PROFESSIONAL SERVICES REQUEST FOR PROPOSALS Moffat Collection System Siphon 1 River Crossing

Size: px
Start display at page:

Download "PROFESSIONAL SERVICES REQUEST FOR PROPOSALS Moffat Collection System Siphon 1 River Crossing"

Transcription

1 Project Description PROFESSIONAL SERVICES REQUEST FOR PROPOSALS Moffat Collection System Siphon 1 River Crossing The Siphon 1 River Crossing project consists of replacing an existing aerial pipe crossing of the Fraser River due to age and condition concerns. The pipe consists of approximately 380 ft. of 72-inch diameter steel pipe which is primarily exposed on supports with anchor blocks, expansion joints, and appurtenant facilities. Background and History Siphon 1 is located at the base of the Winter Park ski area in Grand County, Colorado. The facility was originally constructed in the mid 1930 s. The siphon conveys raw water from the Vasquez Canal to the Moffat Tunnel and represents a key artery of the Moffat Collection system. The aerial pipe crosses over the Fraser River. Project Objectives The following specific project objectives have been identified: Replace the existing pipe. Prepare design drawings and specifications in accordance with Denver Water Engineering standards, Capital Projects Construction Standards (CPCS), Design Drafting Standards and Engineering Specification and Formatting Guidelines. Adhere to Denver Water Capital Project Procedures Manual (CPPM) criteria, procedures and protocols. Consultant Scope of Services Consultant shall prepare drawings and specifications for review and approval by Denver Water. The consultant shall adhere to the Denver Water Capital Project Procedure Manual (CPPM). Drawings and specifications shall be developed in accordance with the Denver Water Capital Project Construction Standards (CPCS). Drafting of the drawings shall be done in accordance with the Denver Water Design Drafting Standards. Contract documents and specification shall be developed in accordance with Denver Water Engineering Specification and Formatting Guidelines. All documents will be finalized and approved by Denver Water. The Consultant Scope of Services shall be for design phase only. Denver Water anticipates handling all bidding and construction phase engineering support activities using in-house resources. Any additional Consultant services needed for bidding or construction phases of the project will be added via a contract amendment at a later time. Consultant Qualifications At a minimum, the Consultant team shall include the following experienced team members: 1) Civil pipeline engineer 2) Structural engineer 3) Geotechnical engineer 4) Drainage/Floodplain engineer Project team members shall have demonstrated experience that is similar in nature to that required for the project. All team members shall be Professional Engineers registered in the State of Colorado. Consultant Proposal shall include a project team organizational chart.

2 Page 2 of 23 For proposed project teams consisting of multiple consulting firms, the proposal shall clearly indicate which firm is to serve as the prime consultant and who will serve in the project manager role. All project team members included in the proposal shall have a direct and active role in executing the project. Owner Responsibility The Owner will provide to the Consultant available relevant information to aid in the design process. This includes but is not limited to: Previous studies including site geotechnical information. Project objectives. Provide detailed quality control review of design drawings and specifications through all phases of the project within agreed upon schedules. Provide surveys including design surveys and as-built elevations. Provide as-built detailed drawings of existing facilities. Finalize design documents and provide final approval for issuance of Final for Bid contract documents. Provide all bidding and construction phase engineering services.

3 Page 3 of 23 Project Assumptions The following assumptions were made in the development of this Scope of Work: The Design Phase will proceed to 30% where major decisions and design criteria will be set. The 30% level will be a major design gate for the project and will meet the requirements of the Owner s CPPM at a minimum. The Owner will provide payment for any required permit or review fees from outside entities. Public relations efforts will be completed by the Owner. The project execution shall follow the Owner s CPPM located online: Drawings shall be provided in electronic media on Windows compatible Hi-Speed USB Flash Drives and in quality hardcopy media. AutoCAD Drawings shall be in accordance with the Owner s Design Drafting Standards and shall include, but not be limited to, the Standards located online in the Owner s CPPM. AutoCAD drawings shall be prepared using AutoCAD Civil3D Attend a meeting with the Owner s Drafting and Administration groups to discuss the Owner s Standards. Project specifications shall be submitted in the latest CSI format and adhere to the Owner s Engineering Specification and Formatting Guidelines. Construction Contract General Conditions, Contract Agreement, Bid Forms, etc., will be provided by the Owner via the Capital Projects Construction Standards (CPCS) located online: The Owner will submit the project to the U.S. Army Corp of Engineers for a Nationwide permit. The Owner will compile documents for bid packages and other submittals. The Owner will provide all necessary bidding and construction phase engineering services using in-house resources. Project Schedule The Owner may elect to follow the proposals with a formal questionnaire and/or interview to assist with the proposal evaluation. Final selection of a Consultant will be based upon scoring of the proposals by the selection committee using the criteria detailed on page 20. The selection committee will utilize information provided in the written proposal, interview as well as formal questionnaire in determining proposal scoring. The anticipated Project Schedule is summarized as follows: December 7, 2017 Request for Proposals Issued to Consultant advertised through December 14, 2017 Mandatory Pre-Proposal Meeting January 17, 2018 Final Written Questions Due January 24, 2018 Proposals Due January 31, 2018 Consultant Interviews February 2, 2018 Consultant Selection Finalized April 3, 2018 Issue Preliminary Work Plan April 19, 2018 Pre-Design Work Shop April 26, 2018 Issue Final Work Plan May 24, % Project Completion July 17, % Project Completion Sept. 12, % Project Completion Oct. 17, 2018 Final for Bid Project Completion November 2019 Construction Complete Proposals shall include a detailed schedule with any deviations from the aforementioned schedule clearly identified.

4 Page 4 of 23 Any requests for clarification or additional information regarding the submission of this RFP shall be submitted in writing via jon.fischer@denverwater.org. The Pre-Proposal Meeting will be held at Denver West, Building 3, Second Floor, Conference Room 5 located at 1526 Cole Boulevard Golden, Colorado on Thursday, December 14, 2017 at 2:00 PM. Written requests for interpretation, clarification, and/or additional information must be received via no later than 5:00 pm, local time, Wednesday, January 17, 2018.

5 Page 5 of 23 Scope of Services Phase 1 Project Management and Administration Project Management and Administration includes the following activities: General Project Management Project Management Plan development Project Controls and Reporting Project Workshops Project Meetings Task 1.1: General Project Management Time for this task is allocated to the Consultant Project Manager to oversee and administer the project. The following deliverables will be provided as part of Task 1.1: Cost loaded schedule/work breakdown structure time allocation. Task 1.2: Project Management Plan The Project Management Plan will document the key project information required by the Consultant Project Team members to assist them in executing the project to meet the required objectives: on-time, on-budget, quality, and meeting the Owner s critical success factors. The key elements of the Project Management Plan are described as follows: The Project Charter will establish the project s goals, objectives, and critical success factors. Consultant Project Team members, roles, and responsibilities. This will also include the staffing plan (e.g., management, engineering, QA/QC). Scope of Services with work breakdown structure. Baseline Planned Value (PV) schedule to be used for Earned Value (EV) reporting. Project schedule in GANTT chart format. Schedule updates will be provided in monthly progress reports, if changes have been made and agreed upon by the Owner. The project schedule shall be developed in the most current version of Microsoft Project; it shall include meetings, workshops, and key deliverables. Dates for Owner-supplied information will also be provided. Project budgets. Communications plan. Risk management plan. QA/QC plan. Project documentation plan and file structure. Change management process. Conflict resolution plan. The following deliverables will be provided as part of Task 1.2: Project Management Plan (which includes the QA/QC plan). Progress reports.

