1 January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines
2 PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared from the technical requirements in the existing standards of major industrial users, contractors, or standards organizations. By harmonizing these technical requirements into a single set of Practices, administrative, application, and engineering costs to both the purchaser and the manufacturer should be reduced. While this Practice is expected to incorporate the majority of requirements of most users, individual applications may involve requirements that will be appended to and take precedence over this Practice. Determinations concerning fitness for purpose and particular matters or application of the Practice to particular project or engineering situations should not be made solely on information contained in these materials. The use of trade names from time to time should not be viewed as an expression of preference but rather recognized as normal usage in the trade. Other brands having the same specifications are equally correct and may be substituted for those named. All Practices or guidelines are intended to be consistent with applicable laws and regulations including OSHA requirements. To the extent these Practices or guidelines should conflict with OSHA or other applicable laws or regulations, such laws or regulations must be followed. Consult an appropriate professional before applying or acting on any material contained in or suggested by the Practice. This Practice is subject to revision at any time. Process Industry Practices (PIP), Construction Industry Institute, The University of Texas at Austin, 3925 West Braker Lane (R4500), Austin, Texas PIP Member Companies and Subscribers may copy this Practice for their internal use. Changes or modifications of any kind are not permitted within any PIP Practice without the express written authorization of PIP. Authorized Users may attach addenda or overlays to clearly indicate modifications or exceptions to specific sections of PIP Practices. Authorized Users may provide their clients, suppliers and contractors with copies of the Practice solely for Authorized Users purposes. These purposes include but are not limited to the procurement process (e.g., as attachments to requests for quotation/ purchase orders or requests for proposals/contracts) and preparation and issue of design engineering deliverables for use on a specific project by Authorized User s client. PIP s copyright notices must be clearly indicated and unequivocally incorporated in documents where an Authorized User desires to provide any third party with copies of the Practice. PUBLISHING HISTORY August 2000 Issued August 2006 Complete Revision January 2016 Complete Revision Not printed with State funds.
3 January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines Table of Contents 1. Introduction Purpose Scope References Process Industry Practices Industry Codes and Standards Definitions Pre-Installation General Receiving Civil/Structural Field Installation Analyzer Shelter Field Hardware Utility Piping Sample Tubing Electric Heat-Traced and Pre-Insulated Tubing Steam-Traced Tubing Bundles Sample Probe Electrical Equipment... 7 Process Industry Practices Page 1 of 8
4 1. Introduction 1.1 Purpose 1.2 Scope 2. References This Practice provides guidelines for the field installation of process analyzer systems. This Practice describes guidelines for field installation of process analyzer systems. Applicable parts of the following Practices and industry codes and standards shall be considered an integral part of this Practice. The edition in effect on the date of contract award shall be used, except as otherwise noted. Short titles are used herein where appropriate. 2.1 Process Industry Practices (PIP) PIP PCSPA002 - Process Analyzer System Data Sheet Instructions PIP PCSPA002-D - Process Analyzer System Data Sheet 2.2 Industry Codes and Standards 3. Definitions National Fire Protection Association (NFPA) NFPA 70 - National Electrical Code (NEC) owner: The party who owns the facility wherein the process analyzer system will be installed purchaser: The party who awards the contract to the supplier. The purchaser may be the owner or the owner s authorized agent. supplier: The party responsible for installing the process analyzer system. 4. Pre-Installation 4.1 General Before installing the analyzer system equipment in the field, a pre-installation meeting should be held between the owner, purchaser, and supplier to review all associated analyzer system installation drawings If required to assist with start-up, calibration, and/or initial operation, analyzer original equipment manufacturer (OEM) service representatives and/or analyzer system vendor personnel should be scheduled. Analyzer OEM s assistance may also be required for warranty validation Installation of all analyzer equipment should be performed by trained, experienced workers. Process Industry Practices Page 2 of 8
