Design Build - Project Delivery Model Trends

Size: px
Start display at page:

Download "Design Build - Project Delivery Model Trends"

Transcription

1 Drag picture to placeholder or click icon to add Drag picture to placeholder or click icon to add Drag picture to placeholder or click icon to add Design Build - Project Delivery Model Trends Sean M. Collins, AIA, LEED AP HGA Architects and Engineers Christine Guyott, FCSI, RD Rippe & Associates 2014 FCSI Conference Phoenix, Arizona Friday, April 11th, 2014

2 DESIGN-BUILD PROJECT DELIVERY MODEL TRENDS AGENDA INTRODUCTION HISTORY & CONTEXT DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD INTEGRATED PROJECT DELIVERY WHAT DOES THIS MEAN TO YOU? LESSONS LEARNED CASE STUDY

3 HISTORY & CONTEXT THE RISE OF PROFESSIONALISM Leonne Battista Alberti: first intentional separation of the art from the craft (1456) Establish architecture as a profession distinct from the science of engineering and construction From 15th century into 19th century Architects retained responsibilities for both design and construction Source: William G. Hasbrook, Jr., DBIA, Fundamentals of Project Delivery 2004 by DBIA

4 HISTORY & CONTEXT PROFESSIONAL SOCIETIES Greater professional specialization Increase in specialized knowledge Promotion and advocacy of professional interests and markets Ethical standards of practice Rise of conflict-of-interest issues LEGAL SEPARATION OF DESIGN & CONSTRUCTION The Miller Act (1935) Public contracting laws mandating separation of design from construction & contractor selection solely on cost Professional licensing requirements Source: William G. Hasbrook, Jr., DBIA, Fundamentals of Project Delivery 2004 by DBIA

5 INDUSTRY EVOLUTION & MARKET CHANGES ECONOMY & THE GREAT RECESSION China building boom & Inflation Recession & competition Consolidation in the market Owner s searching for value Fee Pressure INDUSTRY EVOLUTION Technology BIM Rise of the DBIA Increased competition Hangover

6 PROJECT DELIVERY METHODS DESIGN-BID BUILD CM-AT-RISK DESIGN-BUILD INTEGRATED PROJECT DELIVERY

7

8 DESIGN-BID-BUILD OWNER FOOD SERVICE SUBS STRUCT ARCHITECT GENERAL CONTRACTOR STEEL COST ESTIMATING COST ESTIMATING SD DD CD Bid Construction Administration

9 CONSTRUCTION MANAGER-AT-RISK OWNER FOOD SERVICE SUBS STRUCT ARCHITECT GENERAL CONTRACTOR STEEL COST ESTIMATING COST ESTIMATING SD DD CD GMP Construction Administration

10 DESIGN-BUILD OWNER SUBS FOOD SERVICE GENERAL CONTRACTOR STEEL STRUCT ARCHITECT COST ESTIMATING SD DD GMP CD Construction Administration

11 INTEGRATED PROJECT DELIVERY GENERAL CONTRACTOR OWNER FOOD SERVICE SUBS STRUCT ARCHITECT IFOA GENERAL CONTRACTOR STEEL COST ESTIMATING COST ESTIMATING SD DD GMP CD Construction Administration

12 INTEGRATED PROJECT DELIVERY STRUCT OWNER STEEL FOOD SERVICE IFOA SUB ARCHITECT GENERAL CONTRACTOR COST ESTIMATING SUBS SD DD GMP CD Construction Administration

13 Contractor s Control Owner s Control PROJECT DELIVERY Contractor s Risk Owner s Risk P3 Design-Build Design-Bid-Build CM-at-Risk IPD Owner s Risk Contractor s Risk Owner s Control Contractor s Control

14 DESIGN-BID-BUILD OWNER FOOD SERVICE SUBS STRUCT ARCHITECT GENERAL CONTRACTOR STEEL COST ESTIMATING COST ESTIMATING SD DD CD Bid Construction Administration

15 DESIGN-BID-BUILD Advantages Widely acceptable, well understood, well established Clearly defined roles Most contractual history Large amount of control for the owner Disadvantages Typically a linear process and therefore the longest duration as compared to other delivery methods Opportunity for change orders during construction Constructability reviews are limited to the Design Team since during design Adjustments to scope and program can have an impact on schedule Design & Specifications are completed prior to bidding and construction Can create adversarial relationships Procurement process is easier to manage Higher contingency required. Architect and Contractor are accountable to the owner

16 CONSTRUCTION MANAGER-AT-RISK OWNER FOOD SERVICE SUBS STRUCT ARCHITECT GENERAL CONTRACTOR STEEL COST ESTIMATING COST ESTIMATING SD DD CD GMP Construction Administration

17 CONSTRUCTION MANAGER-AT-RISK Advantages Contractor input to planning and design decisions Opportunity for fast-tracking packages and shortening schedule and thus, general conditions CM is selected on qualifications and experience Disadvantages Need for more experienced CM s and thus a deeper selection process CM s role changes during construction due to being at-risk Not suited for small projects A more collaborative process Need a deeply integrated owner team Continuous cost control. Possibly with a GMP. CM manages schedule during design Ability to accommodate change during the design schedule Lower contingency Reduced competition and possible higher costs GMP not fully resolved and therefore costs can increase

