RAUPANEL DRY SYSTEM HIGH PERFORMANCE PANEL SYSTEM
|
|
- Berenice Roberts
- 6 years ago
- Views:
Transcription
1 RAUPANEL DRY SYSTEM HIGH PERFORMANCE PANEL SYSTEM Construction Automotive Industry
2 RAUPANEL SYSTEM OUTLINE - System Introduction - System advantages - System components - Installation techniques - Installing panels and pipes - Nail-down hardwood floors - Floating and glue-down floors - Carpet and vinyl floors - Tile floors - Over existing slab - RAUPANEL layouts - Routing pipe tails to manifolds - Installing EVERLOC couplings - Wall heating - Features and benefits summary - Comparison with other options - Performance testing - Installed cost comparisons REHAU 26-Mar-10 - Page 2
3 RAUPANEL SYSTEM INTRODUCTION - Aluminum is extruded with groove to hold 3/8 RAUPEX O 2 Barrier pipes with 270-degree contact - Total panel thickness is just 5/8 - Components allow for 6 or 8 o-c pipe spacing - Lightweight system, only 1.5 lbs/ft 2 - Combination of Aluminum and Plywood - λ of Aluminum = 230 Infra-red photograph of RAUPANEL system REHAU 26-Mar-10 - Page 3
4 RAUPANEL SYSTEM ADVANTAGES OF THE RAUPANEL ALUMINUM SYSTEM FOR THE DESIGNER - Ideal for kitchens, baths, entire house - May be used in floors, walls, ceilings - Efficient - Low-profile - Lightweight - High performance - Fast response time - Nighttime setback is an option - Solar gain problems are reduced - Easy to plan - Easy to install REHAU 26-Mar-10 - Page 4
5 RAUPANEL SYSTEM ADVANTAGES OF THE RAUPANEL ALUMINUM SYSTEM FOR THE CONTRACTOR - Higher efficiency thanks to reduced downward heat transfer and aluminum panels - May eliminate insulation under subfloors (over heated space below) - May eliminate double baseplates due to reduced floor thickness - No special equipment necessary (no wet thermal mass) - Faster response time than an overpour (lighter weight) - Suitable for both retrofit and new construction - No complicated scheduling and preparation - Fewer changes to overall construction - Eliminates other trade (thermal mass) - Design flexibility, easier to zone - Available when you want it - Everything is boxed - A complete system - Easy to carry - Low profile REHAU 26-Mar-10 - Page 5
6 RAUPANEL INSTALLATION COMPONENTS FIT TOGETHER AS A SYSTEM (1-2-3) 1. Lay out Return Bends and Furring Strips (for 8 spacing) 2. Drop Aluminum panels onto floor; align into notches with 8 Bends Note: Be sure that subfloor is clean before installation of panels REHAU 26-Mar-10 - Page 7
7 RAUPANEL INSTALLATION COMPONENTS FIT TOGETHER AS A SYSTEM (1-2-3) Note: Leave 1/16 to 1/8 gap between ends of panels to allow for possible house movement or shrinkage REHAU 26-Mar-10 - Page 8
8 RAUPANEL INSTALLATION COMPONENTS FIT TOGETHER AS A SYSTEM (1-2-3) 3. Pipe is walked into the groove; a rubber mallet may be needed to set it in Note: Be sure that panel grooves are clean before installation of pipes Note: No silicone is used to fill grooves. Pipes will not pop out when properly installed REHAU 26-Mar-10 - Page 10
9 RAUPANEL INSTALLATION DEBURR FIELD CUTS WITH DEBURRING TOOL IN THE GROOVE WARNING! Wear gloves and eye protection when handling pieces REHAU 26-Mar-10 - Page 11
10 RAUPANEL INSTALLATION THE NEXT STEPS: THE FOLLOWING INSTALLATION GUIDELINES APPLY TO VARIOUS FLOORING CHOICES 1. Nail-down hardwood flooring (over suspended subfloor) 2. Floating and glue-down flooring (over suspended subfloor) 3. Carpet and vinyl (over suspended subfloor) 4. Tile (over suspended subfloor) 5. Installations over concrete slabs Notes: - These are general guidelines for installation of RAUPANEL under common floor coverings - Certain floor coverings may have specific installation requirements which are not covered in this document - It is the responsibility of the installing heating contractor to work with other trades, including the installer of the finished floors, to ensure that the flooring manufacturer s requirements are adhered REHAU 26-Mar-10 - Page 12
11 RAUPANEL INSTALLATION NAIL-DOWN HARDWOOD FLOORS 1. Install panels and pipes following the first Steps Screw or nail Return Bends and Furring Strips to subfloor (use maximum 8 spacing between screws or nails) 3. Let the Aluminum panels float between plywood panels no need to screw these down 4. Install hardwood directly over RAUPANEL system (perpendicular in direction to panels) 5. Nail or staple hardwood boards into plywood components or through aluminum/into subfloor if necessary - Fasten boards every 6-8 It is recommended to use 8 spacing with furring strips when installing nail-down hardwood Note: Panel system may be loose and noisy until all hardwood is properly secured REHAU 26-Mar-10 - Page 13
