1 Building pit District adjacent to St.Katharinenkirche Hamburg, Germany Implenia Spezialtiefbau GmbH Infrastructure - Northern Branch Heidenkampsweg 81 D Hamburg GERMANY T F hamburg.spezialtiefbau@implenia.com

2 Contract Value (net): 6,0 million EURO (total contract) 3,3 million EURO (Implenia Spezialtiefbau GmbH share) Construction Period: 09/ /2012 Client: Hochtief Projektentwicklung GmbH Execution: JV Building pit District adjacent to St. Katharinenkirche Implenia Spezialtiefbau GmbH, Northern Branch (Technical direction) Fredrich Spezialtiefbau GmbH (Commercial direction) Brauckmann & Damm GmbH & Co. KG Services: Turnkey trough building pit In-situ concrete diaphragm wall In-situ concrete displacement bored piles Secant bored pile wall Grouted anchors Explosive ordnance exploration Overdrilling of a suspected weapons point Earthworks, demolition, disposal Dewatering Diaphragm wall grab

3 The district adjacent to St. Katharinenkirche is undergoing redevelopment in Hamburg old town. To this end services to produce the building pit and pile foundation are to be performed. The planned building was built on an approx. 8,000 m² plot between the streets "Willy-Brandt.Straße", "Neue Gröninger Straße" and "Grimm", and St. Katharinenkirche in the south. Approx. 24,900 m³ soil of soil categories 3-5 and approx. 10,700 m³ of soil category 2 were to be excavated, approx. 350 m building pit supporting system and approx. 500 in-situ concrete displacement bored piles were to be produced. Building pit supporting system In order to build the basement, due to lack of space the plot edge was secured on the construction side with the aid of a one-time rear-anchored (or inclined inwards to the floor) braced in-situ concrete diaphragm wall, D = 60 cm, and a bored pile wall, D = 90 cm. Dewatering In the reach of the historical St. Katharinenkirche structure no dewatering measures could be executed in order to influence the surrounding water level within the organic soft layers. For this reason the building pit enclosure was executed in the form of a watertight trough. The bottom horizontal closure of the building pit trough is formed by the organic soft layers. Dependent on the tide-influenced groundwater level the bottom groundwater horizon had to be relieved in order to secure the buoyancy safety of the natural dam. Diaphragm wall works

4 Weapons On the entire building site and around the rear anchoring of the construction pit supporting system, according to the fire department of the Free and Hansa City of Hamburg the presence of weapons had to be assumed. Accordingly, extensive searches for explosive ordnace were required. During the exploratory borings for the southern lining axis an anomaly was detected close to St. Katharinenkirche. Through additional borings the anomaly was verified and confirmed in terms of location, depth and size. An object was suspected with a calculated volume of litres and a magnetic momentum of Am². The calculated depth was 6.70 m below ground level. Due to the existing soil conditions and the surrounding development, salvaging the suspected point using the standardized method, by means of shaft rings, was not possible. As an alternative the low-vibration method of large diameter hole boring by means of large drilling rig was chosen for the salvage operation. The casing was driven using a rotator, Leffer RDM 2000, down to a depth of approx m below ground level, with low vibration above the suspected point. Then with the aid of a crawler crane, excavation of the soil adjacent to the pipe commenced. The excavation was executed down to a depth of approx m below ground level, i.e. down to approx m before calculated depth of the object by means of crawler crane and spherical grab. Due to the prevailing groundwater conditions the excavation was performed inside the tube under water load, in order to prevent a hydraulic heave. Overdrilling the suspected point

5 After completion of the "rough excavation" by the crawler crane a weapons diver with 20 explosives law certification dived into the flooded casing in order to execute the remaining excavation down to the object manually. Once the object had been salvaged the interior was filled in line with professional practice up to the upper plot edge and the pipe removed. Pile foundation In order to deflect the load around the single-storey basement approx. 500 pieces foundation piles, in the form of partial displacement bored piles D= 45 cm to 60 cm were produced. The piles were partially arranged for tension loads as well in order to guarantee buoyancy safety of the building in its final state. Boring works Rebar cages

6 Quantities: 5,400 m² in-situ concrete diaphragm wall, D= 60 cm, max m deep, partially with inserted beam support 104 pieces large diameter bored piles, D=90 cm, in the form of secant bored pile wall, max. depth 18 m 10 pieces deep wells for relief dewatering 67 pieces grouted anchors, 4-5" strands, max. 625 kn, length m 503 pieces partial displacement bored piles (pressure and tension piles), D = cm, length m 35,500 m³ soil excavation, demolition, and disposal Dewatering 215 tonnes steel bracing Steel bracing