18 DESIGN-BUILD OWNER SUBS FOOD SERVICE GENERAL CONTRACTOR STEEL STRUCT ARCHITECT COST ESTIMATING SD DD GMP CD Construction Administration

19 DESIGN-BUILD Advantages Project schedules are typically shorter Single entity responsible for both design and construction Contractor is selected on qualifications and experience Cost input happens in an integrated fashion during design Opportunity for fast-tracking packages and shortening schedule Change orders should only come from owner-related scope changes Continuous cost control. Possibly with a GMP. Price can match quality Disadvantages Limited design control and limited user group integration Not necessarily suited for smaller projects Changes can be expensive and difficult to integrate Speed of project increases potential for mistakes Focus on efficiency in decision-making which requires strong owner representation and leadership Owner loses the Architect as the agent who contractually protects the owner s interests Multiple jurisdictional approvals can be problematic. Contingency is controlled by the DB entity Need a sophisticated owner to manage the contractor.

20 INTEGRATED PROJECT DELIVERY STRUCT OWNER STEEL FOOD SERVICE IFOA SUB ARCHITECT GENERAL CONTRACTOR COST ESTIMATING SUBS SD DD GMP CD Construction Administration

21 INTEGRATED PROJECT DELIVERY

22 INTEGRATED PROJECT DELIVERY Advantages Similar advantages of combined delivery methods Design-Build & CM-at-Risk Continuous cost control. The entire team works together and their goals are aligned. Sometimes through incentives. Project schedules are typically shorter Built around for large, complex projects Opportunity for fast-tracking packages and shortening schedule Increases predictability Disadvantages Contractual history is limited and negotiation can be extremely intensive. Insurance and liability must be aligned contractually. Adversarial relationships can damage the team environment and goals. Collaboration must be managed, monitored and promoted constantly. Labor costs for design team members is difficult to assess and can vary Need a sophisticated and deeply integrated owner management team. Lower contingency Reduced competition and possible higher costs GMP not fully resolved and therefore costs can increase

23 EXPERIENCE / LESSONS LEARNED W/ IPD / DA-DAB IPD/DA-DB Compressed schedule Communicate Educate Ask questions

24 CALIFORNIA HOSPITAL TRUE IPD MAJOR PLAYERS HAD SHARED INTEREST & FINANCIAL RISK Positive experience True collaboration Change mind set design vs. construction Big Room process All designers and contractors in a room Smart Board/BIM DIFFERENT POINTS OF VIEW Constructability it would be easier if I could Operation we prefer that doesn t happen because Between the two is collaboration and compromise

25 CALIFORNIA HOSPITAL TRUE IPD SHARED EXPERIENCE Talked through things you wish you could say when on PL Plumbing in wall Get the drains flush Clash detection Walk in and duct work Drain and beam locations Practical how we get to that sink behind ice maker? RESULT Both learned about other s perspective Will take to other projects

26 IPD & DA/DB EFFECT ON DESIGN PROCESS DESIGN Compressed schedule package Increments Want early but don t they always?? When do you REALLY need? When will floor be poured? Dealing with equals in equipment Changes to Changes to seismic bracing Rough-ins vs spot connection drawings COST ESTIMATING/SPECIFICATIONS Convincing CM that our CE is better than pricing thru FSEC Provide continual updates decision making Providing spec at GMP

27 IPD & DA/DB EFFECT ON DESIGN PROCESS BID PROCESS Value based decision Who to bid to? Friend of CM or good FSEC/KEC When to contract w FSEC? Who controls specs? Substitutions convince everyone of value not cheap CONSTRUCTION ADMINISTRATION Changing role

28 SPECIFIC IPD & DA/DB LESSONS LEARNED KENTUCKY HOSPITAL Transferred our contract for CA to CM CALIFORNIA HOSPITAL 1 No punch list We are okay thank you for your work LPCH & STANFORD Incremental packages - define OSPHD submittal and structural Multiple document sets GMP, CD/Bid, OSHPD 1, 2 and 3, permit set Running written and drawing log ALL changes in each for TWO years worth of work FSEC EARLY GMP & DESIGN ASSIST Complete drawing and spec still hours of fighting against FSEC for substitutions

29 BOTTOM LINE AFFECTS STAFF TIME REQUIREMENTS & FEE Schedule Number of submittal reviews Who do I work for?

30 PROCESS: STANFORD HOSPITAL & CLINIC 2008 MASTER PLAN FOR SHC ONE TO TWO DEPARTMENTS Recommend split into two departments Distance Service type Adult vs Pediatric Population DIFFERENT DESIGN & CONSTRUCTION TEAMS Similar timeline DA/DB $5M equipment Stanford $3M equipment LPCH 2016 and 2017 install

31 Drag picture to placeholder or click icon to add Drag picture to placeholder or click icon to add Drag picture to placeholder or click icon to add Thank You!

