SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT

Size: px
Start display at page:

Download "SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT"

Transcription

1 SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT Page 1 of 15 Ver. 3-0 March 2010

2 TABLE OF CONTENTS 1. Scope General System Requirements Installation Details QC/QA Requirements Appendix A: Insulation Materials and Accessory Suppliers Appendix B: Insulation Details Page 2 of 15 Ver. 3-0 March 2010

3 1. Scope This specification provides design and application guidelines for the use of Cryogel Z as thermal insulation and/or passive fire protection. It applies to piping and equipment operating at below-ambient service temperatures These guidelines are not intended to be comprehensive, and other application options that are not listed may be appropriate. Please contact Aspen Aerogels for specific recommendations This document is offered as a guide only, and should be employed at the discretion of the user. No warranty of procedures, either expressed or implied, is intended. 2. General System Requirements 2.1 Approved Materials and Accessories Descriptions, product names, manufacturers, and usage limitations for the specified materials and accessories can be found in Appendix A. 2.2 Storage Requirements Aerogel insulation materials should be stored in a clean, dry, and protected environment If material has to be stored in an outdoor setting, it should be placed on pallets and thoroughly covered with a waterproof tarp or plastic sheeting. 2.3 Surface Preparation Before any insulation material is applied, the surfaces to be insulated shall be clean and free of frost, moisture, or other imperfections. 2.4 Thickness of Cryogel Z for Thermal Insulation and/or Passive Fire Protection The total insulation thickness on each piece of equipment or piping shall be determined from published k-values and project-specific parameters. For assistance in generating the correct thicknesses for thermal insulation and/or passive fire proofing, please contact Aspen Aerogels When designing for both thermal insulation and passive fire protection, the greater of the two thickness requirements shall be used Each layer shall be numbered with a grease pen to facilitate inspection Cryogel Z is manufactured in thicknesses of either 5 mm or 10 mm (0.2 in or 0.4 in). Determination as to which thickness to use shall include consideration of pipe size, as described below: Page 3 of 15 Ver. 3-0 March 2010

4 2.5 Insulation Support Rings For pipe or tubing diameters less than 100 mm (4 in.), either 5 mm or V- grooved 10 mm material (see Appendix A) shall be used. For pipe diameters equal to or greater than 100 mm, 5 mm or 10 mm material, or a combination of the two, may be used Insulation support rings are not required for vertical piping or vessels which do not require the insulation to serve as fireproofing Depending on the jacketing material and design, a support ring at or near the bottom of any vertical run may be necessary to support the lagging. 2.6 Expansion / Contraction Joints Expansion contraction joints are not necessary with the Cryogel Z insulation system. 2.7 Jacketing Cryogel Z is compatible with all forms of jacketing, including metal cladding, PVC, mastic-glass-mastic, glass reinforced plastic (GRP), and polymeric and asphaltic membrane systems. Refer to site specifications for jacketing installation procedures As a flexible material, Cryogel Z will always follow the movement of the equipment or piping to which it is affixed. For rigid, fully adhered systems jacketing systems (e.g., some forms of GRP), measures should be taken to minimize the strain buildup between the cladding and the underlying insulation For situations where the thermal insulation is also to be used as passive fire protection, the jacketing shall be stainless- or galvanized steel Screws and rivets are to be avoided unless absolutely necessary In areas where screws or rivets are necessary to secure the jacketing (i.e., vessel heads), a sacrificial layer of 25 mm (1 in) polyolefin foam shall be applied to prevent puncture of the primary vapor barrier. Discrete strips oriented to allow drainage are preferred over full-area coverage When pre-drilling rivet holes, use a mechanical stop or marking tape to prevent penetration of the vapor barrier. 3. Installation Details 3.1 Straight Piping and Horizontal Equipment Cryogel Z insulation materials shall be applied by cigarette wrapping around the pipe (Figure 2, Appendix B). Insulation shall be applied square to the longitudinal axis of the pipe and pulled tight around the circumference. Page 4 of 15 Ver. 3-0 March 2010

5 3.1.2 Circumferential joints shall be tightly butted with no visible gaps. Longitudinal joints shall either be tightly butted, or overlapped by mm (1-2 in). All joints shall staggered by a minimum of 100 mm (4 in) Material may be temporarily affixed with strapping tape, spray adhesive, stainless steel wire, or stainless steel bands (see Appendix A). 3.2 Securement of Thermal Insulation and Fire Protection mm (¾ ) stainless steel bands shall always be placed around the second-tolast layer of Cryogel, between the primary and secondary vapor barrier layers. Bands shall be spaced 450 mm (18 ) apart (refer to Figure 1) On vertical piping and equipment, additional intermediate banding shall be installed over every fourth layer. Bands shall be spaced 450 mm (18 ) apart Where the insulation is to serve as passive fire protection, additional intermediate banding shall installed over every second layer. Bands shall be spaced 450 mm (18 ) apart Stainless steel bands shall not be applied directly to either the primary or secondary vapor barriers. 3.3 Vapor Barriers The primary vapor barrier shall consist of the factory-applied mylar on the outermost layer of Cryogel Z, with all joints sealed with the appropriate tape or mastic (see Appendix A) As an option to provide greater puncture resistance, an additional membrane or mastic can be applied over the outermost layer of the Cryogel Z (see Appendix A). If this option is used, separate joint sealing of the outermost layer is not required On piping or equipment operating below -40 C (-40 F), a secondary vapor barrier shall be installed two layers beneath the primary (see Figure 1). The secondary vapor barrier shall consist of Cryogel Z s factory-applied mylar, with all joints sealed with tape. 3.4 Vapor Stops To insure end-to-end integrity of the vapor barrier, vapor stops shall be installed at all insulation terminations and penetrations, and on either side of all flanges, valves, hangars, and supports. See Appendix A for acceptable vapor stop materials The vapor stop shall tie into both the secondary (where required) and primary vapor barriers with a minimum lap of 50 mm (2 in), as illustrated in Figure All liquid- or paste-applied mastics and sealants shall be constructed with a membrane reinforcement. Page 5 of 15 Ver. 3-0 March 2010