Large-diameter bored piles and Large-hole drillings Applications

Large-diameter bored piles and Large-hole drillings Applications Large-diameter bored piles and Large-hole drillings Applications Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com

More information

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com

More information

Civil Engineering Construction I (CBE5031)

Civil Engineering Construction I (CBE5031) Civil Engineering Construction I (CBE5031) Basement 1 1 Quick Revision 1.1 Problems arising from basement construction a) Excavation method. b) Surface and ground water control c) Lateral stability of

More information

Construction Technology B (CON4313)

Construction Technology B (CON4313) 3 - Basement 1 Quick Revision 1.1 Problems arising from basement construction a. Excavation method. b. Surface and ground water control c. Lateral stability of basement excavation. d. Stability of adjoining

More information

SECANT PILE. Introduction:

SECANT PILE. Introduction: SECANT PILE Introduction: Over the last few decades construction of retaining walls in urban areas has grown significantly, as a result of territorial and economical development of the cities. In most

More information

Diaphragm wall Construction

Diaphragm wall Construction Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support

More information

Urban railway line Wehrhahn route, batch 1 Foundation engineering works Düsseldorf, Germany

Urban railway line Wehrhahn route, batch 1 Foundation engineering works Düsseldorf, Germany Urban railway line Wehrhahn route, batch 1 Foundation engineering works Düsseldorf, Germany Bilfinger Spezialtiefbau GmbH Goldsteinstrasse 114 60528 Frankfurt/Main GERMANY Phone.: +49 69 6688-345 Fax:

More information

A brilliantly simple Foundation Method

A brilliantly simple Foundation Method BAUER Ductile Pile A brilliantly simple Foundation Method Grouted skin friction piles End-bearing piles Non load-bearing soil stratum System Description The Bauer Ductile Pile (BDP) is a simple, fast and

More information

Lesson 2 Substructure. Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD

Lesson 2 Substructure. Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD Lesson 2 Substructure Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD Outline Syllabus 1. Demolition 2. Site problems 3. Substructure 4. Basements 5. Structural Frames 6. Floors 7. External walls

More information

BASEMENT CONSTRUCTION PREPARED BY PN NOOR AISYAH ASYIKIN

BASEMENT CONSTRUCTION PREPARED BY PN NOOR AISYAH ASYIKIN BASEMENT CONSTRUCTION PREPARED BY PN NOOR AISYAH ASYIKIN BASEMENT CONSTRUCTION 01 content 1.DEFINITION 2. CONSTRUCTION CONSIDERATION 3. DESIGN REQUIREMENT 4.METHOD OF CONSTRUCTION a. Open Cut Construction

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

Contents. Glossary 9. Foreword 10

Contents. Glossary 9. Foreword 10 Glossary 9 Foreword 10 1 Design considerations 11 1.1 Introduction 11 1.2 Client's general requirements 11 1.3 The ground 11 1.3.1 The concept of effective stress 11 1.3.2 Ground profile 13 1.3.3 Groundwater

More information

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd. The Technical and Contractual Matters of Bored Piling Works By Wallace Yeung Vibro (H.K.) Ltd. What is large diameter bored pile? How to construct a large diameter bored pile? Its advantages and limitation

More information

BAUER. Diaphragm and Cut-off Walls

BAUER. Diaphragm and Cut-off Walls BAUER Diaphragm and Cut-off Walls BAUER Diaphragm and Cut-off Walls High degree of leak tightness great depths 2 BAUER Diaphragm and Cut-off Walls Content Areas of application Diaphragm walls... 4 Cut-off

More information

FOUNDATION & SHORING. Whatever it takes... We build your vision! WORLDWIDE EXPANSION

FOUNDATION & SHORING. Whatever it takes... We build your vision! WORLDWIDE EXPANSION FOUNDATION & SHORING S P E C I A L I S T S Whatever it takes... We build your vision! WORLDWIDE EXPANSION INDEX 04 08 12 16 COMPANY PROFILE SAFETY & VALUES 06 10 EQUIPMENTS & MAINTENANCE SERVICES 14 18

More information

Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more.

Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more. TECHNOLOGY Diaphragm walls Diaphragm walls are one of the most important technologies of special foundation engineering. A diaphragm wall is constructed using a trench excavated in ground and supported

More information

Aveng Ground Engineering Profile

Aveng Ground Engineering Profile Aveng Ground Engineering Profile Contents Overview 1 2 Piling 2 Renewable Energy 6 Lateral Support 8 Grouting 10 Geotechnical investigations 12 Flagship projects 12 Contact us 12 Visit our website for

More information

* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high

* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high 1 2 Demand for space in cities often makes it essential to use space below buildings. The concept of deep basement technology has been employed since the middle of last century, but is becoming more popular

More information

UNDERPINNING A CRANE FOUNDATION

UNDERPINNING A CRANE FOUNDATION UNDERPINNING A CRANE FOUNDATION Donald R. McMahon, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New York, USA Andrew J. Nichols, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New

More information

Specialising in Ground Engineering & Slope Stabilisation

Specialising in Ground Engineering & Slope Stabilisation Specialising in Ground Engineering & Slope Stabilisation Ground Engineering & Slope Stabilisation for the Road, Rail, Construction & Mining Industries Company Profile Warner Company is proudly an Australian

More information

JET GROUTING Implenia Spezialtiefbau GmbH

JET GROUTING Implenia Spezialtiefbau GmbH JET GROUTING Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com www.foundation-engineering.implenia.com

More information

BAUER DUKI Pile System

BAUER DUKI Pile System BAUER DUKI Pile System The Bauer Duki Pile System How to install a simple, economic and safe foundation system Skin friction piles (grouted) 2 End-bearing piles (non grouted) The Bauer DUKI Pile System

More information

Freezing techniques made a new tunnel possible

Freezing techniques made a new tunnel possible NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Freezing techniques made a new tunnel possible Jens Kofod Nielsen Züblin A/S,

More information

CONTACTS LUCOP Sp. z o.o. Ul. Sejmu Czteroletniego 2 m Warszawa Tel

CONTACTS LUCOP Sp. z o.o. Ul. Sejmu Czteroletniego 2 m Warszawa Tel The LUCOP Sp. z o.o. is a company operating in the Polish market and belonging to the more than 40-year-old Italian group I.CO.P S.p.A. Its entry into the Polish market means technological and quality

More information

Soil Services SCS Ferretti International Soil Services Soil Services Industrial Construction Infrastructures Real Estate Soil Services Soil Services

Soil Services SCS Ferretti International Soil Services Soil Services Industrial Construction Infrastructures Real Estate Soil Services Soil Services COMPANY PROFILE Soil Services position in the industry of Special Subterranean and Deep Foundations is based on the successful combination of skills, knowledge and experience of its employees and partners.

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

AARSLEFF GROUND ENGINEERING. Retaining Structures. Start and end your search with an A.

AARSLEFF GROUND ENGINEERING. Retaining Structures. Start and end your search with an A. AARSLEFF GROUND ENGINEERING Retaining Structures Start and end your search with an A www.aarsleff.co.uk Whatever the client s remit, problem or challenge, if it involves a retaining solution, we can engineer

More information

Basement Construction in Ho Chi Minh Pitfalls and Collected Stories

Basement Construction in Ho Chi Minh Pitfalls and Collected Stories Basement Construction in Ho Chi Minh Pitfalls and Collected Stories HCMC Typical Ground Conditions Soft soils to significant depth Soft clays, loose sands Typically 10 defined strata with sand density

More information

Lesson Learned. Collapse of Diaphragm Wall Trench. Case study. Suez Canal Syphon Project

Lesson Learned. Collapse of Diaphragm Wall Trench. Case study. Suez Canal Syphon Project Lesson Learned Collapse of Diaphragm Wall Trench Case study Suez Canal Syphon Project Bauer Egypt Ashraf Wahby June, 2016 List of Contents 1. Introduction 3 2. Project Description 3 3. Collapse 4 4. Known

More information

Note: Although proprietary brand names are referred to in this document, the FPS does not recommend any particular method or system.