Discussion. SYMPOSIUM 101 PART II An Overview of the Essential Information You Need to Serve the Healthcare Market

Discussion. SYMPOSIUM 101 PART II An Overview of the Essential Information You Need to Serve the Healthcare Market Discussion Strategic and Functional Planning Incorporating Process Improvement Health Information Technology Health Environments Interior Design Deb D Agostino Ann McGauran Annette L. Valenta Rolando Conesa

More information

1/4/2014. Alternative Project Delivery Methods 1. Agenda

1/4/2014. Alternative Project Delivery Methods 1. Agenda Steven. C. Thweatt Assistant Vice Chancellor Facilities Management University of Colorado @ Boulder Steven.thweatt@colorado.edu Introduction Fun in the air More Fun in Chattanooga Licensed Architect Georgia

More information

Project Delivery Process Mapping Exercise: Directions for Implementation

Project Delivery Process Mapping Exercise: Directions for Implementation Helping you deliver on your sustainability promises Project Delivery Process Mapping Exercise: Directions for Implementation Background Do you feel that your project delivery process creates conditions

More information

Choosing a Project Delivery Method. A Design-Build Done Right Primer

Choosing a Project Delivery Method. A Design-Build Done Right Primer Choosing a Project Delivery Method A Design-Build Done Right Primer DESIGN-BUILD DONE RIGHT PRIMER 1 Choosing a Project Delivery Method A DESIGN-BUILD DONE RIGHT PRIMER A DESIGN-BUILD INSTITUTE OF AMERICA

More information

PROJECT DELIVERY METHODS

PROJECT DELIVERY METHODS Understanding the Construction Contract Project Delivery Methods ISBA April 7,2017 Copyright 2017 by K&L Gates LLP. All rights reserved. Design Bid Build Design Negotiate Build Construction Manager Advisor

More information

APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1)

APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1) APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter

More information

Projectwide ROI. A team approach to gaining BIM Benefits (Arizona State University ISTB IV) Dan Russell / Sundt Construction / November 2, 2011

Projectwide ROI. A team approach to gaining BIM Benefits (Arizona State University ISTB IV) Dan Russell / Sundt Construction / November 2, 2011 Projectwide ROI A team approach to gaining BIM Benefits (Arizona State University ISTB IV) Dan Russell / Sundt Construction / November 2, 2011 The Associated General Contractors of America (AGC) is a Registered

More information

Helpful Hints for Creating Requests for Proposals:

Helpful Hints for Creating Requests for Proposals: Helpful Hints for Creating Requests for Proposals: Troy W. Miller, AIA, REFP Education Focus Leader Troy.Miller@LHBcorp.com Direct: 612.766.2819 Cell: 952.448.3357 Agenda 1. The Typical Request for Proposal

More information

An Integrated Approach to Low Voltage Design. Timothy Smith RCDD, RTPM, LEED GA HOK Dallas, Texas

An Integrated Approach to Low Voltage Design. Timothy Smith RCDD, RTPM, LEED GA HOK Dallas, Texas An Integrated Approach to Low Voltage Design Timothy Smith RCDD, RTPM, LEED GA HOK Dallas, Texas AGENDA Understanding the dynamics of an A&E team Understand the impact of project delivery type Understanding

More information

Q&A from the PSMJ Resources, Inc. / XL Group Webinar on September 18, 2012: Developing Satisfied Clients: 6 Steps That Can Save Your Assets

Q&A from the PSMJ Resources, Inc. / XL Group Webinar on September 18, 2012: Developing Satisfied Clients: 6 Steps That Can Save Your Assets Q&A from the PSMJ Resources, Inc. / XL Group Webinar on September 18, 2012: Developing Satisfied Clients: 6 Steps That Can Save Your Assets Q: Can you give us examples of how to set up a procedure to ID

More information

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO Time to Build! What to Expect On Your Upcoming and Journey PRESENTED TO Christopher is an award-winning architect with more than 20 years of diversified architectural experience in design of projects from

More information

Bringing Order out of Chaos

Bringing Order out of Chaos Bringing Order out of Chaos How architects can use simple Lean concepts to double the project team s productivity and maximize client satisfaction Susan Pratt Susan@PrattAandM.com AEC Labor Productivity

More information

Project Delivery Symposium: Delivering the future PROJECT DELIVERY STRATEGIES

Project Delivery Symposium: Delivering the future PROJECT DELIVERY STRATEGIES 2018 Project Delivery Symposium: Delivering the future PROJECT DELIVERY STRATEGIES This presentation is protected by U.S. and international copyright laws. Reproduction, distribution, display and use of

More information

ROLES AND RESPONSIBILITIES

ROLES AND RESPONSIBILITIES Audio Sessions Session 2 ROLES AND RESPONSIBILITIES Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org

More information

Getting Specified. Marketing to Design Professionals. Craig K. Haney, FCSI, CCS Ron Blank & Associates, Inc. IntroSpec LLC.

