Design Build - Project Delivery Model Trends
|
|
- Archibald Simpson
- 6 years ago
- Views:
Transcription
1 Drag picture to placeholder or click icon to add Drag picture to placeholder or click icon to add Drag picture to placeholder or click icon to add Design Build - Project Delivery Model Trends Sean M. Collins, AIA, LEED AP HGA Architects and Engineers Christine Guyott, FCSI, RD Rippe & Associates 2014 FCSI Conference Phoenix, Arizona Friday, April 11th, 2014
2 DESIGN-BUILD PROJECT DELIVERY MODEL TRENDS AGENDA INTRODUCTION HISTORY & CONTEXT DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD INTEGRATED PROJECT DELIVERY WHAT DOES THIS MEAN TO YOU? LESSONS LEARNED CASE STUDY
3 HISTORY & CONTEXT THE RISE OF PROFESSIONALISM Leonne Battista Alberti: first intentional separation of the art from the craft (1456) Establish architecture as a profession distinct from the science of engineering and construction From 15th century into 19th century Architects retained responsibilities for both design and construction Source: William G. Hasbrook, Jr., DBIA, Fundamentals of Project Delivery 2004 by DBIA
4 HISTORY & CONTEXT PROFESSIONAL SOCIETIES Greater professional specialization Increase in specialized knowledge Promotion and advocacy of professional interests and markets Ethical standards of practice Rise of conflict-of-interest issues LEGAL SEPARATION OF DESIGN & CONSTRUCTION The Miller Act (1935) Public contracting laws mandating separation of design from construction & contractor selection solely on cost Professional licensing requirements Source: William G. Hasbrook, Jr., DBIA, Fundamentals of Project Delivery 2004 by DBIA
5 INDUSTRY EVOLUTION & MARKET CHANGES ECONOMY & THE GREAT RECESSION China building boom & Inflation Recession & competition Consolidation in the market Owner s searching for value Fee Pressure INDUSTRY EVOLUTION Technology BIM Rise of the DBIA Increased competition Hangover
6 PROJECT DELIVERY METHODS DESIGN-BID BUILD CM-AT-RISK DESIGN-BUILD INTEGRATED PROJECT DELIVERY
7
8 DESIGN-BID-BUILD OWNER FOOD SERVICE SUBS STRUCT ARCHITECT GENERAL CONTRACTOR STEEL COST ESTIMATING COST ESTIMATING SD DD CD Bid Construction Administration
9 CONSTRUCTION MANAGER-AT-RISK OWNER FOOD SERVICE SUBS STRUCT ARCHITECT GENERAL CONTRACTOR STEEL COST ESTIMATING COST ESTIMATING SD DD CD GMP Construction Administration
10 DESIGN-BUILD OWNER SUBS FOOD SERVICE GENERAL CONTRACTOR STEEL STRUCT ARCHITECT COST ESTIMATING SD DD GMP CD Construction Administration
11 INTEGRATED PROJECT DELIVERY GENERAL CONTRACTOR OWNER FOOD SERVICE SUBS STRUCT ARCHITECT IFOA GENERAL CONTRACTOR STEEL COST ESTIMATING COST ESTIMATING SD DD GMP CD Construction Administration
12 INTEGRATED PROJECT DELIVERY STRUCT OWNER STEEL FOOD SERVICE IFOA SUB ARCHITECT GENERAL CONTRACTOR COST ESTIMATING SUBS SD DD GMP CD Construction Administration
13 Contractor s Control Owner s Control PROJECT DELIVERY Contractor s Risk Owner s Risk P3 Design-Build Design-Bid-Build CM-at-Risk IPD Owner s Risk Contractor s Risk Owner s Control Contractor s Control
14 DESIGN-BID-BUILD OWNER FOOD SERVICE SUBS STRUCT ARCHITECT GENERAL CONTRACTOR STEEL COST ESTIMATING COST ESTIMATING SD DD CD Bid Construction Administration
15 DESIGN-BID-BUILD Advantages Widely acceptable, well understood, well established Clearly defined roles Most contractual history Large amount of control for the owner Disadvantages Typically a linear process and therefore the longest duration as compared to other delivery methods Opportunity for change orders during construction Constructability reviews are limited to the Design Team since during design Adjustments to scope and program can have an impact on schedule Design & Specifications are completed prior to bidding and construction Can create adversarial relationships Procurement process is easier to manage Higher contingency required. Architect and Contractor are accountable to the owner
16 CONSTRUCTION MANAGER-AT-RISK OWNER FOOD SERVICE SUBS STRUCT ARCHITECT GENERAL CONTRACTOR STEEL COST ESTIMATING COST ESTIMATING SD DD CD GMP Construction Administration
17 CONSTRUCTION MANAGER-AT-RISK Advantages Contractor input to planning and design decisions Opportunity for fast-tracking packages and shortening schedule and thus, general conditions CM is selected on qualifications and experience Disadvantages Need for more experienced CM s and thus a deeper selection process CM s role changes during construction due to being at-risk Not suited for small projects A more collaborative process Need a deeply integrated owner team Continuous cost control. Possibly with a GMP. CM manages schedule during design Ability to accommodate change during the design schedule Lower contingency Reduced competition and possible higher costs GMP not fully resolved and therefore costs can increase