6 Page 6 of 23 Task 1.3: Project Controls and Reporting Monthly invoices shall be prepared and submitted to the Owner in an approved format. Invoices shall be broken down by task, Prime Consultant, and Sub consultants and include the following: Total contract amount. Detailed charges for the current invoice period. Total charges to date. Earned value analysis and graph. Previous billings. Outstanding balance. Current amount remaining. Total amount due. The Consultant shall be responsible for the management of the Consultant and the Sub consultant Project Team s overall project controls, actively coordinating with the Owner s Design Project Manager to manage the following: Project costs. Project schedule. Document control. Monthly project status reports shall be prepared and submitted to the Owner, along with the monthly invoices. The reports shall include the following: A summary of services completed since the previous report. The current project schedule and budget status. Project issues and potential change logs. Milestones and/or deliverables scheduled in the coming month. This task also includes periodic project review by the Consultant s management to ensure the project meets the Owner s critical success factors, is on schedule, and is within budget. The following deliverables shall be provided as part of Task 1.3: Monthly invoices. Monthly project status reports. Earned value charts. Task 1.4: Project Meetings Project meetings include the key Project Team stakeholders and, as needed for the current topic, project stakeholders. This task shall not include meetings with outside entities which are specifically indicated in subsequent sections. Discuss ongoing issues and conflict resolution. CAD Standards meeting. Administrative staff meeting regarding Owner s Engineering Specification and Formatting Guidelines. Owner and Consultant Management review meetings. Monthly Owner and Consultant Team meetings through the duration of the project design phase shall be included in the Consultant proposal. Project meetings are considered separate activities to the Project Workshops indicated in subsequent sections.

7 Page 7 of 23 The following deliverables shall be provided as part of Task 1.4: Prepared agendas for each meeting. An ongoing log of decisions and conflict resolutions. Meeting minutes.

8 Page 8 of 23 Phase 2 Pre-Design Phase Task 2.1: Site Drainage/Floodplain Evaluation Evaluate project requirements to determine site drainage requirements as well as Fraser River Floodplain impacts and potential permitting requirements. Analyze site drainage issues. Coordinate with the Town of Winter Park and the Winter Park Ski area on drainage issues as required. The Fraser River has a designated FEMA floodplain. Evaluate project requirements to determine floodplain permitting requirements and impacts from both the permanent facility as well as temporary construction phase issues. Evaluate the existing valve house floor drains as well as the Moffat Tunnel drain lines and provide recommendations for pipe replacement/reconfiguration, pipe routing and outfall locations. At a minimum, the existing drain pipe is to be replaced. The following deliverables shall be provided as part of Task 2.1: Prepare technical memorandum summarizing findings for this task including recommendations. Present recommendations at Pre-Design workshop (Task 2.7). Incorporate Owner selected recommendations into the Project Work Plan (Task 2.8). Task 2.2: Slope Stability Evaluation Using previously gathered geotechnical information, evaluate the west and east slopes of the Fraser River drainage way for slope stability issues. Consultant shall indicate in their proposal if they anticipate any additional geotechnical field exploration being required and, if so, include appropriate cost. Consultant shall propose a methodology for evaluating this issue in their proposal. Coordinate with the Winter Park Ski Area as well as the Union Pacific Railroad on slope stability issues. Assume two meetings will be required for the pre-design phase related to this issue. The following deliverables shall be provided as part of Task 2.2: Prepare technical memorandum summarizing findings for this task including recommendations. Present recommendations at Pre-Design workshop (Task 2.7). Incorporate Owner selected recommendations into the Project Work Plan (Task 2.8). Meeting minutes from outside entity coordination meetings. Task 2.3: Winter Park Drive Impacts Evaluate project impacts to Winter Park Drive (which is owned and maintained by the Town of Winter Park) including the following: Coordinate with the Town of Winter Park and the Winter Park Ski Area as required. Assume two meetings will be required for the pre-design phase related to this issue. Provide recommendation for any permanent changes to the Winter Park Drive corridor (retaining walls, drainage system modifications, guard rail, etc.). Identify requirements for any temporary impacts to the road that should be planned for during construction and coordinated in advance with the Town of Winter Park. This may include full road closure, one direction road traffic limitations and limitation on construction work hours.

9 Page 9 of 23 The following deliverables shall be provided as part of Task 2.3: Prepare technical memorandum summarizing findings for this task including recommendations. Present findings at Pre-Design workshop (Task 2.7). Incorporate Owner selected recommendations into the Project Work Plan (Task 2.8). Meeting minutes from meetings with the Town of Winter Park. Task 2.4: Union Pacific Railroad Coordination Coordinate with the Union Pacific Railroad (UPRR) as required. Potential UPRR issues that may need to be considered in the project include: 1) Vibration monitoring of railroad facilities. 2) Railroad flagger requirements. 3) Railroad crane spotter requirements. 4) Shared slope stabilization issues. 5) Valve house drain/tunnel drain outfall issues. Assume that two meetings with the UPRR will be required for the pre-design phase related to this issue. The following deliverables shall be provided as part of Task 2.4: Prepare technical memorandum summarizing findings for this task including recommendations. Present findings at Pre-Design workshop (Task 2.7). Incorporate Owner selected recommendations into the Project Work Plan (Task 2.8). Task 2.5: Conceptual Level Cost Estimate Prepare conceptual level cost estimate for recommended Project Scope. Alternatives that require an Owner decision shall be presented with the corresponding cost range. The cost estimate shall be itemized in detail so that the Owner can make cost implication decisions related to the Project Scope. The following deliverables shall be provided as part of Task 2.5: Conceptual level cost estimate. Task 2.6: Anticipated Construction Schedule and Sequencing Identify the anticipated construction schedule and sequencing including outage requirements for the siphon, road closures and related outside entity coordination issues. The following deliverables shall be provided as part of Task 2.6: Construction schedule and sequencing. Task 2.7: Pre-Design Workshop Organize and present a pre-design workshop. A 2.5 hour workshop is anticipated. At a minimum, the Workshop shall cover the following topics:

10 Page 10 of 23 Present recommendations and potential alternatives from site drainage/floodplain evaluation (Task 2.1). Present recommendations and potential alternatives from slope stability evaluation (Task 2.2). Present recommendations and potential alternatives from Winter Park Drive impacts Evaluation (Task 2.3). Present recommendations and potential alternatives related to UPRR coordination issues (Task 2.4). Present conceptual level cost estimate including alternatives and cost range implications (Task 2.5). Present anticipated construction schedule and sequencing (Task 2.6). The following deliverables shall be provided as part of Task 2.7: Workshop meeting agenda and supporting presentation material. Workshop meeting minutes. Task 2.8: Work Plan Prepare project Work Plan in preliminary and final versions in accordance with CPPM. Prepare Preliminary Project Work Plan. Prepare comment resolution response to all comments received on the Preliminary Project Work Plan. Prepare Final Project Work Plan. Owners Design Project Manager will obtain original signature approval on the Final Project Work Plan from Denver Water project stakeholders. The following deliverables shall be provided as part of Task 2.9: Preliminary Project Work Plan. Completed comment response resolution form for all comments received on the Preliminary Project Work Plan. Final Project Work Plan.

11 Page 11 of 23 Phase 3 30% Design 30% Design shall adhere to requirements in the Denver Water CPPM. Denver Water anticipates that the replacement facility will be similar in nature to the existing facility. Owner will provide as-built drawings of the existing facility (not available in AutoCAD format) to the Consultant. Task 3.1: Drawing Preparation Prepare 30% Design Drawings per the following: Drawings shall be prepared in accordance with Denver Water Design Drafting Standards. Drawings shall utilize CPCS standard details. Drawings shall be developed in AutoCAD Civil3D Meet with the Denver Water design drafting supervisor in advance of the 30% design submittal to review Denver Water Design Drafting standards. The following deliverables shall be provided as part of Task 3.1: 30% Design Drawings in electronic PDF format as well as electronic AutoCAD files. Task 3.2: Technical Specifications Prepare list of technical specifications applicable to the project per the following: Identify CPCS specification sections that are applicable to the project. Prepare project specific Division 1 specifications. Identify new project specific technical specifications not covered by CPCS specifications. Note that any new project specific technical specification must be pre-approved by the Director of Engineering. Submit a written request to the Design Project Manager prior to preparing any non-cpcs specifications. The following deliverables shall be provided as part of Task 3.2: List of applicable CPCS specification sections. List of proposed project specific specifications. 30% level draft of project specific Division 1 specifications. Task 3.3: 30% Cost Estimate and Schedule Update Update project cost estimate to incorporate the 30% design documents: Update the project cost estimate to incorporate the 30% design documents. Update the project construction schedule to incorporate the 30% design documents. The following deliverables shall be provided as part of Task 3.3: 30% design cost estimate. 30% design project schedule. Task 3.4: 30% Outside Entity Coordination Coordinate 30% design issues with outside entities as required: Coordinate with the Union Pacific Railroad. Coordinate with the Winter Park Ski Area. Town of Winter Park.

