 03005-6 PAYMENT 6 03005_Jan31_2018.pdf

More information

Green Lake, B.C. Lakeshore Survey

Green Lake, B.C. Lakeshore Survey Green Lake, B.C. Lakeshore Survey June 2008 By Amanda Robinson Environmental Monitoring Technician (Co-op) Environmental Protection Division Ministry of Environment Thompson Region ABSTRACT A lakeshore

More information

GEOTECHNICAL INVESTIGATION. 20th Street Connection, Vernon, BC

GEOTECHNICAL INVESTIGATION. 20th Street Connection, Vernon, BC 4 August 2016 GEOTECHNICAL INVESTIGATION 20th Street Connection, Vernon, BC Submitted to: Ministry of Transportation and Infrastructure 447 Columbia Street Kamloops, BC V2C 2T3 Attention: Tom Kneale, PEng

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1 SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL TABLE OF CONTENTS 2.1 General...2-1 2.2 Materials...2-1 2.2.1 Compacted Non-granular Material...2-1 2.2.2 Gravel Material and Crushed Aggregate

More information

210 Prescott Street, Unit 1 (613) P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) May 5,

210 Prescott Street, Unit 1 (613) P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) May 5, Civil Geotechnical Structural Environmental Hydrogeology 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 May 5, 2014 140208 Alium Investments Ltd.

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR SUBBASE, BASE, SURFACE, SHOULDER, AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR SUBBASE, BASE, SURFACE, SHOULDER, AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 314 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR SUBBASE, BASE, SURFACE, SHOULDER, AND STOCKPILING TABLE OF CONTENTS 314.01 SCOPE

More information

Special Provision No. 110S12 September 2014

Special Provision No. 110S12 September 2014 AMENDMENT TO OPSS 1003, APRIL 2013 Special Provision No. 110S12 September 2014 OPSS 1003, April 2013, Material Specification for Aggregates Hot Mix Asphalt is deleted in its entirety and replaced with

More information

SECTION UTILITY BACKFILL MATERIALS

SECTION UTILITY BACKFILL MATERIALS SECTION 31 23 23 UTILITY BACKFILL MATERIALS PART 1: GENERAL 1.01 SECTION INCLUDES A. Material Classifications B. : 1. Concrete sand 2. Gem sand 3. Pea gravel 4. Crushed stone 5. Crushed concrete 6. Bank

More information

Special Provision No. 110S12 April 2016

Special Provision No. 110S12 April 2016 AMENDMENT TO OPSS 1003, APRIL 2013 Special Provision No. 110S12 April 2016 OPSS 1003, April 2013, Material Specification for Aggregates - Hot Mix Asphalt is deleted in its entirety and replaced with the

More information

MATERIAL SPECIFICATION FOR AGGREGATES - HOT MIX ASPHALT

MATERIAL SPECIFICATION FOR AGGREGATES - HOT MIX ASPHALT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1003 NOVEMBER 2004 MATERIAL SPECIFICATION FOR AGGREGATES - HOT MIX ASPHALT TABLE OF CONTENTS 1003.01 SCOPE 1003.02 REFERENCES 1003.03 DEFINITIONS 1003.04

More information

Special Provision No. 199S64 July 2016

Special Provision No. 199S64 July 2016 GENERAL REQUIREMENTS FOR REFEREE TESTING Special Provision No. 199S64 July 2016 1.0 Scope This Special Provision describes the common requirements for referee testing related to laboratory and field testing

More information

REQUEST FOR QUOTE (RFQ) DELIVER, PLACE, AND COMPACT DRIVING SURFACE AGGREGATE (DSA)

REQUEST FOR QUOTE (RFQ) DELIVER, PLACE, AND COMPACT DRIVING SURFACE AGGREGATE (DSA) 3/2018 REQUEST FOR QUOTE (RFQ) DELIVER, PLACE, AND COMPACT DRIVING SURFACE AGGREGATE (DSA) (ROAD NAME(S) & ID #) (NAME OF MUNICIPALITY & COUNTY) 1. SCOPE OF WORK: (hereinafter referred to as Owner ), requires