5 4.2 Receiving Personnel should be assigned to coordinate the arrival of equipment on site. Coordination instructions should include time, location, and date of scheduled delivery; safety requirements for driver of the delivery truck; unloading plan; storage plan; permits; ancillary equipment, etc Personnel should be assigned to verify that all equipment required for unloading and installation is present at the site Personnel should be assigned to make provisions for process analyzer systems that require immediate purging and/or power for climate control The provisions, associated field requirements, storage, and handling should be communicated to field construction personnel. 4.3 Civil/Structural 5. Field Installation The analyzer system location should be verified to be in accordance with area space, elevation, and orientation requirements The foundation or platform preparation should be verified to be in accordance with purchaser s specifications The cylinder rack installation preparation (e.g., ramp access for wheeled cylinder carts, paving, and elevation of cylinder connections) should be verified to be in accordance with purchaser s specifications. 5.1 Analyzer Shelter Field-mounted analyzer enclosure or shelter should be leveled and secured to support foundation Base support structure should be sealed to foundation with appropriate sealing compound For installation of a shelter without a floor, the shelter sealing gasket should be checked to ensure proper installation Ancillary shelter equipment such as awnings/rain shields, detached cylinder racks, fresh air intake, sample recovery systems, etc., should be installed The heating, ventilation, and air conditioning (HVAC) condensate drain line should be connected to the condensate drain header or sewer. Draining condensate freely on a concrete pad should not be permitted. 5.2 Field Hardware Plate- or cabinet-mounted equipment locations should permit maintenance access All components should be in accordance with purchaser s specifications Clamps and brackets should be galvanized or stainless steel. Process Industry Practices Page 3 of 8
6 5.2.4 Tubing supports should be provided and installed with fittings, spacers, clamps, guides, and other accessories as required All sample-wetted materials should meet or exceed the materials of construction described in the purchaser s piping specifications. 5.3 Utility Piping Utility piping should be in accordance with the purchaser s piping specification Utility piping should include local isolation valves, drain valves, and check valves, as specified Piping to drains should be routed under the slab or in such manner that the piping is not a tripping hazard and does not limit access around the analyzer shelter The utility piping specification break should be at the connecting flange to the analyzer shelter If steam is required for heating remote analyzer equipment, each user should have an individual supply with an isolation valve and trap Threaded piping connections should be sealed with PTFE sealing tape or equivalent tape-type sealer Piping should be leak-checked according to project/location procedure and analyzer specification. The piping should be repaired, flushed, and dried as required Utility piping should be cleaned and degreased before final connection to the utility headers of the analyzer system. 5.4 Sample Tubing Sample tubing should be in accordance with process analyzer system data sheet (e.g., PIP PCSPA002-D), purchaser s specification, size, and material Only pre-cleaned tubing should be used for sample-wetted surfaces. Specific applications may require post-installation cleaning Field-tubing runs should be grouped to benefit from use of common support members and to present a finished installation that is routed in a neat and orderly manner Tubing spacing should be adequate and uniform. Tubes should not be permitted to cross over one another Only industry-standard tools should be used for bending to avoid flat spots and kinks. Bent tubing should be de-burred to the original internal diameter and blown free of particles Tubing supports should be installed in accordance with specification, tube material, and service. Tubing trays or perforated angle supports should be used as needed. Galvanic isolation is needed when tubing and support are dissimilar metals. Process Industry Practices Page 4 of 8
7 5.4.7 High-quality two-ferrule tube fittings should be used for gas cylinders and for all sample-wetted lines Continuous tubing runs should be used wherever possible to minimize the number of tubing unions If run in trays, tubing should be equally spaced on the same plane leaving a ¼-inch air gap. If tubing unions are used, the unions should be installed in a raised and staggered fashion away from the plane, using short 45 bends for ease of assembly and disassembly. If possible, tubing unions should be visible All installed tubing should be pressure-tested and leak-checked Pressure sensitive instrumentation should be isolated before pressure testing If a vapor sample can contain liquids or condensables, the sample line should be sloped. The sample line may slope in two directions (toward the sample tap and toward the analyzer), but both slopes should be continuous from the high point. Traps in the sample line should not be permitted. 