12 Page 12 of 23 Assume that a total of three coordination meetings with outside entities will be required during the 30% design stage. Note that certain meetings may include multiple entities. The following deliverables shall be provided as part of Task 3.4: Meetings and site visits with outside entities as required with meeting minutes. Task 3.5: 30% Design Workshop Organize and present a 30% design workshop. A 2.5 hour workshop is anticipated. At a minimum, the Workshop shall cover the following topics: Present project scope based on the 30% design. It is critical that all major design decisions be made at the 30% design level. Consultant shall identify any outstanding design issues that require Owner input and shall present these issues at the workshop. Present 30% design cost estimate and schedule. Provide update to key coordination issues with outside entities. The following deliverables shall be provided as part of Task 3.5: Workshop meeting agenda and supporting presentation material. Workshop meeting minutes. Task 3.6: 30% Design for Additional Scope Items Include in proposal an hour estimate and corresponding budget for 30% level drawing and specification preparation for the following additional scope items that Denver Water may decide to include in the project scope. Consultant shall not proceed with work on this task without specific authorization from Denver Water. Slope stabilization system for both the east and west slopes of the Fraser River drainage. The slope stabilization on the west side could extend to the north approximately 100 ft. to the railroad culvert. 30% Design Drawings in electronic PDF format as well as electronic AutoCAD files. Additional technical specification items as required for the additional scope items in accordance with requirements of task 3.2.

13 Page 13 of 23 Phase 4 60% Design 60% Design shall adhere to requirements in the Denver Water CPPM. Provide written comment resolution response to all comments received on the 30% design submittal a minimum of 2 weeks prior to submitting the 60% design package. Task 4.1: Drawing Preparation Prepare 60% Design Drawings per the following: Drawings shall be prepared in accordance with Denver Water Design Drafting Standards. Drawings shall utilize CPCS standard details. Drawings shall be developed in AutoCAD Civil3D The following deliverables shall be provided as part of Task 4.1: 60% Design drawings in electronic PDF format as well as electronic AutoCAD files. Written comment resolution response to all comments received on 30% design documents. Task 4.2: Technical Specifications Prepare 60% level technical specifications applicable to the project per for the following: Modify CPCS specification sections per the Supplemental Technical Specification (STS) process as required. Revise project specific Division 1 specifications to the 60% level. Prepare project specific technical specifications to the 60% level. At the 60% design level, all technical specifications shall be included in the design package. Documents shall be prepared in accordance with Denver Water Engineering Specification and Formatting Guidelines. The Denver Water Design Project Manager will prepare the front end documents needed for the design package. The following deliverables shall be provided as part of Task 4.2: 60% specification package in electronic Word format. Task 4.3: 60% Cost Estimate and Schedule Update Update project cost estimate to incorporate the 60% design documents: Update the project cost estimate to incorporate the 60% design documents. Update the project construction schedule to incorporate the 60% design documents. The following deliverables shall be provided as part of Task 4.3: 60% design cost estimate. 60% design project schedule. Task 4.4: 60% Outside Entity Coordination Coordinate 60% design issues with outside entities as required: Coordinate with the Union Pacific Railroad. Coordinate with the Winter Park Ski Area.

14 Page 14 of 23 Coordinate with the Town of Winter Park. Assume that a total of two coordination meetings with outside entities will be required during the 60% design stage. Note that certain meetings may include multiple entities. The following deliverables shall be provided as part of Task 4.4: Meetings and site visits with outside entities as required with meeting minutes. Task 4.5: 60% Design Workshop Organize and present a 60% design workshop. A 2-hour workshop is anticipated. At a minimum, the Workshop shall cover the following topics: Present project scope based on the 60% design. It is anticipated that the project scope is largely unchanged from the 30% design and that the discussion issues are primarily refinement of design concepts. Present 60% design cost estimate and schedule. Provide update to key coordination issues with outside entities. The following deliverables shall be provided as part of Task 4.5: Workshop meeting agenda and supporting presentation material. Workshop meeting minutes. Task 4.6: 60% Design for Additional Scope Items Include in proposal an hour estimate and corresponding budget for 60% level drawing and specification preparation for the following additional scope items that Denver Water may decide to include in the project scope. The budget for these items shall be further subdivided by each specific item. Consultant shall not proceed with work on this task without specific authorization from Denver Water. Slope stabilization system for both the east and west slopes of the Fraser River drainage. The slope stabilization on the west side could extend to the north approximately 100 ft. to the railroad culvert. 60% Design Drawings in electronic PDF format as well as electronic AutoCAD files. Additional technical specification items to the 60% level as required for the additional scope items in accordance with requirements of task 4.2.

15 Page 15 of 23 Phase 5 90% Design 90% Design shall adhere to requirements in the Denver Water CPPM. Provide written comment resolution response to all comments received on the 60% design submittal a minimum 2 weeks prior to submitting the 90% design package. Task 5.1: Drawing Preparation Prepare 90% Design Drawings per the following: Drawings shall be prepared in accordance with Denver Water Design Drafting Standards. Drawings shall utilize CPCS standard details. Drawings shall be developed in AutoCAD Civil3D Prepare color QC drawings in accordance with the CPPM. The following deliverables shall be provided as part of Task 5.1: 90% Design Drawings in electronic PDF format as well as electronic AutoCAD files. Color QC drawings. Comment resolution response to all comments received on the 60% design submittal. Task 5.2: Technical Specifications Prepare 90% level technical specifications applicable to the project per the following: Revise STS to the 90% design level. Revise project specific Division 1 specifications to the 90% level. Prepare project specific technical specifications to the 90% level. The Denver Water Design Project Manager will prepare the front end documents needed for the design package. The following deliverables shall be provided as part of Task 5.2: 90% specification package in electronic Word format. Task 5.3: 90% Cost Estimate and Schedule Update Update project cost estimate to incorporate the 90% design documents. The 90% cost estimate shall be prepared by a professional construction cost estimator and include a detailed cost breakdown of labor, material, overhead, profit and related items. Consultant shall indicate in their proposal if this service will be provided using in-house resources or by an outside construction contractor included in their project team. A resume for the lead estimator responsible for this task shall be included in the proposal. Update the 90% project cost estimate to incorporate the 90% design documents. Update the project construction schedule to incorporate the 90% design documents. The following deliverables shall be provided as part of Task 5.3: 90% design cost estimate. 90% design project schedule.

16 Page 16 of 23 Task 5.4: 90% Outside Entity Coordination Coordinate 90% design issues with outside entities as required: Coordinate with the Union Pacific Railroad. Coordinate with the Winter Park Ski Area. Coordinate with the Town of Winter Park Assume that a total of two coordination meetings with outside entities will be required during the 90% design stage. Note that certain meetings may include multiple entities. The following deliverables shall be provided as part of Task 5.4: Meetings and site visits with outside entities as required with meeting minutes. Task 5.5: Work Plan 90% Re-Endorsement Revise the Final Project Work Plan for 90% re-endorsement. 90% design level project scope, schedule and cost estimate shall be incorporated into the document. Owners Design Project Manager will obtain original signature approval on the Final Project Work Plan from Denver Water project stakeholders. The following deliverables shall be provided as part of Task 2.9: Preliminary Project Work Plan. Completed comment response resolution form for all comments received on the Preliminary Project Work Plan. Final Project Work Plan. Task 5.6: 90% Outside Entity Coordination Coordinate 90% design issues with outside entities as required: Coordinate with the Union Pacific Railroad. Coordinate with the Winter Park Ski Area. Coordinate with the Town of Winter Park Assume that a total of two coordination meetings with outside entities will be required during the 90% design stage. Note that certain meetings may include multiple entities. The following deliverables shall be provided as part of Task 5.4: Meetings and site visits with outside entities as required with meeting minutes. Task 5.6: 90% Design for Additional Scope Items Include in proposal a labor hour estimate and corresponding budget for 90% level drawing and specification preparation for the following additional scope items that Denver Water may decide to include in the project scope. The budget for these items shall be further subdivided by each specific item. Consultant shall not proceed with work on this task without specific authorization from Denver Water. Slope stabilization system for both the east and west slopes of the Fraser River drainage. The slope stabilization on the west side could extend to the north approximately 100 ft. to the railroad culvert.