6 3.4.4 When vapor-stopping over the cut ends of the Cryogel Z, it may be necessary to smooth over the ragged surface with a bridge layer of tape or Cryogel Z (see example in Figure 3). 3.5 Elbows Pre-fabricated construction is preferred. Shop- or field-fabricated gore sections are acceptable, as is spiral wrapping with 5 mm thick material For fabricated elbows, gored, or lobster back patterns shall be used on all short-radius, long-radius, swept, and socket-weld elbows larger than 50 mm (2 in) NPS Each layer shall be installed separately and held in place with tape, spray adhesive, wire, or stainless steel bands, subject to the restrictions given in Sections On bent tubing and welded pipe < 75 mm (3 NPS), the elbow shall be insulated as a tee (see Figure 4). 3.6 Small or Irregular Surfaces On small diameter tubing and pipe (<4 NPS), pre-fabricated V-groove (see Appendix A), or cigarette- or spiral-wrapped 5 mm Cryogel is acceptable On irregular surfaces, spiral wrapping with 5 mm Cryogel is preferred. Spiral wrapped material should be pre-cut in widths of mm (2" 3"). Provide an overlap of 50% when wrapping Strapping tape, wire, or adhesive spray may be used to secure the ends of the spiral wrap. 3.7 Flanges Flanges shall be completely insulated to the same thickness as the adjacent piping Flange insulation shall be built up from the adjacent pipe insulation with a shoulder measuring at least 2X the change in radius (see Figure 5). The shoulders shall be banded in place Void spaces shall be filled with Cryogel Z, or wadded mineral or glass fiber. 3.8 Tees, Bonnets and Other Changes In Direction of the Insulation 3.9 Valves Install aerogel blanket using the same bird s-mouth technique as would be used for installing cladding. Insulation joint shall be staircased as shown in Figure Valves shall be insulated to the same thickness as the adjacent piping. The only exception to this is bottom drain lines and bypass tubing, which may be insulated to the thickness prescribed for their diameter. Page 6 of 15 Ver. 3-0 March 2010

7 3.9.2 Consult the valve manufacturer for the recommended insulation height on the valve bonnet Flanged valves shall be insulated similarly to flanges, with the bonnet treated as a tee and capped (refer to Figure 6). The cap shall be shaped to shed water Wherever the insulation makes a change in direction, the joint shall be staircased to avoid a cold-pass (see Figure 7) Void spaces shall be filled with Cryogel Z, or wadded mineral or glass fiber Transitions to Other Insulation Types Transitions between Cryogel Z and other insulation materials (e.g., at highdensity polyurethane supports) shall be constructed as shown in Figure 8. The shoulder shall be at least twice as wide as it is tall The adjacent insulation system shall be fully vapor stopped before the transition is constructed Vessel Heads Pre-fabricated construction is preferred. Field-fabricated is acceptable Seams shall be butt joined. Joints on multi-layer applications shall be staggered. Securement prior to banding and jacketing shall be with spray adhesive Secure insulation with a harness of stainless steel bands or galvanized steel chicken wire, anchored to two circumferential bands located behind the tangent line (see Figure 9). For heads with a central nozzle, use a floating ring. Bands shall be spaced no wider apart than 450 mm (18 in) at the tangent line. 4. QC/QA Requirements All aspects of valve insulation are subject to inspection, sampling, and monitoring by the owner. Work shall not proceed past a hold point without written acceptance Surveillance Point: Verify Work Release Before insulation, written confirmation shall be provided that the piping or equipment has been released for insulation. All adjacent joints and terminations have been adequately sealed, with no holidays, fish-mouths, tears, or punctures Surveillance Point: Verify Secondary Vapor Barrier The correct number of layers have been applied and marked. Intermediate banding, if necessary has been installed and located correctly. All joints and terminations have been adequately sealed, with no holidays, fish-mouths, tears, or punctures. Page 7 of 15 Ver. 3-0 March 2010