More information

July 7, 2008 File: Mine No.:

July 7, 2008 File: Mine No.: .._. i53s4 BRITISH COLUMBIA The Best Place on Earth July 7, 2008 File: 18040-02-07 Mine No.: 1101163 Tim Fisch Mount Polley Mining Corporation Po Box 12 Likely BC, VOL 1 NO Dear Sir: Re: Mine Inspection

More information

106 CONTROL OF MATERIALS SECTION 106 CONTROL OF MATERIALS

106 CONTROL OF MATERIALS SECTION 106 CONTROL OF MATERIALS SECTION 106 CONTROL OF MATERIALS 106.1 SOURCE OF SUPPLY AND QUALITY REQUIREMENTS a. Sources of Supply. (1) Use sources of supply that will generate materials that meet quality requirements. Sources of

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 314 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING 314.01 SCOPE 314.02 REFERENCES

More information

Klohn Crippen Berger Ltd Virtual Way Vancouver BC V5M 4X6 CANADA t f

Klohn Crippen Berger Ltd Virtual Way Vancouver BC V5M 4X6 CANADA t f Klohn Crippen Berger Ltd. 500-2955 Virtual Way Vancouver BC V5M 4X6 CANADA 604.669.3800 t 604.669.3835 f www.klohn.com TABLE OF CONTENTS 1 INTRODUCTION... 1 2 BACKGROUND... 2 3 PAVEMENT DESIGN AND RECOMMENDATIONS...

More information

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 902 DECEMBER 1983 CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES 902.01 SCOPE 902.02 REFERENCES 902.03 DEFINITIONS TABLE OF

More information

SITE C14: H771:04 Slide and Culvert Distress

SITE C14: H771:04 Slide and Culvert Distress SITE C14: H771:04 Slide and Culvert Distress LEGAL LOCATION: NW34-45-1-W5 REFERENCE LOCATION ALONG HIGHWAY: UTM COORDINATES (NAD 83): N 5,868,192 E 696,622 AT FILE: H771:04 AT PLAN & PROFILE: Date of Initial

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

WORK PROGRAMME FORM QUARRY RESOURCE CONSENT

WORK PROGRAMME FORM QUARRY RESOURCE CONSENT WORK PROGRAMME FORM QUARRY RESOURCE CONSENT Please submit this work programme for approval to the West Coast Regional Council, Tainui Street, P.O. Box 66, Greymouth. A site inspection may be required prior

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 HILLIARD S POND DAM REMOVAL AND BIGELOW BROOK STREAM CHANNEL RESTORATION BID NO. 14/15-74

More information

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 304 APRIL 1999 CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT TABLE OF CONTENTS 304.01 SCOPE 304.02 REFERENCES 304.03 DEFINITIONS

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

Partial Depth Reclamation with Emulsified Asphalt Stabilization [PDR-Emulsion] Method Specification 2018

Partial Depth Reclamation with Emulsified Asphalt Stabilization [PDR-Emulsion] Method Specification 2018 1.0 DESCRIPTION This item covers requirements for the in-place partial depth reclamation with emulsified asphalt stabilization of the existing asphalt concrete pavement, sizing, and mixing with binder

More information

Reclaimed Asphalt Pavement (RAP)

Reclaimed Asphalt Pavement (RAP) Reclaimed Asphalt Pavement (RAP) 1 What is RAP An asphalt material removed from the road that is intended to be reused on the roadway. RAP could be used as base course material, shouldering material, and

More information

South Sound Geotechnical Consulting P.O. Box Lakewood, WA (253) Figure 1 Site Plan. SERA Playground Tacoma, WA.