17 Page 17 of 23 90% Design Drawings in electronic PDF format as well as electronic AutoCAD files. Additional technical specification items to the 90% level as required for the additional scope items in accordance with requirements of task 5.2.

18 Page 18 of 23 Phase 6 Final for Bid Final for Bid shall adhere to requirements in the Denver Water CPPM. Provide written comment resolution response to all comments received on the 90% design submittal a minimum of 2 weeks prior to submitting the 90% design package. Additional scope items indicated in previous sections shall be subdivided in the work breakdown structure. Task 6.1: Drawing Preparation Final for Bid Drawings per the following: Drawings shall be prepared in accordance with Denver Water Design Drafting Standards. Drawings shall utilize CPCS standard details. Drawings shall be developed in AutoCAD Civil3D The following deliverables shall be provided as part of Task 6.1: Final for Bid Drawings in electronic PDF format as well as electronic AutoCAD files. Task 6.2: Technical Specifications Prepare Final for Bid technical specifications applicable to the project per the following: Revise STS to the Final for Bid design level. Revise project specific Division 1 specifications to the Final for Bid level. Prepare project specific technical specifications to the Final for Bid level. The Denver Water Design Project Manager will prepare the front end documents needed for the design package. The following deliverables shall be provided as part of Task 6.2: Final for Bid specification package in electronic Word format.

19 Page 19 of 23 Proposal Requirements The proposal shall outline the Consultant s Scope of Services, which shall include, at a minimum, the criteria set forth within this RFP and the Consultant s approach to administer and complete the project. A detailed project approach assists the Owner in understanding the Consultant s comprehension of the project and the opportunities and constraints that a project of this complexity may contain. At a minimum, the Proposal shall include the following: A cover letter. The project approach, including any unique solutions and clearly identifying assumptions. Tailored 2 page resumes, including projects similar in nature and complexity to the Siphon 1 River Crossing Project, shall be provided for key personnel shown within the project organization chart. Key personnel proposed for the project shall remain available for the entirety of the project. A change of project personnel will only be permitted in certain circumstances and may be subject to a monetary penalty. A manpower labor estimate (work breakdown structure) by labor type/hours for the following major project phases and tasks provided under Scope of Services. Include the corresponding hourly rates (an 11-inch by 17-inch format for the work breakdown structure is acceptable). o o o o o Phase 1: Project Management and Administration Task 1.1: General Project Management Task 1.2: Project Management Plan Task 1.3: Project Controls and Reporting Task 1.4: Project Meetings Phase 2: Pre-Design Phase Task 2.1: Site Drainage/Floodplain Evaluation Task 2.2: Slope Stability Evaluation Task 2.3: Winter Park Drive Impacts Task 2.4: Union Pacific Railroad Coordination Task 2.5: Conceptual Level Cost Estimate Task 2.6: Anticipated Construction Schedule and Sequencing Task 2.7: Pre-Design Workshop Task 2.8: Work Plan Phase 3: 30% Design Task 3.1: Drawing Preparation Task 3.2: Technical Specifications Task 3.3: 30% Cost Estimate and Schedule Update Task 3.4: 30% Outside Entity Coordination Task 3.5: 30% Design Workshop Task 3.6: 30% Design for Additional Scope Items Phase 4: 60% Design Task 4.1: Drawing Preparation Task 4.2: Technical Specifications Task 4.3: 60% Cost Estimate and Schedule Update Task 4.4: 60% Outside Entity Coordination Task 4.5: 60% Design Workshop Task 4.6: 60% Design for Additional Scope Items Phase 5: 90% Design Task 5.1: Drawing Preparation Task 5.2: Technical Specifications Task 5.3: 90% Cost Estimate and Schedule Update Task 5.4: 90% Outside Entity Coordination Task 5.5: Work Plan 90% Re-Endorsement Task 5.6: 90% Design for Additional Scope Items

20 Page 20 of 23 o Phase 6: Final for Bid Task 6.1: Drawing Production Task 6.2: Technical Specifications A detailed schedule with any deviations from the schedule included herein clearly identified and tied to the project approach. A written statement regarding the Consultant s eligibility to perform the work without a conflict of interest. A written statement regarding the Consultant s willingness to enter into a contract based on the draft Proposal Agreement in Appendix A. Any requested changes to the contract language shall be stated in this written statement at the time of the proposal. The proposal length shall not exceed 25 pages excluding resumes. Excessively long proposals are discouraged and may result in a lower score. Consultants are encouraged to only provide information in the proposal that is directly relevant to the project. A MWBE goal of 5% has been set for this Work. More information on the Owner s MWBE Program can be found online:

21 Page 21 of 23 Selection Criteria The Owner will review the Proposals and make a selection based on best value while considering the following criteria: Criteria Standard Weighting Factor Team Qualifications Proposed Approach, Project Plan, and Schedule Do the assigned personnel have the skills and experience to provide a detailed and complete study? Do the personnel have firsthand experience in this type of work? Does the firm(s) have the appropriate support capabilities to meet the demands of the project? (Maximum Score of 10) Does the proposal show an understanding of the project objectives and the results desired from the project? (Maximum Score of 10) Cost and Work Hours MWBE Participation Do the work hours presented accurately reflect the level of effort required to complete the project? How do unit labor and overhead costs compare to other firms? (Maximum Score of 10) Proposal will receive the maximum score if stated MWBE goal of 5% is achieved. Proposers are encouraged to achieve MWBE participation in exceedance of the 5% goal, but this will not result in a higher score. MWBE participation less than 5% will be scored on a pro-rated basis, a 3% participation will therefor receive a score of 6. (Maximum Score of 10) The scale of the criteria is from 1 to 10; 1 is a poor rating, 5 is an average rating, and 10 is an outstanding rating. Criteria will be multiplied by the associated weight to give a weighted criteria score. The weighted criteria scores will be summed for a cumulative score. The maximum possible cumulative score is 100. Proposal Submittal Selection of a Consultant will be based on the selection criteria previously described. The Proposal shall address each component of the selection criteria. Costs associated with Proposal preparation, pre-proposal meeting attendance, interview attendance, etc. shall be borne entirely by the proposing Consultant. Proposal information will become the property of the Owner. Proprietary Or Confidential Information: o Proposers acknowledge that Denver Water may be required to disclose any or all of the documents submitted with a Proposal, pursuant to the Colorado Open Records Act, C.R.S , et seq. Under C.R.S (3)(a)(IV), Denver Water may deny inspection of any confidential commercial or financial information furnished to Denver Water by an outside party. Therefore, a Proposer must clearly designate any documents submitted with its Proposal that the Proposer deems proprietary or confidential, to aid Denver Water in determining what must be disclosed in response to a request for documents under the Colorado Open Records Act. o The Proposer s designation of material to be redacted must be reasonable or it will not be honored. For example, a Proposer may not designate the entire Proposal to be confidential and proprietary.

22 Page 22 of 23 It is recommended that firms access and become familiar with a copy of the most recent version of the Owner s CPCS and CPPM at no cost to the Owner. Consultants shall be responsible for meeting the requirements of DW s CPPM. Four hardcopies and one electronic copy (a pdf on a flash drive) of the Consultant s Proposal shall be submitted by 5 pm, local time, on Wednesday January 24, 2017 to Jon Fischer, Design Project Manager, Denver Water, 1600 West 12th Avenue, Denver, Colorado Please contact Jon Fischer, Design Project Manager at or jon.fischer@denverwater.org with questions regarding this request. In addition, submit one hardcopy of the Consultant s Proposal with intellectual or proprietary property redacted.