5.5 Electric Heat-Traced and Pre-Insulated Tubing Manufacturer s instructions should be used for proper installation of electrically heated and/or pre-insulated sample lines and bundles, including the following: a. Minimum bending radius b. Spacing between bundles c. Maximum spacing of supports d. Use of terminator kits e. Connections to electrical supply f. Penetrations through enclosures, e.g., safety precautions Both ends of heat-traced sample tubing should be sealed with the manufacturer s recommended kits to prevent moisture damage The circuit for electrically heat-traced tubing should include equipment for ground fault protection in accordance with NFPA Heat-traced and pre-insulated tubing should be installed in accordance with the purchaser s specifications Tubing trays or perforated angle supports should be used as needed Sample lines should be properly secured. To prevent the creation of hot spots, care should be taken to ensure that the sample line securing devices do not deform the tube bundle Manufacturer s instructions should be checked before shortening electrically heated self-regulating sample line Heat-treated and pre-insulated tubing should be run directly to the device it serves. Process Industry Practices Page 5 of 8
8 5.5.9 Bulkhead tubing unions should not be permitted for cabinet or enclosure penetrations Bundle(s) should penetrate the walls of the enclosure using heat-shrink entry seals to ensure that the sample temperature is uniformly maintained Tubing connections for electrically traced tubing should be installed inside the enclosure The power source for traced tubing should be provided at either of the following locations: a. Analyzer enclosure b. Dedicated heat-tracing panel Traced sample lines that have exposed surface temperatures exceeding plant safety standards should, for personnel protection, be shielded or routed away from normal reach Electrically traced tubing bundles should be checked for proper resistance or continuity before being powered. 5.6 Steam-Traced Tubing Bundles Manufacturer s instructions should be used for proper installation of steamheated sample lines and bundles, including the following: a. Minimum bending radius b. Spacing between bundles c. Maximum spacing of supports d. Use of terminator kits e. Penetrations through enclosures f. Safety precautions If steam is used for heat tracing, the sample line should be sloped Unions and splices in the steam lines should be minimized Steam traps should be located and steam lines should be insulated in accordance with manufacturer s recommendations Steam-traced tubing should be installed in accordance with the purchaser s specifications Tubing trays or perforated angle supports should be used as needed Sample lines should be properly secured. To prevent the creation of hot spots, care should be taken to ensure that the sample line securing devices do not deform the tube bundle Steam-traced tubing should be installed directly to the device it serves Bulkhead tubing unions should not be permitted for cabinet or enclosure penetrations. Process Industry Practices Page 6 of 8
9 Bundle(s) should penetrate the walls of the enclosure using heat-shrink entry seals to ensure that the sample temperature is uniformly maintained The steam source should be provided at either of the following locations: a. Analyzer enclosure b. Other appropriate source Traced sample lines that have the exposed surface temperatures exceeding specified safety standards should, for personnel protection, be shielded or routed away from normal reach Each steam line should have a dedicated trap located in accordance with manufacturer s recommendation. The traps should not be insulated and should be installed at the lowest convenient point Seal kits should be installed on each end of steam-traced sample lines to prevent corrosion. 5.7 Sample Probe Flanged sample probes used to extract the sample from the process line should be installed before hydraulic testing of the lines Proper isolation of the analyzer system should be verified Retractable insertion probes should be retracted before leak testing. Any support requirements for installations in the horizontal plane should be verified In-situ analyzer-sensing elements such as ph, conductivity, chlorine, viscosity, etc., should be installed only after leak testing Orientation of the sample probe or sensor installation should be verified Sample-conditioning equipment at the sample tap should be close-coupled to the tap and mounted and installed in accordance with purchaser s drawings Heating requirements for the sample probe and conditioning equipment, if any, should be verified. 5.8 Electrical Equipment Electrical components should have a nationally recognized testing laboratory approval Conduit, metal-clad, or tray cable wiring can be used AC and DC wiring sizes and color codes should be in accordance with purchaser s requirements Field wiring and connections should be loop-checked for continuity and conformance to purchaser s drawings Junction box or electrical cabinet penetrations should be through the sides or bottom only. Process Industry Practices Page 7 of 8