12 RAUPANEL INSTALLATION NAIL-DOWN HARDWOOD FLOORS - Minimum 8 screws per Return Bend - Minimum 5 screws per Furring Strip - If subfloor is not even or has excessive deflection ( bounce ), then more fasteners may be required to prevent noise - Fasten as necessary - Screws: - Use fine-thread drywall screws or deck screws - Nails: - Use rough roofing nails or ringshank nails, not smooth nails, which could work loose - Nails must be long enough 8 spacing 8 spacing Note: Panel system may be loose and noisy until all hardwood is properly secured REHAU 26-Mar-10 - Page 15
13 RAUPANEL INSTALLATION NAIL-DOWN HARDWOOD FLOORS 6 SPACING INSTALLATION WITH HARDWOOD - If 6 spacing is necessary for heat load, this installation is possible - Aluminum panels and plywood pieces must be fastened to subfloor following instructions - Nail or staple hardwood flooring through aluminum panels into subfloor, every 6 - Must use 2 or longer cleats, nails or staples - It is recommended to use 5/8 or 1/2 thick hardwood to ensure most secure fastening 6 spacing REHAU 26-Mar-10 - Page 17
14 RAUPANEL INSTALLATION NAIL-DOWN HARDWOOD FLOORS 6 SPACING INSTALLATION WITH HARDWOOD - Must use 2 or longer cleats, nails or staples for good bite into subfloor - With 3/4 solid hardwood, a 2 fastener will have 5/8 length bite into subfloor - It is recommended to use 5/8 or 1/2 thick hardwood to ensure most secure fastening 2 Long REHAU 26-Mar-10 - Page 18
15 RAUPANEL INSTALLATION TYPICAL INSTALLATION WITH NAIL-DOWN HARDWOOD FLOORS REHAU 26-Mar-10 - Page 19
16 RAUPANEL INSTALLATION FLOATING AND GLUE-DOWN FLOORS 1. Install panels and pipes following the first Steps Screw or nail Return Bends and Furring Strips to subfloor (use maximum 8 spacing between screws or nails) 3. Fasten Aluminum panels 3 times per side - Total 6 per panel per 6-foot length 4. Install flooring as per manufacturer s recommendations - Avoid contacting glue onto pipes - Use 8 screws per Return Bend* - Use 5 screws per Furring Strip* - Use 6 screws per Aluminum Panel* *Per full length components Note: Always feel free to add extra fasteners if movement or noise is suspected REHAU 26-Mar-10 - Page 20
17 RAUPANEL LAYOUTS TYPICAL INSTALLATION WITH FLOATING FLOORS REHAU 26-Mar-10 - Page 22
18 RAUPANEL LAYOUTS TYPICAL INSTALLATION WITH FLOATING FLOORS REHAU 26-Mar-10 - Page 23
19 RAUPANEL INSTALLATION TILE FLOORS USING MORTAR BOARD AS ALTERNATIVE TO DIRECT PLACEMENT OF THINSET Sample cutaway floor: - 1/4 thick mortar board installed directly over RAUPANEL at 6 o-c spacing with maximum 8 grid spacing for screws - Tile placed on thinset over mortar board Note: When using panels at 6 o-c install screws at 6 o-c spacing also to avoid hitting pipes REHAU 26-Mar-10 - Page 27
20 RAUPANEL INSTALLATION TILE FLOORS USING MORTAR BOARD AS ALTERNATIVE TO DIRECT PLACEMENT OF THINSET Sample cutaway floor: - 1/4 thick mortar board installed directly over RAUPANEL at 6 o-c spacing - Tile placed on thinset over mortar board - Panels installed directly under shower pan for warmth REHAU 26-Mar-10 - Page 28
21 RAUPANEL INSTALLATION TYPICAL INSTALLATION WITH TILE FLOORS - 1/4 or 3/8 mortar board with 8 maximum grid spacing for screws REHAU 26-Mar-10 - Page 29
22 RAUPANEL INSTALLATION OVER EXISTING SLAB 1. If necessary, level floor with self-leveling thin-set 2. Cover existing slab (or above the leveling layer) with a poly or tar paper vapor barrier (not aluminum) to block possible moisture permeation 3. Install panels and pipes following the first Steps Depending on the flooring to be used, follow that typical installation technique: - When anchoring panel pieces, overlayment or mortar board, use proper fasteners for anchoring to concrete (ram-sets may work; masonry screws do work) - Be sure not to penetrate any existing pipes, cables, etc. in existing slab floor - Follow all safety precautions for using concrete fasteners REHAU 26-Mar-10 - Page 30
23 RAUPANEL INSTALLATION SEE REHAU REFERENCE DOCUMENTS CD - REHAU Reference Documents (CD) has Detailed Installation Drawings for installation techniques - Example: REHAU 26-Mar-10 - Page 31
24 RAUPANEL LAYOUTS HALLWAYS SHOULD BE FILLED WITH RAUPANEL TO AVOID COLD FLOORS, BUT THERE MAY NOT BE ENOUGH SPACE FOR ALL CIRCUIT TAILS IN HALLWAYS - Sometimes there are too many pipes to fit in a hallway, all within the panels (too many circuits to supply) - May have to install some pipes outside panels, or you may have to install some pipes through the subfloor to reach the manifold REHAU 26-Mar-10 - Page 38
25 ROUTING PIPE TAILS TO MANIFOLDS MACHINE OR ROUTER YOUR OWN PLYWOOD CUSTOM RETURNS REHAU 26-Mar-10 - Page 39
26 ROUTING PIPE TAILS TO MANIFOLDS DRILL 1 INCH HOLE AT 45-DEGREE ANGLE IN SUBFLOOR USE EVERLOC COUPLINGS TO EXTEND TAILS TO MANIFOLD REHAU 26-Mar-10 - Page 40
