Max. building height (m)

Size: px
Start display at page:

Download "Max. building height (m)"

Transcription

1 Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project 3. Project / Activity 8 (a) Building and Construction Project No. [8(a) or 8(b)] 4. Name of the Himalaya Falaknuma project 5. Name of Himalaya Developers Developer 6. Estimated Project 65 Cost (Rs. In Crores) 7. Whether No construction work has been initiated at site? If yes, details thereof 8. Project Details Land / Plot Area (m 2 ): 12, FSI area (m 2 ): 33, Non FSI area (m 2 ): - Permissible Proposed FSI Area (sqm) 34, , Ground Coverage (sqm) Common Plot Area (sqm) 1, , Max. building height (m) m Total BUA (m 2 ): 57, Building Details No. of Blocks: 7 Scope of buildings/blocks: 2 level Basement, GF to 13 floor No. & size of Commercial 146 number of offices No. & type of Units: Details of amenities if any: Water supply, Electricity supply, Telecommunication facilities, Lifts, staircases, Fire & Safety facilities, Parking spaces, Garden/plantation areas, etc. 10. No. of expected employees / users 11. Water & waste water details during construction phase 12. Water & waste water details during operation phase For commercial Blocks: about 450 Water requirement (cum/day): 24 Source of water: water tankers Waste water generation quantity (KL/day): 3.24 Mode of disposal: Septic tank and soak well pits Details of reuse of water, if any: - Fresh water requirement (cum/day): Source of water: Ahmedabad Municipal Corporation Waste water generation quantity (cum/day): Mode of disposal: Recycled and balance to Drainage facility of AMC In case of STP provision, capacity of STP: 295 cum/d 1

2 STP Technology: - SBR/MBR/conventional Purposes for treated water utilization: Flushing and gardening Quantity of treated water to be reused: cum/d 1.Gardening (KL/day): Flushing (KL/day): Provision of dual plumbing system (Yes/No): - yes Quantity and type (treated)of water to be discharged: cum/d Mode of disposal: balance sewage disposal to Drainage facility of AMC 13. Status of water supply and drainage line 14. Solid waste Management AMC- source of water supply Drainage line of AMC Construction Phase: Generation Quantity to be reused Top Soil (cum) Other excavated earth (cum) Construction debris (cum) Steel scrap (MT) Discarded packing materials Mode of Disposal / Reuse 82,800 9,590 Balance quantity of 73,210 cum to supply to other low-lying areas Re-filling and Re-surfacing Sale to vendor Operation Phase: Type of waste Dry waste Commercial Wet waste Commercial Generation Quantity (Kg/day) Mode of waste collection Through agency Through agency Mode of Disposal / Reuse Municipal Corporation approved agent for collection and disposal Manure Generation through installing Organic Convertor STP Sludge Biomedical waste Other (specify) Other (specify)

3 Details of segregation if to be done: Capacity and no. of community bins to be placed within premises: 38 bins of 80 L capacity Capacity and no. of bins to be placed within premises: 43 bins of 80 L capacity Landfill site where waste will be ultimately disposed by local authority: 15. Parking Details Total parking area requirement for the project as per GDCR: (m 2 ) Parking area requirement for residential units as per GDCR: (m 2 ) Parking area requirement for Commercial units as per GDCR: (m 2 ) Parking area requirement as per GDCR for (specify in case of any other): Total number of ECS requirement for the project as per NBC: 730 Number of CPS requirement for residential units as per NBC: 486 Number of CPS requirement for commercial units as per NBC: 244 Number of CPS requirement as per NBC for (specify in case of any other): - Total Parking area provided (m 2 ) & No. of ECS: Parking provided for residential block, No of ECS: Parking provided for commercial blocks, No. of ECS: Parking provided in basement No. of ECS: 683 Parking provided in hollow plinth No. of ECS: 20 Parking provided as open surface No. of ECS: Traffic Management 17. Details of Green Building measures proposed. 18. Energy Requirement, Source and Conservation Width of adjacent public roads: 18 m wide road on East side, and 12 m wide service road to Sarkhej Vasna road on South side Number of Entry & Exit provided on approach road/s: 1 Width of Entry & Exit provided on approach road/s: 9.07 m for entry & exit Minimum width of open path all around the buildings for easy access of fire tender (excluding the width for the plantation): minimum of 6.10 m on North side to 8.60 m on South side margin area. Width of all internal roads: 9.07 m (minimum) to 9.22 m road adjacent to high rise tower m wide approach road for bungalows Measures for traffic management: Enough width provided for and exit for traffic regulation. Internal road of 9.07 m minimum wide proposed. The width of approaching ramp to basement is 6.03 m wide with divider for regulating vehicles entering and existing from basement for four wheelers. Security staff will regulate the traffic movement. Traffic and Safety signage will be places at site to regulate traffic for safe movement and parking We are proposing to use the energy efficient construction materials like use of AAC blocks substituting conventional bricks Fly ash containing RMC for non-structural concrete work. Fly ash containing paver blocks. Power supply: Maximum demand: - Connected load: 3500 KVA Source: Torrent Power Ltd. 3