Note: Although proprietary brand names are referred to in this document, the FPS does not recommend any particular method or system. Federation of Piling Specialists Breaking Down of Piles Note: Although proprietary brand names are referred to in this document, the FPS does not recommend any particular method or system. The breaking

More information

Grouting Bilfinger Spezialtiefbau GmbH

Grouting Bilfinger Spezialtiefbau GmbH Grouting Bilfinger Spezialtiefbau GmbH Goldsteinstrasse 114 D-60528 Frankfurt Phone: +49 69 6688-345 Fax: +49 69 6688-277 Email: info.spezialtiefbau@bilfinger.com www.foundation-engineering.bilfinger.com

More information

SPECIAL CONDITIONS FOR MICROTUNNELING (MT) October, 2006

SPECIAL CONDITIONS FOR MICROTUNNELING (MT) October, 2006 Michigan Department Of Transportation 3703F (11/06) SPECIAL CONDITIONS FOR MICROTUNNELING (MT) October, 2006 Page 1 of 5 1 Materials 1.1 Pipe (a) Pipe shall be specifically designed and certified for microtunneling

More information

TBM rescue projects using shafts and ground freezing

TBM rescue projects using shafts and ground freezing TBM rescue projects using shafts and ground freezing Dipl.-Ing. Michael Löffler, Dipl.-Ing. Helmut Haß (CDM Consult GmbH, Germany) Dipl.-Ing. Thomas Ahlbrecht (Deilmann-Haniel Shaft Sinking GmbH, Germany)

More information

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 The Institution of Engineers of Ireland Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 MODULE 4 RETAINING STRUCTURES DEEP EXCAVATIONS

More information

ICD Brookfield Place, Dubai. Risk Management for a Deep Basement Excavation. Andrew Smith. Coffey Geotechnics Ltd.

ICD Brookfield Place, Dubai. Risk Management for a Deep Basement Excavation. Andrew Smith. Coffey Geotechnics Ltd. ICD Brookfield Place, Dubai Risk Management for a Deep Basement Excavation Andrew Smith Coffey Geotechnics Ltd. CONTENTS 1. Project description and site history 2. Ground Conditions 3. Assessment of risks

More information

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 The Institution of Engineers of Ireland Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 MODULE 4 RETAINING STRUCTURES DEEP EXCAVATIONS

More information

NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE

NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE Karsten Beckhaus (1), Martin Larisch (2), Habib Alehossein (3,4) (1) BAUER Spezialtiefbau GmbH, Deutschland (2) Keller Australia Pty Ltd, Australia (3)

More information

Geo24h. Buiding Service

Geo24h. Buiding Service Geo24h Buiding Service Sheet pile wall metallic and composite Special Foundations Dredging canals, rivers, lakes and quarries Dewatering with wells Wellpoint sistems Types of application The sheet pile

More information

Basement & Waterproofing

Basement & Waterproofing Basement & Waterproofing Lecture Outline 1. What can basements be used for? So, basements can provide...space additional in a building and thereby enhancing the quality... of life of occupants. What

More information

An Introduction to. By Michael L. Schumaker, P.E. An Introduction to Shaner Industries Metal Foundation System

An Introduction to. By Michael L. Schumaker, P.E. An Introduction to Shaner Industries Metal Foundation System An Introduction to Metal Foundation System By Michael L. Schumaker, P.E. Introduction Various types of deep foundations are routinely used to support structures. Selection of the appropriate type of deep

More information

Hamburg, GERMANY. Predöhlkai extension project Berth 1

Hamburg, GERMANY. Predöhlkai extension project Berth 1 Hamburg, GERMANY Predöhlkai extension project Berth 1 As one of the world s most important ports, Hamburg will handle an expected 14 million TEU by 2010. This represents a major rise from today s 8.5 million

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Earth Retention Systems

Earth Retention Systems haywardbaker.com Earth Retention Systems Mark W. Goodsell, P.E., D.GE Senior Engineer 2 Earth Retention Systems Focus of Presentation Different Types and Purposes of Earth Retention Systems Design Considerations/Geotechnical

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS 1.0 DESCRIPTION This work shall consist of furnishing all materials and labor necessary for conducting an Osterberg Cell (O-cell)

More information

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization www.malcolmdrilling.com Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning

More information

Jet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay

Jet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay GROUND MODIFICATION, PROBLEM SOILS, AND GEO-SUPPORT 265 Jet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay Kyle M. Rollins 1, Matthew E. Adsero 2, and Dan A. Brown 3 1 Prof. Civil &

More information

The Construction of the Langham Place in Mong Kok An Introduction

The Construction of the Langham Place in Mong Kok An Introduction The Construction of the Langham Place in Mong Kok An Introduction Artist Impression of Langham Place r o j e c t c o m p r i s i n g a i l / h o t e l c o m p a n o f f i c e / r e t Fast Fact The site