27 ROUTING PIPE TAILS TO MANIFOLDS DRILL 1 INCH HOLE AT 45-DEGREE ANGLE IN SUBFLOOR RUN PIPES THROUGH THE JOIST CAVITIES TO MANIFOLD - Note: These pipes are too close to the end of the panels. Not a good example REHAU 26-Mar-10 - Page 41
28 ROUTING PIPE TAILS TO MANIFOLDS DRILL 1 INCH HOLE AT 45-DEGREE ANGLE IN SUBFLOOR USE EVERLOC COUPLINGS TO EXTEND TAILS TO MANIFOLD REHAU 26-Mar-10 - Page 42
29 ROUTING PIPE TAILS TO MANIFOLDS DRILL 1 INCH HOLE AT 45-DEGREE ANGLE IN SUBFLOOR RUN PIPES THROUGH THE JOIST CAVITIES TO MANIFOLD REHAU 26-Mar-10 - Page 43
30 ROUTING PIPE TAILS TO MANIFOLDS JIGSAW A SLOT IN THE FLOOR RUN PIPES THROUGH THE JOIST CAVITIES TO MANIFOLD - Route pipes through floors and joist cavities to get to manifolds REHAU 26-Mar-10 - Page 44
31 ROUTING PIPE TAILS TO MANIFOLDS RUN ALL THE PIPES IN ONE NARROW AREA? NO! THIS METHOD IS NOT RECOMMENDED (HOT SPOT) - Avoid routing pipes to manifold on the subfloor go below REHAU 26-Mar-10 - Page 45
32 WALLS AND CEILINGS APPLICATIONS IN WALLS AND CEILINGS - Use panels for walls where supplemental heat is needed - Very nice in bathrooms, tub/shower walls, behind large mirrors, tubs Interior drywall REHAU 26-Mar-10 - Page 47
33 WALLS AND CEILINGS APPLICATIONS IN WALLS AND CEILINGS - Use panels for walls or ceilings where floor space is limited (bathrooms, kitchens, mudrooms) - May be the same circuit of pipe, same water temperature - Keep panels within 3 feet of floor to prevent future pipe punctures - Use furring strips on edges of studs above panels to make walls flush for drywall - Insulate behind panels at outside walls or ceilings REHAU 26-Mar-10 - Page 48
34 WALLS AND CEILINGS INSTALLED IN A WALL SURROUNDING A SHOWER Sample cutaway wall: - 1/4 thick tileboard board installed directly over RAUPANEL at 8 o-c spacing - Tile is placed on thinset over tileboard - Furring strips are used on stud edges above panels to flush out the walls before tileboard installation REHAU 26-Mar-10 - Page 49
35 WALLS AND CEILINGS INSTALLED IN A WALL SURROUNDING A SHOWER Sample cutaway wall: - 1/4 thick tileboard board installed directly over RAUPANEL at 8 o-c spacing - Tile placed on thinset over tileboard - Great for warming tub/shower area - Adds supplemental heat to entire bathroom, kitchen or mudroom REHAU 26-Mar-10 - Page 50
36 RELATIVE OUTPUT OF RFH SYSTEMS VTECH STUDY RESULTS: COMPARISON OF FLOOR OUTPUT WITH 110 F INPUT WATER TEMPERATURE Output with 110 F Input Water Temperature Position System Output BTU/hr-ft RAUPANEL 6" spacing RAUPANEL 8" spacing MDF board with foil face, 8" spacing (ThermalBoard) Expanded PS base with aluminum plates, 6" spacing (Roth) Gypsum cement overpour 1 1/2" thick, 8" spacing Joist Space with heavy gauge extruded aluminum plates, 8" spacing (Thin-Fin) Thin plywood with aluminum backing, 7" spacing (Quik-Trak) Structural plywood with aluminum facing, 12" spacing (WarmBoard) Joist Space, no heat transfer plates, 8" spacing Joist Space, aluminum louvers in air cavities, 24" spacing (Ultra-Fin) REHAU 26-Mar-10 - Page 60
37 RELATIVE OUTPUT OF RFH SYSTEMS VTECH STUDY RESULTS: COMPARISON OF FLOOR OUTPUT WITH 110 F INPUT WATER TEMPERATURE Radiant Floor Heating System Relative Output Output, BTU/hr per Square Foot with 1/4" thick plywood covering RAUPANEL 6" spacing RAUPANEL 8" spacing MDF board w ith fo il fa c e, 8" spacing Expanded PS base with alum imum plates, 6" G ypsum cement overpour, 1 1/2" thick, 8" spacing Joist Space with extruded aluminum plates, 8" Thin plywood with alum inum backing, 7" Structural plywood with alum inum fa c ing, 1 2 " Joist Space, no heat transfer plates, 8" Joist Space, aluminum louvers in air cavities, Commercial Radiant Floor Heating Systems Tested, 110 F Water Temperature REHAU 26-Mar-10 - Page 62
38 RAUPANEL ADVANTAGES HIGHER PUMPING EFFICIENCY (LOWER HEADLOSS) RAUPANEL uses 3/8 PEXa pipe: - 3/8 RAUPEX pipe has 1/3 the headloss of 5/16 PEX pipe - Smaller pumps can be used - Longer circuits are possible - Lower Delta-T across manifold Example: 0.4 GPM, 250 ft circuit designed to deliver 4,000 BTU/hr - 5/16 hepex: 18.6 ft headloss - 3/8 RAUPEX: 6.3 ft headloss Head Loss (feet of head) with 120 o F (49 o C) Water 5/16" (10 mm) PEX** Flow Rate Loss 100 foot 150 foot 200 foot 250 foot GPM per foot* circuit circuit circuit circuit Head Loss (feet of head) with 120 o F (49 o C) Water 3/8" RAUPEX Pipe Flow Rate Velocity 100 foot 150 foot 200 foot 250 foot GPM ft/sec circuit circuit circuit circuit REHAU 26-Mar-10 - Page 63
39 RAUPANEL DRY SYSTEM HIGH PERFORMANCE PANEL SYSTEM Construction Automotive Industry