8 Any necessary repairs shall be made with joint sealing tape, and/or mastic and/or caulk Surveillance Point: Verify Primary Vapor Barrier The correct number of layers have been applied and marked. Banding has been installed and located correctly. All joints and terminations have been adequately sealed, with no holidays, fish-mouths, tears, or punctures. Any necessary repairs shall be made with joint sealing tape, and/or mastic and/or caulk Consult site specifications for jacketing inspection requirements. Page 8 of 15 Ver. 3-0 March 2010

9 5. Appendix A: Insulation Materials and Accessory Suppliers Table 1: Insulation, fire-protection and accessory materials and suppliers. System Component Insulation System Material Description Manufacturer / Brand Names Applicable Surfaces Insulation 5 mm (0.2 in) thick Aspen Aerogels / All and/or Passive aerogel blanket Cryogel Z Fire Protection 10 mm (0.4 in) thick aerogel blanket Aspen Aerogels / Cryogel Z Piping 100 mm (4 in) NPS; all vessels, and equipment V-grooved aerogel Sproule Mfg. / Piping <100 mm (4 in) Joint Sealing Tape Vapor Barrier Mastics Optional Sheet Mastics Vapor Stop Sealant Membrane Reinforcement Elbow Covers Spray Adhesive blanket Cryogel Z V-Groove Pre-cut elbows Sproule Mfg. / Precision CNC AA Fitting Covers Foil-faced butyl tape, mm (2-4 in) wide Foil / polyester laminate, mm (2-4 in) wide Hypalon rubber vapor barrier mastic 1.2 mm (0.050 in) foilfaced butyl sheet Hypalon rubber vapor barrier coating Cryogenic vapor barrier coating Glass or polyester open-weave cloth Pressed aluminum jacket covers sized for aerogel thicknesses Chloride-free spray adhesive (can or bulk) Covalence Adhesives / Polyken Denso / Denso Butyl 35 Tape Venture Tape / 1555CW Foster Products / Monolar II 60-38/39 Polyguard / Insulrap 50 Or equivalent Foster Products / Monolar II 60-38/39 Foster Products / Foster Products / Mast-a-Fab Or equivalent Sproule Mfg. / AA WeatherJacs Foster Products / FOS-STIK 3M / 78-Spray Nashua / 357SA NPS All short-radius, long radius, socket-weld, and swept elbows For application temps at or above 15 C (59 F) For application temps at or above -18 C (0 F) All All For process temperatures down to -40 C (-40 F) For process temperatures down to -196 C (-320 F) All All short- and long-radius elbows up to 900 mm (36 in) All Page 9 of 15 Ver. 3-0 March 2010

10 Table 1 (cont.): Insulation, fire-protection and accessory materials and suppliers. System Component Insulation System Material Description Manufacturer / Brand Names Applicable Surfaces Strapping Tape 12 mm (1/2 in) wide 3M / 3297 All fiber-reinforced packing tape Or equivalent Sacrificial Cushion Layer 25 mm (1 in) thick polyolefin foam K-Flex / LS Sheet Nomaco / EPFI All Armacell / AP Sheet Or equivalent (compliant with ASTM C534) Page 10 of 15 Ver. 3-0 March 2010

11 6. Appendix B: Insulation Details Figure 1: Vapor barrier and band locations for Cryogel installations of 1 to 15 layers. Figure 2: Installation of second layer on piping. Page 11 of 15 Ver. 3-0 March 2010

12 Figure 3: Vapor stop detail on a 7-layer termination, showing the tie-ins with both the primary and secondary vapor barriers. Figure 4: Insulation detail for tubing or small-bore, butt-welded elbows. Figure 5: Flange insulation detail. Page 12 of 15 Ver. 3-0 March 2010

13 Figure 6: Correctly staircased joint at a change of insulation direction (e.g., at a tee). Page 13 of 15 Ver. 3-0 March 2010

14 Figure 7: Valve insulation detail. Figure 8: Insulation transition detail. Page 14 of 15 Ver. 3-0 March 2010

15 Figure 9: Vessel head band harness detail. Page 15 of 15 Ver. 3-0 March 2010

Installation Manual PIPE INSULATION FOR COLD SERVICE

Installation Manual PIPE INSULATION FOR COLD SERVICE PIPE INSULATION Contents (Click below to jump to section) Safety First 3 Material Handling 3 Preparation and Storage 4 Optimal Work Setup 5 Cold Installation Overview 6 Single Layer Installation 10 Single

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS Dyplast Products Copyright 2014 1 Rev 0414 DYPLAST PRODUCTS INSTALLATION GUIDELINES ISO-C1 POLYISOCYANURATE

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS Dyplast Products Copyright 2018 1 Rev 0618 DYPLAST PRODUCTS INSTALLATION GUIDELINES ISO-C1 POLYISOCYANURATE

More information

ITW INSULATION SYSTEMS

ITW INSULATION SYSTEMS ITW INSULATION SYSTEMS 1SCOPE TRYMER RIGID POLYISOCYANURATE INSULATION IN LIQUEFIED NATURAL GAS APPLICATIONS (-260 F) 1.1 This guideline covers the installation of Trymer* Rigid Polyisocyanurate Insulation