More information

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division Drilled Shaft Inspection HQ Construction Office HQ Geotechnical Division Drilled Shafts: What are Drilled Shafts Drilled Shaft Construction Challenges of Drilled Shaft Construction The WSDOT SHAFT Special

More information

TABLE OF CONTENTS. 0 Structural calculations 0.1 General 0.2 Safety concept 0.3 Calculations for waterfront structures

TABLE OF CONTENTS. 0 Structural calculations 0.1 General 0.2 Safety concept 0.3 Calculations for waterfront structures Arbeitsausschuß "Ufereinfassungen" der Hafentechnischen Gesellschaft e.v. Recommendations of the Committee for Waterfront Structures Harbours and Waterways 9., completely revised Edition TABLE OF CONTENTS

More information

Risk Management of the Restoration of Shanghai Metro Line 4

Risk Management of the Restoration of Shanghai Metro Line 4 ISGSR2007 First International Symposium on Geotechnical Safety & Risk Oct. 18~19, 2007 Shanghai Tongji University, China Risk Management of the Restoration of Shanghai Metro Line 4 X. P. Yu, W. J. Zhu

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

TECHNOLOGY. Hydromill

TECHNOLOGY. Hydromill TECHNOLOGY Hydromill Everywhere the diaphragm wall market is moving to higher and higher targets in terms of depth and verticality control. Metro stations, new foundations for residential and commercial

More information

The OMO River Bridge/2010

The OMO River Bridge/2010 Sometimes the simplest bridge designs come in the most complex and innovative engineering and construction packages. Such is the case with the OMO River Bridge located in the Southern Nations and Nationalities

More information

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA) Advantages / Disadvantages of Piling Methods In this Piling Advice Note we will explore the advantages and disadvantages of differing types of piling methods. Continuous Flight Auger (CFA) The pile is

More information

Geo-E2010 Advanced Soil Mechanics L Wojciech Sołowski. 19 March 2017

Geo-E2010 Advanced Soil Mechanics L Wojciech Sołowski. 19 March 2017 Geo-E2010 Advanced Soil Mechanics L Wojciech Sołowski 19 March 2017 Slope stability: review Q: Shortcomings of undrained cohesion You wrote that the shortcoming is that the analysis is short term Well

More information

Topic: Site Formation

Topic: Site Formation Topic: Site Formation Presentation prepared by Raymond Wong February 2006 Purpose of site formation is to prepare a piece of land in order to: Accommodate building/s or other facilities which will be placed

More information

Atlaspile. Full soil displacement bored pile, vibration free - low noise economical

Atlaspile. Full soil displacement bored pile, vibration free - low noise economical Atlaspile Full soil displacement bored pile, vibration free - low noise economical Atlaspile Possible applications The Atlaspile is used where more economical driven piles are not practicable for environmental

More information

Quality & Innovation. Put Together. Australian Piling Technology

Quality & Innovation. Put Together. Australian Piling Technology Quality & Innovation Put Together COMPANY PROFILE Australian Piling Technology Welcome to Australian Piling Technology LLC, Specialist Piling Contractor Introduction Australian Piling Technology L.L.C.

More information

Deep Foundation. Deep Foundation Applications

Deep Foundation. Deep Foundation Applications Deep Foundation Deep Foundation Applications 1. Soils with: High compression Low shear strength Swelling/shrinkage 2. Resist lateral loads 3. Surface erosion 4. Resist tension (anchors) 1 Typical Applications

More information

PRECAST CONCRETE GIRDER ERECTION

PRECAST CONCRETE GIRDER ERECTION 7.1 Precast Concrete Girder Erection - General Erection of precast concrete girders includes transporting the girders to the site, handling and temporary storage, installing anchor bolts, shear blocks

More information

SPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006

SPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006 Michigan Department Of Transportation 3703B (11/06) 1 Materials SPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006 Page 1 of 5 1.1 Pipe - Pipe used in this method includes an external steel

More information

Diaphragm Walls: A Solution For Deep Excavations In Difficult Soil Conditions With Superficial Water Table

Diaphragm Walls: A Solution For Deep Excavations In Difficult Soil Conditions With Superficial Water Table Diaphragm Walls: A Solution For Deep Excavations In Difficult Soil Conditions With Superficial Water Table Paolo Gazzarrini, P.Eng. Sea To Sky Geotech Inc, West Vancouver, BC. ABSTRACT This paper will