RAUPANEL RADIANT HEATING SYSTEMS HEAT TRANSFER PANEL PRODUCT INSTRUCTIONS. Construction Automotive Industry
RAUPANEL RADIANT HEATING SYSTEMS HEAT TRANSFER PANEL PRODUCT INSTRUCTIONS www.rehau.com Construction Automotive Industry SCOPE This guide provides technical instruction regarding the installation of RAUPANEL
More informationronblank.com to receive credit Lance MacNevin REHAU Inc Edwards Ferry Rd. Leesburg, VA
Ron Blank and Associates, Inc. 2010 Please note: you will need to complete the conclusion quiz online at ronblank.com to receive credit SUSTAINABLE BUILDING TECHNOLOGY REHAU s sustainable building technology
More informationRAUPANEL System. Installation Guide
RAUPANEL System Installation Guide Table of Contents 1.0 Introduction 1 2.0 System Components 2 2.1 RAUPANELs 2 2.2 Return Bends 2 2.3 Furring Strips 2 2.4 3/8" RAUPEX O 2 Barrier Pipe 2 3.0 Tools 3 3.1
More informationRAUBOARD RADIANT HEATING SYSTEMS HEAT TRANSFER PANEL PRODUCT INSTRUCTION. Construction Automotive Industry
RAUBOARD RADIANT HEATING SYSTEMS HEAT TRANSFER PANEL PRODUCT INSTRUCTION www.rehau.com Construction Automotive Industry SCOPE This technical information provides instruction regarding the installation
More informationRAUPANEL Radiant Heating Systems. Installation Guide
RAUPANEL Radiant Heating Systems Installation Guide 855.625 Table of Contents 1.0 Introduction 1 2.0 System Components 2 2.1 RAUPANELs 2 2.2 Return Bends 2 2.3 Furring Strips 2 2.4 3/8" RAUPEX O 2 Barrier
More informationQuik Trak design and installation manual
Quik Trak design and installation manual Table of contents Quik Trak design and installation manual Uponor Quik Trak overview.... 1 Installation tools... 1 Prepping the panel area.... 1 Panel calculations....
More informationRADIANT PANEL SYSTEM PLANNING & INSTALLATION. Roth Radiant Heating Systems
RADIANT PANEL SYSTEM PLANNING & INSTALLATION Roth Radiant Heating Systems INTRODUCTION The Roth Radiant Panel System was developed for the wood frame houses of the North American and Scandinavian markets.
More informationINSTALLING MrPEX TUBING
INSTALLING MrPEX TUBING INSTALLING THE TUBING Now that you are ready to install the tubing, take a minute to decide which loop to start with first. Typically, working your way from left to right as you
More informationRADIANT HEATING SYSTEMS QUIK TRAK DESIGN AND INSTALLATION MANUAL. Quik Trak Design and Installation Manual
RADIANT HEATING SYSTEMS QUIK TRAK DESIGN AND INSTALLATION MANUAL Quik Trak Design and Installation Manual Table of Contents Uponor Quik Trak 1 Quik Trak Calculations 2 Installation Methods 3 Quik Trak
More informationSubRay Radiant. Header Sticks Sleepers Corner Sweeps Grippers Tape Conduction Layer C-Covers. Subfloor System
Radiant s s Corner Sweeps Grippers Tape Conduction Layer C-Covers Subfloor System 56 Anatomy of the Radiant System Holds radiant pipe at each end of the room on 8" centers. 6" wide and installed 2" apart.
More informationAquaHeat Installation Guide
Installation Guide AquaHeat Dry Above A systems approach integrating established and emerging technologies Preface System Design and Installation The Mains PEX pipe mains are recommended to reduce labor
More informationPEX Plates for Underfloor Applications
Installation Bulletin: PEX Plates for Underfloor Applications Release Date: October 2001 3131 W. Chestnut Expressway Springfield, MO 65802 ph: 417.864.6108 fax: 417.864.8161 www.wattsradiant.com Watts
More information1. The subfloor must be structurally sound and able to withstand live and dead loads with a deflection limitation of L/360.
HARDWOOD FLOOR Read First These suggestions represent generally accepted procedures for successful installation of Maxxon Products. These instructions may be followed, modified or rejected by the owner,
More informationThermoFin U SPEC - DATA
ThermoFin U Patent 5,454,428 Canada Patent 2,158,302 MADE IN USA ThermoFin U is a versatile extruded aluminum heat transfer plate that can be used in several radiant panel heating applications including
More informationL. W. Mountain, Inc. Floating Glue Installation Instructions *For use with engineered floors only*
L. W. Mountain, Inc. Floating Glue Installation Instructions *For use with engineered floors only* Inspect the job site carefully before you begin the installation. Some conditions require specific installation
More informationPLYWOOD FLOATING FLOOR
PLYWOOD FLOATING FLOOR Read First These suggestions represent generally accepted procedures for successful installation of Enka Building Products. These instructions may be followed, modified, or rejected
More information1. What are the benefits of Decorative Wall Panels? 2. Where can these decorative panels are used? 3. Are the panels waterproof?