Getting Specified. Marketing to Design Professionals. Craig K. Haney, FCSI, CCS Ron Blank & Associates, Inc. IntroSpec LLC. Getting Specified Marketing to Design Professionals Presenters: Craig K. Haney, FCSI, CCS Ron Blank & Associates, Inc. IntroSpec LLC Understanding the Issues The Product Representative s Viewpoint Timing:

More information

Texas Health Resources, Methodist Alliance Hospital, Fort Worth, Texas. Hospital; 188,000 s.f. $46.5m 58 beds with growth potential of 300 beds

Texas Health Resources, Methodist Alliance Hospital, Fort Worth, Texas. Hospital; 188,000 s.f. $46.5m 58 beds with growth potential of 300 beds Seminar Objectives 1) IPD and its impact on team behavior 2) Lean and its role in a collaborative process. 3) Pre-Fabrication 4) How Lean, BIM and collaborative processes impact project value. The Project

More information

AN OVERVIEW OF DESIGN-BUILD. Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014

AN OVERVIEW OF DESIGN-BUILD. Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014 AN OVERVIEW OF DESIGN-BUILD Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014 Design-Build Not a New Concept In California: Multiple statutes govern design-build

More information

Lease-Leaseback Project Delivery Method

Lease-Leaseback Project Delivery Method Lease-Leaseback Project Delivery Method ASBA Technical Meeting & Tradeshow Winter 2013 Presented by: Mark Baginski Principal Verde Design, Inc. James Moore V.P. of Pre-Construction Services Robert A. Bothman,

More information

Higher Value Commissioning

Higher Value Commissioning Higher Value Commissioning Presented by: Erik Jeannette, PE May 2011 Commissioning What is it? Commissioning (Cx) is a comprehensive and systematic process to verify and document the systems of a facility

More information

CMAA Owners Group Construction Delivery Methods

CMAA Owners Group Construction Delivery Methods CMAA Owners Group Construction Delivery Methods January 25, 2017 Today s Agenda Welcome Participants Introduce Themselves Goals for the Year Mission Statement Upcoming Events CMAA Membership CCM Certification

More information

REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT

REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT FOR THE THORNTON HOSPITAL EAST ENTRY AND ATRIUM, & THORNTON HOSPITAL RADIOLOGY/MRI MEDICAL CENTER, LA JOLLA FD&C Project No 5022 Proposals due Tuesday, March

More information

Owner's Representative Scope Matrix - D/B Rev 10/28/2013

Owner's Representative Scope Matrix - D/B Rev 10/28/2013 Ecluded Owner's Representative Scope Matri - D/B Rev 10/28/2013 The following matri is a worksheet to identify required and optional scope for Owner's Representative services. Please identify the scope

More information

Construction Contracting Methods. By: Nick Thornsbury Falcon Engineering

Construction Contracting Methods. By: Nick Thornsbury Falcon Engineering Construction Contracting Methods By: Nick Thornsbury Falcon Engineering Typical Contracting Methods Used Key Elements that Affect Design Engineers How Changes Affect Design Engineers Typical Contracting

More information

Alternative Project Delivery for America s Water Infrastructure

Alternative Project Delivery for America s Water Infrastructure Alternative Project Delivery for America s Water Infrastructure Cal Rozario PMP Design-Build Chief Engineer HDR Water & Natural Resources Business Group TOPICS Traditional Project Delivery Brief History

More information

1/12/2015. Collaborative IPD-ish Project Delivery using Design-Build, P3 or CM at-risk: the Einstein Approach

1/12/2015. Collaborative IPD-ish Project Delivery using Design-Build, P3 or CM at-risk: the Einstein Approach Collaborative IPD-ish Project Delivery using Design-Build, P3 or CM at-risk: the Einstein Approach DRAFT for AIA CCA Knowledge Community 2015 Dale Munhall, AIA not a sign of teamwork Director of Construction

More information

Recent developments in contract procurement models

Recent developments in contract procurement models Recent developments in contract procurement models 5 th Annual Contract Management Masterclass Michael Creedon Partner 7 September 2010 ME_80102001 Overview 1. Introduction The current environment Alliancing

More information

Meeting the Standard of Care in an Evolving Project Delivery Environment

Meeting the Standard of Care in an Evolving Project Delivery Environment Meeting the Standard of Care in an Evolving Project Delivery Environment Russell Jumper & Tim Fandrey Gray Reed & McGraw Texas Society of Professional Engineers Denton Chapter March 9, 2018 Gray Reed &

More information

INTEGRATED PROJECT DELIVERY AIA / AGC JOINT COMMITTEE

INTEGRATED PROJECT DELIVERY AIA / AGC JOINT COMMITTEE INTEGRATED PROJECT DELIVERY AIA / AGC JOINT COMMITTEE 03.24.09 INTRODUCTION: PRESENTERS CLYMER CEASE, AIA, LEED AP / PRINCIPAL / PEARCE BRINKLEY CEASE + LEE ARCHITECTURE SHANN RUSHING, AIA / ASSOCIATE

More information

Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery

Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery Carolinas HealthCare System Case Study Behavioral Health Davidson, NC Project Team Carolinas

More information

Construction Documents Education Program

Construction Documents Education Program PLANNING AND PRE-DESIGN THE CONSTRUCTION SPECIFICATIONS INSTITUTE 110 South Union Street, Suite 100 Alexandria, VA 22314-3351 www.csinet.org CDEP 1.0.1: 03-1 Copyright Materials This presentation is protected

More information

6/10/2018. Building Information Modeling Overview. Pirtle s History with Building Information Modeling (BIM)