18 DESIGN-BUILD OWNER SUBS FOOD SERVICE GENERAL CONTRACTOR STEEL STRUCT ARCHITECT COST ESTIMATING SD DD GMP CD Construction Administration
19 DESIGN-BUILD Advantages Project schedules are typically shorter Single entity responsible for both design and construction Contractor is selected on qualifications and experience Cost input happens in an integrated fashion during design Opportunity for fast-tracking packages and shortening schedule Change orders should only come from owner-related scope changes Continuous cost control. Possibly with a GMP. Price can match quality Disadvantages Limited design control and limited user group integration Not necessarily suited for smaller projects Changes can be expensive and difficult to integrate Speed of project increases potential for mistakes Focus on efficiency in decision-making which requires strong owner representation and leadership Owner loses the Architect as the agent who contractually protects the owner s interests Multiple jurisdictional approvals can be problematic. Contingency is controlled by the DB entity Need a sophisticated owner to manage the contractor.
20 INTEGRATED PROJECT DELIVERY STRUCT OWNER STEEL FOOD SERVICE IFOA SUB ARCHITECT GENERAL CONTRACTOR COST ESTIMATING SUBS SD DD GMP CD Construction Administration
21 INTEGRATED PROJECT DELIVERY
22 INTEGRATED PROJECT DELIVERY Advantages Similar advantages of combined delivery methods Design-Build & CM-at-Risk Continuous cost control. The entire team works together and their goals are aligned. Sometimes through incentives. Project schedules are typically shorter Built around for large, complex projects Opportunity for fast-tracking packages and shortening schedule Increases predictability Disadvantages Contractual history is limited and negotiation can be extremely intensive. Insurance and liability must be aligned contractually. Adversarial relationships can damage the team environment and goals. Collaboration must be managed, monitored and promoted constantly. Labor costs for design team members is difficult to assess and can vary Need a sophisticated and deeply integrated owner management team. Lower contingency Reduced competition and possible higher costs GMP not fully resolved and therefore costs can increase
23 EXPERIENCE / LESSONS LEARNED W/ IPD / DA-DAB IPD/DA-DB Compressed schedule Communicate Educate Ask questions
24 CALIFORNIA HOSPITAL TRUE IPD MAJOR PLAYERS HAD SHARED INTEREST & FINANCIAL RISK Positive experience True collaboration Change mind set design vs. construction Big Room process All designers and contractors in a room Smart Board/BIM DIFFERENT POINTS OF VIEW Constructability it would be easier if I could Operation we prefer that doesn t happen because Between the two is collaboration and compromise
25 CALIFORNIA HOSPITAL TRUE IPD SHARED EXPERIENCE Talked through things you wish you could say when on PL Plumbing in wall Get the drains flush Clash detection Walk in and duct work Drain and beam locations Practical how we get to that sink behind ice maker? RESULT Both learned about other s perspective Will take to other projects
26 IPD & DA/DB EFFECT ON DESIGN PROCESS DESIGN Compressed schedule package Increments Want early but don t they always?? When do you REALLY need? When will floor be poured? Dealing with equals in equipment Changes to Changes to seismic bracing Rough-ins vs spot connection drawings COST ESTIMATING/SPECIFICATIONS Convincing CM that our CE is better than pricing thru FSEC Provide continual updates decision making Providing spec at GMP
27 IPD & DA/DB EFFECT ON DESIGN PROCESS BID PROCESS Value based decision Who to bid to? Friend of CM or good FSEC/KEC When to contract w FSEC? Who controls specs? Substitutions convince everyone of value not cheap CONSTRUCTION ADMINISTRATION Changing role
28 SPECIFIC IPD & DA/DB LESSONS LEARNED KENTUCKY HOSPITAL Transferred our contract for CA to CM CALIFORNIA HOSPITAL 1 No punch list We are okay thank you for your work LPCH & STANFORD Incremental packages - define OSPHD submittal and structural Multiple document sets GMP, CD/Bid, OSHPD 1, 2 and 3, permit set Running written and drawing log ALL changes in each for TWO years worth of work FSEC EARLY GMP & DESIGN ASSIST Complete drawing and spec still hours of fighting against FSEC for substitutions