1. What are the benefits of Decorative Wall Panels? Decorative Wall Panels are made from precision extruded PVC and decorated with unique designs ranging from marble, onyx to wood grain patterns. Other
More informationBASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)
BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) PERMIT SUBMITTAL CHECKLIST: Signed and completed Building Permit application form. A separate Electrical permit is required from
More informationInstallation Instructions
Installation Instructions FW Cable Silicone Jacketed Floor Warming Cable Warning: Delta-Therm Silicone Jacketed Cable must be installed by a qualified installer. All assembly, installation, and test instructions
More informationINSTALLATION METHODS ENGINEERED FLOORING FLOATING, GLUED-DOWN OR NAILED INSTALLATION METHODS
INSTALLATION METHODS ENGINEERED FLOORING FLOATING, GLUED-DOWN OR NAILED INSTALLATION METHODS BEFORE THE INSTALLATION ENGINEERED HARDWOOD FLOOR INSTALLATION: It is important to account for a 5% surplus
More informationExpanded AmDry Installation Guide
Expanded Tools Required: Tape measure Utility Knife Straight edge Rubber mallet Circular saw with plywood blade Pull or pry bar 1/2 spacers Pencil / marker Tapping block (made from a piece of 2 x 4 ) Getting
More informationMAKING IT STICK: Nails and screws, adhesives and compounds... today contractors have a wide variety of choices.
MAKING IT STICK: Fasteners & Adhesives Walls hold up the building but what holds up the walls? Today contractors have a wide variety of fasteners and adhesives from which to choose, according to the needs
More informationInstallation and Planning Guide
Installation and Planning Guide www.dricore.com help@dricore.com or call 1-866-976-6374 Weekdays 9am-5pm EST CONTENTS Why DRIcore... 1 How To Use This Guide... 1 Before You Begin Checklist... 2 Important
More informationR-Matte Plus-3: Insulation for the Building Envelope
Attic and Crawl Space Applications R-Matte Plus-3 may be applied to the interior face of stud walls or roof rafters within attics and crawl spaces to provide a layer of continuous insulation (ci). Simply
More informationExisting Floors & Low Profile Systems
Existing Floors & Low Profile Systems Existing Floors & Low Profile Systems Underfloor heating that goes over the floor For existing solid or timber deck floors - Polypipe s unique Overlay underfloor heating
More informationInstallation Guide. Floor heating. Vodoley CO
Installation Guide Floor heating Vodoley CO Bulgaria, 5000 V.Tarnovo, 7 Ionovka str., Phone/Fax: +359 62 649652 E-mail: floorheating@vodoley91.com, vodoley98@hotmail.com www.vodoley91.com 2 Vodoley Co.
More informationMetal Web Floor System
Metal Web Floor System Contents Contents Introduction and benefits 3 easi-joist definitions 4 easi-joist webs 5-6 Mechanical services 7 Loading and design 8 Floor stiffness 9 Internal non-loadbearing wall
More informationUSG Tile & Flooring Solutions. Lightweight cement board. Easy to cut and fasten. Faster installation USG DUROCK BRAND CEMENT BOARD INSTALLATION GUIDE
USG Tile & Flooring Solutions Lightweight cement board Easy to cut and fasten Faster installation USG DUROCK BRAND CEMENT BOARD INSTALLATION GUIDE USG DUROCK BRAND CEMENT BOARD For more than 30 years,
More informationREHAU RADIANT HEATING SYSTEMS INSTALLATION GUIDE. Construction Automotive Industry.
REHAU RADIANT HEATING SYSTEMS INSTALLATION GUIDE www.rehau.com Construction Automotive Industry Table of Contents 1. Scope................................................... 3 2. Installation Considerations...................................
More information1 PVC or ABS drain with strainer
Patents Pending ProBase II Single-Slope Shower Base and Kit CONTENTS 1. General Information...1 2. Materials...1 3. Planning...2 4. Preparation...3 5. Layout...3 6. Install Base and Shims...4 7. Install
More informationINSTALLATION INSTRUCTIONS
About PROTECH Luxury Vinyl Planks 8.7mm WPC Click Lock Contemporary Collection features patented interlocking planks for easy installation and is installed as a glue less floating floor. The interlocking
More informationTYPICAL BEARING WALL FRAMING
BASIC WOOD FRAMING City of Grand Rapids Building Safety Division 218-326-7601 www.grandrapidsmn.org This handout is intended only as a guide and is based in part on the 2007 Minnesota State Building Code,
More informationRev. 08 9/15 Please Read Disclaimers:
NuPoly panels Guidelines 6006.NP Rev. 08 9/15 Please Read Disclaimers: PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION!! These guidelines are provided in good faith to help prevent any problems
More informationVESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE
VESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE Vesdura Engineered Vinyl Plank features the patented Unilin interlocking planks for easy installation and is installed as a glueless floating floor. The
More informationInformation Kit. Table Of Contents. Radiant Floor Tubing Comparison Page 1. Butt Weld Verses Overlap Weld Page 2
Information Kit Table Of Contents Radiant Floor Tubing Comparison Page 1 Butt Weld Verses Overlap Weld Page 2 Insulation and Vapor Barrier Information Page 3-5 Location of Tubing in Concrete Page 5-6 Lightweight
More informationSection II Subfloor Guidelines & Specifications Page Chapter 4 Wood Subfloor Guidelines 23 Chapter 5 Concrete Subfloor Guidelines 26 Chapter 6
Section II Subfloor Guidelines & Specifications Page Chapter 4 Wood Subfloor Guidelines 23 Chapter 5 Concrete Subfloor Guidelines 26 Chapter 6 Installing a Subfloor Over Concrete 27 24 National Wood Flooring
More informationInstallation Guidelines: Magnolia
Installation Guidelines: Magnolia 3/8 Engineered Hardwood Staple Down Installation ATTENTION Inspect ALL materials carefully BEFORE Warranties DO NOT cover materials with visible defects once they are
More informationAPPLICATION FOR FINISHED BASEMENT PERMIT
APPLICATION FOR FINISHED BASEMENT PERMIT REAL ESTATE TAX I.D. #: - - _ - _ 7607 W College Drive Ph: (708) 361-1804 Fax: (708) 923-7112 building@palosheights.org APPLICANTS: COMPLETE ALL ITEMS AND SUBMIT
More informationAccent Floor Heating. Tmat System Installation Manual. Floor heating system
Tmat System Installation Manual Floor heating system Contents Safeguards and Warnings 1 1 General Information 1 1.1 Use of the Manual 1 1.2 Safety Guidelines 1 1.3 Remember to measure resistance 2 1.4
More informationLAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING
LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction.