10 5.8.6 If conduit wiring is used, covers on conduit fittings should be checked to ensure that they are properly secured. After all inspections are complete, conduit seals should be poured and marked Conduit drains should be used at each low point The shelter and all electrical equipment should be grounded. Process Industry Practices Page 8 of 8
PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces
TECHNICAL CORRECTION January 2017 Structural PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process
More informationPIP STF05521 Details for Angle Railings for Walking and Working Surfaces
TECHNICAL CORRECTION January 2017 Structural PIP STF05521 Details for Angle Railings for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of
More informationREAFFIRMATION WITH EDITORIAL REVISION September Process Industry Practices Insulation. PIP INIH1000 Hot Insulation Installation Details
REAFFIRMATION WITH EDITORIAL REVISION September 2012 Process Industry Practices Insulation PIP INIH1000 Hot Insulation Installation Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to
More informationCOMPLETE REVISION September Process Industry Practices Piping. PIP PNSM0120 Purchasing Requirements for Bolting
September 2013 Process Industry Practices Piping Purchasing Requirements for Bolting PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this
More informationCOMPLETE REVISION January Process Industry Practices Electrical. PIP ELIGD000 Grounding Installation Details
COMPLETE REVISION January 2010 Process Industry Practices Electrical PIP ELIGD000 Grounding Installation Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process
More informationEDITORIAL REVISION January Process Industry Practices Vessels. PIP VEFV1100M Vessel/S&T Heat Exchanger Standard Details (Metric Units)
Vessels PIP VEFV1100M Vessel/S&T Heat Exchanger Standard Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared
More informationREAFFIRMATION WITH EDITORIAL REVISION October Process Industry Practices Insulation. PIP INIC1000 Cold Insulation Installation Details
REAFFIRMATION WITH EDITORIAL REVISION October 2012 Process Industry Practices Insulation PIP INIC1000 Cold Insulation Installation Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to
More informationPIP STF05511 Fixed Industrial Stairs
TECHNICAL CORRECTION January 2017 Structural PIP STF05511 Fixed Industrial Stairs PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice
More informationPIP VEFV1100 Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units)
TECHNICAL CORRECTION February 2014 Process Industry Practices Vessels PIP VEFV1100 Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units) PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an
More informationPIP VEFV1100 Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units)
TECHNICAL REVISION October 2017 Vessels PIP VEFV1100 Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units) PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of
More informationPIP PNSM0115 Purchasing Requirements for Pipe
December 2016 Piping PIP Purchasing Requirements for Pipe PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared
More informationElectrical PIP ELILS000 Lighting and Receptacle Installation Details for Class I, Division 2, Class II, Division 2, and Unclassified Areas
August 2017 Electrical PIP ELILS000 Lighting and Receptacle Installation Details for Class I, Division 2, Class II, Division 2, and Unclassified Areas PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an
More informationCOMPLETE REVISION October Process Industry Practices Piping. PIP PNSC0036 High Density Polyethylene (HDPE) Piping Installation Specification
Piping High Density Polyethylene (HDPE) Piping Installation Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has
More informationPIP INSA1000 Acoustic Insulation Systems Specification
TECHNICAL REVISION April 2015 Insulation PIP INSA1000 Acoustic Insulation Systems Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,
More informationPIP STE05501 Fixed Ladders and Cages Design Guide
TECHNICAL CORRECTION January 2017 Structural PIP STE05501 Fixed Ladders and Cages Design Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,
More informationPIP STF05501 Fixed Ladders Fabrication Details
COMPLETE REVISION July 2018 Structural PIP STF05501 Fixed Ladders Fabrication Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this
More informationEDITORIAL REVISION August Process Industry Practices Insulation. PIP INEG2000 Guidelines for Use of Insulation Practices
August 2013 Process Industry Practices Insulation PIP INEG2000 Guidelines for Use of Insulation Practices PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry
More informationPIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping
July 2017 Piping PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice
More informationCOMPLETE REVISION November Process Industry Practices Architectural. PIP ARS08111 Standard Steel Doors and Frames Supplier Specification
November 2012 Process Industry Practices Architectural PIP ARS08111 Standard Steel Doors and Frames Supplier Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section
More informationPIP RFTF1000 Ceramic Fiber Refractory Installation Qualification, Inspection, and Testing