4 Energy saving by Non-Conventional Methods: - Energy saving measures: The energy conservation is planned at project stage by following steps, Energy efficiency lighting system is proposed like use of LED, CFL for common lighting. Energy Efficient Lift in each block Water meter will be installed at every block and also near underground water tank. Water control valves will be installed at every block. Water fixtures will be or efficient and low water consuming fixture (Smart flush) will be used. % of saving with calculations: - Compliance of the ECBC guidelines (Yes / No), if yes, compliance in tabular form:- DG Sets: 82.5 KVA and HSD used of 16 kg/hr 19. Fire and Life Safety Measures 20. Details on staircase Type & no. of buildings Commercial Building Block A to C High Rise building Block D to G High Rise building 16 nos. of Bungalows 21. Rain Water Harvesting (RWH) No. of floors During Construction Phase: Provision of Personal Protective Equipment s (PPEs) and its usage shall be ensured and supervised During Operation Phase: -Provision of Underground Fire Water Storage Tank: 1 tank with 1,00,000 L capacity per tank -Overhead Fire Water Tank: 30 KL -Fire Hydrant and Sprinkling system proposed for high rise building as per the GDR, linked with UG and OH Fire Water tanks m wide stair case proposed for easy access and rescue in high rise building blocks -Fire Extinguishers and fire hydrant system are proposed to each floor -Nearest Fire Station: Bodakdev Fire station -Distance from the fire station: 9.0 km -Time required for the fire tender to reach at the project site: 20 min Floor area No. of staircase Width of the staircase Travel distance (m) No. of lift GF, FF, SF in each block FF to 13 th Floor FF to 13 th Floor in each block in each block GF & FF NA Level of the Ground water table: >90 m No. & dimensions of RWH tank(s): 1 40KL No. and depth of percolations wells: 4 Details on Pre-treatment facilities: Filtration 22. Green area details Tree covered area (m 2 ): Area covered by shrubs and bushes (m 2 ): covered in lawn covered area Lawn covered area (m 2 ): m 2 4

5 Total Green Area (m 2 ): Green Area % of plot area: 10% No. of trees and species to be planted: 193 trees like like Limbdo, Asopalav, Desi Badam and Gulmohar 23. Budgetary allocation for Environmental Management Plan (Rs. in lacs) 24. Proposed dust control measures during the construction phase No. Head Approximate recurring cost per annum (Rs. in lacs) Approximate Capital cost (Rs. In lacs) Basis for cost estimates 1. Air DG set Stack (Acoustic enclosure), maintenance & monitoring 2. Solid and hazardous waste management 3. Providing STP 4. Environment monitoring Provide bins door to door and transportation cost Providing STP, treated sewage OH & UG Storage tanks The recurring cost would be incurred on hiring of consultants and payment of various statutory fees to regulatory agencies. 5. Rain water Collection system, treatment and recharge well 6. Green belt Tree Plantation Total in lacs Dust suppression techniques should be implemented, such as applying water or non-toxic chemicals to minimize dust. For working environment air quality, workers should be advised of potential dust well in advance. PPE, such as dusk masks, should be used where dust levels are excessive. All dust and any spilled from cement / fine sand should be picked up and provisions should be available to recycle any reclaimed dust back into the construction. To transport the materials from nearest places to avoid the 5