More informationPermaBase BRAND Cement Board
PermaBase BRAND Cement Board Behind Every Great Finish is a Strong Base! PermaBase BRAND Cement Board A Ceramic tile s best friend. Ceramic tile is only as good as the base it sits on. And the best base
More informationTriton BK Backer Board & Tile Underlayment
1 Backer Board & Tile Underlayment Lightest Cementitious Backer Board High strength cement technology Free of Crystalline Silica, VOCs, and harsh chemicals Easy to score and snap, fasten, and install Description
More informationWE International, Inc.
M E E T Y O U R R O U N D T H E Steel Frame Building Roof Application - Drape Method Ideal insulation for steel frame building application Quick and easy to install Provides reflective insulation for radiant
More informationOVERLAY TM. Under floor heating that fits over existing floors
OVERLAY TM Under floor heating that fits over existing floors Overlay TM is a unique low profile floor heating system ideal for both renovation and new build projects. Installed over the existing floor
More informationINSTALLATION MANUAL U.S PATENT #6,533,185 and patents pending. HigH performance cost-effective contractor friendly
ecowarm RADIANT BOARD aluminum laminated radiant floor system HigH performance cost-effective contractor friendly INSTALLATION MANUAL 2018 866-341-1854 TOLL-FREE www.ecowarmradiantheat.com U.S PATENT #6,533,185
More informationDesign No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1
FIRESTOP JOINT SPRAY CFS-SP WB SILICONE JOINT SPRAY CFS-SP SIL F-RATING 2-HR. 2-HR. T-RATING -HR. -HR. APPLICATION THICKNESS PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table /8" WET FILM (/6"
More informationINSTALLATION INSTRUCTIONS
VINYL PLANKS 6.5MM HDPC CLICK LOCK REVIVAL COLLECTION General Information 1. Flooring should be transported and stored in a neatly stacked fashion on a smooth flat surface. Be sure to inspect the run numbers/production
More informationPlease read and review installation instructions completely before proceeding with the actual installation.
INSTALLATION INSTRUCTIONS Important / Read First Please read and review installation instructions completely before proceeding with the actual installation. Owner / Installer responsibility The installer
More informationLAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING
LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s
More informationProduct Installation Manual
HeatPly Inc. Installation Manual Product Installation Manual Table of Contents INTRODUCTION:... 3 Easy to Install... 3 Local Codes and Regulations... 3 Crawl Space Requirements... 3 Subfloor Requirements...
More informationDESIGN and INSTALLATION MANUAL 2018
RADIANT BOARD ecowarmtm Aluminum Laminated Radiant Floor System HIGH PERFORMANCE COST-EFFECTIVE CONTRACTOR FRIENDLY 866-341-1854 TOLL-FREE U.S. PATENT #6,533,185 and patents pending DESIGN and MANUAL 2018
More informationTypical Installation Details
Installation Manual DRAIN SET AT ENTRY TO CURBLESS SHOWER ON CONCRETE SUBFLOOR Typical Installation Details Office : 970.668.0805 or 866.998.6685 Fax : 866.357.8502 P.O. Box 1358 Frisco, Colorado 80443
More informationJ.J. Haines & Co., Inc.
Subfloor Guide for Hardwood Ask any quality wood flooring contractor, and he'll tell you that your hardwood installation is only as good as the subfloor you're installing over. Before the wood is delivered
More informationFloor SoundprooFIng Made Simple
Floor SoundprooFIng Made Simple THE PERFECT SOLUTION FOR Luxury RENOVATION PROJECTS Any Finished Floor Double Plywood Floated Subfloor Original Subfloor Insulation Wood Joists Any Finished Floor Double
More informationChapter 14 - Air Sealing
Chapter 14 - Air Sealing Contents Chapter 14 - Air Sealing... 14-1 Pre-Mechanicals Activities... 14-3 Insulate Bathtub Enclosures... 14-3 Insulate Double Walls and Chases... 14-3 Pre-Inspection Checklist...