More information

ITW INSULATION SYSTEMS

ITW INSULATION SYSTEMS ITW INSULATION SYSTEMS 1SCOPE TRYMER RIGID POLYISOCYANURATE INSULATION IN LIQUEFIED NATURAL GAS APPLICATIONS (Cryogenic to -70 F) 1.1 This guideline covers the installation of TRYMER Rigid Polyisocyanurate

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER Dyplast Products Copyright 2012 1 Rev 0112 DYPLAST PRODUCTS

More information

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

1. Division 23 Section Hangers and Supports for HVAC Piping and Equipment for pipe insulation shields and protection saddles. SECTION 23 07 19 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION PIPING INSULATION

SECTION PIPING INSULATION SECTION 23 07 19 PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Piping insulation for refrigerant piping within building envelope. 2. Furnishing and installation of insulation.

More information

ITW INSULATION SYSTEMS

ITW INSULATION SYSTEMS Installation Guidelines for TRYMER Insulation ITW INSULATION SYSTEMS TRYMER Rigid Polyisocyanurate Insulation in Refrigeration Applications (-70 F to 35 F) 1 SCOPE 1.1 This guideline covers the installation

More information

INSTALLATION GUIDELINE FOR TRYMER INSULATION

INSTALLATION GUIDELINE FOR TRYMER INSULATION INSTALLATION GUIDELINE FOR TRYMER INSULATION TRYMER RIGID POLYISOCYANURATE INSULATION IN CHILLED WATER APPLICATIONS (35 F to 60 F) 1 SCOPE 1.1 This guideline covers the installation of Trymer Rigid Polyisocyanurate

More information

SECTION HVAC INSULATION

SECTION HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY SECTION 23 07 00 HVAC INSULATION A. Section Includes: 1. Ductwork insulation. 2. Duct liner. 3. Insulation jackets. 4. Equipment insulation 5. Piping system insulation. 6. Insulation

More information

079 Quick Installation Guide

079 Quick Installation Guide INSULATION 2212 W. 5th Pl., Tempe, AZ 85268 (480) 967-8888 Step 1: 079 Quick Installation Guide Step 2: *see attached literature for complete installation instructions Step 3: Position the next piece and

More information

10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2

10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2 SECTION 10: 10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING 2 10.2 FINISHES 2 10.3 PIPING FORMAT 3 A. PIPE INSULATION 3 B. PIPE INSULATION 3 C. INSULATION ATTACHMENT 3 D. INSULATION

More information

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS TRYMER RIGID POLYISOCYANURATE INSULATION IN REFRIGERATION APPLICATIONS (-70 F to 35 F) 1 SCOPE 1.1 This guideline covers the installation

More information

PIPE AND EQUIPMENT INSULATION

PIPE AND EQUIPMENT INSULATION Contents (Click below to jump to section) Safety First 2 Material Handling 2 Preparation and Storage 3 Optimal Work Setup 4 Single Wrap Pipe 6 Double Wrap Pipe 7 Multi-Layer Wrap Pipe 8 Pipe Fittings 10

More information

Addendum to Specifications

Addendum to Specifications Addendum to Specifications SOW #: Construction Specification #: Date: Additions to Specifications: Deletions to Specifications: Engineer Date Design Engineering Manager Date Page 2 of 7 PART 1 - GENERAL

More information

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS TRYMER RIGID POLYISOCYANURATE INSULATION IN HOT APPLICATIONS (80 F to 300 F) 1 SCOPE 1.1 This guideline covers the installation of TRYMER

More information

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS TRYMER RIGID POLYISOCYANURATE INSULATION IN HOT APPLICATIONS (80 F to 300 F) 1 SCOPE 1.1 This guideline covers the installation of Trymer*

More information

Installation Manual PIPE AND EQUIPMENT INSULATION

Installation Manual PIPE AND EQUIPMENT INSULATION PIPE AND EQUIPMENT INSULATION Contents (Click below to jump to section) Safety First 3 Material Handling 3 Preparation and Storage 4 Optimal Work Setup 5 Single Wrap Pipe 6 Double Wrap Pipe 7 Multi-Layer

More information

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated.

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated. SECTION 23 07 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

PROJ. NO SECTION HVAC DUCT INSULATION

PROJ. NO SECTION HVAC DUCT INSULATION SECTION 23 07 13 HVAC DUCT INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

FIRE STATION 55 June 14, 2010

FIRE STATION 55 June 14, 2010 SECTION 15250 MECHANICAL INSULATION PART 1 - GENERAL 1.01 DESCRIPTION A. Work Includes 1. Insulation of Domestic Water Piping. 2. Pipe Insulation of refrigerant piping. 3. Insulation of ductwork. 4. Aluminum

More information

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT Specification for Acoustical Insulation (Lagging) for Piping and Equipment 1 of 5 TABLE OF CONTENTS 1.0SCOPE..... 3 2.0REFERENCED PUBLICATIONS...