6 direct energy and associated vehicular emissions To cover the materials during transportation to avoid the fugitive emissions from transportation operation. To use telescopic chute to regulate falling of fine powder materials from height during unloading at site to mitigate the fugitive emissions. Vehicles used should be of well-maintained and properly serviced having PUC certificate To avoid transport movement for materials during night movement as part of mitigative movement for noise, dust, SOx and NOx emissions etc. 25. Eco friendly building material usage details. 26. Basic amenities to be provided to construction workers. 27. Documents related to land possession We are proposing to use the energy efficient construction materials like use of AAC block substituting conventional Brick Fly ash containing RMC for non-structural concrete work. Fly ash containing paver blocks. Proposed good sanitary facilities for the construction workers. The common sanitary facilities like, W.C., bath water supply, periodic health checkup camp etc will be facilitated at site. Please refer Annexure 1. 6

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

No construction activity started

No construction activity started Sr. Particulars Details No. 1. Proposal is for New Project 2. Type of Project Residential Flats and Shops 3. Project / Activity No. 8(a) [8(a) or 8(b)] 4. Name of the project Kaveri Soham Vistara 5. Name

More information

Indicative Checklist for construction projects of EC [Category 8(a)]:

Indicative Checklist for construction projects of EC [Category 8(a)]: Indicative Checklist for construction projects of EC [Category 8(a)]: Sr. Checklist point Remark Yes/No Pg. no./ annexure 1. Covering letter signed by the applicant Yes Form-1 Page 1 page 13 2. Completed

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

Municipal solid / hazardous waste

Municipal solid / hazardous waste (10) ENVIRONMENTAL MANAGEMENT PLAN The mitigation measures for reducing the adverse environmental impacts together constitute a part of EMP. The environmental issues, which need management, plan for the

More information

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land

More information

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure

More information

at various survey numbers of village Jansali, Dist: Surendranagar.

at various survey numbers of village Jansali, Dist: Surendranagar. Page 1 of 187 Minutes of the 318 th meeting of the State Level Expert Appraisal Committee held on 21/12/2016 at Committee Room, Gujarat Pollution Control Board, Gandhinagar. The 318 th meeting of the State

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

ANNEXURE - I AREA CALCULATION AND BREAK UP OF LAND USAGE

ANNEXURE - I AREA CALCULATION AND BREAK UP OF LAND USAGE ANNEXURE - I AREA CALCULATION AND BREAK UP OF LAND USAGE Page 1 ANNEXURE - I AREA CALCULATION AND BREAK UP OF LAND USAGE SCOPE OF BUILDING: Residential LAND ACQUIRED: 10688.00 Sqm Survey No.: 88/p-22,

More information

Consolidated Statement on various Environmental Aspects for Construction Project

Consolidated Statement on various Environmental Aspects for Construction Project Consolidated Statement on various Environmental Aspects for Construction Project S.N. Particular 1 Name of Project Development of IKEA Store in Navi Mumbai, India 2 Name, contact number & address of proponent

More information

PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR

PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PROPOSED CONSTRUCTION BUILDING PROJECT OF NILA INFRASTRUCTURES LTD (25988.59 m 2 Built up Area)

More information

SEIAA-AGENDA

SEIAA-AGENDA 112th SEIAA Meeting Agenda SEIAA Meeting number: 112 Meeting Date July 27, Discussion Item: 01 Open Exhibition Centre and Parkland at Sector 5&8, PCNTDA, Pune : The Development Plan of Pimpri- Chinchwad

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (66460.23 SQ. M) BY GUJARAT HOUSING BOARD AFFORDABLE RESIDENTIAL BUILDING & COMMERCIAL PROJECT PACKAGE 23, PLOT NO. 61/1, 63/1 & 64, TARSAMIYA,

More information

GENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005.

GENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005. GENERAL CONDITIONS 1. The Project Proponent shall comply with all the conditions stipulated in the building approval letter. 2. The applicant (Project proponent) will take necessary measures for preventions,

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE ADDITIONAL ATTACHMENTS TO FORM-1 FOR OBTAINING ENVIRONMENT CLEARANCE For Proposed Commercial Complex Surat Diamond Bourse M/S. SDB DIAMOND BOURSE Block No. 177/P, Moje- Khajod, Taluka- Surat City, District

More information

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps

More information

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006.

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Thus, EIA is not applicable for proposed project. We have derived project

More information

TATA STEEL LIMITED. Environment Compliance Report (Oct 2017 to Mar 2018)

TATA STEEL LIMITED. Environment Compliance Report (Oct 2017 to Mar 2018) TATA STEEL LIMITED Construction of Residential Complex For Tata Steel Plant located at Kalinganagar Industrial Complex, at Environment Compliance Report (Oct 2017 to Mar 2018) Environment Department Tata

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

Environment Compliance Report (Apr 2017 to Sep 2017)

Environment Compliance Report (Apr 2017 to Sep 2017) TATA STEEL LIMITED Construction of Residential Complex For Tata Steel Plant located at Kalinganagar Industrial Complex, at Environment Compliance Report (Apr 2017 to Sep 2017) Environment Department Tata

More information

Approval of Terms of Reference (TOR) For Development of Smart City Project, Ranchi, Jharkhand. M/s Ranchi Smart City Corporation Limited.

Approval of Terms of Reference (TOR) For Development of Smart City Project, Ranchi, Jharkhand. M/s Ranchi Smart City Corporation Limited. 1. INTRODUCTION The proposed Development of Smart City Project is at Ranchi, Jharkhand. The developer of the project is M/s Ranchi Smart City The Land use of the project site is as per master plan of the

More information

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai. To, Maharashtra Maritime Board at Ferry Wharf (Bhaucha Dhakka), Nerul and Mandwa Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:April 10, 2017 Subject: Sir,

More information

Promoter: Navkar Prime Developers Private Limited ENVIRONMENTAL MANAGEMENT PLAN & CER

Promoter: Navkar Prime Developers Private Limited ENVIRONMENTAL MANAGEMENT PLAN & CER ENVIRONMENTAL MANAGEMENT PLAN & CER 52 ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN 1.1 INTRODUCTION: The Environmental impact can be defined as any alteration of environmental conditions, adverse or beneficial,

More information

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers

More information

ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION 1.2 EMP DURING CONSTRUCTION PHASE

ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION 1.2 EMP DURING CONSTRUCTION PHASE ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

RAJASTHAN REFINERY TOWNSHIP PROJECT, RAJASTHAN

RAJASTHAN REFINERY TOWNSHIP PROJECT, RAJASTHAN Page 1 of 10 PRE-FEASIBILITY REPORT FOR Page 2 of 10 Contents 1.0 Introduction... 3 2.0 Approach... 3 3.0 Environmental Sustainability Measures... 4 3.1 Environmental Measures... 4 3.2 Social measures...

More information

CRZ Clearance for Proposed construction of Ghodbundar Jetty, Thane by MMB

CRZ Clearance for Proposed construction of Ghodbundar Jetty, Thane by MMB Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:August 9, 2017 To, Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai

More information

SIX MONTHLY COMPLIANCE REPORT DECEMBER- 2016

SIX MONTHLY COMPLIANCE REPORT DECEMBER- 2016 SIX MONTHLY COMPLIANCE REPORT DECEMBER- 2016 GROUP HOUSING COMPLEX MAHAGUN MANTRA - II AT GH-01, Sector-10, Greater Noida, U.P. Being developed by. The Corenthum Tower-B, Office no. B-44, Plot no.-a-41,

More information

The emphasis on the EMP development is on the following;

The emphasis on the EMP development is on the following; ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL

More information

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report.