29 BOTTOM LINE AFFECTS STAFF TIME REQUIREMENTS & FEE Schedule Number of submittal reviews Who do I work for?
30 PROCESS: STANFORD HOSPITAL & CLINIC 2008 MASTER PLAN FOR SHC ONE TO TWO DEPARTMENTS Recommend split into two departments Distance Service type Adult vs Pediatric Population DIFFERENT DESIGN & CONSTRUCTION TEAMS Similar timeline DA/DB $5M equipment Stanford $3M equipment LPCH 2016 and 2017 install
31 Drag picture to placeholder or click icon to add Drag picture to placeholder or click icon to add Drag picture to placeholder or click icon to add Thank You!
Discussion. SYMPOSIUM 101 PART II An Overview of the Essential Information You Need to Serve the Healthcare Market
Discussion Strategic and Functional Planning Incorporating Process Improvement Health Information Technology Health Environments Interior Design Deb D Agostino Ann McGauran Annette L. Valenta Rolando Conesa
More information1/4/2014. Alternative Project Delivery Methods 1. Agenda
Steven. C. Thweatt Assistant Vice Chancellor Facilities Management University of Colorado @ Boulder Steven.thweatt@colorado.edu Introduction Fun in the air More Fun in Chattanooga Licensed Architect Georgia
More informationProject Delivery Process Mapping Exercise: Directions for Implementation
Helping you deliver on your sustainability promises Project Delivery Process Mapping Exercise: Directions for Implementation Background Do you feel that your project delivery process creates conditions
More informationChoosing a Project Delivery Method. A Design-Build Done Right Primer
Choosing a Project Delivery Method A Design-Build Done Right Primer DESIGN-BUILD DONE RIGHT PRIMER 1 Choosing a Project Delivery Method A DESIGN-BUILD DONE RIGHT PRIMER A DESIGN-BUILD INSTITUTE OF AMERICA
More informationPROJECT DELIVERY METHODS
Understanding the Construction Contract Project Delivery Methods ISBA April 7,2017 Copyright 2017 by K&L Gates LLP. All rights reserved. Design Bid Build Design Negotiate Build Construction Manager Advisor
More informationAPPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1)
APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter
More informationProjectwide ROI. A team approach to gaining BIM Benefits (Arizona State University ISTB IV) Dan Russell / Sundt Construction / November 2, 2011
Projectwide ROI A team approach to gaining BIM Benefits (Arizona State University ISTB IV) Dan Russell / Sundt Construction / November 2, 2011 The Associated General Contractors of America (AGC) is a Registered
More informationHelpful Hints for Creating Requests for Proposals:
Helpful Hints for Creating Requests for Proposals: Troy W. Miller, AIA, REFP Education Focus Leader Troy.Miller@LHBcorp.com Direct: 612.766.2819 Cell: 952.448.3357 Agenda 1. The Typical Request for Proposal
More informationAn Integrated Approach to Low Voltage Design. Timothy Smith RCDD, RTPM, LEED GA HOK Dallas, Texas
An Integrated Approach to Low Voltage Design Timothy Smith RCDD, RTPM, LEED GA HOK Dallas, Texas AGENDA Understanding the dynamics of an A&E team Understand the impact of project delivery type Understanding
More informationQ&A from the PSMJ Resources, Inc. / XL Group Webinar on September 18, 2012: Developing Satisfied Clients: 6 Steps That Can Save Your Assets
Q&A from the PSMJ Resources, Inc. / XL Group Webinar on September 18, 2012: Developing Satisfied Clients: 6 Steps That Can Save Your Assets Q: Can you give us examples of how to set up a procedure to ID
More informationTime to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO
Time to Build! What to Expect On Your Upcoming and Journey PRESENTED TO Christopher is an award-winning architect with more than 20 years of diversified architectural experience in design of projects from
More informationBringing Order out of Chaos
Bringing Order out of Chaos How architects can use simple Lean concepts to double the project team s productivity and maximize client satisfaction Susan Pratt Susan@PrattAandM.com AEC Labor Productivity
More informationProject Delivery Symposium: Delivering the future PROJECT DELIVERY STRATEGIES
2018 Project Delivery Symposium: Delivering the future PROJECT DELIVERY STRATEGIES This presentation is protected by U.S. and international copyright laws. Reproduction, distribution, display and use of
More informationROLES AND RESPONSIBILITIES
Audio Sessions Session 2 ROLES AND RESPONSIBILITIES Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org
More informationGetting Specified. Marketing to Design Professionals. Craig K. Haney, FCSI, CCS Ron Blank & Associates, Inc. IntroSpec LLC.