More information

SECTION (15081) - HVAC INSULATION

SECTION (15081) - HVAC INSULATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: SECTION 23 07 00 (15081) - HVAC INSULATION 1. Insulation Materials 2. Jackets 3. Accessories and Attachments 4. Vapor Retarders B. Related Sections: 1.02

More information

Recommended Installation and Repair Guide

Recommended Installation and Repair Guide Revision 1 7/20/2017 Insulation Jacketing Products Recommended Installation and Repair Guide Pipe and Equipment Insulation Jacketed with Factory and Field Installed Products Table of Contents 1. Scope...

More information

Mechanical Insulation for Refrigeration Systems

Mechanical Insulation for Refrigeration Systems Mechanical Insulation for Refrigeration Systems INDUSTRIAL REFRIGERATION CONSORTIUM RESEARCH & TECHNOLOGY FORUM MAY 2-3, 2012 Peter Gauchel, President/CEO L&C Insulation Inc. Overview Current trends in

More information

379 Quick Installation Guide

379 Quick Installation Guide Step 1: INSULATION 2212 W. 5th Pl., Tempe, AZ 85268 (480) 967-8888 379 Quick Installation Guide Step 2: Step 3: *see attached literature for complete installation instructions Remove and discard packing

More information

This specification describes the minimum requirements for industrial thermal insulation.

This specification describes the minimum requirements for industrial thermal insulation. 016/09/7 1/7 1.0 PURPOSE This specification describes the minimum requirements for industrial thermal insulation. Read it in conjunction with the applicable insulation and insulation finish specifications

More information

K-FLEX K-FONIK INDUSTRIAL

K-FLEX K-FONIK INDUSTRIAL J a n u a r y 2 0 1 3 K-FLEX K-FONIK INDUSTRIAL Sound & Thermal Insulation design compliant with ISO 15665 www.kflexenergy.com Flexible Elastomeric Foam layer INSULATING PIPING WITH K-FLEX SHEETS > FIRST

More information

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds.

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds. SECTION 230713 DUCT INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

A. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket.

A. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket. SECTION 230719 - HVAC PIPING INSULATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Piping insulation. B. Jackets and accessories. 1.2 RELATED REQUIREMENTS A. Section 07813 - Fire Procection, HVAC & Plumbing

More information

Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe

Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe 1 SCOPE 1.1 This guideline covers the installation of ITW Insulation Systems Pabco-Childers brand aluminum and

More information

INSTALLATION GUIDELINE FOR TRYMER SUPERCEL PHENOLIC INSULATION

INSTALLATION GUIDELINE FOR TRYMER SUPERCEL PHENOLIC INSULATION INSTALLATION GUIDELINE FOR TRYMER SUPERCEL PHENOLIC INSULATION TRYMER SUPERCEL PHENOLIC INSULATION IN CHILLED WATER APPLICATIONS (35 F to 60 F) Vers. 1.0 1 SCOPE 1.1 This guideline covers the installation

More information

PERMATHERM PIPE INSULATION PRODUCTS

PERMATHERM PIPE INSULATION PRODUCTS PERMATHERM PIPE INSULATION PRODUCTS PERMATHERM, INC. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.pipe-insulation.net September 2012 This Specification Guideline in the 3-Part Format

More information

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION The specification guideline in the three-part

More information

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulatepipe.com PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION The specification guideline in the three-part

More information

INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION

INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ Temperature Range 34 F to 167 F INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION PERMATHERM,

More information

FOAMGLAS INSULATION SPECIFICATION

FOAMGLAS INSULATION SPECIFICATION FOAMGLAS INSULATION SPECIFICATION PITTSBURGH CORNING CORPORATION FOAMGLAS Products Technical Support 800 Presque Isle Drive Pittsburgh, PA 15239 724-327-6100 SPECIFICATION # I-H/C-89-02-01 REVISION 06/28/2004

More information

INSTALLATION GUIDELINES FOR COLD/CRYOGENIC PIPE INSULATION

INSTALLATION GUIDELINES FOR COLD/CRYOGENIC PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ Temperature Range -310 F to 32 F INSTALLATION GUIDELINES FOR COLD/CRYOGENIC PIPE INSULATION PERMATHERM,

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION SECTION 230713 DUCT INSULATION PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 233113 Ductwork and Accessories 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. E84-96a Test Method

More information

SPECIFICATION FOR COLD INSULATION

SPECIFICATION FOR COLD INSULATION SPECIFICATION FOR COLD INSULATION Specification for Cold Insulation 1 of 21 TABLE OF CONTENTS 1.0. SCOPE..... 3 2.0. REFERENCED PUBLICATIONS... 3 3.0. GENERAL CONDITIONS... 3 4.0. MATERIALS... 5 5.0. APPLICATIONS...