More informationGAF EnergyGuard Polyiso Wall Sheathing
From: Technical Services May 15, 2013 GAF EnergyGuard Polyiso Wall Sheathing GAF s EnergyGuard Polyiso Wall Sheathing is intended to be installed on residential construction only. Application types include:
More informationASC ACOUSTIC. ASC IsoDamp Guide to High Performance Soundproofing. Table of Contents SCIENCES CORPORATION. Introduction Page 2
ASC IsoDamp Guide to High Performance Soundproofing Table of Contents Introduction Page 2 Ceiling Installation Page 3 Perimeter Gasket Page 4 Resilient Channel Page 5 Installing First Layer of Sheetrock
More informationWellmade HDPC Engineered Vinyl Plank/Tile Installation Guide
Wellmade HDPC Engineered Vinyl Plank/Tile Installation Guide Wellmade HDPC is a High Density Plastic Composite (HDPC) flooring with patent pending technology, HDPC is an engineered vinyl plank/tile flooring
More informationInstall Instructions. Helix Z1. Important Information. Important:
Congratulations, you have just purchased the highest quality entrance mat available. Proper installation is necessary to ensure that your warranty will be honored by Impact Specialties. Important Information
More informationSchluter -KERDI-BOARD Substrate, building panel, bonded waterproofing
Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD The universal substrate for tiles Flat. Level. Plumb. Square. No matter the quality, cost, or extravagance of
More information2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE:
SECTION 07651 FLEXIBLE COPPER SHEET FLASHINGS Advanced Building Products, Inc. manufacturer many types of flexible copper sheet flashings. Due to their ductility, high tensile strength, and resistance
More informationHouseWrap Applications System R-Value: R-4.17 Horizontal Heat Flow Only
Installation Method (Existing Walls) 1. ESP Low-E Housewrap is installed over exterior wall sheathing, make sure reflective side faces out: foil flange faces down. 2. Determine width of ESP Low-E HouseWrap
More informationPlease Note: PhoneStar was previously branded as Phonewell
Soundproofing Floors Timber Joist or Concrete Floors Installation Instructions Acoustic Insulation Please Note: was previously branded as Phonewell There are two options to achieve noise reduction through
More informationINSTALLATION INSTRUCTIONS
VINYL PLANKS 6.5MM HDPC CLICK LOCK PERSPECTIVE COLLECTION General Information 1. Flooring should be transported and stored in a neatly stacked fashion on a smooth flat surface. Be sure to Inspect the run
More informationESD5 GENERAL GUIDELINES ESD 5 INSTALLATION ESD 5 ROLLS HANDLING:
GENERAL GUIDELINES ESD 5 INSTALLATION ESD 5 is a reflective insulation composed of the reinforced aluminum facers on a Polyethylene foam core. ESD 5 can be installed in Roof assemblies, Floors and walls.
More informationESD5 GENERAL GUIDELINES ESD 5 INSTALLATION ESD 5 ROLLS HANDLING:
GENERAL GUIDELINES ESD 5 INSTALLATION ESD 5 is a reflective insulation composed of the reinforced aluminum facers on a Polyethylene foam core. ESD 5 can be installed in Roof assemblies, Floors and walls.
More informationFirstEnergy Program Overview
FirstEnergy Program Overview Builder incentives $400 per unit + $0.10/kWh in projected savings Eligibility Located in service area of a FirstEnergy Utility Certificate of Occupancy Dates: FirstEnergy Ohio
More informationINSTALLATION INSTRUCTIONS
VINYL PLANKS 4MM HDPC CLICK LOCK FORESIGHT COLLECTION General Information 1. Flooring should be transported and stored in a neatly stacked fashion on a smooth flat surface. Be sure to Inspect the run numbers/production
More informationADDENDUM A CONSTRUCTION SPECIFICATIONS
ADDENDUM A Description of Improvements: CONSTRUCTION SPECIFICATIONS The Improvements shall consist of constructing an approximate square foot single-family residence including car garage on the real property
More informationFILE / INSTALL TILE ON WOOD SUBFLOOR DOWNLOAD
28 June, 2018 FILE / INSTALL TILE ON WOOD SUBFLOOR DOWNLOAD Document Filetype: PDF 517.82 KB 0 FILE / INSTALL TILE ON WOOD SUBFLOOR DOWNLOAD A cement backer subfloor can be used underneath stone or ceramic
More information10 Steps to Save Energy in Your House
10 Steps to Save Energy in Your House Sealing and insulating your home is one of the most cost-effective ways to make your home more comfortable and energy efficient. You can do it yourself. In this chapter,
More informationSECTION NON-STRUCTURAL METAL FRAMING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable
More informationPDF / HOW TO INSTALL TILE FLOOR OVER WOOD SUBFLOOR
21 May, 2018 PDF / HOW TO INSTALL TILE FLOOR OVER WOOD SUBFLOOR Document Filetype: PDF 109.93 KB 0 PDF / HOW TO INSTALL TILE FLOOR OVER WOOD SUBFLOOR This is true of vinyl tile installation over any. Install
More information1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights
1 Exam Prep Application and Finishing of Gypsum Board GA-216-2013 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2013 Application and Finishing of Gypsum Panel Products. Each
More informationCarpentry. The following describes the scope and sequence of instruction for Carpentry.
Carpentry The Montgomery County Students Construction Trades Foundation, Inc has developed a comprehensive construction technology program designed to prepare students for a rewarding career in the construction
More informationREHAU MONTANA ECOSMART HOUSE PROJECT Bozeman, MT RMEH 04 Test Report
REHAU MONTANA ECOSMART HOUSE PROJECT Bozeman, MT RMEH 04 Test Report Evaluation of Pickup Response Time of Radiant Floor Using Different Water Supply Temperatures F. Javier Alvarez, LEED GA Kevin Amende,
More informationATTICS. Use: PRODEX TOTAL INSULATION Foil-Foam-Foil (FfmF), Foil-Bubble-Foil (FBF), Foil-Fiberglass-Vinyl (FfgV), Foil-Foil (FF)
ATTICS Use: PRODEX TOTAL INSULATION Foil-Foam-Foil (FfmF), Foil-Bubble-Foil (FBF), Foil-Fiberglass-Vinyl (FfgV), Foil-Foil (FF). Installation Method: 1. Starting at the eave and working upwards, roll out
More informationFLOORING SPECIFICATIONS FOR 1744 JOHNSON ST.