Getting Specified Marketing to Design Professionals Presenters: Craig K. Haney, FCSI, CCS Ron Blank & Associates, Inc. IntroSpec LLC Understanding the Issues The Product Representative s Viewpoint Timing:
More informationTexas Health Resources, Methodist Alliance Hospital, Fort Worth, Texas. Hospital; 188,000 s.f. $46.5m 58 beds with growth potential of 300 beds
Seminar Objectives 1) IPD and its impact on team behavior 2) Lean and its role in a collaborative process. 3) Pre-Fabrication 4) How Lean, BIM and collaborative processes impact project value. The Project
More informationAN OVERVIEW OF DESIGN-BUILD. Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014
AN OVERVIEW OF DESIGN-BUILD Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014 Design-Build Not a New Concept In California: Multiple statutes govern design-build
More informationLease-Leaseback Project Delivery Method
Lease-Leaseback Project Delivery Method ASBA Technical Meeting & Tradeshow Winter 2013 Presented by: Mark Baginski Principal Verde Design, Inc. James Moore V.P. of Pre-Construction Services Robert A. Bothman,
More informationHigher Value Commissioning
Higher Value Commissioning Presented by: Erik Jeannette, PE May 2011 Commissioning What is it? Commissioning (Cx) is a comprehensive and systematic process to verify and document the systems of a facility
More informationCMAA Owners Group Construction Delivery Methods
CMAA Owners Group Construction Delivery Methods January 25, 2017 Today s Agenda Welcome Participants Introduce Themselves Goals for the Year Mission Statement Upcoming Events CMAA Membership CCM Certification
More informationREQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT
REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT FOR THE THORNTON HOSPITAL EAST ENTRY AND ATRIUM, & THORNTON HOSPITAL RADIOLOGY/MRI MEDICAL CENTER, LA JOLLA FD&C Project No 5022 Proposals due Tuesday, March
More informationOwner's Representative Scope Matrix - D/B Rev 10/28/2013
Ecluded Owner's Representative Scope Matri - D/B Rev 10/28/2013 The following matri is a worksheet to identify required and optional scope for Owner's Representative services. Please identify the scope
More informationConstruction Contracting Methods. By: Nick Thornsbury Falcon Engineering
Construction Contracting Methods By: Nick Thornsbury Falcon Engineering Typical Contracting Methods Used Key Elements that Affect Design Engineers How Changes Affect Design Engineers Typical Contracting
More informationAlternative Project Delivery for America s Water Infrastructure
Alternative Project Delivery for America s Water Infrastructure Cal Rozario PMP Design-Build Chief Engineer HDR Water & Natural Resources Business Group TOPICS Traditional Project Delivery Brief History
More information1/12/2015. Collaborative IPD-ish Project Delivery using Design-Build, P3 or CM at-risk: the Einstein Approach
Collaborative IPD-ish Project Delivery using Design-Build, P3 or CM at-risk: the Einstein Approach DRAFT for AIA CCA Knowledge Community 2015 Dale Munhall, AIA not a sign of teamwork Director of Construction
More informationRecent developments in contract procurement models
Recent developments in contract procurement models 5 th Annual Contract Management Masterclass Michael Creedon Partner 7 September 2010 ME_80102001 Overview 1. Introduction The current environment Alliancing
More informationMeeting the Standard of Care in an Evolving Project Delivery Environment
Meeting the Standard of Care in an Evolving Project Delivery Environment Russell Jumper & Tim Fandrey Gray Reed & McGraw Texas Society of Professional Engineers Denton Chapter March 9, 2018 Gray Reed &
More informationINTEGRATED PROJECT DELIVERY AIA / AGC JOINT COMMITTEE
INTEGRATED PROJECT DELIVERY AIA / AGC JOINT COMMITTEE 03.24.09 INTRODUCTION: PRESENTERS CLYMER CEASE, AIA, LEED AP / PRINCIPAL / PEARCE BRINKLEY CEASE + LEE ARCHITECTURE SHANN RUSHING, AIA / ASSOCIATE
More informationCarolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery
Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery Carolinas HealthCare System Case Study Behavioral Health Davidson, NC Project Team Carolinas
More informationConstruction Documents Education Program
PLANNING AND PRE-DESIGN THE CONSTRUCTION SPECIFICATIONS INSTITUTE 110 South Union Street, Suite 100 Alexandria, VA 22314-3351 www.csinet.org CDEP 1.0.1: 03-1 Copyright Materials This presentation is protected
More information6/10/2018. Building Information Modeling Overview. Pirtle s History with Building Information Modeling (BIM)
Building Information Modeling Overview Pirtle s History with Building Information Modeling (BIM) 1 Pirtle & BIM Pirtle & BIM Pirtle delivers first As-Build Model to FAU and UF Pirtle delivers 4D model
More informationLean Practices from Competition through Construction