South Sound Geotechnical Consulting P.O. Box Lakewood, WA (253) Figure 1 Site Plan. SERA Playground Tacoma, WA. N TP -3, E3RA TP -4, E3RA TP -2, E3RA B -6, Terracon HA -2 HA -3 HA -1 TP -1, E3RA Legend HA-1 Approximate Hand Excavation Location by SSGC Approximate Exploration Location by others Scale: NTS South Sound

More information

Bids Due and Opening Tuesday, December 12, 2017 Time 10:00 a.m.

Bids Due and Opening Tuesday, December 12, 2017 Time 10:00 a.m. INVITATION TO BID Bid Package Montrose County 2018 Gravel Crushing Services Bids Due and Opening Tuesday, December 12, 2017 Time 10:00 a.m. Location Montrose County Road and Bridge Office 949 N. 2 nd Street

More information

Manistee County Road Commission 2018 Processed Road Gravel Specifications and Bid Form Page 1 of 8

Manistee County Road Commission 2018 Processed Road Gravel Specifications and Bid Form Page 1 of 8 Page 1 of 8 SEALED PROPOSALS (BIDS) WILL BE RECEIVED UNTIL 3:00 PM, EDT, FRIDAY, FEBRUARY 23, 2018 Board of County Road Commissioners of the County of Manistee, 8946 Chippewa Highway, Bear Lake, Michigan

More information

Report to the Montrose County Board of County Commissioners Prepared by the Montrose County Planning and Development Department #1

Report to the Montrose County Board of County Commissioners Prepared by the Montrose County Planning and Development Department #1 Report to the Montrose County Board of County Commissioners Prepared by the Montrose County Planning and Development Department #1 PREPARED BY: MEETING DATE: SUBJECT: APPLICANT: OWNER: LOCATION: PROPOSAL:

More information

MATERIAL SPECIFICATION FOR AGGREGATES - HOT MIX ASPHALT

MATERIAL SPECIFICATION FOR AGGREGATES - HOT MIX ASPHALT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 1003 NOVEMBER 2017 MATERIAL SPECIFICATION FOR AGGREGATES - HOT MIX ASPHALT TABLE OF CONTENTS 1003.01 SCOPE 1003.02 REFERENCES 1003.03 DEFINITIONS 1003.04

More information

Mine Operation Plan (MOP) For New Mexico State Land Office Construction Materials Lease Lease Number: HA-

Mine Operation Plan (MOP) For New Mexico State Land Office Construction Materials Lease Lease Number: HA- Mine Operation Plan (MOP) For New Mexico State Land Office Construction Materials Lease Lease Number: HA- Date: Company Name: Address: Legal Land Description: New Mexico State Highway and Transportation

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 355 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS TABLE OF CONTENTS 355.01 SCOPE 355.02 REFERENCES

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

Attachment 10 Detailed Specifications Group IFB (Revised December 8, 2017) Fine and Coarse Aggregates (Statewide)

Attachment 10 Detailed Specifications Group IFB (Revised December 8, 2017) Fine and Coarse Aggregates (Statewide) Attachment 10 Detailed Specifications Group 33700 IFB 23097 (Revised December 8, 2017) Fine and Coarse Aggregates (Statewide) GROUP 33700 FINE AND COARSE AGGREGATES Page 2 of 14 CONTENTS REFERENCES:...

More information

TLT-113 (02) STANDARD PRACTICE FOR IDENTIFICATION AND DESCRIPTION OF AGGREGATE PROSPECTS (Visual Manual Procedure)

TLT-113 (02) STANDARD PRACTICE FOR IDENTIFICATION AND DESCRIPTION OF AGGREGATE PROSPECTS (Visual Manual Procedure) STANDARD PRACTICE FOR IDENTIFICATION AND DESCRIPTION OF AGGREGATE PROSPECTS (Visual Manual Procedure) 1.0 SCOPE 1.1 This practice covers the procedures for the description of gravels and sands prospected

More information

Aggregate Specifications

Aggregate Specifications Qualified Aggregate Technician Kentucky Specifications Aggregate Specifications State, FHWA, FAA, Contractor Kentucky Transportation Cabinet 107 Aggregate Size Designations Nominal Maximum Size The largest

More information