23 Page 23 of 23 Attachment A Consultant Agreement Attachment B Geotechnical Investigation

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS February 5, 2019

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS February 5, 2019 EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 25-19 February 5, 2019 TO: RE: Invited Firms Request for Submittals to El Paso Water - Public Service Board (EPWater) Statement of Work Professional

More information

EXHIBIT A SCOPE OF SERVICES FOR. FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES

EXHIBIT A SCOPE OF SERVICES FOR. FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES 1 PURPOSE... 3 2 PROJECT DESCRIPTION... 5 3 PROJECT COMMON AND PROJECT GENERAL TASKS... 6 4 ROADWAY

More information

Request for Proposals. 42nd Avenue Pump Station Rehabilitation. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403

Request for Proposals. 42nd Avenue Pump Station Rehabilitation. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 42nd Avenue Pump Station Rehabilitation Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 May 24, 2015 The City of San Mateo (City) is accepting proposals to select a qualified

More information

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017 EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 21-17 June 27, 2017 TO: RE: Invited Firms Request for Submittals to El Paso Water - Public Service Board (EPWater) Statement of Work Professional

More information

Engineering Request for Proposals BJWSA Project CIP #1894 Raw Water Canal Improvements Engineering Contract

Engineering Request for Proposals BJWSA Project CIP #1894 Raw Water Canal Improvements Engineering Contract Engineering Request for Proposals BJWSA Project CIP #1894 Raw Water Canal Improvements Engineering Contract Introduction The Beaufort Jasper Water & Sewer Authority (BJWSA) seeks an Engineering Contract

More information

RECITALS TERMS AND CONDITIONS. The scope of work is contained in Exhibit A, attached hereto and incorporated herein.

RECITALS TERMS AND CONDITIONS. The scope of work is contained in Exhibit A, attached hereto and incorporated herein. FIFTH AMENDMENT TO MASTER CONTRACT FOR PROFESSIONAL SERVICES FOR WASTEWATER TREATMENT PLANT ENGINEERING FINAL DESIGN SERVICES FOR THE DURHAM ADVANCED WASTEWATER TREATMENT FACILITY PRIMARY TREATMENT AND

More information

REQUEST FOR PROPOSAL TOWN OF MIDDLESEX, NEW YORK WATER SYSTEM IMPROVEMENTS PROJECT

REQUEST FOR PROPOSAL TOWN OF MIDDLESEX, NEW YORK WATER SYSTEM IMPROVEMENTS PROJECT REQUEST FOR PROPOSAL TOWN OF MIDDLESEX, NEW YORK WATER SYSTEM IMPROVEMENTS PROJECT PROJECT DESCRIPTION SUMMARY The Town of Middlesex ( the Town ) has been awarded a CDBG.730PW50-14 grant to renovate and

More information

EXHIBIT 2-2-C SCHEDULES

EXHIBIT 2-2-C SCHEDULES EXHIBIT 2-2-C SCHEDULES PART 1 GENERAL 1.01 SUMMARY A. The Work specified in this section consists of furnishing transportation, labor, materials, equipment, and incidentals necessary for preparation,

More information

Appendix A - Technical Specifications Engineering Services for the Ponte Vedra Blvd 6 CI WM Replacement Project

Appendix A - Technical Specifications Engineering Services for the Ponte Vedra Blvd 6 CI WM Replacement Project Appendix A - Technical Specifications Description of Scope of Services GENERAL Consultant agrees to provide Engineering Services for the above project as outlined herein. SCOPE OF SERVICES The Scope of

More information

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS RFQ Term: 1/1/2016 1/1/2020 Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS Denver Water (DW), in an effort to improve the administration and efficiency, has initiated

More information

City of Palo Alto (ID # 4369) City Council Staff Report

City of Palo Alto (ID # 4369) City Council Staff Report City of Palo Alto (ID # 4369) City Council Staff Report Report Type: Consent Calendar Meeting Date: 1/13/2014 Summary Title: Seismic Upgrade Project Amendment #1 w/ URS Title: Approval of Amendment Number

More information

REQUEST FOR QUALIFICATIONS ARCHITECTURAL

REQUEST FOR QUALIFICATIONS ARCHITECTURAL REQUEST FOR QUALIFICATIONS ARCHITECTURAL and ENGINEERING CONSULTING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS SQ # 10565 MIDDLESEX COUNTY COLLEGE 2600 WOODBRIDGE AVENUE EDISON, NEW JERSEY 08818

More information

I-74 Final Design Request For Proposal

I-74 Final Design Request For Proposal Dear Consultants: Introduction I-74 Final Design Request For Proposal Iowa Department of Transportation (In cooperation with Illinois Department of Transportation) October 5, 2007 The Iowa Department of

More information

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services Appendix D University of Maine System Supplementary Requirements to AIA Document B201-2007 Standard Form of Architect s Services This document provides the Architect s scope of services only and must be

More information

Appendix A - Technical Specifications Engineering Services For the RiverTown Water Treatment Plant Project

Appendix A - Technical Specifications Engineering Services For the RiverTown Water Treatment Plant Project 1. GENEAL JEA is implementing the ivertown Water Treatment (WTP) Project to design and construct a new water treatment plant and production wells in the ivertown area of St. Johns County to provide potable

More information

APPENDIX A TECHNICAL SPECIFICATIONS. Engineering Services for the East Grid - Pump Station Upgrade Program DESCRIPTION OF SCOPE OF SERVICES

APPENDIX A TECHNICAL SPECIFICATIONS. Engineering Services for the East Grid - Pump Station Upgrade Program DESCRIPTION OF SCOPE OF SERVICES 159-18 APPENDIX A TECHNICAL SPECIFICATIONS Engineering Services for the East Grid - Pump Station Upgrade Program DESCRIPTION OF SCOPE OF SERVICES GENERAL CONSULTANT agrees to provide Engineering Services

More information

Request for Proposals. Hillsdale Pedestrian/Bicyclist Bridge Design

Request for Proposals. Hillsdale Pedestrian/Bicyclist Bridge Design Request for Proposals Hillsdale Pedestrian/Bicyclist Bridge Design Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 JUNE 13, 2013 The City of San Mateo (CITY) is accepting

More information

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320 REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE 2015 2016 ROOF AND HVAC REPLACEMENT PROJECT PW1320 Issued by: City of Stockton Public Works Department 22 E. Weber Avenue, Room 301 Stockton, CA 95202

More information

REQUEST FOR PROPOSALS FOR. Site Civil Services for the Iowa River Landing Arena CITY OF CORALVILLE IOWA

REQUEST FOR PROPOSALS FOR. Site Civil Services for the Iowa River Landing Arena CITY OF CORALVILLE IOWA REQUEST FOR PROPOSALS FOR Site Civil Services for the Iowa River Landing Arena CITY OF CORALVILLE IOWA City of Coralville Iowa Coralville, IA Page 1 of 6 Please review and provide response to this letter

More information

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR February 5, 2018 SUMMARY OF CM/GC SELECTION PROCESS FOR DIMMIT II APARTMENT BUILDING The Town of Winter Park requests proposals from qualified Construction Manager / General Contractor (CM/GC) firms for

More information

Engineering Department

Engineering Department Engineering Department Q18-08 REQUEST FOR PROPOSALS Engineering Planning & Design Services Bittersweet Drive, Green Valley Place, and Edward Court Water Main Replacement Projects RFP Issuance Date: August

More information

APPENDIX A TECHNICAL SPECIFICATIONS Engineering Services for the Twin Creeks RW Storage Tank and Booster Pump Station