Lean Practices from Competition through Construction UCSF MISSION HALL PROJECT RUDOLPH & SLETTEN, INC WRNS STUDIO Introductions RUDOLPH & SLETTEN, INC Gary Taylor Senior Project Executive Kelli Quinn Senior
More informationDocument Synopses by Series
Document Synopses by Series AIA Contract Documents are divided into six alphanumeric series by document use or purpose: A Series: Owner/Contractor Agreements B Series: Owner/Architect Agreements (p. 13)
More informationJim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide
Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide array of design, construction, construction administration,
More informationAMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY
AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY Conventional Project Family A101 2007 (formerly A101 1997) Standard Form of Agreement Between Owner and Contractor where the basis of payment is
More informationDESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors
DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors YOUR SUPERHERO TRAINERS TODAY ADAM NELSON Senior Architectural
More informationStakeholders and project delivery methods
Stakeholders and project delivery methods CIV-E.1040 Construction Management Lecture II 8 th November 2016 Antti Peltokorpi Assistant Professor Department of Civil Engineering, Aalto University antti.peltokorpi@aalto.fi
More informationIntegrated Project Delivery
Integrated Project Delivery Suzanne H. Harness Consulting Architects of Alberta November 5, 2014 This presentation is protected by US and International copyright laws. Reproduction, distribution, display
More informationPRECONSTRUCTION SERVICES LEVERAGING A BUILDER DURING DESIGN ATHLETIC BUSINESS CONFERENCE
PRECONSTRUCTION SERVICES LEVERAGING A BUILDER DURING DESIGN ATHLETIC BUSINESS CONFERENCE December 4, 2008 Outline Introductions When and Why of Preconstruction Services Role of Builder in LEED Preconstruction
More informationDESIGN IS GOOD BUSINESS
PROJECT DELIVERY: AN INTRODUCTION A profound design process eventually makes the patron, the architect, and every occasional visitor in the building a slightly better human being. JUHANI PALLASMAA The
More informationDesign-Build Project/Team Awards Submission Details
Design-Build Project/Team Awards Submission Details Deadline: May 22, 2019 Please review this information carefully before beginning your online awards submission and share this document with your team
More informationLEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA
Project No. 4484/A4L-379/964840 LEVEL I PREQUALIFICATION DOCUMENTS for OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North
More informationREQUEST FOR STATEMENTS OF QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT AND TENANT REPRESENTATIVE SERVICES. June 2018
REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT AND TENANT REPRESENTATIVE SERVICES June 2018 UNIVERSITY OF CALIFORNIA, DAVIS HEALTH FACILITIES DESIGN & CONSTRUCTION 4800 2 ND AVENUE,
More informationFairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017
Fairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017 Facilities Advisory Committee (FAC) AGENDA FAC focus and framework FPCS Preliminary Design and Construction Schedule Meet our
More informationAPPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)
APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter
More informationWelcome! Achieving Collaborative IPD-ish Delivery with basic D-B, P3 or CM contracts: Yes, there is a way
Welcome! Achieving Collaborative IPD-ish Delivery with basic D-B, P3 or CM contracts: Yes, there is a way Wed, June 10, 2015 1:00 PM - 2:00 PM EDT Earn 1.0 AIA HSW LUs Moderator Jane Cameron, AIA, LEED
More informationPartnering for Alternative Delivery Projects
Partnering for Alternative Delivery Projects Presented by: Renee L. Hoekstra, CVS Managing Partner RHA, LLC Julie Kliewer, PhD, P.E. State Construction & Materials Engineer - ADOT Training Objectives Understanding
More information2016 National Council of Architectural Registration Boards (NCARB) This document is the first edition of the ARE 5.0 Handbook. Please check NCARB s
ARE 5.0 Handbook 2016 National Council of Architectural Registration Boards (NCARB) This document is the first edition of the Handbook. Please check NCARB s website, www.ncarb.org, regularly for updates
More informationAudio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program
Audio Sessions Session 4 PROCUREMENT Construction Contract Administration Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications
More informationMeasuring the Impact of BIM in Design-Bid-Build
Measuring the Impact of BIM in Design-Bid-Build A Case Study Dace A. Campbell, AIA, LEED AP // BNBuilders // 2 November 2011 The Associated General Contractors of America (AGC) is a Registered Provider
More informationDesign-Build Data Sourcebook