6/10/2018. Building Information Modeling Overview. Pirtle s History with Building Information Modeling (BIM) Building Information Modeling Overview Pirtle s History with Building Information Modeling (BIM) 1 Pirtle & BIM Pirtle & BIM Pirtle delivers first As-Build Model to FAU and UF Pirtle delivers 4D model

More information

Lean Practices from Competition through Construction

Lean Practices from Competition through Construction Lean Practices from Competition through Construction UCSF MISSION HALL PROJECT RUDOLPH & SLETTEN, INC WRNS STUDIO Introductions RUDOLPH & SLETTEN, INC Gary Taylor Senior Project Executive Kelli Quinn Senior

More information

Document Synopses by Series

Document Synopses by Series Document Synopses by Series AIA Contract Documents are divided into six alphanumeric series by document use or purpose: A Series: Owner/Contractor Agreements B Series: Owner/Architect Agreements (p. 13)

More information

Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide

Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide array of design, construction, construction administration,

More information

AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY

AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY Conventional Project Family A101 2007 (formerly A101 1997) Standard Form of Agreement Between Owner and Contractor where the basis of payment is

More information

DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors

DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors YOUR SUPERHERO TRAINERS TODAY ADAM NELSON Senior Architectural

More information

Stakeholders and project delivery methods

Stakeholders and project delivery methods Stakeholders and project delivery methods CIV-E.1040 Construction Management Lecture II 8 th November 2016 Antti Peltokorpi Assistant Professor Department of Civil Engineering, Aalto University antti.peltokorpi@aalto.fi

More information

Integrated Project Delivery

Integrated Project Delivery Integrated Project Delivery Suzanne H. Harness Consulting Architects of Alberta November 5, 2014 This presentation is protected by US and International copyright laws. Reproduction, distribution, display

More information

PRECONSTRUCTION SERVICES LEVERAGING A BUILDER DURING DESIGN ATHLETIC BUSINESS CONFERENCE

PRECONSTRUCTION SERVICES LEVERAGING A BUILDER DURING DESIGN ATHLETIC BUSINESS CONFERENCE PRECONSTRUCTION SERVICES LEVERAGING A BUILDER DURING DESIGN ATHLETIC BUSINESS CONFERENCE December 4, 2008 Outline Introductions When and Why of Preconstruction Services Role of Builder in LEED Preconstruction

More information

DESIGN IS GOOD BUSINESS

DESIGN IS GOOD BUSINESS PROJECT DELIVERY: AN INTRODUCTION A profound design process eventually makes the patron, the architect, and every occasional visitor in the building a slightly better human being. JUHANI PALLASMAA The

More information

Design-Build Project/Team Awards Submission Details

Design-Build Project/Team Awards Submission Details Design-Build Project/Team Awards Submission Details Deadline: May 22, 2019 Please review this information carefully before beginning your online awards submission and share this document with your team

More information

LEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA

LEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA Project No. 4484/A4L-379/964840 LEVEL I PREQUALIFICATION DOCUMENTS for OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North

More information

REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT AND TENANT REPRESENTATIVE SERVICES. June 2018

REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT AND TENANT REPRESENTATIVE SERVICES. June 2018 REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT AND TENANT REPRESENTATIVE SERVICES June 2018 UNIVERSITY OF CALIFORNIA, DAVIS HEALTH FACILITIES DESIGN & CONSTRUCTION 4800 2 ND AVENUE,

More information

Fairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017

Fairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017 Fairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017 Facilities Advisory Committee (FAC) AGENDA FAC focus and framework FPCS Preliminary Design and Construction Schedule Meet our

More information

APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)

APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1) APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter

More information

Welcome! Achieving Collaborative IPD-ish Delivery with basic D-B, P3 or CM contracts: Yes, there is a way

Welcome! Achieving Collaborative IPD-ish Delivery with basic D-B, P3 or CM contracts: Yes, there is a way Welcome! Achieving Collaborative IPD-ish Delivery with basic D-B, P3 or CM contracts: Yes, there is a way Wed, June 10, 2015 1:00 PM - 2:00 PM EDT Earn 1.0 AIA HSW LUs Moderator Jane Cameron, AIA, LEED

More information

Partnering for Alternative Delivery Projects

Partnering for Alternative Delivery Projects Partnering for Alternative Delivery Projects Presented by: Renee L. Hoekstra, CVS Managing Partner RHA, LLC Julie Kliewer, PhD, P.E. State Construction & Materials Engineer - ADOT Training Objectives Understanding

More information

2016 National Council of Architectural Registration Boards (NCARB) This document is the first edition of the ARE 5.0 Handbook. Please check NCARB s

2016 National Council of Architectural Registration Boards (NCARB) This document is the first edition of the ARE 5.0 Handbook. Please check NCARB s ARE 5.0 Handbook 2016 National Council of Architectural Registration Boards (NCARB) This document is the first edition of the Handbook. Please check NCARB s website, www.ncarb.org, regularly for updates

More information

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program Audio Sessions Session 4 PROCUREMENT Construction Contract Administration Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications

More information

Measuring the Impact of BIM in Design-Bid-Build

Measuring the Impact of BIM in Design-Bid-Build Measuring the Impact of BIM in Design-Bid-Build A Case Study Dace A. Campbell, AIA, LEED AP // BNBuilders // 2 November 2011 The Associated General Contractors of America (AGC) is a Registered Provider