APPENDIX A TECHNICAL SPECIFICATIONS Engineering Services for the Twin Creeks RW Storage Tank and Booster Pump Station APPENDIX A TECHNICAL SPECIFICATIONS 069-18 Engineering Services for the Twin Creeks RW Storage Tank and Booster Pump Station DESCRIPTION OF SCOPE OF SERVICES GENERAL The Twin Creeks project include the

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

Subject: Statement of Qualifications for Public Safety Building Design

Subject: Statement of Qualifications for Public Safety Building Design March 5, 2010 Subject: Statement of Qualifications for Public Safety Building Design The City of Porterville seeks Statements of Qualification (SOQ) from qualified architectural and engineering firms for

More information

REQUEST FOR PROPOSALS TO PROVIDE PLANNING, RECOMMENDATIONS, AND CONTRACT DOCUMENTS FOR PIPELINE INSPECTION AND CONDITION ASSESSMENT FOR THE

REQUEST FOR PROPOSALS TO PROVIDE PLANNING, RECOMMENDATIONS, AND CONTRACT DOCUMENTS FOR PIPELINE INSPECTION AND CONDITION ASSESSMENT FOR THE REQUEST FOR PROPOSALS TO PROVIDE PLANNING, RECOMMENDATIONS, AND CONTRACT DOCUMENTS FOR PIPELINE INSPECTION AND FOR THE 24-INCH UNIT B AND 27-INCH UNIT K RANCHO SUMMIT DRIVE PIPELINES 12-INCH ENCINITAS

More information

RFP 3512R09 Strategic Consultant Services for the Office of Policy and Public Private Partnerships Addendum 3 Appendix H Questions & Answers

RFP 3512R09 Strategic Consultant Services for the Office of Policy and Public Private Partnerships Addendum 3 Appendix H Questions & Answers 1. Question Is pre-registration required for the pre-proposal conference on May 3? Answer Pre-registration is not required. Please refer to Section I-8 of the RFP for further information. 2. Question Please

More information

Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals:

Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals: Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals: The King County Flood District (District) is seeking proposals from firms to prepare a programmatic

More information

REQUEST FOR PROPOSAL PROFESSIONAL SERVICES FOR ENGINEERING, ENVIRONMENTAL, PERMITTING, RIGHT-OF-WAY PLANNING, AND RELATED SERVICES FOR

REQUEST FOR PROPOSAL PROFESSIONAL SERVICES FOR ENGINEERING, ENVIRONMENTAL, PERMITTING, RIGHT-OF-WAY PLANNING, AND RELATED SERVICES FOR REQUEST FOR PROPOSAL PROFESSIONAL SERVICES FOR ENGINEERING, ENVIRONMENTAL, PERMITTING, RIGHT-OF-WAY PLANNING, AND RELATED SERVICES FOR SEVEN COUNTY INFRASTRUCTURE COALITION UINTA BASIN RAILWAY PROJECT

More information

REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN MARCH 30, 2018

REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN MARCH 30, 2018 REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN MARCH 30, 2018 1 REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN The Kentuckiana Regional Planning and Development Agency (KIPDA), the designated Metropolitan

More information

City of Santaquin REQUEST FOR PROPOSALS For Engineering Services for the East Side Booster Pump Station

City of Santaquin REQUEST FOR PROPOSALS For Engineering Services for the East Side Booster Pump Station City of Santaquin REQUEST FOR PROPOSALS For Engineering Services for the East Side Booster Pump Station The City of Santaquin (the City ) hereby requests competitive proposals from qualified consultants

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS DESIGN / ENGINEERING TEAM RIVERFRONT TOWN CENTER Town of Shallotte 106 Cheers Street, PO Box 2287 Shallotte, North Carolina 28459 Deadline for Submittal: February 9, 2018 at

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

Request for Proposals For Wastewater Treatment Plant Expansion and other Plant Improvements

Request for Proposals For Wastewater Treatment Plant Expansion and other Plant Improvements For Wastewater Treatment Plant Expansion and other Plant Improvements By the City of Tracy April 31, 2017 Response Due: Wednesday, May 31, 2017 @ 3:00 PM City of Tracy Development Services Attention: Ripon

More information

Massachusetts Clean Energy Center Request for Proposals (RFP): Moon Island Engineering Design Consultant

Massachusetts Clean Energy Center Request for Proposals (RFP): Moon Island Engineering Design Consultant Massachusetts Clean Energy Center Request for Proposals (RFP): Moon Island Engineering Design Consultant RFP FY2017-BFD-01 Release Date: May 8 th, 2017 Applications Due: June 23 rd, 2017 1. PROGRAM SUMMARY

More information

REQUEST FOR PROPOSALS (RFP)

REQUEST FOR PROPOSALS (RFP) REQUEST FOR PROPOSALS (RFP) Date: December 8, 2016 To: Open Invitation to Professional Design/Engineering Consultants From: Department of Parks, Recreation & Waterfront, Planning Division Re: Professional

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS 2015 FINAL COVER SYSTEM: DESIGN; BIDDING; AND CONSTRUCTION; PHASE ENGINEERING SERVICES Chester County Solid Waste Authority Table of Contents 1 Public Notice 2 2 Introduction 2 3

More information

APPENDIX D CONSTRUCTION PHASE CRITERIA

APPENDIX D CONSTRUCTION PHASE CRITERIA A. GENERAL REQUIREMENTS CONSTRUCTION PHASE CRITERIA For the Construction Phase of the Project, the Architect/Engineer (A/E) is responsible for providing project administration for the Owner in accordance

More information

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES QUALIFICATION SUBMITTAL DATE: Monday, February 18, 2019 RFQ Number 2019-01 City of McLendon-Chisholm 1371 W. FM 550 McLendon-Chisolm, Texas 75032 972-524-2077

More information

SECTION 10 UTILITIES

SECTION 10 UTILITIES SECTION 10 UTILITIES Virtually every highway construction project in the State of New Jersey impacts utility facilities. The Designer shall examine and seek alternatives to minimize or eliminate the impact

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS FOR COMPENSATION STUDY Proposals Due: November 3, 2016, 4:00 PM 1.0 OBJECTIVE SECTION 1 SUBMITTAL PROCEDURES & DEADLINE The City of Signal Hill is seeking proposals from qualified

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE DIVISION 1 GENERAL REQUIREMENTS SECTION 01 32 16 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. All drawings and technical specifications, Notice to Bidders, Instructions and Information to Bidders, Bid Proposal

More information

EXHIBIT 6 Preconstruction Work

EXHIBIT 6 Preconstruction Work EXHIBIT 6 Preconstruction Work The following tasks shall be accomplished by the CM/GC as part of its obligations during the preconstruction phase. The work is to be coordinated with the services requirements

More information

1.0 ABOUT THE NU GUIDELINES

1.0 ABOUT THE NU GUIDELINES Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner

More information

Request For Proposal Of Printing and Design Services. Marketing Department

Request For Proposal Of Printing and Design Services. Marketing Department Request For Proposal Of Printing and Design Services Marketing Department Released on June 3, 2016 Mosaic Youth Theatre of Detroit Printing and Design Services REQUEST FOR PROPOSAL (RFP) BACKGROUND Mosaic

More information

2018 Sanitary Sewer Overflow and Reduction Program (SSORP) Engineering Design Services Small Diameter

2018 Sanitary Sewer Overflow and Reduction Program (SSORP) Engineering Design Services Small Diameter 2018 Sanitary Sewer Overflow and Reduction Program (SSORP) Engineering Design Services Small Diameter Antonio Leyva, P.E. Engineering Manager Marisol V. Robles Manager SMWVB Program Stella Manzello Contract

More information

The Caltrans Contract Manager will assign specific projects to the Consultant through the issuance of Task Orders.