EDITORIAL REVISION March 2013 Process Industry Practices Refractory PIP RFTF1000 Ceramic Fiber Refractory Installation Qualification, Inspection, and Testing PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES
More informationPIP RFTA1000 Refractory Anchor and Accessory Installation Qualification, Inspection, and Testing
January 2017 Refractory PIP RFTA1000 Refractory Anchor and Accessory Installation Qualification, Inspection, and Testing PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost
More informationPIP ARS08111 Standard Steel Doors and Frames Supplier Specification
May 2018 Architectural PIP ARS08111 Standard Steel Doors and Frames Supplier Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,
More informationPIP VESSP002 Supplemental Design and Fabrication Specification for Shell and Plate Heat Exchangers ASME Code Section VIII, Divisions 1 and 2
November 2014 Process Industry Practices Vessels PIP VESSP002 Supplemental Design and Fabrication Specification for Shell and Plate Heat Exchangers ASME Code Section VIII, Divisions 1 and 2 PURPOSE AND
More informationPipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines
February 2017 Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process
More informationMarch Process Industry Practices Structural. PIP STE05535 Vessel Circular Platform Detail Guidelines
Structural PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared from the technical requirements in the existing
More informationPIP RFTB1000 Brick Refractory Installation Qualification, Inspection, and Testing
EDITORIAL REVISION March 2013 Process Industry Practices Refractory PIP RFTB1000 Brick Refractory Installation Qualification, Inspection, and Testing PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an
More informationCOMPLETE REVISION November Process Industry Practices Structural. PIP STF05530 Grating Fabrication Details
COMPLETE REVISION November 2006 Process Industry Practices Structural PIP STF05530 Grating Fabrication Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process
More informationPIP PNEM0001 Piping Service Index
REAFFIRMATION W/EDITORIAL REVISION October 2016 Piping PIP PNEM0001 Piping Service Index PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,
More informationSECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes.
SECTION 16111 CONDUITS AND BOXES 1.01 DESCRIPTION PART 1- GENERAL A. Work covered by this section includes the furnishing and installation of conduits and boxes. 1.02 SUBMITTALS A. The Contractor shall
More informationPIP INSR1000 Installation of Flexible, Removable/Reusable Insulation Covers for Hot Insulation Service
TECHNICAL REVISION August 2015 Insulation PIP INSR1000 Installation of Flexible, Removable/Reusable Insulation Covers for Hot Insulation Service PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort
More informationSECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph
More informationCOMPLETE REVISION June Process Industry Practices Architectural. PIP ARS08390 Blast Resistant Doors, Frames, and Related Hardware Specification
June 2013 Process Industry Practices Architectural PIP ARS08390 Blast Resistant Doors, Frames, and Related Hardware Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize
More informationCOMPLETE REVISION April Process Industry Practices Piping. PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.
April 2012 Process Industry Practices Piping PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.3 Metallic Piping PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost
More informationThis product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.
Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral
More informationPipeline Systems PLSC0017 Requirements for Welder Qualifications in Accordance with ASME Section IX
June 2018 Pipeline Systems PLSC0017 Requirements for Welder Qualifications in Accordance with ASME Section IX PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process
More informationThis product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.
AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC
More informationMarch Process Industry Practices Refractory. PIP RFIA1000 Refractory Anchor and Accessory Installation Details
March 2014 Process Industry Practices Refractory PIP RFIA1000 Refractory Anchor and Accessory Installation Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process
More informationA. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.
ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationKaf-Tech Product Specification
Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-LUMINARY CABLE
More informationSECTION UNDERGROUND ELECTRICAL CONSTRUCTION
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION A. This section specifies the furnishing, installation, and connection of precast manholes and pullboxes with ducts
More informationDESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7
DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification
More informationPIP PNSC0011 Installation of ASME B31.3 Metallic Piping
February 2015 Piping PIP PNSC0011 Installation of ASME B31.3 Metallic Piping PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice
More informationA. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.
Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to provide design guidelines for Utility Direct Buried
More informationCONDUITS AND FITTINGS
CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit
More informationPIP PNSC0035 Steam Tracing Specification
REAFFIRMATION W/EDITORIAL REVISION August 2017 Piping PIP PNSC0035 Steam Tracing Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,
More informationSECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and
More informationPIP ARS08710 Standard Steel Door Hardware Supplier Specification
April 2018 Architectural PIP ARS08710 Standard Steel Door Hardware Supplier Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,
More informationCHAPTER 11 CONDUITS AND FITTINGS
CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1
More informationYoungstown State University
SECTION 260533 - RACEWAYS PART 1 - GENERAL SUMMARY A. This section includes raceways for electrical wiring. Types of raceways in this section include the following: 1. Flexible metal conduit 2. Liquid
More informationEDITORIAL REVISION March Process Industry Practices Refractory. PIP RFSM1000 Monolithic Refractory Material Specification
March 2013 Process Industry Practices Refractory PIP RFSM1000 Monolithic Refractory Material Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry
More informationUniversity of Delaware
University Contact: Energy & Engineering Group (302) 831-1744 SECTION 22 14 00 _STORM WATER PIPING SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Storm water piping 2. Roof drains. 3. Area
More informationDesign Standard Conduit for Electrical Systems
Design Standard Purpose: This design standard has the purpose of creating a consistent application for the installation of conduits throughout the East Side Union High School District, therefore achieving
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationSECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only)
SECTION 15957 (Applicable to IUPUI Only) I. GENERAL A. NOTES 1. The University has a pre-purchase agreement (PPA) with Johnson Controls (JCI) and Siemens Building Technologies (SBT). The University will
More informationGV 001 Equipment Bases and Enclosures General Information
Eq u ip me n tba s e s a n d En c lo s u re s Ge n e ra lin fo rma tio n E n g in e e r :R.An th o n GV0 0 1 Ap p r o v e r :Jo s h u a Jo n e s Ap r 1 7 2 0 Ap r1 7 GV 001 Equipment Bases and Enclosures
More informationSpecial Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control
Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control 1. DESCRIPTION 2. MATERIALS Furnish, install, relocate, or remove radar vehicle detection systems (RVDS) of
More informationUniversity of Delaware
University Contact: Energy & Engineering Group (302) 831-1744 SECTION 22 13 00 _SANITARY SEWER PIPING SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sanitary sewer piping buried 2. Sanitary
More informationSENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES
SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES Safety Precautions in the Excavation of a Sentinel Wedge take all necessary steps to make sure the pit is secured. Follow all OSHA requirements for digging
More informationPIP RFTM1000 Monolithic Refractory Installation Qualification, Inspection, and Testing
March 2013 Process Industry Practices Refractory PIP RFTM1000 Monolithic Refractory Installation Qualification, Inspection, and Testing PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize
More informationSECTION AIR TERMINAL UNITS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:
More information1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK
1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for
More informationSECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS
SECTION 16711-27 05 28.33 PART 1 - GENERAL 1.01 SUMMARY A. This section includes Labor, materials and equipment necessary to complete the installation required for the items specified under this Section,
More informationMANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS
DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS ISSUE DATE: 5/1/90 EFFECTIVE DATE: 2/4/92 REVIEW DATE:
More informationUniversity of Delaware
University Contact: Energy & Engineering Group (302) 831-1744 SECTION 22 67 00_PROCESS WATER PIPING SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. De-Ionized (DI) Water Systems 2. Distilled
More informationSECTION CONVECTORS
SECTION 23 82 33 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph
More informationSECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Communications equipment coordination and installation. 2. Sleeves for pathways and cables. 3. Raceway
More informationSECTION FACILITY LIGHTNING PROTECTION
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 41 00 FACILITY LIGHTNING PROTECTION SPEC WRITER NOTE: Delete between //----//if not applicable to project. Also delete any other item or paragraph not applicable
More informationSECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION
Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationIce and snow melting Pavements, roads and ramps
Installation Guide Ice and snow melting Pavements, roads and ramps electricheating.danfoss.com Table of Contents 1 Introduction.................... 3 1.1 Safety Instructions...............3 1.2 Installation
More informationSECTION LOW-VOLTAGE TRANSFORMERS
PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not
More informationStandards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington
Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington Rev 062017 Provided by UNCW Physical Security and Access OVERVIEW... 3 CABLE INSTALLATION... 3
More informationSECTION AIR-TO-AIR ENERGY RECOVERY EQUIPMENT
SECTION 23 72 00 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES
SECTION 07 4243 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Composite wall panel system consisting of aluminum-faced composite panels in a rainscreen application as part of the assembly described below.