More information

Design-Build Data Sourcebook

Design-Build Data Sourcebook Design-Build Data Sourcebook What Is Design-Build? It s the fastest growing, most cost and time efficient method used to deliver construction projects in America. Design-build saves time and money by encouraging

More information

New Construction Change Order Negotiation Process. In-Service Training September 2007

New Construction Change Order Negotiation Process. In-Service Training September 2007 New Construction Change Order Negotiation Process In-Service Training September 2007 Change Order Negotiation Process Negotiating change orders is a process. Well negotiated change orders result from up-front

More information

Integrated Practice and Collaboration

Integrated Practice and Collaboration Integrated Practice and Collaboration The Cronkite Experience SUNDT CONSTRUCTION Terry Abair HDR ARCHITECTURE Michael Jackson Case Study THE CRONKITE EXPERIENCE Content: The Challenge The Pursuit Team

More information

Kirk W Buffington, CPFIM, CPPO, C.P.M.,

Kirk W Buffington, CPFIM, CPPO, C.P.M., Kirk W Buffington, CPFIM, CPPO, C.P.M., An Overview We will be talking about: The elements of the RFP process Factors determining the selection of the procurement method The elements of risk and how they

More information

Successful Security Consulting

Successful Security Consulting Successful Security Consulting Extended Consulting Services: Assessing, Designing and Implementing Integrated Management and Technical Solutions Frank Pisciotta, CSC President & Principal Consultant Business

More information

PROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA

PROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA PROGRESSIVE DESIGN-BUILD Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA ADVANTAGES/DISADVANTAGES DESIGN BID BUILD (HARD BID) The traditional project delivery method, which customarily

More information

2017 National Council of Architectural Registration Boards (NCARB) This document, effective August 2017, supersedes all previous editions of the ARE

2017 National Council of Architectural Registration Boards (NCARB) This document, effective August 2017, supersedes all previous editions of the ARE ARE 5.0 Handbook 2017 National Council of Architectural Registration Boards (NCARB) This document, effective August 2017, supersedes all previous editions of the Handbook. Please check NCARB s website,

More information

SECTION QUALITY REQUIREMENTS

SECTION QUALITY REQUIREMENTS SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.

More information

Tendering, Contracting and Prequalification

Tendering, Contracting and Prequalification Tendering, Contracting and Prequalification Overview Tendering Contracting Prequalification Increased understanding of the tendering, contracting and prequalification processes. Outcomes Identification

More information

PROFESSIONAL PRACTICE 544

PROFESSIONAL PRACTICE 544 PROFESSIONAL PRACTICE 544 April 20, 2015 Contracting Methods Alternative Project Delivery Methods Michael J. Hanahan, Esq. Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com

More information

THE PROCESS. Phase 1 Pre-Design Objective: Determine the owner s criteria for the project. Fee Breakdown: 5-10% of total fee.

THE PROCESS. Phase 1 Pre-Design Objective: Determine the owner s criteria for the project. Fee Breakdown: 5-10% of total fee. Considerations on Hiring an Architect How the Design Process Works Page 1 of 9 This guide explains the progression of a typical project from an idea through construction of an actual building. Projects

More information

A Primer Indianapolis, Indiana June 16, 2010

A Primer Indianapolis, Indiana June 16, 2010 Alternative Project Delivery Methods A Primer Indianapolis, Indiana June 16, 2010 Michael Kenig, Holder Construction Company, Past chair of AGC of America s s Project Delivery Committee Jayne O Donnell,

More information

Integrated Project Delivery (IPD) Across the Spectrum of Delivery Systems Who Owns/Controls the Risk? An Owner s Perspective

Integrated Project Delivery (IPD) Across the Spectrum of Delivery Systems Who Owns/Controls the Risk? An Owner s Perspective CMAA National Conference October 13, 2008 Integrated Project Delivery (IPD) Across the Spectrum of Delivery Systems Who Owns/Controls the Risk? An Owner s Perspective Date Presenters Howard W. Ashcraft,

More information

Project Delivery Methods

Project Delivery Methods 7 Project Delivery Methods Design-Bid-Build CM-at-Risk Design-Build Bridging Bridging / CM-at-Risk CM Agency Integrated Project Delivery September 2010 SELECTING THE APPROPRIATE CONSTRUCTION PROJECT DELIVERY

More information

ConsensusDocs. Catalog. Updated Docs Inside

ConsensusDocs. Catalog. Updated Docs Inside ConsensusDocs ConsensusDocs Contracts Catalog Updated Docs Inside ConsensusDocs Keeping You Ahead of the Cur ve ConsensusDocs... Building A Better Way! Whether working at the office, from the road or even

More information

Jay Miller Director of Operations Baker Electric Solar

Jay Miller Director of Operations Baker Electric Solar Construction Industry Breakout Jay Miller Director of Operations Baker Electric Solar (content assist from Wayne Holley) July 22, 2016 PMI SD San Business Diego Presentation Chapter www.pmi-sd.org 2015