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report. The proposal under consideration, Regularization of Existing Resort at Sidheshwarwadi, Village Ubhadanda, Taluka Vengurla, Dist. Sindhudurg is located in CRZ III area having total plot area of 4000 m 2,

More information

CRZ Clearance for Proposed Construction of RO RO Jetties at Narangi-Kharawadashri, Tal. & Dist. palghar by MMB

CRZ Clearance for Proposed Construction of RO RO Jetties at Narangi-Kharawadashri, Tal. & Dist. palghar by MMB Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:August 2, 2017 To, Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai

More information

CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT M/s. DAR Housing Ltd. Proposed Group Housing Project ATS Rhapsody, At Plot No. GH-12/1, Sector-01, Greater Noida (U.P.), having Plot

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017 COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER - 2016 TO MARCH-2017 F.No. SEIAA 281/2014/EC/110 SUBMITTED BY- M/S. TERON CONSTRUCTION PVT. LTD MAA PADMA COMMERCIAL COMPLEX, H/N-

More information

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: -

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Conceptual plan Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Area of plot= 5293SQM, Sanctioned FAR = 10586SQM as per earlier sanctioned.(2) Sanctioned Built up Area=19480.63

More information

Application of Low and Non Waste Technology in the production process;

Application of Low and Non Waste Technology in the production process; 9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management

More information

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath Pre-Feasibility Report for Educational Institute Allen Career Institute-Supath at Plot No. 1, Educational Scheme, Naya Nohra & Hanuwantkhera, Kota, Rajasthan-324001 By M/s. Allen Career Institute Registered

More information

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) [Vide Paragraph - 6 of Notification dated 14 th September 2006, only for construction projects listed under item 8 of the Schedule] (1) LAND ENVIRONMENT (Attach panoramic view of the project site and the

More information

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the

More information

The emphasis on the EMP development is on the following;

The emphasis on the EMP development is on the following; ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

EXECUTIVE SUMMARY SLUM AREA REDEVELOPMENT

EXECUTIVE SUMMARY SLUM AREA REDEVELOPMENT EXECUTIVE SUMMARY SLUM AREA REDEVELOPMENT AT C.T.S. NO. 8 (PT) OF VILLAGE PARIGHAKHADI, TAL ANDHERI & C.T.S. NO. 577 (PT), 578, 579, 580 & 581 (PT) OF VILLAGE KURLA, NEAR KURLA COURT, L.B.S. MARG, KURLA

More information

DRAFT DEVELOPMENT CONTROL REGULATION 2034

DRAFT DEVELOPMENT CONTROL REGULATION 2034 DRAFT DEVELOPMENT CONTROL REGULATION 2034 Presentation by - Shri. Sunil R. De DCR - PART 8 a Design for Physically Challenged People Application (Reg. 27.1) These provision shall apply to common areas

More information

The emphasis on the EMP development is on the following;

The emphasis on the EMP development is on the following; ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In earlier project planning the total plot area

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the construction and

More information

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc. Project name:- Project Code :- Registration Category :- General Comments :- Drawings Feedback:- 1st feedback No Dwg Name Dwg Description Recommendation 1 Site survey plan Site plan showing following in

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT Office Complex at Plot No. 5A & 5B, Shopping Mall, Vasant Kunj Phase - II, New Delhi Developed by M/s Oil and Natural Gas Corporation Limited BRIEF DESCRIPTION OF THE PROJECT

More information

JASWITHA CONSTRUCTIONS (Residential complex)

JASWITHA CONSTRUCTIONS (Residential complex) ENVIRONMENTAL MANAGEMENT PLAN () Sy. No. # 133, Kokapet Village, Gandipet Mandal, Rangareddy District, Telangana Prepared by Flat no: 7-3, Dhruvatara Apartments, Amrutha Estates, Somajiguda, Hyderabad

More information

sqm. 123 kld (Landscaping - 31 kld, Dual Flushing 73 kld Car Washing - 19 kld) Quantity Of Wastewater Discharge

sqm. 123 kld (Landscaping - 31 kld, Dual Flushing 73 kld Car Washing - 19 kld) Quantity Of Wastewater Discharge DETAILS OF PROJECT The project proponent wants to develop a Residential Building with all modern amenities Premises No. 116, Roy Bahadur Road (previously known as 352, Roy Bahadur Road), Kolkata - 700053

More information

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. FOR THE PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF KETONIC RESINS Category: 5(f) OF RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. Located at: Plot No. C-1/46, 100 SHED AREA, GIDC, Vapi,

More information

Expansion of Calcutta Riverside (An Integrated Township)