The Caltrans Contract Manager will assign specific projects to the Consultant through the issuance of Task Orders. Scope of Work/Deliverables Environmental Services for Project Specific High Desert Corridor Area of Los Angeles and San Bernardino Counties (District 7 & 8) Attachment 1 Page 1 of 11 A. Project Description

More information

Department of Public Works Division of Engineering. Nassau County, New York

Department of Public Works Division of Engineering. Nassau County, New York TOWN OF OYSTER BAY Department of Public Works Division of Engineering Nassau County, New York REQUEST FOR PROPOSALS FOR CONSULTANT SERVICES SOLICITATION NO. 2017-12 NOTES: 1. ISSUANCE DATE: Thursday, October

More information

ADMINISTRATIVE DIRECTIVE #CS-04

ADMINISTRATIVE DIRECTIVE #CS-04 HILLSBOROUGH COUNTY Office of the County Administrator ADMINISTRATIVE DIRECTIVE #CS-04 SUBJECT: EFFECTIVE DATE: UTILITY COORDINATION PROCEDURES FOR HILLSBOROUGH COUNTY CONSTRUCTION PROJECTS WITHIN COUNTY

More information

Request for Proposals

Request for Proposals Request for Proposals Comprehensive Parks, Trails, & Recreation Master Plan Services Section 1 Proposal Guidelines PURPOSE This RFP is soliciting proposals for a Professional Planning Consultant Service

More information

REQUEST FOR PROPOSAL SQ # ENGINEERING / ARCHITECTURAL CONSULTING SERVICES HVAC UPGRADES CENTER BUILDINGS I, II, III & IV, L HOMMEDIEU HALL,

REQUEST FOR PROPOSAL SQ # ENGINEERING / ARCHITECTURAL CONSULTING SERVICES HVAC UPGRADES CENTER BUILDINGS I, II, III & IV, L HOMMEDIEU HALL, REQUEST FOR PROPOSAL SQ # 10175 ENGINEERING / ARCHITECTURAL CONSULTING SERVICES HVAC UPGRADES CENTER BUILDINGS I, II, III & IV, L HOMMEDIEU HALL, NORTH HALL PERFORMING ARTS CENTER MIDDLESEX COUNTY COLLEGE

More information

EXHIBIT A SCOPE OF SERVICES CONSULTANT SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING FINANCIAL PROJECT ID:

EXHIBIT A SCOPE OF SERVICES CONSULTANT SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING FINANCIAL PROJECT ID: EXHIBIT A SCOPE OF SERVICES CONSULTANT SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING FINANCIAL PROJECT ID: 22089863202 EXHIBIT A SCOPE OF SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING I. GENERAL REQUIREMENTS...

More information

Olympic and Paralympic Games Tokyo. Overlay Work (1) Ariake Arena, and Ariake Tennis Park. Tender Briefing

Olympic and Paralympic Games Tokyo. Overlay Work (1) Ariake Arena, and Ariake Tennis Park. Tender Briefing B-Ⅰ Olympic and Paralympic Games Tokyo Overlay Work (1) Ariake Arena, and Ariake Tennis Park Tender Briefing April 2018 The Tokyo Organising Committee of the Olympic and Paralympic Games Contents 1. Provisions

More information

Stevens County Request for Proposal. Employee Classification and Compensation Study

Stevens County Request for Proposal. Employee Classification and Compensation Study Stevens County Request for Proposal Employee Classification and Compensation Study Due: April 17, 2014 I. Purpose Stevens County is currently soliciting proposals from qualified consulting firms for an

More information

Allegheny County Sanitary Authority (ALCOSAN)

Allegheny County Sanitary Authority (ALCOSAN) Allegheny County Sanitary Authority (ALCOSAN) REQUEST FOR QUALIFICATIONS for PROFESSIONAL SERVICES WET WEATHER PLANT EXPANSION CONSTRUCTION MANAGEMENT CAPITAL PROJECT NO. S 430 January 2018 1.0 INTRODUCTION

More information

For immediate questions, please contact Dr. Florine P. Raitano, Coalition Director and Project Manager for this project.

For immediate questions, please contact Dr. Florine P. Raitano, Coalition Director and Project Manager for this project. October 17, 2007 Dear : The I-70 Coalition is pleased to announce the release of the long awaited Request for Proposal for the I-70 Corridor Transit Planning Project. Attached you will find a copy of the

More information

Exhibit A Mn/DOT Contract No

Exhibit A Mn/DOT Contract No Exhibit A Mn/DOT Contract No. 98142 SCOPE OF WORK AND DELIVERABLES Preliminary Design Red Wing US 63 Bridge and Approach Roadways State Project (SP) 2515-21 SCOPE OVERVIEW... 2 SCHEDULE... 2 PROJECT TASK

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS ALTERNATIVE COVER DEMONSTRATION: DESIGN; BIDDING; AND CONSTRUCTION; PHASE ENGINEERING SERVICES Chester County Solid Waste Authority Table of Contents 1 Public Notice 2 2 Introduction

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER

More information

REQUEST FOR PROPOSAL (RFP)

REQUEST FOR PROPOSAL (RFP) REQUEST FOR PROPOSAL (RFP) Brigham Young University Civil & Environmental Engineering Temple Steeple Design for the Church of Jesus Christ of Latter-day Saints Statement of Purpose This project will involve

More information

Request for Proposal Energy Efficiency (Conservation) Potential Assessment and Modeling Software Tool

Request for Proposal Energy Efficiency (Conservation) Potential Assessment and Modeling Software Tool Energy Efficiency (Conservation) Potential Assessment and Modeling Software Tool Issued: April 27, 2018 Responses Due: June 8, 2018 Contact: Lori Blattner, Manager Energy Efficiency & Regulatory Process

More information

Fair Oaks Water District

Fair Oaks Water District Fair Oaks Water District Request for Proposal To develop a set of construction drawings, construction specifications and bid documents for a Skyway Well in Fair Oaks. (FOWD Job #C19WTSTSTHD) Prepared by:

More information

REQUEST FOR PROPOSAL Town of Lochbuie Water System Master Plan

REQUEST FOR PROPOSAL Town of Lochbuie Water System Master Plan REQUEST FOR PROPOSAL Town of Lochbuie Water System Master Plan Request for Proposal No: 2016-30 Date of Issue: June 17, 2016 Proposal DEADLINE Submission Date and Time: July 12, 2016 at 2:00 p.m. MST Town

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS DEPARTMENT SUITE 209S - LOGAN OFFICE CENTER ONE HARBORSIDE DRIVE EAST BOSTON, MASSACHUSETTS 02128-2909 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT

More information

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement Township of Severn REQUEST FOR PROPOSAL Architectural & Professional Services Fire Station Replacement Deadline for proposal submission is June 15, 2017 at 2:00 p.m. Contact Person: Tim Cranney Director

More information

WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES

WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES 1. Introduction WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES The Town of West Yellowstone (Town) is seeking a qualified

More information

Coastside County Water District Board of Directors. SRT Proposal for Design of the Hazen s Tank Replacement Project

Coastside County Water District Board of Directors. SRT Proposal for Design of the Hazen s Tank Replacement Project STAFF REPORT To: From: Coastside County Water District Board of Directors David Dickson, General Manager Agenda: June 10, 2014 Report Date: June 5, 2014 Subject: SRT Proposal for Design of the Hazen s

More information

Request for Proposal: City of Claremont Parking Garage Evaluation & Maintenance Program

Request for Proposal: City of Claremont Parking Garage Evaluation & Maintenance Program Request for Proposal: City of Claremont Parking Garage Evaluation & Maintenance Program October 2015 Page 1 of 10 Table of Contents 1.0 General Information 2.0 Evaluation & Maintenance Program Overview

More information

CONSTRUCTION MANAGEMENT SERVICES

CONSTRUCTION MANAGEMENT SERVICES DrAFTDRAFTdd EXHIBIT 1 CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS () SELECTION PROCESS School District of Lee County, Florida TABLE OF CONTENTS 1. INTRODUCTION 1 Lobbying 2 2. REQUEST

More information

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Request for Qualifications Construction Manager at Risk (CMAR) INSTRUCTIONS

More information

Trans Canada Hwy. No.1 Donald Bridges and Approaches

Trans Canada Hwy. No.1 Donald Bridges and Approaches Ministry of Transportation and Infrastructure REQUEST FOR EXPRESSION OF INTEREST Project Number 21754 Trans Canada Hwy. No.1 Donald Bridges and Approaches Conceptual and Detailed Bridge Design & Functional