Design-Build Data Sourcebook What Is Design-Build? It s the fastest growing, most cost and time efficient method used to deliver construction projects in America. Design-build saves time and money by encouraging
More informationNew Construction Change Order Negotiation Process. In-Service Training September 2007
New Construction Change Order Negotiation Process In-Service Training September 2007 Change Order Negotiation Process Negotiating change orders is a process. Well negotiated change orders result from up-front
More informationIntegrated Practice and Collaboration
Integrated Practice and Collaboration The Cronkite Experience SUNDT CONSTRUCTION Terry Abair HDR ARCHITECTURE Michael Jackson Case Study THE CRONKITE EXPERIENCE Content: The Challenge The Pursuit Team
More informationKirk W Buffington, CPFIM, CPPO, C.P.M.,
Kirk W Buffington, CPFIM, CPPO, C.P.M., An Overview We will be talking about: The elements of the RFP process Factors determining the selection of the procurement method The elements of risk and how they
More informationSuccessful Security Consulting
Successful Security Consulting Extended Consulting Services: Assessing, Designing and Implementing Integrated Management and Technical Solutions Frank Pisciotta, CSC President & Principal Consultant Business
More informationPROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA
PROGRESSIVE DESIGN-BUILD Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA ADVANTAGES/DISADVANTAGES DESIGN BID BUILD (HARD BID) The traditional project delivery method, which customarily
More information2017 National Council of Architectural Registration Boards (NCARB) This document, effective August 2017, supersedes all previous editions of the ARE
ARE 5.0 Handbook 2017 National Council of Architectural Registration Boards (NCARB) This document, effective August 2017, supersedes all previous editions of the Handbook. Please check NCARB s website,
More informationSECTION QUALITY REQUIREMENTS
SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.
More informationTendering, Contracting and Prequalification
Tendering, Contracting and Prequalification Overview Tendering Contracting Prequalification Increased understanding of the tendering, contracting and prequalification processes. Outcomes Identification
More informationPROFESSIONAL PRACTICE 544
PROFESSIONAL PRACTICE 544 April 20, 2015 Contracting Methods Alternative Project Delivery Methods Michael J. Hanahan, Esq. Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com
More informationTHE PROCESS. Phase 1 Pre-Design Objective: Determine the owner s criteria for the project. Fee Breakdown: 5-10% of total fee.
Considerations on Hiring an Architect How the Design Process Works Page 1 of 9 This guide explains the progression of a typical project from an idea through construction of an actual building. Projects
More informationA Primer Indianapolis, Indiana June 16, 2010
Alternative Project Delivery Methods A Primer Indianapolis, Indiana June 16, 2010 Michael Kenig, Holder Construction Company, Past chair of AGC of America s s Project Delivery Committee Jayne O Donnell,
More informationIntegrated Project Delivery (IPD) Across the Spectrum of Delivery Systems Who Owns/Controls the Risk? An Owner s Perspective
CMAA National Conference October 13, 2008 Integrated Project Delivery (IPD) Across the Spectrum of Delivery Systems Who Owns/Controls the Risk? An Owner s Perspective Date Presenters Howard W. Ashcraft,
More informationProject Delivery Methods
7 Project Delivery Methods Design-Bid-Build CM-at-Risk Design-Build Bridging Bridging / CM-at-Risk CM Agency Integrated Project Delivery September 2010 SELECTING THE APPROPRIATE CONSTRUCTION PROJECT DELIVERY
More informationConsensusDocs. Catalog. Updated Docs Inside
ConsensusDocs ConsensusDocs Contracts Catalog Updated Docs Inside ConsensusDocs Keeping You Ahead of the Cur ve ConsensusDocs... Building A Better Way! Whether working at the office, from the road or even
More informationJay Miller Director of Operations Baker Electric Solar
Construction Industry Breakout Jay Miller Director of Operations Baker Electric Solar (content assist from Wayne Holley) July 22, 2016 PMI SD San Business Diego Presentation Chapter www.pmi-sd.org 2015
More informationIntegrated Project Delivery
2014 HDR Architecture, 2014 HDR, Inc., all all rights reserved. Integrated Project Delivery It s A New World, And How It Can Benefit Municipal Owners Rich Atoulikian, PMP, PE Rich.Atoulikian@hdrinc.com
More informationALTERNATIVE CONTRACTING METHODS
ALTERNATIVE CONTRACTING METHODS Conventional Design-Bid-Build Design/Build Negotiated General Contractor By Jeff Warner, AIA, LEED AP Principal, ALSC Architects CONVENTIONAL DESIGN-BID-BUILD The most traditional
More informationConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K