Expansion of Calcutta Riverside (An Integrated Township) CONCEPTUAL PLAN Expansion of Calcutta Riverside (An Integrated Township) Project of Riverbank Developers Private Limited at Maheshtala, Batanagar, West Bengal. Project Proponent: Riverbank Developers Private

More information

Larsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN

Larsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN ` Larsen & Turbo Limited The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plans for which the

More information

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

M/S. HETERO INFRASTRUCTURE SEZ LIMITED ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH

More information

Details of Project. Underground source

Details of Project. Underground source Details of Project The project proponent wants to develop a Residential complex with all modern amenities at R.S./L.R. Dag No - (442,447,453,454, 443,444), J.LNo-29 Of Khamar Mouja & R.S./L.R. Dag No-(99(P),101,102(P),103,105,106,107,108,109,110,111,112,113(P),114(P),115,125,126,

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra.

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Pre- feasibility Report For Shiv Kailasha At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Proposed By M/S Om Shivam Buildcon Private

More information

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016 CONECPTUAL PLAN w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire at of J.V.P.D scheme of Vile Parle (W), by December, 2016 GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan Of Dr. Mittal Laboratories Pvt. Ltd. Plot No. C-10/2, SARA Industrial Estate Ltd., Village Rampur, Dehradun - Chakrata Road, Selaqui, Dehradun, Uttrakhand For Manufacturing

More information

Environmental Management Plan during Construction Phase

Environmental Management Plan during Construction Phase Management Plan during Phase Sr 1 Ambient Air Quity Negative inside site premises outside site 2 ise Negative near noise generation sources inside premises on ambient noise levels in the Surrounding area

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED

FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED Ford Motor Private Limited- Conceptual Plan 1 Contents 1 INTRODUCTION 3 1.1 BACKGROUND 3 1.2 PROJECT LOCATION 3 1.3 PROJECT FEATURES

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

Total Built Up Area. Quantum Of Water Required Quantity Of Wastewater Generation 332kld

Total Built Up Area. Quantum Of Water Required Quantity Of Wastewater Generation 332kld DETAILS OF PROJECT The project proponent, P N Memorial Neurocentre & Research Institute Limited, is developing a Hospital Building at Premises No.-720, Anandapur, Ward. Kolkata- 700 107, KMC, Ward No.

More information

Amrut Manthan + Shree Mahalaxmi & Primus Residences by M/s Gurukrupa Developers ENVIRONMENTAL MANAGEMENT PLAN Introduction M/s Gurukrupa Developers pr

Amrut Manthan + Shree Mahalaxmi & Primus Residences by M/s Gurukrupa Developers ENVIRONMENTAL MANAGEMENT PLAN Introduction M/s Gurukrupa Developers pr ENVIRONMENTAL MANAGEMENT PLAN Introduction M/s Gurukrupa Developers proposes a Slum Rehabilitation project Amrut Manthan + Shree Mahalaxmi & Primus Residences located at C.T.S. No. 4091, 4091/1 to 37,

More information

Pre-Feasibility Report

Pre-Feasibility Report PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project

More information

Amendment required in the existing EC

Amendment required in the existing EC Amendment required in the existing EC Change/Addition in Phase I; 250 KLPD Grain based Distillery with 20 MW Co-gen Power Plant / Molasses 160 KLPD based distillery with 12 MW Co-gen Power Plant in Environmental

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

SEIAA Meeting 111 ( Day 1) SEIAA Meeting number: Meeting Number 111 Meeting Date May 11, 2017 Subject: Environment Clearance for Proposed Residential & Commercial Project â??ambika estateâ?? At survey

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

GUIDELINES ON ENERGY CONSERVATION IN SEZs

GUIDELINES ON ENERGY CONSERVATION IN SEZs 1 GUIDELINES ON ENERGY CONSERVATION IN SEZs SEZs are special enclaves aimed at creating world class infrastructure. The guidelines and certification for SEZs is to be implemented as follows: Entire SEZ

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan 1. OBJECTIVE The objective of Environmental Management Plan (EMP) is to formulate which will: Mitigate adverse impacts on various environmental components, which have been

More information

SIA/PB/NCP/53462/2016)