More information

APPLICATION INSTRUCTIONS FOR MUFFL-JAC ACOUSTICAL JACKETING ON HOT PIPE INSULATION

APPLICATION INSTRUCTIONS FOR MUFFL-JAC ACOUSTICAL JACKETING ON HOT PIPE INSULATION APPLICATION INSTRUCTIONS FOR MUFFL-JAC ACOUSTICAL JACKETING ON HOT PIPE INSULATION Jim Young, Director of Technology and Pjeter Skrelji, Eastern Canada Regional Manager Vers. 2 November 19, 2011 Preliminary

More information

PERMATHERM, INC. SPECIFICATION FOR CHILLED WATER PIPE INSULATION

PERMATHERM, INC. SPECIFICATION FOR CHILLED WATER PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ PERMATHERM, INC. SPECIFICATION FOR CHILLED WATER PIPE INSULATION The specification guideline in the

More information

PITTWRAP B100 JACKETING Product Datasheet

PITTWRAP B100 JACKETING Product Datasheet PITTWRAP B100 JACKETING Product Datasheet 1. Description and Area of Application PITTWRAP B100 jacketing is a self-sealing, aluminum butyl laminate used for protecting above ground FOAMGLAS insulation

More information

Division 15 INSULATION Section 15100

Division 15 INSULATION Section 15100 Page 1 of 5 SECTION PAGE PART 1 GENERAL 2 1.1 General 2 1.2 References 2 1.3 Work Included 2 1.4 Related Work 2 1.5 Quality Assurance 3 PART 2 PRODUCTS 3 2.1 Description 3 PART 3 EXECUTION 3 3.1 Workmanship

More information

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin PART 1: GENERAL 1.01 Purpose: This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin 1.02 Scope: A. Extent of mechanical insulation

More information

PIP INSC1000 Cold Service Insulation Materials and Installation Specification

PIP INSC1000 Cold Service Insulation Materials and Installation Specification COMPLETE REVISION Ocber 2017 Insulation PIP Cold Service Insulation Materials and Installation Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort minimize the cost of process industry

More information

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700 SECTION 22 0700 - PLUMBING INSULATION PART 1 - GENERAL 1.1 DESCRIPTION OF WORK: A. All work covered in this section consists of furnishing all labor, equipment, materials and accessories, and performing

More information

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 230719 - PART 1 - GENERAL 1.1 SUMMARY A. Section includes insulating the following HVAC piping systems: 1. Chilled-water and brine piping, [indoors] [and] [outdoors]. 2. Heating hot-water piping,

More information

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness.

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness. SECTION 15250 PIPING AND EQUIPMENT INSULATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification

More information

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Refer to Division 33 and Division 23 - Underground Steam and Condensate Piping.2 Refer to Division 23 - Steam and Condensate Piping Above Grade 1.2

More information

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Pipe and Equipment Insulations Zeston PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Zeston PVC Insulated Fitting Covers Installation Instructions for Hot,

More information

SECTION MECHANICAL INSULATION. A. Types of insulation specified in this section include the following:

SECTION MECHANICAL INSULATION. A. Types of insulation specified in this section include the following: SECTION 15250 PART I - GENERAL 1.01 WORK INCLUDED A. Types of insulation specified in this section include the following: 1. Piping System Insulation: a. Domestic Cold Water b. Domestic Hot water c. Heating

More information

SECTION PLUMBING INSULATION

SECTION PLUMBING INSULATION SECTION 22 07 00 PLUMBING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes equipment insulation, covering, and thermal insulation for piping systems including vapor retarders, jackets and accessories.

More information

1 of 17. PO Box Bellevue Rd, Newark, DE V F

1 of 17. PO Box Bellevue Rd, Newark, DE V F 1 of 17 Raw Material Manufactured from 4 8-foot sheets Fiber-reinforced 1-mil aluminumfaced polyisocyanurate panels 0.032 embossed aluminum Other patterns and stainless steel are available Necessary supplies

More information

.1 Thermal insulation for insulated piping and piping accessories affected by construction and new pipe sections as indicated on drawings.

.1 Thermal insulation for insulated piping and piping accessories affected by construction and new pipe sections as indicated on drawings. BID OPPORTUNITY NO. 253-2011 PAGE 1 OF 8 PART 1 GENERAL 1.1 SUMMARY.1 Section Includes: 1.2 REFERENCES.1 Thermal insulation for insulated piping and piping accessories affected by construction and new

More information

Addendum 1 Section THERMAL INSULATION FOR PIPING Burrow Avenue Pumping Station Upgrades Page 1 of 5

Addendum 1 Section THERMAL INSULATION FOR PIPING Burrow Avenue Pumping Station Upgrades Page 1 of 5 Burrow Avenue Pumping Station Upgrades Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Section Includes:.1 Thermal insulation for piping and piping accessories in commercial type applications. 1.2 REFERENCES.1

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

PITTWRAP CW PLUS JACKETING Product Datasheet

PITTWRAP CW PLUS JACKETING Product Datasheet PITTWRAP CW PLUS JACKETING Product Datasheet 1. Description and Area of Application PITTWRAP CW PLUS jacketing is a 1.27 mm (50 mil) thick self-sealing, modified bituminous membrane for protecting underground

More information

NCCER Progress Blvd, Alachua, Florida Tel: (888)

NCCER Progress Blvd, Alachua, Florida Tel: (888) NCCER 13614 Progress Blvd, Alachua, Florida 32615 Tel: (888) 622-3720 E-mail: info@nccer.org INSULATING Competencies / Objectives Level One MODULE 19101 - ORIENTATION 1. Explain what insulation is and