More information

Integrated Project Delivery

Integrated Project Delivery 2014 HDR Architecture, 2014 HDR, Inc., all all rights reserved. Integrated Project Delivery It s A New World, And How It Can Benefit Municipal Owners Rich Atoulikian, PMP, PE Rich.Atoulikian@hdrinc.com

More information

ALTERNATIVE CONTRACTING METHODS

ALTERNATIVE CONTRACTING METHODS ALTERNATIVE CONTRACTING METHODS Conventional Design-Bid-Build Design/Build Negotiated General Contractor By Jeff Warner, AIA, LEED AP Principal, ALSC Architects CONVENTIONAL DESIGN-BID-BUILD The most traditional

More information

ConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K

ConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K CONTRACTS CATALOG Updated Docs Inside ou Ah ead o f the Cur v e gy epin e K ... BUILDING A BETTER WAY! Whether working at the office, from the road or even at home, the platform provides instant access

More information

SEI Survey: Current Practices and Future Expectations

SEI Survey: Current Practices and Future Expectations Slide 1 Slide 2 SEI Survey: Current Practices and Future Expectations Stephanie Slocum, P.E. on behalf of the ASCE/SEI Business Practices Committee Good afternoon. Today I am going to talk about the future

More information

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. Provider Name: Lean Construction

More information

MEP21252 Revit Plug-in: Automated Hanger and Seismic Bracing Layout and Design for MEP Systems

MEP21252 Revit Plug-in: Automated Hanger and Seismic Bracing Layout and Design for MEP Systems MEP21252 Revit Plug-in: Automated Hanger and Seismic Bracing Layout and Design for MEP Systems Alan Espinoza MMC Contractors Jake Olsen, PE DEWALT Learning Objectives Learn how Revit can be used to efficiently

More information

Standard Form of Agreement Between Owner and Architect with Standard Form of Architect s Services

Standard Form of Agreement Between Owner and Architect with Standard Form of Architect s Services B-Series B- S E R I E S The documents in the B Series relate to various forms of agreement between an owner and an architect for professional services. B141 Standard Form of Agreement Between Owner and

More information

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS GENERAL The commercial bidding process is a well-defined path of positioning oneself to be the successful bidder amongst a group purporting to offer the same quality materials and labor. There are certain

More information

CD based Bid Management Training from Biz Guru Ltd The Missing Piece from the Bidding Process

CD based Bid Management Training from Biz Guru Ltd The Missing Piece from the Bidding Process CD based Bid Management Training from Biz Guru Ltd The Missing Piece from the Bidding Process Page 1 of 14 Biz Guru Ltd Taking you from Wish to Win! Key Benefits From Attending These Training Courses v

More information

***REVISED*** REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT MOORES CANCER CENTER PHARMACY UCSD MEDICAL CENTER LA JOLLA. and

***REVISED*** REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT MOORES CANCER CENTER PHARMACY UCSD MEDICAL CENTER LA JOLLA. and ***REVISED*** REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT FOR THE MOORES CANCER CENTER PHARMACY UCSD MEDICAL CENTER LA JOLLA and ENCINITAS PHARMACY UPGRADE UNIVERSITY OF CALIFORNIA, SAN DIEGO FD&C Project

More information

3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program?

3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program? What is the Architectural Experience Program? The Architectural Experience Program (AXP ) is an essential step in the path to becoming an architect. Through the AXP, you will learn about the daily realities

More information

Professional Practice 544

Professional Practice 544 Spring Semester 2017 Professional Practice 544 Michael J. Hanahan Partner Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com Schiff Hardin LLP. All rights

More information

Why Projects Excel? The Business Case for Lean Construction

Why Projects Excel? The Business Case for Lean Construction California Communities of Practice June 14-152017 Why Projects Excel? The Business Case for Lean Construction John Pemberton Lean Construction Institute Bevan Mace, Ph.D. National VP, Operations & Lean

More information

WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES

WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES 1. Introduction WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES The Town of West Yellowstone (Town) is seeking a qualified

More information

Professional Practice 544

Professional Practice 544 Spring Semester 2018 Professional Practice 544 Michael J. Hanahan Partner Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com Schiff Hardin LLP. All rights

More information

Design-Build Done Right. Sandra Beck AIA, LEED AP University of California, Berkeley

Design-Build Done Right. Sandra Beck AIA, LEED AP University of California, Berkeley Design-Build Done Right Sandra Beck AIA, LEED AP University of California, Berkeley Why Design-Build? TEAM One Integrated Project Team Team Continuity through Project Single source Contract, Contact &

More information

JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING

JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING Baltimore, Maryland Dan Weiger Architectural Engineering, 5th Year Construction Management Option Thesis Proposal Advisor: Dr. John I. Messner January 26, 2009

More information

Design Build Done Right TM : Alternative Delivery Trends

Design Build Done Right TM : Alternative Delivery Trends Design Build Done Right TM : Alternative Delivery Trends 4tyyyyyyyyyv Integration is Our Foundation" Copyright 2017 Benjamin Dzioba, PE, PMP, DBIA 4tyyyyyyyyyv Integration is Our Foundation" Copyright

More information

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright Design Process 101 Michael Barnard, AIA, NCARB animalsheltering.org/expo #AnimalCareExpo Copyright 1 Design and Construction Process Needs Assessment Conceptual Design Schematic Design Design Development

More information

JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING

JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING Baltimore, Maryland Dan Weiger Architectural Engineering, 5th Year Construction Management Option Thesis Proposal Advisor: Dr. John I. Messner December 12,

More information

CBRE Project Management presents PJM PERSPECTIVES. What is IPD?