SIA/PB/NCP/53462/2016) Item No.148.08: Application for environmental clearance under EIA notification dated 14.09.2006 for the development of group housing project namely SSL Highway Towers at Chandigarh-AmbalaHighway, Dera

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN of SECRETARIAT STAFF HOUSING PROJECT AMARAVATI, ANDHRA PRADESH PICTORIAL VIEW OF THE SECRETARIAT STAFF HOUSING PROJECT SEPTEMBER 2017 PROJECT PROPONENT Andhra Pradesh Capital

More information

CONCEPTUAL PLAN FOR INTEGRATED TOWNSHIP MIXED USE DEVELOPMENT AT SURYA NAGAR GWALIOR OF. Gwalior

CONCEPTUAL PLAN FOR INTEGRATED TOWNSHIP MIXED USE DEVELOPMENT AT SURYA NAGAR GWALIOR OF. Gwalior PLAN FOR INTEGRATED TOWNSHIP MIXED USE DEVELOPMENT AT SURYA NAGAR GWALIOR OF Gwalior AT Village Baretha & Laxangarh, Tehsil & District Gwalior (M.P.) Proponent Mr. P.K. Hedau Executive Engineer MPH&IDB,

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

PHOENIX MULTIPLEX PVT. LTD.

PHOENIX MULTIPLEX PVT. LTD. ENVIRONMENTAL MANAGEMENT PLAN (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur, Andhra Pradesh Prepared by Flat no: 7-3, Dhruvatara Apartments,

More information

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s. FORM I [Vide M.o.E.F & C.C tification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE At. 100/1, 100/2, 100/3, 100/4, 100/5, 100/6B, 101/1, 101/2, 101/3, 101/4, 101/5B,

More information

Expansion of Info Technology Park at Manapakkam Village, Kancheepuram District Chennai, Tamil Nadu

Expansion of Info Technology Park at Manapakkam Village, Kancheepuram District Chennai, Tamil Nadu FORM 1A CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental

More information

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Commercial Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

Environmental Management Plan

Environmental Management Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Pakistan Tax Administration Reform Project Environmental Management Plan April 2010 Federal

More information

FORM-1 A CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM-1 A CHECK LIST OF ENVIRONMENTAL IMPACTS San Envirotech Pvt. Ltd. FORM-1 A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT 1.1. Will the existing land-use get significantly altered from the project that is not consistent with the surroundings?

More information

APPENDIX II (See paragraph 6)

APPENDIX II (See paragraph 6) APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information

More information

PROPOSED EXPANSION OF RESIDENTIAL COMPLEX MANI TRIBHUVAN (FORMERLY KNOWN AS MANI TIRUMALA )

PROPOSED EXPANSION OF RESIDENTIAL COMPLEX MANI TRIBHUVAN (FORMERLY KNOWN AS MANI TIRUMALA ) for PROPOSED EXPANSION OF RESIDENTIAL COMPLEX MANI TRIBHUVAN (FORMERLY KNOWN AS MANI TIRUMALA ) at Plot Nos.13, 15, 21 To 31, 33, 36, 37, 38, 28/2573, 40 To 49, 58, 59 & 125 (Part), Mouza: Kalarahanga,

More information

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.

More information

COMPLIANCE STATUS REPORT

COMPLIANCE STATUS REPORT COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status

More information

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

For TOR New Projects. Mo. no. : Contact no. and  ID of the Applicant SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries

More information

TABLE-1 PROJECT AT A GLANCE. Location S. F. Nos. 442/1, 442/3, 442/5, 443/1, 443/2, 443/3, 443/4, 443/5, 434/7, 434/8, 434/9 of Kolappalur Village

TABLE-1 PROJECT AT A GLANCE. Location S. F. Nos. 442/1, 442/3, 442/5, 443/1, 443/2, 443/3, 443/4, 443/5, 434/7, 434/8, 434/9 of Kolappalur Village TABLE-1 PROJECT AT A GLANCE Registered Address M/s. Pallavada Technical Textiles Park Private Limited, No. 78, Greams Road, Thousand Lights, Chennai-600006. Communication Address of M/s. Pallavada Technical

More information