30 Greenway, NW Suite 11 Glen Burnie, Maryland 21061 tel 410.528.8899 fax 410.558.6312 www.gbalternatives.com FLOORING SPECIFICATIONS FOR 1744 JOHNSON ST. VERSION 1 _ 02-07-2007 30 Greenway, NW Suite 11
More informationInstruction and Safety Manual Resilient Sound Isolation Clips (SIC Clips)
SOUND ISOLATION CLIPS Installation Manual Instruction and Safety Manual Resilient Sound Isolation Clips (SIC Clips) SOUND ISOLATION CLIP SPECIFICATIONS Width...1.00 inch Height...1.06 inch Length...3.86
More informationSuper-Compact Ceiling Hanger Model KSCH Patent Pending Ceiling Isolation Theory: Resiliently suspended ceiling systems are designed to minimize floor impact noise and airborne sound transmissions through
More information1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights
1 Exam Prep Application and Finishing of Gypsum Board GA-216-2016 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2016 Application and Finishing of Gypsum Panel Products. Each
More informationPROVEN, RELIABLE SOUND CONTROL COST EFFECTIVE SOLUTION FOR WALLS/CEILINGS MULTI-FAMILY, SINGLE FAMILY, HOME THEATER
SOUND ISOLATION SOLUTIONS PROVEN, RELIABLE SOUND CONTROL COST EFFECTIVE SOLUTION FOR WALLS/CEILINGS MULTI-FAMILY, SINGLE FAMILY, HOME THEATER Model A237R Thermoplastic rubber with no metal washer or ferrule;
More informationRev. 07 8/15 Please Read Disclaimers:
FiberCorr panels Guidelines 6005.FC Rev. 07 8/15 Please Read Disclaimers: PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION!! These guidelines are provided in good faith to help prevent any problems
More informationThermaSteel Corporation ASSEMBLY MANUAL
ThermaSteel Corporation ASSEMBLY MANUAL TABLE OF CONTENTS 1- INTRODUCTION 1.1 THERMASTEEL TM WALL PANELS 1.2 Drawing and Element Numbers 2- ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation of Foundation
More informationINSTALLATION INSTRUCTIONS LAMINATE
INSTALLATION INSTRUCTIONS LAMINATE DROP LOCK GENERAL INSTRUCTIONS FOR LAMINATE HARDWOOD FLOORING ACCLIMATION Acclimation is a recommended procedure prior to installation of laminate flooring either on
More informationYOUR LITE-DECK SECTIONS
General Information Warning - Serious injury or death may result from safety hazards caused by improper use or installation. When in doubt about proper use or installation of Lite-Deck, immediately contact
More informationTOP CAP Snaps into bottom track Aluminum - trimmed to length. RAMPS Covered by carpet ABS plastic and MDF QUESTIONS? CALL US AT !
IN-CARPET WIREWAY INSTALLATION GUIDE 2.7 These components are typical for each wireway installation: WALL BASE TRIM Finishes cable opening at wall BOTTOM TRACK Screws to concrete Aluminum - trimmed to
More informationNATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction
Walls And Ceilings Single- And Double-Layer Construction 09 9 00/NGC Single-Layer Construction The single-layer construction system consists of a single layer of Gold Bond brand Gypsum Board applied to
More information- Inbound/Outbound window placement - Window buck & air sealing - Weep holes IN THE WOODS DETAILS - WINDOW SILL
- Inbound/Outbound window placement - Window buck & air sealing - Weep holes IN THE WOODS DETAILS - WINDOW SILL PRE-EXISTING SITE Program: Traditional farmhouse Single level living potential Garage connection
More informationThermasheath-XP. Insulation for Exposed Use
Insulation for Exposed Use PRODUCT DESCRIPTION Rmax Thermasheath-XP is an energy-efficient thermal insulation board composed of a closed-cell polyisocyanurate (Polyiso) foam bonded to durable, embossed
More informationECOWARM PLUS INSTALLATION MANUAL ENVIRONMENTALLY FRIENDLY RADIANT FLOOR HEATING SYSTEMS. OFFERED BY:
ECOWARM PLUS R FSC Certified Radiant Board INSTALLATION MANUAL ENVIRONMENTALLY FRIENDLY RADIANT FLOOR HEATING SYSTEMS OFFERED BY: www.ecowarm.us 503-266-1615 U.S. Patent # 6,533,185 and Patents Pending
More informationGenesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions
Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions Thank you for purchasing the Genesis Dura-Max Brick Panel system for your project. The system allows you to have the look
More informationPLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION
DRAINAGE SOLUTIONS SINCE 1908 PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION PROVEN PERFORMANCE ARMTEC.COM
More informationStandard Practice for Installing Sound-Isolating Lightweight Partitions 1
Designation: E 497 99 Standard Practice for Installing Sound-Isolating Lightweight Partitions 1 This standard is issued under the fixed designation E 497; the number immediately following the designation
More informationWooden suspended floors
UPONOR PEX PRODUCTION UNDERFLOOR HEATING WOODEN SUSPENDED FLOORS Wooden suspended floors 08 2006 Uponor Underfloor Heating in Wooden suspended floors Wooden suspended floors The term suspended floors in
More informationInstallation Guide Mesh Floor Heating System
Installation Guide Mesh Floor Heating System WarmFeet Tel: 1-450-482-1919 Toll Free: 1-866-994-4664 Fax: 1-450-482-1920 www.warmfeet.ca 1 This guide describes the WarmFeet Mesh Floor Heating System how
More informationLonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN (507) fax (507)
Lonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN 55046 (507) 744-2327 fax (507) 744-5554 2006 RESIDENTIAL CONSTRUCTION CHECKLIST The following checklist has been designed
More informationFor Ideal Living. Installation Instruction. Maintenance Instruction. Product Warranty.
For Ideal Living Installation Instruction Maintenance Instruction Product Warranty www.idealwood.ca Part 1, Pre-installation: A, Responsibility of customers and installers: It is a highly recommendation
More information