More information

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems. Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to provide design guidelines for Utility Direct Buried

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL WALL PANELS This Guide Specification

More information

STANDARD SPECIFICATIONS. Followings have been covered in this section. The work is to be carried based on the standard specifications:

STANDARD SPECIFICATIONS. Followings have been covered in this section. The work is to be carried based on the standard specifications: STANDARD SPECIFICATIONS APPENDIX -3 Followings have been covered in this section. The work is to be carried based on the standard specifications: 1) Standard Specifications for Cold Insulation 2) Standard

More information

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS Insulation First Revison October 2016 DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS 1. General Information This Guide describes the use of Kingspan GreenGuard DC14 Drainage

More information

ITEM 458 WATERPROOFING FOR STRUCTURES

ITEM 458 WATERPROOFING FOR STRUCTURES ITEM 458 WATERPROOFING FOR STRUCTURES 458.1. Description. This Item shall govern for the furnishing and placing of waterproofing on concrete and steel bridge decks of railroad structures and on other structures

More information

MECHANICAL INSULATION

MECHANICAL INSULATION MECHANICAL INSULATION GENERAL INFORMATION 1.1 Comply with more stringent of following latest edition of Energy Conservation and Construction Code of New York City, ASHRAE and this Guideline. DESIGN REQUIREMENTS

More information

B. Refer to Section : Air Distribution for lined ductwork requirements.

B. Refer to Section : Air Distribution for lined ductwork requirements. SECTION 230700 MECHANICAL INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

KoolthermTM. Installation Guide. HVAC & Building Services Pipe Insulation

KoolthermTM. Installation Guide. HVAC & Building Services Pipe Insulation FM KoolthermTM Installation Guide HVAC & Building Services Pipe Insulation 2 Installation Guide This installation guide is an extract from the KoolthermTM FM Pipe Insulation Project Specification brochure

More information

SECTION HVAC PIPING INSULATION

SECTION HVAC PIPING INSULATION SECTION 23 0719 HVAC PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install insulation on above ground refrigerant piping and fittings as described in Contract

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 071326 - SELF-ADHERING SHEET WATERPROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

1.2 The Engineer shall select appropriate sections of the specification to ensure that the specification is comprehensive for specified work.

1.2 The Engineer shall select appropriate sections of the specification to ensure that the specification is comprehensive for specified work. STAC Coating System Specification & Installation Guide 1.0 Scope 1.1 This specification may be used for the priming, caulking and wrapping with the STAC Petrolatum Coating System of any of the following

More information

Testing. Test drainage products according to the applicable AASHTO or ASTM specification, except as otherwise noted.

Testing. Test drainage products according to the applicable AASHTO or ASTM specification, except as otherwise noted. 909.01 Section 909. DRAINAGE PRODUCTS 909.01 General Requirements. If only the size and class are specified for a culvert or sewer, use the pipe materials as shown in Table 401-1 and 402-1 respectively.

More information

Cold Work Cladding Fabrication & Application

Cold Work Cladding Fabrication & Application TRADE OF Industrial Insulation PHASE 2 Module 3 Substructures, Advanced Cold Work and Cladding UNIT: 4 Cold Work Cladding Fabrication & Application Produced by In cooperation with subject matter expert:

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION PART 1 GENERAL 1.01 SUMMARY Section 15145 This Section includes insulation for piping and equipment as called out on the Plans. 1.02 MEASUREMENT AND PAYMENT No separate payment will be provided for the

More information

SECTION MECHANICAL SYSTEMS INSULATION

SECTION MECHANICAL SYSTEMS INSULATION SECTION 23 0700 MECHANICAL SYSTEMS INSULATION PART 1 - GENERAL 1.1 RELATED WORK A. Section 23 0529 - Mechanical Supporting Devices B. Section 23 3114 - Ductwork (Duct Lining) 1.2 REFERENCE A. Work under

More information

Duct Wrap Flexible Wraps

Duct Wrap Flexible Wraps Design No. 3MU/ 60-01 December 23, 2010 VENTILATION DUCT PROTECTION 3M Company 3M Fire Barrier Duct Wraps: 615 and 615+ 3M Fire Barrier Sealants: Water-Tight 1000-NS Silicone, Water-Tight 1003-SL Silicone

More information

SECTION 07530CP EPDM MEMBRANE ROOFING

SECTION 07530CP EPDM MEMBRANE ROOFING PART 1 GENERAL 1.1 SUMMARY SECTION 07530CP EPDM MEMBRANE ROOFING A. Section includes: 1. Adhered membrane roofing and flashing 2. Mechanically fastened roof insulation 3. Walkway pads 1.2 ARCHITECTURAL

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING SECTION 09665 RESILIENT SHEET FLOORING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies the installation of sheet flooring with backing and integral cove base. 1.2 RELATED WORK A. Color and pattern:

More information

B C M T e c h n i c a l, L L C A v o n I n d u s t r i a l D r. R o c h e s t e r H i l l s, M I P h o n e : T o l