More information

Ductile Iron Systems trm.at

Ductile Iron Systems trm.at 1. Piling Zeile Systems for 2. Deep Zeile Foundations Deutsch Ductile Iron Systems trm.at Ductile iron piles Safe and very flexible foundation elements The construction industry can benefit from simple,

More information

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by Construction Technology B (CON4313) Self Assessment Questions: Chapter 1 Prestressed Concrete 1. How does the prestressing of steel tendons in prestressed concrete offer a higher loading capacity than

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced

More information

SUPPLEMENTAL TECHNICAL SPECIFICATION

SUPPLEMENTAL TECHNICAL SPECIFICATION July 14, 2015 HIGH STRAIN DYNAMIC LOAD TESTING OF DRILLED SHAFTS 1.0 GENERAL This work shall consist of performing high-strain dynamic testing using a drop weight loading system on a test drilled shaft

More information

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch SEMINAR Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013 Facilitator: Martin Larisch 1 Brief History of Piling Contractors, its capabilities and market Introduction to CFA piling

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update July 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The entails the construction of a cast in place

More information

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP A. TECHNICAL INFORMATION OF OUR FOUNDATION WORKS The major types of our foundation works (with illustrative diagram, where applicable) are set out below: 1. Bored piles 0.80m 3.5m pile shaft By Grabbing

More information

BREAKTHROUGH AND BURIAL OF TBMS ON THE BRISBANE AIRPORT LINK PROJECT

BREAKTHROUGH AND BURIAL OF TBMS ON THE BRISBANE AIRPORT LINK PROJECT BREAKTHROUGH AND BURIAL OF TBMS ON THE BRISBANE AIRPORT LINK PROJECT Russell Connors 1 ABSTRACT The Airport Link Project (APL) was constructed in the Northern Suburbs of Brisbane and connects the Central

More information

Innovative Construction Technology

Innovative Construction Technology Innovative Construction Technology Learning Objectives Be able to explain the innovativeness of the following construction technology / method Top Down Construction Pre-stressed concrete System Formwork

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

ROTARY DRILLING TECHNIQUES LARGE DIAMETER

ROTARY DRILLING TECHNIQUES LARGE DIAMETER INTRODUCTION This paper presents details about large diameter rotary drilling techniques typically employed in the civil engineering industry. These techniques have also been applied to the resources /

More information

Case study of deep excavation in existing underground structure of three-story basement and diaphragm wall

Case study of deep excavation in existing underground structure of three-story basement and diaphragm wall Geotechnical Aspects of Underground Construction in Soft Ground Yoo, Park, Kim & Ban (Eds) 2014 Korean Geotechnical Society, Seoul, Korea, ISBN 978-1-138-02700-8 Case study of deep excavation in existing

More information

Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay

Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay External view of Manulife Tower from various location Block plan showing the building layout of the new

More information

Mining on Seattle s SR99 tunnel began in July of. Construction of the SR-99 recovery shaft

Mining on Seattle s SR99 tunnel began in July of. Construction of the SR-99 recovery shaft Fig. 1 Feature ARTICLE Construction of the SR-99 recovery shaft Site layout/access constraints - Note existing SR-99 behind work area, and pile-supported structure above Puget Sound in foreground, just

More information

Blade Pile Technical Design Manual 27 June Forward... x

Blade Pile Technical Design Manual 27 June Forward... x TABLE OF CONTENTS Forward... x 1 Scope and General... 1 1.1 Scope... 1 1.2 Applications... 1 1.3 Blade Pile Group Capability... 1 1.4 Technical Report Outline... 2 1.5 Notations... 3 2 General Design Requirements...

More information

Passion for Progress... and Progress in Water Resource Development

Passion for Progress... and Progress in Water Resource Development BAUER on Large Dams Passion for Progress... and Progress in Water Resource Development Based on experience of more than fifty years BAUER Spezial tiefbau GmbH as the parent company within the BAUER Group,

More information

Requirements for Measuring and Pricing of Structural Concrete

Requirements for Measuring and Pricing of Structural Concrete Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing

More information

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA) Advantages / Disadvantages of Piling Methods In this Piling Advice Note we will explore the advantages and disadvantages of differing types of piling methods. Continuous Flight Auger (CFA) The pile is

More information

Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding)

Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding) Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding) Always Try To Do The Best In Your Life TYPES OF FOUNDATION TYPES OF FOUNDATION a) Shallow Foundation System i) Spread Foundation

More information

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Overall Information Location: Singapore Date of Completion: 2010 Cost: $5.7 billion Architect: Moshe Safdie Executive Architect: Aedas, Pte

More information

Rapid Axial Load Testing of Drilled Shafts

Rapid Axial Load Testing of Drilled Shafts Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial

More information

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall

More information

Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk

Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk Presented by Raymond Wong Wai Man, Division of Building Science & Technology, City University of Hong Kong Raymond

More information

Diaphragm Walls Slurry Walls. Planning Technology Execution

Diaphragm Walls Slurry Walls. Planning Technology Execution Diaphragm Walls Slurry Walls Planning Technology Execution Diaphragm walls The Diaphragm walling technique offers improved verticality tolerances to CFA or rotary bored piling and delivers a smoother finish.

More information

SCREW PILE APPLICATION SHEETS

SCREW PILE APPLICATION SHEETS SCREW PILE APPLICATION SHEETS Advantages of screw piles Exceptionally fast installation rate up to 2... linear metres of pile installed per minute Load bearing capacities of over 300kN SWL Load bearing

More information

This guide only applies for sewer assets up to and including 225mm diameter.

This guide only applies for sewer assets up to and including 225mm diameter. INTRODUCTION This guide only applies for sewer assets up to and including 225mm diameter. These guidelines (subject to change) provide an outline of the requirements which need to be considered when planning

More information

FOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1

FOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1 FOUNDATIONS Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1 Liquefaction reduced the soil strength under these apartment buildings in Niigata (Japan) 1964. Liquefaction

More information

CONSTRUCTION OF TWO MICROTUNNEL ACCESS SHAFTS USING THE CUTTER SOIL MIX (CSM) METHOD IN THE SAN JOAQUIN DELTA, CALIFORNIA

CONSTRUCTION OF TWO MICROTUNNEL ACCESS SHAFTS USING THE CUTTER SOIL MIX (CSM) METHOD IN THE SAN JOAQUIN DELTA, CALIFORNIA CONSTRUCTION OF TWO MICROTUNNEL ACCESS SHAFTS USING THE CUTTER SOIL MIX (CSM) METHOD IN THE SAN JOAQUIN DELTA, CALIFORNIA Eric S. Lindquist, Berti-Lindquist Consulting Engineers, Moraga, CA, USA John Morgan,

More information

Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New Zealand

Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New Zealand Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New Zealand N Wharmby 1 ABSTRACT In recent years in New Zealand there have been a number of tunnelling and deep directionally drilled

More information

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Issued: Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Introduction Proper installation and anchorage of Flygt pumps and installation accessories is critical to limiting vibration

More information

No. 1 SPINNINGFIELDS MANCHESTER

No. 1 SPINNINGFIELDS MANCHESTER No. 1 SPINNINGFIELDS MANCHESTER Client: Project Manager: Description: Allied London Gardiner & Theobald Asbestos Removal Demolition Enabling Works Date: October 2014 to July 2015 Duration: Location: 41

More information

Design and construction of NATM underground station tunnel by using the forepoling method in difficult conditions for Athens Metro

Design and construction of NATM underground station tunnel by using the forepoling method in difficult conditions for Athens Metro Design and construction of NATM underground station tunnel by using the forepoling method in difficult conditions for Athens Metro P. Kontothanassis, N. Koronakis, A. Karinas & S. Massinas Omikron Kappa

More information

An Introduction to Keller in the UK COLCRETE EURODRILL GETEC PHI GROUP. Piling and Ground Improvement. Grouting, Soil Nails and Anchors

An Introduction to Keller in the UK COLCRETE EURODRILL GETEC PHI GROUP. Piling and Ground Improvement. Grouting, Soil Nails and Anchors An Introduction to Keller in the UK Piling and Ground Improvement Grouting, Soil Nails and Anchors Retaining Walls Equipment Manufacture Monitoring and Instrumentation PHI GROUP GETEC COLCRETE EURODRILL

More information

Bi-Directional Static Load Testing of Driven Piles

Bi-Directional Static Load Testing of Driven Piles Bi-Directional Static Load Testing of Driven Piles Paul J. Bullock, PhD Fugro Consultants Inc. Loadtest Bi-Directional Osterberg Cell Testing Specialized jack in pile uses bearing to mobilize side shear

More information