CONTRACTS CATALOG Updated Docs Inside ou Ah ead o f the Cur v e gy epin e K ... BUILDING A BETTER WAY! Whether working at the office, from the road or even at home, the platform provides instant access
More informationSEI Survey: Current Practices and Future Expectations
Slide 1 Slide 2 SEI Survey: Current Practices and Future Expectations Stephanie Slocum, P.E. on behalf of the ASCE/SEI Business Practices Committee Good afternoon. Today I am going to talk about the future
More informationPlease comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at
Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. Provider Name: Lean Construction
More informationMEP21252 Revit Plug-in: Automated Hanger and Seismic Bracing Layout and Design for MEP Systems
MEP21252 Revit Plug-in: Automated Hanger and Seismic Bracing Layout and Design for MEP Systems Alan Espinoza MMC Contractors Jake Olsen, PE DEWALT Learning Objectives Learn how Revit can be used to efficiently
More informationStandard Form of Agreement Between Owner and Architect with Standard Form of Architect s Services
B-Series B- S E R I E S The documents in the B Series relate to various forms of agreement between an owner and an architect for professional services. B141 Standard Form of Agreement Between Owner and
More information1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS
GENERAL The commercial bidding process is a well-defined path of positioning oneself to be the successful bidder amongst a group purporting to offer the same quality materials and labor. There are certain
More informationCD based Bid Management Training from Biz Guru Ltd The Missing Piece from the Bidding Process
CD based Bid Management Training from Biz Guru Ltd The Missing Piece from the Bidding Process Page 1 of 14 Biz Guru Ltd Taking you from Wish to Win! Key Benefits From Attending These Training Courses v
More information***REVISED*** REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT MOORES CANCER CENTER PHARMACY UCSD MEDICAL CENTER LA JOLLA. and
***REVISED*** REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT FOR THE MOORES CANCER CENTER PHARMACY UCSD MEDICAL CENTER LA JOLLA and ENCINITAS PHARMACY UPGRADE UNIVERSITY OF CALIFORNIA, SAN DIEGO FD&C Project
More information3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program?
What is the Architectural Experience Program? The Architectural Experience Program (AXP ) is an essential step in the path to becoming an architect. Through the AXP, you will learn about the daily realities
More informationProfessional Practice 544
Spring Semester 2017 Professional Practice 544 Michael J. Hanahan Partner Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com Schiff Hardin LLP. All rights
More informationWhy Projects Excel? The Business Case for Lean Construction
California Communities of Practice June 14-152017 Why Projects Excel? The Business Case for Lean Construction John Pemberton Lean Construction Institute Bevan Mace, Ph.D. National VP, Operations & Lean
More informationWEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES
1. Introduction WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES The Town of West Yellowstone (Town) is seeking a qualified
More informationProfessional Practice 544
Spring Semester 2018 Professional Practice 544 Michael J. Hanahan Partner Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com Schiff Hardin LLP. All rights
More informationDesign-Build Done Right. Sandra Beck AIA, LEED AP University of California, Berkeley
Design-Build Done Right Sandra Beck AIA, LEED AP University of California, Berkeley Why Design-Build? TEAM One Integrated Project Team Team Continuity through Project Single source Contract, Contact &
More informationJOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING
JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING Baltimore, Maryland Dan Weiger Architectural Engineering, 5th Year Construction Management Option Thesis Proposal Advisor: Dr. John I. Messner January 26, 2009
More informationDesign Build Done Right TM : Alternative Delivery Trends
Design Build Done Right TM : Alternative Delivery Trends 4tyyyyyyyyyv Integration is Our Foundation" Copyright 2017 Benjamin Dzioba, PE, PMP, DBIA 4tyyyyyyyyyv Integration is Our Foundation" Copyright
More informationDesign Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright
Design Process 101 Michael Barnard, AIA, NCARB animalsheltering.org/expo #AnimalCareExpo Copyright 1 Design and Construction Process Needs Assessment Conceptual Design Schematic Design Design Development
More informationJOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING
JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING Baltimore, Maryland Dan Weiger Architectural Engineering, 5th Year Construction Management Option Thesis Proposal Advisor: Dr. John I. Messner December 12,
More informationCBRE Project Management presents PJM PERSPECTIVES. What is IPD?