B C M T e c h n i c a l, L L C A v o n I n d u s t r i a l D r. R o c h e s t e r H i l l s, M I P h o n e : T o l P r o d u c t C a t a l o g w w w. p i p e i n s u l a t i o n. n e t B C M T e c h n i c a l, L L C 2 1 7 5 A v o n I n d u s t r i a l D r. R o c h e s t e r H i l l s, M I 4 8 3 0 9 P h o n e : 2 4

More information

L'ISOLANTE K-FLEX. LNG applications Manual

L'ISOLANTE K-FLEX. LNG applications Manual L'ISOLANTE K-FLEX LNG applications Manual LNG applications Manual The insulation LNG plants may forsee a multilayer design according to the specific characteristics and the working temperatures of the

More information

CFC & HCFC Free Thermal Insulation INSTALLATION AND SPECIFICATION GUIDE

CFC & HCFC Free Thermal Insulation INSTALLATION AND SPECIFICATION GUIDE Resolco Insul-Phen CFC & HCFC Free Thermal Insulation INSTALLATION AND SPECIFICATION GUIDE TABLE OF CONTENTS RESOLCO INC. Specification: Insul-Phen closed cell CFC & HCFC free phenolic foam Pipe & Equipment

More information

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 220719 - PART 1 - GENERAL 1.1 SUMMARY A. Section includes insulating the following plumbing piping services: 1. Domestic hot-water piping. 2. Domestic recirculating hot-water piping. 3. Supplies

More information

GUIDE SPECIFICATION: MECHANICAL SYSTEMS

GUIDE SPECIFICATION: MECHANICAL SYSTEMS GUIDE SPECIFICATION: MECHANICAL SYSTEMS This specification guide includes thermal & acoustical insulation for piping, equipment, vessels, and air handling systems. This section is based on the format recommended

More information

HVAC Piping Insulation FIBERGLAS Insulation. General Specification Guide SECTION

HVAC Piping Insulation FIBERGLAS Insulation. General Specification Guide SECTION HVAC Piping Insulation FIBERGLAS Insulation General Specification Guide PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals,

More information

SECTION MECHANICAL INSULATION

SECTION MECHANICAL INSULATION SECTION 15250 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work

More information

Installation Guidelines VBC Products

Installation Guidelines VBC Products Installation Guidelines VBC Products Composite STEP 1A: Ground Surface Preparation Earth Base Select the suitable product (VBC-350, 31 mil) and ensure the installation surface is relatively smooth. Barrier-Bac

More information

HVAC Piping Insulation- FIBERGLAS Insulation

HVAC Piping Insulation- FIBERGLAS Insulation PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT PART 1 GENERAL SECTION 22 0553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 1.01 SECTION INCLUDES A. Pipe markers. 1.02 REFERENCE STANDARDS A. ASME A13.1 - Scheme for the Identification of Piping

More information

SECTION Rev #0811 MECHANICAL INSULATION

SECTION Rev #0811 MECHANICAL INSULATION SECTION 15080 Rev #0811 MECHANICAL INSULATION ISO-HT TM (POLYISO) RIGID FOAM PIPE, VESSEL, DUCT, AND EQUIPMENT INSULATION FOR HIGH TEMPERATURE APPLICATIONS UP TO 375F (190C), and up to 400F (204C) intermittent

More information

INDUSTRIAL SYSTEMS. Application Manual for Piping Equipment. ARMASOUND INDUSTRIAL SYSTEMS - Application Manual for Piping Equipment

INDUSTRIAL SYSTEMS. Application Manual for Piping Equipment. ARMASOUND INDUSTRIAL SYSTEMS - Application Manual for Piping Equipment INDUSTRIAL SYSTEMS Application Manual for Piping Equipment INDEX Introduction................................ 2 Tools for Installing ArmaSound.............. 2 INTRODUCTION The advice contained within this

More information

UBC Technical Guidelines Section Edition Insulation of Tanks, Steam and Condensate Piping Page 1 of 6

UBC Technical Guidelines Section Edition Insulation of Tanks, Steam and Condensate Piping Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 Refer to Division 33 and Division 23 - Underground Steam and Condensate Piping.2 Refer to Division 23 - Steam and Condensate Piping Above Grade.3 Section

More information

University of New Hampshire Scholars' Repository

University of New Hampshire Scholars' Repository University of New Hampshire University of New Hampshire Scholars' Repository Division 07 Thermal and Moisture Protection Chapter 5 Technical Construction and Renovation Standards 1-25-2013 075423 - TPO

More information

Gensler 2014/06/16 Hertz Global Headquarters ISSUE FOR BUILDING PERMIT Estero, Florida SECTION

Gensler 2014/06/16 Hertz Global Headquarters ISSUE FOR BUILDING PERMIT Estero, Florida SECTION SECTION 072700 VAPOR PERMEABLE AIR BARRIER LIQUID MEMBRANE PART 1 GENERAL 1.1 GENERAL REQUIREMENTS A. The Work of this Section, as shown or specified, shall be in accordance with the requirements of the

More information

SECTION ALUMINUM HANDRAIL SYSTEMS

SECTION ALUMINUM HANDRAIL SYSTEMS SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American

More information