CBRE Project Management presents PJM PERSPECTIVES. What is IPD? CBRE Project Management presents PJM PERSPECTIVES Is Integrated Project Delivery (IPD) Right for You? Clint Stancil, Managing Director of CBRE PJM s Global Leadership and Platform Stephen Powell, Senior

More information

STRATEGIC ARCHITECTURAL DESIGN: HOW TO MEET BUSINESS GOALS AND MAXIMIZE ROI

STRATEGIC ARCHITECTURAL DESIGN: HOW TO MEET BUSINESS GOALS AND MAXIMIZE ROI STRATEGIC ARCHITECTURAL DESIGN: HOW TO MEET BUSINESS GOALS AND MAXIMIZE ROI TABLE OF CONTENTS PART I: STRATEGIC PROJECT PLANNING AND SMARTER DESIGN...4 PART II: STRATEGIES TO CAPTURE VALUE AND SAVINGS

More information

Project Management. Total Construction. George J. Ritz Sidney M. Levy. Second Edition. Graw. Hill

Project Management. Total Construction. George J. Ritz Sidney M. Levy. Second Edition. Graw. Hill Total Construction Project Management George J. Ritz Sidney M. Levy Second Edition Mc Graw Hill Education New York Chicago San Francisco Lisbon London Madrid Mexico City Milan New Delhi San Juan Seoul

More information

Sounds good. What could possibly go wrong? 5/6/2014. Potential Benefits of Design Build. Potential Downsides of Design Build

Sounds good. What could possibly go wrong? 5/6/2014. Potential Benefits of Design Build. Potential Downsides of Design Build When Design Build Goes Wrong: Worst Practices to Avoid DBIA Edition for the O.N.E. Conference Blue Springs MO May 8, 2014 Dale Munhall, AIA Sounds good. What could possibly go wrong? Potential Benefits

More information

75% of the sample reported an increase in demand for BIM in Ireland. What is your role with the company?

75% of the sample reported an increase in demand for BIM in Ireland. What is your role with the company? Organisation Type The first national survey to benchmark the level of Building Information Modelling (BIM) adoption in Ireland revealed that 67% of the industry sample possessed confidence in their skills

More information

DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD

DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD OWNER OWNER OWNER DESIGNER GC DESIGNER DESIGN CONSULTANTS TRADE SUBS DESIGN CONSULTANTS TRADE SUBS DESIGN CONSULTANTS TRADE SUBS DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD Contracts Communications

More information

Managers at Bryant University

Managers at Bryant University The Character of Success for Managers at Bryant University Interviewing Guide (Revised 8/25/04) Career Strategies, Inc. Boston, MA A New Approach to Interviewing for Managers at Bryant University An interviewer

More information

THE 2007 AIA OWNER- ARCHITECT AGREEMENTS

THE 2007 AIA OWNER- ARCHITECT AGREEMENTS THE 2007 AIA OWNER- ARCHITECT AGREEMENTS Mark C. Friedlander Schiff Hardin LLP 6600 Sears Tower Chicago, Illinois 60606 (312) 258-5546 Fax: (312) 258-5600 mfriedla@schiffhardin.com http://www.schiffhardin.com/design-build

More information

Wendy Landry, AIA, LEED AP Richard Rodriguez, LEED AP

Wendy Landry, AIA, LEED AP Richard Rodriguez, LEED AP Wendy Landry, AIA, LEED AP Richard Rodriguez, LEED AP Wendy Landry, Associate Principal, Green Building Services 112 Lake Ave., Orlando, FL 32801, 407-367-2901, wendyl@greenbuildingservices.com Richard

More information

The Owner s Role in Successful Design-Build Project Delivery

The Owner s Role in Successful Design-Build Project Delivery The Owner s Role in Successful Design-Build Project Delivery Northwest Construction Consumer Council Tulalip Resort Casino & Conference Center October 23, 2013 presented by: Barbara Wagner Design-Build

More information

Design-Build Trifecta A joint presentation of DBIA WESTERN PACIFIC REGION

Design-Build Trifecta A joint presentation of DBIA WESTERN PACIFIC REGION Design-Build Trifecta A joint presentation of DBIA WESTERN PACIFIC REGION and AIA LOS ANGELES September 16, 2014 Design-Build Trifecta MODERATOR: SPEAKERS: Robert J, Hartung, Hon AIA, DBIA President, Alternative

More information

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. LEVERAGING VIRTUAL DESIGN &

More information

Negotiation Strategies for *BREAKTHROUGH* TCO

Negotiation Strategies for *BREAKTHROUGH* TCO THE Godfather of Negotiation Planning ~ Intel Corp Omid Ghamami PURCHASING AND NEGOTIATIONS EXPERT Negotiation Strategies for *BREAKTHROUGH* TCO Omid Ghamami President & Chief Purchasing Officer, Purchasing

More information