CBRE Project Management presents PJM PERSPECTIVES Is Integrated Project Delivery (IPD) Right for You? Clint Stancil, Managing Director of CBRE PJM s Global Leadership and Platform Stephen Powell, Senior
More informationSTRATEGIC ARCHITECTURAL DESIGN: HOW TO MEET BUSINESS GOALS AND MAXIMIZE ROI
STRATEGIC ARCHITECTURAL DESIGN: HOW TO MEET BUSINESS GOALS AND MAXIMIZE ROI TABLE OF CONTENTS PART I: STRATEGIC PROJECT PLANNING AND SMARTER DESIGN...4 PART II: STRATEGIES TO CAPTURE VALUE AND SAVINGS
More informationProject Management. Total Construction. George J. Ritz Sidney M. Levy. Second Edition. Graw. Hill
Total Construction Project Management George J. Ritz Sidney M. Levy Second Edition Mc Graw Hill Education New York Chicago San Francisco Lisbon London Madrid Mexico City Milan New Delhi San Juan Seoul
More informationSounds good. What could possibly go wrong? 5/6/2014. Potential Benefits of Design Build. Potential Downsides of Design Build
When Design Build Goes Wrong: Worst Practices to Avoid DBIA Edition for the O.N.E. Conference Blue Springs MO May 8, 2014 Dale Munhall, AIA Sounds good. What could possibly go wrong? Potential Benefits
More information75% of the sample reported an increase in demand for BIM in Ireland. What is your role with the company?
Organisation Type The first national survey to benchmark the level of Building Information Modelling (BIM) adoption in Ireland revealed that 67% of the industry sample possessed confidence in their skills
More informationDESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD
OWNER OWNER OWNER DESIGNER GC DESIGNER DESIGN CONSULTANTS TRADE SUBS DESIGN CONSULTANTS TRADE SUBS DESIGN CONSULTANTS TRADE SUBS DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD Contracts Communications
More informationManagers at Bryant University
The Character of Success for Managers at Bryant University Interviewing Guide (Revised 8/25/04) Career Strategies, Inc. Boston, MA A New Approach to Interviewing for Managers at Bryant University An interviewer
More informationTHE 2007 AIA OWNER- ARCHITECT AGREEMENTS
THE 2007 AIA OWNER- ARCHITECT AGREEMENTS Mark C. Friedlander Schiff Hardin LLP 6600 Sears Tower Chicago, Illinois 60606 (312) 258-5546 Fax: (312) 258-5600 mfriedla@schiffhardin.com http://www.schiffhardin.com/design-build
More informationWendy Landry, AIA, LEED AP Richard Rodriguez, LEED AP
Wendy Landry, AIA, LEED AP Richard Rodriguez, LEED AP Wendy Landry, Associate Principal, Green Building Services 112 Lake Ave., Orlando, FL 32801, 407-367-2901, wendyl@greenbuildingservices.com Richard
More informationThe Owner s Role in Successful Design-Build Project Delivery
The Owner s Role in Successful Design-Build Project Delivery Northwest Construction Consumer Council Tulalip Resort Casino & Conference Center October 23, 2013 presented by: Barbara Wagner Design-Build
More informationDesign-Build Trifecta A joint presentation of DBIA WESTERN PACIFIC REGION
Design-Build Trifecta A joint presentation of DBIA WESTERN PACIFIC REGION and AIA LOS ANGELES September 16, 2014 Design-Build Trifecta MODERATOR: SPEAKERS: Robert J, Hartung, Hon AIA, DBIA President, Alternative
More informationPlease comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at
Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. LEVERAGING VIRTUAL DESIGN &
More informationNegotiation Strategies for *BREAKTHROUGH* TCO
THE Godfather of Negotiation Planning ~ Intel Corp Omid Ghamami PURCHASING AND NEGOTIATIONS EXPERT Negotiation Strategies for *BREAKTHROUGH* TCO Omid Ghamami President & Chief Purchasing Officer, Purchasing
More information