More information3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).
SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.
More informationSECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:
SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.
More informationSECTION GROUNDING AND BONDING
SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSTATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625
STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 METRIC SPECIFICATIONS FOR FUSION SPLICE AND SPLICE ENCLOSURE FIBER OPTIC CABLE N.J. Specification No. Effective Date: July 1,
More informationCOMPLETE REVISION May Process Industry Practices Piping. PIP PNSM0110 Purchasing Requirements for Valves
May 2013 Process Industry Practices Piping Purchasing Requirements for Valves PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice
More informationSECTION 401 WATER PIPE AND FITTINGS 2.2 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS
SECTION 401 PIPE AND FITTINGS PART 2 MATERIALS 2.2 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS A. PVC Pressure Pipe sizes 4 inch through 12 inch: ANSI/AWWA C 900 1. DR18 B. PVC Pressure Pipe sizes 14 inch
More informationCopyright 2004 and 2005 by The American Institute of Architects (AIA)
Page 232500-1 Copyright 2004 and 2005 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Modified by MSU Physical
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / 11-14
SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION
SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler
More informationDIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS
PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.
More informationInstallation Guide. Ice and snow melting. Pavements, roads and ramps. Intelligent solutions with lasting effect. Visit DEVI.com
Installation Guide Ice and snow melting Pavements, roads and ramps Intelligent solutions with lasting effect Visit DEVI.com Table of Contents 1 Introduction.................... 3 1.1 Safety Instructions...............3
More informationUnderground Piping for Private Hydrants & Sprinkler Supply Line
City of Brea Brea Fire Department Fire Prevention 1 Civic Center Circle Phone: (714) 990-7655 Underground Piping for Private Hydrants & Sprinkler Supply Line PURPOSE The provision of adequate water supplies
More informationNYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017
SECTION 27 05 26 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationOSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS
OSU PROJECT NO. 30-04-15 PAGE 1 PART 1 GENERAL 1.1 WORK INCLUDED A. Supports and anchors for piping systems and equipment. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. The provisions of Section 15050, Basic
More informationD. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS
PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment
More informationTrex Commercial Products page Metal Railing
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Post Rail (Glass). D. Tensiline Railings (Cable). E. Track Rail (Glass).
More informationDesign & Construction Standards, Revised January
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationEngineering Specifications
PROPRESS WITH SMART CONNECT FEATURE PART 1: GENERAL 1.1 SUMMARY A. Copper Tubing and Fitting System for Hot and Cold Water Distribution Systems, Sprinkler and Standpipe Systems and Hydronic Piping Systems
More informationEngineering Specifications
PROPRESS WITH SMART CONNECT FEATURE PART 1: GENERAL 1.1 SUMMARY A. Copper Tubing and Fitting System for Hot and Cold Water Distribution Systems, Sprinkler and Standpipe Systems and Hydronic Piping Systems
More informationTERMS OF REFERENCE. Supply and Delivery of Prefabricated Wind Noise Reduction Systems (WNRS) and Equipment Vaults
ANNEX B TERMS OF REFERENCE Supply and Delivery of Prefabricated Wind Noise Reduction Systems (WNRS) and Equipment Vaults 1. INTRODUCTION The Preparatory Commission for the Comprehensive Nuclear-Test-Ban
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationPATHWAYS FOR COMMUNICATIONS SYSTEMS
270528 PATHWAYS FOR PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, and equipment for the complete installation of work called for in the Contract Documents. 1.2 SCOPE OF WORK A. This
More informationElectrical Metallic Tubing (EMT) Fittings
Suggested Specifications for Electrical Metallic Tubing (EMT) Fittings Series 2 Insulated EMT Connector (Raintight) (Compression Type) Series 20 EMT Coupling (Raintight) (Compression Type) Series 0 Pipe
More information