More information

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility RFP Components CLIENT: TradePort International Corporation, Operators of John C. Munro

More information

BID PHASE GUIDELINES

BID PHASE GUIDELINES Chapter 7 BID PHASE GUIDELINES A. INTRODUCTION 1. The Bid Phase starts once the project has been accepted by the OGS D&C Office of Project Control (OPC) and passed on to the OGS D&C Office of Contract

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS Floodplain Restoration and Wetland Creation 12/12/18 This Request for Qualifications (RFQ) is made available to interested consulting firms for professional design and implementation

More information

REQUEST FOR PROPOSAL FOR. CONSTRUCTION MANAGER and DESIGN TEAM FOR. Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH

REQUEST FOR PROPOSAL FOR. CONSTRUCTION MANAGER and DESIGN TEAM FOR. Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER and DESIGN TEAM FOR Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH December 2010 I. GENERAL The Urban Redevelopment Authority of

More information

Chapter HEALTH & WELLNESS CENTER TASK FORCE CHARTER

Chapter HEALTH & WELLNESS CENTER TASK FORCE CHARTER Chapter 10-16 HEALTH & WELLNESS CENTER TASK FORCE CHARTER Task Force Members: Board of Directors Representatives 2 members (one designated as Chair of the Task Force) Management Representatives 3 members

More information

Ground Transportation Management Services

Ground Transportation Management Services ONE (1) HARDCOPY ORIGINAL AND ONE (1) ELECTRONIC COPY FLASH DRIVE MUST BE SUBMITTED REQUEST FOR INFORMATION - RFI #PGT-2018-002 Ground Transportation Management Services Department of Ground Transportation

More information

Request for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County

Request for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County Request for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County April 09, 2018 Responses Due Date/Time April 30, 2018 before 4:00 PM Pacific

More information

REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR DESIGN OF RECHARGE BASIN ON VICTORIA SITE

REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR DESIGN OF RECHARGE BASIN ON VICTORIA SITE REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR DESIGN OF RECHARGE BASIN ON VICTORIA SITE General Provisions Western Municipal Water District (WMWD) requests a qualified Design Consultant

More information

ANNOUNCEMENT REQUEST FOR PROPOSALS (RFP)

ANNOUNCEMENT REQUEST FOR PROPOSALS (RFP) Fleetwood Community Pool Feasibility Study ANNOUNCEMENT REQUEST FOR PROPOSALS (RFP) The chair of Parks and Recreation of the Fleetwood Borough in Berks County, Pennsylvania, is accepting proposals for

More information

Third Party Contracts Quality Management Plan (TPCQMP) Revision 00 Issue Date: August 6, 2018

Third Party Contracts Quality Management Plan (TPCQMP) Revision 00 Issue Date: August 6, 2018 Third Party Contracts Quality Management Plan (TPCQMP) Revision 00 Issue Date: August 6, 2018 Northeast Illinois Regional Commuter Railroad Corporation 547 West Jackson Boulevard Chicago, Illinois 60661

More information

2. Services. The Scope of Work is amended by adding additional work. The additional work is detailed in the attached Exhibit A.

2. Services. The Scope of Work is amended by adding additional work. The additional work is detailed in the attached Exhibit A. AMENDMENT TO THE PERSONAL SERVICES AGREEMENT Amendment No. 4 Agreement #105972/31700039 Project Number: IT14AA This Amendment No. 4 to Personal Services Agreement is entered into effective between the

More information

REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT

REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT Camp Hall Commerce Park (Camp Hall) Ridgeville, South Carolina March 2, 2018 Addendum 2 March 29, 2018 Comment Sheet 1 of 5 Sheets

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion

REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion Page 1 of 5 REQUEST FOR PROPOSALS Syracuse City is seeking the services of a qualified engineering consultant

More information

PROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ)

PROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) PROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) MARCH 2018 INTRODUCTION AND BACKGROUND The City of Keller is in search of the most qualified firms to provide professional expertise and

More information

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING) 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR QUALIFICATIONS (RFQ) REQUEST FOR QUALIFICATIONS (RFQ) ENGINEER OF RECORD UTILITIES DEPARTMENT (WATER, SEWER & STORMWATER) The City of Fairburn is soliciting Statements of Qualifications for professional engineering services.

More information

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems CITY OF CHINO HILLS Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems February 18, 2016 Department: Public Works Proposal Due Date: March 17, 2016

More information

600 - Phase C Intermediate Review Checklist for the Architect- Engineer

600 - Phase C Intermediate Review Checklist for the Architect- Engineer 600 Phase C Intermediate Review Checklist for the Architect Engineer This checklist is to be used by the ArchitectEngineer during Phase C of the Project and shall be included in the Intermediate Review

More information

ADDITIONAL TYPES OF WORK REQUIRED

ADDITIONAL TYPES OF WORK REQUIRED NOTICE TO PROFESSIONAL ENGINEERING CONSULTANTS REQUEST FOR LETTERS OF INTEREST FOR DESIGN CONSULTANT SERVICES FOR THE SUPPLEMENTAL DATA COLLECTION SENSOR AND CCTV DEPLOYMENT PROJECT PROJECT NO. 599-537,

More information

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR: SE 9 TH STREET STORMWATER PUMP STATION Activity ID

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR: SE 9 TH STREET STORMWATER PUMP STATION Activity ID REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR: E 1 ST STREET & E MARKET STREET STORMWATER PUMP STATION Activity ID 01-2016-025 SE 9 TH STREET STORMWATER PUMP STATION Activity ID 01-2016-026 SE 1 ST STREET

More information

MANDATORY PRE-BID MEETING FLORIDA KEYS AQUEDUCT AUTHORITY

MANDATORY PRE-BID MEETING FLORIDA KEYS AQUEDUCT AUTHORITY MANDATORY PRE-BID MEETING FLORIDA KEYS AQUEDUCT AUTHORITY NAVY SYSTEM UPGRADES WASTEWATER PUMPING SYSTEMS BOCA CHICA KEY, SIGSBEE PARK, AND FLEMING KEY FKAA PROJECT # 4072-17 Date: April 26 th, 2018 1.

More information

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017.

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017. REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF LEGAL SERVICES General Counsel ISSUE DATE: August 10, 2017 DUE DATE: August 23, 2017 Issued by: Trenton Parking Authority NOTE: In the event an interested

More information

DESIGN-BUILD PROCUREMENT AND ADMINISTRATION

DESIGN-BUILD PROCUREMENT AND ADMINISTRATION Approved: Effective: April 15, 2015 Review: April 1, 2015 Office: Construction Topic No.: 625-020-010-l Department of Transportation 1.1 PURPOSE DESIGN-BUILD PROCUREMENT AND ADMINISTRATION SECTION 1 INTRODUCTION

More information

PLEASANT GROVE CITY FIRE STATION AND POLICE AND COURTSBUILDINGS

PLEASANT GROVE CITY FIRE STATION AND POLICE AND COURTSBUILDINGS REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES FOR DESIGN AND CONSTRUCTION OF THE PLEASANT GROVE CITY FIRE STATION AND POLICE AND COURTSBUILDINGS Mandatory Pre-Proposal Conference January 11, 2017 4:00

More information

Request for Proposal (RFP 13-02)

Request for Proposal (RFP 13-02) Request for Proposal (RFP 13-02) for Preparation of Scoping and Project Report, Environmental Document, Plans, Specifications and Estimate for I-680 North Segment Express Lane Conversion Posted on website

More information

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System Issued by the City of Montpelier, Vermont Department of Planning and Community Development Responses Due: August 12, 2011,

More information

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO. Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions

More information

Attachment 1 Architectural Services

Attachment 1 Architectural Services A. Phase 1, Programming and Schematic Design: 1. Ascertain the requirements for each project through a meeting with the COUNTY, and a review of an existing schematic layout of each project, if such layout

More information